LANDSCAPE ARCHITECTURE PORTFOLIO
Landscape Architecture Works Seleted From 2012-2017
XINRUI LI 05. 2018
XINRUI LI LANDSCAPE ARCHITECT
Nationality, Chinese
Contact
Born, April 20th XXXX
+61 040637XXXX, +86 1860201XXXX
Relationship, Single
micolee2000@hotmail.com
Language, English, Mandarin, Cantonese, Kakka
XXXX Jeffcott st, West Melbourne, Victoria Australia, Post Code 3003
PROFILE
DESIGN SKILLS
" Thought of better living for all creatures.
AutoCAD
In my studies and experience I have brought two design areas together, interior design and landscape arhcitecture. My goal is to learn more about design - better living for all creatures, both aesthetically and environmentally. Progressively, I have engaged with design skills and logical thinking through multiple experiences.
3ds Max
My bachelor degree of enironmental art was completed in Chinese, while master degree of landscape architecture was completed in English, my second language, which now allows me to communicate efficiently in two languages.
Adobe Illustrator
Interior design and landscape architecture now inform the way I work as a landscape architect intersectionally. It is exciting prospect to work with people and context those are entirely new to me, in my skilled fields.
Ladybug for Rhinoceros
EDUCATION From February 2016 to December 2017 Master of Landscape Architecture Royal Melbourne Institute of Technology University, Australia From April 2015 to January 2016 Intermediate to Advanced English Royal Melbourne Institute of Technology University, Australia
Rhinoceros
SketchUp Adobe Indesign Adobe Photoshop
Microsoft Office Grasshopper for Rhinoceros
Follow Design
LANGUAGE SKILLS English Mandarin (Chinese) Cantonese (Chinese) Kakka (Chinese)
Access Process From March 2009 to January 2013 Bachelor of Environmental Art Guangzhou Academy of Fine Arts, China
INTERESTS
Reading
Ping-pong
Fitness
Swimming
Food
Coffee
Photograph
Badminton
WORK EXPERIENCE From November 2017 to December 2017 Intern Landscape Architect AECOM, Guangzhou, China From October 2011 to October 2014 Senior Interior Designer WA Stutio, Guangzhou, China
Travel
Language Study
LINKS
From March 2009 to September 2011 Junior Interior Designer Jimei Group, Guangzhou, China
https://www.instagram.com/xinrui_lee/
From March 2008 to January 2009 Assistant Interior Designer Inspiration Studio, Guangzhou, China
https://weibo.com/micolee2000/profile?rightmod=1&wvr= 6&mod=personinfo&is_all=1
https://www.facebook.com/profile.php?id=100007897725
This is part of my landscape architecture works selected from 2012 to 2017, conducted at the study course of master in RMIT University, and professioal works from WA studio.
01
FOLDING LAND
02
INTO THE WILD
03
CO-FORMING EDGE
04
RESEARCH CENTRE OF SOUTH CHINESE ECOLOGY AND METEOROLOGY
05
XINFENG METEOROLOGY BUREAU
06
QUJIANG METEOROLOGY BUREAU
07
OTHER WORKS
Royal Melburn Institute of Technology University, Australia | 2016 | Studio 7 | team
Royal Melburn Institute of Technology University, Australia | 2016| Studio 8 | team
Royal Melburn Institute of Technology University, Australia | 2017| Lab | self
WA Studio, China | 2013 | Professional work | team, as a director designer
WA Studio, China | 2013 | Professional work | team, as a director designer
WA Studio, China | 2012 | Professional work | team, as a director designer
Rendering | Collage | Hand Drawing | Develop Design | Mapping | Modeling
01
FOLDING LAND ECOLOGICAL CORRIDOR
POSITION The project is to regenerate the city spot, Franklin st, where the CBD north station is located in, to be a public open space for people to stay in the urban context, as well as a transition place from the metro station. The project is trying to utilize the natural resources systems serve to urban, such as vegetation, soil, stormwater and underground water flowing system, associating with artificial materials which are impermeable. CONCEPT The idea is to consider the landscape as a system to collect, filter and store stormwater by forming specific topography, eventually providing the irrigation water for urban green. The conception of land form is created by folding a piece of square paper as a component, and configuring those units to the site. The idea is to maximize the collection of water and lead to the storage by the natural way. The idea is referenced from Johanna F. Barthmaire, who does the project, Tempelhof Wasserpark.
FOLDING
CONFIGURATION
The project is to regenerate the site, Franklin st, where the CBD north station is located in, to be a public open space for people to stay in the urban context, as well as a trasition place from meatro station. The idea is trying to utilize the natural resources and system serve to urban, such as stormwater and underground water flowing. In this project, the landscape is considered as the way to collect stormwater, and better to lead the water flow to underground when there is a heavy rain or even rainstorm. Surface materials and the landscape objects would be the core elements concerned on the project.
Data of Topography
Underground Streams & Direction
Purposing Stream
Access for Cars, Cycle & Pedestrian
Site Section
Intersection of Swanton st and Franklin st Metre Entrance
City Bath Extension
INTO THE WILD THE WILD JOURNEY IN EAST HAMBURG
The project is to utilize and rebuild the ignored places in the factory area in the East Hamburg to create a recreational area to attract residents and tourists. Pelple nowdays live in a secure and comfort lives with technical devices such as mobile and computer, our porject is to design the space into an innovative and make a bold change in your lifestyle and begin to boldly do things which you may previously never have thought of doing, or been too attempt. This is to make people live in the real world, make a new type of adventurous touring style as well as get away from normal lifestyle for a while. Within this project, we want to biuld a linear wild landscape area in the large competition area, the whole linear space is a transition from normal city experience to a radical and innovative wild experience. The city experience is safe, comfort and monotonous within a clear and organized spaces and boundaries, while in the experience in our project, residents and tourists can have an excited and fickle experience with sunlight, fog, topography, wind and temperature. Such as walking in the mist in the forest, slope on the dirt and grass, sleep on the trunk of tree and many other risky experiences. Wild and Urbanism appear as two opposites that were combined in this project. Reflecting the city in the wild and the wild in city. Located in Hamburg, Germany, Wild Urbanism acts as a nature and adventure in the city. The design echoes the remanent and artificial wild of Hamburg and calls people to experience a narrative of place which is often underprivileged in an age of economic and urban growth.
02
A Blur boundary - the extention of trees
Windy area
Sunny area
Wind - the high ruderals with allotment
B
Hard boundary - divided by the road
C
Hard boundary - the elevation of the ground
Topography, temperature and wind- create caves and hills
A B
D
C Windless region
Shady region
Humidity and sunshade - Topography, pond, ruderal and trees
D
Windy area
Sunny area
Blur boundary - transit with high ruderal
Design scenario
Wind - Grass slope with factory building
STRATEGY PLAN
Transition area
Slide into the river water
Cave
Design area
Woodland
Kindergarten University Budget hotel Blur boundary area Hard boundary area Connection
Scalar area with shelf
Strategic master plan 1: 5000
Grass slope
Our team used the Grasshoper, Ladybug and Follow Design to simulate the site atmospheric elements - wing, sunlight and moist, purpose to come up with the sitespecific strategy.
