Dyke relocation at Hondsbroeksche Pleij The Pleijdijk (dyke) in the Hondsbroeksche Pleij has been moved land inward and a high water channel, a control system and a pond have been created. These interventions increase the drainage capacity of the rivers IJssel and Nederrijn during high water. They also maintain the agreed distribution of water discharge.

The control system ensures that there is no disruption to the set distribution of water over the IJssel and Nederrijn even during high water.

Rijndijk (dyke)

new Pleijdijk (dyke)

pumping station

old Pleijdijk (dyke)

regelwerk

pond

control system

N W

A pond is being created to cope with the rising groundwater during high water. This prevents cellars and crawl spaces from being submerged.

In the case of the pond, a pumping station is being built that pumps captured water back into the IJssel.

E IJssel

S

flood channel groundwater

N325

Nederrijn

pumping station

seepage barrier

bifurcation point

Key to map: ‘text’

old Pleijdijk (dyke)

modified / new situation new, modified or replaced objects

250 m

high water channel

IJssel

new quay/dyke

current

Ne

de

rri

pond

Hondsbroeksche Pleij

removed dyke dyke

The seepage barrier protects this dyke from being weakened.

new Pleijdijk ( (dyke)

jn

WESTERVOORT

(provincial) road control system

Effect Planning 1 2 3 4

40 cm drop in water level in the event of extreme high water and maintenance of a constant distribution of water discharge between the Nederrijn (2/3) and IJssel (1/3).

Project decision Preparation phase Start of work Delivering water safety

Scale: 1 2003

www.roomfortheriver.nl

2 2004

2005

2006

3 2007

4 2008

2009

2010

0

300 m

2011 Jan 2015 / 42


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.