Robert Magdy Morgan
Portfolio
Contents 01 Below The Surface 03 Brooklyn Housing
Don Wall / NJSOA Studio IV
Brooklyn, NY David Cunningham / NJSOA Studio III
04 Newark, NJ Darius Sollohub / NJSOA Studio IV Clover Street School 05 Philly Remix
Philadelphia, PA Keith Kaseman / GSAPP AAD Studio
06 Montclair, NJ Yanku Architects, llc. Moore Residence 07 New Haven, CT BAM Architecture Studio Yale Medical Center 08 New York, NY Marc Tsurumaki / GSAPP Advanced Studio V Delancey Underground
Spring 2007 > NJIT
Below Studio
IV
Machines and architecture are concealed inside a packaging that hides the mechanism and tectonics that should fashion them. The proposal seeks an architecture that is readily open to interrogation, fiddling, and having the mechanism typically hidden be exposed. An intrusion that calls for the removal of the surface to reveal the complexity of what’s behind it. Elevating the program somewhere above the ground plane to carry on the obsession, desolate, taking place above the stratum where repetitive rituals of daily life take place.
The |
A desire for control, not pure functionality, implicates the occupant with its use. A mechanism with the occupant being the operator. An operable machine that turns the typically stationary into mobile space. Architecture is the rearrangement and reassembly of the materials of the world; placing the will of the occupant and his body in direct contact with the operational aspects of the architecture.
Don
Surface Wall
The outer structure - a descriptive index of alignment and symmetry, rational and hyper-efficient - the engineer’s handicap. The inside shell, a dynamically stiff space, highlights the contrast between the architect’s intuitive design process and the engineer’s obsession with efficiency and alignment.
1 - Packaged Unit 2 - Flexible Air Supply Tube 3 - Flexible Air Return Tube 4 - 1’ Steel Outer Framing 5 - 6” Steel Inner Frame 6 - White-Coated Synthetic Outer Fabric 7 - Translucent Inner Fabric Membrane 8 - 1/4” dia. Tubular Bracing Rod 9 - 1/4” dia. Suspension Cable 10 - Cast Aluminum Cable Termination Node 11 - Truss as Foundation/Anchor 12 - Catenary Lighting 13 - 1” Tubular Tent Framing 14 - Tubular Floor Framing 15 - 1” wood Flooring 16 - Zippered Entry, Rolled Up 17 - Curved Binding Frame 18 - 1” Bracing Rod for 17 19 - Suspended Lighting Fixture 20 - Water Storage Tank 21 - Flexible Hot Water Supply Tube 22 - Flexible Cold Water Supply Tube 23 - Vent Opening 24 - Drainage Tube 25 - Compact Adjuster
m Fall
Brooklyn Studio
2006
>
NJIT
Housing III
|
David
Porosity was the concept explored for the Brooklyn housing project. A subtractive process was used to carve out communal space for the residents to enjoy the various amenities added to the restrictive program, including a day care center and an inclusive public space. The notion of individuality, one that is rarely undertaken because of the repetition needed for efficiency in housing, was studied with the desire to create unique apartments each with a view and layout that does not repeat while retaining the benefits of repetition by using the same elements.
Project Cunningham
Spring 2007 > NJIT
Clover Studio
IV
The proposal for the Clover Street School creates a public facade for the institution along Clover Street. The Clover Street Elevation displays the ascending process a student would make through the grade levels, with stacked seating from each house to the next. The space is meant to engage the faculty and the students as they approach the school, creating a public exhibit space where the students can see the city and be seen from the outside.
Street |
Darius
As a path, it extends upward symbolizing a typical student’s progression. The school is arranged in a way that allows the three houses to become a part of a single organization, allowing shared use of this space during Move-Up day where the students are elevated up one level, also allowing for the event to be seen by the public.
School
Sollohub
The design allows for the school to present itself as a public organization, visually connected to the exterior where the ceremony can be seen from the street, engaging the public and making a public exhibition of the ceremony.
Clover Street School
Clover Street School
Summer 2013 > GSAPP
P
h
Summer
i
l
Studio
The project re-envisions the N. American corridor in Philadelphia, once a bustling industrial hub, as an agent of change for the down trotted region of Philly - once proudly proclaimed to be the “Workshop of the World.� The 3d printer fabricates spatial invitations conducive to fiddling, aggregating, configuring and reconfiguring to allow for growth and new possibilities of unplanned future urban spaces to sprout. Tapping into the existing infrastructure and abandoned factories as agents of future change, giving Philadelphia a jolt of energy, charging the city with new possibilities with spatial seeds peppered across vacant lots along the once bustling N. American street to energize the city of Philadelphia, fabricated in abandoned industrial buildings.
l
I
Y
|
R
An urban future forged in the very same streets it is meant to revitalize, a new strategy for dealing with economic calamities facing many American cities today including Philadelphia, Detroit, Providence, and Trenton. The project re-formulates the North American Corridor of Philadelphia, now a remanent of it’s industrial past, as a fabrication facility manufacturing spatial seeds. Turning the entirety of the corridor into a 3D printer for the city, the proposal seeks to fabricate spatial seeds that invite the user to generate possible future constructs for the once bustling industrial corridor. The urban projects that sprout from using Philadelphia as initial grounds for exploration will then provide the framework for similar
e
Keith
m
i
x
Kaseman
projects in Detroit, Flint, etc. These new constructs seek to challenge the diminishing role of the architect and by extension place The fabrication facility is a system that allows for growth, appropriating construction as needed. A system that feeds off of the residents of Philadelphia, expanding to facilitate the needs of its residents while revitalizing its industrial past.
Architect
Moore
Assistant
2006
>
Yanku
Residence
Architects,
llc.
23
Intern
Architect
2013
>
BAM!
