Rodrigo Cumsille / Portfolio

Page 1

RODRIGO CUMSILLE PORTFOLIO


STEVEN TANGER CENTER Greensboro, NC

SANTA LUCIA RECITAL HALL Santiago, Chile

RAMIREZ HOUSE Santiago, Chile

CORNEJO HOUSE Santiago, Chile

02

04

38

52

59

GULFSHORE PLAYHOUSE Naples, FL

DENVER ARTS COMPLEX Denver, CA

SILVA HOUSE Santiago, Chile

JOHN DEERE FINANCIAL Santiago, Chile

12

44

54

60

KNIGHT FOUNDATION Miami, FL

FILLMORE THEATRE Miami, FL

YATES HOUSE Pucon, Chile

PATIO FOSTER Santiago, Chile

20

46

55

62

26

BROOKLYN PARAMOUNT THEATRE Brooklyn, NY

ACE THEATRE Miami, FL

MONTES HOUSE Santiago, Chile

PATIO LIVE Santiago, Chile

48

56

64

LAS CONDES THEATRE Santiago, Chile

BERNER HOUSE Santiago, Chile

MOMARES HOUSE Santiago, Chile

34

50

58

66

MARIO TORAL - MUSEUM COMPETITION Santiago, Chile


A bout M e Rodrigo is a Chilean architect based in NYC, with over 13 years of experience and a Master’s degree in Design and Architecture from Universidad Pompeu Fabra in Barcelona, Spain. He has a strong background in cultural, residential, and commercial projects. For the past three years, he has been based at an NYC firm working on large-scale performing arts centers in New York, Florida, North Carolina, and Colorado. In addition to his USA experience, Rodrigo has an extensive portfolio working on hiresidential projects in South America. Rodrigo’s strength as a team player has resulted in him being a “go-to” person across all phases of a project, from conceptual design to construction administration and managing multiple projects at once. Rodrigo’s portfolio highlights his most relevant projects developed throughout his professional career. From an internship working on “Las Condes Theater and Civic Center,” a symbolic cultural space opened in 2010 in Santiago, Chile, to the construction administration of the “Steven Tanger Center for The Performing Arts,” a 3,000 seats facility in Greensboro, NC; scheduled to open in March of 2020. This document illustrates Rodrigo’s prolific international career.

355 Clinton Ave. Brooklyn, NY 11238 contact@rodrigocumsille.com +1 (929) 500 5526

KEY: CS CONCEPT STUDY / SD SCHEMATIC DESIGN / DD DESIGN DEVELOPMENT / CD CONSTRUCTION DOCUEMNTS / CA CONSTRUCTION ADMINISTRATION

03


STEVEN TANGER CENTER FOR THE PERFORMING ARTS COMPANY: H3 / Arquitectonica PARTICIPATION: CD / CA ROLE: Project Architect CLIENT: City of Greensboro TYPE: Arts & Culture LOCATION: Greensboro, NC SIZE: 105,000 sq. ft COST: $93 Million COMPLETION: 2020 STATUS: Built The Steven Tanger Center for the Performing Arts is an important civic building in downtown Greensboro, NC. As a focal point for the arts, it is a symbol of the city’s growth and commitment to nurturing a lively downtown lifestyle. Conceived as a Broadway-style touring venue, the 3,000 seats venue is housed in 65,000 square feet of functional, flexible space. This ground up construction project cost $93 Million and was scheduled to open in March of 2020. Along with one of H3’s principals, Rodrigo managed this project through contract administration to its completion. His responsibilities included coordinating the engineering consultants, local architects and the construction manager, while communicating with the client. As the contract administrator, he responded to RFI’s, managed BIM 360 and Procore portals while producing multiple construction details for theatrical acoustics, lighting, and mechanical systems. As the site representative, Rodrigo spearheaded on site visits and developed punch lists during multiple site visits. When additional fund-raising rendering were needed, Rodrigo created interior and exterior renderings as well as creating the detailed signage package.

