architecture
ROSALYN ROMÁN IGLESIAS ● THESIS ● PROFFESIONAL
Thesis & Professional Experience
This Portfolio includes my Thesis for the Professional Bachelor’s Degree of Architecture at the Polytechnic University of Puerto Rico and some of the works of my Professional Experience as a Entry Level Architect. It contains construction documents, preliminary and conceptual drawings.
Rosalyn I. RomĂĄn Iglesias (787) 648-2509 r.romaniglesias@gmail.com Urb. Floral Park c/Francisco Sein #429 Hato Rey, PR 00917
Thesis: Productive Housing.
Cayey Theater and Tourist Information Center
Contemporary Culture Center of San Juan
(Assembly)
(Assembly)
Construcion documents
Construcion documents
•Theater •Concessions •Activity Center •Parking
•Theater •Concessions •Gallery •Offices o plans
o plans o reflected
ceiling plan o roof plans o interior elevations
o reflected
ceiling plan & wall sections o bathrooms o details
o sections
Luis Muñoz Marín Park (Rehabilitation / Dotacional)
Construcion documents • Park •Concessions inventory landscape plan o demolition plans o proposed plans o reflected ceiling plan o roof plans o bathrooms o doors & windows schedules
o tree
28 - 39
40 - 53
Children’s Park “Parque de los Niños”
University of Puerto Rico Hotel
(Rehabilitation / Dotacional)
(Rehabilitation / Residential)
University of Puerto Rico Concessionaires & Playroom Area
Construcion documents
Preliminary Documents
20 - 27
(Rehabilitation / Commercial)
Conceptual • Park o tree
inventory landscape plan inventory schedule o details
o tree
2 - 19
54 - 57
• Hotel for interns students and faculty o asbuilt o rooms
and proposed plans plans and interior elevations o ADA room plans
58 - 63
• Food Concessions o conceptual
plans / demolitions o conceptual proposal o abuilt
64- 69
Productive Housing
Diana’s Housing Typology in the XXI Century: A Multifamily Productive Housing. Synopsis
Problem
Throughout history, housing and work have been a part of the daily life of every person. As the twentieth century these two spaces have been disconnected from each other by mismanagement and planning on the ground. The spread of urbanity caused housing and work to be segregated in the city increasing the distance between the two and decreasing productivity and recreation.
The urban growth in Puerto Rico has caused a separation between production space and domestic space. Starting from this segregation of duties, the distance between these two have caused a significant loss of time moving from one to the other, time which could be devoted to production or recreation.
“Puerto Ricans lose 32 days in traffic jams”
2
Existing Housing Typology
“Casa Diana” is a construction of dual character, since it has the capacity to accommodate housing and productive space (workshops, office, trade, etc.) to serve the same The proposed project is based on the housing typology owner. of “La Casa Diana” that will be taken to the multifamily Proposed Housing Typology housing low-rise and high density in a suburban area. At the end of the study and classification of different areas of Productive Housing- develops economic-productive production a new prototype of housing arises called activities goods and services. Housing is aimed at consoliProductive Housing. In order to cater to the different dating the bond of social integration with the work needs of customers and the need of production space the associated with the territory. design of the unit consists of several prototypes or Proposal modules which are superimposed atop one another to A productive housing is proposed based on the typoloform adequate space for each owner. The classification of gy of the “Diana House” in Puerto Rico. This housing will productive spaces, jointly with privacy factors, the flow of provide the owner both a living space as well as a space visitors and the use of these productive housing modules to carry out production, both functions under one place. make it possible to adapt these modules to a tower or It will be a productive housing of high density and low block building. height in a suburban area.
3
Housing and Work Space_ San Juan, P.R._Fifth Year_Thesis
site analysis: programs The site has various programs, mostly single family units. It includes hospitals, businesses, industries, public transportation facilities and government offices.
4
site analysis: roads network The site is bordered by two main avenues which are very busy, JosĂŠ de Diego Avenue on the west and Jose Custodio Avenue on the south; and two tertiary roads on the north and east leading to the Urban Train.
proposal & site photomontage The place of intervention is in San Francisco, Rio Piedras. The site of the project is located is the parking lot of the Urban Train measuring approximately 3.5 acres. The place takes advantage of its proximity to the two main roads and easy access to transportation systems. The place has the necessary amenities, including shops, housing, endowments and industry.
site elevation
volumetric diagram
accesses diagram
structural diagram
Conceptually the proposal initially part of three volumes, one vertical (rotated 30 degrees) and two horizontal (one parallel to one of the main roads and the other parallel to the tertiary pathway).
To break the volumetry, some "push and pull" moves have been made. The vertical and horizontal accesses have been arranged in such a way that the access to the tower is located in the center of the volume and for the blocks, accesses are located on the outskirts of the two volumes connected by corridors. These accesses refer to the privacy level of the buildings.
Structurally, both buildings (tower and bars) behave differently. The tower, with a super structure made of concrete, gives the allusion of a folding plane in which it is "filled" with a lightweight aluminum structure, polycarbonate, glass and gypsum board. The bar has structural walls every 25'–0, which are “filled� in the same way as the tower.
proposal components diagram The proposal includes besides the buildings, an underground parking, a raised platform above street level that connects the buildings and serves as a promenade for customers who visit the productive units and green areas, including a large plaza / park which faces the Urban Train.
5
6
site plan / roof plan
ground floor plan
47
1
2
3
4
5
6
7
8
9
10
11
12
13
nivel %
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
15
2
3
4
5
6
7
8
9
10
11
12
13
4th floor& plan
parking level
nivel
nivel
1
2
3
4
5
6
7
8
9
10
11
12
13
2nd floor plan nivel $
1
2
3
4
5
6
7
8
9
10
11
12
13
nivel %
5fh floor plan
ESCALA 1/32�=1’0
8
1
2
3
4
5
6
7
8
9
10
11
12
13
% 3rd floor plan nivel
block structure & skin diagram
0”
9
10
ESCALA 1/16”=1’0” ESCALA 1/16”=1’0”
nivel 1
nivel 2
nivel 1
nivel 2
1
nivel 3
2
nivel 3
3
nivel 4
nivel 5
nivel 6
nivel 4
nivel 5
nivel 6
5
6
ESCALA 1/16”=1’0” ESCALA 1/16”=1’0”
4
7
nivel 7 nivel 7
nivel 8 nivel 8
8
nivel 9 nivel 9
9
nivel 10 nivel 10
10
nivel 5 nivel 5
11
nivel 12 nivel 12
12
tower structure & skin diagram
11
l
l
p p p
l p
p
l
Ideogram The composition of the building is based on the assembly of a number of modules or parts which overlap one above the other. This assembly system makes it easier to adapt to different customers with different needs. The modular pieces can be formed as a towering building as well as a bar structure.
12
l
p
l = LIVING SPACE block modules
p = PRODUCTION SPACE
p
l
l
p
l
l
p
p
tower modules
l
p
l
l
p
p
13
14
front / south elevation
15
16
block section
tower section
17
Capa vegetal Sustrato Filtro
Tubular metálico d. 1” acabado cromado
Aislación Térmica Terminción interior Impermeabilización
Tubular metálico d. 3” acabado cromado Barandal en acero inoxidable alt. 3’- 6” Jardinera
Parapeto de hormigón alt. 2’- 6” “Flashing” Losa de hormigón 2’
Goterón Voladizo Viga de acero 1’ x 6”
Ventana fija en aluminio tipo “casement” Valcor Samcor
Perfilería en aluminio tipo Valcor Samcor
Puerta corrediza en aluminio y crsital templado
Barandal de cristal 4’ x 4’
Anclaje Ventana de aluminio tipo “awning” Zinc acanalado Plancha de policarbonato “LEXAN” 4’ x 8’
Perfilería en aluminio
Pared en “gypsum board”
Losa de ceramica 12 x 12
Plafón
Plancha de policarbonato “LEXAN” 4’ x 8’ Perfilería en aluminio
Ventana fija en aluminio tipo “casement” Valcor Samcor
18
Losa de hormigón 2’
lateral / west elevation
tower wall section
Losa de ceramica 12 x 12 Anclaje Zinc acanalado Ventana de aluminio tipo “awning” Plancha de policarbonato “LEXAN” 4’ x 8’
Barandal de cristal 4’ x 4’
Viga de acero 1’ x 6” Plafón
Perfilería en aluminio Luminaria Plafón acústico Ventana fija en aluminio tipo “casement” Valcor Samcor
Losa de hormigón 6”
Gravilla Losa de hormigón de estacionamiento Lamina impermeable “Miradrain”
Grava Tubo de desague soterrado Zapata en hormigón
Tubería de desague Terreno compactado Formaleta para el desague
block wall section
19
Cayey Theater and Tourist Information Center
20
Assembly (Theater, Concessions, Activity Center, Parking)_ Cayey, P.R._2015
1. Theater Ground Floor Plan 2. Theater Second Floor Plan 3. Theater Reflected Ceiling Plan 4. Theater Longitudinal Interior Elevation 5. Theater Transversal Interior Elevation 6. Theater Transversal Interior Elevation 7. Ground Floor Reflected Ceiling Plan 8. Activity Center Reflected Ceiling Roof Plan 9. Activity Center Roof Plan
21
CENTRO DE ACTIVIDADES
THEATER
CONCESSION 1
TOURISM INFORMATION CENTER
LOWER TERRACE LEVEL T1
north
CONCESSION 2
2 A 356
A
1 A 356
D
E
F
80'-5 3/4" 68'-4"
1
F.F.E. 399.37
1 4'-0"
Ramp 14'-0" 3'-4"
15'-0"
F.F.E. 397.41
9'-4" 3'-8"
11'-0"
1'-6"
3'-4"
34'-2"
1
2'-11"
up
6'-7"
up
6"
3'-4"
12'-0"
6"
9'-7"
5'-3" Electrical Room
13
21'-8"
6"
6"
4'-6"
13
7
8
F.F.E. 399.74
F.F.E. 399.38
F.F.E. 399.74
F.F.E. 400.09
F.F.E. 400.54
8"
16'-10"
8"
3'-0"
6"
12'-0"
F.F.E. 400.81
F.F.E. 401.16
F.F.E. 401.52
F.F.E. 401.87
F.F.E. 402.23
F.F.E. 397.60
F.F.E. 397.60
Storage Room
7
35'-6"
4"
43'-4"
GWB Wall
8'-7"
3'-0"
3'-0"
3'-0"
33'-6"
3'-4"
3'-0"
3'-0"
Concession A2
2
10'-6"
6"
1'-2" 1'-2"
6'-0"
11'-11"
F.F.E. 399.74
4'-0"
Stage
TYP.
3'-8"
3'-8"
8"
Movie Screen
7
h1
3
6"
18'-10"
10" 6"
1 A 354
4'-0"
# A ###
1'-6"
Stairs
1'-6"
TYP. TYP.
8
12'-0"
3'-6"
12
3'-6"
3'-6"
Acoustic wall treatment as specified
up 1
up 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
10"
2
4'-6"
Metal Ladder
5'-6"
11'-11"
6'-0"
21'-8"
2"
h2
2'-10" high, 1 1/2" ø Stainless Steel Railing Satin Finish
Roof Access Door
4"
4"
theater ground floor plan
2 A 356
1 A 356
4"
c1 4'-0"
22
8"
34'-0"
2'-10" high, 1 1/2" ø Stainless Steel Railing Satin Finish
31'-10"
9'-6"
12'-8"
1 A 354
1
1 A 355
Steel frame above to suport movie screen, see Structural dwgs.
11
Backstage
2
2'-0"
EXP. JT. TYPE "C"
7 Savaria V1504 Standard Accessible Conveyor Elev Chain Hydraulic Drive / 750lb. Capacity 42" High Platform Guard Panels 38.5" x 48-11/16" interior cab size
10'-9"
8
8'-6"
Acoustic wall treatment as specified
6'-4"
4'-6"
1'-4"
3'-8" 5'-0"
3"
3'-6"
3
1 A 355
9
1'-6"
Open to below
2'-10" high, 1 1/2" ø Stainless Steel Railing Satin Finish
Stairs
6"
10
10'-11"
8'-0"
F.F.E. 399.73
4'-10"
1'-3"
4'-8"
6"
GSEducationalVersion
4"
c2 4'-0"
4'-0"
EXP. JT. TYPE "C" 4'-0"
2 A 356
A
1 A 356
D
E
F
80'-6" 68'-4"
1'-3"
10'-11"
6"
32'-8"
SLOPE
SLOPE
SLOPE
RD #2
SLOPE 1 1/2" ø Stainless Steel Railing Satin Finish
SLOPE
EXP. JT. TYPE "C"
8
Stairs
6"
6"
7'-3"
2'-6"
2'-0"
20
1 A 355
19
4
7'-5"
8'-0"
6'-4"
Acoustic wall treatment as specified
8'-0"
1 A 355
4'-6"
3'-6"
17'-4"
10"
10"
2'-0"
EXP. JT. TYPE "A"
Open to below
RD #2
3
SLOPE
6"
10"
GWB Wall w/ Galv. Structure
4'-0"
24
1
1 1/2" ø Stainless Steel Railing
2 3
Stage
4 5
7
8
F.F.E. 399.74
F.F.E. 399.38
F.F.E. 399.74
F.F.E. 400.09
F.F.E. 400.54
F.F.E. 400.81
F.F.E. 401.16
F.F.E. 401.52
F.F.E. 401.87
F.F.E. 402.23
F.F.E. 402.58
F.F.E. 402.94
F.F.E. 403.29
F.F.E. 403.65
F.F.E. 404.01
6
F.F.E. 404.92
8
i
3'-8"
Control Room 2'-0"
22'-0"
7
11'-6"
33'-6"
43'-4"
35'-6"
1'-2"
2
TYP.
1'-2" 1'-2"
EXP. JT. TYPE "B"
8'-7"
SLOPE
6r @ 6"
Steel frame, see Structural dwgs.
11" 11" 11" 11" 11"
SLOPE
7'-6"
21'-8"
RD #2
8
SLOPE 1'-4" 8"
1 A 354
3'-0"
6"
12'-0"
8'-7"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
6"
7'-0"
10"
8"
10'-11"
8"
1 A 354
6" 8'-3"
33'-4"
1 1/2" ø Stainless Steel Railing Satin Finish # A ### 67'-7"
6"
Electrical Room
6'-2"
7'-7"
12 rows @ 19 seats / row= 228 seats
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
4'-10"
21
4'-10"
3'-4"
F.F.E. 399.38
2
22
4
9"
Acoustic wall treatment as specified
4'-10"
3'-6" RD #2
23 6"
1'-6" 1'-6" TYP. TYP.
4'-6"
SLOPE
SLOPE
2
F.F.E. 404.01
9"
1'-6"
3'-4" 6'-8"
10'-8"
21'-8"
6"
Low wall 404.92 TOW
SLOPE
10"
1 1'-6"
Roof Access Door
# 1 1/2" ø Stainless Steel Railing Satin Finish A ###
1'-6" 36'-0"
theater second floor plan
2 A 356
EXP. JT. TYPE "A" Stairs
EXP. JT. TYPE "C"
8 7'-6"
10" 6"
6"
7'-3"
6"
4'-0"
1 A 356
23
CENTRO DE ACTIVIDADES
THEATER
CONCESSION 1
TOURISM INFORMATION CENTER
LOWER TERRACE LEVEL T1
2 A 356
1 A 356
north
CONCESSION 2
A
GSEducationalVersion
D
E
F
80'-6" 68'-4"
1'-3"
10'-11"
3
4'-6"
9'-0"
1'-6" 4'-6"
3'-0"
9'-0"
E.Q.
28'-0" 9'-0"
7'-0"
E.Q.
2'-0"
2'-0"
1 A 354 Exp JT Type "C"
7'-0"
21'-8"
10'-3"
E.Q.
1'-6"
3'-3"
18'-0"
3'-0"
E.Q.
1'-6"
4'-6"
4'-0"
12'-0" 4'-6"
1 A 354
7'-0"
67'-7"
10"
6"
8"
10'-11"
Exp JT Type "C"
8"
ACT +8'-0"
14'-0"
A/C Diffuser
2
1'-6"
A/C Diffuser
1 A 355
7'-0"
1 A 355
Downlights
3'-1" 4'-0"
E.Q.
1
2 A 356
theater reflected ceiling plan
24
1 A 356
E.Q. EC
1'-6"
Exp JT Type "C"
E.Q.
1'-6"
E.Q.
1'-6"
1'-6"
1'-6" 3'-3"
1'-6"
3'-1"
E.Q.
10'-3"
21'-8"
7'-0"
A/C Diffuser
E.Q.
E.Q.
E.Q.
1 A 356
D 68'-4"
E
1'-3" PVC single ply roofing membrane 4" polyisocianurate RVAL=19 rigid foam insulation 1/4" recover board dense deck
F 10'-11"
Surface monted ext alum. regled
4'-0"
2-ply SBS roofing membrane
6"
type B gauge 18 steel deck
4" XPS rigid foam insulation
steel joists 2'-0"
lightweight conc. with elevations as shown on Roof Plan conc. slab
2"
conc. beam
clerestory window
A/C duct
A/C
A/C duct
A/C diffusers
6"
A/C duct
1'-6"
A/C duct
2'-1"
m 1
3'-10"
drip
4'-4"
Expansion Flashing Type "D"
2'-6"
2 A 356
A
3'-3" 1'-10" 6"
15'-8"
16'-0"
ID
9'-6"
2'-0"
18'-1"
CONTROL ROOM
Wall Lamp
2'-6"
Acoustic wall treatment as specified
A/C 20'-0"
3'-0"
2'-0"
1'-6"
Downlights
2'-10"
GWB Ceilings
3'-10"
1'-6"
6"
6" 3'-0"
1'-6" 6"
1'-0"
GWB ceiling 4'-6" 1'-6"
3'-9"
9'-3"
5'-10"
Exp. JT Type "C" GWB wall
Steel Beam tube for support of A/C units
F.F.E. 404.92
F.F.E. 396.61 F.F.E. 396.67
8'-0"
8"
F.F.E. 404.01
8
20
21
6"
3'-0"
3'-2"
7"
2'-6"
12 STORAGE ROOM
STORAGEROOM
6" F.F.E. 399.38
8'-2"
GND FL LEVEL
8'-4"
7"
Steel Sub-Structure w/ 2 3/4" treated playwood and carpet
Exp. JT Type "C"
21'-0"
7
19
TERRACE LEVEL
Exp. JT Type "B"
20'-3"
6
14
18
24
18'-4"
5
11
17
23
15'-2"
(14 Strips)
5'-10" 9"
10'-1"
Max water level
8
F.F.E. 397.60
2"
All walls and floor covered with vandex water proofing
2
4
10
1'-10"
1
3
9
15
16
22
26
3'-1"
6'-6"
7'-0"
8'-0"
14
1'-2" 6"
6"
2'-6" 2'-6" 6"
Access Door See Mechanical DWG
1'-6" 1'-0" 1'-0" 1'-0" 1'-0"
10'-3"
PUMP ROOM
8'-0"
F.F.E. 399.38
2"
2" 1'-6" 4'-8"
CP
13
CP
9
2'-6"
4'-0" 1'-6" 4" 3" 2"
drip
Wall Lamp
3'-4" 7'-6"
8'-0"
11
2" topping & floor finish as shown 2"
1 1/2" ø Stainless Steel Railing Satin Finish
25
6'-6"
4'-0"
12'-0"
3"
Exit Sign
GWB Ceiling
F.F.E. 399.74
13 Risers @ 1'-2" EA
5'-10"
21'-8"
18'-0"
3'-4"
4'-0"
4'-0"
3"
Movie Screen
h1
CP
Wall Lamp 3'-10"
Steel frame to suport movie screen, see Structural dwgs.
6"
4'-0"
1'-6" 1'-0"
27'-6"
A/C
F.F.E. 397.60
GND FL LEVEL
Vapor Barrier 6 Mil
8'-2"
16'-10" 2 A 256
theater longitudinal interior elevation
GSEducationalVersion
1 A 356
25
CENTRO DE ACTIVIDADES
THEATER
CONCESSION 1
TOURISM INFORMATION CENTER
LOWER TERRACE LEVEL T1
north
CONCESSION 2
3
2
1
3
2
1
GSEducationalVersion
43'-4"
43'-4"
21'-8"
21'-8"
21'-8"
21'-8"
PVC single ply roofing membrane
PVC single ply roofing membrane
4" polyisocianurate RVAL=19 rigid foam insulation 1/4" recover board dense deck
4" polyisocianurate RVAL=19 rigid foam insulation 1/4" recover board dense deck type B gauge 18 steel deck
type B gauge 18 steel deck
1'-0" 4" 2'-1 1/2" 1 1/2"
2'-0"
2'-0"
2'-1 1/2" 1 1/2"
steel joists 2'-0"
F.F.E. 410.72
2'-0"
1'-0" 4"
steel joists
5'-4"
1'-6"
GWB Ceiling
6'-9"
28'-8" 18'-0"
1'-6"
21'-8"
1'-2" F.F.E. 399.38
3'-6"
8'-0"
9'-2"
8'-0"
Movie Screen 18'x35'
2'-6"
9
F.F.E. 404.01
1'-10" 6"
6" 9'-2"
1'-2"
1'-0"
28'-8"
26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Ramp
7"
8'-0"
21
3'-0"
1 1/2" ø Stainless Steel Railing Satin Finish
Tupakustik wall acoustic panel system by Fantom Group
15'-2" 26 Risers @ 7" EA
20
GWB Ceiling
Drywall painted
8'-0"
i
1'-3"
6"
6"
6"
22'-0"
1'-6"
Interior Ceiling Recessed Light
6" 2'-0"
A/C Duct
Interior Ceiling Recessed Downlight
6"
6" 2'-0"
A/C Duct
Max water level
6"
6'-0"
Max water level
All walls and floor covered with vandex water proofing membrane or similar approved
6'-0"
All walls and floor covered with vandex water proofing membrane or similar approved
F.F.E. 396.46
Vapor Barrier 6 mil
theater transversal interior elevation
26
GSEducationalVersion
Vapor Barrier 6 mil
theater transversal interior elevation
6"
CENTRO DE ACTIVIDADES
THEATER
CONCESSION 1
TOURISM INFORMATION CENTER
LOWER TERRACE LEVEL T1
CONCESSION 2
1 A430
2 A430
Be
1 A431
C A421
Ce
1 A430
Ae
De
Be
2 A430
1 A431
C A421
Ce
De
north
Ae 27'-0"
27'-0"
27'-0"
27'-0"
27'-0"
27'-0"
GSEducationalVersion
RD #1
Roof #2
RD #1
RD #1
14'-0"
+2 ½"
+2"
4'-3"
E.Q.
8'-0"
1 A434
8'-0"
A/C
RD #2
9'-6"
RD #2
RD #2
4'-0"
+3 ½"
14'-0"
Roof #1
+3 ½"
+3 ½"
4e
18'-0"
cabin 2
Roof #7
E.Q.
9'-6"
+2"
+2"
SALÓN DE ACTIVIDADES
5'-6"
5'-6"
+3 ½"
+3 ½"
14'-0"
B A420
11'-0"
RD #1
RD #2
+2"
Structural Slope
11'-0"
+3 ½"
+2"
4'-0" 4'-0"
5'-6"
+3 ½"
Metal Ladder
+3"
5'-6"
13'-0" 18'-6" 14'-0"
16'-0"
33'-0"
5'-6"
Roof Access Door
A/C
+3"
Roof #2
14'-0"
cabin 1
4e
4'-0"
A/C
+3" +2"
E.Q.
4'-0"
+2 ½"
Roof #2
2'-0"
RD #2
3e
58'-0"
3e
RD #1
+3 ½"
RD #2
+3 ½"
1 A433
5e
4'-0"
RD #1 +3"
32'-0"
E.Q.
1 A433
5e
9'-6"
RD #1
RD #2
1 A434
# A ###
E.Q. 32'-0"
2'-6" 2'-9" 2'-9" 2'-9" 2'-9" 2'-6"
1 A433
Roof #7
+3"
+2 ½"
4'-6"
9'-6"
4'-6"
+2 ½"
RD #2
5'-6"
E.Q. 27'-0"
# A ###
RD #1
+2"
6e
E.Q.
1 A434
+2 ½"
Roof #7
2'-9"
14'-0"
E.Q.
