ABOUT THE STUDIO : LEARNING PROCESS

The studio focused on understanding and planning cities at the Development Plan level with several varied exercises being conducted to understand planning and regulations and their implementations. Once these were concluded, the students had to work on one of Gujaratʼs 3 major Urban Development Authority (SUDA; Surat, RUDA; Rajkot, BAUDA; Bharuch and Ankleshwar), and form a development plan, its report and GDCR bylaws. This portfolio focuses on the exercises in order to understand and augment the cities for the preliminary exercises and then goes on to prepare a Development Plan for 35 lakh population for the city of RAJKOT. Various stakeholder presentations, reviews and feedbacks were taken into account during the course of the semester - along with several visits to RUDA and RMC and meetings with their officials. Their insight proved to be extremely useful and their key comments were incorporated.

OVERVIEW

Unlike several implemented Development plans, this exercise takes liberty to promote and adhere to idealized views and contemplates how practical or radical the approach might be. Nonetheless,

“Cities have the capability of providing something for everybody, only because, and only when, they are created by everybody” - Jane Jacobs; The Death and Life of Great American Cities, 1961


CONTENT WA R M U P EXERCISES

design the precinct development plan analysis road network analysis

CONTENT

01 02 03 precinct - thakkarbapa nagar berlin fnp 2015 - 2030 vallabh vidyanagar

INFRASTRUCTURE P RO J E C T S

physical infrastructure social infrastructure special projects costing

U N D E R S TA N D I N G R A J KOT

background

vision for 2041 population estimation

04 context 2031 dp features analysis aim and objectives ke y ďŹ g u r e s

I M P L E M E N TAT I O N S T R AT E G I E S

phasing

05

zoning approach

concept

road network

proposed road infrastructure proposed road infrastructure sections and visualizations

zoning

water and sanitation B RT S a n d h o u s i n g heritage conser vation green and blue network project costing

07 TP delineation and outcome

GDCR and bylaws

regulations

policies

regulations

OUTCOME P R E PA R I N G THE DP

06

ke y t a ke a w a y s studio outline

Throughout the document, there are indications of contribution beside each topic. Their legend is as follows: Primary input :

The topic was covered by author

Primary input :

The topic was covered by author + one other member

transect

Primary input :

The topic was covered by author + two other members

existing and proposed views

Equal input :

All members contributed equally to the topic

land use zoning

Secondary input : The topic was headed by another member/s


01 DESIGN THE PRECINCT

PRECINCT – THAKKARBAPA NAGAR Solutions Thakkarbapa nagar is located on the East of Ahmedabad, beyond Bapunagar. Its most distinctive features are the dense fabric and the presence of ‘Karigar Nakaʼ.

01 02 03 W A R M

AMC Plots

2. Acquiring ground that was once part of the adjacent mill.

N

Water Tank Urban Health Center

Existing Roads

U P

DESIGN THE PRECINCT

DEVELOPMENT PLAN ANALYSIS

ROAD NETWORK ANALYSIS

The exercise was an introduction to planning - we took a 1 sq km area of Ahmedabad which was studied and analyzed in detail in Sem 1 and then identified 3 major issues of the area.

The goal was to learn how several Indian and international cities formulate and implement their development plans - or plans similar in nature but different in nomenclature.

Each city forms its own intricate road network that not only defines its connectivity patterns, but also affects its growth and zoning.

Berlin, the capital of Germany calls the plan at this scale an FNP plan, the study of which is taken up in this exercise.

AUDA Plots

1. AUDA Water Tank area

Existing Buildings

Existing Plots

EXERCISES

These issues where then addressed with solutions and suggestions that would help eliminate the issue and prove to be optimum for the budget too.

1. Addition of Recreational Spaces on AMC/AUDA plots

Vallabh Vidyanagar is a planned city with grid and radial network pattern. Its study helped identify block sizes, accessibility and mobility of the city.

Currently empty AUDA walled area 2600 sqm

School Plot for school Currently empty plot 4860 sqm

Issues 1. Lack of Public/Open/Recreational Spaces 2. Larger Block Perimeters - Poor Walkability 3. Unorganized Parking and Vending = Street Spillage 4. Traffic Congestion 5. Insufficient Street Infrastructure 6. No plotting in North East & South West region

Costing -

373 lakh rs The highlighted issues are the three issues taken into consideration for solutions

1. Here, there is no need to acquire land and let the industry develop it and give it tax rebate. 2. To create recreational spaces - 5000 x 4860 = 2,43,00,000 & 5000 x 2600 = 1,30,00,000


01

01

DESIGN THE PRECINCT

DESIGN THE PRECINCT

PRECINCT – THAKKARBAPA NAGAR Solutions

PRECINCT – THAKKARBAPA NAGAR

Solutions 3. Organized and allo ed standing/waiting and vending spaces

2. Remove Gated Communities - Remove Dead Nodes

Recreational Spaces - proposed

1

1

01 N

Markets on Road

TBN Flyover

Impact radius

Existing 4 Roads (088 nos)