04


05


EXTERIOR STUDY VIEW

06


INTERIOR STUDY VIEW

07


SITE VISIT PHOTOS

08


AUDITORIUM EXPERIENCE

09


AUDITORIUM FINISHES

10


VIEW FROM STAGE

11


GULFSHORE PLAYHOUSE COMPANY: H3 / Arquitectonica PARTICIPATION: SD / CD ROLE: Project Architect CLIENT: Gulfshore playhouse TYPE: Arts & Culture LOCATION: Naples, Florida SIZE: 42,000 sq. ft COST: $28 Million COMPLETION: 2022 STATUS: Under Construction Gulfshore Playhouse is Naples’s first professional theatre company and fills a niche in a community that values the performing arts. The professional self-producing theatre brings Broadway quality shows to Naples, and after years of renting their facility, will begin construction on their own theater in early 2021. Their new 56,000 square foot complex will feature a 375-seat multi-purpose theater, and a 150-seat black-box studio. The distinct, sculpted architecture reflects the innovative spirit of the performances taking place within while carefully selected exterior materials respond to the local climate of Southwest Florida. Rodrigo worked on this project from the conceptual design phase through the completion of the construction docuements phase. During the schematic design phase, he developed layouts for the main theater and studio theater, building the original central Revit file and producing scale study models. During construction documents, Rodrigo was responsible for the building’s exterior, producing details for all exterior wall conditions, including curtain walls, theatrical walls, and the exterior canopy, among others.

12


VIEW FROM STAGE

13


SOUTH WEST VIEW

14


NORTH WEST VIEW

15


MAIN LOBBY

16


INTERIORS & TERRACE

17


MAIN THEATRE

18


STUDIO THEATRE

19


KNIGHT FOUNDATION RECITAL HALL UNIVERSITY OF MIAMI COMPANY: H3 / Arquitectonica PARTICIPATION: CD ROLE: Project Architect CLIENT: University of Miami TYPE: Arts & Culture LOCATION: Miami, Florida SIZE: 25,435 sq. ft COST: $26.5 Million COMPLETION: 2022 STATUS: Under Construction The Frost School of Music is a national music leader in higher education, presenting over 350 performances per year and working to enhance the cultural richness of Miami and the surrounding regions of South Florida. Continuously recognizing the need to create more flexibility, appropriately sized venues to accommodate a range of performances, and upgraded technology, the University is building a new facility that includes a 200 seat recital hall, large ensemble rehearsal room and support areas. The design includes creates a prominent, cantilevered structure sited on a sliver of space at the edge of Lake Osceola. A large transparent glass lobby maximizes the site’s vantage point, setting the stage with a picturesque backdrop while also creating the opportunity for viewing the performance from the outdoors. Rodrigo joined the team to produce the contract documents. His responsibilities include creating the overall floor plans and reflected ceiling plans. He produced details for the GFRC panel geometry at the recital hall facade, acoustical walls within the rehearsal room, the acoustical wood ceiling at the recital hall and millwork details throughout the building.

20


LAKESIDE PATH VIEW

21


EXTERIOR EXPERIENCE

22


RECITAL HALL VIEW

23


STAGE VIEW

24


RECITAL HALL - SCALE MODEL SECTION

RECITAL HALL - SECTION

REHEARSAL STUDIO

RECITAL HALL - FLOORPLAN

25


BROOKLYN PARAMOUNT THEATRE COMPANY: H3 / Arquitectonica PARTICIPATION: DD / CD ROLE: Project Architect CLIENT: Paramount theatre, LIU TYPE: Arts & Culture LOCATION: Brooklyn, New York SIZE: 56,000 sq. ft / 104,000 sq. ft COMPLETION: 2019 STATUS: Unbuilt

H3 was commissioned to plan and design the renovation of the historic Brooklyn Paramount Theatre at Long Island University. The Theatre opened its doors in 1928 as an ornate movie palace, one of the first to show talking pictures. The venue later introduced rock and roll and jazz to the borough, hosting artists such as Buddy Holly, Chuck Berry, Miles Davis, Dizzy Gillespie, Ella Fitzgerald, and Frank Sinatra. The Paramount was converted into a gymnasium in the 1960s and was utilized by many generations of Blackbirds basketball champions. Along with one of H3’s principals, Rodrigo led the renovation and rejuvenation of the historic Brooklyn Paramount Theatre. Rodrigo produced full design development and construction documents sets. Rodrigo had an essential role in the design phase, developing layouts for the auditorium, grand foyer, new entrance, and common areas. He coordinated with consultants, interior designers, and the LIU management office while participating in multiple site visits.