Architecture
Studio
Yale New Haven Hospital | Medical Center
L205 GOWNED WAIT RADIOLOGY
EXAM #4
REC./REGIST./ INTERVIEW L102 TOILET PATIENT
E
L103 FILES
L107 OFFICE #1
L109 OFFICE #2
L108 OFFICE #2
4'-612"
8'-1"
2'-6" MIN.
12'-7"
18'-8"
L243 ULTRA SOUND 1
L407 TOILET PUBLIC #2
L411 EXAM #1 ISO. NEG.
L410 TOILET PATIENT
L412 EXAM #2
L2C1 CORRIDOR
L253 LOUNGE STAFF-DI
L403A REGISTRATION OFFICE #1
L2C2 CORRIDOR
L203A DRESSING ACCESS.
L252B ASST MANAGER OFFICE
L203B DRESSING L203 LOCKER AREA
L4C3 CORRIDOR
L428 OFFICE NURSE MANAGER
L430 FAMILY CONSULT
L134 CONTROL/PROCESS CT. SIM.
L422 EXAM #4
L237 DRESSING
L250 SOILED LINEN
L204 REC./REGIST./ INTERVIEW
L205 GOWNED WAIT RADIOLOGY
L2C8 CORRIDOR
L247 CT CONTROL
L236 WAIT. RM. DI
L1C7 CORRIDOR
L139 TEMPORARY 1
L234 DRESSING A.
L2P1 PASSAGE
111 GOOSE LANE GUILFORD, CT 06437
--???
E
L427 EXAM #7 TREATMENT
L426 EXAM #6 TREATMENT
L425 EXAM #5 ORTHO
L232 RAD./FLOURO. ROOM 2
L206 ED EXAM #1
L235 RADIOLOGY ROOM 1
L233 TOILET PAT. ACC.
L207 EQUIP. STORAGE
L2C9 CORRIDOR
--CONTROL RAD. #1
--CONTROL RAD. #2
L209 ED EXAM #2
--AMBULANCE BAY
--MECHANICAL
E
E
--CONTROL RAD. #2
Yale-New Haven Hospital
ED Renovation Phase 2
L138 OFFICE #4 PHYSICS
E
DISPLAY
E
L424 TOILET PATIENT
L432 AMBULANCE VESTIBULE
FD
L137 STORAGE EQUIPMENT
L258 POC TESTING
L251 UTILITY CLEAN-DI
DN. FROM 1ST FL.
LS2 STAIR
COLD & HOT WATER CONNECTION
L1C6 PASSAGE
L140 JANITOR'S CLOSET
L1C10 CORRIDOR
L2C6 CORRIDOR
L4C4 CORRIDOR
L136 CT. SIM. ROOM
L257 BIO WASTE
E
L429 CRASH CART ALCOVE
L135 DOSIMETRY ROOM
L256 TRANSFORMER ROOM
L252A ELECT. CLOSET
T: 919.890.3880 Snow Building, F: 646.349.5556 Suite 208 331 West Main St. www.bam-studio.com Durham, NC 27701
L133A FUTURE EQUIP. RM.
L255 STORAGE
L2C7 CORRIDOR
L238 TOILET
L202 WAITING RM. DI
L420 NOUR.
L431 L404C COMM./EMS/ STORAGE PISON CONTROL
L132 CONTROL/REVIEW LINAC#2
E
LOCKERS E
L419 LOUNGE STAFF
L4C2 CORRIDOR
L423 NURSE'S STATION
L133 FUTURE LINAC#2
L1C5 CORRIDOR
E
L254 TOILET STAFF
L421 EXAM #3
L409 EXAM #8
L403B REGISTRATION OFFICE #2
L131 TOILET STAFF
E
E
Second Floor T: 646.522.5550 415 West Broadway F: 646.349.5556 www.bam-studio.com New York, NY 10012
E
E E
L246 CT SCAN
L4C1 CORRIDOR
L408 TRIAGE #2
BAM Architecture Studio
L117 NURSE'S STATION
MED. CABINET
L130 STAFF LOUNGE CONFERENCE ROOM
L244 TOILET PATIENT
L245 CLEAN INSTR.
L239 ULTRASOUND ROOM 2
E
L2C3 CORRIDOR
Project No. 08-100.017
E
LS3 STAIR
L2P3 PASSAGE STAFF
L208 ED EXAM #3
L400 E.D. STORAGE E
UP 12"
L228 STAFF WK. PROCESS
E
L211 ED EXAM #4
L229 EQUIP. RM. MRI
--???
--MECHANICAL
L234 IT AREA
L210 NURSE'S STATION
4'-8"
L208 ED EXAM #3
2'-9"
L225 TOILET STA. ACCESS.
L2C4 CORRIDOR
LS4 STAIR
L218 ED EXAM #7 L215 TOILET
L216 BIO WASTE
L222 PATIENT HOLD
L220 TECHNICAL SUPPORT
L221 REVIEW/ READ-DI
L224 UTILITY CLEAN-DI
L217 SUPPLY CLOSET
L223 TOILET MD ACCESS.
4'-8"
E
135째
2'-9"
3'-0"
L2P2 PASSAGE
L2C5 CORRIDOR
UP TO EXTERIOR
째
3'-0"
E
E
L214 ED EXAM #8
UP 12"
L228 STAFF WK. PROCESS
L226 MRI ROOM
L212 ED EXAM #5
E
1
16'-4"
135
3'-0"
UP
11'-612" +/L210 NURSE'S STATION 15'-812"
1'-6" 3'-9"
L227 CONROL MRI
L213 ED EXAM #6
8'-0"
A-201.10
E
15'-6" 2
L227 CONROL MRI
KEY PLAN
A-201.10
SCALE: 1/16" = 1'-0"
KEYED NOTES
10'-7"
7"
L212 ED EXAM #5 E
L214 ED EXAM #8
ALIGN.
