Two Fold Electrical & Mechanical Contracting Co LLC Pre-Qualification Document
Introducing Two Fold Two Fold commenced operations in the United Arab Emirates in 2003, and we are continuing to expand our operation organically. We can cover all project MEP design, project management, execution and maintenance requirements. Two Fold has a blue chip client base that includes leading International and Local Development & Construction Companies, Contractors, Retailers, Service Providers, Consultants and Government Departments. Our company has had continued growth due to implementing new management procedures from early 2011. In 2012 the company achieved ISO 18001 & 14001 ,9001 accreditation, we have invested in a new state of the art contract management system, established an office in the Emirate of Dubai to service Dubai and the Northern Emirates and continue to invest in our company assets and people.
Our Divisions Mechanical, Electrical, Plumbing Engineers and Contractors We are able to offer a full MEP design and build service for our clients using the most innovative and energy efficient products to provide state-of-the-art installations which save both time and cost throughout the construction phase and provide a cost effective and maintainable end product to our clients. In short, Two Fold can do it all!
Planned Preventative Maintenance As a support to complement our MEP services, Two Fold established a dedicated department to undertake and execute planned preventative maintenance for our clients. We have a dedicated team of experts who manage our maintenance division and are able to provide cost effective planned preventative maintenance solutions.
Technical Services Two Fold have a team of experienced and qualified engineers who can provide specialist technical services including project management, design, engineering, procedure writing & implementation, programming, feasibility studies, thermal imaging & accoustic consultancy. We can also assist with local authority regulations, compliance, review and approvals. Operation & Maintenance manuals can be provided in paper or electronic format.
Organisation Chart CO M PA NY PA R T NE RS
DA R R EN HU NT MA N AG I N G PA R T N E R
JAY K UT TAN
MA RK COX
SIMON GARTON
EX TERN AL
PR O JEC T MA N AG ER
PR OJEC T MANAGER
ACCOUNTS MANAGER
FINANCIAL AUDITOR
OPER ATI ONS DI R EC TOR ABU DHABI
P R OJEC T TEAMS
RAJESH RAMACHANDRAN HR, TRANSPORT & LOGISTICS
TH OMA S JAMES
PR OCUR EMENT OFFICER
CENTR AL SER VICES
O P ER AT IO NS DIR EC TO R DU BA I
PR OJEC T TEAMS
LOUELLA ARISTORENAS HSEQ
AFZAL BASHI R
ENGINEER ING MA NAGER
GEOR GE JHON DR AW ING O FFIC E
RYAN I N O C E NT E
C HIEF ES TIMATOR
PROJECTS LIST
IINDUSTRIAL NDUSTRIAL
MEP Value
Project
Main
Client
Description
Location
Status
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
AED (Millions)
TFU Scope
PROJECTS LIST
INDUSTRIAL MAINTENANCE
MEP Value
Project
Main
Client
Description
Location
Status
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
AED (Millions)
TFU Scope
PROJECTS LIST
INDUSTRIAL C OMMERCIAL
MEP Value
Project
Main
Client
Description
Location
Status
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
AED (Millions)
TFU Scope
PROJECTS LIST
INDUSTRIAL CONSULTANCY
MEP Value
Project
Main
Client
Description
Location
Status
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
Water Tank Replacement
N/A
NCR
Printing Works
Dubai
Completed September 2012
0.7
To shut dowm, install temporary water tank, strip out existing water tank and replace with a new 100,000 US Gallon water tank.
Khalifa Port Offshore Buildings
Ed Zublin AG
Abu Dhabi Ports
Off Shore Facilities
Abu Dhabi
Completion December 2012
4.2
Supply of Ductwork; Supply of Manpower; Supply & Installation of Pipe & Duct Insulation & Cladding.
AED (Millions)
TFU Scope
Darren Hunt
Mark Cox
Simon Garton
Jay Kuttan
Afzal Basheer
Ryan Inocente
Thomas James
Seshanandam Murali
Managing Director BSc(Hons) Elect. & Electronic Engr; HND & HNC Elect. Engineering Experience 24 Years
Operations Manager C&G 236 PT 2&1 Electrician,C&G Testing & Inspection, C&G Elect. Apprenticeship Experience 24 Years
Sr. Mechanical Engineer Bachelors (B-Tech) in Mechanical Engineering Experience 9 Years
Procurement Engineer H.S.C. & Passed Trade Cert. Proficiency in Domestic & Ind. Electronics Experience 8 Years
Operations Director C&G 236 PT 2&1 Electrician,C&G Testing & Inspection, C&G Elect. Apprenticeship Experience 22 Years
Accounts Manager BCAM, MBA Experience 18 Years
Electrical Engineer Bachelor of Science in Electrical Engineering Experience 10 Years
Electrical Site Engineer ITI – 2 Years Electrical Trade 2+ Years Higher Secondary Experience 27 Years
Principal Individuals
Shanmugam Chokalingham
Ram Mohan
Kumaran Thampi
Ronald Nazareth
John Bosco
George John
Rajesh Ramachandran
Name Louella Aristorenas
Mechanical & Plumbing Site Engineer ITI – 2 Years Mechanical Trade 2+ Years Higher Secondary Experience 17 Years
Ducting Supervisor ITI – 2 Years Mechanical Trade Experience 30 Years
Electrical Supervisor 10th + ITI – 2 Years Electrical Trade Experience 18 Years
HR Administrator Qualifications Degree Experience 6 Years
Electrical Supervisor ITI – 2 Years Electrical Trade Experience 35 Years
Electrical Supervisor S.S.L.C. & I.T.I. in Electrical Experience 19 Years
MEP Draftsman Diploma in Electrical Engineering, 2004-2001;(I.T.I) Electrical; S.S.L.C. & Pre-Degree Experience 10 Years
Document Controller Degree in Bachelor of Science in Psychology Experience 18 Years
Resources Two Fold you will find a wealth of technical experience. Our key strategy in providing a top quality service to our clients is to use individuals who are experts in their field, and bring them together to form a world-class team. We can provide management, support and system designs to meet any requirements be it strategic planning, commercial cost control or project delivery. Real time communication between our regional offices and project sites are employed to ensure accuracy of installations. Our construction teams are sourced from around the world and all are highly experienced in the delivery of multi-disciplinary projects. Our design team have access to state-of-the-art software and drafting tools to support their expertise. We have labour accommodation in Abu Dhabi, Al Ain, Dubai & Sharjah to house our work force.