6e
B A420
RD #1
7e
7e
RD #2
RD #2
RD #1
RD #2
16'-0"
+3 ½"
2 A433
2 A433
32'-0"
32'-0"
2 A433
+2"
+3 ½"
+2"
+3 ½"
+3 ½"
18'-6"
RD #2
+2"
2e
2e 11'-0"
11'-0"
11'-0"
RD #2
RD #2
4'-0" 14'-0"
14'-0"
11'-0"
14'-0"
4'-0"
RD #2
RD #1
RD #1
1e
1e
+2"
1 A430 1 A430
2 A430
activity center reflected ceiling plan
GSEducationalVersion
A A420
1 A431
activity center roof plan
2 A430
A A420
1 A431
27
28 WV
TMH
TMH
SMH
TMH
MC
BOX CTV
EMH
TLC
WV
EP
MC
A/C
MC
A/C
SMH
TMH
TLC
2CTV
EMH
TLC
EMH
EMH MC
MC
TLC
TLC
SMH
MC
SB
MC
CS EB
MH MC
MC
EMH
EMH
MC
SMH
T=4.81 TMH
TMH
Contemporary Culture Center of San Juan
Garbage Station
MC
SMH
SMH
MC
SMH
New manhole see Civil plans
SMH
Electrical Substation,Transfer & Switching Unit, see Electrical Drawings
Assembly (Theater, Concessions, Gallerry, Public Space)_ San Juan P.R._2015
Electrical Substation,Transfer & Switching Unit, see Electrical Drawings
SMH
EMH
Garbage Station
1. Gallery Floor Plan 2. Theater Ground Floor Plan 3. Gallery Reflected Ceiling Plan 4. Theater Reflected Ceiling Plan 5. Gallery Transversal Section 6. Gallery Wall Section 7. Theater Section 8. Gallery Building Bathrooms 9. Theater Dressing Rooms & Bathrooms 10. Details: a. Skylight Details b. Gallery Gypsum Board and Tupakustik Ceiling Details c. Lavatory Detail d. Reflecting Pool Details e. Theater Handrails Plan & Details
29
F
G
H
I
1 A410
J
2 A410
K
L
M
N
1 A411
O
P
1 A311
Q
2 A411
R
S
1 A412
T
2 A312
U
V
246'-3" 16'-3"
16'-3"
5'-9"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
matchline A207
27
6"
1'-0"
15'-0"
1'-0"
15'-0"
1'-0"
15'-0"
1'-0"
15'-0"
1'-0"
15'-0"
1'-0"
15'-0"
1'-0"
15'-0"
ELEV MOD B (mirror)*
10'-0"
15'-0"
8'-6"
7'-6"
15'-0"
1'-0"
6"
1'-0"
5'-4"
7
8'-10"
53
5'-10"
1'-0"
7
7
17'-0"
53
1'-0"
19'-4"
4'-0" 6"
6
4 A415
8'-6"
6"
1'-0"
53
6
6" ru 9
4
6'-0"
15'-0"
8'-6"
F.D.
7'-6"
17'-0"
2 A310
4
17'-0"
53
7
8'-10"
5'-10"
7
ELEV MOD B*
ELEV MOD C* 4 A415
ELEV MOD D*
ELEV MOD E*
ELEV MOD G*
ELEV MOD H*
ELEV MOD D*
ELEV MOD E*
10'-0"
ELEV MOD N *
2'-0"
21 NOTES:
ELEV MOD B (mirror)*
ELEV MOD A (mirror)*
ELEV MOD A*
ELEV MOD N*
steel & glass railing MONITOR
note 1: asterisk (*) denotes metal lath and plaster structure.
4 A415
19
note 2: for upper part of brise-soleil module refer to drawing of Collonade Module Types in A-305.
2 A 70 0
2 A 30
1 A411
16'-0 "
2 A410 3
1 A410
16
2 A411
steel & glass railing
1 A412
2 A312
Wall Metal Lath & Plaster w/ Galvanized Steel Structure
R FL
OW
+2" +2"
17
PE
16'-0 " .W.
4 A 70 0 RD#1
SLO
M.B 1 A 70 0
SBS
OVE
.W. M.B SBS
30
3 A 70 0
SLO
PE
4 A 70 0 RD#1
4 A 70 0 RD#1
SBS
E.W
.
16'-0 "
18
1 A310
16
center line
1 A413
6"
55
1'-0"
11'-6"
6'-0"
17'-0" 7
4
8'-6"
1'-0"
1'-0"
1'-0"
5'-10"
6'-10" 2'-0"
4
15'-0"
Janitor
9'-6"
ru 9
15'-0" 21'-0"
4'-0"
13
Wall Metal Lath & Plaster w/ Galvanized Steel Structure 1'-0"
15'-0" 53
6'-0"
6"
56
53
2'-0"
22'-0"
6" st. stl 304 railing over 3'-0" conc. low wall
30'-0"
15'-0"
31'-0"
19'-4"
31'-0"
13
F.F.E. 13.78
1'-0"
1 A312
14'-8" 5'-1 3/8"
2 A311
F.D.
3'-4"
1'-0"
Gallery
13
7
1'-0"
4
1'-0"
ru 9
2'-0"
6'-0"
6"
11'-0"
4
9'-6"
15'-0"
2'-0" 11'-4"
13
1'-0"
4
1'-0"
15'-6" 17'-0"
79'-0"
center line
P1
2'-0" 1'-0"
15'-0"
ELEV MOD N*
15'-6"
15'-0"
4'-4"
metal lath and plaster wall over conc. base
1'-0"
ELEV MOD A*
4'-0"
15'-0"
5'-0" 1'-0"
15'-0"
1'-0"
steel & glass railing
52
20'-2"
54
4'-0"
3'-10"
8"
4 A415
3'-4" 2'-0"
15'-11"
17
E
15'-0"
# A###
8"
7a
12" 2'-0" 2'-0" 2'-0" 2'-2"
F.F.E. 56 wood steps
8"
2'-0" 1'-3"
2 A310 16'-0"
15'-0" 21'-4"
OPEN TO BELOW
2'-0"
22
8'-6"
53
5'-10"
7
3'-2"
12'-0"
Bathroom 301
8"
F
8'-6"
53
7
8'-0"
1'-0"
8"
2'-0" Elev 1
15'-0"
15'-0"
15'-8"
A/C Chase
3'-0"
6"
23
6'-0"
ru 9
33'-0"
8'-0" 34'-0"
6"
Bathrooms 301-302 / ELEV 1
4
S1
5'-10"
2'-0"
3'-4" 5'-9"
7a
1 A413 16'-0"
1 A601
8" 8"
18
5'-0"
metal lath and plaster wall over conc. beam
40'-0"
2'-0"
8'-0"
3'-10"
6"
O 1
15'-0"
ELEV MOD A (mirror)*
17'-0"
ELEV MOD E*
64'-0"
ELEV MOD D*
7
2ND FLOOR FFE + 13.78
2'-0" 17'-0" 6"
1'-2"
6'-5"
Bathroom 302
5'-0"
12'-0"
16'-0"
8"
3'-2"
8"
17
6" 3'-4"
3'-0"
2'-0" 1'-3"
E
R 1
10"
6'-10"
41'-0"
7'-1"
steel & glass railing
4'-0"
5'-0" 7
7a
F
9'-0"
7
3'-0"
Stair No. 1
15'-0"
Vestibule
EXP. JT. TYPE 4
9'-0"
steel & glass railing
2'-0"
7'-1" 10"
4'-4"
4 A415
Stair No. 1
1'-0"
MONITOR
ELEV MOD H*
19'-4"
15'-6"
16'-0"
5'-1"
EXP. JT. TYPE 4
19'-0"
7 Landing FFE + 11.95 Q 1
48'-0"
15'-1"
10" 6"
10" 11"
1'-0"
24
5 A713
4 A415
15'-7"
10"
59
ru 8
1 A800
2 A311
1 A321
6'-6"
6"
1'-0"
26 25
9'-1"
5'-4"
15'-0" 7
Gallery 3
6"
9'-1"
6"
59
2'-0"
6'-6"
10"
7
4'-0"
5'-1"
57
1'-0"
5'-0"
9'-6"
11'-2"
FG
15'-11"
8"
11'-6"
T1
2'-0"
FG
58
gallery floor plan
6"
14'-9" 1 A605
6"
J
J
I
L
LL
M
6'-4"
12'-9"
13'-5"
6"
10"
EXP. JT. TYPE 2
10'-0"
6"
6'-4"
Curved Wall Cladding
2'-8"
15'-3"
10"
5'-8"
12a
1'-0"
31'-1"
Stage
STAGE APRON
FFE +6.00
G 4'-0" 6"
8"
21'-9"
11'-2"
6'-10" 6"
6
13'-5" 4'-6"
6
up
6'-10" FFE +6.00
6
37
35
12'-5"
7'-11"
31'-2"
FFE +6.00
6'-4" 14'-6"
10'-0"
4'-0"
1'-0"
4'-0"
23'-6"
# A ###
Terrace
ru 6
6
I
17'-8"
1'-1"
10"
Studio / Workshop
ru 5
6
1 A424
10"
6
H
4'-0" 6"
6"
8'-4"
7'-8"
FFE +6.00 #
Important Note: The intersection of axis 38 and Theater Module centerline is the point of origin of all radii / arcs in the Theater Hall's Gnd FL & 2nd FL balcony.
Fire emergency guillotine type metal door with alarm
Seating Area
18
6" 34
6'-4"
10"
FFE +6.00
25
7a
3'-4"
11'-10"
3'-4"
11'-4"
10'-0"
Back-Stage Workshop
ru 4
12
4'-4"
BAÑO 108
17
conc. top with double industrial sink
Fire emergency guillotine type metal door with alarm
10
36
8'-4"
Baño ADA
8"
5'-8" 3'-4" Bathroom 107
17
Stair No. 3
7'-10"
30'-0"
31'-0"
Seating Area
10
3'-4" 5'-8" Bathroom 106
3'-4"
1 A830
4'-0"
8"
6'-4"
7a
7a
10'-2" ELEV 2
12'-5"
Wood flooring
14'-2"
7'-6"
4'-2" 3'-4"
31
15'-0"
6
Taller de Utilería
1'-0"
4'-4"
ru 7
31
7'-0"
2'-0"
3'-4"
9'-0"
8"
7'-6"
FFE +6.00
4'-0"
6"
Pin rail projection above
27'-0"
26'-10"
47'-2"
6"
6
9'-0"
8"
1 A820
1'-0"
19'-0"
4
10
41'-0"
Loading Dock
6
Oficina Recibo
2'-6"
1 2 3
Aprox. 334 Seats
#
7'-6" galv. steel railing (both sides) 20'-0"
30
46'-10"
15'-3"
Hall
33
5'-1" 6"
12'-10"
1'-10" 1'-8"
28
1'-0"
1 A230
9'-10"
Bathroom 108 & Workshop
1 A605
Q
5'-1"
2'-6"
Ladder with cage to grid and door lock
10
74'-8" Seating Area
P
10'-1"
Theater Back-Stage
4" 3'-2" 10"
9'-6"
29
5
7
22'-2"
Bathroom 106-107
10"
3'-4"
27
10'-0" FFE +4.80
7" 8"
16'-2"
14
2'-0"
Not-so-quick Room
4'-4"
6
4'-1"
14
Control Luces
6" 2'-2"
7'-4"
3'-11"
24
Oficina Producción
2'-8"
3'-4"
14'-10" 1'-10"ø Concrete Column
8"
5'-8"
5'-0"
8'-4"
projection above
FFE +6.46
26'-10"
Pantaflex black-out Roller Shade eq. or app. sim. to Shades & Rollers Hato Rey, PR. 787 281-6550
14
2'-6"
14
FFE +6.00
10
19'-6"
25
3'-4"
7a
7" VIP Seating Area Acoustic Wall Cladding
P
8"
1 A604
27'-0"
14
FFE +6.00
9'-0"
8"
5'-6"
Baño ADA
14
5'-1"
6"
VIP dressing rm
dressing table @29"
7'-10"
8'-10" 3'-6"
8'-4"
25
21
10"
13'-5"
6"
#
2'-0"
24
6"
8"
10" 2'-6" 5'-6"
7a
6"
Dressing Rm 2 8.13 TOW.
9'-11"
21
4'-8" 14
11'-0" st. steel railing satin finish / ss 304 (both sides) (x2)
ramp L=9'-0"
FFE +6.23
3'-4"
24
10'-0"
14
ramp L=9'-0"
2'-6"
9'-0"
10"
FFE +6.00
6'-0"
10'-0"
26
5'-6"
14'-10" 2 bumper guards molded dock bumpers spectra shield ss1213 by durable corp. or app. eq.
ru 3
32
6"
9'-0"
FFE +6.46
6"
10'-0"
27'-0"
14
7
2'-3"
3'-6"
6"
5'-1"
8.13 TOW.
6"
14
10'-0"
9'-11"
26
10'-8"
5'-6"
6" 14
6"
FFE +4.73
N
5"
3'-2"
ret. wall 46cm
8'-0"
6"
3'-4"
8'-4"
Seguridad
8"
10'-0"
3'-6" 2'-0"
5'-0"
6"
Dressing Room 1
11'-8"
10'-0"
3'-4"
7'-4"
K
3'-2"
conc. stairs: 7R@.057"= 48" 6T@11= 66"
8" 7
14'-10"
Bathroom 105
16'-3"
6'-6"
25'-11"
6"
5'-9"
7'-3"
3'-4"
1'-0"
16'-0"
10
center line
48'-0"
8'-4"
44
9'-2"
8"
8"
43
22'-10"
6'-8"
9'-10"
2 A423
41
19'-2"
35'-0"
6"
8"
10'-0"
39
12'-10"
10'-1"
6"
3'-4" 2" 6"
8"
25
6" 24" 24" 3'-0"
5'-1"
5'-1" 6" 10"
11'-0"
10'-2"
6'-0"
J
8"
center line
11
8'-0"
Wardrobe 7a
8'-4"
22
6'-4"
7'-0"
6"
EXP. JT. TYPE 2
Interior Vestibule
8"
6'-0"
6'-0"
4'-8"
EXP. JT. TYPE 2
ru 1
6"
J
14
3'-4"
Concession
10"
FFE+ 6.00 10'-8" 6 Cuarto Eléctrico
7
20
7
10'-0"
Bathroom 104
6"
15'-8" 10'-8"
8"
Oficina Producción CCCSJ
7'-2"
FFE+ 6.46
6"
Bathroom 103 & Dressing Rm 1 / Bathrm 104 & Dressing Rm 2 equal but inv.
38
16'-0"
27'-0"
3'-2"
15'-2" 6"
6" 10'-8"
Stair No. 1
10'-0"
I
ret. wall 46cm
6
FFE+ 6.46
8" 1 A603
9'-2"
7'-10"
Cuarto Mecánico FFE+ 4.60 14'-2"
ret. wall 1.86m
8'-4"
G
8"
1'-0"
14'-2"
2'-8"
23
1 A423
37
16'-0"
2'-2" 5'-6" 1'-0"
6'-4"
36
8"
2'-10"
10'-8" EXP. JT. TYPE 1
2 A422
32'-0"
1'-9"
15'-2"
5'-4"
1 A422
1 A321
34
4'-0"
10" 10" 6"
12'-4"
19
2 A421
38'-8"
3'-4" 2" 6"
6'-6"
1 A421
31
21'-2"
11'-8"
7'-8"
1 A800
29
20'-2"
15'-8"
27
15'-11"
6"
2'-0"
26
3'-6"
25
11"
5'-0"
1 A420
16'-0"
5'-8 3/8"
2 A311
24
1 A425
1 A426
7'-11"
21
4'-0" 1'-5"
10'-1"
7'-6"
5'-0"
7'-6"
4'-6"
1'-0"
3'-0"
11'-0"
8"ø Steel Column
FFE +6.00
Alum. joint
FFE +6.00
2'-11" #
Alum. joint
4'-0"
4'-0"
Ramp #
6" Block Wall
VJ
1'-0"
15'-0"
6
ELEV MOD E (mirror)
1'-0"
31'-0"
6"
15'-0"
ELEV MOD D (mirror)
1'-0"
4'-0" 6"
ELEV MOD H (mirror)
15'-0"
1'-0"
27'-0"
6"
15'-0"
4'-0" 6"
ELEV MOD A
1'-0"
ELEV MOD B
15'-0"
1'-0"
27'-0"
6"
3'-0"
4 3
7'-6"
7'-6"
5
NP-1
60'-0"
NP-1
9'-6" 14'-6"
3'-0"
4'-0"
2
3'-0"
2 A311
1 A420
25
26
27
28
Alum. joint
ELEV MOD C (mirror)
1'-0"
15'-0"
ELEV MOD B (mirror)
1'-0" 4'-0" 6"
Terrace #
4'-0" NP-1
15'-0" Alum. joint
6"
5
M
4
ELEV MOD A (mirror)
1'-0"
15'-0"
27'-0"
1'-0" 6"
4'-0" 6"
12'-6"
4
4 3
4'-0"
5
5
NP-1
7'-6"
6
6
28'-0"
planting area
6"
58'-0" 9'-6"
V-Joint
NP-1
3
2
2
1
1
conc. bench @ 16"
6"
sidewalk
5'-0" V-Joint
#
french drain with gravel surface
1
DREN-1 french drain below
9'-0" SL-3 solar luminaire
24
28'-0"
15'-0"
6" 9'-6" st. steel railing satin finish / ss 304 both sides (typ.) 5'-0"
3
ELEV MOD D (mirror)
1'-0"
2'-0"
2'-6"
8 A110
Typical Alcorque & Step Detail
4
15'-0"
4'-0"
NP-1
3'-6"
1
5
ELEV MOD E (mirror)
1'-0"
6
2
6
15'-0"
2'-0" 2'-6"
15'-0"
2'-0"
1'-0"
9'-6"
15'-0"
6'-6"
1'-0"
2'-0"
15'-0"
ELEV MOD B
8'-6"
10" 6" 10"
ELEV MOD L (mirror)
9'-6"
14'-8"
ELEV MOD M
9'-6"
1'-0"
ELEV MOD L
9'-6"
ELEV MOD F2
L
1 427
4'-0"
VJ
8"ø
4'-8" 1'-0"
R
39
4'-6" 1'-0"
16'-0"
S
4'-0"
7" 5"
1'-0"
7"
10'-1"
9'-11"
3'-0"
2 A320
Collonade / Arcade
Alum. joint
S
39
11'-0"
4'-8" 1'-0"
FFE +6.00
2'-3 1/8"
R
2'-6"
4'-8" 8"
18'-2 7/8"
6"
4'-8" 8"
#
TOW +6.91
6'-4"
12'-0"
3'-0"
# A###
1'-2"
9'-11"
4"
12a
1'-2"
36'-6" 20'-0" st. steel railing satin finish / ss 304 (both sides) ramp L=18'-0"
11'-7"
2'-6"
FFE +6.46
4'-0"
Stage wood steps, see detail
5
10
5"
10 38
EXP. JT. TYPE 1
11'-6"
10
21
1'-2"
6'-0"
3 4
Acoustic Wall Cladding 7
6'-0"
2'-0" 7
1'-6"
3'-6"
10'-2" 10"
1'-9" 6"
2'-4" 6"
H
6'-4"
12
1 2
8"
8'-10"
ru 2
3'-2"
Box Office
30
32
1 A421
2 A421
33
7 L200
SL-3 solar luminaire
34
SL-3 solar luminaire
1 A320
35
1 A422
2 A422
36
SL-3 solar luminaire
37
1 A423
38
grass lawn
SL-3 solar luminaire
40
41
SL-3 solar luminaire
2 A423
42
44
theater floor plan
31
F
G
H
I
1 A410
J
2 A410
K
L
M
N
1 A411
O
1 A311
P
Q
2 A411
R
S
1 A412
T
2 A312
U
V
246'-3" 16'-3"
16'-3"
5'-9"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
26
2 A 222
ACP
Drip Detail # A ###
3"
spkr
+14'-0"
3"
26
CEILING PANELS
spkr
EXP. JT. TYPE 4
ACOUSTIC
EXP. JT. TYPE 4
15'-11"
EXP. JT. TYPE 1
8"
6"
11"
25
4'-0"
G.W.B. +17'-6"
8'-6"
7'-6"
17'-0"
6"
spkr
spkr
spkr
spkr
8'-0"
spkr
G.W.B. spkr
spkr
spkr
16'-6"
spkr
L13
L13
spkr
L13
5'-4"
L13
spkr
L13
L13
5'-4"
L13
L13
5'-4"
L13
L13
L13
L13
L13
5'-4"
spkr
spkr
L13
spkr
L13
L13
L13
L13
spkr
L13
L13 spkr
L13
L13
L13
L13
L13
L13
L13
spkr
L13
L13
L13
L13
L13
L13
L13
L13
L13 Concrete
spkr
L13
spkr
L13
L13
spkr
L13
spkr
spkr
3'-2"
spkr
L13
L13 spkr
12'-6"
L13
spkr
L13
G.W.B. spkr
8'-0"
spkr
spkr
spkr
spkr
spkr
G.W.B. 17'-0"
19'-6"
spkr
6"
spkr
L13
1 A413
G.W.B. +11'-6"
E.Q.
spkr
L13
19'-4"
L13
8'-0"
spkr
16'-0"
spkr
1 A312
spkr
G.W.B. 4'-6" 6"
spkr
5'-10"
G.W.B.
G.W.B. spkr
L10 2 A311
1'-8"
# A ###
3'-2"
spkr
L10
E.Q. 6" spkr
spkr
spkr
spkr
G.W.B. 8'-0"
spkr
spkr
spkr
G.W.B. 16'-6"
spkr
spkr spkr
E.Q. E.Q.
1'-0"
spkr
L10
3'-6"
9'-0"
2 A 720
L10 A/C Return
5'-10"
6'-0"
spkr
L10
19'-6"
8'-0"
1'-0" EQ
+8'-0"
L10
Concrete
# A ###
+16'-0"
L13
6'-8"
+41'-0"
spkr EQ
L10
spkr
ACP
4'-4" 1'-0"
EQ
6'-4"
EQ EQ
3'-3"
A.C.T. +12'-0"
4'-2"
7'-9"
5'-6"
spkr
EQ
8"
12'-0"
16'-0"
spkr
+9'-6"
# A ###
5'-0"
+41'-0"
Elev.
A.C.T.
8'-0"
G.W.B. spkr
5'-0"
13'-8" +43'-6" 8'-6"
6"
+9'-6"
8'-0" spkr
1'-8"
5'-0"
+41'-0"
19'-4"
1'-2" 6"
G.W.B
8'-0"
5'-0"
1'-0"
8'-0" spkr
4'-4"
9'-0"
Elev.
Janitor
8'-0"
+9'-6"
8'-0"
1'-0"
3'-3"
spkr
6'-0"
A.C.T.
1 A413
8'-0" spkr
4'-0" EQ
5'-6"
spkr
spkr
7'-9"
EQ
8" 16'-0"
12'-0"
spkr
8'-8"
2'-0"
A.C.T. +12'-0"
spkr
8'-0"
2'-0"
6'-6"
spkr
+15'-0"
64'-0"
8'-0"
spkr
1'-3"
24
1 A321
8'-0"
19'-6"
2 A311
23
6'-6"
8'-0"
16'-0"
Concrete
2'-0"
22 2 A310
19'-6"
L10
L10
L10
L10
L10
2 A310
A/C Return
Concrete
L10
19'-6"
L10
L10
L10
L10
L10
L10
3"
16'-0"
Concrete
L10
21
Drip Detail 1 A410
32
2 A410
1 A411
1 A310
2 A411
2 A 222
1 A412
2 A312
gallery reflected ceiling plan
2 A 311
24
1 A 420
25
26
27
29
1 A 421
31
2 A 421
1 A 422
1 A 321
34
2 A 422
36
1 A 423
37
38
39
41
2 A 423
43
44
240'-10" 16'-0"
11"
15'-11"
20'-2"
21'-2"
38'-8"
32'-0"
16'-0"
16'-0"
12'-10"
19'-2"
22'-10"
9'-2"
8'-4" EXP. JT. TYPE 1
spkr G.W.B.
G.W.B.
G.W.B.
+8'-6"
+8'-6"
+8'-6"
+8'-6" 2'-0"
spkr
A.C.T.
spkr
spkr
EXP. JT. TYPE 4
spkr
spkr
spkr
G.W.B.
spkr
+8'-6"
spkr
A.C.T.
A.C.T.
+9'-0"
+9'-0"
+9'-0"
spkr
G.W.B.
spkr
spkr
+8'-6"
+11'-4"
spkr spkr
A.C.T.
G.W.B.
2'-2"
A.C.T. +9'-0"
H
spkr G.W.B.
spkr
+8'-6"
spkr
+8'-6"
EXP. JT. TYPE 2
spkr
Pin Rail
spkr
spkr
spkr
10'-0"
spkr
spkr
12'-0"
10'-0"
spkr
spkr
spkr
spkr
spkr
spkr
10'-0"
A/C Duct (See Mechanical DWG)
6'-0"
spkr
1 A 323
spkr
3'-9"
spkr
Drip Detail CONCRETE
Open To
+26'-0"
Above spkr
spkr
spkr
1 A 425
spkr
8'-0"
8'-0"
+26'-0"
1 A 426
5'-5"
EXP. JT. TYPE 2
spkr
2 A 222
CONCRETE
8'-0"
6'-0"
8'-0"
6'-0"
8'-0"
3'-9"
30'-0"
EXP. JT. TYPE 3
spkr
I
spkr
86'-0"
10'-0"
spkr
8'-0"
8'-0"
spkr
spkr
8'-0"
5'-5"
6'-0" A/C Duct (See Mechanical DWG)
+18'-0"
spkr
8'-0"
8'-0"
spkr EXP. JT. TYPE 2
G.W.B.
spkr
1'-0"
spkr
8'-0"
8'-0"
2 A 222 spkr
+21'-0"
1 A 424
Drip Detail
spkr
G.W.B
G Stairs
+8'-6"
spkr
spkr
G.W.B.
spkr
4'-8"
48'-0"
6'-6"
spkr
spkr
A.C.T. +9'-0" spkr
spkr
+9'-0"
2'-2" 2'-6"
5'-1"
spkr
+9'-0"
6'-6"
spkr 4'-0"
2'-6"
2'-6"
spkr
A.C.T. 6'-6"
spkr 6'-2" 2'-0" CONCRETE.