26


27


EXTERIOR RENOVATION

28


STUDY 3D MODELS

29


INTERIOR RENOVATION

30


AREA RESTORED TO ORIGINAL THEATER FUNCTION

CELLAR

LOWER BALCONY LEVEL

AREA REQUIRED FORT THEATER USE SUPPORT

ORCHESTRA & ACCES LEVEL

UPPER BALCONY LEVEL

AREA TO REMAIN FOR L.I.U USE

AREA REQUIRED FOR MECHANICAL EQUIPMENTS

MEZZANINE LEVEL

CONTROL ROOM LEVEL

31


AUDITORIUM

32


BALCONY SIGHT LINES - STUDY SECTION

33


LAS CONDES THEATRE AND CIVIC CENTER COMPANY: San Martin & Pascal PARTICIPATION: DD / CD ROLE: Intern CLIENT: Borough Hall TYPE: Arts & Culture LOCATION: Santiago, Chile SIZE: 37,000 sq. ft COST: $20 Million COMPLETION: 2010 Las Condes Theatre and Civic Center, opened in 2010, is a multifunctional performing arts center with a capacity of 874 seats, located five stories beneath ground level, and includes parking for 400 vehicles. The three-story administration building is organized around a central triple-height longitudinal hall at street level, towards which the two upper-levels open. Working as an intern, Rodrigo participated in creating board meetings presentations, producing interior study renders, and producing his first Construction document package. Rodrigo actively worked completing layout studies for the Municipal Council offices and developing interiors elevations for the construction set.

34


35


INTERIOR EXPERIENCE

36


37


SANTA LUCIA RECITAL HALL A RCHI T EC TUR AL TH ESIS

COMPANY: Universidad Mayor ROLE: Student TYPE: Arts & Culture LOCATION: Santiago Chile SIZE: 22,500 sq. ft / 35,250 sq. ft COMPLETION: 2006 STATUS: Unbuilt

Cerro Santa Lucía Concert Hall was born in response to the lack of mid-sized music venues needed for the development of Santiago’s performing arts scene. After Rodrigo’s thesis research, the results showed that there were two types of venues in Santiago. Big venues, with capacities between 6,000 and 13,000 people, and small venues, with capacities between 100 and 600 people, creating a barrier for emerging artists. The idea was​ to design a space to cover this gap and, at the same time, create a hotbed for new artists, promoting the growth of the performing arts in Santiago. With a capacity for 1,800 assistance, the main auditorium was conceived as a flexible space with a multipurpose stage. Santa Lucía Concert Hall also has a recording studio, a rehearsal room, and another stage for more intimate performances in the lounge area where the bar/restaurant is. The project tries to be as least invasive as possible. It keeps the existing terrace that can be simultaneously used for outdoor events, with the main auditorium, generating a pole of cultural attraction and unique entertainment in the city. 38


ACCESS AND MEZZANINE LEVEL

ORCHESTRA LEVEL

39


RECITAL HALL FLOORPLANS AND STAGE SECTION

ORCHESTRA LEVEL

ACCESS YARD, LOUNGE AND MEZZANINE LEVEL

40

STAGE SECTION


RECITAL HALL AND LOUNGE BAR SECTIONS

PIANO BAR AND ACCESS YARD SECTION

AUDITORIUM SECTION OVERLOOKING THE CITY

LOUNGE AND ACCESS YARD SECTION

41


EXISTING CONDITION

RECITAL HALL AND UPPER TERRACE

RECITAL HALL AND LOWER TERRACE 42

RECITAL HALL AT NIGHT + FLOW DIAGRAM


ANALYSIS AND PROJECT STRATEGY

43


DENVER PERFORMING ARTS COMPLEX COMPANY: H3 / Arquitectonica PARTICIPATION: CS ROLE: Project Architect CLIENT: City of Denver, Arts and Venues TYPE: Arts & Culture LOCATION: Denver, Colorado SIZE: 2.4 Million sq. ft Development COST: $750 Million over 10 Years COMPLETION: 2017 Vision Plan With over 10,000 seats, the Denver Performing Arts Complex is the nation’s second largest center for the arts after Lincoln Center. Designed and constructed in the late 1970’s, DPAC today occupies a wholly different landscape. Urban life has changed, audiences have diversified and traditional funding models are challenged. In response, the City of Denver’s Department of Arts and Venues engaged H3 and Webb Management Services to develop a visionary master plan for the complex and its surrounding district. The master plan will contain a range of tangible improvements. Large scale catalytic projects are envisioned to shift investment from government support towards public-private partnerships. New commercial, residential and hotel development will make the complex viable in the future. In the near to mid term time frames, capital facility improvements will change the character of underused physical spaces. Lastly, an intensive program of activities and events will give exposure to community art organizations, increase revenues, draw new audiences to DPAC. With these changes, DPAC will continue to be a vital and exciting center for Denver’s growing arts community. Rodrigo assisted on the visionary master plan for the Denver Performing Arts Complex District, doing multiple volumetric studies to illustrate feasibility for the commercial and residential towers. 44


