Digital Portfolio - Robert Magdy Morgan

Page 1

Robert Magdy Morgan

Portfolio



Contents 01 Below The Surface 03 Brooklyn Housing

Don Wall / NJSOA Studio IV

Brooklyn, NY David Cunningham / NJSOA Studio III

04 Newark, NJ Darius Sollohub / NJSOA Studio IV Clover Street School 05 Philly Remix

Philadelphia, PA Keith Kaseman / GSAPP AAD Studio

06 Montclair, NJ Yanku Architects, llc. Moore Residence 07 New Haven, CT BAM Architecture Studio Yale Medical Center 08 New York, NY Marc Tsurumaki / GSAPP Advanced Studio V Delancey Underground


Spring 2007 > NJIT

Below Studio

IV

Machines and architecture are concealed inside a packaging that hides the mechanism and tectonics that should fashion them. The proposal seeks an architecture that is readily open to interrogation, fiddling, and having the mechanism typically hidden be exposed. An intrusion that calls for the removal of the surface to reveal the complexity of what’s behind it. Elevating the program somewhere above the ground plane to carry on the obsession, desolate, taking place above the stratum where repetitive rituals of daily life take place.

The |

A desire for control, not pure functionality, implicates the occupant with its use. A mechanism with the occupant being the operator. An operable machine that turns the typically stationary into mobile space. Architecture is the rearrangement and reassembly of the materials of the world; placing the will of the occupant and his body in direct contact with the operational aspects of the architecture.

Don

Surface Wall

The outer structure - a descriptive index of alignment and symmetry, rational and hyper-efficient - the engineer’s handicap. The inside shell, a dynamically stiff space, highlights the contrast between the architect’s intuitive design process and the engineer’s obsession with efficiency and alignment.






1 - Packaged Unit 2 - Flexible Air Supply Tube 3 - Flexible Air Return Tube 4 - 1’ Steel Outer Framing 5 - 6” Steel Inner Frame 6 - White-Coated Synthetic Outer Fabric 7 - Translucent Inner Fabric Membrane 8 - 1/4” dia. Tubular Bracing Rod 9 - 1/4” dia. Suspension Cable 10 - Cast Aluminum Cable Termination Node 11 - Truss as Foundation/Anchor 12 - Catenary Lighting 13 - 1” Tubular Tent Framing 14 - Tubular Floor Framing 15 - 1” wood Flooring 16 - Zippered Entry, Rolled Up 17 - Curved Binding Frame 18 - 1” Bracing Rod for 17 19 - Suspended Lighting Fixture 20 - Water Storage Tank 21 - Flexible Hot Water Supply Tube 22 - Flexible Cold Water Supply Tube 23 - Vent Opening 24 - Drainage Tube 25 - Compact Adjuster


m Fall

Brooklyn Studio

2006

>

NJIT

Housing III

|

David

Porosity was the concept explored for the Brooklyn housing project. A subtractive process was used to carve out communal space for the residents to enjoy the various amenities added to the restrictive program, including a day care center and an inclusive public space. The notion of individuality, one that is rarely undertaken because of the repetition needed for efficiency in housing, was studied with the desire to create unique apartments each with a view and layout that does not repeat while retaining the benefits of repetition by using the same elements.

Project Cunningham







Spring 2007 > NJIT

Clover Studio

IV

The proposal for the Clover Street School creates a public facade for the institution along Clover Street. The Clover Street Elevation displays the ascending process a student would make through the grade levels, with stacked seating from each house to the next. The space is meant to engage the faculty and the students as they approach the school, creating a public exhibit space where the students can see the city and be seen from the outside.

Street |

Darius

As a path, it extends upward symbolizing a typical student’s progression. The school is arranged in a way that allows the three houses to become a part of a single organization, allowing shared use of this space during Move-Up day where the students are elevated up one level, also allowing for the event to be seen by the public.

School

Sollohub

The design allows for the school to present itself as a public organization, visually connected to the exterior where the ceremony can be seen from the street, engaging the public and making a public exhibition of the ceremony.




Clover Street School

Clover Street School


Summer 2013 > GSAPP

P

h

Summer

i

l

Studio

The project re-envisions the N. American corridor in Philadelphia, once a bustling industrial hub, as an agent of change for the down trotted region of Philly - once proudly proclaimed to be the “Workshop of the World.� The 3d printer fabricates spatial invitations conducive to fiddling, aggregating, configuring and reconfiguring to allow for growth and new possibilities of unplanned future urban spaces to sprout. Tapping into the existing infrastructure and abandoned factories as agents of future change, giving Philadelphia a jolt of energy, charging the city with new possibilities with spatial seeds peppered across vacant lots along the once bustling N. American street to energize the city of Philadelphia, fabricated in abandoned industrial buildings.

l

I

Y

|

R

An urban future forged in the very same streets it is meant to revitalize, a new strategy for dealing with economic calamities facing many American cities today including Philadelphia, Detroit, Providence, and Trenton. The project re-formulates the North American Corridor of Philadelphia, now a remanent of it’s industrial past, as a fabrication facility manufacturing spatial seeds. Turning the entirety of the corridor into a 3D printer for the city, the proposal seeks to fabricate spatial seeds that invite the user to generate possible future constructs for the once bustling industrial corridor. The urban projects that sprout from using Philadelphia as initial grounds for exploration will then provide the framework for similar

e

Keith

m

i

x

Kaseman

projects in Detroit, Flint, etc. These new constructs seek to challenge the diminishing role of the architect and by extension place The fabrication facility is a system that allows for growth, appropriating construction as needed. A system that feeds off of the residents of Philadelphia, expanding to facilitate the needs of its residents while revitalizing its industrial past.







Architect

Moore

Assistant

2006

>

Yanku

Residence

Architects,

llc.

23


Intern

Architect

2013

>

BAM!

