PORT FOLIO ARCHITECTURE
by A.Rupendar kumar
CO N TE N T
2 RESUME 01
3
BASIC DESIGN SEMESTER-I 03 WATCH MAN CABIN SEMESTER-II 04
4
KINDERGARTEN SEMESTER-III 05 HOSTEL SEMESTER-IV 07
4
WATER FRONT RESORT SEMESTER-IV 09 HOSPITAL SEMESTER-V 11 BUS TERMINAL SEMESTER-VI 13 NEIBOURHOOD HOUSING SEMESTER-VII 15
5
BUILDING CONSTRUCTIONS DRAFTING 19 WORKING DRAWINGS 20 ARCHITECTURE DRAWINGS AND GRAPHICS 21 PRODUCT DESIGN 22 SKETCHING 23 MY PHOTOGRAPHY 25
7
6
NAME
: AITEPAMULA RUPENDAR KUMAR
LOCATION
: HYDERABAD, TELANGANA
D.O.B
: 25-12-1997
NATIONALITY
QUALITIES
: INDIAN
LANGUAGES
Present B. ARCH Vaishnavi school of architecture & planning. Hyderabad PERSNOAL INFORMATION ADDRESS
13-6-267/128/A
New Satyanarayana Nagar, Jaffarguda,
Near Mohini Function Hall, Karwan,
Hyderabad, Telangana-500006 MAIL-ID
rupendarkumar123@gmail.com PHONE
+91 8341913828
distinction in all previous semesters.
Served as the General Secretary of The Student Council 2017-2018. Served as the President of The Student Council 2018-19.
2015
Intermediate, Sri Chaitanya Junior College.
2013
Class X, IX, VIII, Bhashyam School, Attapur, Hyderabad.
2010
G. Pulla Reddy High School, Mehdipatnam, Hyderabad.
•
Leadership &team work
Communication skills
• Approachable
PROFESSIONAL SKILLS • Drafting •
Model making
• Sketching INTRESTS
Gardening
Chart Title
SOFTWARE SKILLS
Determination & persistence
•
: HINDI, TELUGU, ENGLISH
EDUCATION
•
SKTECHBOOK
Interior Decoration
ADOBE INDESIGN LUMION
Photography
Watching movies
ENSCAPE
Travel
V-RAY
Swimming
SKETCHUP REVIT AUTOCAD 0
10
20
30
40
50
60
70
80
Playing table tennis RESUME
01
TRAVEL LOG
ACHIEVEMENTS 1. Attended Thinking Hand Workshop has Photographer. 2.
Attended INDO-EURO Thinking Hand Workshop-2017.
3.
Attended Auroville Green Practices workshop on EXPLORING AUROVILLE-2017.
4. Attended IGBC seminar on Affordable Housing and Smart Cities. 5. Attended Delhi wood 2019, India wood 2018, Mumbai wood 2017 exhibitions on furniture industries. 6. Attended ACETECH 2019 Asia’s largest architecture, building materials, design and decor exhibitions.
Japan
02
RESUME
7.
Attended Telangana Real Estate Developers’ Association – TREDA 2018 property show.
8.
Participated in JNAFAU MANASARA 2019 photography competition –1st place .
9.
Published an article with the help of group of people on - Analysing the Impact of Horizontal Shading Device – A Case of
Octagonal Shape Building-2017 certified by International Advanced Research Journal in Science, Engineering and
Technology (IARJSET).
10.
Attended workshop on Plumbing For Architecture.
11.
Attended seminar on A PROCESS FROM INTUITION TO SOLUTION by IIID – Institute Of Indian Interior Designers.
Representing Rhythm through composition of different shapes
Representing Rhythm through composition of different shapes
Application of the principles of design to design a simple brochure for a chair manufacture company
Representation of an illusion using contrasting effects of colors
Designing of an entrance gate for a popular "FILM CITY"
Experimenting with the geometric shapes to create an abstract background
PRINCIPLES OF DESIGN
03
BASIC DESIGN
SEMESTER - I
Redesign of the college compound walls considering the security and aesthetic requirements
WATCHMAN CABIN : 2ND
CONCEPT EVOLUTION
PROJECT TITLE : SEMESTER
PROJECT AIM : To design a security for residence
2D DEVELPOMENT
To enunciate the functionality of the watchman cabin, the form that has been chosen is one that runs parallel to the turning
BUILT UP AREA : 14 sqm
3D DEVELOPMENT
bay of the main entrance road. To increase the line of visibility, the clear glass has been positioned at an obtuse angle of 115 degrees.