45


FILLMORE MIAMI BEACH JACKIE GLEASON THEATRE COMPANY: H3 / Arquitectonica PARTICIPATION: CS ROLE: Project Architect CLIENT: Live Nation TYPE: Arts & Culture LOCATION: Miami, Florida SIZE: 35,420sq. ft COMPLETION: 2018 STATUS: Unbuilt The story of The Fillmore Miami Beach at the Jackie Gleason Theatre began in 1950 when golden era musicians graced the stage of The Miami Beach Municipal Auditorium. With the television boom in the 1960s, the city of Miami Beach offered Jackie Gleason to move his show in the auditorium. In the 1970s, having been renovated by Morris Lapidus and renamed Miami Beach Theatre of the Performing Arts, it became a regular stop touring Broadway shows. In 2007, the theatre was again reborn, undergoing a multi-million dollar transformation. Operated by Live Nation, the music business’s future, The Fillmore Miami Beach at the Jackie Gleason Theatre showcases the biggest names in live entertainment. Along with the reconfiguration of the demolished areas, H3 envisioned a major renovation with the idea of creating a new destination at Fillmore Lobby. To attract conventioneers and locals, a food/beer hall with hi-speed wifi will work as a meet-up/hangout space during the daytime that co-exists with Fillmore night-time activities using separate entries. Rodrigo helped to develop this idea that also creates a connection between the convention center Grand Lobby, The Hotel, Fillmore Lobby, and the convention center East Lobby, encouraging movement at all levels.

46

3 1 2

1) ARQ HOTEL 2) FILLMORE THEATER 3) CONVENTION CENTER


FILLMORE PARTIAL DEMOLITION

GROUND LEVEL PLAN

MEZZANINNE LEVEL PLAN

SECOND LEVEL PLAN

47


ACE THEATRE COMPANY: H3 / Arquitectonica PARTICIPATION: SD ROLE: Project Architect CLIENT: Private TYPE: Arts & Culture LOCATION: Coconut Grove, Miami, FL SIZE: 18,350sq. ft COMPLETION: 2019 STATUS: Unbuilt

Built around 1930, this art deco motion picture theater located in Coconut Grove was a reunion place for the West Grove black community keeping them organized to fight for equal rights and a better future. Later on, in the ‘80s, it was used as a reunion place for the Cuban community. Currently, the building is in a state of abandonment and has a significant level of deterioration. The assignment was to bring this important building for the Coconut Grove community back to life through a complete interior renovation. Rodrigo worked actively in the design of two proposals for the revitalization of the ACE Theater. As it is a historical building, the original idea consisted of maintaining the existing facade and renovating the first and second floors, adding a third level as a rooftop, and turning the interior space into a multi-use stage that would primarily serve as a jazz club. The spacious rooftop will become a recreational space with an open-air stage, a bar, and restaurant service.

48


EXISTING CONDITIONS

PROPOSAL A / 485 SEATS

PROPOSAL B / 527 SEATS

49


BERNER HOUSE COMPANY: Arcubo Arquitectos PARTICIPATION: SD / DD ROLE: Project Manager CLIENT: Private TYPE: Residencial LOCATION: Santiago, Chile SIZE: 3,230 sq. ft COMPLETION: 2014 STATUS: Unbuilt Located in the suburban area of Santiago, ​​ Chile, Berner House is a residential project that provides flexible, multi-functional spaces. The design creates open spaces that visually connect, while large floor to ceiling windows opens to the backyard and an interior illuminated garden (with a tree as a central piece). Movable panels allow the space to change, creating different configurations. From schematic design to design development, Rodrigo participated as a project manager, handling design meetings with the client and developing a full design set. He managed permits approvals, coordinate with consultants, and produced scale study models.