Architecture

Studio

Yale New Haven Hospital | Medical Center


L205 GOWNED WAIT RADIOLOGY

EXAM #4

REC./REGIST./ INTERVIEW L102 TOILET PATIENT

E

L103 FILES

L107 OFFICE #1

L109 OFFICE #2

L108 OFFICE #2

4'-612"

8'-1"

2'-6" MIN.

12'-7"

18'-8"

L243 ULTRA SOUND 1

L407 TOILET PUBLIC #2

L411 EXAM #1 ISO. NEG.

L410 TOILET PATIENT

L412 EXAM #2

L2C1 CORRIDOR

L253 LOUNGE STAFF-DI

L403A REGISTRATION OFFICE #1

L2C2 CORRIDOR

L203A DRESSING ACCESS.

L252B ASST MANAGER OFFICE

L203B DRESSING L203 LOCKER AREA

L4C3 CORRIDOR

L428 OFFICE NURSE MANAGER

L430 FAMILY CONSULT

L134 CONTROL/PROCESS CT. SIM.

L422 EXAM #4

L237 DRESSING

L250 SOILED LINEN

L204 REC./REGIST./ INTERVIEW

L205 GOWNED WAIT RADIOLOGY

L2C8 CORRIDOR

L247 CT CONTROL

L236 WAIT. RM. DI

L1C7 CORRIDOR

L139 TEMPORARY 1

L234 DRESSING A.

L2P1 PASSAGE

111 GOOSE LANE GUILFORD, CT 06437

--???

E

L427 EXAM #7 TREATMENT

L426 EXAM #6 TREATMENT

L425 EXAM #5 ORTHO

L232 RAD./FLOURO. ROOM 2

L206 ED EXAM #1

L235 RADIOLOGY ROOM 1

L233 TOILET PAT. ACC.

L207 EQUIP. STORAGE

L2C9 CORRIDOR

--CONTROL RAD. #1

--CONTROL RAD. #2

L209 ED EXAM #2

--AMBULANCE BAY

--MECHANICAL

E

E

--CONTROL RAD. #2

Yale-New Haven Hospital

ED Renovation Phase 2

L138 OFFICE #4 PHYSICS

E

DISPLAY

E

L424 TOILET PATIENT

L432 AMBULANCE VESTIBULE

FD

L137 STORAGE EQUIPMENT

L258 POC TESTING

L251 UTILITY CLEAN-DI

DN. FROM 1ST FL.

LS2 STAIR

COLD & HOT WATER CONNECTION

L1C6 PASSAGE

L140 JANITOR'S CLOSET

L1C10 CORRIDOR

L2C6 CORRIDOR

L4C4 CORRIDOR

L136 CT. SIM. ROOM

L257 BIO WASTE

E

L429 CRASH CART ALCOVE

L135 DOSIMETRY ROOM

L256 TRANSFORMER ROOM

L252A ELECT. CLOSET

T: 919.890.3880 Snow Building, F: 646.349.5556 Suite 208 331 West Main St. www.bam-studio.com Durham, NC 27701

L133A FUTURE EQUIP. RM.

L255 STORAGE

L2C7 CORRIDOR

L238 TOILET

L202 WAITING RM. DI

L420 NOUR.

L431 L404C COMM./EMS/ STORAGE PISON CONTROL

L132 CONTROL/REVIEW LINAC#2

E

LOCKERS E

L419 LOUNGE STAFF

L4C2 CORRIDOR

L423 NURSE'S STATION

L133 FUTURE LINAC#2

L1C5 CORRIDOR

E

L254 TOILET STAFF

L421 EXAM #3

L409 EXAM #8

L403B REGISTRATION OFFICE #2

L131 TOILET STAFF

E

E

Second Floor T: 646.522.5550 415 West Broadway F: 646.349.5556 www.bam-studio.com New York, NY 10012

E

E E

L246 CT SCAN

L4C1 CORRIDOR

L408 TRIAGE #2

BAM Architecture Studio

L117 NURSE'S STATION

MED. CABINET

L130 STAFF LOUNGE CONFERENCE ROOM

L244 TOILET PATIENT

L245 CLEAN INSTR.

L239 ULTRASOUND ROOM 2

E

L2C3 CORRIDOR

Project No. 08-100.017

E

LS3 STAIR

L2P3 PASSAGE STAFF

L208 ED EXAM #3

L400 E.D. STORAGE E

UP 12"

L228 STAFF WK. PROCESS

E

L211 ED EXAM #4

L229 EQUIP. RM. MRI

--???

--MECHANICAL

L234 IT AREA

L210 NURSE'S STATION

4'-8"

L208 ED EXAM #3

2'-9"

L225 TOILET STA. ACCESS.

L2C4 CORRIDOR

LS4 STAIR

L218 ED EXAM #7 L215 TOILET

L216 BIO WASTE

L222 PATIENT HOLD

L220 TECHNICAL SUPPORT

L221 REVIEW/ READ-DI

L224 UTILITY CLEAN-DI

L217 SUPPLY CLOSET

L223 TOILET MD ACCESS.

4'-8"

E

135째

2'-9"

3'-0"

L2P2 PASSAGE

L2C5 CORRIDOR

UP TO EXTERIOR

3'-0"

E

E

L214 ED EXAM #8

UP 12"

L228 STAFF WK. PROCESS

L226 MRI ROOM

L212 ED EXAM #5

E

1

16'-4"

135

3'-0"

UP

11'-612" +/L210 NURSE'S STATION 15'-812"

1'-6" 3'-9"

L227 CONROL MRI

L213 ED EXAM #6

8'-0"

A-201.10

E

15'-6" 2

L227 CONROL MRI

KEY PLAN

A-201.10

SCALE: 1/16" = 1'-0"

KEYED NOTES

10'-7"

7"

L212 ED EXAM #5 E

L214 ED EXAM #8

ALIGN.