SITE DESIGN -- CAVE EXPERIENCE The site is designed to be cave topography, which is purposed to experience different temperature. Experiencing a contrast condition, dark and light at day, warm and cold in winter, cool and hot in summer, humidity and dry contrast will happen in spring.
Elements
SITE DESIGN -- ADVENTURE WOODLAND Elements
Since a plenty of natural resources within the site, intervention to nature is intented to happen at this site, by creating adventure facilities and raised path. The wetland is designed to form a foggy.space in this windless area. Experiencing windless, shade, wet and foggy.
SITE DESIGN - Rolling on the Factory Roofs This is one part of factories area within the south of competition area. Poor accessability and single utility are the main issue. Creating public function is considered to contribute for resident and tourist, and potentially connect to urban context. The factory roofs are designed to be grass slope, linking by bridges. More windy and sunny will happen after deisgn.
CO-FORMING EDG
03
STRATEGY PLAN
STONY CREEK PARK
Westgate Bridge Memorial Park
SPOTWOOD PUMPING STATION
Main Zone of Silt Deposit
CO-FORMING EDGE
Filter waste water
The CO-FORMING EDGE is a proposal to reform the current intertidal edge in the estuary Yarra River into a formation able to cultivate a hybrid landscape; one where ecology sits above but in relationship with the general public.
Access Water Option
CALTEX MELBOURNE TERMINAL
Since the 1870’s West Melbourne has undergone an extensive urbanisation converting the landscape into an “effective” channel for shipping requirements. This extensive urbanisation has been at the expense of the Yarra River estuary and its ecological value.
Industrial Zone A short disatance to river, and a low demand of recreational activites within this region, the strategy will be kept the specific function, such as parking, barging, waste water discharge. The proposing edge is much intent to form a terrain co-existance with the site facilities.
Instead of the fertilized interface between earth and water as recorded previous to this urbanisation, an unyielding and raised edge - constructed not as a site specific intervention but a common formation for the urban context, a pragmatic solution for flood mitigation but at expense to the ecology. This investigation takes a critical thinking on its intertidal habitat that has ecological and public value.
PORT MELBOURNE
RIVERSIDE PARK
While the city was originally formed by the river, the river has been shaped by urban development. This research project intends to reclaim this estuarine landscape; one which co-forms as presence of landscape serving the shorebird, duck and frog, and to allow access to the abundance of benefits to the community that have grown beside the river. The research presents a review of the agenda behind the river’s edge, while also examining a range of formal outcomes specific to interaction through material investigation and design. This concern is intent to grow up the estuarine environment for intertidal species. This argument identifies four methods – terrain, blur, extend to the water and create dune. Taking the way of terrain the edge develops to implement as five phases, implies a strategy plan on the Yarra site.
Filter waste water
Power Facilities In case on a mutiple facilities are across the spot, retaining the current edge and stabalise the interface of the current form and the proposing
DIGMAN RESERVE
NEWPORT POWER STATION
Access Water Option
Community Zone A mutiple funtion will be set up on this region in case of around communities. The reforming edge is proposed to break down the current recreation to the water, and bring people down to the water as well. Co-forming edge is intent to
WILLIAMSTOWN ATHLETIC CLUB
SOUTH PACIFIC HEALTH CLUB WILLIAMSTWON
THE WARMIES GREENWICH RESERVE
STRATEGY PLAN 5m
10m
20m
30m
50m 1:500
PROPOSING TERRAIN EDGE PROPOSING SILT DEPOSIT ZONE SILT COURSE SILT DEPOSIT EXISTING SHORES EXISTING MUDDY LAND WOODEN PLATFORM
ROAD EXISTING PATH PROPOSING ADDING PATH CURRENT EDGE SHIPPING CHANNEL WATER ACCESS OPTION
WILLIAMSTOWN BOATRAMP
ACCESSABLE
DISCHARGE WATER
BARGE
SEAWATER FALL
RIVERWATER FALL
RESERVE
TRAIN STATION 10m 20m
40m
60m
100m 1:3000
Shipping Canal
IMPLEMENT PHRASES
1S
TY EA
R
PURPOSING FORMS Marsh Land
Access Water Platform
Proposing Water Access Path
Depth Contours High Tide Sea level Rise+ SLR Mean Sea level
Water Access Existing Road Existing Path Existing Building
Cite: ‘SHUTTER STOCK’
High Tide
1ST YEAR
Mean Sea level + SLR Mean Sea level
de
PHASE 1
Tide
R
EA TY
h Ti Hig
Remove Basalt
w Lo
Remove Basalt to the Deep River Edge Put the Basalt in the Water Grow the Fresh-salty water Condition Soften the Unyielding Edge -
-
1S
Existing Edge
Vesicular Basalt
Shipping Channel
TERRAIN
FORM - TERRAIN
Vesicular basalt is largely used for the edge of earth-wa ter interface . The vesicular is unable to deposit silt that produces a plenty of micronism.
High Tide Sea level Rise+ SLR Mean Sea level
Marsh Land
Access Water Platform
Depth Contours
Water Access
5TH YEAR
Existing Road
Get Water into the shallowsReformTerrain by Erosion -
Reform Terrain
Existing Path Existing Building
PHASE 2 High Tide Mean Sea level + Mean Sea level
Saltmarsh Saltmarshes occur at the upper levels of the intertidal zone, often behind mangroves, and, while they're not tides and semi-permanent pools of brackish water.
R
EA HY
5T Existing Edge
Shipping Channel
High Tide Sea level Rise+ SLR Mean Sea level
BLUR EDGE
FORM - BLUR 6TH YEAR
Move Basalt Back to the Terrain Edges A Temporal Silt Deposition-
Stabalise Shallows
Prposing Floating Marsh
PHASE 3
Access Water Platform
Depth Contours
Water Access Existing Road Existing Path Existing Building
High Tide Mean Sea level + SLR Mean Sea level
6TH
Shallow
R
YEA
water leading silt movement.
High Tide Sea level Rise+ SLR Mean Sea level
7TH YEAR
Existing Edge
Shipping Channel
EXTEND
Micronism Growing Estuarine Hydrophytes -
Grow Fertile
PHASE 4
FORM - EXTEND
Prposing Dune Land
7TH
Wooden Path
YEA
Depth Contours
R
Estuarine Plants
Water Access
Estuarine plants are important plants as they protect shore lines from erosion, improve water quality by trapping sediments, provide habitat, and are highly productive. The productivity of these habitats is largely due to an abundance of algae and diatom phytoplankton, which feed a diverse foodweb. Seagrasses may contain up to 1000 times more animals than a comparable area of bare sediment. Juveniles of Cite: JCHO website
High Tide Mean Sea level + SLR Mean Sea level
High Tide Sea level Rise+ SLR Mean Sea level
Existing Edge
Shorebirds Frog Duck People Intervention -
Invite Species
Estuarine Species
IMPLEMENTATION PLAN
types of habitats, as such oyster reefs, coral reefs, rocky shore submerged
Cite: JCHO website
PHASE 5 CREATING DUNE
FORM - CREATE DUNES
Shipping Channel
MODELING Purposing forms testing
Past Reform Forces
Past Reform Forces
1888-Present
1850
1844
31,000~40,000
1606
1802
Aborigines
First Sailing
First Landing
Kulin and Wrundjeri oborigines lived in the north of Rarra River and Port Phillip, fishing, hunting and gathering living from the rich food sources of Port Phillip, and the surraounding grassland.