16'-3"
G.W.B.
+8'-6"
5'-9"
G.W.B.
E.Q. E.Q.
+8'-6"
2'-6"
3'-8"
G.W.B.
10'-8"
E.Q.E.Q.
spkr
spkr
spkr
spkr
spkr
EXP. JT. TYPE 1
spkr
spkr
spkr
spkr
spkr
9'-0"
spkr
7'-1"
spkr
8"ø
8"ø
L10
L10
L
16'-0"
Fire Protection System (See Mechanical Plans)
L10
L10
L10
L10
L10
L10
L10
L10
L10
L10
L10
L10
L10
L10
1 A 427
8"ø
M
16'-0"
11"
15'-11"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
16'-0"
Drip Detail
24
2 A 311
1 A 420
25
26
2 A 222
27
28
30
32
1 A 421
2 A 421
33
34
1 A 320
35
1 A 422
2 A 422
36
37
1 A 423
38
40
41
2 A 423
42
44
theater reflected ceiling plan
33
11"
7'-2"
2nd Floor
a/c di ffuser
2'-0"
Mezz Floor
Mezz Floor
interior down light exhibition wall panels
2"
12'-0"
12'-0"
6.46 F.F.E.
steel & glass railing
Ground Floor 9'-8"
Theater Hall
MATCHLINE
Interior Vestibule
10.19 F.F.E.
4'-8" 1/2" gypsum board ceiling w/ galv. structure
2 A 415
CL
2nd Floor
11" interior down light
O1
2'-0"
10.12 F.F.E.
Countertop
Covered Vestibule
Patio
13.78 F.F.E.
2'-0" 6" 13.78 F.F.E.
2'-0"
19'-6"
2"
19'-6" 52'-0"
52'-0"
18'-0"
7'-6"
24'-0"
10'-0"
6.46 F.F.E.
EXP. J.T. Type 5
concrete roof floor slab
1/2" gypsum board ceiling w/ galv. structure
Rollup
ru1
11
1'-6"
Ground Floor
2 A 415
10'-6"
12'-0"
23'-1"
U steel & glass railing
19.71 F.C.E.
12'-0"
metal lath and plaster ceiling w/ galv. structure
Roof
1 A 701
6'-0"
4'-8"
4'-6"
1'-0"
43'-6"
plaster & paint finish
19.71 F.C.E.
exposed concrete
4 A 700
12'-6"
12'-0" 14'-0"
ru8
EXP. JT. type 4
3 steel & glass A 415 railing
13.78 F.F.E.
plaster & paint finish
Roof
2'-0" 19'-4"
19'-6"
19'-5"
2 A 415
exhibition wall
Gallery 3 2nd Floor
19.71 F.C.E.
1/2" gypsum board ceiling w/ galv. structure
O1
3 A 415
Upper Roof
Upper Roof
2 ply modi fied bitumen membrane system
8'-6"
9'-6"
11'-0" 2'-0"
steel & glass railing
19'-6"
Module Type C
(metal lath and plaster w/ galv. structure)
22.30 F.R.E.
19'-6"
19.72 F.C.E.
EXP. JT. type 5
1'-0"
Roof
4'-6"
4'-6"
2ply modi fied bitumen membrane system
22.30 F.R.E.
2'-7"
16'-0"
4 A 700
19'-6"
32'-0"
1 A 701
2ply modi fied bitumen membrane system
13'-3"
WS2 A 414
26 11"
12'-0"
16'-0"
25 16'-0"
14'-0"
WS1 A 414
24
26
4'-6"
1 A 721
25
17'-6"
skylights
24
4'-6"
23
2"
22
MATCHLINE
21
ru8
flooring & base as indicated 2"
13.78 F.F.E.
Gallery 3
18
16'-0"
15'-5"
7'-2"
4'-0"
12'-0"
3'-6"
1'-0" 44'-6"
1'-0"
2"
2 A 415
2'-0" 21'-6"
Rollup
18'-0"
24'-0"
2"
steel & glass railing 13.78 F.F.E.
steel & glass railing
2'-0"
19'-6"
19'-5"
3 A 415 1'-0"
41'-6"
10.19 F.F.E.
(metal lath and plaster w/ galv. structure)
plaster & paint finish
3 A 415
54
EXP. JT. type 4
interior down light
2'-0"
2'-0" 19'-6" 14'-0" 12'-0"
P1
O1
ru8
4'-6"
51'-3"
13.78 F.F.E.
exhibition wall panels
U
Roof
stair no. 1
2nd Floor
ru1
metal lath and plaster ceiling w/ galv. structure
U
19'-6"
11 Countertop
24'-0"
23'-1"
24'-0"
V Rollup
9'-8"
10'-0"
1/2" gypsum board ceiling w/ galv. structure
12'-0"
9'-0" 11'-0"
9'-6" 7'-6"
4'-6"
13'-0"
19.71 F.C.E.
10"
a/c duct
1'-0"
Module Type C
1/2" gypsum board ceiling w/ galv. structure
5" 5" 6"
1/2" gypsum board ceiling w/ galv. structure a/c di ffuser
2ply modi fied bitumen membrane system
19.72 F.C.E.
interior down light
exposed concrete
16'-0"
skylights
22.01 F.R.E.
4 acustic ceiling
2nd Floor
16'-0"
16
4'-0"
1 A 721
17
6'-0"
21
16'-0"
19
2'-0"
20
4'-6"
22
32'-0"
EXP. JT. type 5 Roof
23
16'-0"
2ply modi fied bitumen membrane system
Upper Roof
24
2"
25
MATCHLINE
26
MATCHLINE
2'-6"
conc. floor slab
ru2
34
Interior Vestibule
11
Covered Vestibule
Ground Floor 6.46 F.F.E.
Patio
CL
ELEV MOD (K) mod.
ELEV MOD (J) mirror
ELEV MOD (K) mirror
ELEV MOD (J)
gallery section
flooring & base as indicated
2"
12
6.46 F.F.E.
Theater Hall
MATCHLINE
Ground Floor
MATCHLINE
Countertop
6.46 F.F.E.
Covered Vestibule
Interior Vestibule
vapor barrier 6mil
6.46 F.F.E.
Ground Floor
Theater Hall
gallery wall section
24
25
26
5'-6"
Roof hatch access door
11"
5'-6"
6 A700
16'-0" 4 A 700
Flashing
2'-0"
6"
2'-6"
2 ply modi fied bitumen membrane system 1 A 701
4'-6"
1'-0"
2'-6"
1 A 702
19.71 F.C.E.
5'-10"
Galvanized steel floor & structure
1'-0"
2'-0"
1'-0" concrete roof floor slab Roof
19.71 F.C.E.
Gridiron
Roof
±23.272m F.F.E.
drip gutter
a/c duct
galv. steel structure w/ metal lath and plaster & paint
1'-0"
3'-6"
Flashing
1'-0"
gallery track lighting
5'-10"
acoustic ceiling panels Roof exp. joint cover
19'-5"
1/2" gypsum board ceiling
exhibition wall panel
5°
14'-0"
16'-0"
Catwalk see detail
5°
54
5'-1"
22
21
20
19
17
16
15
14
13
12
11
10
9
3'-0"
1"
68'-0" Fire emergency guillotine type metal door with alarm
Acoustic Wall Panels AWP
AWP
8
7
6
Access Opening 5
4
2
ru 4
1 11° 22'-0"
18'-0"
2 A234
16'-0" 11'-8"
9'-0"
TOW
3'-0"
6"
±6.00m F.F.E.
Vapor Barrier 6MIL Vapor Barrier 6MIL
1 A234
28
12 Stage flooring
12a \
concrete steps ±5.24m F.F.E.
1'-6" 6.46 F.F.E.
Stage
2'-0"
3 '- 0 "
Ladder with cage to grid and door lock
8'-0"
21
8'-0"
Wall Cladding
10'-0"
12'-0"
Acoustic ceiling panels
±6.46m F.F.E.
Ground Floor
Galvanized floor & railing anchor to concrete wal l
Pin rail 3
16'-6"
2'-0"
21'-10"
arcade concrete column plaster & paint finish
ru 1
exterior angle down light
Stainless steel 304 Handrail
18
6'-0"
10"
Sound system
concrete beamAcoustic Wall Panels
1'-0"
2"
23
GWB
19'-6"
Countertop
1'-0" AWP
2nd Floor
metal lath and plaster wall 24
metal lath and plaster ceiling w/ galv. structure
Rollup
1" Acoustic Wall Panels
AWP
13.78 F.F.E.
drip gutter
4'-1"
Acoustic Wall Panels
exterior down light
8" galv. steel column
1'-0"
1"
2'-2"
4 1/2"
3'-0" 9 '- 0 "
2'-0" 2'-6"
2 '- 0 "
±13.77m F.F.E.
5" 2"
2"
1'-0"
4'-6"
k2
60
Fl. exp. joint
Wall Cladding
Control Room 9 '- 0 "
14'-0"
12'-0"
13.78 Gallery F.F.E. conc. floor slab
9'-8"
ru 8
Acoustic ceiling panels ACP
floor drain
10°
2"
2'-2"
flooring & base as indicated
11 A 415
56'-8"
3'-0"
2nd Floor
8'-0"
6"
6.46 F.F.E.
Vapor Barrier 6MIL
Ground Floor
Covered Terrrace
theater interior elevation
35
2 A 601
4 A 601
2'-2"
5'-4"
D
G
E A1 C1
ADA F
B
5'-0"
2 A 602
3'-0"
P-1
P-1
D
D
3'-0"
2x2 Acoustic Tile
3'-0"
1'-3"
Cem. Plaster & Paint
3 A 602
Ba単o 102 202 302 B
3'-0"
A1 B
B
5'-6"
P-3 H
P-3
P-4
4'-0"
Diaper Changer
P-3
2'-10"
ID
P-3
9"
7
Janitor
4'-2"
P-1 D
3'-4"
3'-6"
P-1 D
3'-4"
5'-6" I
P-1A
A
5'-0"
2'-11"
13'-0"
3'-0"
13'-0"
3'-3" 3'-0" 3'-0"
8"
P-2
Chase
D
H
C-2
6'-2"
3'-4"
I
G.W.B. Ceiling
3'-0"
3'-0" 2'-0"
P-2
P-1
13'-11" 3'-4"
P-3
D
7
F.F.E. 6.00
C-2
P-1
Ba単o 101 201 301
C1
1' x 2' Integral Ceramic Tile to be Selected by Architect
B
P-2
D
C1
C1
2'-0"
3'-0"
3'-6"
1'-0"
3'-0"
P-1
C1
C1
P-3
D
C1
H
B
P-4
3'-0"
B P-3
3 A 602
P-1 C1
3'-0"
3'-0"
D P-1
C1
P-4
C1
F
A P-3
D
3'-0"
13'-0"
13'-0"
B P-3
G E
2'-9"
A P-3
C1
P-3
1'-5"
F
Cem. Plaster & Paint
1'-8"
P-1A
ADA
B
1'-8"
5'-4"
1'-6"
5'-0"
C1
6"
1'-6"
D P-1A
P-3
3'-0"
3'-6" 5'-0"
7'-0"
G
A1
2 A 602
12'-0" 1'-0"
1'-6"
E 3'-6"
1'-0"
5'-0"
3'-0"
3'-6"
G.W.B. Ceiling
2'-0"
6" 5'-4"
3'-0"
12'-0" 7'-0" 1'-8"
2x2 Acoustic Tile
1 A 602
5'-0"
3 A 601
6"
F.F.E. 6.00
ID
1' x 2' Integral Ceramic Tile to be Selected by Architect
6'-5"
ID
G.W.B. Ceiling
2x2 Acoustic Tile
Elev 1 1 840 3'-4"
3'-2"
8"
15'-8"
Cem. Plaster & Paint 8"
3'-2"
3'-4"
Corridor C1
C1 C2
C2
ID
G E
P2
P-1
D
1'-6"
1'-0"
1'-5"
3'-0"
P2
4'-0"
F P2
1'-6"
7
Window in Mezz Floor
P-1A
D
3'-3"
Door @ Gnd Floor & 2nd Floors
F.F.E. 6.00
1' x 2' Integral Ceramic Tile to be Selected by Architect
3 A 601
36
2 A 601
4 A 601
1 A 602
gallery bathrooms
5 A 603
6 A 603
7 A 603
8 A 603
8'-4" 6'-0"
2'-4"
D 5'-0"
2 A 603
B P-3
P-1
3'-0"
10'-0"
6"
10'-0"
1'-2"
A1 A
2 A 603
P-4
3 A 603
ID
H
2'-4"
2'-8"
2'-2"
3'-2"
3 A 603
3'-0" High
6"
Full Mirror
@ 29"
Baño de Mujeres
6"
Band
6"
3'-6"
5'-6"
9a
2 A 603
H
F.F.E. 6.00
Full Mirror shown on
Backsplash
2 A 603
Backsplash
6"
P-3 P-4
1'-8"
3'-0"
ID
B
2'-6"
3'-6"
Dressing Room FFE +6.00
3'-6"
P-3
6"
2'-10"
5'-6"
2'-6"
Band
Full Mirror shown on
1'-0"
2'-5"
4 A 603
1" Ø Clothes 3'-5" Hanging Rod
B
3'-4"
3'-5"
7'-0"
2'-6"
Tow
9"
#
Tow
Cem. Plaster & Paint
1" Ø Hanging Rod
A-1
7
P-4
2'-8"
3'-0" 3'-0"
10'-2"
A
B
P-3
3'-0"
FG
3/4" Lam. Plas. Playwood Shelf
Cem. Plaster & Paint
Table Support
Table Support
CLOSET
1' x 2' Integral Ceramic Tile to be Selected by Architect
2x2 Acoustic Tile
2x2 Acoustic Tile
FG
10'-6"
B
Full Mirror 1'-2"
3'-0"
Splash
P-3
A-1
A-1
P-7
B P-3
P-3
B
B
P-3
P-3
P-4 P-4
1'-6"
1'-5"
Table Support
1'-0"
Table Support
1' x 2' Integral Ceramic Tile to be Selected by Architect
2'-10"
1'-0"
2'-5"
3'-2"
P-4 P-1
12'-10"
A
A A1
6"
D
4"
Full Mirror
7'-0"
P-3
6'-5"
7'-0"
3'-0"
B
P-7
OPEN
A
10'-6"
6" A1
G.W.B. Ceiling
7'-0"
12'-10"
12'-10"
Cem. Plaster & Paint A
G.W.B. Ceiling
3'-0"
Cem. Plaster & Paint 3'-0"
FG
7'-0"
FG
6"
FG
3'-0"
2'-0"
FG
2'-10"
6"
G.W.B. Ceiling
Cem. Plaster & Paint
F.F.E. 6.00
6"
6"
2'-10"
3'-7"
G.W.B. Ceiling
FG
7'-0" High Wall
A1
2'-1"
Cem. Plaster & Paint
4'-0"
P-3
P-1
F.F.E. 6.00
F.F.E. 6.00
1' x 2' Integral Ceramic Tile to be Selected by Architect
1' x 2' Integral Ceramic Tile to be Selected by Architect
3'-7" OPEN
Full Mirror Dressing
Table
ID
6"
6"
Backsplash
2'-5"
3'-5"
3'-4"
Table Support
6" 7"
Table
Backsplash
H
10'-6"
12'-10"
6" 3'-0"
Dressing
Band 10'-0"
10'-6"
Low Wall @ 3'-5" Plaster & Paint
ID
Backsplash
4"
2'-6" 1'-0" 3'-5" Table Support
2'-5"
3'-5" Table Support
Low Wall @ 3'-5" Plaster & Paint
Full Mirror
3'-0"
3'-0" 7'-0"
Dressing Table @ 29"
6" 2'-5"
F.F.E. 6.00
Band Full Mirror
Cem. Plaster & Paint 2x2 Acoustic Tile
Cem. Plaster & Paint
OPEN 6"
12'-10"
OPEN
Low Wall @ 3'-5" Plaster & Paint
G.W.B. Ceiling
Cem. Plaster & Paint
Full Mirror
Backsplash
OPEN
G.W.B. Ceiling
Cem. Plaster & Paint
7'-0"
2x2 Acoustic Tile
G.W.B. Ceiling
Cem. Plaster & Paint
Table Support
1'-0" F.F.E. 6.00
2'-5"
6"
6"
2'-4"
1' x 2' Integral Ceramic Tile to be Selected by Architect
2x2 Acoustic Tile
10'-0"
4 A 603
Dressing Table
3'-0"
3'-4"
1'-0"
2'-1"
10" H
3'-7"
4'-2"
7'-8"
2x2 Acoustic Tile A A1
F.F.E. 6.00
1' x 2' Integral Ceramic Tile to be Selected by Architect
theater Dressing Rooms & Bathrooms
37
to be Selected by Architect
15'-4"
See A201 4
ACRYLIC 5 A 721 SKYLIGHT
2
ACRYLIC 4 A 721 SKYLIGHT
3'-2 5/8"
6"
1'-6"
6"
BATHROOM EQUIPMENT
1'-0"
1'-0"
6"
2'-5 3/4"
6 3/4"
1'-0"
MKD
6"
2'-5 3/4"
1'-6"
ALUM "Y" FIXED LOUVER WINDOW
6 3/4"
7'-5 1/2"
6
6
1'-0"
CONCRETE BEAM
K-4670-C
P1A
TOILET ADA
KOHLER
K-4405
P1A
1'-0"
6"
2'-6"
KOHLER
K-4670-C
WHITE
TOILET FLUSHSOMETER
MOEN
8310DF16
POLISHED CHROME BATTERY POWERED EXPOSED STYLE POWERED FLUSH VALVE, 1.00 GPF
URINAL
KOHLER
K-5244-ET
WHITE
P2
URINAL FLUSHSOMETER
MOEN
8316
POLISHED CHROME BATTERY POWERED EXPOSED STYLE POWERED FLUSH VALVE, 0.125 GPF
P3
LAVATORY
P3
LAVATORY FAUCET
KOHLER
P4
LAVATORY COUNTER
PALAZZO
2'-0"
MKD
9'-6" CONCRETE PYRADIAN BASE FOR SKYLIGHT (PLASTER & PAINTED)
4'-6"
4'-6"
LUMINARY
2'-0"
2'-0"
21'-4"
8" Concrete Block Wall
6"
2'-6"
1'-0" 4'-5 5/8"
5 7/8"
OYSTER BLACK
GLASS
SEE NOTE A201 3/16" STRUCTURAL ALUM. FLASHING 3/8" EXP. BOLT @ 18" O.C.
CONCRETE
DESCRIPTION
MANUF. MODEL PYRAMID BASE FOR SKYLIGHT
(PLASTER & PAINTED)
FINISH
REMARKS
GLASS
AV. MTG. HT.
MIRROR
BOBRICK
B-165 1830
SS POLISHED
CHANNEL FRAME MIRROR
A1
MIRROR ADA
BOBRICK
B-293 1830
SS POLISHED
FIXED POSITION TILT MIRROR
B
SOAP DISPENSER
VOLA
T-10
BRIGHT POLISHED SURFACE MOUNTED
BARRIER FREE: 47 3/4" TO TOP
C1
TOILET PARTITION
BOBRICK
1030 DESIGNER SERIES
COLOR D14 PORT FLOOR BRACED
SEE NOTE A201 FLASHING
C2
URINAL PARTITION
BOBRICK
1030 DESIGNER SERIES
COLOR D14 PORT WALL-HUNG
SEE NOTE A201 -
D
TOILET TISSUE DISPENSER BOBRICK
B-2888
SS SATIN
SURFACE MOUNTED MULTI ROLL 28"; BARRIER FREE: 28" TO TOP OF UNIT
28"; BARRIER FREE: 28" TO TOP OF UNIT
E
GRAB BAR
BOBRICK
B-6806X42
SS SATIN
1 1/2" DIA.
F
GRAB BAR
BOBRICK
B-6806X36
SS SATIN
G
GRAB BAR
BOBRICK
B-6806X18
SS SATIN
1 1/2" DIA.
H
WARM AIR HAND DRYER
BOBRICK
B-7128
SS SATIN
SURFACE MOUNTED
L
MOP & BROM HOLDER
BOBRICK
B-223 X 24
SS SATIN
3 MOP HOLDER
CONCRETE PYRADIAN BASE FOR SKYLIGHT (PLASTER & PAINTED)
13'-8"
21'-4"
1'-0"
POLISHED CHROME STATIONARY SPOUT, VANDAL RESISTANT AERATOR.
ZZ0188
3/16" STRUCTURAL ALUM.
Hanger Nonius
1 1/2" DIA.
-
GLASS
CONCRETE PYRAMID BASE FOR SKYLIGHT (PLASTER & PAINTED)
-
3/16" STRUCTURAL ALUM. FLASHING
3/8" EXP. BOLT @ 18" O.C.
3/8" EXP. BOLT @ 18" O.C. CONCRETE PYRAMID BASE FOR SKYLIGHT (PLASTER & PAINTED)
SKYLIGHT B 4'-6"
Turning Clips
2 PLY SBS MEMBRANE 4'-5 5/8" WATER PROOFING Topakustik
5 7/8"
1'-6 1/8"
3/16" STRUCTURAL ALUM. FLASHING CONCRETE BEAM
9'-6"
6" ALUM. "Y" ACRYLIC 5 FIXED LOUVER SKYLIGHT B A 721 WINDOW
ACRYLIC 3 SKYLIGHT A A 721
8'-6"
6"
6"
LUMINARY
2 PLY SBS MEMBRANE WATER PROOFING
2'-0"
1'-0"
5'-0" 8'-0"
7'-0"
1'-6"
Connector in Length
H bar
3/8" EXP. BOLT @ 18" O.C. 3/16" STRUCTURAL ALUM. FLASHING
4'-6"
GLASS
2'-0"
2'-0"
1'-0"
3/8" EXP. BOLT @ 18" O.C.
SKYLIGHT B
9'-0"
1'-0"
LUMINARY
5'-0"
15'-0"
Metal Stud Hanging to Ceiling
Metal Stud Framing Fry Reglet W Molding
2 PLY SBS MEMBRANE WATER PROOFING
3/16" STRUCTURAL ALUM. FLASHING
3/16" STRUCTURAL ALUM. FLASHING
Metal Stud Hanging to Ceiling 3/8" EXP. BOLT
4'-6"
1/2"
GLASS@ 18" O.C.
3/8" EXP. BOLT @ 18" O.C.
Erco 2 Circuit Flanged Track
2'-0"
5'-0"
CONCRETE BEAM
Tape & Joint Compound
G.W.B. Ceiling SKYLIGHT A
Metal Stud Framing
1'-6"
9'-0"
6"
6"
1'-0"
2'-6"
5'-0" G.W.B. Ceiling
Fry Reglet Corner Trim
15'-0" Tape &
Joint Compound
B
CONCRETE PYRAMID BASE FOR SKYLIGHT (PLASTER & PAINTED)
G.W.B. Ceiling Hanger Nonius
A
Metal Stud Framing
1 5/16"
2'-0"
1 3/8"
A Tape & 7'-0" Joint Compound
G.W.B. Ceiling Concrete Wall
6"
2'-0"
2 1/2"
CONCRETE PYRADIAN BASE FOR SKYLIGHT (PLASTER & PAINTED)
9'-6"
2'-0"
2 3/32"
Tape & Joint Compound
8" Concrete Block Wall
6"
6"
1/2"
ALUM. "Y" FIXED LOUVER2'-6" 6" WINDOW
Metal Stud 1'-6" 6" Hanging to Ceiling
8'-6"
2 PLY SBS MEMBRANE WATER PROOFING
7'-0"
2'-0"
6"
1 3/8"
5'-0"
7'-0"
1 5/16"
1'-6"
Metal Stud Framing
8'-0"
CONCRETE PYRAMID BASE FOR SKYLIGHT (PLASTER & PAINTED)
4'-6"
SKYLIGHT A
8" Concrete Block Wall
Fry Reglet W Molding
CONCRETE PYRADIAN BASE FOR SKYLIGHT (PLASTER & PAINTED)
H bar
B
2 3/32"
Fry Reglet Corner Trim
Tape & Joint Compound
Erco 2 Circuit Flanged Track
C
Turning Clips Connector in Length
Tape & Joint Compound
Fry Reglet W Molding
D
3/16" STRUCTURAL ALUM. FLASHING
Topakustik
Tape & Joint Compound
3/8" EXP. BOLT @ 18" O.C.