8'-0" HOLD

6'-0" 4'-9" 3'-6"

16'-812"

E

L129A EQUIPMENT ROOM

L128 CONTROL/REVIEW LINAC#1

L1C4 CORRIDOR

E

L416 LAB.

L404 TRIAGE/INTER./ CHECK-OUT

E

29'-412"

L201 TOILET PATIENT

L4C2 ADM-ALCOVE

L233 TOILET PAT. ACC.

L115 PT. HOLD

L113 UTILITY CLEAN

E

L418 TOILET STAFF

BAM

L125 DRESSING #1

L129 LINAC#1

E

L417 UTILITY CLEAN

L404A

L4C5 CORRIDOR

L232 RAD./FLOURO. ROOM 2

6'-0" 4'-9" 3'-6"

L213 ED EXAM #6

L127 LOCKER AREA

L105

DUMB WAIT.

L416 PASSAGE

E

E

L211 ED EXAM #4

L405 VENDING PUBLIC TELE.

L402 WAITING ROOM

L401 VESTIBULE WALK-IN

29'-1"

5'-0"

L2C3 CORRIDOR

L2P1 PASSAGE 8'-0" HOLD

6"

L209 ED EXAM #2

L234 DRESSING A.

E

3'-0"

L207 EQUIP. STORAGE

L122 GOWNED WAITING

L121 STORAGE CLOSET

E

3'-912"

"

L206 ED EXAM #1

L120 EXAM #4

L126 TOILET PATIENT

UP TO 1ST FL.

LS1 STAIR

L415 BIO WASTE

L406 TOILET PUBLIC #1

5'-3"

-8 2'

E

L119 EXAM #3

L1C3 CORRIDOR

L240 STA. TECH DI

6'-6"

2'-0" 3'-3" 4'-6"

5'-612"

L424 TOILET PATIENT L425 EXAM #5 ORTHO

L118 EXAM #2

L114 TOILET PATIENT

L112 UTILITY SOILED

L1C2 CORRIDOR

L414 UTILITY SOILED

L413 JANITOR CLOSET

E

L111 FAMILY CONSULT

DISPLAY

8'-0" HOLD

8'-0" HOLD

L106 OFFICE SECRETARY

E

11"

L4C4 CORRIDOR

L116 EXAM #1 ENT

L106A PASSAGE L239 ULTRASOUND ROOM 2 L104 REC./REGIST./ INTERVIEW

L1C1 CORRIDOR

--MECHANICAL

L124 DRESSING #2

L123 DRESSING #3

L110 OFFICE #3

L101 WAITING ROOM

--???

LEAVE 2" BETWEEN WALL AND FINISHED WINDOW OPENING TO AVOID SILL.

E

-----

5'-6" HOLD

-----

6"

L2C5 CORRIDOR

5"

---

L2C4 CORRIDOR

---

17'-11"

UP TO EXTERIOR

8'-5"

L215 TOILET

4'-2"

L218 ED EXAM #7

9'-0"

13'-4"

6'-0" 4'-9" 3'-6"

L216 BIO WASTE

7'-2"

L222 PATIENT HOLD

L220 TECHNICAL SUPPORT

copyright date: 01.01.14

L221 REVIEW/ READ-DI

L217 SUPPLY CLOSET

7'-912"

1'-3"

---

10'-5"

LS4 STAIR

L223 TOILET MD ACCESS. E

No. Date

Description

01 02 03 04

FOR BID DOPH REVIEW FOR PERMIT FOR CONSTRUCTION

01.13.14 02.12.14 02.20.14 03.18.14

REVISIONS No. Date B1

Description

02.20.14 BULLETIN 1

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Architecture Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Architecture Studio. This sheet must be returned upon the request of the Architect.

UP

NORTH

1

GROUND FLOOR DIMENSIONED PARTITION PLAN - ED & DI

A-201.10

SCALE: 1/4" = 1'-0"

GROUND FLOOR DIMENSIONED PARTITION PLAN - ED & DI

L1C2 CORRIDOR

L102 TOILET PATIENT

L1C3 CORRIDOR

L103 FILES

L107 OFFICE #1

L109 OFFICE #2

L108 OFFICE #2

L116 EXAM #1 ENT

L106A PASSAGE L239 ULTRASOUND ROOM 2 L104 REC./REGIST./ INTERVIEW

L1C1 CORRIDOR

--MECHANICAL

L106 OFFICE SECRETARY

L111 FAMILY CONSULT

L118 EXAM #2

L119 EXAM #3

L120 EXAM #4

L127 LOCKER AREA

L125 DRESSING #1

L126 TOILET PATIENT

E DISPLAY

L122 GOWNED WAITING

L114 TOILET PATIENT

L112 UTILITY SOILED

L1C2 CORRIDOR

L121 STORAGE CLOSET

L1C3 CORRIDOR

L129A EQUIPMENT ROOM

L128 CONTROL/REVIEW LINAC#1

L129 LINAC#1

E

L243 ULTRA SOUND 1

4'-512"

12'-612"

E

L240 STA. TECH DI

E

L115 PT. HOLD

L113 UTILITY CLEAN

L243 ULTRA SOUND 1

L240 STA. TECH DI

L413 JANITOR CLOSET

MED. CABINET

L105

L402 WAITING ROOM

DUMB WAIT.

L416 PASSAGE

L407 TOILET PUBLIC #2

L411 EXAM #1 ISO. NEG.

L410 TOILET PATIENT

L1C4 CORRIDOR

L412 EXAM #2

E E

L417 UTILITY CLEAN

L418 TOILET STAFF

L201 TOILET PATIENT

L2C1 CORRIDOR

E

L244 TOILET PATIENT

L245 CLEAN INSTR.

L239 ULTRASOUND ROOM 2

L253 LOUNGE STAFF-DI

4'-0"

L245 CLEAN INSTR.