Willem Jamszon sailed to Austrlia, recording as the first time.
John Murry landed at Lady Nelson (Port Phillip) in 1802, recording as the first landing Australia
1803
300 Convicts Settlement
Daivd Collins settled 300 convicts in Sorrento (Morning Peninsula). John Flemminry sought for settle, has was exploring from Maribynong River return back to Yarra River, because of the fresh water found at esturine Yarra.
1835
1838
European Settlement
John Batman purchased 600,000 acres land around the Yarra River and Corio, Batman treaty was taken place around Merri Creek.
Pastoral Stations
There are pastoral stations in the Yarra Valley, on both sides of the stream, more than 40km from Melbourne, which was initially determined a spread of settlement. Yering Station was one of the largest in the area.
1844
Prince Bridge Built
John Batman purchased 600,000 acres land and established Batman tready Corio Bay (Port Phillip).
1870’ ~1880’
Gold Rush
1892
Rivercourses transformation
The discovery of gold in Victoria in mid-1851 led to a gold rush, and Melbourne, which served as the major port and provided most services for the region, experienced rapid growth. Within months, the city's population had increased from 25,000 to 40,000 inhabitants. Chinese magrants built China twon. Railway lines coered the unoccupied land in old stream valles as the expendation of population, started at coastal residential growth.
YARRA ESTUARY
Map 1864
Map Current
Esturine rivercourse was transformed to be straigh way, Victoria dock built. Batman Hill was removed. West Melbourne Swamp was disappearing.
1972
Docks Construction
Swanson Dock and Appleton Dock were built, Maribyrnong River estuarine canal was re constructed to be straigh. River course between Yarra River and Maribyrnong River was removed. Coode Island disappeared. West Melbourne Swamp completely disappeared.
1972-1984
Planned Construction
In February, 2017, a greater flow of water occured ephemeral streams such as Elizabeth Street, caused by the stripping away of vegetation and sealing of ground surfaces with non-porous materials such as bitumen and concrete.
MATERIALITY Site materials study
MATERIAL TESTING
Sand This is a test of geological material, sand, purpose to find out its performance when it is encountered the external forces. The test is under taken on three phrases, shape, movement of top view and side view. The testing method is that a sand mountain is set on a paper, repeatedly hit by an object on its one point. The action is captured to pictures and recorded to video on its top and side. - Shape The shape will be changed by the force, the mountain is reformed around the object, and the scatter sand run far away from the centre of the pile. Meanwhile, it makes the pile boundary become blur. Within in the repeated hit on the one point of the pile, its shape doesn't change so much after the third hit. The size changes from 16.5cm to 26cm by five times hit. - Movement - top view While is encountered an external force, the sand mountain scatters around, and it is tendence to move to the folding line when the paper is folded. - Movement - side view The size of original pile is 16.5cm of diameter and 2cm of high. The sand pile runs from the centre to side and high. It is about 10cm on high, and 13cm from centre to side. Even it is fine sand, when it is hit, a quick totally fall down happens because of its quality.
PROFESSIONAL WORKS
RESEARCH CENTRE OF SOUTH CHINESE ECOLOGY AND METEOROLOGY, CHINA
RESEARCH CENTRE OF SOUTH CHINESE ECOLOGY AND METEOROLOGY, CHINA
QUJIANG METEOROLOGY BUREAU, CHINA
07
LEGEND
A AREA TO BE DEMOLISHED
EXISTING CRICKET NETS
B
D
C
E
F
8
35M
EXISTING LEVELS EXISTING CRICKET NETS
EXISTING TREES TO BE RETAINED AND PROTECTED
N: 448.3363 E: 909.1200
7
EXISTING OVAL
30M
PROPOSED PLAYGROUND
EXISTING CRICKET NETS
6
25M BOUNDARY OF EXISTING PLAYGROUND
EXISTING FOOTBALL OVAL
FOREST MAZE
LAWN REINSTATEMENT AREA. (EXISTING PLAYGROUND ZONE REMOVED)
EXISTING SEAT
SE
SE G
5
SE
FLAT SEAT & TODDLER SEAT TO FACE SOUTH
R
SEAT
G
CONCRETE EDGE
PROPOSED PLAYGROUND EXISTING PATH
SF
20M
8
T
KEY PLAN - 1:500 @ A1
T
SLIDE
NOTE: ANY EXISTING TREES WITHIN WORK SITE TO BE RETAINED AND PROTECTED DURING DEMOLITION AND CONSTRUCTION
SE
SF
SE
REFER TO KEY PLAN
CLIMBING NET
G R
R TUNNEL UNDER
SF
SPRING
TABLE
SWING
EXISTING SEAT
SPRING SLIDE
SE
1.8
BIRDS NEST SWING
EXISTING / REINSTATED LAWN
NEW NATIVE GARDEN BED WITH LOCAL LOW LEVEL SHRUBS, GROUNDCOVERS AND GRASSES
INDICATIVE FALL ZONES EXACT FALL ZONE REQUIREMENTS TO BE PROVIDED BY NOMINATED PLAY EQUIPMENT MANUFACTURER. ALL FALL ZONE SETOUT TO THE APPROVAL OF THE SUPERINTENDENT
TIMBER LOGS, RECYCLED FROM COUNCIL DEPOT. SEATING AND NATURE PLAY OPPORTUNITIES
FOREST MAZE
SE
ROCKS. SEATING AND NATURE PLAY OPPORTUNITIES
5M
G
LAWN REINSTATEMENT AREA. 2000mm OFFSET TYP.
THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING ANY SHOP DRAWINGS. FIGURED DIMENSIONS SHOULD BE USED IN PREFERENCE TO SCALED DIMENSIONS. ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM THE LANDSCAPE ARCHITECT. THIS DRAWING REMAINS COPYRIGHT AND THE
EXISTING PATH
COMMON NAME
INSTALL SIZE
SIZE AT MATURITY
QUANTITY
Install subsurface sewer grade solid PVC pipe or flexible agricultural pipe wrapped in geotextile liner within trench filled with approved fine graded aggregate/sand.
