Roaa Amer Ali Second Stage (A)
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT 2020-2021
2
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
GYMNASIUM AND SWIMMING POOL PROJECT
CONNTENT 4 6 8 10 12 24 26 ARCHITECTURE PORTFOLIO
PROJECT BRIFER 3D DESIGN SITE ANALYSIS MASS PROGRASS PLANS SECTIONS ELEVASTIONS
3
4
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
This project is located in Iraq , Baghdad , in the Jadriya area . The project is designed to be a closed swimming pool and a gym , the project area is 2650 sqm , the project spaces are :-
GYMNASIUM AND SWIMMING POOL PROJECT
PROJECT BRIFER
ARCHITECTURE PORTFOLIO
*Indoor swimming pool for children and adults. * Project management rooms. * Basketball hall. * Tennis hall. * Sauna. * Restaurant. * Cafeteria.
5
GYMNASIUM AND SWIMMING POOL PROJECT
3D DESIGN
ARCHITECTURE PORTFOLIO
Design this project by harmoniously combining two shapes of rectangle and curve . The Tigris River , which is located in the place , was used to be the main interface through it and to be overlooked by the cafeteria and the swimming pool
6
7
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
GYMNASIUM AND SWIMMING POOL PROJECT
SITE ANALYSIS
Location Map Chart
ARCHITECTURE PORTFOLIO
The site is located in Iraq, Baghdad, Al-Jadriya area. The site›s surroundings are distinguished\ significant, such as, The Tigris river, AL-Nahrain university, AlJadriya bridge and The university of baghdad. also, there are many service building and restaurants near it. the most important feature of the site is that it has a nice view of the Tigris river.
8
Environment study Noise North-western wind path
South-eastern wind path Sun path after analyzing the direction of the wind and the sun, we find that the cold winds are from the north and north-western sides of the site, while the hot summer winds are from the south and south-eastern sides of
Dimension & Area chart The site is open from the four sides which is a positive point that can give a view from all four elevations, One of the site›s best features is that it overlooks the Tigris River which gives it a nice view and can help in creating different levels while designing
Vehcles & Peddstrian Circulation Study
pedestrian movment car movment Al-Jadriya Bridge is crowded during working hours, which are limited between 8 a.m. and 2 p.m. and this congestion causes noise to the site, while the rest of the streets are less crowded. Pedestrian traffic is limited around the site’s boundaries and neighborhoods , so pedestrian traffic ranges between the site , the marina , the sports club , the parks and the river , there are many human gatherings on the bank of the river
AL-jadiriya bridge
The river
Main street
car parking
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
LAND USE STUDY
9
ARCHITECTURE PORTFOLIO
MASS PROGRASS
10
GYMNASIUM AND SWIMMING POOL PROJECT
GYMNASIUM AND SWIMMING POOL PROJECT ARCHITECTURE PORTFOLIO
The formation of the block began with a rectangle, then the curve, the square, and the remainder of the rectangle were cut out and merged to form this final shape.
11
ARCHITECTURE PORTFOLIO
PLAN AT LEVEL 0.0M
12
GYMNASIUM AND SWIMMING POOL PROJECT
13
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
ARCHITECTURE PORTFOLIO
PLAN AT LEVEL - 2M
14
GYMNASIUM AND SWIMMING POOL PROJECT
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
ARCHITECTURE PORTFOLIO
PLAN AT LEVEL 1.5M
16
GYMNASIUM AND SWIMMING POOL PROJECT
17
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
ARCHITECTURE PORTFOLIO
PLAN AT LEVEL 3.5M
18
GYMNASIUM AND SWIMMING POOL PROJECT
19
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
ARCHITECTURE PORTFOLIO
PLAN AT LEVEL 4M
20
GYMNASIUM AND SWIMMING POOL PROJECT
21
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
ARCHITECTURE PORTFOLIO
PLAN AT LEVEL 7M
22
GYMNASIUM AND SWIMMING POOL PROJECT
23
ARCHITECTURE PORTFOLIO
GYMNASIUM AND SWIMMING POOL PROJECT
24
GYMNASIUM AND SWIMMING POOL PROJECT
We have here in the section on the top that shows the filters that have been adopted in the project and also shows the view of the block on the river, while the section at the bottom also shows the filters that have been adopted more clearly.
ARCHITECTURE PORTFOLIO
SECTIONS
25
ARCHITECTURE PORTFOLIO
BACK ELEVATION
ELEVATIONS
26
GYMNASIUM AND SWIMMING POOL PROJECT
GYMNASIUM AND SWIMMING POOL PROJECT FRONT ELEVATION
As for the back façade, it will be low on glass and do not enjoy a wonderful view as in the front facade and contains the main entrance to the project ARCHITECTURE PORTFOLIO
We note that the front facade is mostly glass and it overlooks the river to enjoy a wonderful view and has a cafeteria overlooking the river
27
Roaa Amer Ali Second Stage roaaamer949@gmail.com
@roaa.3amer
roaa.3amer