QUESTION 1 Which of the following risk strategies is represented by the purchase of insurance? A. B. C. D.
Mitigate Accept Transfer Avoid
Correct Answer: C Explanation: "Transfer: Moving the liability for the risk to a third party by purchasing insurance, performance bonds, and so on"
QUESTION 2 A project manager is releasing resources and archiving documents. Which of the following phases is the project MOST likely in? A. B. C. D.
Initiation Planning Monitor and control Closing
Correct Answer: D
QUESTION 3 Which of the following are characteristics of a project? (Choose two.) A. B. C. D. E. F.
Ongoing Temporary Start and finish Achieving a goal Consisting of milestones Restricting the budget
Correct Answer: BC Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 27
QUESTION 4 A project manager has identified a minor skills gap in the operational team that will end up supporting the project solution. Which of the following is the BEST risk mitigation strategy that the project manager should use? A. B. C. D.
Organize adequate training and have one of the operational staff as part of the project team. Raise a risk in the risk register, identify the likelihood and the consequence of the risk occurring. Have the project adequately document the solution and ensure a transition is in place. Escalate this as an issue to the project control board and ensure that there is adequate discussion.
Correct Answer: A Guaranteed Success with EnsurePass VCE Software & PDF File
The Latest PK0-004 Exam ☆ Instant Download ☆ Free Update for 180 Days
QUESTION 5 A software upgrade project has been postponed because it may impact a critical business system. Which of the following strategies has been applied? A. B. C. D.
Accept risk Mitigate risk Avoid risk Exploit risk
Correct Answer: C
QUESTION 6 The key stakeholders have reported the project pace as being slow. The project sponsor would like to cancel the project if it cannot be completed before the end of the year. The project is scheduled to be completed three months after the requested date. To alter the pace of the project, which of the following should the project manager do FIRST? A. B. C. D.
Give approval for the change requested by the project sponsor. Deny the request from the project sponsor. Document the change request from the project sponsor. Ask the project sponsor to change the request.
Correct Answer: C
QUESTION 7 During the initiation phase, a project manager has asked for a document containing the high-level objectives and goals for a project. Which of the following documents would contain these items? A. B. C. D.
Business case Requirements document Project timeline Task plan
Correct Answer: B Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 138
QUESTION 8 A quality auditor finds suspicious code during a software test. For which of the following could this be a trigger? A. B. C. D.
Incident response Quality control Resource changes Business continuity response
Correct Answer: A
Guaranteed Success with EnsurePass VCE Software & PDF File
The Latest PK0-004 Exam ☆ Instant Download ☆ Free Update for 180 Days
QUESTION 9 Which of the following roles has approval authority for project funding? A. B. C. D.
Champion Chief Financial Officer (CFO) Project Management Office (PMO) Sponsor
Correct Answer: D
QUESTION 10 Which of the following job roles is primarily tasked with communicating the project timeline changes? A. B. C. D.
Project scheduler Project manager Project sponsor Project coordinator
Correct Answer: B Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 93
QUESTION 11 Which of the following tools would a project manager use to determine the root cause of an issue? A. B. C. D.
Pareto Chart Ishikawa Diagram Histogram Monte Carlo Analysis
Correct Answer: B
QUESTION 12 Which of the following charts is a graphical representation of the causes of a specific event? A. B. C. D.
Histogram Scatter Fishbone Gantt
Correct Answer: C Explanation: A fishbone diagram is a cause-and-effect diagram that shows the relationship between the effects of problems and their causes. This diagram depicts every potential cause of a problem and the effect that each proposed solution will have on the problem.
Guaranteed Success with EnsurePass VCE Software & PDF File
The Latest PK0-004 Exam ☆ Instant Download ☆ Free Update for 180 Days
QUESTION 13 The project manager for a TV tower construction project receives notification that a strong storm is expected the following week. Which of the following should the project manager do NEXT? A. Evaluate the risk, inform major stakeholders about the problem, and issue a change request immediately. B. Evaluate the risk, fill in the issue log, and communicate it according to the communication plan. C. Evaluate the risk, develop a mitigation plan, and communicate it according to the communication plan. D. Evaluate the risk, reschedule all outdoor tasks for a later time, and inform major stakeholders. Correct Answer: C Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 238
QUESTION 14 A project is coming to the end of a phase. The PMO required that the quality team review the work and budget before moving on to the next phase of the project. The project manager must schedule the review of the phase and have the stakeholders present. This review is referred to as: A. B. C. D.
change management. a milestone. a tollgate. an incident response.