CONTEXT
ENTRACE ARCH DESIGN
•
The site assigned is on a busy road.
•
The aim is to design a watchman cabin that can compliment the luxury apartments and the surroundings.
view of watchmasn
FRONT ELEVATION
FRONT ELEVATION
SITE PLAN
RIGHT SIDE ELEVATION
PLAN
WATCHMAN CABIN
SEMESTER - II
04
KINDERGARTEN : 3rd
PROJECT TITLE : SEMESTER
PROJECT AIM : To design a kindergarten BUILT UP AREA : 2260 sqm SITE AREA
: 11,500 sqm, 2.8 acres
CONCEPT AND FORM DEVELOPMENT
CONCEPT EVOLUTION
WORKING MODEL
Division of spaces according to the function. Centrally located auditorium for easy approach from the classes. Separation of the auditorium by moving it away from the academic sections to reduce noise. A glass covered walkway has been provided to increase the ventilation for the corridors and to allow clear vision of the sky for a soothing atmosphere.
PERSECTIVE VIEW OF FRONT FACADE
SITE SECTION
KINDERGARTEN
05
13
T
he first day at school is a big step for someone in tiny shorts and a finest memory for his parents. The environment at kindergarten school should be able to soothe the overwhelmed little heart and should be able to create a sense of security and a feeling of enthusiasm to interact with the surroundings for someone venturing out of home for the first time. This is the age the children pick up ability to think, use and recognize language and their fine motor skills will be developed through play, art, dance, music, movement and interacting with others. The environment in a Kindergarten school should nurture the child to positively engage him with these activities with ease and enthusiasm. Designing a Kindergarten school kindles the creative instinct of the designer and also calls for detail study about both physical and cognitive needs of the child and his interaction with his immediate environment.
9
12
11
9
15
10 10
5
6
9 10
9
EAST ELEVATION
SEMESTER - III
9
14
FLOOR PLAN
06
10
9
SOUTH ELEVATION
8
7
1
3
4 2
1. Administration 2. Reception 3. Waiting area 4. Principal 5. Meeting room 6. Staff room 7. Stationery 8. Medical room 9. Class room 10. Wash room 11. Multipurpose room 12. Dining 13. Kitchen 14. Pet area 15. Kids play area
HOSTEL : 4th
PROJECT TITLE : SEMESTER
PROJECT AIM : To design a hostel for students of
10
7
graphic design.
10
BUILT UP AREA : 1230 sqm SITE AREA
: 5114 sqm, 1.26 acres
9
8
2
CONCEPT EVOLUTION CONCEPT AND FORM DEVELOPMENT
7
The most important considerations in a hostel design are •
Security restrictions for the visitors and for the students.
•
Privacy for the residential zone
•
Clear division of space between the girls’ and boys’
18
1
17
6
11
14 5
residential blocks. •
16
19
Accessible utilities like canteen and recreational areas.
3
13 4
2
7
15
1
9
20
2. Guest House 3. Cafeteria
5. Step Sitting 6. Library
7. Hostel Block (Boy And Girls)
6 7
1. Hod And Faculty House
4. Sitting Area
19 8
12
3
12
15
8. Mess And Kitchen 9. Play Ground
10. Service Road 11. Car Parking
12. Bike Parking
13. 6m Wide Road 14. Lawn
15. Existing Block
16. Meeting Room (Staff)
Centrally located canteen for the students to access it easily WORKING MODEL
07
HOSTEL
The arrangement of the blocks is according to the hierarchy of movement
SITE PLAN
17. Hod Office 18. Garden
19. Garden And Sitting
20. Name Plate Of Collage.
FRONT ELEVATION
SIDE ELEVATION
GROUND FLOOR PLAN
FIRST FLOOR PLAN
SEMESTER-IV
08
RESORT : 4th
PROJECT TITLE : SEMESTER
PROJECT AIM : To design a lake front resort.
