Dyke relocation at cortenoever

Page 1

Current situation

Dyke relocation at Cortenoever

New situation

Dyke relocation work is being carried out in Cortenoever to protect the hinterland during high water of the river IJssel.

dyke

dyke

N3

high water

14 IJssel

IJssel A new dyke is being constructed a kilometre inland. Lowering sections of the old dyke on the north and south sides, will create inflow and outlet openings.

N

E

W

S

IJssel Lowering the dyke will create inflow and outlet openings during high water.

N345

planning area ‘text’

Sections of the surface level are being lowered by between 1 and c. 3 metres and several houses and farming companies are being moved. Where possible, the ground will remain in use for farming purposes.

IJssel

Key to map:

(farming) ground

high water

Flood plain Cortenoever

outlet opening

modified / new situation new dyke lowering dyke excavation/lowering

existing dyke

current dyke (provincial) road

dyke

inflow opening

railway track

Lowering the surface level will encourage flow during high water.

inflow opening

Planning 1 2 3 4

Effect

Project decision Preparation phase Start of work Delivering water safety

35 cm drop in water level during high water at Cortenoever. BRUMMEN

Scale: 1 2012

www.roomfortheriver.nl

2

3 2013

2014

4 2015

0

1 km

2016 Jan 2015 / 32