B1
Gallery Gypsum Board and Tupakustik Ceiling Details
8" Concrete Block Wall Metal Stud Framing
1 5/16"
Metal Stud Hanging to Ceiling
Fry Reglet W Molding 1 3/8"
38
3/8" EXP. BOLT @ 18" O.C.
-
G.W.B. Ceiling
A
3/16" STRUCTURAL ALUM. FLASHING
3/8" EXP. BOLT - 18" O.C. @
3/16" STRUCTURAL ALUM. FLASHING
10'-8" 5 ACRYLIC SKYLIGHT B A 721
ACRYLIC 3 SKYLIGHT A A 721
Metal Stud Hanging Ceiling6" 1'-6 to 1/8"
Tape & Joint Compound
B
3/16" STRUCTURAL ALUM. FLASHING
CONCRETE PYRAMID BASE FOR SKYLIGHT K-T11840 (PLASTER & PAINTED)
1'-0"
6"
6'-8"
1/2"
STANDARD HYBRID HIGH EFFICIENCY URINAL, FLUSHING RIM. TOP SPUD, UNIVERSAL MOUNTING BRACKET.
A
Metal Stud Framing
1'-6"
COMMERCIAL SOLID POLYPROPYLENE PLASTIC SEAT, OPEN FRONT, WITH CHECK HINGE, STAINLESS STEEL MOUNTING BOLTS.
TOILET SEAT
P2
6'-6"
2 PLY SBS MEMBRANE WATER PROOFING
13'-8"
F.F.E. 6.46
4'-8"
MILLENNIUM FLOWISE ELONGAED BOWL TOILET, FLUSHOMETER, 1.28 GPF
BATHROOM ACCESSORIES
10'-8"
4'-0"
1'-0"
LUMINARY
Fry Reglet W Molding
COMMERCIAL SOLID POLYPROPYLENE PLASTIC SEAT, OPEN FRONT, WITH CHECK HINGE, STAINLESS STEEL MOUNTING BOLTS.
CONCRETE P1 BEAM
8'-6"
6"
GLASS
MILLENNIUM FLOWISE ELONGAED BOWL TOILET, FLUSHOMETER, 1.28 GPF
WHITE
CONCRETE BEAM
1'-6" 1'-6"
6'-8"
Skylight Details
REMARKS
WHITE 3/8" EXP. BOLT @ 18" O.C. WHITE
4'-6"
4'-6"
1'-6"
4'-8"
K-4405
KOHLER
FINISH
3/8" EXP. BOLT @ 18" O.C.
ALUM "Y" FIXED LOUVER WINDOW
LUMINARY
2'-0"
8'-0"
11'-0"
10'-0"
2 PLY SBS MEMBRANE WATER PROOFING
CONCRETE BEAM ALUM "Y" FIXED LOUVER WINDOW
KOHLER
TOILET SEAT
4'-0"
LUMINARY
2 PLY SBS MEMBRANE WATER PROOFING
TOILET
CONCRETE BEAM
6
MODEL
P1
9'-6"
1'-0"
2 PLY SBS MEMBRANE WATER PROOFING
ALUM "Y" FIXED LOUVER WINDOW
6"
MANUF.
P1
6'-6"
1'-6"
1'-0"
6"
8'-0" 10'-0"
11'-0"
1'-0"
3'-2 5/8"
1'-6"
CONCRETE BEAM
ACRYLIC 4 A 721 SKYLIGHT
DESCRIPTION
8'-6"
ACRYLIC 5 A 721 SKYLIGHT
3/16" STRUCTURAL ALUM. FLASHING
7'-5 1/2"
1/2"
2 3/32"
to be Selected by Architect See A201 Patio Galería
3a
ID 12'-0" 1'-0"1'-0"
3'-8"
6'-8"
3'-4"
Galería
Exposed Concrete
2'-0"
ID 8" 1'-0"
1'-0"
4'-0"
7'-4"
22'-0" 1'-0"
3'-8"
2'-8"
6'-8"
RBN Bubbler Nozzles
1'-0" 6"
1'-4"
Patio
2'-0" 3"
1'-6"
3"
Cement Plaster
Cement Plaster 7'-5"
ID
10'-0"
12'-0"
3/4"
10'-0"
3"
6'-8"
1'-1 1/4"
-
3"
Concrete Beam
8"
8"
3/4" Negro Absoluto Granite
2'-0"
3'-4" 3'-4"
4"
8"
6'-8"
1'-8"
4"
2'-8"
4
2'-4"
18'-8"
2
2"
9" 4"
2
6'-8"
4"
Doors
6"
VARIES
2"
3a
3b
3b
3a Reflecting Pool
3/4" Quarte Custom Lavatory Cement Plaster Floor drainage Argamasa Finish Floor
2'-0" 3"
1"
1'-4"
1"
3"
F.D.
3/4"
1'-0" Water Level
3"
1"
8"
6"
1"
# A ###
# A ###
8"
F.F.E. +6.46
1'-0"
6'-0"
"Chino de Rio" 2"Ø
2"
3/4" Negro Absoluto Granite
3a
4"
Lavatory Detail
9"
6'-0"
4" 3/4"
6'-0"
4"
6'-0"
2"
F.D.
Concrete Slab
3b
3/4" Negro Absoluto Granite Base
1
Reflecting Pool Details
Theatre Handrail Plan & Front Elevation scale 1/4" =
3"
1'-0"
9"
Argamasa Finish Floor
1'-0" 9"
3" 1"
3/4"
4"
Water Level
2"
F.D.
6'-0"
9"
6"
1"
3/4"
2"
4"
1'-0"
4"
3/4"
3/4"
"Chino de Rio" 2"Ø
6'-0"
6'-0"
6'-0"
F.D.
2'-4"
3/4" Negro Absoluto Granite Base
# A ###
# A ###
3'-4"
1/2"
3'-4 1/2"
3'-7
6"
6" 6"
9"
1'-0"
1'-6"
9"
1'-0"
9"
4 1/2"
3"
2'-0"
Theatre Handrail Plan & Front Elevation scale 1/4" =
1'-0"
6"
1'-0"
1'-0"
2'-0"
3"
1
6"
Theater Handrails Plan & Details
Metal Stud Hanging to Ceiling
39
Rehabilitation of Luis Muñoz Marín Park
PEDRÍN ZORRILLA
ANFITEATRO TITO PUENTE
EXPRESO LAS AMERICAS
JOSEFINA CREEK ENTRANCE
AVENIDA JESUS T
40
original park
. PIÑERO
C CC -SJ PEDRÍN ZORRILLA
ANFITEATRO TITO PUENTE
A 10 A 10 2 1
CONNECTION WITH AVE DOMENECH
RÍO
PIEDR AS
EXPRESO LAS AMERICAS
JOSEFINA CREEK A 10 A 10 2 1
LMM - R . BETANCOURT MEMORIAL
SOUTH ENTRANCE BLDG (TERMINAL 1)
0
25
50
100 GRAPHIC SCALE
Dotacional ( Park, Concessions, Play Grounds, Bycicle Track, Pavilions)_ San Juan P.R._2014
ITH NW ECTIO NN CO
1. Tree Inventory Site Plan 2. Tree Inventory Site Blow UP 3. Entrance Site Plan 4. Entrance Building Demolition Plans 5. Entrance, Bridge & Entrance Building Photos Before Rehabilitation 6. Entrance Perspective & Photos After Rehabilitation 7. Entrance Building Proposed Plans 8. Entrance Canopies & Bridge Plans 9. Photos After Rehabilitation & Reopening 10. Entrance Building Bathrooms Plans 11. Doors & Windows Schedule 12. Details a. Entrance Building Roll-up Grill Detail b. Entrance Building Window Detail c. Entrance Building Roof Skylight d. Entrance Building Second Floor Skylight e. Entrance Building Handrail Detail f. Entrance Building Roof Details
(METERS )
ENTRANCE
AVENIDA JESUS T
new park
. PIÑERO
41
LEGEND
1381
L 03
# Match Line
Existing Palm and Reference Number
L 01
#
Existing Palm and Reference Number to be Removed 4.00
#
Existing Tree and Reference Number #
Existing Tree and Reference Number to be Removed L 07
L 07
L 08
L 08
L 05
L 05
L 06
L 06
1392
1391
1393
#
Match Line
Match Line
Existing Bamboo and Reference Number #
1388
1394 4.60
Existing Bamboo and Reference Number to be Removed
1390 1389
RÍO PIED RAS EXPRESO
1396
CCC -SJ
5.00
LAS AMERICAS
NORTH
7 5.40
1398 4.20
CREEK
JOSEFINA
6
3
1397
HIGHWAY LAS AMERICAS
JOSEFINA
5
4
CREEK
SOUTH
2 5.60
1
L 01
L 05
L 06
L 06
L 03
L 03
L 04
L 04
Key Plan
Match Line
Match Line
1235
4.60
JESUS T PIÑERO AVE .
1236 1262
1261
1399
1400
5.40
1299
1260 5.20
4.80
1787 1170
1792
1381
1298
1790
4.80
LEGEND
4.60 4.80
4.60
1171
1172
1383
L 03
#
1294
L 03
L 04
L 01
L 02
5.00
1297
Match Line
Existing Palm and Reference Number
5.20
4.80
1173 4.60
4.60
L 01
4. 6 0
#
1263
5.00
5.00
Existing Palm and Reference Number to be Removed
5.00
1384 4.80
4.00
#
4.80
1296
4.80
1295
4.80
Existing Tree and Reference Number 4.80
#
1784 1391
1386
5.00
1392 1393
1385
1403
1293
4.60
Existing Tree and Reference Number to be Removed #
Existing Bamboo and Reference Number
5.00
5.00
#
1794
1388
1394
1387 5.00 4.60
1795
1798
4.60
Existing Bamboo and Reference Number to be Removed
1390
5.00
1389
5.20
6.00
1796
1396
CCC -SJ
1802
1801
5.00
5.00
1803
1291
6.00
1292
5.40
5.40
NORTH
1797
1174
5.00
1800 1175
1805
L 02
5.40
1176
1283
1290
5.60
4.20
1398
1807
1808
5.60
4
6.00
5.60
1234
SOUTH
5.00
1809
1177
5.60
1813
1178 4.40
1289
Match Line 5.60
1185
1183 6.00
1179
2 5.60
1235
1284 1286
1182
1815 ? NO ID
1277 1501
1186
1184
6.20
1279
1285
1232
1817 ? NO ID
1816 ? NO ID
1814 1810
1187 1188
5.40
4.60
1233
1181
1180
5.60
JESUS T PIÑERO AVE .
4. 4 0
1
1812
5.00 5.00
Match Line
5.20
1189
6.00
1231
1811
6.60
1281 5.00
6.80
Key Plan
6.00
1230
1505
1504
5.20
4.40
5.00
1236
1503
5.40
1229
1288
1191
NO ID
1819 8.00
6.00
1237
6.00
1262
7.00
L 04
L 02
1799
5.00
L 04
L 01
1804
5.40
5.20
6
CREEK
L 03
L 01
1397
HIGHWAY LAS AMERICAS
JOSEFINA
5
3
L 03
1806
5.00
7
5.00
9.00
9.60
1261
5.60
4. 6 0
1818
1287
5.00
6.00
NO ID
1282
1238
1278
1502
1280
1193
1197
1190
1194
1673
1508 1219
1400
NO ID
1221
1192
5.00
1196
6.60
1239
6.00
1218
1220
5.40
1299
6.40
1399
1260
1240
1195
1226
5.20 5.00
1217
1227
5.20
5.20
4.80
1216
1241 1259 5.60
1298 1294
1225
5.20
1223
1224
5.20
5.40
1203
5.80
1258
5.00
1297
1506
6.00
1222
REMOVIDO
1507
5.20
1228
5.00
4.60
1257 5.00
1263
1406
5.00
5.00
4.80
1405
5.80
1296
1256
1295
1202
6.00
1204
5.20
1213 1215
1255
1201 1254 1248
1247
1404
3070
5.00
4.60
1212 1249
5.00
1245
1211
1206
1209 REMOVIDO
5.40
1264
1210
1207
REMOVIDO 1853
1265 1291
1856 1208
6.00
1250
1266
6.20
1292
1671
1205
1214 6.40
1293
1242
1246
5.00
1251 5.00
5.20
6.20
1267
5.00
1290
1851
1244
1253 1270
1283
1277 1501
1279
1285
1844 1838
6.20
1858
1862
1845
1843
1268
1272
1857
1243
1837
6.00
1275
1855
1846
1841 1836
5.00
1284 1286
1854
1842
1252
1269 1289
1852
6.40
1864
1865
1867
1861
1840 6.20
1281 5.00
1835
4. 6 0
1287 1278 1280
1828
1273 1502
1866 1863
1868
6.00
5.80
1848
1830
5.60
1829
1274
1508
1847
3069
5.40
JESUS T . PIÑERO AVE .
1833
1834
5.20
1831 1506
1821
5.00
5.20
tree inventory site plan
1860
1849
1832 1825 1826
5.00
42
1859 1850
1824
1271 1282
1839
1505
1504 1503 1288
1406
1507
1822
1827
1276
6.00
6.00
tree inventory site blow-up
1869
1870
1871
12
1787 1170
1792 4.80
1790 4.60
4.80
4.60
1171
1172
1383
4.80
L 03
L 04
L 01
L 02
17
1173 4.60
4. 6 0
4b 5.00
1384 4.80
4.80
4.80
1a
4.80
GREEN AREA 1784
1
1
1403
CONCRETE BRIDGE TO BE REPAIRED
ALUMINUM JOINTS
27'-0"
27'-0"
16'-0"
4.60
1385
PLAZA
5.00
1386
1 4 '- 0 "
5.00
5.00
1794 1387 1795
1798
6"
5.20
1802
1801
GREEN AREA
GREEN AREA
6.00
5.00
1 8 '- 0 "
1796
G1
G1
5.00
6.00
E .Q.
1803 5.40
1797 5.00
5'-0"
11'-0" 1800
11'-0"
5'-0"
11'-0"
11'-0"
1175
EXISTING CONCRETE TOPPING TO BE REMOVED , (APPROX . 1") TO BE REPLACED BY NEW 1 1/2" CONCRETE TOPPING WITH FIBER ADDITIVE OVER MESH . 1/16" ALUMINUM JOINTS AS SHOWN . EXISTING CONCRETE SLAB SHALL BE REPAIRED WITH CONCRETE PATCHER ON TOP & BOTTOM SURFACE AS NEEDED . ON UNDERSIDE OF SLAB , PATCH , REPAIR AND REPLASTER AS REQUIRED .
5'-0"
11'-0"
11'-0" 1805
86'-0"
5.20
5.40
5.00
1806 1804
1799
1176 1807 5.60
1808
5.60
K1
CL
17
GREEN AREA
E .Q.
5'-0"
5.40
1174
EXISTING POND TO REMAIN
G1
6.00
5.60
1234
1809
1177
5.60
5.00
1813
1178 4.40
1181
1180
5.60
1182
1815 ? NO ID
1812 1814
1186
1184
6.20
1810
3
CONCRETE BRIDGE TO BE REPAIRED
1187
5.40
1188 5.20
1189
6.00
1231
1817 ? NO ID
1816 ? NO ID
6.00
4. 4 0
1179
1232
5.00
1185
1183
EXISTING PARKING LOT
5.60
1233
1811
6.60
6.80
6.00
1230
5.20 4.40 5.00
5.40
6.00
1237
1229 1819
7.00
NO ID
8.00
6.00
1191
5.00
GREEN AREA
EXISTING POND TO REMAIN 9.60
9.00
5.60
1818 5.00
6.00
1197
1
1194
1219
NO ID
1192
E.Q
1673
.
5.00
1 A221
1216
1259 5.60
1225
1223
1224
GREEN AREA
6.00
5.40
REMOVIDO
ENTRANCE
1203
5.80
G1
1258
1222
NEW ENTRANCE GATE G 1
5.20
1257
1228
5.00
1405
5.80
1204
5.20
1213
3
1 A170
1202
6.00
1247
6.40
1404
1211
1210
1856
6.20
1 A170
1251 6.20
EXISITNG SIDEWALK TO REMAIN
5.20
5.00
1267
1244
1253
6.40
1842
1252 1841 1836
1243
1837 1844
6.00
GREEN AREA
1 A213
G1
CANOPY C -2
1838
6.20
1835
1824
1828
1273
POOL
NEW CONCRETE PARAPET SAME AS EXISTING
NEW FENCE 1858
NEW CONCRETE STRUCTURE FOR POOL PUMP . REFER TO DWG
2 A150
1862
1864
1865
1867
6.20
1859 1860
1869
1870
1871
GREEN AREA
1861
NEW METAL GATE G 2
1866 1863
1868
6.00
5.80
CANOPY A-1 NEW CONCRETE BENCH (SAME AS EXISITNG )
1 A210
ALUMINUM JOINTS
NEW METAL ROOF OVER EXISITNG GUARD HOUSE
GREEN AREA G1 EXISTING REFLECTING POOL & CONCRETE BENCHES TO BE REPAIR 1
3
5.60
1847 1834
NEW CONCRETE
3069
5.40
1833
1831 1827
1857
1848
1830
5.20
1822
1855
1829
1274
1821
1854
1849
1832 1825 1826
1852
NEW SIDEWALK
1845
1840
1839 1850
1271
1851
1846
1843
1268
1272
EXISTING REFLECTING
1208 1242
1246
5.00
1 A211
1207
REMOVIDO 1853
6.00
1250
1270
3070
1206
1209 REMOVIDO
5.40
1245
1265
GREEN AREA
NEW FENCE
CANOPY A-2
1212 1249
5.00
1275
4b
1 A170
1205
1214 1248
1266
NEW FENCE
1671
1201 1254
BUILDING
G1
1215
1255
1269
.
1217
1227 1241
1264
E.Q
6 A211
G1
1195
1226
5.20
5.20
1256
CANOPY B
GREEN AREA
1196
6.60
6.00
1218
1220 1240
1193
1190
1221
1
1239
6.40
NO ID 1238
NEW CONCRETE
SIDEWALK
1 A600
NEW BRIDGE ROOF
1 A212
276
SIDEWALK
17
CANOPY C -1
NEW CONCRETE WALL (SAME HIGH AS EXISTING )
6.00
6.00
EXISTING GUARD HOUSE TO REMAIN
EXISTING SIDEWALK TO REMAIN
GREEN AREA G1
entrance site plan
43 1
6 A203
3 A203
21
6 A203
FLOORS
10
1
3 A203 OPEN TO BELOW 21
12
21
10
10
15
10
10
09 14
21
10
21
32 31
23
21
18 07
21
10
18 14 5 A203
15 09
22 07
11
22
15
5 A203
18
5 A203
07
34 3'-8"
32
1718
21 21
30
32
29
21
26 31
11
29
34
18
21
22
10 10
5'-0"
18 02
10
32
07
17
07
18
4 A203
07
34
GREEN AREA
20
Existing ceramic tile floor be removed 6" concrete blocktowall to be demolished
10
30 MISCELLANEOUS Existing concrete ELEMENTS parapet to be demolished
21
28 Existing removed Existing soil vaultto to 31 bebe removed
32
floor sink Existing janitor 6" concrete wallto to be bedemolished demolished
21
29 CIRCULATION Existing concrete countertops to be removed
31
8
WALLS Existing g .w.b. wall to be demolished
ANDconcrete EXTERIOR 32 SITE Existing stucture to be demilished
5 9
4" concrete block wall Existing playwood partition walltotobe bedemolished demolished
30 Existing elevator concretemechanical parapet demolished 33 11 to be 21 dumbwaiter to be removed
6
Existing 6" concrete block wall to be demolished ROOF
22
31 Existing soil 34 to bemechanical removed lift to be removed elevator
5
A203 6" concrete wall roof to bestructure demolished 7 Existing metal 10 frame and to be removed completely
18
5 A203
CIRCULATION
34 3'-8"
32 21Existing concrete stucture to be demilished
TO to be demolished partition 9 Existing playwood 12 glass skylights toOPEN bewall removed
21 33 Existing elevator mechanical dumbwaiter to be removed
ROOF standing seam metal ceiling to be removed 13 Existing
34 Existing elevator mechanical lift to be removed
OPEN TO BELOW
21
11
12 skylightsto tobe beremoved removed 15 Existing glass window 2 A203
13 16 Existing standing seam metal ceiling to be removed wood door to be removed
23
4 A203
31
21
15
03
33
09 15
07
32
21
18 Existing Existing metal door to be removed (including frame &see hardware 21 railing to be removed and relocate detail ) _______
16
27
18
07
10
10
19 Existing Existing metal metal grill vault, door be/ or removed 22 gate to and security bars to be removed
20 BATHROOM Existing 4" xEQUIPMENT 4" metal column&toACCESORIES be removed 07
17 18
21 Existing metal 24 railing tocounter be removed washing basin top toand be relocate removedsee detail
_______
22 25 Existing metal grill , gatetoand or security bars to be removed toilet partitions be/removed
32
23 26 Existing toilet metal, rolling grill lavatory to be removed urinal and to be removed
1 A203
BATHROOM EQUIPMENT 17
15
to be removed Existing tile 4" concrete block wall to be demolished
3 6
23 METAL ExistingFABRICATIONS metal rolling grill to be removed
1 A203
07
2 5
17 Existing glass 20 block window to to bebe removed 4" x 4" metal column removed
10
32
28
15
OPEN TO
16 METAL ExistingFABRICATIONS wood door to be removed
10
23
VAULT 07
27 SITE 21 Existing tile on wall to be removed ANDceramic EXTERIOR
10
DOORS glass & WINDOWS 17 Existing block window to be removed
19
14
Existing floor to be demolished WALLS
15 to be removed 19 Existing glass metalwindow vault door to be removed
15
6 A203 6 A203
1
MISCELLANEOUS ELEMENTS
14 21 window to be removed 18 Existing metal door to be removed (including frame & hardware )
10
07 21
01
07
25
27
15 31
27
BELOW 29 Existing concrete countertops to be removed
11 lath and to plaster ceiling to be demolished 14 Existing metal window be removed
4 A203
10
09
21 16
11
14
26
FLOORS Existing janitor floor sink to be demolished
10 DOORS Existing metal frame and roof structure to be removed completely & WINDOWS
21
09
10
17 18 32
07
15
03
12 33
15
20
10 21
21
03
28 Existing vault to be removed
4
BELOW
04
5'-4"
15
F.F. E . =6.82 33
LEGEND : Existing ceramic tile floor to be removed
.w.b.lath walland to be demolished 8 Existing g 11 metal plaster ceiling to be demolished
3'-6"
24
06
21
10
21
26
06 06
18
31
12 23
15
5 A203
05 03
PLANTER
OPEN TO BELOW
17 11
20
2 A203
5 A203
25
18
31
07 2 A203
24
17
21
PLANTER
OPEN TO BELOW
4 A203
26
26
01
22 31
3'-8"
18
21
14 17
21
34
OPEN TO BELOW 31
21
11
Existing tile to be removed
3
4 7
27
27 Existing ceramic tile on wall to be removed
Existing floor to be demolished
2
5'-0"
6 A203
10
3 A203
21
LEGEND : 12
6 A203
& ACCESORIES
1 A203
24 Existing washing basin counter top to be removed
07
12
10
25 Existing toilet partitions to be removed 6 A203
LEGEND :
12 12
3 A203
26 Existing toilet , urinal and lavatory to be removed
10
6 A203
10
FLOORS 1 2 3 4
Existing tile to be removed 21
Existing ceramic tile floor to be removed
12 MISCELLANEOUS ELEMENTS
10
10 28 21
21
Existing janitor floor sink to be demolished
6
10
21
21
21
09 09
17 15
21
5 Existing 6" concrete wall to be demolished A203
8
Existing g .w.b. wall to be demolished
32 Existing concrete stucture to be demilished
9
Existing playwood partition wall to be demolished
33 Existing elevator mechanical dumbwaiter to be removed
ROOF
34 Existing elevator mechanical lift to be removed
32
CIRCULATION
05
5 A203
34
21 22
21
13
10
21
7
21
17
15
21
21
21
10
15
13
34
23 31 Existing soil to be removed
Existing 6" concrete block wall to be demolished
21
32
SITE AND EXTERIOR
21
12
21
21
30 Existing concrete parapet to be demolished
Existing 4" concrete block wall to be demolished
3 A203
12 10
09
15
10
23 to be removed Existing vault
29 Existing concrete countertops to be removed
WALLS 5
21
27 Existing ceramic tile on wall to be removed
Existing floor to be demolished
06 21
17
21
17
09
5 A203
5 A203 22
21
05
06
10 Existing metal frame and roof structure to be removed completely 11 Existing metal lath and plaster ceiling to be demolished 12 Existing glass skylights to be removed
12
2
A203 standing seam metal ceiling to be removed 13 Existing
4 A203
10
2 A203
DOORS & WINDOWS
10
4 A203
12
14 Existing metal window to be removed 15 Existing glass window to be removed 16 Existing wood door to be removed
12 10
10
10
21
15
17 Existing glass block window to be removed
11
10
21
18 Existing door to be removed (including frame & hardware )
21
23 20 Existing 4" x 4" metal column to18be removed
21
15
21 Existing metal railing to be removed and relocate see detail
16
10
10
METAL FABRICATIONS
12
21
19 Existing metal vault door to be removed
11 11 21
_______
21
21
11
21
21
23
22 Existing metal grill , gate and / or security bars to be removed
16
22
23 Existing metal rolling grill to be removed
44
BATHROOM EQUIPMENT
18
& ACCESORIES23
24 Existing washing basin counter top to be removed
11 6 A203
25 Existing toilet partitions to be removed
entrance building demolition plans 26 Existing toilet , urinal and lavatory to be removed
GSEducationalVersion
21
1 A203
21
11 22
23 6 A203
1 A203
LEGEND : 12
FLOORS
10
1
09
21
10
15
Existing tile to be removed
3
Existing ceramic tile floor to be removed
28 Existing vault to be removed
4
Existing janitor floor sink to be demolished
29 Existing concrete countertops to be removed
21
14
07
32
17
17
MISCELLANEOUS ELEMENTS
SITE AND EXTERIOR
WALLS 5
Existing 4" concrete block wall to be demolished
30 Existing concrete parapet to be demolished
6
Existing 6" concrete block wall to be demolished
31 Existing soil to be removed
7 22
18
27 Existing ceramic tile on wall to be removed
Existing floor to be demolished
2
Existing 6" concrete wall to be demolished
CIRCULATION
8
Existing g .w.b. wall to be demolished
32 Existing concrete stucture to be demilished
9
Existing playwood partition wall to be demolished
33 Existing elevator mechanical dumbwaiter to be removed
ROOF
34 Existing elevator mechanical lift to be removed
10 Existing metal frame and roof structure to be removed completely 11 Existing metal lath and plaster ceiling to be demolished 12 Existing glass skylights to be removed 13 Existing standing seam metal ceiling to be removed DOORS & WINDOWS 12
14 Existing metal window to be removed
10
15 Existing glass window to be removed 16 Existing wood door to be removed 17 Existing glass block window to be removed 18 Existing door to be removed (including frame & hardware )
10
34
10 21
19 Existing metal vault door to be removed
21 15
METAL FABRICATIONS 20 Existing 4" x 4" metal column to be removed
14
21 Existing metal railing to be removed and relocate see detail 32
_______
22 Existing metal grill , gate and / or security bars to be removed 23 Existing metal rolling grill to be removed BATHROOM EQUIPMENT
17 07
15
& ACCESORIES
24 Existing washing basin counter top to be removed
07
25 Existing toilet partitions to be removed 26 Existing toilet , urinal and lavatory to be removed
12
10
12 10
21
09
15
21
15
21 10
21
23 21
21
21
21
13
10 32
21
34
17
05
21
17
09
22
21
06
12 10 10
10
15
12
10 21 11 21
21
21
18
23
11 21 23
21
16
11 22
45
entrance building view
46
4 A230
6 A230 13
6 A230
1 A231
4 A230
OPEN TO BELOW TROLLEY ROAD
1 A231
PLANTING AREA BOARDING PLATFORM 6"
4" X 4" NEW GALV . STEEL COLUMN
M
29
1 A250
BATHROOM A
4'-8"
6"
M 17
15'-9"
ROLL -UP
G -1
M
ROLL -UP M
EQ.