Correct Answer: B
QUESTION 15 A project team is overseeing the installation of a new reptile habitat at the local zoo. During execution, zoo personnel decides to house a different type of reptile that will require a different temperature range than the capacity of the installed system. The modification has been approved. Which of the following constraints are MOST likely to be affected? (Choose two.) A. B. C. D. E.
Quality because the existing system is now outside the threshold. Requirements because this is a change to initial scope. Cost because replacing the system incurs additional expense. Schedule because this was an unscheduled task and will impact the timeline. Stakeholders because they will need to understand the modification and provide buy-in.
Correct Answer: CD Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 293
QUESTION 16 An outsourced project team member approaches the project manager and complains that the contract does not permit overtime. The project manager had fast-tracked tasks that require additional hours. Which of the following documents did the project manager fail to reference? A. MOU Guaranteed Success with EnsurePass VCE Software & PDF File
The Latest PK0-004 Exam ☆ Instant Download ☆ Free Update for 180 Days
B. MOA C. SOW D. SLA Correct Answer: B
QUESTION 17 A project sponsor and Chief Information Officer (CIO) disagree about how to release the final deliverables to the market. The sponsor wants to do a massive product release, while the CIO wants to be extremely cautious and add more time for testing and defect resolution. The project manager works with both parties and determines the best solution is to roll the product out in a pilot release to see how it tests, and then use customer feedback to determine next steps. Which of the following conflict resolution techniques is the project manager using? A. B. C. D.
Forcing Negotiating Compromising Avoiding
Correct Answer: B Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 200
QUESTION 18 Which of the following is a schedule that illustrates the duration of an activity? A. B. C. D.
Process diagram Ishikawa diagram Gantt chart Pareto chart
Correct Answer: C Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 168
QUESTION 19 A milestone task on the critical path has been completed. Which of the following should the project manager notify? A. B. C. D.
Owner of predecessor task Project team Project sponsor Project steering committee
Correct Answer: C
Guaranteed Success with EnsurePass VCE Software & PDF File
The Latest PK0-004 Exam ☆ Instant Download ☆ Free Update for 180 Days
QUESTION 20 Several team members report that meeting objectives are not being met. Which of the following documents would a project manager create to make team meetings more effective? (Choose two.) A. B. C. D. E. F. G.
Create an SOW prior to each meeting and adhere to it. Create a meeting agenda prior to each meeting and adhere to it. Create a lessons learned list prior to each meeting and adhere to it. Create a project charter prior to each meeting and adhere to it. Create an action item list during the meeting and adhere to it. Create a corrective action plan prior to each meeting and adhere to it. Create a WBS prior to each meeting and adhere to it.
Correct Answer: BE
QUESTION 21 When forming a project team, there are a number of phases. When a project team is productive and effective this phase is known as which of the following? A. B. C. D.
Forming Norming Performing Storming
Correct Answer: C
QUESTION 22 A project schedule lists a resource as 50% because it likely: A. B. C. D.
is a shared resource. depict a resource shortage. signifies overallocation of a resource. notes underallocation of a resource.
Correct Answer: A
QUESTION 23 A company decides to give a large section of its development project to another firm to manage and complete because that firm has the appropriately skilled resources to execute the work. This approach is referred to as: A. B. C. D.
Resource leveling Staff Augmentation Work relocation Outsourcing
Correct Answer: D Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 297
Guaranteed Success with EnsurePass VCE Software & PDF File
The Latest PK0-004 Exam ☆ Instant Download ☆ Free Update for 180 Days
QUESTION 24 A project team is composed of numerous team members who are located throughout a country. All personnel have identified core business hours. A team engineer based in a machine shop has a question during business hours for the project manager, who is located at a different facility. Which of the following is the MOST expedient communication method, assuming the question can be resolved quickly? A. B. C. D.
Email Social media Text messaging Face-to-face
Correct Answer: C Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 261
QUESTION 25 A company hires a number of interns and assigns them key roles on a project. Which of the following should the project manager MOST likely anticipate? A. B. C. D.