SMALL TREES Al
Allocasuarina littoralis
Black Sheoak
45 Litre
8m(H) x 4m(W)
5
Em
Eucalyptus melliodora
Yellow Box
45 Litre
10m(H) x 8m(W)
2
Qr
Quercus rubra
Red Oak
45 Litre
10m(H) x 9m(W)
2
Common Correa
tubestock @ 6/m²
1-1.5m(H) x 1-1.5m(W)
65 395
10.60 EXISTING CRICKET NETS
SHRUBS AND GROUNDCOVERS Correa reflexa
5M
T
Ll*
Lomandra longifolia
Spiny-Head Mat-Rush
tubestock @ 9/m²
0.5-0.6m(H) x 0.65m(W)
Pl*
Poa labillardieri
Large Tussock Grass
tubestock @ 9/m²
0.8-1m(H) x 0.8-1.2m(W) 170
EXISTING OVAL
10M
300mm consolidated depth (typical/ subject to fall height requirements) approved and tested impact absorbing soft fall mulch. Comprised of min. 200mm depth new approved organic softfall mulch and 100mm depth good condition site salvaged mulch
0M
G
15M
20M
10.80
Planting in 75mm approved mulch over 275mm approved topsoil over cultivated subgrade
11.00 SOAKAGE TRENCH WITH COARSE SAND
11.27 x
x 11.20
SUB SURFACE AG. PIPES
x 11.14
8
x 11.20
11.38 x 11.40 x 11.51
01 LD04
11.20
11.37 x x 11.40
75
TYPICAL GRANITIC GRAVEL PATH DETAIL
SCALE 1:10
Adhesive & 100mm min. thick 25MPa insitu concrete slab, F62 reinforcing to Engineers detail. 45° chamfer to edges
SCALE 1:10
100mm depth organic softfall mulch over EPDM rubber under swings/high impact zones Edge of EPDM wet pour synthetic surface to be embedded into subgrade Adjacent surface typically garden bed, organic soft fall or granitic gravel path
15
11.40
LEGEND 8.20
x 8.45
x 11.64
100
2 Al
x
PROPOSED LEVELS GRADE TO MATCH BACK INTO EXISTING
SPADE EDGE
NEW NATIVE GARDEN BED WITH LOCAL LOW LEVEL SHRUBS, GROUNDCOVERS AND GRASSES
EXISTING TREES TO BE RETAINED AND PROTECTED
NEW FEATURE SHADE TREES
11.60 TIMBER LOGS, RECYCLED FROM COUNCIL DEPOT. SEATING AND NATURE PLAY OPPORTUNITIES
x
x 11.72
11.80
11.80
100
ROCKS. SEATING AND NATURE PLAY OPPORTUNITIES DRAINAGE SUB SURFACE AG. PIPES
SOFTFALL FINISH LEVEL OF SOFTFALL UNDER SWINGS TO BE NOMINALLY 100mm BELOW FINISH SIFTFALL MULCH
12.00 x
Bespoke Timber balustrade
0.6m ht above ground level Access
Access to slide Tunnel under
1.5m ht above ground level
1.2m ht above ground
Bespoke Timber roof over platforms 0.9 to 1.8 Sliding pole
THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING ANY SHOP DRAWINGS. FIGURED DIMENSIONS SHOULD BE USED IN PREFERENCE TO SCALED DIMENSIONS. ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM THE LANDSCAPE ARCHITECT. THIS DRAWING REMAINS COPYRIGHT AND THE
Tumble Turn and Spider Web connection to structure 08 LD04
Subgrade proof rolled and compacted to min. 95% SMDD to AS1289
Climbing wall access to play structure
PLAY STRUCTURE - BALUSTRADE LOCATIONS SCALE 1:50
TYPICAL PLANTING & GRAVEL PATH INTERFACE
150mm wide x 300mm deep 32MPa coloured concrete edge. Tooled control joints every 1m. Pencil round top edges. Colour: Colourlinx 'Sunburnt' @ 4.15% in grey cement
50mm compacted base course recycled FCR, 95% SMDD
Rubber landing pad
Softfall rubber by approved sub-contractor as specified. Refer to Specification. A1 Rubber EPDM. Finish to rubber edge to Manufacture's Specification
75
15 varies
75
100
TYPICAL SOFTFALL & RUBBER INTERFACE SCALE 1:10 BENEATH SWINGS
50
75mm depth compacted granitic gravel over 75mm depth compacted FCR over approved subgrade
1.8 ht above ground level. Rubber surface beneath with wheelchair access
Slide
06 LD04
100
07 LD04
75
SCALE 1:10
50
TYPICAL SOFTFALL & RUBBER INTERFACE ACCESSIBLE PATH SCALE 1:10
0.9m ht above ground level
NOTES: SUB GRADE IN SOFTFALL MULCH ZONES TO HAVE MINIMUM 1:50 FALL TOWARDS AGRICULTURAL DRAINAGE TYPICALLY PROVIDE FALLS ACROSS HARD SURFACES TOWARDS GARDEN BEDS: MIN. FALL IN DIRECTION OF TRAVEL - 1:100 MAX. FALL IN DIRECTION OF TRAVEL - 1:25 MAXIMUM CROSSFALL - 1:50
SOAKAGE TRENCH WITH COARSE SAND (NO GEO-FABRIC)
04 LD04
75 225
varies
Subgrade proof rolled and compacted to min. 95% SMDD to AS1289
MODULAR PLAY EQUIPMENT. REFER TO 08/LD04 FOR BALUSTRADE LOACTIONS
Spade edge to garden bed
Adhesive & 100mm min. thick 25MPa insitu concrete slab, F62 reinforcing to Engineers detail. 45° chamfer to edges
300
75mm depth compacted granitic gravel over 75mm depth compacted FCR
75
Impact absorbing EPDM wet pour synthetic surface wear layer in accordance with Manufacturers Specifications for fall heights. Colour TBC. Install to Manufacturers Specification
15
50mm compacted base course recycled FCR, 95% SMDD EXISTING CONTOURS AND LEVELS
planting in 75mm approved mulch over 275mm approved topsoil over cultivated subgrade
TYPICAL PLANTING & SOFTFALL INTERFACE
50
11.60
2 Em
Impact absorbing EPDM wet pour synthetic surface wear layer in accordance with Manufacturers Specifications for fall heights. Colour TBC. Install to Manufacturers Specification
300
FINISH LEVEL OF RUBBER SOFTFALL UNDER SWING TO BE NOM. 100 BELOW FINISH SOFTFALL MULCH
11.40 x
x
11.77
Edge of EPDM wet pour synthetic surface to be embedded into subgrade
KEY PLAN - 1:500 @ A1
02 LD04
SCALE 1:10
Adjacent surface typically garden bed, organic soft fall or granitic gravel path
EXISTING PATH
11.53
11.60
75mm depth compacted FCR base over compacted subgrade 75
750
TYPICAL ORGANIC SOFTFALL MULCH
Wrap EPDM wet pour synthetic around 45° chamfered edge. Round edges to nom. 50mm radius PROPOSED PLAYGROUND
11.48 x
11.60 x
THE CONTRACTOR MUST VERIFY ALL DIMENSIONS MAKING ANY SHOP DRAWINGS. FIGURED DIMENSIO SCALED DIMENSIONS. ALL DRAWINGS MAY NOT BE PERMISSION FROM THE LANDSCAPE ARCHITECT. T
NOTE PROPOSED TREE PLANTING HAS BEEN REMOVED FROM PLAN FOR CLARITY
75mm depth compacted Granitic Gravel
03 LD04
varies
11.33 x
x
RE-GRADE AREA LOCALLY TO ACHIEVE CONSISTENT FALL ACROSS NEW LAWN AND TO MATCH ADJACENT EXISTING LEVELS
2 Al
REFER TO KEY PLAN
TIMBER FLUSH THRESHOLDS TIMBER SALVAGED FROM EXISTING PLAY STRUCTURES REFER TO SPECIFICATION
300mm consolidated depth of organic softfall mulch over compacted subgrade with falls to sub-surface drainage.