NEW CHAIN HYDRAULIC LIFT MODEL : V.1504 . STD BY DEYA ELEVATORS OR EQUAL APPROVED
2 A231
2 A231
OPEN TERRACE
3 A231
13
E.Q.
NEW WALL AT 3'-0" HEIGHT AND RAILING AT 3'-6" HEIGHT .
13
1 A231
3'-2"
4" X 4" NEW GALV . STEEL COLUMN
EQ.
PLANTING AREA
NEW CHAIN HYDRAULIC LIFT MODEL : V.1504 . STD BY DEYA ELEVATORS OR EQUAL APPROVED
5 A230
4'-8"
PLANTING AREA
15'-9"
1 A190
MEN 5 A230
12
RAMP
I
3'-2"
5 A230
5 A230
13 4" X 4" NEW GALV . STEEL COLUMN
PLANTING AREA
11 A90
A
STAIRS
OPEN TO BELOW
OPEN TO BELOW
3'-4"
JAN
PLANTING AREA
1'-8" 1 A231
3'-4"
12
ELECTRIC ROOM
12
A
STAIRS E.Q.
3'-7" PLANTING AREA
PLANTING AREA
1'-8"
13
1 A231
13
6" 9'-0"
10'-6"
14
13 6"
6'-6"
6"
F.D.
6"
LOBBY
F.D.
OPEN TERRACE
12
13 F.D. 6" 2'-0"
4'-0"
3'-4"
6"
D
6" 2'-0"
K1
30
PLANTING AREA
ROLL -UP
13 4 A250
1'-0" 2'-0"
1 A231
3 A230
WOMEN
2'-7"
3 A230 OPEN TO BELOW 2 A231
11 2 A230
1 A231
13 2 A230
A
INFORMATION & TICKET ROOM
I
CONCESSION AREA
G -1
5'-0"
1 A231
18
15
15
16
16
7'-0"
JANITOR
PLANTING AREA
11
K
G -1
ROLL -UP
3'-4"
A
3'-6"
1 A231 D
2'-9"
2'-5"
11
5'-0"
PLANTING AREA
11
B
BATHROOM B
2 A231
F.D.
3'-4"
NEW VENTILATED SKYLIGHT ON NEW CONCRETE CEILING
6"
3'-4"
3'-4"
D3
6"
A
3'-10"
20 2'-6"
4 A231
A
CONCESSION AREA SERVICE SERVICE
1'-0"
INFIRMARY
ROAD 13
YARD
1
19
FAMILY BATHROOM
11
12
3 A231
1'-6"
NEW METAL ROOF
BATHROOM "C " & KITCHENETTE
5'-6"
4'-0"
11
2 A223
28
NEW METAL ROOF F.D.
6 A230
6 A240
2
8 A231
A 6 A231
6 A231
6 A240 + 3'-11"
15
6 A231
12'-10 11/16" + 0'-1"
+ 0'-1"
Relocate Exisitng Handrail
+ 0'-0"
12'-10 11/16"
F.F.E
+ 0'-1"
1 A231
Exisitng Handrail
15
+ 0'-1"
C L
5'-9"
+ 0'-1"
STRUCTURAL SLOPE
+ 0'-0"
9"
7'-0" 1'-0" 1'-9"
+ 0'-1"
1513
15
+ 0'-5"
+ 0'-5" A
New 6" Concrete Block Parapet A "aline with existing one"
A
+ 0'-5" A
2 A223
NEW METAL ROOF
SKYLIGHT
6 A240
+ 0'-5"
1 A223
Relocate Exisitng Handrail
6 A240
1 A231
28
A
I
NEW SKYLIGHT
+ 0'-1"F.F.E
6 A 231
30
I
New 6" Concrete Block Parapet New 6" Concrete Block Parapet "aline with existing one" "aline with existing one" Relocate 1 Relocate 1 5'-9" Exisitng Handrail A231 Exisitng Handrail A231 + 0'-1"
5'-9"
+ 0'-1"
15
3 A230
NEW METAL LATH & PLASTER FASCIA
M
Relocate Exisitng Handrail
I
STRUCTURAL SLOPE
I
I
I
30
K 1 Relocate A231
28
Exisitng Handrail
1 A231
28
30
SKYLIGHT
15
6 A240 ROOF DRAIN C
New 6" Concrete Block Parapet "aline with existing one "
1
A223 METAL ROOF NEW METAL ROOF NEW
SKYLIGHT
F.F.E
11'-6"
entrance building proposed plans
EXISTING ROOF CONCRETE
+ 0'-5" C L
Relocate 1 Exisitng Handrail A231
C L
F.F.E
+ 0'-1"
6 A240
STRUCTURAL SLOPE
7'-0" 1'-0"
9"
1'-9"
9'-6"
F.F.E
9'-6"
13
F.F.E
1 Exisitng Concrete Column Exisitng Concrete Column A231
A + 0'-5"
8'-9"
16 A
F.F.E
1'-6"
Relocate 1 A231 Exisitng Handrail
12'-6"
F.F.E
1 A223
SKYLIGHT 5 A230
6 NEW SKYLIGHT A 231 F.F.E
9'-6"
16
4'-2 7/8"
9"
15+ 0'-5" K1
+ 0'-5"
2 A230
NEW METAL ROOF + 0'-1"
8'-9"
7'-0" 1'-6"
1'-0"
Exisitng Concrete Column New 6" Concrete Block Parapet New 6" Concrete Block Parapet "aline with existing one " with existing one " "aline A
K1
Relocate Exisitng Handrail
1 A230
C L
16
13 C L
STRUCTURAL SLOPE
C
B
EXISTING ROOF CONCRETE
8'-9"
Exisitng Handrail
11'-6"
1'-6"
F.F.E
1 A231
3'-6"
3'-6"
F.F.E
1 Relocate A231
15
K
+ 0'-0"
+ 0'-0"
F.F.E
1 A231
New 6" Concrete Block Parapet New 6" Concrete Block Parapet "aline with existing one " with existing one " "aline Relocate Exisitng Handrail
K
+ 0'-1"
+ 0'-1"
K1 6 A240
15
20
+ 3'-11"
6 A230
1'-9"
5 A230
Relocate Exisitng Handrail
20
15
A
STRUCTURAL SLOPE
12'-10 11/16"
6 A240
16 Relocate 1 Relocate 1 Exisitng Handrail A231 Exisitng Handrail A231
+ 0'-1"
2 A223
SKYLIGHT
16
D
ROOF DRAIN
+ 0'-5"
STRUCTURAL SLOPE
1 A231
3'-6"
Relocate Exisitng Handrail
F.F.E
Relocate A231 Exisitng Handrail
C
SKYLIGHT
1
Relocate A231 Exisitng AHandrail
C L
A
+ 3'-11"
A223 NEW METAL ROOF
15
+ 0'-1" C L
+ 0'-1"
A
+ 0'-5"
C
New 6" Concrete Block Parapet "aline with existing one "
2
NEW METAL ROOF
A 16
D
+ 0'-1"
2'-6"
+ 0'-0"
B
New 6" Concrete Block Parapet "aline with existing one "
F.F.E
C
STRUCTURAL SLOPE
SKYLIGHT 6 A240
K
1
16
1 A231
A ROOF DRAIN C
+ 0'-1"
5 A231
8 A231
A
+ 0'-1"
2 A223
+ 0'-1"
5 A231
Exisitng Handrail
C L 5'-9"
+ 0'-1"
+ 0'-1"
12'-10 11/16"
K
NEW METAL ROOF
1 Relocate A231
3 A230
STRUCTURAL SLOPE
K
Relocate Exisitng Handrail C L
+ 0'-5"
6 A 231
11'-6"
18
F.F.E
A
NEW SKYLIGHT
New 6" Concrete Block Parapet New 6" Concrete Block Parapet "aline with existing one" "aline with existing one"
15
+ 0'-5"
3'-6"
A
+ 0'-1"
15
+ 0'-5"
16
28
20
A
5 A230
A + 0'-5"
+ 0'-5"
3'-6"
15
STRUCTURAL SLOPE
A
A
EXISTING ROOF CONCRETE A
A + 0'-5" 4'-2 7/8"
3'-6"
3'-6"
15
+ 0'-5"
2 A230
8 A231
New 6" Concrete Block Parapet "aline with existing one"
Relocate 1 Exisitng Handrail A231
28
15
1 Relocate A A231
12'-6"
18
1 A223
D
+ 0'-1"
Relocate Exisitng Handrail NEW SKYLIGHT
A + 0'-5"
6 A240
+ 3'-11"
3'-6"
6 A 231
Exisitng Concrete Column Exisitng Concrete Column C L
6 A240
Relocate Exisitng Handrail
A
STRUCTURAL SLOPE
11'-6"
16
5 A230
28
SKYLIGHT
+ 0'-5"
STRUCTURAL SLOPE
3'-6"
+ 0'-1"
16
28
SKYLIGHT
B + 0'-5"
C
STRUCTURAL SLOPE
K
16
A231
1 A231
36'-0"
ROOF DRAIN + 0'-0"
+ 0'-1"
1 A231 Relocate A231 Relocate Exisitng Handrail Exisitng Handrail 616
6 A231
16
1 A231
C L
C
15
4 A230
+ 0'-1"
STRUCTURAL SLOPE
New 6" Concrete Block Parapet New 6" Concrete Block Parapet "aline with existing one " "aline with existing one "
5 A231
8 A231
C
18
C L
+ 0'-1"
New Metal Lath & Plaster New Metal Lath & Plaster Fascia Around New Grill Doors B Fascia Around New Grill Doors 8 A231
A
Exisitng Concrete Column
C L
1 A231
STRUCTURAL SLOPE
3'-6"
A240
5 A231
F.F.E
1
A223 METAL ROOF NEW METAL ROOF NEW + 3'-11"
B
Relocate 6 Exisitng A230 Handrail
+ 0'-5"
+ 0'-5"
3'-6"
28 6
5 A231
F.F.E
1 A230
4 A230
B
16
SKYLIGHT
6 A231
3'-6"
16
6 New 6" Concrete Block Parapet New 6" Concrete Block Parapet A231 "aline with existing one " with existing one " "aline
1
6 A240
9 A250
36'-0"
8 A231
6 A231
C L
6 A230
+ 3'-11"
5 A231
1 A223
6'-6"
28
2 A223
A223 NEW METAL ROOF
8 A231
SKYLIGHT
8 A231
F.F.E
SKYLIGHT
New 6" Concrete Block Parapet "aline with existing one "
5 A231
1
A231 Relocate Exisitng Handrail
5 A231
6 A230
New Metal Lath & Plaster Fascia Around New Grill Doors NEW METAL ROOF
New 6" Concrete Block Parapet "aline with existing one "
6"
SKYLIGHT
1 A230
2
15
NEW METAL LATH NEW METAL LATH & PLASTER FASCIA & PLASTER FASCIA
C L C
STRUCTURAL
M
M
K
K
47
1
2 2'-0"
1
11'-0" ROOF DRAIN 1'-0"
1'-0"
10'-0"
2
18'-0"
ROOF DRAIN 8" ø GALV . STEEL TOUND TUBE
5
6'-0"
IN GROUND LIGHTING
4
5
4 A210
ROOF DRAIN B
6 A210
ROOF DRAIN 2'-0" 2'-6"
B RAIN LEADER
18'-0" 8'-0"
18'-0"
4'-0"
12'-0"
10'-0" 3
8
14'-0"
4'-0"
3'-0"
14'-0"
GUTTER GALV . STEEL 8" ø STRUCTURAL COLUMN
2
3
2'-0"
4
20'-0"
8'-0"
GALV . STEEL 8" ø COLUMN
2'-0"
17'-0"
12'-0" RAIN LEADER
2'-6"
10'-0"
1
2'-0"
B
6"
A
5
10'-0"
STRUCTURAL COLUMN
14'-0"
2'-0"
9'-0" 2'-0" 6'-0"
A
12'-0"
4 A210
4
GALV . STEEL 8" ø
2
8'-0" SAME MEASURE AS STRUCTURAL ONCE
12'-0"
9'-6"
17'-0"
6"
2'-6"
1
A
8 E.F.F.E
14'-0"
A
B
2'-6"
6"
4 B A210
IN GROUND LIGHTING
9'-0"
2'-6"
10"
CANOPY GUTTER DRAIN MODEL BY SMITH OR APPROVED EQUAL
GALV . STEEL 8" ø STRUCTURAL COLUMN
4'-6"
ROOF DRAIN 18'-0"
RAIN LEADER
22'-0"
6
4'-0"
14'-0"
GUTTER
5'-6"
#1620
5"
6"
14'-0"
4'-6"
5
4 8'-0"
5'-6"
3 14'-0"
1'-0"
2 8'-0"
2'-6"
1 14'-0"
7'-0"
9'-0"
1'-0"
A
1'-6"
3
CONCRETE CANOPY
6 GALV . STEEL 8" ø
4
STRUCTURAL COLUMN
4'-0"
18'-0"
18'-0"
1/2"
2'-6"
IN GROUND LIGHTING
3/4"
A
3"
ROOF DRAIN
E.F.F.E
SAME MEASURE AS STRUCTURAL ONCE
E.F.F.E 8" ø GALV . STEEL TOUND TUBE 14'-0"
9'-0"
4
1/2"
4'-0"
GALV . STEEL 8" ø COLUMN
3
8'-0"
8'-0"
14'-0"
2
9'-6"
3" ø PVC SCH 40 1
9'-6"
GUTTER GALV . STEEL 8" ø STRUCTURAL COLUMN
5
4 ROOF DRAIN
2'-6"
B
18'-0"
18'-0"
4'-0"
3
4'-0"
14'-0"
12" x 12" X 1/4" GALVANIZED STEEL RECTANGULAR TUBE , PAINTED
3" x 3" 3/16" GALVANIZED STEEL SQUARE TUBE PAINTED
4
9" x 9" x 1"AGALVANIZED STEEL ANGLE 2'-6" TO BE CONCRETE STRUCTURE 9'-0" ANCHOR 6"
GUTTER
6 8'-0"
GALV . STEEL 8" ø STRUCTURAL COLUMN GALV . STEEL 8" ø COLUMN
GALV . STEEL 8" ø STRUCTURAL COLUMN
EXISTING CONCRETE STRUCTURE TO BE REPAIRED & PAINTED
1/2"
IN GROUND LIGHTING
1/2"
GUTTER
2'-6"
6
NEW METAL STRUCTURE SEE SECTION
9'-6"
GSEducationalVersion
B
4'-6"
4'-6" 5'-6" 1'-6"
1'-6"
4" W BY 6" TO 18" H x 1/4" GALVANIZED STEEL RECTANGULAR TUBE PAINTED
,
6"
14'-0"
4 A210
5'-6"
8'-0"
ROOF DRAIN
9'-6"
3 14'-0"
8'-0"
2 8'-0"
1'-6"
1 14'-0"
5'
6"
1'
5 A601
3/4" 3"
E.F.F.E
E.F.F.E
30'-9"
A R Í N 8" ø DOUBLE EXTRA STRONG GALVANIZED STEEL TUBE , PAINTED
3 A601
1 A601
EXISITNG METAL PEDESTRIAN BRIDGE TO BE REPAIR AND PAINTED 7'-0"
2'-0"
2'-2"
GSEducationalVersion
48
entrance canopies & bridge proposed plans 9'-10"
55'-8"
49
D
P -3
H P -3
A-1
6"
6'-0"
6'-0"
B
P -3
B
H 2'-10"
1'-6"
3'-4"
5'-8"
2'-0"
1'-10"
B
P -3
P -3
P -3
2"
F
3'-0" P -2
P -1
P -1
F.D.
P -1A
D
D
D
G
G C1
E F.D.
E
1'-6"
P -3
P -3
WOMEN
3'-4"
MEN
3 2
P -3
P -3
P -3
C1
P -3 C1
H
A
H
B
A
B
A
A-1
7'-0"
B
A
F
E
P -2 2'-4"
F.D.
2'-4"
F.D.
2'-4"
2'-4"
1'-6"
13'-0"
P -1A 1'-6"
11'-10"
P -1
P -1
E
P -1A
2'-0"
2'-4"
3'-3"
2'-4"
G F
P -2
3'-0"
1'-6"
C1
C1 8'-0"
G B
A-1
7'-0"
3'-1"
C1
6"
1'-0"
6"
3'-4"
6'-0"
2'-7" 4'-8"
P -2
5'-1"
4'-0"
A
F.F.E
P -1A C1
3'-11"
F.D.
JANITOR
3'-4"
B F.D.
F.D.
C -1
F
A
2'-10"
2"
F.D. 3'-5"
A
4'-8"
3'-5" 5'-3"
3'-4"
1'-10" 5'-1" 1'-6"
A
6"
A-1
D
D
D
D F.F.E
A-1
G
H
3'-0"
#
F.F.E
6
6"
6'-0" 1'-6"
3'-0"
3'-3"
2'-9"
P -3
D
P -1A
F.F.E
F.F.E
4"
8
4'-4" 1'-4"
7
E
F
D
3'-0"
H
5
E
I
B
2'-10"
KITCHENETTE P -1A
F.F.E
D G
H P -1A 1'-6"
D
P -3
3" H COLORED CONCRETE COUNTERTOP
3'-0"
2'-9"
3'-4"
2'-10"
2'-11"
P -3
1'-6"
A-1
P -1A
E
2'-0"
D
P -1A
F
3'-4"
I
B
F 6'-0"
6"
E
1'-6" 3'-3"
B
F
F
E 1'-3"
1'-6"
G
A-1 G
G 8'-8"
1'-3"
1'-3"
1'-6"
4"
3'-4"
1'-6"
I
H
F
B
A-1
P -1A P -3
2'-7" D
E B H
F.F.E
50
entrance building bathroom plans GSEducationalVersion
B
2'-9" F.F.E
F.F.E
2'-10"
I 3'-4"
2'-10"
2'-9"
P -3
I
6'-0"
I
A-1
10 11 13 12
6"
G
A-1
F.F.E
D3 A1
A2
A3
B
B1
C
C1
D
I D1
D2
E
F
G
G1
H
J
H1
7'-6"
8'-0"
7'-0"
8'-0"
8'-0"
1'-0"
3'-0"
8'-0"
8'-0"
7'-5"
7'-2"
7'-5"
8'-0"
7'-6"
8'-0"
7'-2"
8'-0"
7'-0"
7'-2"
7'-6"
8'-0"
5'-0"
A
2"
2"
2"
3'-4" A
A1
A2
2"
2"
2'-5"
Galv . Steel
2"
2"
2"
3'-4"
B1
2'-9"
A3
B
C
Galv . Steel
3'-4" 3'-10"
C1
Galv . Steel w / Fixed Louvers
2" D
D1
D2
D3
Galv . Steel & Glass
2"
2"
2'-4"
2'-4"
3'-3"
5'-0"
E
F
Wood & Glass
Galv . Steel & Glass
2"
2"
2"
2"
3'-4"
2"
2'-10"
2"
3'-4"
Galv . Steel & Glass
2"
2"
1'-11"
3'-4"
5'-3"
G
2'-1 1/4"
2'-1 1/4"
H1
4'-0"
G1
2'-1 1/4"
2'-1 1/4"
2'-1 1/4"
6"
2'-1 1/4"
N4
N
N1
8'-0"
N3
2'-5"
2'-5"
2" J
8'-0"
9'-6"
7'-0"
7'-2"
7'-6"
2'-0"
8'-0"
4" 7'-2"
3'-6" 4"
K2
4"
4"
15'-3"
5'-9"
15'-3"
K1
M
Galv . Steel Rolling Grille
N1
8'-8"
R
3"
5'-7"
3"
3'-6 1/2"
13'-0"
P
Galv . Steel w / Transom
N
10'-0"
N7
12'-6"
1'-6"
3'-6 1/2"
N2
N4
9'-6"
Q
Galv . Steel Roling Counter Door
N3
8'-0"
K
O
N5
6'-6"
31'-6"
Galv . Steel Rolling Grille
N6
8'-6"
2'-6"
Galv . Steel Roling Door
3'-1"
7'-1"
2'-6" 15'-0"
Galv . Steel
O
N6
L
4"
8'-6"
15'-6"
2'-6"
P
N2
4" 3'-0"
13'-0"
2'-5"
Galv . Steel w / Fixed Louvers
L
4"
2'-5"
3'-6"
K2
2"
2'-0"
N7 M
8'-0"
K1
2"
I
N5 K
2'-1 1/4"
8'-9"
18'-0"
Galv . Steel w / Fixed Louvers
Galv . Steel & Glass
2'-1 1/4"
8'-9"
H
5'-0"
2'-7 1/2"
12
13
3'-0"
F.D.
F.D.
F.D.
13
1'-9 3/8"
22
12'-2"
23
3'-11"
15
16
3'-0 7/16"
27
9 1/8" 25
3'-10 5/16"
2'-11 3/8"
3'-1 1/4"
3'-7"
3'-7 1/4"
3'-8 1/16"
4'-2"
26
2'-3 3/8" 10'-10"
26
24 27
8'-6"
8'-6"
8'-6"
8'-6"
3'-0"
8'-6"
12'-3 3/8"
48 33 40
31
37
38
39
40
2'-5" x 3'-8" 1'-9" x 3'-8"
3'-0"" x 3'-8" 5'-9"
6'-0" 6'-0"
1 1
2'-0" 2'-0"
Fixed Glass Fixed Glass
5'-9"
41 42 43 46
9'-3"
5'-0"
4'-0"
2'-5" x 3'-10"
3'-0" x 3'-8"
46 47
3'-6"
36 5'-0"
F.D. 33
45
35
2'-0"
32
44
9'-3"
2'-0"
34
47
42
2'-0"
2'-0"
1'-0"
1'-4"
1'-6"
2'-0"
1'-0"
F.D.