8'-0" HOLD
6'-0" 4'-9" 3'-6"
16'-812"
E
L129A EQUIPMENT ROOM
L128 CONTROL/REVIEW LINAC#1
L1C4 CORRIDOR
E
L416 LAB.
L404 TRIAGE/INTER./ CHECK-OUT
E
29'-412"
L201 TOILET PATIENT
L4C2 ADM-ALCOVE
L233 TOILET PAT. ACC.
L115 PT. HOLD
L113 UTILITY CLEAN
E
L418 TOILET STAFF
BAM
L125 DRESSING #1
L129 LINAC#1
E
L417 UTILITY CLEAN
L404A
L4C5 CORRIDOR
L232 RAD./FLOURO. ROOM 2
6'-0" 4'-9" 3'-6"
L213 ED EXAM #6
L127 LOCKER AREA
L105
DUMB WAIT.
L416 PASSAGE
E
E
L211 ED EXAM #4
L405 VENDING PUBLIC TELE.
L402 WAITING ROOM
L401 VESTIBULE WALK-IN
29'-1"
5'-0"
L2C3 CORRIDOR
L2P1 PASSAGE 8'-0" HOLD
6"
L209 ED EXAM #2
L234 DRESSING A.
E
3'-0"
L207 EQUIP. STORAGE
L122 GOWNED WAITING
L121 STORAGE CLOSET
E
3'-912"
"
L206 ED EXAM #1
L120 EXAM #4
L126 TOILET PATIENT
UP TO 1ST FL.
LS1 STAIR
L415 BIO WASTE
L406 TOILET PUBLIC #1
5'-3"
-8 2'
E
L119 EXAM #3
L1C3 CORRIDOR
L240 STA. TECH DI
6'-6"
2'-0" 3'-3" 4'-6"
5'-612"
L424 TOILET PATIENT L425 EXAM #5 ORTHO
L118 EXAM #2
L114 TOILET PATIENT
L112 UTILITY SOILED
L1C2 CORRIDOR
L414 UTILITY SOILED
L413 JANITOR CLOSET
E
L111 FAMILY CONSULT
DISPLAY
8'-0" HOLD
8'-0" HOLD
L106 OFFICE SECRETARY
E
11"
L4C4 CORRIDOR
L116 EXAM #1 ENT
L106A PASSAGE L239 ULTRASOUND ROOM 2 L104 REC./REGIST./ INTERVIEW
L1C1 CORRIDOR
--MECHANICAL
L124 DRESSING #2
L123 DRESSING #3
L110 OFFICE #3
L101 WAITING ROOM
--???
LEAVE 2" BETWEEN WALL AND FINISHED WINDOW OPENING TO AVOID SILL.
E
-----
5'-6" HOLD
-----
6"
L2C5 CORRIDOR
5"
---
L2C4 CORRIDOR
---
17'-11"
UP TO EXTERIOR
8'-5"
L215 TOILET
4'-2"
L218 ED EXAM #7
9'-0"
13'-4"
6'-0" 4'-9" 3'-6"
L216 BIO WASTE
7'-2"
L222 PATIENT HOLD
L220 TECHNICAL SUPPORT
copyright date: 01.01.14
L221 REVIEW/ READ-DI
L217 SUPPLY CLOSET
7'-912"
1'-3"
---
10'-5"
LS4 STAIR
L223 TOILET MD ACCESS. E
No. Date
Description
01 02 03 04
FOR BID DOPH REVIEW FOR PERMIT FOR CONSTRUCTION
01.13.14 02.12.14 02.20.14 03.18.14
REVISIONS No. Date B1
Description
02.20.14 BULLETIN 1
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Architecture Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Architecture Studio. This sheet must be returned upon the request of the Architect.
UP
NORTH
1
GROUND FLOOR DIMENSIONED PARTITION PLAN - ED & DI
A-201.10
SCALE: 1/4" = 1'-0"
GROUND FLOOR DIMENSIONED PARTITION PLAN - ED & DI
L1C2 CORRIDOR
L102 TOILET PATIENT
L1C3 CORRIDOR
L103 FILES
L107 OFFICE #1
L109 OFFICE #2
L108 OFFICE #2
L116 EXAM #1 ENT
L106A PASSAGE L239 ULTRASOUND ROOM 2 L104 REC./REGIST./ INTERVIEW
L1C1 CORRIDOR
--MECHANICAL
L106 OFFICE SECRETARY
L111 FAMILY CONSULT
L118 EXAM #2
L119 EXAM #3
L120 EXAM #4
L127 LOCKER AREA
L125 DRESSING #1
L126 TOILET PATIENT
E DISPLAY
L122 GOWNED WAITING
L114 TOILET PATIENT
L112 UTILITY SOILED
L1C2 CORRIDOR
L121 STORAGE CLOSET
L1C3 CORRIDOR
L129A EQUIPMENT ROOM
L128 CONTROL/REVIEW LINAC#1
L129 LINAC#1
E
L243 ULTRA SOUND 1
4'-512"
12'-612"
E
L240 STA. TECH DI
E
L115 PT. HOLD
L113 UTILITY CLEAN
L243 ULTRA SOUND 1
L240 STA. TECH DI
L413 JANITOR CLOSET
MED. CABINET
L105
L402 WAITING ROOM
DUMB WAIT.
L416 PASSAGE
L407 TOILET PUBLIC #2
L411 EXAM #1 ISO. NEG.
L410 TOILET PATIENT
L1C4 CORRIDOR
L412 EXAM #2
E E
L417 UTILITY CLEAN
L418 TOILET STAFF
L201 TOILET PATIENT
L2C1 CORRIDOR
E
L244 TOILET PATIENT
L245 CLEAN INSTR.
L239 ULTRASOUND ROOM 2
L253 LOUNGE STAFF-DI
4'-0"
L245 CLEAN INSTR.