Reduced quality Reduced scope Reduced risk Reduced timeline
Correct Answer: A
QUESTION 26 A project manager has contracted a third-party vendor to achieve milestones. Which of the following risk strategies is the project manager applying? A. B. C. D.
Transfer Accept Avoid Mitigate
Correct Answer: A Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 238
QUESTION 27 A business has implemented a new online performance management tool that allows functional and project managers to rate employees online. This action is known as which of the following? A. B. C. D.
Business process change Organizational change Internal reorganization Business continuity planning
Correct Answer: A Guaranteed Success with EnsurePass VCE Software & PDF File
The Latest PK0-004 Exam ☆ Instant Download ☆ Free Update for 180 Days
Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 297
QUESTION 28 A PM receives notification that an issue will impact a deliverable on the critical path. The issue is logged with a unique ID and assigned to a team member; however, the team member has not addressed it after a week. Which of the following would be the BEST approach to resolving the issue? A. B. C. D.
Assign a different team member to resolve the issue before the next status meeting. Review the issue with the assigned team member to determine a due date. Set a due date to resolve the issue and inform the assigned team member. Report the team member to a functional manager for disciplinary action.
Correct Answer: B
QUESTION 29 A project coordinator logs potential events that can affect project constraints, and then records the results of brainstorming of potential strategies. Which of the following documents should the project coordinator use? A. B. C. D.
Risk register Issue log Communication plan Status report
Correct Answer: A Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 240
QUESTION 30 A project manager is justifying a required change with the associated impact on the project. Which of the following is the NEXT step? A. B. C. D.
Implementation Approval Validation Auditing
Correct Answer: B Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 294
QUESTION 31 An industry leader may be joining the project team and can potentially provide additional expertise. Which of the following strategies should the project manager employ? A. Exploitation B. Acceptance Guaranteed Success with EnsurePass VCE Software & PDF File
The Latest PK0-004 Exam ☆ Instant Download ☆ Free Update for 180 Days
C. Validation D. Transfer Correct Answer: C
QUESTION 32 A project manager provides status reports to a customer on a biweekly basis, but the customer is very busy and only has a few minutes to review the project. Which of the following are critical for the project manager to provide? A. B. C. D.
Cost, schedule, organizational chart, and risks/issues Risks/issues, cost, RACI chart, and action items Schedule, cost, risks/issues, and milestones Action items, organizational chart, schedule, and NDA
Correct Answer: C Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 326
QUESTION 33 A risk with a high probability and medium consequence to a project has been identified. In response, the project manager has purchased an insurance plan with the intent to provide additional funds if the risk is realized. There is no risk to the schedule or scope. Which of the following types of risk strategies is this an example of? A. B. C. D. E.
Accept risk Transfer risk Mitigate risk Exploit risk Avoid risk
Correct Answer: B Explanation: "Transfer: Moving the liability for the risk to a third party by purchasing insurance, performance bonds, and so on" Excerpt From: Kim Heldman. "CompTIA Project+ Study Guide." iBooks.
QUESTION 34 The executive sponsor asks a project manager to summarize the following for a project: 1. Final capital expenditures. 2. Anticipated cost of new employee resources to support the solution. 3. Maintenance estimates. Which of the following information should the project manager provide? A. Cost baseline B. Burn rate C. Cost variance report Guaranteed Success with EnsurePass VCE Software & PDF File
The Latest PK0-004 Exam ☆ Instant Download ☆ Free Update for 180 Days
D. Total project cost Correct Answer: A
QUESTION 35 Which of the following documents should be used to provide high-level reporting to key stakeholders? A. B. C. D.
Dashboard Communication plan Statement of work Project charter
Correct Answer: A Explanation: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 325
QUESTION 36 Resources for a project report to a project manager and a functional manager. The organizational structure is: A. B. C. D.
Matrix Ad hoc Functional Projectized
Correct Answer: A
QUESTION 37 Three IT companies have agreed to summarize their efforts as a common organization to generate new businesses in the IT cloud computing industry. Which of the following is the type of organizational change described? A. B. C. D.
Expansion Rightsizing Merger Onboarding
Correct Answer: C
QUESTION 38 A post implementation review is being performed as a part of project closure. Which of the following are applicable areas that the review should cover? (Choose two.) A. B. C. D. E.