30
5'-2"
3'-6"
43
41
6'-0"
2'-0" 2'-10"
13'-0"
46
3'-6"
39
6'-0"
38
5'-6"
5'-6"
6'-2"
6'-6"
5'-6"
37
2'-0"
36
2'-0"
35
2'-0"
34
2'-0"
32
2'-10"
31
GSEducationalVersion
Distance
14
10'-6"
25
21
doors & windows schedules 2 Number
9'-0" 11
24
Doors Schedule
Opening
12
22'-5"
23
22
16
5'-6"
7'-0" 22'-3"
9
Notes : 1. All Aluminium Doors shall be shop baked enamel . Color to be selected by architect . 2. All Galvanized Steel Doors shal be factory bake -on enamel . Color to be selected by architect . 3. All hardware trademark shall be as recomended by manufacture . Except for the wood doors , the hardware schedule below is for fucntion a quality purposes
WINDOWS SCHEDULE
15
F.D.
10
10'-10"
2'-9"
7
F.D.
8
F.D.
F.D.
7'-0"
1'-0"
5'-6"
11'-4" 6'-6"
Solid Surface 9'-2" Solid Surface Solid Surface Solid Surface Solid Surface Solid 21 Surface With Fixed Louvers With Fixed Louvers With Laminated Glass Panel With Laminated Glass Panel With Laminated Glass Panel With Laminated Glass Panel 9'-2" With Laminated Glass Panel With Laminated Glass Panel With Laminated Glass Panel Solid Surface With Fixed Louvers With Fixed Louvers With Fixed Louvers Solid Surface Galv . Steel Open Courtain Grilles Galv . Steel Open Courtain Grilles Galv . Steel Open Courtain Grilles Solid Surface Galv . Steel Open Courtain Grilles 30 Galv . Steel Rolling Door Galv . Steel Rolling Door Galv . Steel Rolling Door Galv . Steel Rolling Door Galv . Steel Rolling Door Galv . Steel Rolling Door Galv . Steel Rolling Door Galv . Steel Rolling Door Galv . Steel Rolling Counter Door 29 Solid Surface Solid Surface Solid Surface
3'-0"
Remarks
6
F.D.
Material 5'-7"
14
5'-0"
4'-0"
11
4'-2"
3'-6"
10
4'-2"
4'-2"
9
4'-2"
8
1 3 /4" GALV . STEEL 6'-0" 5 1 3 /4" GALV . STEEL 1 3 /4" 5'-3"GALV . STEEL 4 1 3 /4" GALV . STEEL 1 3 /4" GALV . STEEL GALV . STEEL 20 1 3 /4" GALV . STEEL / ALUM . JALOUSIES 1 3 /4" 1 3 /4" GALV . STEEL / ALUM . JALOUSIES GALV . STEEL / LAM . GLASS 1 3 /4" GALV . STEEL / LAM . GLASS 1 3 /4" GALV . STEEL / LAM . GLASS 1 3 /4" 1 3 /4" GALV . STEEL / LAM . GLASS 1 3 /8" WOOD / LAM . GLASS 1 3 /4" GALV . STEEL / LAM . GLASS 1 3 /4" GALV . STEEL / LAM . GLASS 4'-0" 1 3 /4" GALV . STEEL 5'-6" 1 3 /4" GALV19. STEEL / ALUM 2'-6" . JALOUSIES 20 1 3 /4" GALV . STEEL / ALUM . JALOUSIES GALV . STEEL / ALUM . JALOUSIES 1 3 /4" GALV . STEEL 1 3 /4" GALV . STEEL GALV . STEEL GALV . STEEL GALV . STEEL GALV . STEEL 29 GALV . STEEL GALV . STEEL GALV . STEEL GALV . STEEL GALV . STEEL GALV . STEEL GALV . STEEL GALV . STEEL GALV . STEEL 10'-4 5/8" 3" 28 GALV . METAL MESH W / TRANSOM 1 3 /4" GALV . STEEL 1 3 /4" WOOD F.D.
6'-0"
Thickness
F.D.
8'-0" 3'-0" 7'-10" 7'-6" 2 7'-4" 3'-0" 7'-2" 1 7'-0" 33'-0" 7'-0" 6'-10" 3'-0" 8'-0" 2'-5" 7'-10" 7'-2" 2'-1" 7'-0" 19 8'-0" 3'-0" 7'-10" 7'-5" 3'-0" 7'-3" 8'-0" 3'-0" 7'-10" 7'-5" 3'-0" 7'-3" 7'-2" 3'-0" 7'-0" 8'-0" 3'-6" 7'-10" 7'-5" 3'-0" 7'-3" 8'-0" 2'-4" 7'-10" 8'-0" 3'-0" 7'-10" 1'-6" 17 8'-0" 3'-0" 7'-10" 8'-0" 7'-10" 183'-8" 8'-0" 3'-0" 7'-10" 8'-0" 2'-1 1 /4" 7'-10" 7'-6" 2'-5 5 /16" 7'-4" 8'-0" 8'-0" 14'-10" 12'-4" 8'-0" 8'-0" 8'-0" 7'-10" 8'-0" 2'-0" 3'-0" 2'-0" 8'-0" 15'-3" 7'-8" 8'-0" 7'-8" 8'-10" 7'-6" 7'-2" 7'-4" 7'-2" 7'-4" 6'-10" 7'-0" 5'-10" 6'-8" 7'-6" 8'-0" 7'-2" 7'-6" 5'-1" 7'-2" 9'-6" 11'-10" 9'-2" 8'-0" 9'-4" 7'-8" 3'-6" 6'-6" 3'-2" 15'-6" 10'-0" 12'-9" 7'-10" 7'-1" 2'-4" 6'-11" 8'-6" 2'-7 1 /2" 8'-2" 3'-0"
6'-6"
4'-0"
Height
5'-6"
3'-5"
DOORS SCHEDULE
7
Door Size Width 3'-0"
2'-6"
4'-2"
5'-2"
3'-8" F.D.
F.D. 7'-0"
5'-0" 3'-0"
3'-4" 3'-4" 3'-4" 3'-4" 2'-9" 2'-5" 3'-4" 3'-4" 3'-4" 3'-4" 3'-4" 3'-10" 3'-3" 5'-0" 3'-4" 3'-4" 4'-0" 3'-4" 8'-9" 15'-0" 15'-6" 13'-0" 8'-6" 3'-0" 31'-6" 9'-6" 8'-0" 8'-0" 6'-6" 8'-8" 5'-9" 12'-6" 10'-0" 7'-2" 13'-2" 2'-8" 5'-3"
Height
6
F.D.
5'-6"
3'-0"
3'-6"
A A1 A2 A3 B B 1 18 17 C C1 D D1 D2 D3 E F G G1 H H1 I J K K1 K2 L M 28 N N1 N2 N3 N4 N5 N6 N7 O P Q R
Opening Width
5
3'-0"
5'-8"
Mkd
R
Wood 4
4'-5"
3
2'-7 1/2" 5'-3"
Q Galv . Steel & Glass 2
F.D.
2'-10"
1
9'-10"
44
45
47 48
51
1
GalvanizedGalvanized Steel Structure Steel Structure
1"
ROOF
Existing Metal LathMetal & Plaster Existing Lath & Plaster Ceiling to Ceiling Remain to Remain
1 '- 4 "
Existing Metal LathMetal & Plaster Existing Lath & Plaster Ceiling to Ceiling Remain to Remain
drail
1 '- 4 "
1"
EXISTING EXISTING CONCRETECONCRETE ROOF
NEW ALUMINUM WINDOW WINDOW NEW ALUMINUM 4"
3'-1"
4" 7"
7"
4'-0"
Existing Metal Lath & Plaster Ceiling to Remain
Relocate Exisitng Metal Handrail
NEW METAL NEWLATH METAL LATH & PLASTER& PLASTER FASCIA FASCIA
Extension
1 '- 4 "
3'-1"
4'-0"
6
te Parapet 3/4"
New 1 ¼ New Ø " Galv 1 ¼. Steel Ø " Galv . Steel
New Concrete Extension
Round Tube Round Tube NEW ROLLING GRILL NEW ROLLING GRILL
1/2"
3'-6"
1/2"
Exisitng Concrete Parapet to Remain
3/4"
3/4"
GSEducation
New Concrete New Extension Concrete Extension 1/2"
1/2" 1/2"
1/2"
3'-6"
3'-6"
E.F.F.E
Exisitng Concrete Exisitng Parapet Concrete Parapet to Remain to Remain
Galvanized Steel Structure
EXISTING CONCRETE
ROOF
1"
E.F.F.E
E.F.F.E
Existing Metal Lath & Plaster Ceiling to Remain
1 '- 4 "
Existing Metal Lath & Plaster Ceiling to Remain
NEW ALUMINUM WINDOW
Grill Detail 522 Roll-up 2
Grill Grill Detail Detail scale 1" scale = 1'-0" 1" = 1'-0"
3'-1"
4"
7" NEW METAL LATH & PLASTER FASCIA
4'-0"
Window Detail Handrail Detail 1 Window Detail Window Detail scale 1"
3 3
= 1'-0"
scale 1" scale = 1'-0" 1" = 1'-0"
2
Grill Detail scale 1"
= 1'-0"
scale 1"
2
= 1'-0"
1
scale 1"
3
= 1'-0"
Handrail Detail scale 1"
Grill Detail
2
= 1'-0"
scale 1"
3
= 1'-0"
scale 1"
5
= 1'-0"
Window Detail scale 1"
5
= 1'-0"
scale 1 1/2"= 1'-0"
Steel Roof Detail 1
GALVANIZED STEEL METAL DECK TYRE
MODEL COOLITE ACRILIC / PRISMATIC BY BRISOLITE DAY CIGATING SYSTEM OR EQUAL APPROVED
1/2" SECUREROCK
6"
6"
6"
6"
TUBE
FIXED LOUVER FIXED LOUVER ALUMINUMALUMINUM WINDOW WINDOW
GALVANIZED STEEL METAL DECK TYRE
ELASTOMERIC MEMBRANE ELASTOMERIC MEMBRANE
POLYESTER BUILT -UP ROOFING MODEL 1/2" SECUREROCK HARDBOARD SARNAFILL S 327 BY OR APPROVED POLYESTER BUILTSIKA -UP ROOFING MODEL
POLYESTER SARNAFILL
B
S 327 BY SIKA OR APPROVED
ROOF
EXISTING CONCRETE
1"
Detail
7
scale 1 1/2"= 1'-0"
scale 3/4" scale = 1'-0" 3/4" = 1'-0"
Skylight Detail 3'-1"
7"
GALVANIZED STEEL METAL TYRE B TYRE B GALVANIZED STEEL DECK METAL DECK NEW METAL LATH 2" INSULATION HUNTER HUNTER PANELS ISO 2" 2" INSULATION PANELS ISO 2" & PLASTER FASCIA OR APPROVED EQUAL FASTENERS No. 15 OR APPROVED EQUAL FASTENERS No. 15 @ w 3" PLATE @ w 3" PLATE 1/2" SECUREROCK HARDBOARD 1/2" SECUREROCK HARDBOARD
4'-0"
GSEducationalVersion
scale 3"
4
6"
= 1'-0"
scale 3"
2'-0"
Relocate Exisitng Metal Handrail
Round Tube
scale 3/4" = 1'-0"
Existing Metal Lath & Plaster Ceiling to Remain
3'-6"
3/4"
1/2"
1" x 4" x 6"4'-0" GALVANIZED STEEL PLATE
4" x 8" x 3/8" GALVANIZED STEEL BEAM
1'-0"
DWG )
6" 6"
5 5
scale 1 1/2"= scale 1'-0" 1 1/2"= 1'-0"
EQUAL 7"
NEW GALVANIZED STEEL STRUCTURAL TUBE (SEE STRUCTURAL
DWG )
E.F.F.E
6" NEW CONCRETE
Skylight Skylight SteelSteel RoofDetail Detail 1 1 Roof Detail 4 scale 3/4" = 1'-0"
4"
Exisitng Concrete Parapet to Remain Exisitng Concrete Parapet to Remain
E.F.F.E
2'-0"
BUILT -UP ROOFING MODEL S 327 BY SIKA OR APPROVED
New Concrete Extension
STEEL BEAM STEEL BEAM
6"
B
2" INSULATION HUNTER PANELS ISO 2" OR APPROVED EQUAL FASTENERS No. 15 @ w 3" PLATE 1/2" SECUREROCK HARDBOARD
3'-1"
1/2"
3'-6"
1/2"
NEW GALVANIZED STEEL NEW GALVANIZED STEEL ELASTOMERIC MEMBRANE STRUCTURAL TUBE (SEETUBE STRUCTURAL DWG ) STRUCTURAL (SEE STRUCTURAL
GALVANIZED STEEL METAL DECK TYRE
New Concrete Extension 1/2"
FIXED LOUVER 4" x 8" x 3/8" 4" xGALVANIZED 8" x 3/8" GALVANIZED ALUMINUM WINDOW
ROOF
Skylight Detail
POLYESTER SARNAFILL
3/4"
1" x 4" x 6"1"GALVANIZED STEEL PLATE x 4" x 6" GALVANIZED STEEL PLATE
NEW CONCRETE
= 1'-0"
x 30" DOME SKYLIGHT MODEL COOLITE ACRILIC / PRISMATIC BY BRISTOLITE
nalVersion
6"
Details
1"
POLYESTERPOLYESTER BUILT -UP BUILT ROOFING MODEL MODEL -UP ROOFING SARNAFILLSARNAFILL S 327 BY SIKA S 327OR BY APPROVED SIKA New OR 1 ¼ APPROVED Ø "EQUAL Galv . Steel EQUAL NEW ROLLING GRILL30"
Roof Steel Details Roof 7
NEW ALUMINUM WINDOW 4"
ROOF EDGE GALVANIZED STEEL FLASHING BY MET OR EQUAL APPROVED
Steel Roof Details
1 '- 4 "
scale 1 1/2"= 1'-0"
4" x 8" x 3/8" GALVANIZED STEEL BEAM
MEMBRANE
ROOF EDGE GALVANIZED STEEL FLASHING BY METAL HICKMAN OR EQUAL APPROVED
6"
Existing Metal Lath & Plaster Ceiling to Remain
4 4 Skylight Steel Roof
6" x 12" x 3/8" STEEL BEAM
STEEL BEAM
ELASTOMERIC
ROOF
6" x 12" x 3/8" STEEL BEAM PAINTED
Steel Roof Skylight Skylight Detail Skylight Detail 6
4" x 4" x 3/16" GALVANIZED ANGLE WELDED TO STEE
FIXED LOUVER ALUMINUM WINDOW 4" x 8" x 3/8" GALVANIZED
6"
PAINTED
6
1'-0"
4" x 8" STEEL BEAM 6" x 12" x 3/8" STEEL BEAM
ROOF 6" x 12" NEW x 3/8" STEELCONCRETE BEAMNEW CONCRETE
EQUAL
4" x 4" x 3/16" GALVANIZED STEEL ANGLE WELDED TO STEEL BEAM
6" x 12" x 3/8" STEEL BEAM
4" x 8" x 3/8" GALVANIZED BEAM xSTEEL 3/8" GALVANIZED 6" x 12" x 3/8" STEEL BEAM
Galvanized Steel Structure 6"
6"
HARDBOARD
BUILT -UP ROOFING MODEL S 327 BY SIKA OR APPROVED
3
ROOF
Handrail Detail
Window Detail scale 1"
HARD
BUILT -UP RO S 327 BY SIKA
30" x 30" DOME SKYLIGHT MODEL COOLITE ACRILIC / PRISMATIC1" x 4" x 6" GALVANIZED S 1" x 4" x 6" GALVANIZED STEEL PLATE BY BRISTOLITE
EQUAL EQUAL
1'-0"
2'-0"
POLYESTER SARNAFILL
@ w 3" PLATE
SARNAFILL
4" x 6" GALVANIZEDSTEEL STEEL PLATE PLATE 1" x 4" x1"6"x GALVANIZED
2'-0"
1/2" SECUREROCK
4"
3" x 12" x 3/8" STEEL RECTANGULAR 2" INSULATION HUNTER PANELS ISO TUBE 2" OR APPROVED No. 15 GALVANIZEDEQUAL STEEL FASTENERS METAL DECK TYRE B @ w 3" PLATE 2" INSULATION HUNTER PANELS ISO 2" OR APPROVED HARDBOARD EQUAL FASTENERS No. 15 1/2" SECUREROCK
4"
1'-0"
1'-0"
3" x 12" x 3/8" STEEL RECTANGULAR
6"
2" INSULATION HUNTER OR APPROVED EQUAL FA @ w 3" PLATE
B
2" INSULATION HUNTER PANELS ISO 2" OR APPROVED EQUAL FASTENERS No. 15 @ w 3" PLATE
GABLE RIDGE SKYLIGHT MODEL COOLITE ACRILIC / PRISMATIC BY BRISOLITE DAY CIGATING SYSTEM OR EQUAL APPROVED
6"
GALVANIZED STEEL META
scale 1 1/2"= 1'-0"
30" x 30" DOME SKYLIGHT 30" x 30" DOME SKYLIGHT MODEL COOLITE ACRILIC / ACRILIC PRISMATIC MODEL COOLITE / PRISMATIC BY BRISTOLITE GABLE RIDGE SKYLIGHT BY BRISTOLITE
1'-0"
1
= 1'-0"
Roof Details Steel Roof 5 scale 1 1/2"= 1'-0"
Detail 1
53
1
1.5 0
1.7 5
5 1.2
1
2.25
455
459
2
1
ES N O LL BE PA
460
456
466
457
2
467
461
464
465
1
2
462
463
1
1
Rehabilitation of “Parque de los Niños” 1
454
2
458 453 513 452
512
451
468
510
450
469
509
445 449
470
508
2.5 0
507
442
444
448
471
504
2.50
472
505
429
417 416
474
501
4
419
005
435 427
420 413
3
498
428
414
476
499
514 418
415
0 2.5
500
475
CLARO N° 1: AGUA FUENTE
436
3
502
437
438
446
473
503
439
440
447
506
2
441
443
425
006
430
433 431
494
393
4 478
3
406
2.75
3
395
2.50
405
400
403 3
479
315
318
357
300
354
321
355
319
322
3
323
368
519
369
324
325
349
402
401
399
326
327
348
4
485
3
0 2.5
487
396
352 353
364
316
317
3
398 404
486
488
370
371 397
0 2.5
489
362 3.25
365 356 366 367
376 394
359
351
363
373 372
314 392
490 491
391
377 379
358
360
374
375 380
3
409
3
361
0 2.5
2.50
493
359
376
407
4
492
381
385
390 408
423 410
382
384
3
411 477
383
386
389
424
422
2.75
497 496 495
387
388
421 412
432
434 426
3
2
511
482
484
2.50
483
2.75
345
344
2.50 2
2
481
54
tree inventory site plans
2
347
346
480 2
343
341 342
339
340
3
DESARR
Dotacional (Public Park, Play Grounds,Track, Pavilions)_ San Juan P.R._2014
Hon. Carm
Arquitectos
andrés
Andrés M
Lic. 10046 C Lic. 546 Col
CLARO N° 5: TIERRA LABERINTO
E
3
3
33
7
001
CAMPO DE JUEGOS
3
3
CLARO N° 4: FUEGO SISTEMA SOLAR
3
6
1
CLARO N° 3: QUINTAESCENCIA GIMNASIO AL AIRE LIBRE
3
3
CLARO N° 2: AIRE AVIARIO / ͗2
5
PO Box 364 tel 787 751andresmign
2
4
EXI STI NG FIC US HE DG E AT LAB IRY EXISTING FICUS HEDGE AT AT EXISTING FICUS HEDGE NT LABYRINTH LABIRYNTHTO TOBE BE DEMOLISHED DEMOLISHE H (REMOVED) COMPLETE (REMOVED): COMPLETE TO BE DE MO LIS HE (RE MO VE D): CO
3
3
3 3
284
204
182
195
199
205
193
3
3.25
281
280
299
282
207
208
190
191
192
186
300
169
278
275
276
210
277
273
272
263
264
261
265
4
2.50
262
260 259
337
2.25
333
257
258
250
271
3
267
255
256
209
211
212
213
214
215 266
189
188
172 171
187
151
163
156
162
157
145
142
141
140
139
147
150
155
144
160
268
4.25
254
269
218
252
253
245
242
247
3 2 2 1.75
246 244
240
161
238
2.50
107
239
236
234
235
132
120
219
127 058
229
224 223
222
227
221
056
2.25
226 231
059
060
055
053
128
117
3
2252
223
1.75
1.50 1.25 1
057
1
097
096
095
126
125
063
064
124
054
089
090
010
123
065
122 066
119
068
061
069
062
049
002
003 088
002
005
087
105
004
086
108
3
085 008
011
083 012
081
112
114
113
115
116
012
079
023
078
076
118
074
070 3 071
072
073
075
013
014
080
077
2.50
228
091
084
111
121
129 3
230
092
082
131
220
232
093
104
110
216
233
237
098
099
136 103 106
130
5 2.7
241
094
109
150
217
270
3.50
100
101
137 102
135
134
133
517
138
143
149
139
2.75
243 248
251
154
164
x 3.50
249
2 1.75 1.50 1.25
146
152
148
170 3.25
185
153
4
279
274
329
5 2.7
334
165
0 3.5
176 177
184
166
167
029
030
028
051
048
050
046
044
052 049
1 1
040 042
047
043
039
027
036 035
Nº de Proy
Nº de Cont
Entrega / Is
Fase Issue
De De
3
Co
2
Pre
1
Co
Revisión Revision
1
026
3
067
Yo, Andrés certifico que planos y las También c planos y disposicion Conjunto y Reglamento jurisdicción. declaración que se hay negligencia empleados, conocimien cualquier a OIGPe y incluyendo, de la parti certificación
Revisiones 2
5
2
3.50
178
168
173
175
179
183
5 3.2
206
174
3.75
0 3.5
194
180
2
201
203
181
3
302
328
332
202
196
3
307
301
338
286
285
283
306
0
290
197
1
5 3.2
2.7 5
293
294
298
198
1
297
3.50
200
2
305 303
308
314
3
309
208
3
310
289
3
3
312
291
1
292
2
295
1
296
2
304
4
1
311
320
335
MUNICIP
1. Tree Inventory Plan 2. Site Inprovement Plan 3. Fountain Plans & Details
037
3
041
2
1
0
5
10
GRAPHIC SCALE (METERS)
15
20
25
1
55
Fecha / Da 1 AB 2014
Dibujado p a mignucci
Archivo / C
M a tc h L ine
3
L 203
L 202
3 3
3
001
6
7
2
5
3
4
3
1
CLARO N째 4: FUEG O SISTEMA SOLA R
CLARO N째 5: TIERR A LABERINT O
CAMPO DE JUEG O 3
3
3
3
3
3
178
175
174
NT 1
168
173
167
153
166
169
165
NT 9
152
146
NT 1
154
145
150
183
0
3.2
144
147
141
3.
192
3.25
-
184
137
100
102
101
099
NH 2
172
092
NT 1
NT 1
NT 11
NT 11
NT 1
091
089
095
NT 11
NT 1
098
NT 1
097
096
002
006
103
133
134
087
105 106
086 3
107
132
109
084
3.50
NP 1 160
161
008
011
085
186 NT 9
005
108
149
NH 3 157
187
004
NT 3
NH 2
170 171
003
088
NH 3 156
162
049
010
104
135
NH 3
177
185
094
155
163 3.50
517
136
164
176
139
NH 2
150
3
138
NT 9
50
5
140
143
NT 9 3.75
3.5
142
2
182
180
1
181
3
196
012 083
130
110 4
082
120
112 081
NT 4
131
2
113
023
5m
114
NT 4 NT 4
129
5m
223
222
058
060
059
126 061
125
124 064
074
123 067
066
065
029
077
118
127
2.75
224
078
115
122
3
128
012
079
116
NH 2
3
5m
080
NH 2
NH 3
NT 4
076
070
068
016
030 017
072
019
028
063
2
026
018
1
031 071
062
073
3
032
021 022
040
050 048
221
1.50
226
L 202
L 203
036
046
044
042
Existing Tree to be remove d
#
Existing Palm to be remove d
035
052
225 1
057
1
056
054
052
041
1
049 1
038 1
047
043
M a tc h L ine
56
#
1
040
2
1.75
1.25
Existing Palm and reference number
2
223
2.25
#
020
027
069 033
2
053
Existing Tree and reference number
1
2.50
055
#
1
075
3
2
228
014
5m
3
111 150
220
013
NH 3
1
121
NT 4 139
0
5
GRAPHIC SCALE (METER S )
site improvement plan
10
15
20
25 SCALE 1:250
CONCRETE ROOF STRUCTURE TO BE STRIPPE D, CLEANE D, REPLASTERE AS REQUIRE D, PRIMED & PAINTE D.
D
CONCRETE
CONCRETE STRUCTURE TO BE STRIPPE D, CLEAN E D, REPLASTERE AS REQUIRE D, PRIMED & PAINTE D.