7'-2"

L408 TRIAGE #2

L431 L404C COMM./EMS/ STORAGE PISON CONTROL

L409 EXAM #8

L203A DRESSING ACCESS.

L423 NURSE'S STATION

L203B DRESSING L203 LOCKER AREA

L4C3 CORRIDOR

L428 OFFICE NURSE MANAGER

L430 FAMILY CONSULT

L422 EXAM #4

4'-412"

L424 TOILET PATIENT

L432 AMBULANCE VESTIBULE

LS2 STAIR

L426 EXAM #6 TREATMENT

L232 RAD./FLOURO. ROOM 2

L206 ED EXAM #1

L209 ED EXAM #2

--AMBULANCE BAY

L2C3 CORRIDOR

L227 CONROL MRI

L213 ED EXAM #6

L226 MRI ROOM

E

E

L2P2 PASSAGE

7'-6" 10'-6"

4'-7"

2'-1"

15'-10"

UP TO EXTERIOR

L216 BIO WASTE

L222 PATIENT HOLD

L220 TECHNICAL SUPPORT

L221 REVIEW/ READ-DI

L224 UTILITY CLEAN-DI

L2C8 CORRIDOR

L223 TOILET MD ACCESS.

UP

L257 BIO WASTE

L251 UTILITY CLEAN-DI

4'-3"

L215 TOILET

E

2 A-202.10

L250 SOILED LINEN

L225 TOILET STA. ACCESS.

L2C4 CORRIDOR

L217 SUPPLY CLOSET

6"

3'-612"

L252A ELECT. CLOSET

KEY PLAN SCALE: 1/16" = 1'-0"

E 1801B STORAGE CLOSET

L258 POC TESTING

1805 OFFICE #1

1806 OFFICE #2

1801 WAITING ROOM

1801A TV CLOSET

1159A AUTOCLAVE ROOM

1165A VALET WHEEL CHAIRS

VESTIBULE

CORRIDOR

1159 STERILE ROOM

1802 NOUR. 1165 EQUIPMENT STORAGE

1705 STA DRAW #2

1706 STA DRAW #1

1707 TOILET PATIENT

11C4 CORRIDOR

PASS THRU.

1702A STORAGE CLOSET

PYXIS

189 EXAM

190 SOILED UTILITY

188 DOCTOR OFFICE

187 DOCTOR OFFICE

1167 BIO-WASTE

LOBBY

1166 TRASH

1164 SOILED LINEN

1101 TOILET

1152 SUB-WAITING

1158 MALE LOCKER ROOM

1S1 STAIR

1168 OFFICE

DUMB WAIT.

186 DOCTOR OFFICE

11C3A CORRIDOR

1162 LINEN CLOSET

DN. TO LOWER LEVEL

1703 LAB

KEYED NOTES

1153 UTILITY ROOM

1702 RECEPTION

1704 STAFF WORKSTATION

11V3 VESTIBULE

1151 OPERATING ROOM #1

1157 SOILED WK. ROOM

1161 UTILITY ROOM

1701 WAITING ROOM

GROUND FLOOR DIMENSIONED PARTITION PLAN - CT

1170 STAFF LOUNGE

1154 FEMALE LOCKER ROOM

1156 TOILET

1150 JANITOR CLOSET

11C3 CORRIDOR

1176 SUB-WAITING

1149 RECOVERY ROOM

1160 TOILET

1169 TOILET

11C5 CORRIDOR

PASS THRU WINDOW

181 JANITOR CLOSET

1171 EXAM #1 CHANGE RM

206 WAITING

180 LAB

179 DRAWING STATION

1002 CORRIDOR

1172 EXAM #2 CHANGING ROOM

1100 WAITING

1173 EXAM #3 CHANGING ROOM

1174 EXAM #4 CHANGING ROOM

1175 PRE-MEDICATION

ENDO MEDICINE RM.

RECOVERY NURSE STATION

WHEEL CHAIR STORAGE PUBLIC TOILET

EQUIP STORAGE/ MD STATION/ NOURISHMENT AREA

1102 RECEPTION

CANOPY BELOW

193 EXAM ROOM

195 WORK

---

197 NURSE STATION

171 TREATMENT ROOM

1003 CORRIDOR

194 EXAM ROOM

196 EXAM ROOM

191 EXAM ROOM

1104 NURSE'S DIRECTOR

11C6 CORRIDOR

1001 CORRIDOR

209 ANTE ROOM

210 PHARMACY

ENDO NURSE STATION MALE LOCKER ROOM

CLEAN UTILITY ROOM

1S2 STAIR

CORRIDOR

207 OFFICE ROOM

198 EXAM ROOM

INST. PROCESS

CLEAN SCOPE ROOM

1133 TOILET

NEGATIVE PRESSURE

EYE WASH

FEMALE LOCKER ROOM

STAFF LOUNGE ENDO RECOVERY #2

SCOPE PASS-THRU CAB.

1136 TOILET ENDOSCOPY PROCEDURE #3

203A CLOSET

ENDOSCOPY PROCEDURE ROOM

ENDO RECOVERY #1

1105A TEL/ DATA ROOM

11C1 CORRIDOR

SERVING AREA

---

CORRIDOR

1413 CHAIR STORAGE

1304A CLEAN ROOM

1404A CLOSET 1405 OFFICE ADMIN #2

1404 KITCHENETTE

1403 STAFF TOILET

1402 OFFICE ADMIN #2

1400 TRANSFORMER ROOM

DOWN

JANITOR CLOSET

1302 RECEIVING

GEN.

FIRST FLOOR KEY PLAN SCALE: 1/16" = 1'-0"

NURSE'S STATION

1125 ENDOSCOPY PROCEDURE ROOM

REVISIONS No. Date B1

Description

02.20.14 BULLETIN 1

NORTH

1401 CART HOLD CLOSET 1303 MEDICAL STORAGE

--LOADING DOCK

TRANSF.

