Assembly Instructions 1. Locate Studs / Level Line
2. Align Panel to Studs and Level Line
(recommended creating guidelines)
(recommended 8-12 screws per 4’ panel)
18”
s
Top LEVEL LINE
s
s
n atio Loc Stud 6” 1
FIND STUDS
L EVE
L
n atio Loc Stud 6” 1
n atio Loc Stud 6” 1
E
LIN
LEVEL LINE
Bottom
12”-24”
3. Mount Panel to Studs (recommended 12 - FLOW 2’’ Screws)
5. Vertical Mounting
4. Horizontal Mounting
(overlap panels)
(use dowels to connect boards)
STUD LOCATION
6. Attaching End Caps
Orientation Options
(left edge start from bottom / right edge start from top)
(using 6 Panels)
1B
3A 2A
2B
1A
3B
6x1
3x2
2x3 1x6
7. Placing Hooks (insert from top to bottom)
visit: Thank you for your purchase from Flow Wall! 100% customer satisfaction is our goal. Please contact us between 9am-5pm MST, Monday through Friday, with any questions.
1891 W 2100 S Salt Lake City, UT 84119 (888) 353-0917 customerservice@flowwall.com