#Arjo Kleinhuis Work in the floodplains along the river IJssel

Safety for four million people in the Dutch delta

Dutch Water Programme Room for the River Facts and figures The water in the rivers reached extremely high levels in 1993 and 1995. 250,000 people and one million head of livestock had to be evacuated in 1995. Budget € 2.3 billion Planning Start Completion

2007 2013-2019

Current maximum discharge capacity 15,000 m3/sec Discharge capacity on completion 16,000 m3/sec

As a consequence, the Dutch government implemented ­ anti-flooding measures in the region of the rivers. The ‘Room for the River’ approach was born.

Natural floodplain restored Room for the River restores the river’s natural floodplain in places where it is least harmful in order to protect those areas that need to be defended. In a few years, by means of a series of more than 30 measures, we will have lowered and broadened our floodplain and created river diversions and temporary water storage areas. We will restore marshy riverine landscapes to serve once again as natural ‘water storage’ sponges and to safeguard biodiversity and aesthetic and recreational values.

Local and global The Netherlands is one of the most densely populated countries in the world and more than half of it is below sea level. Flood protection is therefore a very high priority for the Dutch Ministry of Infrastructure and the Environment within the compass of water management.

Provinces, municipalities, regional water authorities and Rijkswaterstaat are cooperating on the implementation of the Room for the River Programme. Furthermore, within the compass of the Room for the River programme there is close collaboration at international level on flood protection.

Keeping one step ahead of disasters The cadence of Dutch history has been punctuated by sea floods and the responses to these. For the most part the danger stemmed from the sea. In 1993 and 1995, however, flooding hit the Netherlands from behind its defences. The Dutch rivers swelled to unprecedented levels, with nigh on catastrophic results. In 1995 large tracts of farmland were inundated. 250,000 people and one million head of livestock were evacuated.

The Afsluitdijk, the Delta Works, Room for the River – all of these flood defence projects have been reactive in nature, responding to specific threats. In the opinion of the Dutch government this needs to change. The Netherlands would like to be one step ahead of disasters, implementing measures in a timely fashion. This is being effectuated by means of the Delta Programme, which sees the country preparing itself for climate change in the lead up to the year 2100.

www.roomfortheriver.com


rUimte voor de rivier ijsseldelta ketelmeer

ROOM FOR THE RIVER | DUTCH WATER PROGRAMME ROOM FOR THE RIVER

dijkverlegging westenholte

Kampen

markermeer

Zwolle

Lelystad

Uiterwaardvergraving sCheller en oldeneler buitenwaarden iJs l se

HoogwatergeUl Veessen-wapenVeld Almere

Haarlem Amsterdam

Uiterwaardvergraving bolwerKsplas, worp en ossenwaard

dijkverbetering leK / betuwe / tieleren CulemborGerwaard

Deventer

Uiterwaardvergraving de tollewaard

Hilversum Amersfoort Leiden

Den Haag

e

w at er

eg

o No rd

oude maas i sPu

gv

lie

t

dijkverbetering oude maas / hoeKsChe waard

hollaNdsch dieP

krammer/ volkerak

waterberging VolKeraK-zoommeer

kil

riN

lek

Zutphen

Uiterwaardvergraving meinerswijK

Arnhem

Culemborg

ontpoldering noordwaard

munniKenland kribverlaging beneden-waal merwede

kribverlaging midden-waal

dijkverbetering steurGat / land Van altena s aa

amer

kadeverlaging zuiderKlip kadeverlaging biesbosCh dijkverbetering amer / donGe

m he

gsc

Ber

rivierverrUiming oVerdiepse polder dijkverbetering berGsChe maas / land Van altena

er

Uiterwaardvergraving millinGerwaard

d

l

eN

sc

h Bov

eN-r

iJN

Nijmegen

dijkverbetering nederrijn / betuwe / tieler- en CulemborGerwaard

’s-Hertogenbosch

N

aa

dijkterUglegging lent

kribverlaging waal Fort st. andries

Uiterwaardvergraving huissensChe waarden

Pa N

waal

dijkverlegging CortenoeVer

dijkverbetering nederrijn / arnhemseen VelpsebroeK dijkverlegging hondsbroeKsChe pleij

ka N

Tiel

Dordrecht dordtsche

ha

dijkverbetering nederrijn / GeldersChe Vallei

Uiterwaardvergraving aVelinGen Uiterwaardvergraving

Nieuwe maas

dijkverbetering oude maas / Voorne putten

Uiterwaardvergraving middelwaard

NederriJN

Rotterdam

w

obstakelverwijdering maChinistensChool elst

Velp

dijkverbetering leK / lopiKer- en Krimpenerwaard

rga t

w

dijkverlegging VoorsterKlei

Apeldoorn

Uiterwaardvergraving doorwerthsChe waarden

Utrecht

ste u

eu

N m ieuw er w e ed e

Ni

Uiterwaardvergraving bossenwaard, pontwaard en heerenwaard dijkverbetering leK / alblasserwaard en VijFheerenlanden

Uiterwaardvergraving Keizers-, stobben- en olsterwaarden

obstakelverwijdering suiKerdam / Gendtse waard kribverlaging waalboChten

current projects additional reduction achieved in water levels for neighbouring projects means implementation no longer required

Zoommeer

Bergen op Zoom Eindhoven

How we are making room for the river

Deepening summer bed The river bed is deepened by excavating the surface layer of the river bed. The deepened river bed provides more room for the river.

Strengthening dikes Dikes are strengthened in areas in which creating more room for the river is not an option.

Lowering groynes Groynes stabilise the location of the river and ensure that the river remains at the correct depth. However, at high water levels groynes can form an obstruction to the flow of water in the river. Lowering groynes increases the flow rate of the water in the river.

Water storage The Volkerak-Zoommeer lake provides for temporary water storage when exceptional conditions result in the combination of a closed storm surge barrier and high river discharges to the sea.

Dike relocation Relocating a dike land inwards increases the width of the floodplains and provides more room for the river.

High-water channel A high-water channel is a diked area that branches off from the main river to discharge some of the water via a separate route.

Lowering of floodplains Lowering (excavating) an area of the floodplain increases the room for the river during high water levels.

Depoldering The dike on the river side of a polder is relocated land inwards and water can flow into the polder at high water levels.

Removing obstacles Removing or modifying obstacles in the river bed where possible, or modifying them, increases the flow rate of the water in the river.