Lessons learned during the project. Produce operational support documentation. Gathering and centralizing project documentation. Organizing the communication of project closure. Identify the key project achievements. Guaranteed Success with EnsurePass VCE Software & PDF File
EnsurePass.com Members Features: 1. 2. 3. 4. 5.
Verified Answers researched by industry experts. Q&As are downloadable in PDF and VCE format. 98% success Guarantee and Money Back Guarantee. Free updates for 180 Days. Instant Access to download the Items
View list of All Exam provided: http://www.ensurepass.com/certfications?index=A To purchase Lifetime Full Access Membership click here: http://www.ensurepass.com/user/register
Valid Discount Code 20% OFF for 2019: MMJ4-IGD8-X3QW To purchase the HOT Exams: Vendors Cisco Cisco Cisco Cisco Cisco Cisco Cisco Cisco Cisco Cisco CompTIA CompTIA CompTIA CompTIA CompTIA CompTIA CompTIA CompTIA CompTIA CompTIA CompTIA Microsoft Microsoft Microsoft Microsoft Microsoft Microsoft Microsoft Microsoft ISC
Hot Exams 100-105 200-105 200-125 200-310 200-355 300-101 300-115 300-135 300-320 400-101 220-1001 220-1002 220-901 220-902 CAS-003 LX0-103 LX0-104 N10-007 PK0-004 SK0-004 SY0-501 70-410 70-411 70-412 70-740 70-741 70-742 70-761 70-762 CISSP
Download http://www.ensurepass.com/100-105.html http://www.ensurepass.com/200-105.html http://www.ensurepass.com/200-125.html http://www.ensurepass.com/200-310.html http://www.ensurepass.com/200-355.html http://www.ensurepass.com/300-101.html http://www.ensurepass.com/300-115.html http://www.ensurepass.com/300-135.html http://www.ensurepass.com/300-320.html http://www.ensurepass.com/400-101.html http://www.ensurepass.com/220-1001.html http://www.ensurepass.com/220-1002.html http://www.ensurepass.com/220-901.html http://www.ensurepass.com/220-902.html http://www.ensurepass.com/CAS-003.html http://www.ensurepass.com/LX0-103.html http://www.ensurepass.com/LX0-104.html http://www.ensurepass.com/N10-007.html http://www.ensurepass.com/PK0-004.html http://www.ensurepass.com/SK0-004.html http://www.ensurepass.com/SY0-501.html http://www.ensurepass.com/70-410.html http://www.ensurepass.com/70-411.html http://www.ensurepass.com/70-412.html http://www.ensurepass.com/70-740.html http://www.ensurepass.com/70-741.html http://www.ensurepass.com/70-742.html http://www.ensurepass.com/70-761.html http://www.ensurepass.com/70-762.html http://www.ensurepass.com/CISSP.html
Cisco Exam Dumps CCDA
CCIE Security
200-310
300-101
300-701
400-251
CCDE
CCIE Service Provider
352-001
300-501 400-201
CCDP
CCIE Wireless
300-115
300-320
400-351
CCENT
CCNA
100-105
200-301
CCIE Collaboration
CCNA Cloud
300-801
400-051
CCIE Data Center 300-601
400-151
CCIE Enterprise Infrastructure 300-401
CCIE Enterprise Wireless 300-401
210-451
210-455
CCNA Collaboration 210-060
210-065
CCNA Cyber Ops 210-250
210-255
CCNA Data Center 200-150
200-155
CCIE Routing and Switching
CCNA Industrial
400-101
200-601
CCNA Routing & Switching 100-105
200-105
CCNP Routing & Switching 300-101 300-115
200-125
300-135
CCNA Security
CCT Data Center
210-260
010-151
CCNA Service Provider
CCT Routing & Switching
640-875
640-878
640-692
CCNA Wireless
Cisco Certified DevNet Associate
200-355
200-901
CCNP Cloud
Cisco Network Programmability Design and
300-460
300-465
Implementation Specialist
300-470
300-475
300-550
CCNP Collaboration
CCNP Enterprise
300-070 300-075
300-080
300-401
300-410
300-415
300-085 300-801
300-810
300-420