7'-2"
L408 TRIAGE #2
L431 L404C COMM./EMS/ STORAGE PISON CONTROL
L409 EXAM #8
L203A DRESSING ACCESS.
L423 NURSE'S STATION
L203B DRESSING L203 LOCKER AREA
L4C3 CORRIDOR
L428 OFFICE NURSE MANAGER
L430 FAMILY CONSULT
L422 EXAM #4
4'-412"
L424 TOILET PATIENT
L432 AMBULANCE VESTIBULE
LS2 STAIR
L426 EXAM #6 TREATMENT
L232 RAD./FLOURO. ROOM 2
L206 ED EXAM #1
L209 ED EXAM #2
--AMBULANCE BAY
L2C3 CORRIDOR
L227 CONROL MRI
L213 ED EXAM #6
L226 MRI ROOM
E
E
L2P2 PASSAGE
7'-6" 10'-6"
4'-7"
2'-1"
15'-10"
UP TO EXTERIOR
L216 BIO WASTE
L222 PATIENT HOLD
L220 TECHNICAL SUPPORT
L221 REVIEW/ READ-DI
L224 UTILITY CLEAN-DI
L2C8 CORRIDOR
L223 TOILET MD ACCESS.
UP
L257 BIO WASTE
L251 UTILITY CLEAN-DI
4'-3"
L215 TOILET
E
2 A-202.10
L250 SOILED LINEN
L225 TOILET STA. ACCESS.
L2C4 CORRIDOR
L217 SUPPLY CLOSET
6"
3'-612"
L252A ELECT. CLOSET
KEY PLAN SCALE: 1/16" = 1'-0"
E 1801B STORAGE CLOSET
L258 POC TESTING
1805 OFFICE #1
1806 OFFICE #2
1801 WAITING ROOM
1801A TV CLOSET
1159A AUTOCLAVE ROOM
1165A VALET WHEEL CHAIRS
VESTIBULE
CORRIDOR
1159 STERILE ROOM
1802 NOUR. 1165 EQUIPMENT STORAGE
1705 STA DRAW #2
1706 STA DRAW #1
1707 TOILET PATIENT
11C4 CORRIDOR
PASS THRU.
1702A STORAGE CLOSET
PYXIS
189 EXAM
190 SOILED UTILITY
188 DOCTOR OFFICE
187 DOCTOR OFFICE
1167 BIO-WASTE
LOBBY
1166 TRASH
1164 SOILED LINEN
1101 TOILET
1152 SUB-WAITING
1158 MALE LOCKER ROOM
1S1 STAIR
1168 OFFICE
DUMB WAIT.
186 DOCTOR OFFICE
11C3A CORRIDOR
1162 LINEN CLOSET
DN. TO LOWER LEVEL
1703 LAB
KEYED NOTES
1153 UTILITY ROOM
1702 RECEPTION
1704 STAFF WORKSTATION
11V3 VESTIBULE
1151 OPERATING ROOM #1
1157 SOILED WK. ROOM
1161 UTILITY ROOM
1701 WAITING ROOM
GROUND FLOOR DIMENSIONED PARTITION PLAN - CT
1170 STAFF LOUNGE
1154 FEMALE LOCKER ROOM
1156 TOILET
1150 JANITOR CLOSET
11C3 CORRIDOR
1176 SUB-WAITING
1149 RECOVERY ROOM
1160 TOILET
1169 TOILET
11C5 CORRIDOR
PASS THRU WINDOW
181 JANITOR CLOSET
1171 EXAM #1 CHANGE RM
206 WAITING
180 LAB
179 DRAWING STATION
1002 CORRIDOR
1172 EXAM #2 CHANGING ROOM
1100 WAITING
1173 EXAM #3 CHANGING ROOM
1174 EXAM #4 CHANGING ROOM
1175 PRE-MEDICATION
ENDO MEDICINE RM.
RECOVERY NURSE STATION
WHEEL CHAIR STORAGE PUBLIC TOILET
EQUIP STORAGE/ MD STATION/ NOURISHMENT AREA
1102 RECEPTION
CANOPY BELOW
193 EXAM ROOM
195 WORK
---
197 NURSE STATION
171 TREATMENT ROOM
1003 CORRIDOR
194 EXAM ROOM
196 EXAM ROOM
191 EXAM ROOM
1104 NURSE'S DIRECTOR
11C6 CORRIDOR
1001 CORRIDOR
209 ANTE ROOM
210 PHARMACY
ENDO NURSE STATION MALE LOCKER ROOM
CLEAN UTILITY ROOM
1S2 STAIR
CORRIDOR
207 OFFICE ROOM
198 EXAM ROOM
INST. PROCESS
CLEAN SCOPE ROOM
1133 TOILET
NEGATIVE PRESSURE
EYE WASH
FEMALE LOCKER ROOM
STAFF LOUNGE ENDO RECOVERY #2
SCOPE PASS-THRU CAB.
1136 TOILET ENDOSCOPY PROCEDURE #3
203A CLOSET
ENDOSCOPY PROCEDURE ROOM
ENDO RECOVERY #1
1105A TEL/ DATA ROOM
11C1 CORRIDOR
SERVING AREA
---
CORRIDOR
1413 CHAIR STORAGE
1304A CLEAN ROOM
1404A CLOSET 1405 OFFICE ADMIN #2
1404 KITCHENETTE
1403 STAFF TOILET
1402 OFFICE ADMIN #2
1400 TRANSFORMER ROOM
DOWN
JANITOR CLOSET
1302 RECEIVING
GEN.
FIRST FLOOR KEY PLAN SCALE: 1/16" = 1'-0"
NURSE'S STATION
1125 ENDOSCOPY PROCEDURE ROOM
REVISIONS No. Date B1
Description
02.20.14 BULLETIN 1
NORTH
1401 CART HOLD CLOSET 1303 MEDICAL STORAGE
--LOADING DOCK
TRANSF.