1

02

N

Existing 3 Roads (382 nos)

Exisitng Dead Ends (267 nos)

Road blocks existing

Road blocks exisiting

2

3 2

Recreational Spaces - proposed

1

2

W A R M

Thakkarbapa Nagar Flyover - Exisiting

Organized Vending on service lanes

U P

EXERCISE 1

Service lane waiting

3 Possible Dispute in Road Join Less Dispute in Road Join

Pedestrian Streets6 am to 1 pm

Parking under flyover - best scenario

2

Road Widening

Organized St. vendors Pedestrian Only from 6 am to 1 pm

Costing -

Costing Service lane vending

10 lakh rs

0.77 lakh rs

The costing for basic change in street furniture to allow for more walkability and to add pedestrian walkways over a stretch of 367m total will require an investment of about 10 lacs.

The simplest method is to remove walls, closed gates and spillages. The cost of removal will be unskilled and skilled labor per day plus machinery rent, which is 800 + 1200 + 1200 respectively. Finish sample work in 8 days =76,800 for 3 of each. Service lane Vending - best scenario

03 3D Visualizations


02

02

DEVELOPMENT PLAN ANALYSIS

DEVELOPMENT PLAN ANALYSIS

BERLIN - FNP PLAN 2015-2030

BERLIN - FNP PLAN 2015-2030 Spatial Evolution

Land Use Plan (Flachennutzungsplan/FNP) 2015 - 2030

Urban Fabric

Area of Berlin 891.8 square km

Berlin in 1862

Growth by 1925 Overview of typical building structures of Berlin

Implementation Mechanism Population of Berlin 3,562,038 as of 2015 Berlin-Brandenburg Key Plan West Berlin in 1961

Statutory Framework

Joint Planning for Berlin/Brandenburg Co-operation on the regional level (LEPro, LEP B-B, regional plans/FNP Berlin) Stretegic Development Concept (StEK Berlin 2030) Land Use Plan (FNP Berlin)

Sectoral Development Plans (StEP)

Federal Level

-Basic ideas and principles -Federal Spatial Planning Act - Guidelines for Regional Planning -Federal Building Code/Federal Land Utilization Ordinance

Landscape Programme (LaPro)

State Level

Principles/Objectives for the States -State Planning Law -Regional Planning Acts -Building Regulations Objectives of Regions

Planning Regions

Intermediate Area Plans (BEP), Area Planning Concepts

- Objectives for Regions -Regional Spatial Plan -Coordination of Interests Speci cations, Examination

Local Landscape Plan Urban Design Schemes

Specialized Planning e.g Transpo Water Agriculture Environment Etc.

Objectives of Municipality

Municipalities -Preparations and execution of legally binding land use plans -Land use principles and objectives for municipal area Speci cations, Agreement, Approval

Individual Projects by Private or Public Org

Top Down

Important and Must

Inferences

Internal consultations on the proposed modi cation

-Building Plan -Construction of projects

Upcoming Plans Not necessarily Made

Drawing up a planning concept O cial sta of process

Cooperation: Federal and State govts.

Speci cations, Examination, Approval

Local Development Plan

Coordination

Levels of Planning

Bo om Up

Berlin has always been at the mercy of war. 25 years after the wall came down, it still sees a huge gap in the economy and development of the East and West Berlin. To overcome the deficit, Berlin has laid down the following 6 areas that it shall work on by 2030.

First stage of public pa icipation, consultation of other public bodies ( rst dra ) Analysis of objections and comments on the rst dra

West Berlin in 1981

Second stage of public pa icipation (2nd dra ) Analysis of objections and comments on the second dra

2. Berlin Strategie involving real stake holders - Both top down and bottom up framework

Decision of Senate, endorsement by City Council

3. Strict Environmental laws incorporated - large green spaces.

Publication in the o cial gaze e, communication to objectors

FNP implementation process

Great design and planning points incorporated 1. The invention of Les Adickes (Land Readjustment)

Adapted from BBR 2000 and Kunzmann 2001

Germanyʼs ‘Counter Currentʼ Spatial Planning System

Land Readjustment is the implementation method in entire Germany which was invented by Franz Adickes. Known as Les Adickes, this method is much like the Land pooling method, wherein plots are resized and reshaped and required land by government is reducted from it. Of the 12 Boroughs of Berlin, each borough has its own governing body, which works under the senate and has limited powers

No wall in 1994

4. Revisiting the DP at shorter intervals - sometimes as often as once every two months.


03

03

ROAD NETWORK ANALYSIS

ROAD NETWORK ANALYSIS

V A L L A B H V I DYA N A G A R

V A L L A B H V I DYA N A G A R

Road Map and Block Sizes The planned city of Vallabh Vidyanagar is only 2.5 sq km in area. It has a total population of 23,783 people.