CONCRETE
5 A402
90°
COLUM N
6"
8"
7'
1'-8 "
1'-2 "
6"
67.50°
1'-6 "
3"
01 A4 5
1'-4 "
1' 3"
8"
112.50°
D
SEAT TO BE CLEANE D, PRIMER & PAINTE D
1'-6 "
135°
45°
1'-6 "
WALL SCONCE LIGHTIN G TO BE REPLACE D REFER TO ELECTRIC DWG S .
6'
3'
6"
WALL SCONCE LIGHTIN G TO BE REPLACE D REFER TO ELECTRIC DWG S .
GRANITE PLAQU E TO BE REMOVE D
CONCRETE
TO BE FLUSHED & CLEANE D
EXISTING 3/4" THIC K . STONE PAVEMEN T TO BE CLEANED & REPOINTED
a
a
VINE PLANTING AREA
ROOF DRAINS TO BE REPLACE D.
3"
1'
3"
3/4"
EXISTING
RAIN LEADERS
COLUM N
8'
ROOF DRAIN E Q. TO SMIT H 22.50° N° -163 0, 2" BRONZ E
157.50°
6'-10 "
6'
EXISTING STONE PAVEMEN T TO BE CLEANED & REPOINTED
PLANTING AREA
7'
1'-2 "
27'-6 "
27'-6 "
PAVERS TO BE CLEANE D
1'-6 "
3"
3/4 Ø GRANITE
6"
3' 8" 1'-8 "
EXISTING
1'-8 " 8" 3'
1'
2'
2'
6 A401
2 A402
1'-6 "
7'-6 " 6"
EXISTING LOW WALL TO BE STRIPPE D CLEANE D, PRIMED & PAINTE D
3" 1'-2 "
0° 1'-2 "
6"
180°
3/4 Ø VINE PLANTING ALU M. RO D TO BE REPLACE D
CONCRETE STRUCTURE TO BE STRIPPE D, CLEANE D, REPLASTERE AS REQUIRE D, PRIMED & PAINTE D.
7'
ROOF DRAIN TO BE REPLACE D E Q. TO SMITH N°-163 0, 2" BRONZ E
D 1'-2 "
6"
1'-8 "
8"
CONCRETE STRUCTURE TO BE STRIPPE D, CLEANE D, REPLASTERE AS REQUIRE D, PRIMED & PAINTE D.
6'-4 "
8"
D CONCRETE
2'
1'-6 "
1'-4 "
1'-6 "
NEW CONCRETE SLA B SEE STRUCTURAL DETAIL S
4" 1'-6 " 3"
1'-6 " 4"
10"
2"
3"
1'-3 " 3"
1'
3"
8' 6'
EXISTING 3/4" THIC K . STONE PAVEMEN T TO BE CLEANED & REPOINTED
PLANTING AREA
4"
6'-4 1/2" max. 6'-1" min. 4"
3" 12 A402
1'-2 " 2"
2'
EXISTING CONCRET E BENCH TO BE STRIPPE D CLEAN E D, PRIMED & PAINTE D
6"
1'
3"
3/4" THIC K . STONE PAVEMEN T TO BE CLEANED & REPOINTED
EXISTING CONCRET E PRECAS T BENC H TO BE STRIPPE D, CLEANE D, PRIMED & PAINTE D
3/4"
1'
10" 4"
3"
fountain plans & details
3"
EXISTING LOW WALL TO BE STRIPPE D CLEAN E D, PRIMED & PAINTE D EXISTING
5 A402
PLANTING AREA
SLA B
3"
WALL SCONCE LIGHTIN G TO BE REPLACE D REFER TO ELECTRIC DWG S .
3" 4" 6" 3"
8'
8'
CONCRETE
WALL SCONCE LIGHTIN G TO BE REPLACE D REFER TO ELECTRIC DWG S .
6'-6 "
6'-10 " 3"
3/4" THIC K . STONE PAVEMEN T TO BE CLEANED & REPOINTED
12 A402
2'
EQ .
1'-6 "
3/4 Ø ALUMINIUM PLANTING ROD TO BE REMOVED & REPLACED SE E 11 13 A402 A402
EXISTING
EXSTING
6'
3/4 Ø ALUMINIUM PLANTING ROD TO BE REMOVED & REPLACED SE E 11
5 A402
NEW CONCRETE SLA B SEE STRUCTURAL DETAIL S
3'
RAIN LEADER T O BE FLUSHE D
13 A402
1'
6"
3" 6"
1'-2 " 8"
1'-6 "
3" 6'
6"
EQ .
BEAM S
RAIN LEADER TO B E FLUSHED & CLEANE D
A402
6"
2'
CONCRETE
6"
3'
1'-9" max.
6"
8"
6"
1'-6 "
6"
TRELLI S
6"
1'-2 "
8"
3"
1'-8 "
10"
ROOF DRAIN TO BE REPLACE D E Q. TO SMITH N°-163 0, 2" BRONZ E 1'-2 "
E XS T ING CONCR E T E SLA B
57
Rehabilitation of University of Puerto Rico Hotel
58
Residential (Students & Faculty Hotel)_ San Juan P.R._2015
1. Demolition & Proposed Plans 2. Elevation and Sections 3. Demolition Typical Unit Plan 4. Proposed Typical Unit Plan 5. Typical Unit Interior Elevations 6. A.D.A. Room Plan 7. Proposed A.D.A. Room Plan 8. A.D.A. Bathroom Sections
59
STUDENT ORGANIZATION FACILITIES
STUDENT ORGANIZATION FACILITIES
Project Limit
Project Limit
Project Limit
Elev
Elev
Elev COMPUTER ROOM N.I.C.
Stair No 1
Stair No 1
ELECTRICAL BOX
11'-8" 11'-8"
4"
Exist. jalousie window to remain
11'-8" 11'-8"
4"
Exist. jalousie window to remain5"
5"
D 5"
5"
4"
Exist. jalousie window to remain
C 5"
5"
A
A
Exist. jalousie window to remain5"
B 5"
4"
Exist. jalousie window to remain
1'-6 1/2"
11'-8" 11'-8"
1'-6 1/2"
12'-0"
Exist. jalousie window to remain
2'-0"
Exist. jalousie window to remain
Exist. jalousie window to remain5"
5"
A
A Stair No 2
Stair No 2
Stair No 2
up
Project Limit
1
60
Project Limit
Project Limit
2
3
demolition & proposed plan
1
2
3
# # A ### A ###
5"
5"
dn Stair No 2
# A ###
4"
Exist. jalousie window to remain
4"
Exist. jalousie window to remain
4" 24'-0"
ID
# # A ### A ###
5"
1
1
up
Project Limit
2
3
2
3
96'-0"
4" 11'-8" 11'-8"
# A ###
Exist. jalousie window to remain5"
Project Limit
11'-8"
12'-0"
4" 24'-0" 4" 24'-0"
Exist. jalousie window to remain
12'-0"
11'-8"
24'-0"
ID
11'-8"
A/C
ID
A
ID
HOUSEKEEPING ROOM
5"
3 A 200
ID
12'-0"
24'-0"
ID 3'-2"
12'-0"
12'-0"
Exist. jalousie window to remain
12'-0"
5"
A.D.A ROOM
5"
2'-0"
ID
1'-6''
A/C
12'-0"
12'-0" 24'-0"
Exist. jalousie window to remain
ID
Project Limit
11'-8"
96'-0" 4" 11'-8"
B
5"
ID
Exist. jalousie window to remain
4"
B
B
Exist. jalousie window to remain
12'-0"
ID
ID
11'-8"
12'-0" 24'-0" 12'-0" 96'-0"
12'-0"
A/C
ID ID
C # A ###
24'-0"
ID
5"
B
# A ###
# A ###
11'-8"
ID
# A ###
ID
12'-0"
12'-0"
Exist. jalousie window to remain
Project Limit
5"
ID
Project Limit
A/C A/C
96'-0" 12'-0"
ID
24'-0"
24'-0"
Exist. jalousie window to remain
# A ###
C
# A ###
Project Limit
C # A ###
# A ###
ID
12'-0"
24'-0"
ID ID ID
Project Limit
96'-0"
# A ###
5"
5"
12'-0"
# A ###
ID
ID
12'-0"
# A ###
Exist. jalousie window to remain
Project Limit
C
12'-0"
# A ###
ID
A/C
12'-0"
12'-0" 24'-0"
Exist. jalousie window to remain
ID
12'-0"
5"
ID
Exist. jalousie window to remain
4"
D
12'-0"
D
D
12'-0"
4" 24'-0"
ID
D
Exist. jalousie window to remain
12'-0"
ID
ID
11'-8"
5"
A/C
ID
ID
A.D.A ROOM
5"
G
24'-0"
ID
3'-2"
12'-0"
12'-0"
ID
12'-0"
A/C
12'-0" 24'-0"
24'-0"
24'-0"
Exist. jalousie window to remain
G 5"
ID
ID STACKABLE W/D (2) ICE MAKER MACHINE & VENDING MACHINES ROOM
Project Limit
G
G 5"
Stair No 1
ID
dn
ELECTRICAL BOX
Exist. jalousie window to remain
Elev
COMPUTER ROOM N.I.C.
Stair No 1
G
Project Limit
4"
ID 11'-8" 4"
11'-8" 4"
ID 11'-8"
A/C
12'-0"
11'-8"
A/C
4"
96'-0" 4"
11'-8"
A/C
12'-0"
11'-8"
4"
4" 24'-0"
ID 11'-8"
A/C
12'-0"
11'-8"
A/C
24'-0" 12'-0"
A/C
12'-0"
11'-8"
A/C
12'-0"
11'-8"
11'-8"
A/C
12'-0"
11'-8"
A/C
12'-0"
ID
ID
ID
ID
ID
Stair No 2
1 ID
ID
ID
ID ID
ID
ID
ID ID
ID ID
ID ID
ID ID
ID
ID ID
ID
ID
ID
ID ID
ID
ID ID
ID
ID
ID ID
ID
ID
ID ID
ID
ID
2 ID
N.I.C
ID
ID
ID
ID
ID
ID
ID
ID ID
ID
ID
ID
ID
ID
3 2 # A ### # A ###
# A ### # A ###
3 A 300 3 A 300
A
existing elevation & sections N.I.C 12'-10"
4"
4" 24'-0"
24'-0"
ID
N.I.C 12'-10"
4"
4"
A/C
12'-0"
Stair No 1
10'-1"
10'-1"
Elev
ID
N.I.C 10'-1"
Stair No 1
10'-1"
11'-8"
A/C
12'-0"
4" 24'-0"
12'-0"
Elev
10'-1"
1 A/C
11'-8"
24'-0"
C
12'-0"
B 4"
A/C
12'-0"
# A ###
A/C
11'-8"
A/C
12'-0"
D
12'-0"
4" 24'-0"
24'-0"
# A ###
11'-8"
A/C
12'-0"
ID ID
G
ID
ID
ID
ID
ID
ID
ID ID
ID ID
ID
Stair No 2
N.I.C
3
61
10'-1"
Demolished (Existing flooring Original closet floor to be and cement base to be removed).Demolished (Existing flooring and cement base to be 16removed).
2'-0"
3F A510
A/C
9 A/C
2'-0"
3F A510
F.D. 7'-0'' F.D.
F.D.
6'-8" 7'-0''
7'-0''
New concrete wall
1'-3"
2'-8"
3B A510
1'-3"
4'-8"
2'-0"
2'-0" 1'-4"
1'-7"
6'-8"
4'-8" 1'-4"
1'-7"
1'-4" 1'-11" 1'-7"
1'-7"
4"
53'-9"
3'-6"
5
New polish cement flooring.
flooring to be protected and restored (clean & polish).
Other features
11'-8"
Existing Original HK |1959 concrete
3
1
3'-6"
1
5
Restore, remain & protect
DEMOLITION & RESTORATION
4
KEY
4
1
Existing wall New concrete block wall
3
Existing flooring and concrete base to be removed.
Newwall concrete block wall New concrete
4
Existing ceramic tile floor to be removed.
KEY
4
KEY
New concrete wall Existing wall
1 2
New concrete block wall Existing wall Existing Original HK |1959 Concrete Tile Floor to be protected and restored (clean & polish). New concrete wall New1concrete block wall Existing Original HK |1959 Concrete to be protected and restored Existing Original HK |1959 concrete flooringTile to Floor be protected and restored (clean & (clean polish).& polish).
7
Walls Existing concrete block wall to be demolished.
9
Existing wall to remain.
1
13 14
3'-3"
3
4 and concrete base to be 9 CHASE Existing flooring removed. PLUMBING
4
Existing ceramic tile floor to be removed. Walls Existing concrete block wall to be demolished. 3C Existing to remain. A520 Door and wall windows Existing window to be removed, delivered to UPR. Existing window to remain.
2
GSEducationalVersion
P
3
sca
Bathroom equipment and accessories Existing shower dam to be demolish.
Demoliton Typical Unit Plan
7
15 16
Bathroom equipment and accessories to be removed. 3'-2" scale 3/8" = 1'-0" Existing shower drainage to be removed & replaced/relocate 18
7
19
7
4 Floor PLUMBI Original HK |1959 Concrete Tile Floor and coloured ceme
4 Tile Floor and coloured Original HK |1959 Concrete ceme PLUMBI finish to be removed.
9
Floor Original HK |1959 Concrete Tile Floor and coloured cement base finish to be protected and restored (clean & polish). Original HK |1959 Concrete Tile Floor and coloured cement base 7 finish to be removed.
2'-0"
PLUMBING CHAS
2
7
2
Existing wall
DEMOLITION 4 & RESTORATION
finish to be protected and restored (clean & polish). A.D.A ROOM
5
Wall
1'-6"
Restore, remain & protect
7
3'-0"
A/C
2
Other features 3'-6"
4'-6"
4'-8" 1'-4" 2'-3" 3'-3"
3'-3"
1'-11"
1'-11"
3'-9"
3'-9"
2'-3"
Existing Original HK |1959 Concrete Tile Floor to be protected and restored (clean & polish).
Flooring Wall
3'-6"
Flooring 1
4
1'-3"
Demolition ELECTRICAL OUTLET
3'-0" 3'-9"
Demolition
3B A510
ELECTRICAL OUTLET
3'-0"
KEY 3'-0" Demolition & Restoration Code
2'-2"
15 3A A520 19
KEY Demolition & Restoration Code ELECTRICAL OUTLET
3'-3"
1'-4" 3'-3"
2'-2"
22
16
4
7'-2"
New concrete block wall
6'-11"
proposed typical unit interior elevations 2'-8"
Existing wall
proposed typical unit plan 2'-10"
2'-2"
21
1'-7"
3A A510
3F A510
9
3F A510
2'-10"
2'-2" 2'-8"
1'-11"
2'-8"
PLUMBING CHAS
9
ELECTRICAL OUTLET
2'-3"
2
KEY
ELECTRICAL BOXES
4 Typical Unit
Existing ceramic tile on wall to be removed. A/C
1'-0"
1'-6"
5
ELECTRICAL ELECTRICAL SWITCH BOXES
4"
Proposed Typical Unit Plan
1'-6"
7'-3" 4'-6"
7
3'-2"
F.D. 11'-11" F.D. 3'-4"
3A A510
3B A510
51'-3" 2'-10"
7
3A A510
2
3B A510
5
2'-10"
2'-0"
3A A510
2
KEY
Rectangular metal tube
3'-6"
23
TUBE
3 2'-0"
1'-6"
21 3'-9"
2'-3"
3
3
1'-6"
3'-0"
2'-3"
3
5'-0"
9
5'-0"
9 9
11'-11"
11'-11" F.D. F.D. 3'-4"
7
6'-8" 6'-8"
Rectangular metal tube
scale 3/8" =
9
7
7
5'-0"
3C A510 3C A510
Door with key 5 access card lock. 2 7 Door with key access card lock. 5
32'-9"
3F A510 2'-9"
Rectangular metal tube
GSEducationalVersion
11'-11"
2'-0" 2'-0" 3'-0"
9
7
5
5'-0"
A/C A/C
1
3D A510 3D A510
3C A510
3'-0"
3D A510
3C A510
3B Rectangular A510 metal tube
62
1'-3" Door with key access card 4 Door with key lock. 7 access card lock.
3
6'-8"
New 3B GE Zone-line wall AC Unit with 18'' grille. A510
1
6'-8"
A/C
A/C
3D A510
A/C
New GE Zone-line wall AC Unit with 18'' grille. New GE Zone-line wall AC Unit with 18'' grille.
2
2'-10" 3
2'-9"
3A A510
New GE Zone-line wall AC Unit with 18'' grille.
2'-0" 3 2'-9"
7
3'-4"
3A A510
6'-1"
2
7
ELECTRICAL SWITCH
3B A510
3 23
ELECTRICAL OUTLET
14
1'-0"
ELECTRICAL BOXES
5
3
1'-6"
3'-0"
1
ELECTRICAL SWITCH ELECTRICAL BOXES
5
7
A.D.A ROOM
1
scale 3/8" = ELECTRICAL SWITCH
5'-0"
6'-8" 2'-0" 2'-0" 3'-0"
3A A510
3F A510
LAMP 2'-2"
2'-8"
3'-4"
9
3F A510
1
3B A510
3F A510
Exist. jalousie window to remain
1
3'-4"
3'-0"
A/C A/C
3C A510
Rectangular metal tube
3B A510
5 5 7
3F A510
LAMP
2
7
2'-9"
9
3B A510
3A A510
9
7 with key Door access card7 lock. 5
3
6'-11"
A/C
A/C
3A A510
3D A510
New GE Zone-line wall AC Unit with 18'' grille.
ELECTRICAL BOX LAMP ELECTRICAL LAMP BOX
9
1
1'-0"
A/C
scale 3/8" =
2'-0"
7'-0''
7
4'-8"
9
3'-3"
Existing ceramic tile on wall to be removed.
1'-0"
Demoliton Typical Unit Plan 3A A510 1 scale 3/8" = 1'-0" Demoliton Typical Unit Plan
1
7'-0''
Existing A/C hole to be resize by new GE Zone-line wall A/C unit.
23
14
Original closet flo Demolished (Exis 6' and cement base removed). 1
22
21
1'-11"
Existing shower drainage to 18 removed.& replaced/relocated. Bathroom equipment and accessories to be be removed 19 Existing ceramic tile on wall to be removed. Existing shower drainage to be removed & replaced/relocated.
ELECTRICAL BOXES
ELECTRICAL BOX ELECTRICAL BOX
6'-11"
19
Exist. jalousie window to remain
6'-11"
18
22
9
ELECTRICAL SWITCH
A/C & hole to be resize attach by newtoGE Zone-line wall 23 galv.Existing Existing metal stud other features wall or ceiling to A/C unit. be removed.
A
sca
9
6'-11"
16
Bathroom equipment to be removed. Existing ceramic tile onand wallaccessories to be removed. Bathroom equipment and accessories Existing shower dam to be demolish.
COMUNICATION BOX COMUNICATION BOX
11'-11"
15
1
9
4'-8"
16 19
2'
19
7'-3"
19
7
3'-2"
14
22
4'-6"
16
13 18
COMUNICATION BOX COMUNICATION BOX
Miscellaneous elements Existing electrical and telecommunication features to be removed, Miscellaneous as speci fied in electricalelements plans. Existing electrical and telecommunication features to be removed, 21 as speci plans. attach to wall or ceiling to Existing galv. metalfied studin&electrical other features be removed. Existing galv. metal stud & other features attach to wall or ceiling to 22 Miscellaneous elements behole removed. Existing A/C to be resize by telecommunication new GE Zone-line wall A/C unit. 23 Existing electrical and features to be removed, 5 21 as speci A/C fiedhole in electrical plans. Existing to be resize by new GE Zone-line wall A/C unit. 23 Miscellaneous elements Existing galv. metal stud & other features attach to wall or ceiling to Existing 22 electrical and telecommunication features to be removed, 21 as speci fiedbe in removed. electrical plans. 21
window to remain. BathroomExisting equipment and accessories Existing shower damwindows to be demolish. Door and Bathroom equipment and accessories 15 13 windowdam to betoremoved, delivered to UPR. shower be demolish. BathroomExisting equipment and accessories to be removed. 14 16 Existing window to remain. Bathroom equipment and accessories to be removed. Door and windows Existing window to be removed, to Existing shower drainage to bedelivered removed & UPR. replaced/relocated. Bathroom equipment and accessories 3F 15 Existing shower drainage dam to betodemolish. beA510 removed & replaced/relocated. 18 window Existing to tile remain. Existing ceramic on wall to be removed.
22
9
4'-6"
Door and windows Existing window to be removed, delivered to UPR. Door and windows 13 Existingtowindow Existing window remain.to be removed, delivered to UPR. 14
15
4
1'-6"
3'-2"
3'-2"
14
9
scale 3/8" =
ELECTRICAL BOX ELECTRICAL OUTLET ELECTRICAL OUTLET
F.D.
1
7'-0''
demolition typical unit plan
9
13
2'-0"
1
3'-0"
LAMP
A/C
9
ELECTRICAL OUTLET ELECTRICAL OUTLET
3'-0"
Other features Demolition & Restoration Code Restore, remain & protect Flooring Demoliton Typical Unit Plan Restore, remain & protect
7
21
Existing A/C hole to be resize by new GE Zone-line wall A/C unit.
7'-3"
2'-0"
16 9
7'-3"
1'-6"
Existing wall to remain. Walls Demoliton Typical Unit Plan Existing concrete block wall to be demolished. Demoliton Typical Unit Plan Existing wall to remain. scale 3/8" = 1'-0"
3'-0" 23
Existing shower drainage to be removed & replaced/relocated. 1'-6" 2'-0" Existing ceramic tile on wall to be removed.
Flooring
Demolition Wall scale 3/8" = 1'-0" FlooringDEMOLITION & RESTORATION Other features DEMOLITION & RESTORATION WallFloor remain & protect OriginalRestore, HK |1959 Concrete Tile Floor and coloured cement base 1 Floor to be protected and restored (clean & polish). finish Other features Original HK |1959 Concrete Tile Floor and coloured cement base 1 to be protected and restored (clean & polish). finish remain protect Original HK&|1959 Concrete& Tile Floor and coloured cement base 2 Restore, DEMOLITION RESTORATION finish to be removed. Original HK |1959 Concrete Tile Floor and coloured cement base 2 Floor to be removed. finish 3 Existing flooring and base to Tile be removed. Original HK concrete |1959 Concrete Floor and coloured cement base DEMOLITION & RESTORATION 1 to be protected and restored polish). finish 3 Existingtileflooring and base(clean to be & removed. 4 Existing ceramic floor to beconcrete removed. Floor 4 HK |1959 Concrete Tile Floor and coloured Original |1959 Concrete Tile Floor and cement basecement base 2 HK Original Existing ceramic tile floor to becoloured removed. 1 Walls removed. finish to be to be protected and restored (clean & polish). finish Existing concrete block wall to be demolished. 7 Walls 3 HK Existing flooring and concrete base to be removed. Original |1959 Concrete Tile Floor and coloured cement base concrete block wall to be demolished. 2 9 7 Existing wall to remain. finish4to be removed. 9 ceramic tile floor to be removed. Existing wall to remain. 3 Existing flooring and concrete base to be removed. Walls 4 Existing concrete block wall to be demolished. 7 Existing ceramic tile floor to be removed.
4'-11" 4'-11" 2'-0"
Wall KEY features Other Demolition
1
22
3'-0"
9
F.D.
19
2'-0"
COMUNICATION BOX
F.D.
18
Code
21
18
1'-6" Bathroom equipment and accessories to be removed.
KEY Demolition & Restoration Code
New GE Zone-line wall AC Unit with 18'' grille. A/C New GE Zone-line wall AC Unit with 18'' grille.
A/C
13
Miscellaneous elements 9 13 Existing electrical and telecommunication features to be removed, as speci fied in electrical plans. 9 13 Existing galv. metal stud & other features attach to wall or ceiling to be removed.
18
7'-0''
16
9
2
15 15 19
19
Bathroom equipment and accessories 1'-6" Existing shower dam to be demolish.
A/C
23
7'-0''
Existing flooring and concrete base to be removed. Existing KEY ceramic tile floor to be removed.
Existing window to remain.
6' New GE Zone-line wall AC Unit with 18'' grille. New GE Zone-line wall AC Unit with 18'' grille. A/C
1
13
18
4
3
14
ELECTRICAL SWITCH
4'-6"
14
16
9 windows 4 Door and Existing window to be removed, delivered to UPR.
9
Alum. tube Exist. jalousie window to remain
ELECTRICAL SWITCH
9 ELECTRICAL OUTLET
4'-6"
13
4
Wall
9
19
22
3
KEY & Restoration Code WallsDemolition Existing concrete block wall to be demolished. Demolition & Restoration Demolition Existing wall to remain. Flooring Demolition
15 16 18
9
7'-3"3'-2"
6'-8"
22
Concrete Tile Floor and coloured cement base finish to be removed. Concrete Tile Floor and coloured cement base finish to be removed.
