Infographics Hagestein Opheusden ENG 2015

Page 1

Dyke reinforcement Hagestein - Opheusden

Causes

Height

Primary river dykes along the Nederrijn and Lek do not meet requirements set for these watercourses. Some sections of the dyke have to be improved to pass (regular) safety tests.

Wherever river widening is impossible, A28 additional dyke reinforcement work will be carried out. Sections of the dyke along the rivers Lek and Nederrijn ZEIST between U T R E C H THagestein and Opheusden will be improved.

Stability (piping)

High water pressure is causing the top layer of the dyke to deteriorate. This weakens the dyke.

Water seeps under the dyke (seepage), taking sand with it (piping). This weakens the dyke and will lead to breaches.

The dyke is too low. At high water, the river water flows over the dyke.

Solutions

Stability

2. Construction

1. Dyke reinforcement in ground

3. Dyke reinforcement in ground

inwards

outwards

In principle, dyke reinforcement is done inwards. In case unfeasible due to i.e. A12 a lack of space, alternative measures will be taken in the order set out right.

A30 A50

W

E

1

A27

S

EDE

VEENENDAAL

HOUTEN

N

AmsterdamRijnkanaal Amsterdam-Rijnkanaal (channel)

Clay is being buried under surface level to create an impermeable layer. This will prevent groundwater from flowing under the dyke, preserving the stability of the dyke as a result.

A12 2 ELST

1

An L-wall is being constructed to reinforce the dyke because of the lack of space due to the historical buildings on either side of the dyke in Rijswijk (protected townscape).The L-wall is a concrete flood wall with cut-offs level at the driveways of the houses. WAGENINGEN

RHENEN

2 CULEMBORG

ELDEN

RIJSWIJK

Key to map:

ELST

A15

dyke reinforcement

A325

Waal

A2

(provincial) road

structure with L-wall

OPHEUSDEN

Lek

modified / new situation

motorway

ARNHEM

Nederrijn

Lek

‘text’

OOSTERBEEK

clay burying

2

TIEL

A50 1

Planning Project decision Preparation phase Start of project Delivering water safety

1 2 3 4

www.roomfortheriver.nl

Effect

1

2

2011

2012

Preventing or breach of N I J M Eflooding GEN the dyke during exceptional high water.

Maas WIJCHEN

A73

2013

3

4

2014

2015

Scale: 0

A50

5 km

Jan 2015 / 27-29-30


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.