4
Description FOR BID DOPH REVIEW FOR PERMIT FOR CONSTRUCTION
01.13.14 02.12.14 02.20.14 03.18.14
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Architecture Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Architecture Studio. This sheet must be returned upon the request of the Architect.
1407A CLOSET
1407 ADMIN WAITING
copyright date: 01.01.14 No. Date 01 02 03 04
1304 CLEAN ROOM
1408 SECRETARY
1402A COAT CLOSET
MEDICINE ROOM
GAS 1301 MEDICAL GAS STORAGE
1412 AUDIO STORAGE
WHEEL CHAIR STOR.
HAND SINK ALCOVE
3 A-202.10
1121 EXAM 4
1411 KITCHENETTE
1409 OFFICE ADMIN #1
1129 UTILITY ROOM
WORK AREA
1414 KITCHENETTE
1407B WORK CENTER
1127 WORK ROOM
WAIT/ PROCESS #1 1S3 STAIR
1416 TOILET
1410 STAFF TOILET
1138 TOILET
CLEAN LINEN ALCOVE
WAIT/ PROCESS #2
STAFF TOILET
DINING
1412 CONFERENCE ROOM
ENDO RECOVERY #3
HAND SINK
CAFE 1415 TOILET TENANT SPACE
---
ENDO RECOVERY #5
ELECTRICAL PANEL CLOSET
1103 CONSULT ROOM
---
A-202.10
MD DICTATION
ENDO NOURISHMENT
ENDO RECOVERY
CUSTOMER AREA
---
ENDO RECOVERY BAY 6
ENDO RECOVERY #4
1103 CONSULT ROOM
201 STAFF TOILET
1108 JANITOR CLOSET
11C2 CORRIDOR
175 TOILET
201A CLOSET 203 STAFF
TRASH ROOM
1100A VESTIBULE 208 RECEPTION
205 TOILET ROOM
SOIL LINEN ROOM
1102A COAT CLOSET
192 EXAM ROOM
-----
SCALE: 1/4" = 1'-0"
1155 OPERATING ROOM #2
1163 OPERATING ROOM #3
1801C STORAGE CLOSET
1804 TOILET PUBLIC
SCALE: 1/4" = 1'-0"
???
L214 ED EXAM #8
L256 TRANSFORMER ROOM
1'-3"
2'-4"
1'-3"
6'-0"
10'-0"
L252B ASST MANAGER OFFICE
---
--MECHANICAL
L234 IT AREA
L212 ED EXAM #5
E
L2C5 CORRIDOR
4'-0"
5'-6" +\-
L229 EQUIP. RM. MRI
L210 NURSE'S STATION
L255 STORAGE
LEAVE 2" BETWEEN WALL AND FINISHED WINDOW OPENING TO AVOID SILL.
A-202.10
Project No. 08-100.017
LS3 STAIR
L2P3 PASSAGE STAFF
UP 12"
L228 STAFF WK. PROCESS
L211 ED EXAM #4
EMERGENCY EYE WASH
FIRST FLOOR DIMENSIONED PARTITION PLAN - CT
A-202.10
E
E
ALIGN.
3
111 GOOSE LANE GUILFORD, CT 06437
2
--MECHANICAL
E
L208 ED EXAM #3
L400 E.D. STORAGE
L1C10 CORRIDOR
1171 1'-9" EXAM #1 CHANGE RM
--CONTROL RAD. #1
E
--CONTROL RAD. #2
E
6" 1
L2C9 CORRIDOR
E
UP TO 2ND FL.
A-202.10
L139 TEMPORARY 1
--??? L235 RADIOLOGY ROOM 1
L233 TOILET PAT. ACC. E
L207 EQUIP. STORAGE
2'-9"
L2C6 CORRIDOR
L1C7 CORRIDOR
L234 DRESSING A.
L2P1 PASSAGE
L425 EXAM #5 ORTHO
L246 CT SCAN
L247 CT CONTROL
Yale-New Haven Hospital
ED Renovation Phase 2
E
L427 EXAM #7 TREATMENT
E
L254 TOILET STAFF
L1C6 PASSAGE
L138 OFFICE #4 PHYSICS
E
DISPLAY
E
6'-1" +\-
L236 WAIT. RM. DI
L140 JANITOR'S CLOSET
FD
L137 STORAGE EQUIPMENT
L258 POC TESTING
L251 UTILITY CLEAN-DI
E
L253 LOUNGE STAFF-DI
LS4 STAIR
6"
7'-0" HOLD L237 DRESSING
L2C8 CORRIDOR
COLD & HOT WATER CONNECTION
L1C10 CORRIDOR
L2C6 CORRIDOR
L4C4 CORRIDOR
L136 CT. SIM. ROOM
L257 BIO WASTE
L250 SOILED LINEN L247 CT CONTROL
L236 WAIT. RM. DI
L135 DOSIMETRY ROOM
L256 TRANSFORMER ROOM
L252A ELECT. CLOSET
L237 DRESSING
L204 REC./REGIST./ INTERVIEW
L205 GOWNED WAIT RADIOLOGY
L429 CRASH CART ALCOVE
L218 ED EXAM #7
5'-8"
L252B ASST MANAGER OFFICE
T: 919.890.3880 Snow Building, F: 646.349.5556 Suite 208 331 West Main St. www.bam-studio.com Durham, NC 27701
L133A FUTURE EQUIP. RM.
L255 STORAGE
L2C7 CORRIDOR
L238 TOILET
L202 WAITING RM. DI
E
8'-8"
4'-7"
1'-3"
L2C7 CORRIDOR
L238 TOILET
L4C5 CORRIDOR
L403A REGISTRATION OFFICE #1
L2C2 CORRIDOR
L420 NOUR.