Towards anand Arterial road 2

Road Network

City Area

Population Density

Average Block Size

Average Distance Between Rings

Average Distance Between Radials

It has a green block in the very center of the city. The green open space is known as shastri maidan. Beyond shastri maidan are university buildings, after which comes the ring roads.

Type A blocks Type B blocks

Ring 2

ks

Type F bloc

cks

Type E blo

Ring 1

There are two major axis that divides Vvn.

exception block

exception block

Arterial road 1

Type C blocks exception block

Type D blocks

exception block

AVKUDA area :

283.34 sq km Anand + Vidyanagar + Karamsad N

Note : exception blocks are not taken into measurement consideration due to high influence in average by a single block

Arterial road 3

Length of arterial roads Average Block Sizes Arterial road 1 : 2178 m Arterial road 2 : 1659 m Arterial road 3 : 1000 m Length of ring road 1 : 2286 m approximately Length of ring road 2 : 2760 m approximately

Type E blocks : 32,683 sq mts Type A blocks : 5709 sq mts Type B blocks : 4371 sq mts Type C blocks : 4507 sq mts Type D blocks : 10,562 sq mts Type F blocks : 16,798 sq mts

(12 nos.) (24 nos.) (49 nos.) (34 nos.) (38 nos.) (12 nos.)

Average Distance between Shastri Maidan & Ring Road 1: 211 mts

Average Distance between Ring Road 1 & Ring Road 2: 59 mts


04 BACKGROUND

CONTEXT History Area 686 sq km

Area

0.27 sq km

Ÿ Ÿ Ÿ

City incepted in 1635 under Vibhoji. Fortification of the city. City municipality was established in 1830ʼs.

Ÿ Ÿ Ÿ

C i t y w i d e electrification Railway Line laid in Jamnagar First cotton mills set up in Morbi.

Ÿ Ÿ

Post 1947,Saurashtra State is formalised. Dams are constructed over Machhu and Aji.

Transect Study

Ÿ

Focus shifted to making Rajkot an Industrial intensive Zone.

Demographics Area

04

686 sq.km RMC+RUDA

Population 15.35 lakhs

Density ( pph ) 122.74 (RMC) 4.27 RUDA

Avg HH size 4.7 (Urban) 5.64 (UA)

UNDERSTANDING

R A J KO T Connectivity BACKGROUND

VISION FOR 2041

Understanding what Rajkot stands for, its development patterns and its issues and concerns is the first step towards planning a sensitive and rudimentary development plan.

A city is not only its land parcels, but also its infrastructure, its road and its society. The vision of Rajkot comes from the need of Rajkot in the contemporary society along with understanding what makes Rajkot what it is today.

The goal in achieved by studying previous DP, noting down SWOT analysis and understanding the key concerns of Rajkot as a city.

The objectives are a set of goal that the DP plan designed for 2041 should accomplish.

No. of HH 4,68,000 (RMC 2,79,150)

POPULATION ESTIMATION The current population of Rajkot, the future population and some more key figures are discussed here. The size of the city and whether it is enough to cater its future population is also contemplated.

Rajkot has a predominant industrial base (mainly gems and automobile parts) with partial dependence on the service sector. 46% of current RUDA + RMC are is under agriculture use. Rajkot has a good road connectivity to the cities in vicinity also facilitated by the railways connecting major towns and cities.


04

04

BACKGROUND

BACKGROUND

2 0 3 1 D P F E AT U R E S

A N A LY S I S

The 2031 Development Plan passed by the Rajkot Urban Development Authority covered existing Rajkot and proposed plans of physical and social infrastructure, land use and density plans, urban design projects, special projects, implementation bylaws, policies and their costing. A few of its salient features for Land Use plan is shown below.

SWOT Analysis

unified regulations throughout the city discontinuing fixed built up area prosperous areas strong manufacturing base strategic location ample land availability

HOUSING Densification along transit corridors through TOZ

HOUSING Development around existing zoned areas to incentivize Aff Housing

resource infrastructure scarcity environmental impact of industries rate of influx higher than housing growth sprawl along industrial corridors development on watershed area drying Aji river basin

S

W

T

O

inadequate water supply infrastructure hard strata causing urban flooding lack of PT inadequate public open spaces lack of organized business districts

zoned yet unused land scope for physical and social infrastructure local culture and tourism development AIIMS and similar upcoming institutions

Key Concerns

ZONING Development of polycentric corridor

ZONING Agriculture zone to preserve agriculture land

SPATIAL DEVELOPMENT

INFRASTRUCTURE

GOVERNANCE

Growth

Water

Heritage

Mismatch between expected growth location and actual location.

Drinking water carcity and inadequate water management

Underutilized heritage potential

Development

Inadequate low income housing (13% of the city population lives in slums)

GDCR

Road

Casual ignorance of bylaws and their strict implementation

High influx of population as compared to development

Housing

Monitoring Lack of periodic plan monitoring mechanisms

I n a d e q u a te roa d n e t wo r k connectivity in peripheral areas.