SECTION 1-1

SECTION 2-2

50


TERRACE

FIRST FLOOR PLAN

SECOND FLOOR PLAN

BACKYARD

1

ENTRANC

E

1

POOL

2

2

SITE AND ROOF PLAN

51


RAMIREZ HOUSE COMPANY: Arcubo Arquitectos PARTICIPATION: SD / DD ROLE: Project Manager CLIENT: Private TYPE: Residencial LOCATION: Santiago, Chile SIZE: 3,980 sq. ft COMPLETION: 2016 STATUS: Unbuilt Located in Santiago, Chile, Ramirez House was designed to provide privacy at the entrance by creating a fully hermetic facade. On the opposite side, a visual connection to the terrace and pool opened the house to the backyard. Public and private spaces are separated by a double-height space crossed by a bridge that defines access to the house. An interior courtyard full of natural light illuminates the kitchen and services area. All bedrooms face the back yard and the main terrace. From schematic design to design development, Rodrigo participated as a project manager, handling design meetings with the client, and developing a full design development set. He managed permit approvals, coordinate with consultants, and produced multiples 3D study images.

SECTION 1-1

SECTION 2-2

52


1

2

SECOND FLOOR PLAN

ENTRANCE ELEVATION

POOL

BACKYARD

SECTION A-A

SECTION B-B C

C

B

B

SECTION C-C

ENTRANCE

A

A

1

2

FIRST FLOOR PLAN

BACKYARD ELEVATION

53


SILVA HOUSE COMPANY: Arcubo Arquitectos PARTICIPATION: SD / DD ROLE: Project Manager CLIENT: Private TYPE: Residencial LOCATION: Santiago, Chile SIZE: 3,015 sq. ft COMPLETION: 2016 STATUS: Unbuilt Silva House was designed with two intercepted volumes creating a spacious access hall. The public volume floating on the garden serves as a cover and defines the exterior/interior area where the barbecue and bar connects to the pool. The rooftop was designed as an extension of the patio, which gives incredible views of Santiago City. From schematic design to design development, Rodrigo participated as a project manager, handling design meetings with the client and developing a full DD set. He managed permit approvals, coordinate with consultants, and produced scale study models.

AXONOMETRIC SECTION VIEW

54


YATES HOUSE COMPANY: Arcubo Arquitectos PARTICIPATION: SD / DD / CD ROLE: Project Manager CLIENT: Private TYPE: Residencial LOCATION: Santiago, Chile SIZE: 3,980 sq. ft COMPLETION: 2017 STATUS: Built

Yates House design, located in southern Chile, responds to the area’s natural conditions and the region’s homes’ typical characteristics. With an iron structure but clad in wood, this holiday home has six rooms, a game room, a swimming pool, and a parking area with enough space to store a boat and a jet ski. From schematic design to construction docuemnts, Rodrigo led the design process. Handled meetings with the client, managed permit approval, fully developed set for construction, coordinated with consultants, and produced interior and exterior renders and presentations.

55


MONTES HOUSE COMPANY: Arcubo Arquitectos PARTICIPATION: SD / DD / CD / CA ROLE: Project Manager CLIENT: Private TYPE: Residencial LOCATION: Santiago, Chile SIZE: 2,950 sq. ft COMPLETION: 2015 STATUS: Built

Montes House is a residential project located in Santiago, Chile. The concept seeks to optimize the complex site conditions and take advantage of the exceptional views overlooking Santiago City. From SD to DD, Rodrigo participated as a project manager, handling design meetings with the client to leading the design process. Coordinated with consultants and construction managers and developed a full set for construction. He managed the permit approval process. Lead site visits and solved problems on-site and provided after-sales services for additional work requested by the client.

56


57


MOMARES HOUSE COMPANY: Arcubo Arquitectos PARTICIPATION: SD / DD / CD / CA ROLE: Project Manager CLIENT: Private TYPE: Residencial LOCATION: Santiago, Chile SIZE: 3,980 sq. ft COMPLETION: 2016 STATUS: Built

Momares House is located in a sloped site in Santiago, Chile. The project takes advantage of the surrounding landscape, its slope, and the city’s skyline. The common areas face the large front yard, with predominant views towards Santiago’s city, while all bedrooms face a side patio that connects to the front courtyard through a wood deck that runs along the house’s side. Rodrigo oversaw meetings with the client and led the design process from schematic design to construction administration. He coordinated with consultants and construction managers and participated in several site visits. Rodrigo developed a full DD set and also a complete set for construction while managed permit approval.