300
Compacted subgrade. Fall sub-base towards sub-base drainage
8
1 Al
EXISTING TREES TO BE RETAINED AND PROTECTED
10.80
11.00
11.20
TIMBER BEAMS TIMBER SALVAGED FROM EXISTING PLAY STRUCTURES REFER TO SPECIFICATION
25M
225
100
x 11.05
x 11.22 x 11.24
SPADE EDGE
SE
75
200 new
PROPOSED PLAYGROUND
11.20 x
BOUNDARY OF EXISTING PLAYGROUND (TO BE REMOVED)
PLAY / MAZE. REFER TO SPECIFICATION
* Source stock from local provenance plants
2 Qr
NEW PLAYGROUND SOFTFALL MULCH TO COMPLY WITH AUS. PLAYGROUND STANDARDS
SF
MODULAR PLAY EQUIPMENT. REFER TO 08-LD04 FOR BALUSTRADE LOACTIONS
B
BOTANICAL NAME
11.40
NEW RUBBERISED SOFTFALL TO COMPLY WITH AUSTRALIAN PLAYGROUND STANDARDS
SE
2
PLANT SCHEDULE - LAKESFIELD RESERVE
CDB*
R
10M
SF
WHEELCHAIR CUBBY ACCESS
R
0M
10.60
NEW GRANITIC GRAVEL PATH PROVIDING ACCESS TO PLAY SPACE
R R
1
CODE
G
SE
LAWN REINSTATEMENT AREA. (EXISTING PLAYGROUND ZONE REMOVED)
NOTE: ANY ROCKS. LOGS AND SOFTFALL WITHIN DEMOLITION SITE TO BE RETAINED AND STOCKPILED ON SITE FOR USE IN NEW PLAY SPACE
1.5
G
0.9
ROOF & BALUSTRADE
RELOCATED PICNIC TABLE FINAL LOCATION TBC
SEAT
0.6
1.2
SLIDE
TABLE
SEAT
SLIDING POLE
3
G
SF
SF
LEGEND
15M
CONCRETE EDGE
R
SE
EXISTING PLAY EQUIPMENT: - 2 x SLIDE / PLAY - SWING SET - 2 x SPRING/ROCKER TO BE DISMANTLED AND REMOVED TO COUNCIL STORAGE OFF SITE
SF
G
4
8
07 LD04
50mm compacted depth 20mm recycled compacted FCR or similar
Provide 1 x N12 bar, placed continuously along extent of edge, 50mm from top
CONCRETE EDGE TO GRAVEL & RUBBER INTERFACE SCALE 1:10
THE CONTRACTOR MUST VERIFY ALL DIME MAKING ANY SHOP DRAWINGS. FIGURED SCALED DIMENSIONS. ALL DRAWINGS MAY PERMISSION FROM THE LANDSCAPE ARCH
Cut top of log as required to achieve even surface suitable for seating and play
Nom. 650mmØ x 2-3m long natural timber log. Set approx 1/4 in ground. Log to be free from all side branches. All non conforming cracks to be appropriately filled. Trunk to be sanded smooth and allowed to weather naturally. Adjoining organic soft fall mulch
Stabilise log with 150mm nom. FCR compacted to 95% SMDD. To extend along entire length of log
450 max. varies Adjoining organic soft fall mulch
Supply and installation of plants and garden bed surface mulching by Council. Any site salvaged mulch found to e unfit should not be used and should be disposed of at the Contractors expense
750-1250mm Ø 'Castella'rock boulders or similar approved. Max. 450mm height from FFL of adjoining garden/soft fall. Firmly install 1/3 of boulder below FFL. Base below boulder to be compacted FCR to min. 95% SMDD
450 nom.
Compacted subgrade to 95% SMDD under footing
200mm consolidated depth 50:50 site:imported topsoil to Specification. Where sufficient stockpiled site topsoil isn't available, the Contractor is to import topsoil as specified at the Contractors own expense. Seeded grass. protect new grass areas with temporary fencing. Refer to Specification for variety & sowing
75mm deep 60mm depth sandy loam topsoil and spade edge Dynamic Lifter starter as per Manufactures application rates. 75
200 nom.
150≈ Fill as required with reused tosoil, depth varies, 150mm max. Lightly cultivated to achieve bond between existing soil and fill
150 nom.
01 LD05
TYPICAL TIMBER LOG - SEAT AND PLAY
Timber supports, Class 1 Recycled hardwood timber, fastened with 4 no. bridge spikes driven into log. 50mm min. cover 100mm depth base course, Class 2 FCR compacted to 95% SMDD Subgrade to be compactedto 95% SMDD as per AS1289
150 nom.
TYPICAL ROCKS - SEATS AND PLAY
02 LD05
SCALE 1:10
Stepping beams 150mm nom width at varying heights above FFL.. Class 1 recycled hardwood timber. OrganOil finish. Ensure smooth, non slip, flat level surface. Firmly install into subgrade with concrete footing
Varies
EXISTING HOUSE NO. 17
TYPICAL PLANTING DETAIL SCALE 1:10
NOTE: ANY EXISTING TREES WITHIN WORK SITE TO BE RETAINED AND PROTECTED DURING DEMOLITION AND CONSTRUCTION
Fix timber balance beam to timber supports with countersunk coach screw
150 nom.
25MPa concrete footing. Top of footing to be 50mm nom. below base of mulch level.
varies
03 LD05
SCALE 1:10
EXISTING HARD COURT TO BE RETAINED
EXISTING PLAY EQUIPMENT: - SLIDE / PLAY - SWING SET - 2 x SPRING/ROCKER TO BE DISMANTLED AND REMOVED TO COUNCIL STORAGE OFF SITE
60
225
EXISTING HOUSE NO.3
150 max.
EXISTING BBQ TO BE REPLACED BY OTHERS
50
SWING
50 100
04 LD05
TYPICAL TIMBER BALANCE BEAM (SIDE)
TYPICAL TIMBER BALANCE BEAM (FRONT)
05 LD05
SCALE 1:10
Tree as specified refer to planting plans 3 no 50x50x2400mm hardwood stakes free of knots, splinters and cracks. stakes are to be driven 900mm into the ground, clear of the root ball, and painted black.
SCALE 1:10
150mm wide Class 1 recycled timber hardwood to sit flush with finish ground level. OrganOil finish, ensure smooth, non slip, flat level surface Varies
3 no. black cloth reinforced rubber ties, attached with galvanised nails nailed into stake Watering bowl formed up with soil and mulched
Re use timber from existing swing bridge
SPRING AREA TO BE DEMOLISHED
Provide 'osmocote' or similar approved at rates recommended by the manufacturer
EXISTING LEVELS
Approved imported topsoil backfill to planting hole, min 150mm around root ball.
Roughen sides and firm soil at bottom of hole
TIMBER THRESHOLD - FLUSH WITH GROUND LEVEL
07 LD05
SCALE 1:10
THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING ANY SHOP DRAWINGS. FIGURED DIMENSIONS SHOULD BE USED IN PREFERENCE TO SCALED DIMENSIONS. ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM THE LANDSCAPE ARCHITECT. THIS DRAWING REMAINS COPYRIGHT AND THE
Mound base of hole as shown, prior to planting of tree.