DEVELOPMENT

DEVELOPMENT

Development around village Gamtals

Development in growth centers

PT

Drainage

Public Space

Poor pedestrian infrastructure and public transport.

Lack of stormwater drainage.

Low quantity and distribution of public open spaces (including parks)


04

04

VISION FOR 2041

POPULATION ESTIMATION

AIM AND OBJECTIVES

KEY FIGURES

Vision

Population Estimated by 2041

Developing rajkot as the green capital for the saurashtra region and as an affordable city with a well connected road network thereby promoting holistic development.

COMMUNITY self sufficient and prosperous

ENVIRONMENT greener tomorrow than today HOLISTIC DEVELOPMENT

RUDA

RMC 2011 POPULATION PROJECTED POPULATION

ECONOMY continuous growth

PROJECTED POPULATION

35,11,041

13,78,042

2011 POPULATION

30,79,603

DOUBLING THE PROJECTED POPULATION

70,22,082

PROJECTED POPULATION

PROJECTED REIDENTIAL POPULATION

NO OF HOUSEHOLDS 655234 + 77042

RESIDENT WORKERS

11,12,288

7,32,276

11,12,288

1,70,347

4,31,438

SPACE/PERSON=89 OPEN SPACE = 9 TOTAL=

97

LAND REQUIRED (97*3511041*2)/1.2

567 sq.km

Objectives Assuming the population grows to 35 lakhs by 2041, enough land cover is available since required is

• To promote heritage conservation.

• To restrict development around the river beds and relocate and rehabilitate the slum dwellers (if any) from sensitive areas.

567 sq km but available is 686 sq km • To create urban parks, gardens and a network of green spaces along the Aji and Nyari rivers thereby increasing t h e p e rc e n t a g e o f g re e n a n d recreational areas in the city of Rajkot.

“Plan for outcomes rather than for time frames” 1988 -2001

2004 -2012

2012 -2031

Spatial Growth Zoned undeveloped land as per DP proposal Settlement Outgrowth

• To improve the existing road network and construct new roads wherever necessary with special attention to the surroundings by creating custom road sections.

• To increase commercial activity and liveliness of the city by creating interactive street edges.

15 km 2

91 km 2

200 km 2

Developed Area

111 km 2

152 km 2

187 km 2

Undeveloped Area

334 km 2

686 km 2

686 km 2

Planned Area

Why?

How?

Projections do not meet time since it does not always go as per planning because of market and other factorsʼ intervention.

Keeping a count of future population by doing regular checks of birth rates.

Expected versus actual growth is different since 1988.

This can be done by using documents such as aadhar cards and birth certificates which gives population growth as follows: 43.8% - Natural increase 56.2% - Migration & reclassification of boundaries (As of 2011) So, when 90% of the projected population is about to be achieved, revision of DP will take place.


05 ZONING APPROACH

CONCEPT Planning Theories

PREPARING THE

DP ZONING APPROACH

ROAD NETWORK

ZONING

Concepts Growth is from several independent points rather than from one CBD Ÿ Coexistence of complementary urban land uses Ÿ Specialization of regional centers like heavy industry, business parks. Ÿ Suitable for fast expanding cities like rajkot. Ÿ

zoning

COMPLETE FREEDOM

SALIENT FEATURES

DCR

Sector model

05

Zoning and Land Use exercises a higher degree of freedom. Control to only increase quality of life and handle basic infrastructure and amenities is imposed. Ÿ DCRs will have control over FSI and heights that will help in desired development and controlled growth rather than haphazard development Ÿ For specific regions like eco sensitive zones and walled city areas, higher control over building regulations and form based zoning shall apply Ÿ

Current

Concentric zone model

Some of the better known planning models that exist in practice are the concentric model, the sector model and the multiple nuclei model. In Indian context, the multiple nuclei model is more practical and is the most common model seen throughout.

Controls

FLEXIBLE MARKET LIVEABILITY

The most widely practiced in India is use based zoning. Several models discuss this.

The primar y step to city expansion and development is roads. They are the first infrastructure that the government lays - everything else follows. A good road network is the outcome of smaller block sizes, better mobility and accessibility. It is imperative to propose roads in the direction the development is desired.

The development plan for 35 lakhs population proposes an elaborate land use based zoning which takes existing uses into consideration and allows for complimentary uses to be put together while buffers are provided for contrasting uses. Besides land use, Floor area ratio based zoning is also proposed based on market forces as well as compatibility.

special projects

T h e ap p ro a c h t o z o n i n g determines the outcome of the Development Plan. At this stage it is important to decide the zoning will be done based on what - whether be formed based zoning, height based zoning, use based zoning or nuisance based zoning.

