Flood channel Veessen-Wapenveld
Current situation
New situation Westdijk (dyke)
By constructing two new dykes, a high water channel will be created between the villages of Veessen and Wapenveld. There will be farmland between the dykes. In the event of extreme high water, this area will be capable of discharging a proportion of the water from the river IJssel.
high water
Oostdijk (dyke) high water
flood channel IJssel
IJssel
550 - 1500 m
WINDESHEIM
E
Oostdijk (dyke)
S
W
N
IJssel
H AT T E M
IJss
quay bridge Werverdijk brug Werverdijk
Key to map: ‘text’
el
N337 Westdijk (dyke)
WERVEN
modified / new situation
outlet
MARLE
new, modified or replaced objects new quay/dyke
IJssel bridge + inflow construction
pumping Oo station (dy stdij ke k )
pumping station
flood channel
flood channel
new bridge
W est
high water channel
dij
WIJHE
k(
WAPENVELD
current
dy
ke
Grote Wetering
)
dyke
VORCHTEN
Ap
motorway
ns
ete eW
oor
ot
Gr
eld
(provincial) road
g
aal
rin
kan
railway track
(ch ann
VEESSEN
el) HEERDE
A50
bridge Kerkdijk + inflow construction
Planning 1 2 3 4
Under the Kerkdijk bridge, there is a quay with an inflow construction built on it. The inflow construction can be opened as soon as the water from the IJssel reaches 5.65 metres NAP.
Effect Project decision Preparation phase Start of work Delivering water safety