4

Description FOR BID DOPH REVIEW FOR PERMIT FOR CONSTRUCTION

01.13.14 02.12.14 02.20.14 03.18.14

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Architecture Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Architecture Studio. This sheet must be returned upon the request of the Architect.

1407A CLOSET

1407 ADMIN WAITING

copyright date: 01.01.14 No. Date 01 02 03 04

1304 CLEAN ROOM

1408 SECRETARY

1402A COAT CLOSET

MEDICINE ROOM

GAS 1301 MEDICAL GAS STORAGE

1412 AUDIO STORAGE

WHEEL CHAIR STOR.

HAND SINK ALCOVE

3 A-202.10

1121 EXAM 4

1411 KITCHENETTE

1409 OFFICE ADMIN #1

1129 UTILITY ROOM

WORK AREA

1414 KITCHENETTE

1407B WORK CENTER

1127 WORK ROOM

WAIT/ PROCESS #1 1S3 STAIR

1416 TOILET

1410 STAFF TOILET

1138 TOILET

CLEAN LINEN ALCOVE

WAIT/ PROCESS #2

STAFF TOILET

DINING

1412 CONFERENCE ROOM

ENDO RECOVERY #3

HAND SINK

CAFE 1415 TOILET TENANT SPACE

---

ENDO RECOVERY #5

ELECTRICAL PANEL CLOSET

1103 CONSULT ROOM

---

A-202.10

MD DICTATION

ENDO NOURISHMENT

ENDO RECOVERY

CUSTOMER AREA

---

ENDO RECOVERY BAY 6

ENDO RECOVERY #4

1103 CONSULT ROOM

201 STAFF TOILET

1108 JANITOR CLOSET

11C2 CORRIDOR

175 TOILET

201A CLOSET 203 STAFF

TRASH ROOM

1100A VESTIBULE 208 RECEPTION

205 TOILET ROOM

SOIL LINEN ROOM

1102A COAT CLOSET

192 EXAM ROOM

-----

SCALE: 1/4" = 1'-0"

1155 OPERATING ROOM #2

1163 OPERATING ROOM #3

1801C STORAGE CLOSET

1804 TOILET PUBLIC

SCALE: 1/4" = 1'-0"

???

L214 ED EXAM #8

L256 TRANSFORMER ROOM

1'-3"

2'-4"

1'-3"

6'-0"

10'-0"

L252B ASST MANAGER OFFICE

---

--MECHANICAL

L234 IT AREA

L212 ED EXAM #5

E

L2C5 CORRIDOR

4'-0"

5'-6" +\-

L229 EQUIP. RM. MRI

L210 NURSE'S STATION

L255 STORAGE

LEAVE 2" BETWEEN WALL AND FINISHED WINDOW OPENING TO AVOID SILL.

A-202.10

Project No. 08-100.017

LS3 STAIR

L2P3 PASSAGE STAFF

UP 12"

L228 STAFF WK. PROCESS

L211 ED EXAM #4

EMERGENCY EYE WASH

FIRST FLOOR DIMENSIONED PARTITION PLAN - CT

A-202.10

E

E

ALIGN.

3

111 GOOSE LANE GUILFORD, CT 06437

2

--MECHANICAL

E

L208 ED EXAM #3

L400 E.D. STORAGE

L1C10 CORRIDOR

1171 1'-9" EXAM #1 CHANGE RM

--CONTROL RAD. #1

E

--CONTROL RAD. #2

E

6" 1

L2C9 CORRIDOR

E

UP TO 2ND FL.

A-202.10

L139 TEMPORARY 1

--??? L235 RADIOLOGY ROOM 1

L233 TOILET PAT. ACC. E

L207 EQUIP. STORAGE

2'-9"

L2C6 CORRIDOR

L1C7 CORRIDOR

L234 DRESSING A.

L2P1 PASSAGE

L425 EXAM #5 ORTHO

L246 CT SCAN

L247 CT CONTROL

Yale-New Haven Hospital

ED Renovation Phase 2

E

L427 EXAM #7 TREATMENT

E

L254 TOILET STAFF

L1C6 PASSAGE

L138 OFFICE #4 PHYSICS

E

DISPLAY

E

6'-1" +\-

L236 WAIT. RM. DI

L140 JANITOR'S CLOSET

FD

L137 STORAGE EQUIPMENT

L258 POC TESTING

L251 UTILITY CLEAN-DI

E

L253 LOUNGE STAFF-DI

LS4 STAIR

6"

7'-0" HOLD L237 DRESSING

L2C8 CORRIDOR

COLD & HOT WATER CONNECTION

L1C10 CORRIDOR

L2C6 CORRIDOR

L4C4 CORRIDOR

L136 CT. SIM. ROOM

L257 BIO WASTE

L250 SOILED LINEN L247 CT CONTROL

L236 WAIT. RM. DI

L135 DOSIMETRY ROOM

L256 TRANSFORMER ROOM

L252A ELECT. CLOSET

L237 DRESSING

L204 REC./REGIST./ INTERVIEW

L205 GOWNED WAIT RADIOLOGY

L429 CRASH CART ALCOVE

L218 ED EXAM #7

5'-8"

L252B ASST MANAGER OFFICE

T: 919.890.3880 Snow Building, F: 646.349.5556 Suite 208 331 West Main St. www.bam-studio.com Durham, NC 27701

L133A FUTURE EQUIP. RM.

L255 STORAGE

L2C7 CORRIDOR

L238 TOILET

L202 WAITING RM. DI

E

8'-8"

4'-7"

1'-3"

L2C7 CORRIDOR

L238 TOILET

L4C5 CORRIDOR

L403A REGISTRATION OFFICE #1

L2C2 CORRIDOR

L420 NOUR.