Multiple nuclei model

SUSTAINABILITY

COMPLETE CONTROL

LIBERAL APPROACH SMART GROWTH NEW URBANISM MULTIPLE NUCLEI HUMAN SCALE NEIGHBOURHOODS


05

05

ROAD NETWORK

ROAD NETWORK

PROPOSED ROAD INFRASTRUCTURE

PROPOSED ROAD INFRASTRUCTURE

Final Road Network in Phases

Road Width and Heirarchy

Arterial Roads 1 Width – 52 m Nos. Length – 210.78 km Area

– 6 2 – 11 km

Arterial Roads 2 Width – 45 m Nos. Length – 141.84 km Area

–8 - 6.3 km2

Sub Arterial Roads 1 Width – 36 m Nos. Length – 114.72 km Area

–7 2 – 4.12 km

Sub Arterial Roads 2 Width – 24 m Nos. Length – 183.08 km Area

– 19 2 – 4.4 km

Collector Roads Width – 16 - 24 m Nos. Length – 223.56 km

– 37

Local Roads Width – >16 m

LEGEND Arterial 1 Arterial 2 Sub Arterial 1

ROADS LEGEND Existing roads Phase 1 Phase 2 Phase 3 Revisit in 10 years Water bodies Gamtals

Industrial Bypass

Sub Arterial 2 Collector

Freight Corridor

Existing road network Average ring distance

Average block sizes

Total arterial and sub arterial network

3.8 KM 3.2 KM

7.86 KM 5.34 KM

361.2 KM 649.6 KM

Proposed road network

Block Sizes Industrial Bypass road is created to decongest the city by forming a road specifically to connect the industrial zones to each other such that the transportation takes place directly from outside the city instead of putting vehicular pressure on the ring roads LEGEND

The roads that allow heavy vehicles all day are specifically introduced into the DP for the purpose of connecting the industrial zones and helping to reduce traffic on other roads.

LEGEND

Hazardous Industries

0.01 sq km to 2.0 sq km

Non Hazardous Industries

2.1 sq km to 4.0 sq km

Water Bodies

4.1 sq km to 8.0 sq km

Bypass

Allows heavy goods and carrier vehicles to run on freight corridors

8.1 sq km to 10.0 sq km 10.1 sq km +

LEGEND All Day 12 am to 5 am

Routes that are closer to the city and has heavy traffic will allow transport goods only at night between 12 am to 5 am.


05

05

ROAD NETWORK

ZONING

SECTIONS AND VISUALIZATIONS Visualizations

LAND USE ZONING Draft Development Plan for 35 lakhs population

• As per new urbanism compound wall is not provided in MU1 and MU-2 to promote mixed use development as commercial edges. • Crossings are demarked on roads for pedestrians

• Footpath is provided on both the sides for pedestrians. • Separate BRTS lane is provided to promote public transport • Side lanes are provided to separate. Boulevards are provided along footpath and side lanes as green buffer. • Parallel parking along the road edges.

Sections

24 M WIDE SAMPLE SUB ARTERIAL ROAD SECTION

16 M WIDE SAMPLE COLLECTOR ROAD SECTION 49.02

8.17

16.28

FSI 1.2 + 0.5 1.2 + 1.0 1.0 + 0.0 0.2 + 0.0

52 M WIDE SAMPLE ARTERIAL ROAD SECTION

2.0 + 0.25 2.0 + 0.25 1.8 + 0.7

USE

FSI

Obnoxious Industries General Industries Logistics Hub Agriculture Zone

0.2 + 0.0 1.1 + 0.0

Gamtals Buffer Gamtals Core Smart City Mixed Use -3

2.25 + 0 2.0 + 0.5 1.8 + 2.2 1.8 + 0.0

USE 165.14

Water Bodies No development Zone Eco -Sensitive Zone Re -creational Areas City – A (Walled City) City Area - B Mixed Use -1 Mixed Use -2

190.96 23.68 14.32 118.37

37.3 21.11 6.78

3.76 4.21 26.6

0.3

2

AREA IN KM


05

05

ZONING

ZONING

TRANSECT

EXISTING AND PROPOSED VIEWS

A transect model of how the city shall look by 2041 – representation purposes, projected view. IZ 1

Before

After

IZ 2

Use based LEGEND

max FSI : 4.0 Area : 118.37 sq mts

Water Body Barren land Cultivable soil Areas with lots of trees

1

Zone based LEGEND Eco Zone Mixed Use -1 Mixed Use -3

Scarce vegetation Farmlands

max FSI : 2.5 Area : 14.32 sq mts

Grasslands

max FSI : 2.5 Area : 37.3 sq mts max FSI : 1.1 Area : 6.78 sq mts

IZ 1

max FSI : 2.2 Area : 49.02 sq mts max FSI : 1.8 Area : 190.96 sq mts

Use based LEGEND Institutional Residential Barren land Cultivable soil Areas with lots of trees Scarce vegetation Farmlands Grasslands Commercial