15 4 19
Original cl Demolishe and cemen removed).
22
21
Alum. tube
ELECTRICAL SWITCH ELECTRICAL SWITCH
9
Concrete Tile Floor and coloured Concrete Tile cement base finish Floor and coloured to be removed. cement base finish to be removed.
16 4
6'-8"
21
15
9
7
9
DEMOLITION & RESTORATION 21 Floor Original HK |1959 Concrete Tile Floor and coloured cement base finish to be protected and restored (clean 21& polish). 22
Alum. tube
3'-2"
9 22
Original HK |1959 Concrete Tile Floor and coloured cement base finish to be removed.
7
4'-11"
6'-8" 6'-8"
23 21
Alum. tube
13
16
9
2
13 13
3'-0" 7
2 2
23
Restore, remain & protect
1
9
7
5"
6'-1" 2'-0"
7
Demolition
Other features
2
13 9
23
KEY 1 Demolition & Restoration Code
Wall
3
1'-6" 7
1
9
5"
7 6'-1"
2
7
1
13
9
3
14 23
Flooring
2'-0"
2'-0" 7
14
9
6'-1"
6'-8"
Exist. jalousie window to remain
22
14
2'-0"
Exist. jalousie 1 window to remain
22
9
22 21
2'-0"
21 21 Exist. jalousie 14 window to remain Exist. jalousie window to remain
AC Unit with 18'' grille.
A/C
Original closet floor to be Demolished (Existing flooring 4 15 and cement base to be removed). 3 closet Original floor to be flooring Demolished (Existing 5" 19base3to be 18 and cement 5" removed). 6'-1"
7'-0''
22
21
4'-11"
22
21
3B A520
1
16 9 21
4
1'-6"
15
2'-0"
22
19 21
18
2'-0" 13
Exist. jalousie window to remain
9
1'-0"
13
Original closet floor to be Demolished (Existing flooring and cement base to be removed).
22
loset floor to be ed (Existing flooring nt base to be
9
scale 3/8" =
3'-0"
7 Typical Unit
9
3'-2"
3
5 3A A520
13
5"
14
5"
4"
'-1"
11'-0"
6'-8"
6'-1"
7
Concrete Tile Floor and coloured cement base finish to be removed.
22
21
1'-0"
9
13
2'-6"
9
1'-6"
3'-0"
3C A520
3
3C A520
6'-8"
3'-0"
1
9
Existing Original HK |1959 concrete
A
1'-6" 6"
1'-6"
3'-0" 1'-3"
LAMP
B
Section
A.D.A. Bathroom Sections scale 3/8" =
ELECTRICAL BOX
C
Section
A.D.A bathroom elevations
ELECTRICAL BOX
1'-0"
1'-0"
ELECTRICAL BOXES 1'-3"
3'-3"
7
4'-8"
ELECTRICAL SWITCH LAMP
KEY 1'-6"
5'-0"
Section
flooring to be protected and restored (clean & polish).
New polish cement flooring.
9
3
7
3'-0"
ELECTRICAL BOX
1'-6"
5 4
3'-3"
2'-10"
F.D.
9
3'-0" 7'-0''
3'-4"
1'-3"
6"
1'-6"
1'-6" 6"
1'-6"
6'-11"
2'-0"
6"
7
1'-0" 6"
COMUNICATION BOX
3B A520 7'-2"
7
6" 6"
1'-6" 6"
1'-6" 6"
F.D.
4
3
Existing Original HK |1959 Concrete Tile Floor to be protected and restored (clean & polish).
3"
KEY
11'-0"
4'-0"
5'-0"
5'-5"
7'-2"
7'-0''
3'-0"
proposed A.D.A unit plan
2'-3" 11'-0"
F.D.
12'-2"
COMUNICATION BOX
7'-3"
12'-2" 4"
11'-0"
2'-3" 6'-11"
6"2'-3"
7
3F A510
3
6"
6"
TUBE 6"
0"
2
3C A520
3B A520
3"
0"
1
Section
2'-0"
9 3B A520
COMUNICATION BOX
New concrete wall
7'-0''
A
5'-5"
1'-6''
4 2'-0"
"
11'-0" 6"
5
3'-6"
3'-2"
Existing A/C hole to be resize by new GE Zone-line wall A/C unit.
ed.
7'-0''
2'-0"
9 3
be removed.
23
New GE Zone-line wall AC Unit with 18'' grille.
7
New concrete block wall
2'-6"
3A A520
Existing galv. metal stud & other features attach to wall or ceiling to 6"
22
A/C
12'-2"
3C A520
2'-0"
21
1'-0" 3'-6"
TUBE
4'-11"
2'-0"
Existing A/C hole to be resize by new GE Zone-line 7wall A/C unit.
Proposed A.D.A ROOM
n
6'-11" 4'-0"
4'-6"
Existing galv. metal stud & other features attach to wall or ceiling to 9 be removed.
23
11'-11"
Existing ceramic tile on wall to be removed. 3C A520 Miscellaneous elements Existing electrical and telecommunication features to be removed, as speci fied in electrical plans.
2'-6"
1'-6" 7'-2" 7'-2"
22
3
7
New GE1 Zone-line wall AC Unit with 18'' grille.
Existing wall
ELECTRICAL OUTLET
2'-0"
19
5
3'-3"
Miscellaneous elements Existing electrical and telecommunication features to be removed, as speci fied in electrical plans.
2'-6"
Existing shower drainage to be removed & replaced/relocated. A/C
18
2'-0"
5'-0"
1'-6"
16 3/8" = 1'-0" scale Bathroom equipment and accessories to be removed.
2'-6"
2
6"
15
3
7
11'-0"
1'-0"
1
1'-0"
7'-0''
11'-8"
A/C
Demoliton Typical Unit Plan Bathroom equipment and accessories Existing shower dam to be demolish.
ent INGbase CHASE
Existing ceramic tile on wall to be removed.
5
PLUMBING CHASE
Section
A
1'-0"
7
4"
Existing window to remain.
Existing shower drainage to be removed & replaced/relocated.
1
A/C
1'-0"
ELECTRICAL OUTLET
Existing A/C hole to be resize by new GE Zone-line wall A/C unit. 3B KEY A520
23
18
21
scale 3/8" =
Existing galv. metal stud & other features attach to wall or ceiling to be removed.
22
3"
Bathroom equipment and accessories to be removed.
A.D.A ROOM
4
Miscellaneous elements Existing electrical and telecommunication features to be removed, as speci fied in electrical plans.
21
4'-0"
3'-4"
14
2'-0"
Bathroom equipment and accessories Existing shower dam to be demolish.
3A A520
6"
A/C
HOUSEKEEPING ROOM OR STACKABLE W/D ICE MAKER MACHINE
& VENDING MACHINES Door and 5 windows ROOM Existing window to be removed, delivered to UPR.
New GE Zone-line wall AC Unit with 18'' grille.
2
7
3C A520
1'-6"
Existing7wall to remain. 2
9
13
A/C
7
ELECTRICAL SWITCH
ELECTRICAL SWITCH
PLUMBING CHASE
4
16
19
KEY
2'-6"
ELECTRICAL OUTLET 5
5
5
6"
Existing window to remain.
4"
Walls Existing concrete block wall to be demolished.
3'-6"
Door and windows 3'-2" Existing window to be removed, delivered to UPR.
15
3B A520
2'-0"
Existing ceramic tile floor to be removed.
SE 3
ING CHASE
11'-0"
TUBE
Existing flooring and concrete base to be removed.
4
7
ent base
3A A520
14
3B A520
1
Alum. tube
Alum. tube Proposed A.D.A ROOM
2
GSEducationalVersion
9
13
3
13
Original HK |1959 Concrete Tile Floor and coloured cement base finish to be removed.
3
3'-0"
7
3'-0"
4"
1
3'-0"
2'-0"
DEMOLITION & RESTORATION 9 13 Floor Original HK |1959 Concrete Tile Floor and coloured cement base finish to be protected and restored (clean & polish).
18
2
1'-6"
HOUSEKEEPING ROOM OR STACKABLE W/D ICE MAKER MACHINE & VENDING MACHINES ROOM
9
2
5
6"
Restore, remain & protect 5
9
5'-0"
Other 7 features
5
9
3C Typical Unit A520
Wall
SE
18
Floor and coloured cement base finish to be removed.
Flooring
1'-6''
KEY 19 Concrete Tile Demolition & Restoration Code
Demolition
13
3'-0"
3'-3"
15
2'-0"
5'-0"
4
5'-5"
6'-8"
A.D.A ROOM
1'-6"
7'-2"
9
16
11'-8"
A/C
22
1'-0"
4'-11"
A.D.A ROOM scale 3/8" =
ELECTRICAL SWITCH
7'-0''
4'-6"
7
9
demolition units plan (for A.D.A)
3
1
11'-0"
Concrete Tile Floor and coloured cement base finish to be removed.
5"
1
3B
A520 PLUMBING CHASE
1
18
3'-4"
13
9
15 19
2'-0"
2'-0"
4 4'-11"
4"
16
4
4"
9
5
6"
6'-1"
9 22
Alum. tube
3"
A/C
3A A520
7
21
Concrete Tile Floor and coloured cement base finish to be removed.
5
5"
2
7
ale 3/8" =
4 2'-0"
4'-11"
Typical Unit
7
13
2'-0"
2'-0"
4'-11"
9
3
7
2
7
23
oor to be sting flooring '-1" to be
3
3'-2"
1'-6''
22
6"
4"
6'-8"
Original closet floor to be Demolished (Existing flooring 1 and cement base to be removed).
6'-1"
E
5"
6'-1"
1'-0"
21
7
3'-6"
12'-2"
3
14
5'-0"
ale 3/8" =
3'-2"
13
6"
Exist. jalousie window to remain
A.D.A ROOM
9
1'-6''
2'-0"
2'-0"
13
18 Original closet floor to be Demolished (Existing flooring and cement base to be removed).
2'-0"
9
15
2'-0" 19
5'-0"
18
4
7'-2"
3'-0"
9
1'-6"
2'-0"
'-0"
22
2
5 3'-3"
11'-8"
9 21
15
A/C
6'-1"
6
7
3 1
A.D.A ROOM
16
3'-4"
Concrete Tile Floor and coloured cement base finish to be removed.
4'-11"
5'-5"
23
4'-6"
5'-5"
2'-0"
2
1 7
1'-0"
1'-3"
3'-3"
63
A
sc
University of Puerto Rico Concessionaires & Playroom Area
64
Commercial (Food Court & Playroom)_ San Juan P.R._2015
1. Asbuilt / Demolition Plan 2. Asbuilt / Demolition Interior Elevations 3. Proposed Conceptual Alternatives Plans 4. Concession Conceptual Elevation 5. Concession Conceptual Section 6. Concession Conceptual Plan 7. Concession Conceptual Perspectives
65
9 X 1
3
4
6
7
8 W up
G
V
Existing glass partition to be removed Planter to be restored
4 K
Pro
it t Lim
jec
Access 1
H
up
11
14
15
U
tL it im
Existing glass partition to be removed
T
T T
G
T
C
T
9
BATHROOM WOMEN
G
jec
C
Existing glass partition to be removed
Pro
N.I.C. STAIRS
S
Existing fascia above to be removed
Fl. Fin. Limit
H
1
Access 6
Original HK |1959 Concrete Tile Floor finish to remain clean & polish.
J
Concession B E F GH I
ELEC. CLOSET
1999 | Epoxy Terrazzo Flooring to be removed
Existing
S
Freezer
up
Existing Cooler
C
Project Limit
Service Access
1
A
T T
Project Limit
S
Existing glass partition to be removed
LOADING AREA
OFFICE
H
G
BATHROOM MEN
K
STORAGE "B"
TRAY WASH
S
STORAGE "C"
R
Elev
H
6'' x 6'' Quarry tile floor to be removed
STORAGE "A"
K
6'' x 6'' Quarry tile floor to be removed
MECHANICAL CLOSET
H Existing freezer
Q
4"
Existing Cooler
P
S Existing fascia above to be removed
Access 5
2
H
3
K
Concession B E F GH I
Concession B E F GH I
6'' x 6'' Quarry tile floor to be removed
K
6'' x 6'' Quarry tile floor to be removed
Project Limit
T T T
Existing fascia above to be removed
A
Project Limit
C
N.I.C. INDOOR TERRACE
S
K
H
H
T
Fl. Fin. Limit
T
H
6'' x 6'' Quarry tile floor to be removed
Line of First Floor above
Concession
Fl. Fin. Limit
B E F GH I H
T
G
O
4
A
T
Existing glass partition to be removed
T
K
A
T
6'' x 6'' Quarry tile floor to be removed
T T T
S
T
S
Project Limit
Existing marble saddle bevel to be removed Fl. Fin. Limit
Line of First Floor above
T T
1
Original HK |1959 Concrete Tile Floor finish to remain clean & polish.
A
T
H
H
C
T
Fl. Fin. Limit
Access 4
H Access 3
T T
Existing glass partition to be removed
G
up
N
S
T
T
M G
Access 2
Existing glass partition to be removed
K
B 2
Existing wood louvers to remain
Existing gypsum board with glass panels to be removed
1
Original HK |1959 Concrete Tile Floor finish to remain clean & polish.
Project Limit Existing corrugated glass partition wall to remain
66
G
Existing wood louvers to remain
K 2 N.I.C. LOBBY
No
rte
3 N.I.C. CONCESSION
asbuilt / demolition plan
GSEducational
6 TV
Exist. gypsum board fascia
Exist. gypsum board ceiling
Exist. sign to be removed
Exist. concrete slab
6
7
8
TV
TV
TV & Accessories to be removed
Exist. steel Joist
TV
TV
D 5
TV & Accessories to be removed
TV
TV
TV
TV
G G
Existing glass partition to be removed
Door & Roll-up- Door/ Grilles to be removed
8
6
7
8
6
7
8
TV
6 Signage & Ornamental C Structures to be removed
7
TV
7
D 5
8
Existing glass partition to be removed
H
TV
Existing wood louvers to remain
GWB, Mosaic tile Wall & Metal Decorative Panels to be Removed
8
G C
H
6
7
8
Signage [menu board] to be removed
Existing wood louvers to remain
H
2
Door & Roll-up- Door/ Grilles to be removed
8 C
6
7
8
Signage [menu board] to be removed
GWB, Mosaic tile Wall & Metal Decorative Panels to be Removed
B
H
Door & Roll-up- Door/ Grilles to be removed
GWB, Mosaic tile Wall & Metal Decorative Panels to be Removed
Door & Roll-up- Door/ Grilles to be removed
7
Existing glass partition to be removed
B
Exist. A/C duct to Remain
8
3
B
Exist. A/C duct to Remain Door & Roll-up- Door/ Grilles to be removed
Existing corrugated glass partition wall to remain
2
Signage & Ornamental C Structures to be removed
G
3
& Roll-up- Door/ H Door Grilles to be removed
GWB, Mosaic tile Wall & Metal Decorative Panels to be Removed
Existing glass partition to be removed
Existing corrugated glass partition wall to remain
G
Existing glass partition to be removed
G
Existing glass partition to be removed
B
H
6
Exist. A/C duct Exist. steel Joist
8
7
B
Exist. gypsum board ceiling
Signage & Ornamental Structures to be removed
C
B
Exist. gypsum board fascia
6
Exist. concrete slab
8
7
Exist. A/C return duct
B
Exist. gypsum board ceiling
Signage & Ornamental Structures to be removed
C
B
Exist. gypsum board fascia
6
Exist. concrete slab
8
7
Exist. A/C return duct
6
Exist. A/C duct Exist. steel Joist
A
C
Signage & Ornamental Structures to be removed
H
Door & Roll-up- Door/ Grilles to be removed
GWB, Mosaic tile Wall & Metal Decorative Panels to be Removed
A
Existing gypsum board with glass windows to be removed
C
Signage & Ornamental Structures to be removed
H
B G
asbuilt / demolition interior elevations
Door & Roll-up- Door/ Grilles to be removed
GWB, Mosaic tile Wall & Metal Decorative Panels to be Removed
lVersion
Existing gypsum board with glass windows to be removed
B
B G
B
67
KEY: Project Limit
#
Structural Grid
Access
9
KEY:
X
Service Area Food Court
1
Project Limit
3
4
6
7
8
Service Area
W
Concession Services Counter Seating / Dinning Area
#
Structural Grid
Seating Area Capacity Tables for four
up
1
1536
12
18
27
8
8'-4'' x 8'-4'' = 69.44
14
22
32
10
Access 1
8
Seating Area 1 974 sq ft
Service Area
W 3
4
5
1536
2267
413
712
Total
9'-0'' x 9'-0'' = 81
12
18
27
5
8
70
8'-4'' x 8'-4'' = 69.44
14
22
32
6
10
V
je
ELEC. CLOSET
1
Access 1
T
9
BATHROOM WOMEN
STORAGE "A"
STORAGE "B"
TRAY WASH
S
STORAGE "C"
R
Elev
MECHANICAL CLOSET
Q P
Concession
2
Access 5
AREA
Playroom area
14
11
up
Dispense counter # & AREA
84
3 Concession
1,232 sq ft
Existing Bathrooms to be Remodeled
up
Project Limit
Concession 1,576 sq ft
Project Limit
Pro
Seating Area 2
Concession Queue Area
as Rev. Ref. Time-Saver Standards for Building Types
15
4 Concession
1,170 sq ft
1,546 sq ft
O Seating Area 3 2,267 sq ft
N.I.C. INDOOR TERRACE
Pro
N.I.C. STAIRS
U
LOADING AREA
OFFICE
1,536 sq ft
1
Playroom area
15
14
BATHROOM MEN
Project Limit
Seating / Dinning Area 2
974
Area in sq ft
11
Service Access
Concession Services Counter
Seating Area Capacity Tables for four
up
T
9
BATHROOM WOMEN
up
N.I.C. STAIRS
Access 6
it im ct L
AREA
Project Limit
7
Concession
# & AREA
78
mit t Li
6
Dispense counter 65
ec Proj
4
712
Existing Bathrooms to be Remodeled
Proj
Service Area Food Court
3
Total
as Rev. Ref. Time-Saver Standards for Building Types
mit
Li ect
X 1
2267
Concession Queue Area
4
974
Area in sq ft
Access
3
9'-0'' x 9'-0'' = 81
V
9
2
jec
U
tL it im
Seating Area 1 974 sq ft
Access 6
M
LOADING AREA
Seating Area 2
ELEC. CLOSET
up
Access 3
Project Limit
Service Access
Concession 1,576 sq ft
Project Limit
Seating Area 4 712 sq ft
Access 4
OFFICE
1
N
Project Limit
5
Concession 452 sq ft
BATHROOM MEN
STORAGE "A"
STORAGE "B"
TRAY WASH
S
STORAGE "C"
L
Access 2
K
Playroom area 1,064 sq ft
N.I.C. LOBBY
Project Limit
R
N.I.C. CONCESSION
1,536 sq ft
up
Elev
Proposed Floor Plan 2
1
scale 3/32" =
GSEducationalVersion
1'-0"
MECHANICAL CLOSET
Q KEY: Project Limit
P
2
3
5
3
4
6
Service Area Concession Services Counter Seating / Dinning Area Seating Area Capacity Tables for four
1
Concession Queue Area
2
3
4
5
974
1536
2267
716
712
Total
9'-0'' x 9'-0'' = 81
12
18
27
8
8
73
8'-4'' x 8'-4'' = 69.44
14
22
32
10
10
Area in sq ft
V
Dispense counter # & AREA
it Lim
Concession
88 AREA
as Rev. Ref. Time-Saver Standards for Building Types
ect Proj
Playroom area
Existing Bathrooms to be Remodeled
Access 1
T
9
BATHROOM WOMEN
up
N.I.C. STAIRS
11
15
14
U
t Li
1,180 sq ft
mit
Seating Area 1 974 sq ft
N.I.C. INDOOR TERRACE
BATHROOM MEN
Access 6
LOADING AREA
OFFICE
1
Project Limit
Seating Area 2 1,536 sq ft
N
Project Limit
Service Access
Concession 739 sq ft
ELEC. CLOSET
up
2
STORAGE "A"
STORAGE "B"
TRAY WASH
S
STORAGE "C"
R
Elev
726 sq ft
MECHANICAL CLOSET
Q
Seating Area 5 712 sq ft
P
Access 4
3
Access 5
L
Access 2
K
Playroom area
Project Limit
up
Access 3
4
Concession 641 sq ft
M
1,064 sq ft
8
up
Concession
Project Limit
7
W
O
4
Concession 573 sq ft
Seating Area 4 413 sq ft
Service Area Food Court
1
5
Concession 563 sq ft
Concession 773 sq ft
6
Concession 748 sq ft
7
Concession 1,180 sq ft
Project Limit
Seating Area 3 2,267 sq ft
Concession 1,546 sq ft
ec Proj
Project Limit
Concession 1,232 sq ft
Structural Grid
Access
X
Project Limit
Access 5
# 9
O Seating Area 3 2,267 sq ft
N.I.C. INDOOR TERRACE
N
Project Limit
N.I.C. LOBBY
Seating Area 4 716 sq ft
Seating Area 5 712 sq ft
Access 4
M up
Access 3
Project Limit
Access 2
1,064 sq ft
N.I.C. CONCESSION
N.I.C. LOBBY
Project Limit
68
N.I.C. CONCESSION
1
GSEducationalVersion
Proposed Floor Plan 3 scale 3/32" =
1'-0"
L K
Playroom area
proposed conceptual alternatives plans
Proyecto / Project
Concessionaires Playroom Area CENTRO DE ESTUDIANTES A/C DUCT CONCESSION SIGNAGE ALTERNATIVE LOCATION 1
CONCESSION SIGNAGE ALTERNATIVE LOCATION 1
Universidad de Puerto Rico Recinto de Río Piedras San Juan, Puerto Rico
ACOUSTICAL CEILING
5/8" GYPSUM BOARD FASCIA
Oficina de Diseño y Construcción Oficina del Presidente de la UPR
LAMP
ROLL-UP DOOR
CONCESSION SIGNAGE 80" ABOVE THE FLOOR FINISH ALTERNATIVE LOCATION 2
Arquitectos / Architects COLUMN ROLL-UP
Lic. 10046 Colegio de Arquitectos de Puerto Rico Lic. 546 Colegio de Planificadores de Puerto Ric
2'-10"
2'-10"
PO Box 364821 San Juan PR 00936 T 787 751 2210 E andresmignucci@gmail.com
3'-0"
Elevation & Section
concession conceptual elevation
arquitectos
Andrés Mignucci Giannoni, FAIA
BAR EQUIPMENT
POWDER COATED SATIN RED FINISH (ALUM. PANELS)
1a
andrés mignucci A.D.A [Counter with cashier 36'' max. above the floor, Serving counter 34'' max. above the floor]
6'-8"
COLUMN
10'-6"
ANODIZED ALUM. SILVER
CONCESSION SIGNAGE ALTERNATIVE LOCATION 2
Consultor / Consultant
4'-0"
concession conceptual section
Yo, Andrés F. Mignucci Giannoni, Lic. 100 certifico que soy el profesional que diseñó es planos y las especificaciones complementar También certifico que entiendo que dichos plano especificaciones cumplen con las disposicio aplicables del Reglamento Conjunto y disposiciones aplicables de los Reglamentos Corporaciones Públicas con jurisdicci Reconozco que cualquier declaración falsa falsificación de los hechos que se haya produc sin conocimiento o por negligencia ya sea por mis agentes o empleados, o por otras personas mi conocimiento, me hacen responsable cualquier acción judicial y disciplinaria por la OIG y otras autoridades competentes, incluyendo, p sin limitarse, a la terminación de la participación los procedimientos de certificación profesional e OIGPe.
Nº de Proyecto / Project Number
AM-CE 27 AUG
Nº de Contrato / Contract Number Entrega / Issue
Line of back counter or nearest obstruction
Fase Issue
Edge of equipment top
CONSTRUCTION DOCUMEN
Descripción Description
Fec Da
3
Construction Documents
2
Preliminary Design
1
Conceptual Design
JAN 20, 20
Revisiones / Revisions
Edge of counter top
Descripción Description
Revisión Revision
Fec Da
5
4'-0"
Working/Activity Zone
4 3 2
2'-0"
1
Fecha / Date 1/20/15
4'-0"
28''-38''
A.D.A [Counter with cashier 36'' max. above the floor, Serving counter 34'' max. above the floor]
A.D.A [Wheelchair Space 30''X48'']
Escala / Scale
Dibujado por / Drawn by: a. mignucci arquitectos
Checked by: A. Mignu
Archivo / CADD File ID:
1401 CE UPR A 2
Titulo de Hoja / Sheet Title
3'-0"
Conceptual Concession Queue Zone
Nº de Hoja / Sheet Number
Line of nearest obstruction
A 200
6'-0"
Circulation Zone
Documento / Document
Design Guidelines
69
Sello / Stamp
1b
Floor Plan
concession conceptual plan 1
GSEducationalVersion
Conceptual Plan scale 3/8" =
1'-0"