L403B REGISTRATION OFFICE #2

LOCKERS E

L419 LOUNGE STAFF

L4C2 CORRIDOR

L421 EXAM #3

L404 TRIAGE/INTER./ CHECK-OUT

DN. FROM 1ST FL.

16'-10"

6"

3'-10"

4'-112"

E

E

8'-0" HOLD

E

L130 STAFF LOUNGE CONFERENCE ROOM

E

3'-0"

L239 ULTRASOUND ROOM 2

3'-0"

2'-0"

8'-11"

E

12'-4"

3'-3"

L201 TOILET PATIENT

LOCKERS E

L244 TOILET PATIENT

L134 CONTROL/PROCESS CT. SIM.

E

L404A

L133 FUTURE LINAC#2

L1C5 CORRIDOR

E

L132 CONTROL/REVIEW LINAC#2

L246 CT SCAN L4C2 ADM-ALCOVE

1'-3"

L131 TOILET STAFF

E

L254 TOILET STAFF

E

Second Floor T: 646.522.5550 415 West Broadway F: 646.349.5556 www.bam-studio.com New York, NY 10012

E

E E

L416 LAB.

L4C1 CORRIDOR

L401 VESTIBULE WALK-IN

BAM Architecture Studio

L117 NURSE'S STATION

MED. CABINET

L130 STAFF LOUNGE CONFERENCE ROOM

UP TO 1ST FL.

LS1 STAIR

L415 BIO WASTE

L406 TOILET PUBLIC #1 L405 VENDING PUBLIC TELE.

L115 PT. HOLD

L113 UTILITY CLEAN

L105

L414 UTILITY SOILED

A-201.10 BAM

L124 DRESSING #2

L123 DRESSING #3

L110 OFFICE #3

L101 WAITING ROOM

--???

DIMENSIONED PARTITION PLANS - CT

A-202.10


BAM

2200 CGE SPACE

2614 BONE DENSITY 2613A STAFF TOILET

2613 LOUNGE CW

BAM Architecture Studio

2610E ELEC CLOSET

Second Floor T: 646.522.5550 415 West Broadway F: 646.349.5556 www.bam-studio.com New York, NY 10012

2610D SOILED LINEN

1

2612 SUBWAITING

2610C CLEAN LINEN

A-203.10

2S1 STAIR

LOBBY

3'-3" 2'-6" 2'-0"

CW

7'-2"

2613A STAFF TOILET

2609 BREAST IMAGING

1'-7"

6"

6'-412"

2N5.1 TOILET PATIENT

5'-3" 5'-3"

2Q4.1 CARE AREA

2Q6.1 STAFF

2.P8.6 ELECTRICAL ROOM

2.08.4 SOILED UTILITY

2.P8.3 PASSAGE

2Q8.4 CORRIDOR

2Q6.2 WAIT GOWNED

ROOF

2S3 STAIR

2.P8.5 TOILET STAFF

2P8.2 CLEAN STORAGE CLOSET

2.Q85 CLOSET

2Q8.3 ECHO ROOM #2

2Q8.1 ECHO STRESS ROOM

2Q8.2 LAB

2R5.1 CORRIDOR

2S1 STAIR

7'-1012"

2S4.6 CORRIDOR

2.P8.1 STORAGE

2N5.2 DRESSING

2P5.2 DRESSING ROOM

2P5.1 PASSAGE

2S8.3 OFFICE ADMIN

2S4.5 EXAM ROOM

LOBBY

CW

2S4.3 EXAM ROOM

2S4.4 PASSAGE

2S8.6 PASSAGE

2S8.5 HOT LAB

2S8.4 TOILET PATIENT

2S6.1 NUCLEAR MED ROOM 2S8.2 LOUNGE

2S4.1 DOCTORS OFFICE 2S4.2 EXAM ROOM

2S8.1 NUCLEAR STRESS LAB

5'-0" 1'-3"

2S8.7 INJECT

ROOF

2 A-203.10

KEY PLAN SCALE: 1/16" = 1'-0"

1'-8"

4'-5"

6'-1"

1'-8"

2604 WAITING

KEYED NOTES

512"

7'-2"

7'-0"

7'-0"

2'-612"

6"

3'-3"

ALIGN.

2'-0" HOLD

4'-9" 3'-6" 2'-3"

째 821"

LEAVE 2" BETWEEN WALL AND FINISHED WINDOW OPENING TO AVOID SILL. ---

5'-112" 1'-3"

2606 TOILET #1

---

18'-1112"

9'-1112"

5'-0" HOLD

2608 TOILET #2

20'-9"

4"

-----

13'-612"

2602 RECEPTION

6"

-----

copyright date: 01.01.14 6" 12'-8"

2601 READING ROOM

2603 TECH AREA 6'-1"

10'-0"

2605 ULTRA SOUND #2

5'-0" HOLD

6" 2'-3" 3'-6" 4'-9"

---

6'-0"

2600 CORRIDOR

6"

6'-3"

11'-11"

17'-9"

3'-9" 5'-0" 2607 ULTRA SOUND #1

5'-0" HOLD

6"

6"

12'-10"

82

5'-0" HOLD

1'-3" 5'-0"

2610 CORRIDOR

11'-8"

5'-0" HOLD

2609 BREAST IMAGING 29'-9"

2M4.4 RECEPTION / CHECKOUT

2M4.3 ALCOVE OFFICE

CORRIDOR

2M4.5 MEDICAL RECORD

90

10'-1"

Project No. 08-100.017

2304 WS OFFICE

MECHANICAL

2P4.1 EXAM ROOM

6'-412" 812"

8'-1112"

5'-512" 9'-6"

2'-0"