B
D
C
E
TYPICAL TREE PLANTING DETAIL
N: 505.8795 E: 159.3449
6
5
RECYCLED TIMBER FLUSH WITH GROUND
BOUNDARY OF EXISTING PLAYGROUND
B
12.80
13.00
13.20
D
C
E
25M
13.40
F RESIDENCE NO. 3
N: 505.8795 x 13.20 E: 159.3449
6
25M
12.00
RESIDENCE NO. 17
RESIDENCE NO. 17
RE-GRADE AREA LOCALLY TO ACHIEVE CONSISTENT FALLS ACROSS NEW LAWN AND MATCH ADJACENT EXISTING LEVELS
PROPOSED PLAYGROUND PROPOSED PICNIC AREA
T
REINSTATE GRASS IN REMOVED PLAY GROUND ZONE
SE
12.60
RESIDENCE NO. 3
SEAT ELEMENT LAWN REINSTATEMENT AREA. 1000mm OFFSET TYP
12.40
A
EXISTING HARDCOURT RETAINED
F
THE CONTRACTOR MUST VERIFY ALL DIME MAKING ANY SHOP DRAWINGS. FIGURED SCALED DIMENSIONS. ALL DRAWINGS MAY PERMISSION FROM THE LANDSCAPE ARCH
SCALE 1:20
12.20
A
NOTE: ANY ROCKS. LOGS AND SOFTFALL WITHIN DEMOLITION SITE TO BE RETAINED AND STOCKPILED ON SITE FOR USE IN NEW PLAY SPACE
EXISTING TREES TO BE RETAINED AND PROTECTED
ROOT BALL
06 LD05
LEGEND
Mulch (as for garden beds) 1200mm minimum circle kept away from trunk
Garden bed in organic mulch over topsoil
Stabilise timber beam with FCR compacted to 95% SMDD
SPRING SLIDE
5
EXISTING HARDCOURT
20M
2 Qr
PROPOSED PLAYGROUND
13.20
x 13.00
PROPOSED PICNIC AREA
20M
EXISTING HARDCOURT
T
15M
4
LAWN REINSTATEMENT AREA. 1000mm OFFSET TYP TO NEW PATH
0.6
TUNNEL UNDER
B
1.8
ROOF & BALUSTRADE
SE
BIRDS NEST SWING
WHEELCHAIR CUBBY ACCESS
10M
NEW GRANITIC GRAVEL PATH PROVIDING ACCESS TO PLAY SPACE
G SF
SF
R
SE
SE PLAY/ MAZE
0M 15M
20M
25M B
SETOUT NOTES 1. GENERAL SETOUT TO BE DETERMINED BY GRID AS SHOWN. CONTRACTOR TO STAKE OUT AND MARK ALL PROPOSED FEATURES FOR THE APPROVAL OF THE SUPERINTENDENT PRIOR TO CONSTRUCTION WORKS COMMENCING 2. ALL ITEMS SHOWN ARE TO BE CENTERED, TRUE, STRAIGHT AND ALIGNED TO THE SETOUT COORDINATES 3. WHERE CONFLICT OCCURS WITH SETOUT INFORMATION, REPORT DISCREPANCIES IMMEDIATELY TO THE SUPERINTENDENT 4. ANY DIMENSIONS PROVIDED ARE TO TAKE PRECEDENCE OVER GRID SETOUT
SF
T
NEW PLAYGROUND SOFTFALL MULCH TO COMPLY WITH AUS. PLAYGROUND STANDARDS
NEW RUBBERISED SOFTFALL TO COMPLY WITH AUSTRALIAN PLAYGROUND STANDARDS
EXISTING / REINSTATED LAWN
NEW NATIVE GARDEN BED WITH LOCAL LOW LEVEL SHRUBS, GROUNDCOVERS AND GRASSES
INDICATIVE FALL ZONES EXACT FALL ZONE REQUIREMENTS TO BE PROVIDED BY NOMINATED PLAY EQUIPMENT MANUFACTURER. ALL FALL ZONE SETOUT TO THE APPROVAL OF THE SUPERINTENDENT
x
12.66 x
12.64 x
x 12.68
TEIN
CR
ESC
EN
T
12.80
TIMBER LOGS, RECYCLED FROM COUNCIL DEPOT. SEATING AND NATURE PLAY OPPORTUNITIES
BOUNDARY OF EXISTING PLAYGROUND (TO BE REMOVED)
ROCKS. SEATING AND NATURE PLAY OPPORTUNITIES
SPADE EDGE
TIMBER BEAMS TIMBER SALVAGED FROM EXISTING PLAY STRUCTURES REFER TO SPECIFICATION TIMBER FLUSH THRESHOLDS TIMBER SALVAGED FROM EXISTING PLAY STRUCTURES REFER TO SPECIFICATION PLAY / MAZE. REFER TO SPECIFICATION
T3 T2 T1 T TP1
DATE
15.07.15 03.07.15 26.03.15 20.03.15 27.02.15
REVISIONS
x12.60
3
BY
LDP LDP LDP LDP LDP
REVISED TENDER ISSUE REVISED TENDER ISSUE REVISED TENDER ISSUE TENDER ISSUE DRAWINGS PRE TENDER REVIEW
12.40
x x 12.45
11.60
SE
EXISTING TREES TO BE RETAINED AND PROTECTED
NOTE PROPOSED TREE PLANTING HAS BEEN REMOVED FROM PLAN FOR CLARITY
PROJECT:
12.40
52-54 Rathdowne Street Carlton, 3053 Victoria Australia Telephone: 03 9348 2788 Fax: 03 9348 1965 Email: info@landdesign.com.au www.landdesign.com.au
1 0M
CODE
1:100 @ A2 JM 15/07/15
REV.
T3
DRG.NO.
15/4620-LD02
BOTANICAL NAME
Ac
Acacia cognata 'Emerald Curl'
GH
5M 12.40
x
FINISH LEVEL OF RUBBER SOFTFALL UNDER SWING TO BE NOM. 100 BELOW FINISH SOFTFALL MULCH
5M
10M
15M
COMMON NAME
INSTALL SIZE
SIZE AT MATURITY
Emerald Curl
11.80
200mm 0.75m ht
4-5m(H) x 2.5-3m(W)
12.40
20M QUANTITY
8
Em
Eucalyptus melliodora
Yellow Box
45 Litre
10m(H) x 8m(W)
2
Qr
Quercus rubra
Red Oak
45 Litre
10m(H) x 9m(W)
2
25M
SOAKAGE TRENCH WITH COARSE SAND. TRENCH ALIGNMENT TO BE CONFIRMED ON SITE.