Use based LEGEND

max FSI : 2.5 Area : 23.68 + 0.3 sq mts

max FSI : 0.2 Area : 165.14 sq mts

max FSI : 0.2 Area : 21.11 sq mts

max FSI : 1.7 Area : 16.28 sq mts

Farmlands Tree cover Industrial Barren lands Cultivable soil Grasslands

2

Zone based LEGEND General Industries Logistics Hub Obnoxious Industries Mixed Use -1 Mixed Use -3

3

Zone based LEGEND General Industries Logistics Hub Existing Buildings

IZ 2

max FSI : 1.0 Area : 4.53 sq mts

Use based LEGEND Residential Institutional Commercial Agriculture Barren Land Water Body

2

4

4

Zone based LEGEND Recreational Zone Mixed Use - 1 Mixed Use - 2

1 3 Key map


06 PHYSICAL INFRASTRUCTURE

WATER AND SANITATION Solid Waste Management

Water Treatment Plants

LEGEND

LEGEND

existing WTP proposed WTP

existing land fill proposed land fill

Sewage Treatment Plants

06 INFRASTRUCTURE

PROJECTS PHYSICAL & SOCIAL INFRASTRUCTURE While physical infrastructure is the key to a functional city, social infrastructure is also one of the most crucial aspect that ever y government has to provide. The scale, locations and project details of a few major endeavors are published in the DP report along with the draft DP, a few of which are covered here.

SPECIAL PROJECTS

COSTING

Beyond projects that fall into physical and social infrastructure category are certain essential, however not mandatory projects that are taken upon. These are the projects that separate one city from another - for better or for worse.

E a c h p ro j e c t , n o m a t t e r however small or big or important or secondary it is, is allotted a budget based on an estimate that is calculated during the conception and proposal of the project.

These can be urban design projects, investment zones or even intangible programs.

The total costing of all the projects and proposals combined results into the cost of the implementation of the DP.

The location of each of these is based on land availability. While for water treatment plants, proximity to water bodies was also an aspect, for STP, the contour mattered and for landfill sites; it was the wind direction that was taken into consideration.

LEGEND existing STP proposed STP

INFRASTRUCTURE FACILITIES

EXISTING SCENARIO

FUTURE SCENARIO

PROVISIONS MADE

WATER

110 MLD served (89% population)

242 MLD served (100% population)

For this, 4 new WTPS, new water supply lines and 50 ESRs will be provided with a total cost of 593 Cr.

SEWAGE

95.9 MLD served (70% population)

267 MLD served (100% population)

For this, 5 new STPS, new sewerage network and 42 pumping stations will be provided with a total cost of 209 Cr.

SOLID WASTE MANAGEMENT STORM WATER DRAINAGE

500 Metric tonnes generated (70% population) N.A.

1389 Metric tonnes generated(100% population) 223068

nos. of pipes

For this, 2 new landfill sites and 1957 chhota hathis will be provided with a total cost of 108 Cr. For this, Using PVC pipe of 4” dia. Pipes allowing 4kgs/sq.km. working pressure will be provided with total cost of 94 Cr.


06

06

SOICAL INFRASTRUCTURE

SPECIAL PROJECTS

BRTS AND HOUSING

HERITAGE CONSERVATION Prioritizing Conservation

BRTS and Intercity Bus Depot

GRADE 1

GRADE 2

GRADE 3

Precincts of National or Historical Importance

Precincts of Regional Importance

Precincts of Regional or historic Importance

•Highest Priority •Immediate preservation and conservation measures

LEGEND BRTS Phase 1 BRTS Phase 2

•Preservation by adaptive reuse •Allowing inclusive activities that encourages local heritage

•Preservation of existing conditions •Retrofitting where necessary

BRTS Phase 3 Proposed Depot

Heritage Docket

Existing Depot

The bus depot is split into two so as to cover more grounds and its removal from the city center will prevent unnecessary travel to the city center then away from it. The villages or wards with higher walking and PT trips are taken into consideration for BRTS routes and their phases.

City Area B

Preserving Heritage

Sample BRTS Corridor along high rise high density roads with width more than 30 mts

74,423

Social Housing

No. of DU required

Standard Size of DU (in sq.m.)

EWS

32,072

30

962,160

4

240,540

LIG

24,737

50

12,36,850

5

247,370

MIG

17614

65

11,44,910

5

2,28,982

Typology

City Area A - Walled City

Built-up Area No of Area (in Sq. (in Sq. m.) Floors m.)

Building height :

Building will open to

Buildingʼs facade will

Windows & Doors

Maximum 10 m

Streets

Align to others

Facing street

No

No

No

No

Maintain

Maintain

Compound Walls

Stilts

Road Widening

Amalgamation/ Subdivision of plots

Existing Structure

Street Character

Facade to be maintained, hoardings, stickers and banners to be removed. However, engaging graffiti can be encouraged

Total Area required for Social Housing

0.72 sq km

Social housing is calculated by taking 20% of total households.