21
BUILTUP AREA : 2676 sqm SITE AREA
21
21
: 22644 sqm, 6 acres 16
17
SCALED MODEL
20 19
T
he scope of a resort in India is vast due to extensive sites available near the sea shores, lakes, dams flowing through the country. Th resort to have a range of activities by and for the people to converge in to a creative conclave which will set in an environment of beautiful landscape, open to sky, wide access roads, gardens, sports and artistic skill etc
1. Car Parking
2. Bus Parking
3. Bike Parking
18
14
14
14
12
12
4. Administration Block
12
5. Banquet Hall and Club House 6. Kitchen
23
11
9
5
6
12
12
12
12
9. Swimming
15
10. Pond
11. Glass Bridge
13
7
24
8. Bar
13
8
22
7. Restaurant
13
9
10
13
12. Cottage (Double Bed Room) 13. Cottage (Single Bed Room) 14. Cottage (Lake View)
13
15. Tree Huts
16. Coffee Shop 17. Play Ground
18. Pond View Sitting
15
4
19. Outdoor Banquet
20. Badminton Court and Cricket 21. Deck (Lake View Sitting) 22. Boulders
23. Staff Quarters
1
3
SITE PLAN
24. Laundry
2
1
25. Watch Man Cabin
25
SITE SECTION WATER FRONT RESORT
09
TOPOGRAHPY
RIDGES & VALLEYS
WIND DIRECTION & SUN DIRECTION
SECTION AA’
SECTION AA’
SECTION AA’
ZONING FLOW CHART
FRONT ELEVATION
GROUND FLOOR PLAN
10
SEMESTER -IV
FIRST FLOOR PLAN
FRONT ELEVATION
FRONT ELEVATION
GROUND FLOOR PLAN
GROUND FLOOR PLAN
TYPICAL FLOOR PLAN FOR NEXT FLOOR
TYPICAL FLOOR PLAN FOR NEXT FLOOR
PROJECT TITLE SEMESTER PROJECT AIM
MULTISPECAILITY HOSPITAL : 5TH :
: To design a 100 bedded multispeciality hospital
BUILTUP AREA
: 3945 sqm
SITE AREA
: 19581 sqm, 4.8 acres
13 16
15
14
12
5
CONCEPT EVALUTION
4
1 11
provision of a semi- courtyard in the centre helps with ample ventilation for the internal spaces. provision of balconies around the courtyard reduces the possibility of heat and act as barriers.
2
17
3
10 9 1
5
6
6
4 5
4
18
7
WORKING MODEL
11
HOSPITAL
SITE PLAN
1. HOSPITAL 2. ENTRANCE LOBBY & RECEPTION 3. GARDEN 4. CAR PARKING 5. BIKE PARKING 6. DOCTORS PARKING 7. AMBULANCE PARKING 8. ELECTRICAL ROOM 9. RECORDS ROOM 10. GENERAL STORE 11. CANTEEN 12. A H U 13. OXYGEN CYLINDER STORAGE 14. SERVICE ROOMS 15. LAUNDRY 16. MOURTUARY 17. ENTRANCE -1 18. ENTRANCE -2
FRONT ELEVATION ENTRANCE LOBBY
H
ospitals vary widely in the services they offer and therefore, in the departments they have They may have acute services such as an emergency department or specialist trauma centre,burn unit, surgery, or urgent care. These may then kibe backed up by more specialist units such as cardiology or coronary care unit, intensive care unit, neurology, cancer center, and obstetrics and gynecology Hyderabad is the State Capital of Telangana. It is a very fast growing city. Its expansions taking at a rapid stride that the development is beyond city boundaries, Infrastructure needs are growing at the same stride There is a urgent necessity of providing infrastructure facilities in the suburbs of the twin cities of Hyderabad.
OPD WAITING AREA
SECTION AA’
SECOND FLOOR PLAN
SOUTH EAST VIEW
EMERGENCY ENTRANCE
FIRST FLOOR PLAN IPD ENTRANCE
GARDEN SEATING
GROUND FLOOR PLAN
SCALED MODEL
SEMESTER-V
12
O
ne of the major terminus proposed is near the Nagole road for an area of 76500 sq mts 19 acres, in PPP mode structure, to carter for about 1500 buses per day. For the given case, Peak hours to be considered for 4-5 hours, as-
BUS TERMINAL : 6TH
PROJECT TITLE : SEMESTER
PROJECT AIM : To design a Bus Terminal BUILTUP AREA : 21769 sqm SITE AREA
: 76500 sqm, 19 acres
TOTAL BAYS
:75
DEPARTURE
:65
ARRIVAL
:10
Hence the bus terminus (approximately) caters
suming 300 buses per hour during peak hours.
6
to 75000 pax per day.
7 1
P
ublic Transportation is an important facility, which has to be given and promoted in every region. Sustainability in mobility is achieved through pedestrian, personal and public transport. Buses are one of the major public transports. Better the connectivity, better the region. Hence it must be planned and designed carefully.
3
2
2
1. 2. 3. 4. 5. 6. 7.