L403B REGISTRATION OFFICE #2
LOCKERS E
L419 LOUNGE STAFF
L4C2 CORRIDOR
L421 EXAM #3
L404 TRIAGE/INTER./ CHECK-OUT
DN. FROM 1ST FL.
16'-10"
6"
3'-10"
4'-112"
E
E
8'-0" HOLD
E
L130 STAFF LOUNGE CONFERENCE ROOM
E
3'-0"
L239 ULTRASOUND ROOM 2
3'-0"
2'-0"
8'-11"
E
12'-4"
3'-3"
L201 TOILET PATIENT
LOCKERS E
L244 TOILET PATIENT
L134 CONTROL/PROCESS CT. SIM.
E
L404A
L133 FUTURE LINAC#2
L1C5 CORRIDOR
E
L132 CONTROL/REVIEW LINAC#2
L246 CT SCAN L4C2 ADM-ALCOVE
1'-3"
L131 TOILET STAFF
E
L254 TOILET STAFF
E
Second Floor T: 646.522.5550 415 West Broadway F: 646.349.5556 www.bam-studio.com New York, NY 10012
E
E E
L416 LAB.
L4C1 CORRIDOR
L401 VESTIBULE WALK-IN
BAM Architecture Studio
L117 NURSE'S STATION
MED. CABINET
L130 STAFF LOUNGE CONFERENCE ROOM
UP TO 1ST FL.
LS1 STAIR
L415 BIO WASTE
L406 TOILET PUBLIC #1 L405 VENDING PUBLIC TELE.
L115 PT. HOLD
L113 UTILITY CLEAN
L105
L414 UTILITY SOILED
A-201.10 BAM
L124 DRESSING #2
L123 DRESSING #3
L110 OFFICE #3
L101 WAITING ROOM
--???
DIMENSIONED PARTITION PLANS - CT
A-202.10
BAM
2200 CGE SPACE
2614 BONE DENSITY 2613A STAFF TOILET
2613 LOUNGE CW
BAM Architecture Studio
2610E ELEC CLOSET
Second Floor T: 646.522.5550 415 West Broadway F: 646.349.5556 www.bam-studio.com New York, NY 10012
2610D SOILED LINEN
1
2612 SUBWAITING
2610C CLEAN LINEN
A-203.10
2S1 STAIR
LOBBY
3'-3" 2'-6" 2'-0"
CW
7'-2"
2613A STAFF TOILET
2609 BREAST IMAGING
1'-7"
6"
6'-412"
2N5.1 TOILET PATIENT
5'-3" 5'-3"
2Q4.1 CARE AREA
2Q6.1 STAFF
2.P8.6 ELECTRICAL ROOM
2.08.4 SOILED UTILITY
2.P8.3 PASSAGE
2Q8.4 CORRIDOR
2Q6.2 WAIT GOWNED
ROOF
2S3 STAIR
2.P8.5 TOILET STAFF
2P8.2 CLEAN STORAGE CLOSET
2.Q85 CLOSET
2Q8.3 ECHO ROOM #2
2Q8.1 ECHO STRESS ROOM
2Q8.2 LAB
2R5.1 CORRIDOR
2S1 STAIR
7'-1012"
2S4.6 CORRIDOR
2.P8.1 STORAGE
2N5.2 DRESSING
2P5.2 DRESSING ROOM
2P5.1 PASSAGE
2S8.3 OFFICE ADMIN
2S4.5 EXAM ROOM
LOBBY
CW
2S4.3 EXAM ROOM
2S4.4 PASSAGE
2S8.6 PASSAGE
2S8.5 HOT LAB
2S8.4 TOILET PATIENT
2S6.1 NUCLEAR MED ROOM 2S8.2 LOUNGE
2S4.1 DOCTORS OFFICE 2S4.2 EXAM ROOM
2S8.1 NUCLEAR STRESS LAB
5'-0" 1'-3"
2S8.7 INJECT
ROOF
2 A-203.10
KEY PLAN SCALE: 1/16" = 1'-0"
1'-8"
4'-5"
6'-1"
1'-8"
2604 WAITING
KEYED NOTES
512"
7'-2"
7'-0"
7'-0"
2'-612"
6"
3'-3"
ALIGN.
