Infographics Tollewaard ENG 2015

Page 1

Excavation of the flood plain area at De Tollewaard

New situation

Current situation industrial estate flood plain

The banks and the summer quay in De Tollewaard (flood plain) are being lowered, to create more space for the river Nederrijn during high water, as a result.

summer quay

lowered summer quay and bank

bridge

high water Nederrijn

Nederrijn

more shallow ponds

N W

E S

N225

REMMERDEN

dwelling mound

N233

bank summer quay

summer quay bridge

Key to map: planning area ‘text’

industrial estate and houses

modified / new situation

flood plain

bank

De Tollewaard (flood plain) bridge

dwelling mound

industrial estate and houses

existing objects lowering quay new quay new bridge

The bridge will ensure that the western dwelling mound remains accessible at high water.

RHENEN

summer quay

excavation

Ne

(provincial) road

Planning 1 2 3 4

de

rri

jn

Effect Effect

Project decision Preparation phase Start of work Delivering water safety

Waterstanddaling van 3 cm drop in water level 7 cm bij hoogwater. during high water. Scale:

1 2010

www.roomfortheriver.nl

2 2011

2012

3

4

0

500 m

2013 Jan 2015 / 23


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.