LEGEND Slums

According to DP report, housing shortage is of 20,087 houses currently, while 49,741 households are there in 124 slums pockets. Housing requirements are calculated based on which sector the working population does a job in.

Parking and Vending

Carriageway/Walkway

Parking

Carriageway/Walkway

Sidewalk/ Footpath

Parking and Vending

Carriageway/Walkway

Parking


06

06

SPECIAL PROJECTS

COSTING

GREEN AND BLUE NETWORK

PROJECT COSTING

Eco Sensitive Zone Recreational area Ecozones

6.78 sq.km 21.11 sq.km

Issues

Solutions

Illegal encroachment on water bed

• Monitoring System • Relocation of Informal settlements

Solid waste Disposal

• Rejuvenation of major streams • Providing Basic Infrastructure

Domestic Sewerage disposal

19% Key Plan

20%

Roads

Heritage

Ecozone Land Acquisition

4,678 crores

45 crores

5,010 crores

LEGEND

• Proper channelizing of Sewage • Organic treatment of sewage

Water Bodies Farm Lands Afforestation Recreational Area Existing Pradyuman Zoo

Industrial Effluent

0.4%

• Regulating the norms for effluent treatment. • Regularizing the monitoring system.

47%

1%

2%

Public Transport

Social Housing

Water Supply

235 crores

11,495 crores

593 crores

1%

1%

0.6%

Solid Waste Management

Sewerage

Storm Water Drainage

108 crores

209 crores

94 crores

Eco Resorts Buffer Interlinking of lakes

Riverfront Development

9% Provide Riperian Buffers

Improve Existing conditions by cleaning and desilting

3 Dimensional visualization of the riverfront near twin lakes. Ecotone and green buffer is to be provided around all water bodies Contingencies @ 10%

2,247 crores

TOTAL COST (IN CRORES) = 25,719 ~ ~ Ecotone

River

Riperian Buffer

Sitting/walking area

Stepped Riverfront

Ecotone

25,800


07 PHASING

TP DELINEATION AND OUTCOME TP delineation

Expected Outcome

MUZ 3

07

MUZ 2

Phase

Year

Area

IMPLEMENTATION

Existing

2020

74 sq km

52

STRATEGIES

Phase 1

by 2025

72 sq km

55

Phase 2

by 2035

179 sq km

110

Phase 3

by 2041

154 sq km

56

479 sq km

273

PHASING

GDCR AND BYLAWS

POLICIES

W h i l e a D P i s p re p a re d throughout India for about an interval of 15 - 20 years, the projects listed down and the implementation of such cannot be done all together when the DP passes.This is when phasing comes into play.

To make sure that the DP is implemented as advised and desired, there are certain guidelines given by the local authorities which are known as General Development Control Regulations - a set of bylaws that each individual should abide by while opting for any kind of construction in the city.

To promote or demote certain aspects - tangible or intangible the ULB also lays a set of policies that incentivizes or discourages certain actions.

Thus the “development” and implementation of the development plan takes place in stages.

Some crucial bylaws are laid out.

Such policies prove to be very beneficial in guiding the citizen (consumer) behaviour. Certain policies are covered here.

Total

No. of TP MUZ 1

Proposed final form As can be seen, the existing growth is limited to the RMC region, while the proposed form narrates growth on south west and north east corridors - which are also the natural growth corridors. The proposed form is projected based on zoning of the development plan and DCR regulations; at the end of the three phases of TP, road network and individual projects along with infrastructure development.

Existing form


07

07

POLICIES

GDCR AND BYLAWS

REGULATIONS

REGULATIONS Gamtals Mixed Use Zone 3 Mixed Use Zone 2 RD Width 18 - 36

Mixed Use Zone 2 RD Width > 36

60 %

16.5 mts 50 %

<

30 mts

12 ts m

45 mts 8 -1 12 mts

Mixed Use Zone 1 RD Width 18 - 36 Industries

70 mts

45 % ts

PT IS SUPPLY BASED COMMODITY increase in number of private vehicles cheaper private transport failing BRTS networks

CONVERT PT INTO DEMAND BASE COMMODITY create incentive – generate revenue similar to life insurance premium - pay first

6m

3 8-

1

Agriculture, Recreational, Ecozone

ts

15 %

36

+m

THE DPSIR APPROACH Respond to Drivers, reduce Pressure, creating positive Impact by ensuring the State provides provisions

RD width based height restrictions Minimum Plot Size Restrictions max.

9 MTS

max.

16.5 MTS

max.

20 MTS

max.

20 MTS

max.

30 MTS

30 MTS max. 45 MTS

max.

max.

70 MTS

max.