2611 CONSULT 11'-212"

2305 WS OFFICE/ FILE ROOM

2L6.1 OFFICE SCHEDULING

2M4.2 EXAM ROOM

2610B NUTRITION CW STATION

2612B DRESS #2 ACESS

2303 OFFICE

2L5.1 WAITING FAMILY

2L4.2 CORRIDOR

2Q4.1 EXAM ROOM

111 GOOSE LANE GUILFORD, CT 06437

CORRIDOR 2K4.2 TOILET PATIENT

2M4.1 DOCTORS OFFICE

2610C CLEAN LINEN

5'-11"

2301 TOILET 2302 RECEPTION

2610D SOILED LINEN

1'-2"

5'-11" 2'-11"

2600 LANDLORD SPACE

2L4.1 EXAM ROOM

5'-0" HOLD 13'-212"

Yale-New Haven Hospital

ED Renovation Phase 2

2602 RECEPTION

2601 READING ROOM

2603 TECH AREA

2605A CLOSET

2K4.1 DOCTORS OFFICE

2612 SUBWAITING 8'-712"

2608 TOILET #2

2600 CORRIDOR

2605 ULTRA SOUND #2

6"

2610E ELEC CLOSET

6'-0" 4'-9" 2'-1" CW

T: 919.890.3880 Snow Building, F: 646.349.5556 Suite 208 331 West Main St. www.bam-studio.com Durham, NC 27701

2604 WAITING

2606 TOILET #1 2610 CORRIDOR

ROOF

2613 LOUNGE

4'-412" 3'-9"

2610B NUTRITION CW STATION

2607 ULTRA SOUND #1

3'-4"

6"

2612A DRESS #1

2612B DRESS #2 ACESS

2611 CONSULT

2614 BONE DENSITY

9'-11"

1'-3"

2612A DRESS #1

No. Date

Description

01 02 03 04

FOR BID DOPH REVIEW FOR PERMIT FOR CONSTRUCTION

2301 TOILET

9'-4"

REVISIONS No. Date

19'-11"

B1

2605A CLOSET

2K4.1 DOCTORS OFFICE

CORRIDOR 2K4.2 TOILET PATIENT

01.13.14 02.12.14 02.20.14 03.18.14

Description

02.20.14 BULLETIN 1

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Architecture Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Architecture Studio. This sheet must be returned upon the request of the Architect.

NORTH

2L5.1 1 A-203.10

SECOND FLOOR DIMENSIONED PART.PLAN - BREAST IMAGING SCALE: 1/4" = 1'-0"

SECOND FLOOR DIMENSIONED PART.PLAN - BREAST IMAGING

A-203.10


LINEN 2S1 STAIR

LOBBY

2610B NUTRITION STATION

LIGHT COVE, SEE CEILING DETAILS

2604 WAITING

A-524.00

TELEVISION, SEE FFE SCHEDULE

4 A-524.00

3

A-524.00

A-524.00

LIGHT FIXTURE, SEE SCHEDULE

2606 TOILET #1 1

2610

KEY PLAN

A-524.00

MOISTURE AND MOLD RESISTANT GWB ON ALL INTERIOR SURFACES OF PLANTER

SCALE: 1/4" = 1'-0"

SOLID SURFACE, SEE FINISH PLAN

7"

1'-0"

2609 REAST AGING

6"

112"

SOLID SURFACE, SEE FINISH PLAN

2

543"

112"

5 A-524.00

3'-3" +/-

6A

2611 ONSULT

2'-0"

2612B DRESS #2 ACESS

6

8"

A-524.00

2'-9"

WATER TIGHT GALVANIZED PLANTER, FABRICATED TO FIT WELL 5/8 " GWB 6" +/-

3'-0" +/-

H8 A-200.30

1'-0"

3'-0" +/-

3'-2" +/-

1'-0"

3'-2" +/-

1'-0"

BASE, TYP. SEE FINISH PLAN.

1'-0"

J8

10

11

A-200.30

A-524.00

A-524.00

SEALANT

4 A-524.00

2

KEY ELEVATION

A-524.00

SCALE: 1/2" = 1'-0"

SECTION - PLANTER WALL SCALE: 1 1/2" = 1'-0"

7 A-524.00

1'-2" +/-

3'-0"

1'-0"

3'-0"

3'-0" +/-

1'-0"

H9 A-200.30

2" +/-

MA ON 3'-6" +/-

1'-0"

1'-0"

2'-3" +/-

8 A-524.00

10

J9

9

A-524.00

A-200.30

A-524.00

MA ON

Z-C BLO AS

BA SEE

3

KEY ELEVATION

7

A-524.00

SCALE: 1/2" = 1'-0"

A-524.00

SECTIO SCALE:


2

2'-9"

A-524.00

LIGHT COVE, SEE CEILING DETAILS

6A A-524.00

TYPICAL MOUNTING HEIGHT SCALE: 3" = 1'-0"

3 4"

1 4"

312"

10" 112"

SOLID SURFACE, SEE FINISH PLAN

2'-0"

7"

WATER TIGHT GALVANIZED PLANTER, FABRICATED TO FIT WELL

112"

1 2"

MOISTURE AND MOLD RESISTANT GWB ON ALL INTERIOR SURFACES OF PLANTER

112"

LIGHT FIXTURE, SEE SCHEDULE

543"

6

8"

8"

A-524.00

FINISHED HARDWOOD 2'-9"

5/8 " GWB

6

BASE, TYP. SEE FINISH PLAN.

SECTION - CHAIR RAIL

A-524.00

SCALE: 6" = 1'-0"

SEALANT

5

SECTION - DOUBLE SIDED PLANTER

A-524.00

SCALE: 1 1/2" = 1'-0"

MAPLE VENEER ON SUBSTRATE

Z-CLIP BLOCKING AS REQ'D

Z-CLIP 3

GWB HEADER 5"

1'-0" +/-

212"

12" 7'-0"

8"

8 A-524.00

10 A-524.00

SCALE: 3" = 1'-0"

PLAN - MILLWORK WALL SCALE: 3" = 1'-0"

1 2"

MAPLE VENEER ON SUBSTRATE

SECTION - MILLWORK WALL

2'-3" +/-

512"

3 4" 6 A-524.00

1 2"

Z-CLIP

BASE, TYP. SEE FINISH PLAN.