2'-0" HOLD
4'-9" 3'-6" 2'-3"
째 821"
LEAVE 2" BETWEEN WALL AND FINISHED WINDOW OPENING TO AVOID SILL. ---
째
5'-112" 1'-3"
2606 TOILET #1
---
18'-1112"
9'-1112"
5'-0" HOLD
2608 TOILET #2
20'-9"
4"
-----
13'-612"
2602 RECEPTION
6"
-----
copyright date: 01.01.14 6" 12'-8"
2601 READING ROOM
2603 TECH AREA 6'-1"
10'-0"
2605 ULTRA SOUND #2
5'-0" HOLD
6" 2'-3" 3'-6" 4'-9"
---
6'-0"
2600 CORRIDOR
6"
6'-3"
11'-11"
17'-9"
3'-9" 5'-0" 2607 ULTRA SOUND #1
5'-0" HOLD
6"
6"
12'-10"
82
5'-0" HOLD
1'-3" 5'-0"
2610 CORRIDOR
11'-8"
5'-0" HOLD
2609 BREAST IMAGING 29'-9"
2M4.4 RECEPTION / CHECKOUT
2M4.3 ALCOVE OFFICE
CORRIDOR
2M4.5 MEDICAL RECORD
90
10'-1"
Project No. 08-100.017
2304 WS OFFICE
MECHANICAL
2P4.1 EXAM ROOM
6'-412" 812"
8'-1112"
5'-512" 9'-6"
2'-0"
2611 CONSULT 11'-212"
2305 WS OFFICE/ FILE ROOM
2L6.1 OFFICE SCHEDULING
2M4.2 EXAM ROOM
2610B NUTRITION CW STATION
2612B DRESS #2 ACESS
2303 OFFICE
2L5.1 WAITING FAMILY
2L4.2 CORRIDOR
2Q4.1 EXAM ROOM
111 GOOSE LANE GUILFORD, CT 06437
CORRIDOR 2K4.2 TOILET PATIENT
2M4.1 DOCTORS OFFICE
2610C CLEAN LINEN
5'-11"
2301 TOILET 2302 RECEPTION
2610D SOILED LINEN
1'-2"
5'-11" 2'-11"
2600 LANDLORD SPACE
2L4.1 EXAM ROOM
5'-0" HOLD 13'-212"
Yale-New Haven Hospital
ED Renovation Phase 2
2602 RECEPTION
2601 READING ROOM
2603 TECH AREA
2605A CLOSET
2K4.1 DOCTORS OFFICE
2612 SUBWAITING 8'-712"
2608 TOILET #2
2600 CORRIDOR
2605 ULTRA SOUND #2
6"
2610E ELEC CLOSET
6'-0" 4'-9" 2'-1" CW
T: 919.890.3880 Snow Building, F: 646.349.5556 Suite 208 331 West Main St. www.bam-studio.com Durham, NC 27701
2604 WAITING
2606 TOILET #1 2610 CORRIDOR
ROOF
2613 LOUNGE
4'-412" 3'-9"
2610B NUTRITION CW STATION
2607 ULTRA SOUND #1
3'-4"
6"
2612A DRESS #1
2612B DRESS #2 ACESS
2611 CONSULT
2614 BONE DENSITY
9'-11"
1'-3"
2612A DRESS #1
No. Date
Description
01 02 03 04
FOR BID DOPH REVIEW FOR PERMIT FOR CONSTRUCTION
2301 TOILET
9'-4"
REVISIONS No. Date
19'-11"
B1
2605A CLOSET
2K4.1 DOCTORS OFFICE
CORRIDOR 2K4.2 TOILET PATIENT
01.13.14 02.12.14 02.20.14 03.18.14
Description
02.20.14 BULLETIN 1
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Architecture Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Architecture Studio. This sheet must be returned upon the request of the Architect.
NORTH
2L5.1 1 A-203.10
SECOND FLOOR DIMENSIONED PART.PLAN - BREAST IMAGING SCALE: 1/4" = 1'-0"
SECOND FLOOR DIMENSIONED PART.PLAN - BREAST IMAGING
A-203.10
LINEN 2S1 STAIR
LOBBY
2610B NUTRITION STATION
LIGHT COVE, SEE CEILING DETAILS
2604 WAITING
A-524.00
TELEVISION, SEE FFE SCHEDULE
4 A-524.00
3
A-524.00
A-524.00
LIGHT FIXTURE, SEE SCHEDULE
2606 TOILET #1 1
2610
KEY PLAN
A-524.00
MOISTURE AND MOLD RESISTANT GWB ON ALL INTERIOR SURFACES OF PLANTER
SCALE: 1/4" = 1'-0"
SOLID SURFACE, SEE FINISH PLAN
7"
1'-0"
2609 REAST AGING
6"
112"
SOLID SURFACE, SEE FINISH PLAN
2
543"
112"
5 A-524.00
3'-3" +/-
6A
2611 ONSULT
2'-0"
2612B DRESS #2 ACESS
6
8"
A-524.00
2'-9"
WATER TIGHT GALVANIZED PLANTER, FABRICATED TO FIT WELL 5/8 " GWB 6" +/-
3'-0" +/-
H8 A-200.30
1'-0"
3'-0" +/-
3'-2" +/-
1'-0"
3'-2" +/-
1'-0"
BASE, TYP. SEE FINISH PLAN.
1'-0"
J8
10
11
A-200.30
A-524.00
A-524.00
SEALANT
4 A-524.00
2
KEY ELEVATION
A-524.00
SCALE: 1/2" = 1'-0"
SECTION - PLANTER WALL SCALE: 1 1/2" = 1'-0"
7 A-524.00
1'-2" +/-
3'-0"
1'-0"
3'-0"
3'-0" +/-
1'-0"
H9 A-200.30
2" +/-
MA ON 3'-6" +/-
1'-0"
1'-0"
2'-3" +/-
8 A-524.00
10
J9
9
A-524.00
A-200.30
A-524.00
MA ON
Z-C BLO AS
BA SEE
3
KEY ELEVATION
7
A-524.00
SCALE: 1/2" = 1'-0"
A-524.00
SECTIO SCALE:
2
2'-9"
A-524.00
LIGHT COVE, SEE CEILING DETAILS
6A A-524.00
TYPICAL MOUNTING HEIGHT SCALE: 3" = 1'-0"
3 4"
1 4"
312"
10" 112"
SOLID SURFACE, SEE FINISH PLAN
2'-0"
7"
WATER TIGHT GALVANIZED PLANTER, FABRICATED TO FIT WELL
112"
1 2"
MOISTURE AND MOLD RESISTANT GWB ON ALL INTERIOR SURFACES OF PLANTER
112"
LIGHT FIXTURE, SEE SCHEDULE
543"
6
8"
8"
A-524.00
FINISHED HARDWOOD 2'-9"
5/8 " GWB
6
BASE, TYP. SEE FINISH PLAN.
SECTION - CHAIR RAIL
A-524.00
SCALE: 6" = 1'-0"
SEALANT
5
SECTION - DOUBLE SIDED PLANTER
A-524.00
SCALE: 1 1/2" = 1'-0"
MAPLE VENEER ON SUBSTRATE
Z-CLIP BLOCKING AS REQ'D
Z-CLIP 3
GWB HEADER 5"
1'-0" +/-
212"
12" 7'-0"
8"
8 A-524.00
10 A-524.00
SCALE: 3" = 1'-0"
PLAN - MILLWORK WALL SCALE: 3" = 1'-0"
1 2"
MAPLE VENEER ON SUBSTRATE
SECTION - MILLWORK WALL
2'-3" +/-
512"
3 4" 6 A-524.00
1 2"
Z-CLIP
BASE, TYP. SEE FINISH PLAN.
