SWINBURNE STATION!
ROHIT NAIR
BACHELOR OF DESIGN (ARCHITECTURE) ARCHITECTURAL DESIGN STUDIO 5 SEMESTER 2, 2019 SWINBURNE UNIVERSITY UNIT CONVENOR - DR. IAN WOOCOCK
1
2
ABSTRACT SWIN 15 is a proposal for the re-design of Glenferrie Station. It tackles the issue of the disconnect between Swinburne University and the general Hawthorn community. As well as providing a much needed front door/main entrance for the university. This design proposes a tall 15 storey building to be an iconic structure for Swinburne. To put Swinburne and the station at the centre of the current campus and to be eyecatching for the entire community. The program includes new open public spaces as well as private floors for the university and for lease. SWIN 15 embraces the station as a central point for the university and the community, by bringing it further into the site.
3
4
CONTENTS ABSTRACT
3
BRIEF
7
SITE ANALYSIS
11
SPACES & ACCESS
19
PLANS
25
APPENDIX
39
5
6
BRIEF 7
REQUIREMENTS
- Develop new pedestrian access from the Glenferrie Station precinct - Update so that it meets contemporary standards for universal access - Cater for at least twice the current throughput. - Create space for a 4th track and new platform is to be provided - Consider Swinburne’s Master Plan
8
SITE CONTEXT
METROPOLITAN MELBOURNE
MELBOURNE CBD
SITE: SWINBURNE
BELGRAVE LINE LILYDALE LINE
PACKENHAM LINE CRANBOURNE LINE
ALAMEIN LINE
9
10
SITE ANALYSIS
11
SITE ANALYSIS LAND USES
INSTITUTE OF SOCIAL RESEARCH
SWINBURNE LOCAL COMMUNITY
12
13
SITE ANALYSIS
SITE PLAN (BEFORE) PARK ST
JOHN ST
GLENFERRIE RD
WAKEFIELD ST
EXISTING STATION
BURWOOD RD
14
SITE ANALYSIS SITE PLAN (AFTER)
PARK ST
NEW PATHWAY TO NORTH
JOHN ST
GLENFERRIE RD
WAKEFIELD ST
NEW STATION
NEW PATHWAY TO SOUTH
BURWOOD RD
15
SITE ANALYSIS
PERMEABILITY (BEFORE) PARK ST
JOHN ST
GLENFERRIE RD
WAKEFIELD ST
EXISTING STATION
BURWOOD RD
16
SITE ANALYSIS
PERMEABILITY (AFTER)
JOHN ST
GLENFERRIE RD
WAKEFIELD ST
NEW STATION
AFTER REMOVING THE EMBANKMENT, THE NORTH-SOUTH DISCONNCT IS BROKEN.
17
18
SPACE + ACCESS
19
SPACES + CONNECTIONS WEEK 4 29.08.2019
MASTER PLAN ALLOCATIONS BRANDING + IDENTITY 3,200 COMFORT + WELLBEING 500 EQUITY + INCLUSION 1,000 FLEXIBLE LEARNING SPACES 2,500 INFORMAL + SOCIAL SPACE 2,500 LIBRARY 350 LOCAL + WIDER COMMUNITY 1,000 PROFESSIONAL CULTURE + LEARNING WORKPLACES 3,500 HIGHLY ENGAGED 1,000 SERVICES + SUPPORT 300 STUDENT RESIDENCES + MIXED USE 1,050 RESEARCH HUBS 6,500
TOTAL: 23,400
20
COUNSELLING ROOMS
S&S
MEDITATION ROOMS
BAR
WORKSTATIONS
A
SOCIAL S L&
P
AL
S CE A
M