8.20
EXISTING CONTOURS AND LEVELS
MODULAR PLAY EQUIPMENT. REFER TO 08/LD04 FOR BALUSTRADE LOACTIONS SPADE EDGE
x 8.45
PROPOSED LEVELS GRADE TO MATCH BACK INTO EXISTING NEW NATIVE GARDEN BED WITH LOCAL LOW LEVEL SHRUBS, GROUNDCOVERS AND GRASSES
EXISTING TREES TO BE RETAINED AND PROTECTED
NEW FEATURE SHADE TREES
TIMBER LOGS, RECYCLED FROM COUNCIL DEPOT. SEATING AND NATURE PLAY OPPORTUNITIES
0M
SHRUBS AND GROUNDCOVERS CHKD
12.40 x
12.00
SMALL TREES
THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING ANY SHOP DRAWINGS. FIGURED DIMENSIONS SHOULD BE USED IN PREFERENCE TO SCALED DIMENSIONS. ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM THE LANDSCAPE ARCHITECT. THIS DRAWING REMAINS COPYRIGHT AND THE PROPERTY OF THE LANDSCAPE ARCHITECT.
SCALE
11.80
PLANT SCHEDULE - GRAVENSTEIN RESERVE
PROPOSED PLAYGROUND GRAVENSTEIN RESERVE THE BASIN SETOUT & SURFACES PLAN
DATE
11.60
3 Ac 1 Em
RE-GRADE AREA LOCALLY TO ACHIEVE CONSISTENT FALLS ACROSS NEW LAWN AND MATCH ADJACENT EXISTING LEVELS
KNOX PLAY SPACE
DRAWN BY
x
12.20
RENEWAL DRAWING:
LEGEND
CONTRACT NO. 2035
Land Design Partnership
KEY PLAN - 1:500 @ A2
10M 12.60
LOCAL PLAYGROUND RENEWAL 2014-15 G:\14\2046 Knox Play Spaces\LDP\inserts\JPEG\Knox-City-Council-logo.jpg
12.80
x 12.54
2
MODULAR PLAY EQUIPMENT. REFER TO 08-LD04 FOR BALUSTRADE LOACTIONS
SE
1 LAWN REINSTATEMENT AREA. 2000mm OFFSET TYP
NO.
LEGEND
5M
10M
NS
15M
REFER TO KEY PLAN
SLIDE
2
5M
SUB SURFACE AG. PIPES
12.43 x
REFER TO KEY PLAN
KEY PLAN - 1:500 @ A2
SF R
0M
5 Ac
REFER TO KEY PLAN
R
R
1.5
SLIDING POLE
SE
SF 0.9
1.2 SF
REFER TO KEY PLAN
AVE
1 Em
CLIMBING WALL
3
12.17
11.80
C:\DWG\14_2046
SF
x 12.11 EX
UR
T
CO
EN
PEN
ESC
R CLIMBING NET
GR
13.00 CR
PIP
TEIN
12.20
12.20
NOTES: SUB GRADE IN SOFTFALL MULCH ZONES TO HAVE MINIMUM 1:50 FALL TOWARDS AGRICULTURAL DRAINAGE
ROCKS. SEATING AND NATURE PLAY OPPORTUNITIES
TYPICALLY PROVIDE FALLS ACROSS HARD SURFACES TOWARDS GARDEN BEDS: MIN. FALL IN DIRECTION OF TRAVEL - 1:100 MAX. FALL IN DIRECTION OF TRAVEL - 1:25 MAXIMUM CROSSFALL - 1:50
DRAINAGE SUB SURFACE AG. PIPES
SOFTFALL FINISH LEVEL OF SOFTFALL UNDER SWINGS TO BE NOMINALLY 100mm BELOW FINISH SIFTFALL MULCH
SOAKAGE TRENCH WITH COARSE SAND (NO GEO-FABRIC)
NO.
DATE
REVISIONS
BY
T3 T2 T1 T TP1
15.07.15 03.07.15 26.03.15 20.03.15 27.02.15
REVISED TENDER ISSUE REVISED TENDER ISSUE REVISED TENDER ISSUE TENDER ISSUE DRAWINGS PRE TENDER REVIEW
LDP LDP LDP LDP LDP
LOCAL PLAYGROUND RENEWAL 2014-15
52-54 Rathdowne Street Carlton, 3053 Victoria Australia Telephone: 03 9348 2788 Fax: 03 9348 1965 Email: info@landdesign.com.au www.landdesign.com.au
Land Design Partnership
PROJECT:
KNOX PLAY SPACE RENEWAL
DRAWING:
PROPOSED PLAYGROUND GRAVENSTEIN RESERVE THE BASIN GRADING & PLANTING PLAN
THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING ANY SHOP DRAWINGS. FIGURED DIMENSIONS SHOULD BE USED IN PREFERENCE TO SCALED DIMENSIONS. ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM THE LANDSCAPE ARCHITECT. THIS DRAWING REMAINS COPYRIGHT AND THE PROPERTY OF THE LANDSCAPE ARCHITECT.
SCALE
1:100 @ A2
CDB*
Correa reflexa
Common Correa
tubestock @ 6/m²
1-1.5m(H) x 1-1.5m(W)
90
DRAWN BY
JM
Ll*
Lomandra longifolia
Spiny-Head Mat-Rush
tubestock @ 9/m²
0.5-0.6m(H) x 0.65m(W)
514
DATE
Pl*
Poa labillardieri
Large Tussock Grass
tubestock @ 9/m²
0.8-1m(H) x 0.8-1.2m(W) 216
15/07/15
REV.
T3
DRG.NO.
15/4620-LD03
* Source stock from local provenance plants
CONTRACT NO. 2035
G:\14\2046 Knox Play Spaces\LDP\inserts\JPEG\Knox-City-Council-logo.jpg
CHKD
GH C:\DWG\14_2046
NEW GRANITIC SAND PATH
SE
CONCRETE EDGE
NS
T
AVE
UR
GR
NEW GRANITIC SAND PATH
CO
SE
PEN
4
SEAT PROPOSED PICNIC AREA (TABLE & SEATING)
PIP
EXISTING BBQ TO BE REMOVED NEW BBQ BY OTHERS
T
T SE
Install subsurface sewer grade solid PVC pipe or flexible agricultural pipe wrapped in geotextile liner within trench filled with approved fine graded aggregate/sand.
300mm consolidated depth (typical/ subject to fall height requirements) approved and tested impact absorbing soft fall mulch. Comprised of min. 200mm depth new approved organic softfall mulch and 100mm depth good condition site salvaged mulch
Planting in 75mm approved mulch over 275mm approved topsoil over cultivated subgrade
75mm depth compacted Granitic Gravel
300mm consolidated depth of organic softfall mulch over compacted subgrade with falls to sub-surface drainage.
75mm depth compacted FCR base over compacted subgrade
Cut top of log as required to achieve even surface suitable for seating and play 75 75
225
100
Stabilise log with 150mm nom. FCR compacted to 95% SMDD. To extend along entire length of log
450 max. varies
75
200 new
Nom. 650mmØ x 2-3m long natural timber log. Set approx 1/4 in ground. Log to be free from all side branches. All non conforming cracks to be appropriately filled. Trunk to be sanded smooth and allowed to weather naturally.
Adjoining organic soft fall mulch
300 03 LD04
Compacted subgrade to 95% SMDD under footing
TYPICAL GRANITIC GRAVEL PATH DETAIL
Adjoining organic soft fall mulch
Firmly install 1/3 of boulder below FFL. Base below boulder to be compacted FCR to min. 95% SMDD
450 nom.