300-425
300-430
300-815 300-820
300-835
CCNP Data Center
300-435
CCNP Security
300-160 300-165
300-170
300-206
300-208
300-209
300-175 300-180
300-601
300-210
300-701
300-710
300-610 300-615
300-620
300-715
300-720
300-725
300-625
300-635
300-730 300-735
CCNP Service Provider 300-501 300-510
300-515
642-883 642-885
642-887
642-889
300-535
CCNP Wireless 300-360
300-365
300-370
300-375
Cisco Certified DevNet Professional 300-435 300-535
300-635
300-735 300-835
300-901
300-910 300-915
300-920
Cisco Certified DevNet Specialist 300-435 300-535
300-635
300-735
300-835
300-901
300-910 300-915
300-920
Cisco Network Programmability Developer Specialist 300-560
Role-based Exams Dumps Azure Security Engineer Associate
Microsoft 365 Certified Fundamentals
AZ-500
MS-900
Dynamics 365 Fundamentals
Messaging Administrator Associate
MB-900
Dynamics 365 for Marketing Functional Consultant Associate MB-200
MS-200
MS-201
MS-202
Modern Desktop Administrator Associate MD-100
MD-101
MB-220
Dynamics 365 for Field Ser vice Functional
Security Administrator Associate
Consultant Associate
MS-500
MB-200
MB-240
Dynamics 365 for Finance and Operations, Financials Functional Consultant Associate MB-300
Teamwork Administrator Associate MS-300
MS-301
MS-302
MB-310
Dynamics 365 for Finance and Operations,
Azure Administrator Associate
Manufacturing Functional Consultant
AZ-103
Associate MB-300
MB-320
Dynamics 365 for Finance and Operations,
Azure AI Engineer Associate
Supply Chain Management Functional
AI-100
Consultant Associate MB-300
MB-330
Azure Data Engineer Associate DP-200
DP-201
Azure Data Scientist Associate DP-100
Microsoft Certified Azure Fundamentals AZ-900
Azure Solutions Architect Expert AZ-300
AZ-301
Azure Developer Associate
Dynamics 365 for Customer Ser vice
AZ-203
Functional Consultant Associate MB-200
MB-230
Azure DevOps Engineer Expert
Dynamics 365 for Sales Functional Consultant
AZ-400
Associate MB-200
MB-210
MCSA Exams Dumps
BI Reporting
SQL Ser ver 2012/2014
70-778
70-461
70-779
70-462 70-463
Microsoft Dynamics 365 for Operations
Universal Windows Platform
70-764
70-483
70-765
70-357
MB6-894
SQL 2016 BI Development
Web Applications
70-767
70-480
70-768
70-483 70-486
SQL 2016 Database Administration
Windows Ser ver 2012
70-764
70-410
70-765
70-411 70-412
SQL 2016 Database Development
Windows Ser ver 2016
70-761
70-740
70-762
70-741 70-742
MCSE Exams Dumps
Business Applications
Data Management and Analytics
MB2-716
70-464
MB2-718
70-465
MB2-719
70-466
MB6-895
70-467
MB6-896
70-762
MB6-897
70-767
MB6-898
70-768 70-777
Core Infrastructure
MCSE Productivity Solutions Expert
70-744
70-345
70-745
70-339
70-413
70-333
70-414
70-334
70-537
MCSD Exams Dumps
70-357
70-486
70-487
MTA Exams Dumps
Exam 98-349
Exam 98-369
Exam 98-361
Exam 98-375
Exam 98-364
Exam 98-380
Exam 98-365
Exam 98-381
Exam 98-366
Exam 98-382
Exam 98-367
Exam 98-383
Exam 98-368
Exam 98-388
CompTIA Exam Dumps CompTIA A+ 2019
220-1001
CompTIA A+ 2019
220-1002
CompTIA A+ 2019
220-901
CompTIA A+ 2019
220-902
CompTIA Advanced Security Practitioner
CAS-003
CompTIA Cloud Essentials
CLO-001
CompTIA Cloud Essentials
CLO-002
CompTIA CySA+
CS0-001
CompTIA Cloud+
CV0-002
CompTIA IT Fundamentals
FC0-U51
CompTIA IT Fundamentals
FC0-U61
CompTIA Linux+
LX0-103
CompTIA Linux+
LX0-104
CompTIA Network+
N10-007
CompTIA Project+
PK0-004
CompTIA PenTest+
PT0-001
CompTIA Security+
SY0-501
CompTIA CTT+
TK0-201
CompTIA CTT+
TK0-202
CompTIA CTT+
TK0-203
CompTIA Linux+
XK0-004