51
District Architect
Department of Human Settlement, Punakha District Administration, RGoB
Construction technique
I worked on following: 1. Master Plan 2. 2-D drawing of 4 choekhang, VVIP, VIP and Guest Tents, lam and Telkhu tents, Purthang area designed, and seating arrangement Design. 3. 3- D design. 4. Presentation 5. Supervised the construction.
52