Work sample runpu song 2016

Page 1

RUNPU SONG

raphic puscule pace rbanism

enovation

WORKSAMPLE 2008-2015 B.Arch. IIT M.s. AAD. Columbia


1. Roosevelt island Capmus, 2014 1,350,000 Sqft "University-in-the-Middle"

2 Youth Camp, 2013 2,630 Sqft "A Tree House"

3 Re-think Lincoln Center, 2014 710028 Sqft "Urban Inclination"

4 NYC Chinatown Urbanism, 2015 5,670,956 Sqft "Interior Alley"

5 Harmony Hotel in Suzhou, 2014-2015 1,300,221 Sqft with Tsao & Mckown Colleagues

6 Skycrapper in Chicago, 2012 400,182 Sqft "A Infiltrating Tower"

7 Ski Lodge in Chicago, 2011 27,000 sqft Focus on structure and tech. study


1. Roosevelt island Capmus 1,350,000 Sqft "University-in-the-Middle"




2

Youth Camp, 2013 2,630 Sqft "A Tree House"



3 Re-think Lincoln Center 710028 Sqft "Urban Inclination"


pe

ca nds

La

ium

or dit

Au

ts

Ar g in rm o f r Pe

ial

rc me

m

Co

ion

Ex

it hib


3 NYC Chinatown Urbanism 5,670,956 Sqft "Interior Alley"




6 Skycrapper in Chicago 400,182 Sqft "A Infiltrating Tower"

1000+’ Height Density 33%

700’ - 1000’ Height Density 49%

550’ - 700’ Height Density 75%

400’ - 550’ Height Density 91%

250’ - 400’ Height Density 94%

100’ - 250’ Height Density 98%

5’ - 100’Density Height100%

Chicago City in Section/density



5 Harmony Hotel in Suzhou 1,300,221 Sqft with Tsao & Mckown Colleagues





7 Ski Lodge in Chicago, 2011 27,000 sqft Focus on structure and tech. study

Critical Deta

3.5� Precast Self-compacting Concrete Steel holder Structural Pipe/ Curtain wall


2” yellow plaster panel 1.5” air gap/metal clamp Membrance layer Rigid Insolation 12” Concrete Shearing Wall 3/8” Plywood Ceramic tiles 3.5” Wood Decing Wood Battern/Insolation 12” Concrete Slab 24” Drop Ceiling

3.5” precast concrete pavement Drainage connected to structural pipe Membrance layer Isolation layer 6” Concrete Waffle Slab

3.5” precast concrete pavement pavement 2“3.5” air precast gap withconcrete steel reinforcement to structural pipe 6”Drainage Concreteconnected Waffle Slab Membrance layer Isolation layer 6” Concrete Waffle Slab

2.5” Cement panel 3/8” Plywood 12” Concrete 3/8” Plywood Plaster Tiles

2” Wood Decking, finishing quantity 3/8” Plywood 12” Concrete Slab 24” Drop Ceiliing Space 3.5” precast concrete pavement 2“ air gap with steel reinforcement 6” Concrete Waffle Slab

3.5” Whit Precast Concrete Facade 1.5” Air Gap Membrance Layer/ Steel Holder 3” Rigid Insolation 12” Concrete Shearing Wall Steel Clap with 3” Air Gap 3/8” Plywood 1/2” Precast Plaster Tiles

Wall Section 1/2” = 1’- 0”

3/4” Wood Floor 3.5” Sleeper/ Air Gap 12” Concrete Slab

2” Wood Decking, finishing quantity 3/8” Plywood


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.