Breakdown of Resources Management Administration Accounts Commercial Engineering Site Supervision Tradesmen
11 26 5 2 16 27 210
Total Staff
297
80 Seater Bus 14 Seater Mini Bus 1 Tonne Pick Ups Company Cars
1 3 5 5
Total Vehicles 14
Company Software Accounts
Amtech Entreprise Financial accounts
Contract management
Amtech Entreprise Contract Costing
Design Software Amtech Pro design 100
Inspection & Test Amtech Fast test
Service & Maintenance
Amtech Entreprise Service Manager Amtech Mobile device
Drawing AutoCAD
Planning & Programming Microsoft project
Administration Microsoft Office
Microsoft outlook
Communication Skype Whatsapp
Bankers, Auditors & Insurance Bankers
National Bank of Abu Dhabi (NBAD), PO Box Dubai Main Branch, PO Box 4436, Dubai, United Arab Emirates Tel: 1900 213 04 Fax: 1906 213 04
Auditors
Pioneer Auditing, PO Box 15892, Dubai, UAE, Tel: 6464 222 04, Fax: 3020 227 04
Two Fold United Electrical Mechanical Contracting Company LLC
Schedule of Insurance Policies 1 Contractors All Risk HFCO201300000122 2 Contractors All Risk HFCR201300005550 3 Property Insurance HFAP201300004099 4 Public Liability Insurance HFTP201300004398 5 Workmen Compensation HFWC201300003981 6 Medical Insurance - AXA 12/XP/1/32799 7 Medical Insurance - Daman 4056857
HSEQ Two Fold has developed and operates a health, safety, environmental and quality management system accredited to ISO14001 ,9001 and 18001 to ensure that all aspects of our business are managed safely and effectively delivering quality services and products to our Clients in a safe and environmentally friendly manner. The system is applied to all contracts and is intended to contribute to and enhance project performance. The HSEMS (Health, Safety, Environment Management System) ensures compliance with company procedures and provides for safety orientation and training of all personnel prior to commencement of work on site. The purpose of the system is to establish an efficient and disciplined organisation that is responsible and accountable for all aspects of related works. Professional expertise is emphasized in safety supervision with the scheduling and conducting of tool box talks, HSE Meetings and HSE inspections to ensure effective implementation of the HSEMS. Audits and incident investigations are performed to identify any immediate and under lying causes against non-conformances and incidents and to ensure that the recommended preventive measures are strictly applied. Project HSE Plans are developed on award of a project, the major contents of the HSE Plan include Safety Management System, all relevant Safety Procedures, Method Statements, Risk Assessments & COSHH for all activities and tasks. Method Statements, Risk Assessments and COSHH data sheets are prepared to suit individual project requirements prior to the start of the activity to eliminate potential hazards. Two Fold has a commitment towards quality. All company activities office and site based will be strictly compliant to ISO 9001:2008 requirements. The quality plans will be developed and customized to incorporate specific project requirements. ITPs , Checklists and continuous progressive inspections are used to verify that work exceeds contract requirements. All operations will be subject to the company Quality Assurance auditing procedures to ensure that the services provided are fully compliant with the Procedures. The Quality Management Systems ensure our Clients receive a high quality end product or service.
HSEQ STATEMENT
HSEQ CERTIFICATE
Company Mission Statement Our vision is to be the leading MEP service provider in the region. Our mission is to provide excellence in our products and services. Our people share our passion for excellence; we invest in our people to ensure continued growth and development; our people treat our customer’s, supply chain, colleagues, business partners and stake holders with the utmost respect and dignity and undertake business in an ethical and honest manner at all times. Our Commitment is to demonstrate excellence in design and engineering solutions, to use innovative and sustainable products and services, to understand our customer’s needs and to provide a quality cost effective product in a safe environment. Our Process is flexible to meet our customer’s requirements, ensures full compliance with local and international HSEQ standards and good working practices, allows us to respond to customers individual requirements in a timely and professional manner and to deliver the right solution every time. Our Customers are our business and can be confident that our products and services will meet their requirements, can rely on us when they need us and can be assured that they will receive a quality service at all times.
Two Fold United Electrical and Mechanical Contracting Company LLC. Abu Dhabi: Office No. 201, 2nd Floor, Falcon Tower Building, Al Nasser St. T: +971 2 627 7584 / 6 F: +971 2 627 0758 Dubai: Office 322, 3rd Floor, Sultan Business Centre, Oud Metha, P. O. Box 128918, Dubai, UAE T: +971 4 396 8680 F: +971 4 396 8682 info@twofoldunited.com www.twofoldunited.com Business Registration: Commercial License, 1011409, Abu Dhabi