58


CORNEJO HOUSE COMPANY: Self-employed PARTICIPATION: SD / DD / CD / CA ROLE: Architect CLIENT: Private TYPE: Residencial LOCATION: Santiago, Chile SIZE: 3,015 sq. ft COMPLETION: 2007 STATUS: Built

Cornejo House (2008) was Rodrigo’s first, self-employed commissioned project. This concrete house, constructed on two levels, seeks to capture Santiago’s beautiful views. The house facade faces the condo street and is divided into several hermetic volumes from where the master bedroom’s terrace appears. Rodrigo oversaw meetings with the client and led the design process from schematic design to construction administration. He coordinated with consultants and construction managers and participated in several site visits. Rodrigo developed a full DD set and also a complete set for construction while managed permit approval.

59


JOHN DEERE FINANCIAL OFFICES COMPANY: Arcubo Arquitectos PARTICIPATION: SD / DD / CD / CA ROLE: Project Manager CLIENT: John Deere Financial TYPE: Comercial LOCATION: Santiago, Chile SIZE: 6,190 sq. ft COMPLETION: 2015 STATUS: Built

This project is located on the fourth floor of a LEED category building in the business district of Santiago, Chile. With an open-plan office, the open central core with medium-height walls promotes interaction between coworkers. From schematic design to construction administration, Rodrigo participated as a project manager. Handle meetings with the client and developed a full set for construction. Managed permits approval. Coordinate with consultants and construction managers. Lead site visits and solved problems on-site. Provide after-sales services for additional works requested by the client.

60


61


PATIO FOSTER COMPANY: Arbol Estudio ROLE: Project Director ​C LIENT: Patio Real Estate TYPE: Marketing LOCATION: Santiago, Chile COMPLETION: 2011 In 2011, Rodrigo created Arbol Estudio, his own Design Studio, focused on developing graphic material for real estate projects, mostly office and hi-residential buildings. Alongside a photographer, a graphic designer, the team developed brochures, including 3D images, floorplan illustrations, and photographs for the sales brochure of Patio Foster, a new office building in Santiago, Chile.

PRINTED BROCHU RE

62


63


PATIO LIVE COMPANY: Arbol Estudio ROLE: Project Director ​C LIENT: Patio Real Estate TYPE: Marketing LOCATION: Santiago, Chile COMPLETION: 2011 In 2012, as Arbol Estudio, Rodrigo was commissioned to develop the corporate image and an “inspirational” video for a new LEED category office building in Santiago, Chile. Rodrigo, accompanied by a graphic designer with a filmmaker, created a storyboard that captured and evoked Live Costanera’s building spirit. The team also developed the building’s logo, which ties in with the video and branding manual.

64


VIDEO SCREENSHOTS

65


MARIO TORAL MUSEUM COMPETITION COMPANY: Arcubo Arquitectos ROLE: Project Manager CLIENT: Mario Toral Foundation TYPE: Arts & Culture LOCATION: Santiago, Chile SIZE: 38,000 sq. ft / 154,000 sq. ft COMPLETION: 2016

Working with Arcubo Arquitectos, Rodrigo created the basic concepts and developed the Mario Toral Foundation’s museum proposal. Mario Toral is a renowned Chilean artist called an architecture competition to build a museum on his property where it is also his house. The idea consisted of creating circulations that respect the existing trees designing a large park on the upper level, with outdoor exhibition spaces. While the museum and exhibition areas lived under the park, the entrances emerged as part of the landscape project generating multiples interactions between the museum and its landscape. The park, an open-air theater, and an auditorium under the park are part of the additional proposed architectural program.