& SOCIAL S P
OFFICES
I NF OR
RESEARCH HUBS
SHARED STUDY AREAS
SILENT STUDY AREAS
LIBRARY
NEW STATION MEETING ROOMS
FLEXIBLE LEARNING SPACES
S
CONFERENCE ROOMS
M
OUTDOOR STUDY AREAS
EQUITY & INCLUSION
CE A
INF OR
ACCOMODATION
STUDENT RESIDENCES & MIXED USE
COMFORT & WELLBEING
ADMINISTRATION
COMMUNITY FOCUSED LIBRARY
LOCAL & WIDER COMMUNITY
COMMUNITY SPACES
BRANDING & IDENTITY
RESEARCH SPACES/LABS
PROFESSIONAL CULTURE & LEARNING WORKPLACES
FOYER
ART INSTALLATIONS
OFFICES
EMPLOYMENT SERVICES
PHD STUDY AREAS
21
PROGRAM DISTRIBUTION ROOFTOP BAR & RESTAURANT PROFESSIONAL WORKSPACES / LEASABLE SPACE
RESEARCH HUBS
LEARNING SPACES
SWINBURNE MAIN RECEPTION SPACE
COMMUNITY SPACE & LIBRARY
NEW GLENFERRIE STATION
PARK & ENGAGING INSTALLATION
22
ACCESS
EXPRESS ELEVATORS FOR FLOORS 8 - ROOFTOP
ELEVATOR ACCESS TO PUBLIC SPACES
ESCALATOR ACCESS TO COMMUNITY SPACES
ESCALATOR ACCESS TO STATION
23
24
PLANS
25
CONCRETE PARK LEVEL 00 1:500 @ A3
26
27
NEW STATION LEVEL 01 1:500 @ A3
28
29
COMMUNITY SPACE & LIBRARY LEVEL 02
30
31
32
LEVEL 2 OPEN COMMUNITY SPACE FOR PERFORMANCES AND EVENTS, WITH TWO LEVELS OF SIGHT ONTO A MINI STAGE, AS WELL AS UNOBSTRUCTED VIEWS TO THE CITY
33
SPS BUILDING
34
INSTITUTE FOR SOCIAL RESEARCH
SWIN 15 Section Cut North/South Facing East
35
SHADOW DIAGRAM SUMMER SOLSTICE 1:2000
36
SHADOW DIAGRAM WINTER SOLSTICE 1:2000
37
38
APPENDIX
39
MAPPING MOBILITY EXPERIENCES WEEK 1 07.08.2019
2
TIME
TRANSPORT
DEPART
1
13:40
TRAIN
GLENFERRIER
2
14:12
TRAIN
RICHMOND
CARNEGIE
3
14:32
BUS
623
CARNEGIE
GLEN WAVERLEY
15:20
BUS
902
GLEN WAVERLEY
BURWOOD HIGHWAY
5
15:43
TRAM
6
15:54
BUS
7
16:40
TRAIN
BURWOOD HIGHWAY MIDDLEBOROUGH RD 733
MIDDLEBOROUGH RD BOX HILL BOX HILL
GLENFERRIE
7
1
5
4 3
ICHMOND
4
6
40
ARRIVE
MAP FO SURFACES EXPERIENCED IN THIS RESEARCH EXERCISE
41
42
EXPERIENCING CARNEGIE STATION
43
44
MEASURING CLEARANCES AROUND EXITING LINE
45
ANALYSING TRACK DISTRIBUTION
46
EARLY CONCEPT SKETCHES
47
APPENDIX
MID-SEMESTER PRESENTATION
PROGRAM DISTRIBUTION FOR EARLY CONCEPT OF 3 BUILDINGS
FLEXIBLE LEARNING SPACES
LIBRARY
LOCAL & WIDER COMMUNITY BRANDING & IDENTITY
RAILWAY TRACKS PU
BL
IC
WA L
KW AY
BUILDING 1
48
INFORMAL SOCIAL SPACES
PROFESSIONAL CULTURE & LEARNING WORKSPACES
RESEARCH HUBS
INFORMAL SOCIAL SPACES
BUILDING 2 SERVICES & SUPPORT
STUDENT RESIDENCES EQUITY & INCLUSION
COMFORT & WELLBEING
BUILDING 3 49
APPENDIX
MID-SEMESTER PRESENTATION
POSITIONING FOR 3 BUILDING CONCEPT
50
TRAIN TRACKS
ACCESS POINT ACCESS POINT
WALKWAY
BUILDING 2
BUILDING 1 + TRAIN STATION
ACCESS POINT
BUILDING 3
51
52
53
54