750
01 LD04
TYPICAL ORGANIC SOFTFALL MULCH
02 LD04
SCALE 1:10
Wrap EPDM wet pour synthetic around 45° chamfered edge. Round edges to nom. 50mm radius Adjacent surface typically garden bed, organic soft fall or granitic gravel path Edge of EPDM wet pour synthetic surface to be embedded into subgrade
Impact absorbing EPDM wet pour synthetic surface wear layer in accordance with Manufacturers Specifications for fall heights. Colour TBC. Install to Manufacturers Specification Adhesive & 100mm min. thick 25MPa insitu concrete slab, F62 reinforcing to Engineers detail. 45° chamfer to edges
TYPICAL PLANTING & SOFTFALL INTERFACE SCALE 1:10
100mm depth organic softfall mulch over EPDM rubber under swings/high impact zones Edge of EPDM wet pour synthetic surface to be embedded into subgrade Adjacent surface typically garden bed, organic soft fall or granitic gravel path
15
100
100
50
04 LD04
100
50
Bespoke Timber balustrade
0.6m ht above ground level Access
Access to slide Tunnel under
1.5m ht above ground level
1.2m ht above ground
Bespoke Timber roof over platforms 0.9 to 1.8 Sliding pole Tumble Turn and Spider Web connection to structure
Climbing wall access to play structure
PLAY STRUCTURE - BALUSTRADE LOCATIONS SCALE 1:50
07 LD04
75
Rubber landing pad
TYPICAL TIMBER LOG - SEAT AND PLAY
SCALE 1:10
100mm depth base course, Class 2 FCR compacted to 95% SMDD Subgrade to be compactedto 95% SMDD as per AS1289
150 nom.
varies
02 LD05
Stepping beams 150mm nom width at varying heights above FFL.. Class 1 recycled hardwood timber. OrganOil finish. Ensure smooth, non slip, flat level surface. Firmly install into subgrade with concrete footing
TYPICAL ROCKS - SEATS AND PLAY SCALE 1:10
Varies
07 LD04
03 LD05
TYPICAL PLANTING DETAIL SCALE 1:10
Fix timber balance beam to timber supports with countersunk coach screw
150 nom.
25MPa concrete footing. Top of footing to be 50mm nom. below base of mulch level.
150 max.
50 100
15
04 LD05
50
50mm compacted depth 20mm recycled compacted FCR or similar
150≈
50
100
TYPICAL SOFTFALL & RUBBER INTERFACE SCALE 1:10 BENEATH SWINGS
60
Fill as required with reused tosoil, depth varies, 150mm max. Lightly cultivated to achieve bond between existing soil and fill
varies
75
75mm depth compacted granitic gravel over 75mm depth compacted FCR over approved subgrade
1.8 ht above ground level. Rubber surface beneath with wheelchair access
Slide
08 LD04
Subgrade proof rolled and compacted to min. 95% SMDD to AS1289
Softfall rubber by approved sub-contractor as specified. Refer to Specification. A1 Rubber EPDM. Finish to rubber edge to Manufacture's Specification
75mm deep 60mm depth sandy loam topsoil and spade edge Dynamic Lifter starter as per Manufactures application rates.
225
Timber supports, Class 1 Recycled hardwood timber, fastened with 4 no. bridge spikes driven into log. 50mm min. cover
TYPICAL PLANTING & GRAVEL PATH INTERFACE
150mm wide x 300mm deep 32MPa coloured concrete edge. Tooled control joints every 1m. Pencil round top edges. Colour: Colourlinx 'Sunburnt' @ 4.15% in grey cement
50mm compacted base course recycled FCR, 95% SMDD
TYPICAL SOFTFALL & RUBBER INTERFACE ACCESSIBLE PATH SCALE 1:10
0.9m ht above ground level
06 LD04
15
Subgrade proof rolled and compacted to min. 95% SMDD to AS1289
75
SCALE 1:10
varies
50mm compacted base course recycled FCR, 95% SMDD
01 LD05
75 225
Seeded grass. protect new grass areas with temporary fencing. Refer to Specification for variety & sowing
150 nom.
Spade edge to garden bed
Adhesive & 100mm min. thick 25MPa insitu concrete slab, F62 reinforcing to Engineers detail. 45° chamfer to edges
300
75mm depth compacted granitic gravel over 75mm depth compacted FCR
75
Impact absorbing EPDM wet pour synthetic surface wear layer in accordance with Manufacturers Specifications for fall heights. Colour TBC. Install to Manufacturers Specification
varies 300
planting in 75mm approved mulch over 275mm approved topsoil over cultivated subgrade
200mm consolidated depth 50:50 site:imported topsoil to Specification. Where sufficient stockpiled site topsoil isn't available, the Contractor is to import topsoil as specified at the Contractors own expense.
75
SCALE 1:10
200 nom. Compacted subgrade. Fall sub-base towards sub-base drainage
Supply and installation of plants and garden bed surface mulching by Council. Any site salvaged mulch found to e unfit should not be used and should be disposed of at the Contractors expense
750-1250mm Ø 'Castella'rock boulders or similar approved. Max. 450mm height from FFL of adjoining garden/soft fall.
TYPICAL TIMBER BALANCE BEAM (SIDE)
SCALE 1:10
05 LD05
Provide 1 x N12 bar, placed continuously along extent of edge, 50mm from top
TYPICAL TIMBER BALANCE BEAM (FRONT) SCALE 1:10
150mm wide Class 1 recycled timber hardwood to sit flush with finish ground level. OrganOil finish, ensure smooth, non slip, flat level surface Varies
CONCRETE EDGE TO GRAVEL & RUBBER INTERFACE
Re use timber from existing swing bridge Stabilise timber beam with FCR compacted to 95% SMDD
Tree as specified refer to planting plans
3 no. black cloth reinforced rubber ties, attached with galvanised nails nailed into stake Watering bowl formed up with soil and mulched
3 no 50x50x2400mm hardwood stakes free of knots, splinters and cracks. stakes are to be driven 900mm into the ground, clear of the root ball, and painted black.
Mulch (as for garden beds) 1200mm minimum circle kept away from trunk Provide 'osmocote' or similar approved at rates recommended by the manufacturer
Garden bed in organic mulch over topsoil
SCALE 1:10
ROOT BALL THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY WORK OR MAKING ANY SHOP DRAWINGS. FIGURED DIMENSIONS SHOULD BE USED IN PREFERENCE TO SCALED DIMENSIONS. ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM THE LANDSCAPE ARCHITECT. THIS DRAWING REMAINS COPYRIGHT AND THE
Roughen sides and firm soil at bottom of hole 06 LD05
TIMBER THRESHOLD - FLUSH WITH GROUND LEVEL SCALE 1:10
07 LD05
TYPICAL TREE PLANTING DETAIL
SCALE 1:20
Approved imported topsoil backfill to planting hole, min 150mm around root ball. Mound base of hole as shown, prior to planting of tree.
THE CONTRACTOR MUST VERIFY ALL DIM MAKING ANY SHOP DRAWINGS. FIGURED SCALED DIMENSIONS. ALL DRAWINGS MA PERMISSION FROM THE LANDSCAPE ARCH
Thank You.