Infographics Nederrijn Arnhemse Velpsebroek ENG 2015

Page 1

dam wall

Current situation

Improving dykes at Nederrijn/Arnhemsebroek and Velpsebroek

New situation

cap

high water dam wall

high water

Sections of the quay along the Westervoortsedijk in Arnhem no longer meet the statutory water safety requirements. As such, part of the dam wall is being heightened.

quay

Rijn

quay

Rijn

The dam wall at the Westervoortsedijk is being heightened to ensure its capacity of withstanding representative high water levels.

N W

50 cm

The cap is being replaced by a new, L-shaped cap.

The new heightened dam wall will be a maximum of 50 cm higher than the current one.

E S ARNHEM

Westervoortsedijk (dyke)

Badhuisstraat Key to map: ‘text’

modified / new situation new quay/dyke

1,3 km

road

Nieuwe Haven

Nede

N225

rrijn

N325

industrial estate

Planning Project decision Preparation phase Start of work Delivering water safety

el

Preventing flooding or breach of the dyke during exceptional high water.

IJss

1 2 3 4

Effect

Scale: 1 2011

www.roomfortheriver.nl

2 2012

3

4

0

200 m

2013 Jan 2015 / 28


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.