GROUND CUTTING LINES

66

VOLUMETRICS


TOPOGRAPHY + SITE CENTER POINT

PEDESTRIAN ACCESS

TREES + PROGRAM # + PARAMETERIZED POLYGONS

EXTERIOR CIRCULATION AND EXHIBITION AREAS

VOLUMETRICS

LANDSCAPE

FLOW DIAGRAM

GROUND CUTTING LINES

VEHICLE ACCESS

WATER MIRRORS

OUTDOOR AMPHITHEATER

67


ROOF PLAN & LANDSCAPE PLAN A

B

C

A

B

C

A

B

C

A

B

C

THIRD FLOOR PLAN - UPPER ENTRANCE

68


SECOND FLOOR PLAN - AUDITORIUM A

B

C

A

B

C

A

B

C

A

B

C

FIRST FLOOR PLAN - LOWER ENTRANCE

69


LON G S EC T I O N - M U SE U M & LOWER ENTR ANCE

70

SECTION A-A

SECTION B-B

SECTION C-C


LONG SECTION - PARKING ENTRANCE

71


RODRIGO CUMSILLE / RESUME ED U CA T I O N

2011-2016 Arcubo Arquitectos - Project Manager - Santiago, Chile

2009 Universidad Pompeu Fabra - Master’s Degree in Design and Architecture Barcelona, Spain.

Berner House · 3,230 sq. ft - SD / DD Ramirez House · 3,980 sq. ft - SD / DD Silva House · 3,015 sq. ft - SD / DD Yates House · 5,900 sq. ft - SD / DD / CD Montes House · 2,950 sq. ft - SD / DD / CD / CA John Deere Financial · 6,190 sq. ft - SD / DD / CD / CA (comercial) FOUR SPORTS Store and Offices · 4,845 sq. ft - SD / DD / CD / CA (retail) BAYER Seed Processing Plant · 16,100 sq. ft - SD / DD / CD / CA (industrial) BAYER Seeds Distribution Plant · 12,900 - 5,400 sq. ft - SD / DD / CD / CA (industrial) Tire Warehouse and Offices · SALFA Car Sales · 12,915 sq. ft - CD / CA (comercial) Mario Toral Foundation Museum · 38,000 sq. ft / 154,000 sq. ft (competition)

2006 Universidad Mayor - Bachelor’s Degree in Architecture Santiago, Chile. WORK EXPERIENCE 2017-2020 H3 Hardy Collaboration Architecture - Project Architect Steven Tanger Center · Greensboro, NC · 105,000 sq. ft - CD / CA Gulfshore Playhouse · Naples, FL · 42,000 sq. ft - SD / CD Knight Foundation Recital Hall · MIA, Florida · 25,435 sq. ft - CD Paramount Theatre · Brooklyn, NY · 104,000 sq. ft - DD / CD Ace Theatre · Coconut Groove, Miami, LF · 18,350 sq. ft - SD Fillmore Theatre · Miami, FL · 35,420 sq. ft - CS Denver Performing arts complex · Denver, CO · 2.4 Million sq. ft - CS Saratoga Public Library · Brooklyn, NY · 8,000 sq. ft - DD / CD South Orange Public Library · New Jersey, NJ · 17,000 sq. ft - DD Invited panelist at FITAM’s International Conference “Rethinking Space” - July 2020 2016-2017 Mazzella Architects - Design Architect Fort Greene Place, Brooklyn, NY · 8,125 sq. ft - SD / DD / CD (residential) Rivington St, New York, NY · 13,300 sq. ft - SD / DD / CD (residential) West 76th St, New York, NY · 9,800 sq. ft - DD (residential) Euclid Ave, Brooklyn, NY · 7,500 sq. ft - SD / DD (residential) East 54th St, Brooklyn, NY · 2,200 sq. ft - DD (residential) JAY St, Brooklyn, NY · 3,060 sq. ft - SD (commercial)

2010-2011 Arbol Estudio - Founder - Santiago, Chile Patio Foster Building · Marketing Patio Live Building · Marketing Salesroom Condominium Valle Mar · Marketing 2007-2008 Balmaceda LTDA. - Junior Architect - Santiago, Chile Social Housing · 2010 Earthquake Reconstruction · 810 sq. ft - SD / DD Modular Construction System · 2010 Earthquake Reconstruction - SD / DD Alto El Manzano House · 1,290 sq. ft - SD / DD Alto El Manzano Condominium · Masterplan Feasibility Studies · 358 Units - SD Salesroom Condominium El Manzano · 2,045 sq. ft - SD / DD / CD / CA 2007 San Martin & Pascal Arquitectos - Intern - Santiago, Chile Las Condes Theater and Civic Center · 37,000 sq. ft - DD / DD (arts & culture)

SOFTWARE Revit, AutoCAD, ArchiCAD, Bluebeam, Adobe Acrobat, Photoshop, InDesign, Illustrator, SketchUp, 3D Studio Max, Enscape, Procore, BIM 360, MindManager, Microsoft Office.


Thank you for reading!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.