7 A-524.00
SECTION - MILLWORK WALL SCALE: 1 1/2" = 1'-0"
2'-0"
MAPLE VENEER ON SUBSTRATE
3
4"
BRUSHED S.S. ANGLE
MAPLE VENEER ON SUBSTRATE Z-CLIP 3"
Z-CLIPS BLOCKING, AS REQD.
1 2"
BLOCKING WITH MAPLE VENEER 2'-9"
MAPLE VENEER ON SUBSTRATE
9 A-524.00
PLAN - MILLWORK WALL SCALE: 3" = 1'-0"
11 A-524.00
PLAN - MILLWORK WALL SCALE: 3" = 1'-0"
4"
BUSHED S.S. ANGLE
Fall 2013 > GSAPP
D e l a n c e y U n d e r g r o u n d Advanced
Studio
Below the street level lies an infrastructural sub-surface level of tunnels, pipes, transportation networks, and drain systems that are kept hidden. Occasionally, we are made aware of it through ground vibrations, steam rising from utility holes, subway ventilation grates, and storm drains. Spaces carved out that aren’t meant for the public, graffitied by art that wasn’t meant for an audience. Over the years, the underground space has accumulated layers of infrastructure, some of which were abandoned, unable to keep pace with the changing needs above. On the surface, the connection to the existing infrastructure is implicit. Commuting by train offers a brief experience of the subterranean city. The site selected for the Institute is located Below Delancey Street, a 60,000 sq. ft. abandoned trolley station in the Lower East Side, below 3 vacant blocks. The institute is an extension of what lies below, a public interface, a manifestation of the existing, an archeological exercise rendering the history of the subterranean city and what is typically hidden exposed. The project is an exploration of the contrast between complete immersion and exchange with the public to moments of isolation and removal from the ambience of urban life where the city surface disappears. The varying degrees of engagement with the urban environment and awareness of what’s below is contrasted with the complete removal from the surface of the city and the stimuli encountered above.
V
|
The complete immersion by carving below the surface and expanding the subway as a typology to bring awareness of the existing infrastructure just beneath the surface of Delancey Street is contrasted with the observation tower, which serves as a place for solitude framing views of the city from above. The street surface acts as the façade, an extension of what’s below. The changing elevation shifts from light to dark, effectively experiencing the city from above and below. Descending below ground evokes emotions of unease, with the absence of external references light serves to delimit the excavated gallery space below, the retaining surface holds the earth back with slivers revealing what’s behind. The public gallery highlights the framework of the existing station and engages the senses and perceptual modality of the underground space.
Marc
Tsurumaki
A shift from hyper stimulation and complete immersion within the urban fabric to removal of stimuli as the project shifts from segmented public bands and extension of the existing abandoned station to private bands. The bands serve as the main organizational structure, creating a rhythm that shifts from the main public band on the north side that leads to the gallery to the administrative band that houses the offices, meeting spaces, and labs towards the south. The shear between the bands allow for light and sound to filter in below and artificial light to radiate above, acting as a signifier. The slippages between each band serve as a visual reference to above, filtering light and sound to inform the space below.
Delancey St.
Broome St.
BAR AUDITORIUM
(PUBLIC) GALLERY
1
Delancey Underground
Essex St. Station
Williamsburg Bridge Trolley Station
New St.
Public
RESTAURANT AUDITORIUM CAFE
2
Extend Block
(PUBLIC )GALLERY
Existing
Public
Expose Existing
AUDITORIUM CAFE
(RESEARCH) LIBRARY
Y (PUBLIC) GALLER
PUBLIC INTERFACE
3
Proposed
Shared
Underground Excavation CAFE
(RESEARCH) LIBRARY
4
Underground Excavation
Shared
Observation Tower
Cafe Gallery Research Library
5
Link Space
ADMINISTRATIVE (OFFICES)
Reading Rooms
Auditorium
Public
Offices
LIGHT (LABS)
Meeting Rooms
Private
4 6
Light Labs
Private
Program
2 1
5
6
ADMINISTRATIVE (OFFICES)
LIGHT (LABS)
Private
Public
Shared
Private
3
Bands
Williamsburg Bridge Trolley Station
Existing
Proposed
Underground Excavation
Light Labs
Program
Thank You
ROBERT MAGDY MORGAN Contact Information 45 Tiemann Pl Apartment 2L New York, NY 10027
Phone: 862-215-3086 Email: rmm2219@columbia.edu Web: www.designedbyruby.com
Education Master of Science in Advanced Architectural Design, 2014 Columbia University, GSAPP - New York, NY Bachelor of Architecture, 2009 New Jersey Institute of Technology, NJSOA - Newark, NJ Awards and Achievements - Works featured in annual Columbia GSAPP ABSTRACT publication - Selected works showcase at End of Year Show 2014 - Partial Scholarship through the Graduate School of Architecture, Planning and Preservation - Dean’s List, NJIT: 2006 through 2009 - Selected Exhibitor: Works showcased at end of the year exhibit for NJSOA Skills and Languages 3D/Modeling: Rhino, SolidWorks, Revit, 3DS Max 2D/Post Processing: Illustrator, Photoshop, InDesign, AutoCAD, SigmaNEST Other Skills: Model Making, Rendering, Web Design and Content Management Fluent in English and Arabic Experience BAM Architecture Studio, New York, NY Testrite Visual, Hackensack, NJ Appel Design Group, Union, NJ Yanku Architects llc., Montclair, NJ
Intern Architect, Jan. - May 2013 Lead Designer, Sept. 2009 - Dec. 2012 Internship, summer 2008 Architect Assistant, 2006