4
BUS TERMINAL CAB BOOKING COUNTER CAR PARKING BIKE PARKING AUTO STAND IDLE BUS PARKING EXTISTING BUS DEPOT
5
SITE PLAN
View of the platforms for alighting the buses
Rendered representation of the view from the waiting hall overlooking the bus bays
Interior view of the waiting lounge showcasing an in-house waterfall
View of the entrance from the departure bays
BUS TERMINAL
13
SECTION AA’
14
SEMESTER -VI
NEIGHBORHOOD HOUSING SEMESTER : 7TH PROJECT AIM : To design a neighborhood housing PROJECT TITLE :
BUILTUP AREA : 21769 sqm SITE AREA
A
rchitecture provides a significant form of shelter for human life. With the vast population explosion in underdeveloped countries the housing for common people is unquestionably the biggest job for us. Shelter is the
second important element in the makeup of the town or community as it is in a human life. Hence the design of the dwelling unit and its surroundings are the important factors
: 76951 sqm, 19 acres
OUTCOMES OF THE DESIGN •
Zoning is done hierarchy of building as following the sciography
•
Common interaction spaces to facilitate human contact
•
Play area for kids,outdoor games space and relaxation spaces for other age groups
•
Provision of amenities such as supermarket, vegetable market retail shops, banking services like ATM and etc
•
OAT for HIG is provided in park.
•
Provision of club house, gym guest house, cafeteria
•
SITE PLAN 15
NEIBOURHOOD HOSUING
indoor games outdoor games
TYPE
: Middle Income Group
AREA : 81 sqm
FACILITES : park, walking track,
TYPE
: High In come Group
AREA : 117 sqm
FACILITES : park, open air
theatre, walking track, outdoor play area
outdoor play area
TYPE
: Low Income Group
AREA : 60 sqm
FACILITES : park, walking track, outdoor play area
SEMESTER -VII
16
ROAD NETWORK & ZONING
4
2 1
6
3
5
TYPE
: Economical Weaker Section
AREA : 45,40,42 sqm
FACILITES : park,kids play area
NEIGHBORHOOD HOUSING
17
18
VIEW 1
VIEW 2
VIEW 3
VIEW 4
VIEW 5
SEMESTER-VII
SCALED MODEL 1:500
VIEW 6
BUILDING CONSTRUCTION DRAFTING
19
BUILDING CONSTRUCTION DRAFTING
WORKING DRAWINGS
FOOTINGS LAYOUT
FOOTINGS LAYOUT
LINTEL AND SAJJA LAYOUT
SLAB LAYOUT
PLINTHBEAM LAYOUT
ELECTRICAL LAYOUT
BRICK MARKING LAYOUT
SLAB LAYOUT
STAIRCASE SECTION DETIALS
FRONT ELEVATION
BRICK MARKING LAYOUT
BATHROOM SECTION DETIALS
WORKING DRAWINGS
20
PERSPECTIVE LINE RENDERING
PERSPECTIVE DOT RENDERING
PROJECTION OF 2D PLAN TO 3D
DOT RENDERING BY USING PAINT
21
ARCHITECTURE DRAWING AND GRAPHICS
STRAW PAINTING WITH DIFFERENT STYLES
THREE POINT PERSPECTIVE
PARTITION WALL
TEA POI & STORAGE SHELF
HOME BOOK SHELF TEA POI COME BOOK SHELF
COMPUTER TABLE
KITCHEN DESIGN
O
PLYWOOD PEN STAND
ne of the interests i keep is designing products and experimenting the techniques offered by the machines available to me. The products showcased are all customised according to the appropriate requirement of the function and the user. Homag Cnc Beam Saw ELEVATION
Homag Edgebander
PRODUCT DESIGN
22
PERSPECTIVE OF ASSMEMBLY HALLCHANDIGARH
RAILWAY STATION PERSPECTIVE VIEW
ONE POINT PERSPECTIVE OF KITCHEN
VILLA SAVOYE
ANT EYE VIEW FISH EYE VIEW
SKTECHING
23
STREET VIEW
DIGITAL ART DIGITAL ART
VIEW FROM METRO WINDOW
EIFFEL TOWER
24
SKTECHING
SKETCH
25
MY PHOTOGRAPHY
MY PHOTOGRAPHY
26
"Together let us desire, conceive, and create the new structure of the future, which will embrace architecture and sculpture and painting in one unity and which will one day rise toward Heaven from the hands of a million workers like the crystal symbol of a new faith"
- WALTER GROPIUS
PHONE
+91 8341913828
MAIL-ID rupendarkumar123@gmail.com
ark_rupendar
@kumarRupendar
rupendarkumar123