Merging of no more than 4 plots

Industries RD Width < 24

Use based height restrictions regardless of road width

IZ - 2 Obnoxious Ind

4.5 LZ RD Width < 36 LZ RD Width > 36 City A All widths City B All widths Gamtal All widths

Obnoxious Industries RD Width < 24

Ba

ck

- 3 - 4.5

3-3-3

5-4-3 MUZ 1 RD Width 18 - 36

1.5 - 0 - 0

50 sq mts

1.5 - 0 - 1.5

7.5 - 3 - 3

3 - 1.5 - 2.5 MUZ 2 RD Width 18 - 36

4.5 - 1.5 - 2.5

improve tourism

REVENUE GENERATION lack of government services that generate revenue

6% rebate in property tax

logistic hubs and freight terminals 150 sq mts

penalties for repeat offences

250 sq mts

ADDITIONAL MECHANISMS to improve DP and smoothen its implementation process

supply based services not being utilized

Industries RD Width > 24

Mixed Use Zone 2 RD Width > 36

MUZ 1 RD Width 36 + MUZ 2 RD Width <18

RAINWATER HARVESTING compulsory for all new buildings

chargeable FSI

4.5 - 3 - 3

1.5 - 0 - 0

WATER SCARCITY hard strata less water availability lack of water infrastructure

80 sq mts

Mixed Use Zone 1 RD Width 18 - 36 Mixed Use Zone 3 RD Width < 18

5 - 3 - 3.5

adaptation and mitigation policies as per NAFCC & IPCC

70 MTS

City A, City B, Gamtals For all road widths

IZ -1 Regular Ind

ENVIRONMENTAL ISSUES urbanization and encroachment high demand for land and water degraded eco system and pollution

Mixed Use Zone 1 RD Width > 18 Mixed Use Zone 3 RD Width > 18

350 sq mts

Obnoxious Industries RD Width > 24 Logistic Zone RD Width > 36

500 sq mts

regularly monitoring population revisiting the DP more often at shorter intervals creating TPs and LAPs wherever necessary public participation and stakeholder reviews creating special teams for driving projects integrate various departments

MUZ 2 RD Width 36 +

7.5 - 2.5 - 3

nt

Fro

MUZ 3 RD Width < 18

e

Sid

2.5 - 1.5 - 2.5 MUZ 3 RD Width > 18

3 - 1.5 - 2.5

Margin Restrictions heights are only for representation purposes Margin format :

Front in mts - Side in mts - Back in mts

TOWARDS A COMPREHENSIVE AND EXTENSIVE DP


K E Y TA K E AWAY S

Rajkot is the 7th fastest developing city in India, and it was a challenge to plan Rajkot due to the unique mind set of the people who live there. Rajkot is the costliest city in Gujarat, with certain areas having land prices higher than Ahmedabad. However, after stakeholder discussions and meetings with RUDA and RMC officials, it became increasingly clear as how Rajkot grows, in which direction and what measures to apply to develop Rajkot into a liveable city. With the correct measures, the feat can be achieved rather steadily and efficiently. But besides Rajkot, there are some key points regarding planning and implementation that were deduced during the semester.

1. One should plan for outcomes, rather than for time frames. 2. Allow markets to take over the growth of a city. Identify these growth markers. A liberal approach is a good approach. 3. Allow the stakeholdersĘź participation in the progression and evolution of their cities.

4. Roads come first - wherever roads go, development goes. To control the growth

OUTCOME

of the city in one direction, one can encourage or discourage it by providing or not providing roads.

5. In Indian context, no area should have dedicated uses, a mixed use zoning approach is more feasible and practical. 6. Various regulations and supporting policies control development while infrastructure projects and special projects can promote it.


RUDA and RMC ofďŹ cials

SCHEDULE

Development Plan Studio 2020 MUP | Semester 2 | Duration 18 weeks Exercise 1: Plan your precinct: Duration 1 Week Exposure to planning through proposals for 1 sq km of area, already studied in the previous semester. (Individual)

RMC and private developers

Exercise 2: Comparative analysis of Development Plans and road networks: Duration 1 Week Understand various development models and planning approaches around the world supported with road network study to identify patterns, block sizes, and spacing of arterial roads. (Individual) Studio Project: Preparation of the development plan for a case study city Iteration 1: Existing Situation Analysis & Initial Concepts: Duration 3 Weeks Analyzing the existing situation through both primary and secondary data sources (Group of 16) followed by developing individual concept for the Development Plan (individual)

RBA meeting

Iteration 2: Vision, Approach, DP Framework and Zoning: Duration 4 Weeks Development of key proposals related to zoning and development regulations, along with vision and objectives (Group of 4) Iteration 3A: Draft Development plan: Duration 3 Weeks Draft proposals for zoning, transportation, housing, infrastructure, environment, heritage, economic development etc. along with broad cost estimates and revenue generation (Group of 4 + Individual Proposals)

RUDA presentation

Iteration 3B: Final Development Plan: Duration 4 weeks Refining the work in Iteration 3A with addition of 3D visualizations for urban form resulting from regulations at city, area, and/or street levels; implementation phasing through TP Schemes, monitoring & evaluation Framework. (Group of 4 + Individual Proposals)