7 A-524.00

SECTION - MILLWORK WALL SCALE: 1 1/2" = 1'-0"

2'-0"

MAPLE VENEER ON SUBSTRATE

3

4"

BRUSHED S.S. ANGLE

MAPLE VENEER ON SUBSTRATE Z-CLIP 3"

Z-CLIPS BLOCKING, AS REQD.

1 2"

BLOCKING WITH MAPLE VENEER 2'-9"

MAPLE VENEER ON SUBSTRATE

9 A-524.00

PLAN - MILLWORK WALL SCALE: 3" = 1'-0"

11 A-524.00

PLAN - MILLWORK WALL SCALE: 3" = 1'-0"

4"

BUSHED S.S. ANGLE


Fall 2013 > GSAPP

D e l a n c e y U n d e r g r o u n d Advanced

Studio

Below the street level lies an infrastructural sub-surface level of tunnels, pipes, transportation networks, and drain systems that are kept hidden. Occasionally, we are made aware of it through ground vibrations, steam rising from utility holes, subway ventilation grates, and storm drains. Spaces carved out that aren’t meant for the public, graffitied by art that wasn’t meant for an audience. Over the years, the underground space has accumulated layers of infrastructure, some of which were abandoned, unable to keep pace with the changing needs above. On the surface, the connection to the existing infrastructure is implicit. Commuting by train offers a brief experience of the subterranean city. The site selected for the Institute is located Below Delancey Street, a 60,000 sq. ft. abandoned trolley station in the Lower East Side, below 3 vacant blocks. The institute is an extension of what lies below, a public interface, a manifestation of the existing, an archeological exercise rendering the history of the subterranean city and what is typically hidden exposed. The project is an exploration of the contrast between complete immersion and exchange with the public to moments of isolation and removal from the ambience of urban life where the city surface disappears. The varying degrees of engagement with the urban environment and awareness of what’s below is contrasted with the complete removal from the surface of the city and the stimuli encountered above.

V

|

The complete immersion by carving below the surface and expanding the subway as a typology to bring awareness of the existing infrastructure just beneath the surface of Delancey Street is contrasted with the observation tower, which serves as a place for solitude framing views of the city from above. The street surface acts as the façade, an extension of what’s below. The changing elevation shifts from light to dark, effectively experiencing the city from above and below. Descending below ground evokes emotions of unease, with the absence of external references light serves to delimit the excavated gallery space below, the retaining surface holds the earth back with slivers revealing what’s behind. The public gallery highlights the framework of the existing station and engages the senses and perceptual modality of the underground space.

Marc

Tsurumaki

A shift from hyper stimulation and complete immersion within the urban fabric to removal of stimuli as the project shifts from segmented public bands and extension of the existing abandoned station to private bands. The bands serve as the main organizational structure, creating a rhythm that shifts from the main public band on the north side that leads to the gallery to the administrative band that houses the offices, meeting spaces, and labs towards the south. The shear between the bands allow for light and sound to filter in below and artificial light to radiate above, acting as a signifier. The slippages between each band serve as a visual reference to above, filtering light and sound to inform the space below.


Delancey St.

Broome St.

BAR AUDITORIUM

(PUBLIC) GALLERY

1

Delancey Underground

Essex St. Station

Williamsburg Bridge Trolley Station

New St.

Public

RESTAURANT AUDITORIUM CAFE

2

Extend Block

(PUBLIC )GALLERY

Existing

Public

Expose Existing

AUDITORIUM CAFE

(RESEARCH) LIBRARY

Y (PUBLIC) GALLER

PUBLIC INTERFACE

3

Proposed

Shared

Underground Excavation CAFE

(RESEARCH) LIBRARY

4

Underground Excavation

Shared

Observation Tower

Cafe Gallery Research Library

5

Link Space

ADMINISTRATIVE (OFFICES)

Reading Rooms

Auditorium

Public

Offices

LIGHT (LABS)

Meeting Rooms

Private

4 6

Light Labs

Private

Program

2 1

5

6

ADMINISTRATIVE (OFFICES)

LIGHT (LABS)

Private

Public

Shared

Private

3

Bands










Williamsburg Bridge Trolley Station

Existing

Proposed


Underground Excavation

Light Labs

Program


Thank You


ROBERT MAGDY MORGAN Contact Information 45 Tiemann Pl Apartment 2L New York, NY 10027

Phone: 862-215-3086 Email: rmm2219@columbia.edu Web: www.designedbyruby.com

Education Master of Science in Advanced Architectural Design, 2014 Columbia University, GSAPP - New York, NY Bachelor of Architecture, 2009 New Jersey Institute of Technology, NJSOA - Newark, NJ Awards and Achievements - Works featured in annual Columbia GSAPP ABSTRACT publication - Selected works showcase at End of Year Show 2014 - Partial Scholarship through the Graduate School of Architecture, Planning and Preservation - Dean’s List, NJIT: 2006 through 2009 - Selected Exhibitor: Works showcased at end of the year exhibit for NJSOA Skills and Languages 3D/Modeling: Rhino, SolidWorks, Revit, 3DS Max 2D/Post Processing: Illustrator, Photoshop, InDesign, AutoCAD, SigmaNEST Other Skills: Model Making, Rendering, Web Design and Content Management Fluent in English and Arabic Experience BAM Architecture Studio, New York, NY Testrite Visual, Hackensack, NJ Appel Design Group, Union, NJ Yanku Architects llc., Montclair, NJ

Intern Architect, Jan. - May 2013 Lead Designer, Sept. 2009 - Dec. 2012 Internship, summer 2008 Architect Assistant, 2006



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.