ARCHITECTURE PORTFOLIO 2018 - 21
RUTU KEVADIYA
This portfolio is a collection of past three years’ academic and other curricular activites related to architecture which helped me to pursue and further enhance my ideas and skills.
For me, architecture is a profession that brings together all disciplines in order to realise the dream and the opportunity that it has to turn the imagination into reality.
RUTU KEVADIYA DOB :
18 - 01 - 2001
Nationality : Indian Contact :
(+91) 7046194698 ruttukevadiya502@gmail.com 18bar056@nirmauni.ac.in root2__1.41 (Instagram)
Address :
D-502, Sentosa Heights, Utran, Surat.
COMPETITION 2019 2020 2020 2020
Reubens Trophy | NASA Sundar-Bari Design Competition ANDC Trophy | NASA Solar Decathlon India
WORKSHOP 2018 2019 2020 2020 2020 2021
Bamboo Workshop Wood- Concrete Workshop Computational Design Khamir Craft Landscape Design Green Building design
EDUCATION
DOCUMENTATION | STUDY TRIPS
Institute of Architecture and Planning | Nirma University B.Arch I Ongoing 3rd Year | 2018 - 2023
2018 Dhal Ni Pol, Ahmedabad | Measure Drawing 2019 Khadia Pol, Ahmedabad | Measure Drawing 2021 British Cemetery, Surat | Audio - Visual (Ongoing)
P. P. Savani Vidhyabhavan | Surat HSC I GHSEB | 2018 SSC | GSEB |2016
INTEREST
LANGUAGE
ACHIEVEMENTS
Sketching Photography (Street | Architectural ) Travelling Graphic Design Movie Making
Gujarati English Hindi
2020 Solar Decathlon India (Ongoing) 2019 Reubens Trophy | NASA 2020 ANDC Trophy | NASA 2020 Best Studio Performance 2020 Consistent Performance 2019 Best Studio Performance
Finalist Citation Top 100 Academic Academic Academic
SKILL
CONTENT
Computerised
1 Writer’s Retreat Semester 02 | 2018
04-09
2 MATERIAL STUDIO Semester 03 | 2019
10-15
3 HOUSING STUDIO (Group Work) Semester 04 | 2020
16-23
4 INSTITUTION STUDIO Semester 05-06 | 2020-21
24-31
5 COMPETITION ENTRY (Group Work) Solar Decathlon India | 2021 Sundar-Bari Competition | 2020 ANDC Trophy | 2020
32-37 38 39
AutoCAD Rhino 3D Grasshopper Sketchup Adobe Photoshop Adobe InDesign Adobe Illustrator Adobe PremierePro Revit Lumion Vray Microsoft Suite CFD
Manual Hand Drafting 3D Modeling Sketching Wood Carpentry Bamboo Workmanship Laser Cutting Clay Modeling
6 INSTALLATION (Group Work) Canopavallion | 2020 Tensigrity Dome | 2019
7 RELATED STUDY PROGRAMME Dhal NI Pol | 2018
8 MISCELLENOUS Photography Digital - Handmade Model Illustration Bamboo Workshop
40-41
42-43
44-47
VI EW OVE R TH E LAK E
HURST HOUSE
The project brief was to design a residence for an author whose book we had read during the semester, and the design should reflect the author’s character, attitudes, and preferences, as well as what the book represents.
Writer’s Retreat Charodi, Ahemedabad 52 Sqm
The site is located in Charod village of Ahemdabad and was a part of a natural depression in the earth that would transform into a lake during the monsoon season, and the studio was further defined by the use of timber roofing structure that was requested. 5
Site Plan 0
e vat Pri c bli Pu le ub Do ume l Vo n
o lati
cu Cir
es vic
r Se
of Ro g in
p Slo
Design Evolution
5 10
Mario Puzo, author of “The Godfather”, was very calm and nature lovered person. So, giving a window with a view of the lake and green space in surroundings was major concept and defining a thin boundary between work space and public or family space was kept during deign which was achieved by corridor. We learned about the site analysis, topographical conditions, architectural expressions, climatic response, and construction technology.
20M
Floor Plan
8
1. Living Room 2. Kitchen 3. Corridor 4. Working Area 5. Library 6. Yard 7. Toilet 8. Varandah 9. Frontyard
7
1
2 6 3
5
7
4 8 9
n
Section7
E X P L O D E D V I E W9
E X H I B ITI O N S PAC E
CURST CAFE CENTRE Material Studio Nirma University, Ahmedabad 980 Sqm
The idea was to provide a space where students can feel peace- their own space and a platform where interaction among the various institutes’ stundetns will take place. Site was located in the campus of Nirma University conected to SG Highway. Covered with numbers of trees, idea was led to diffused light coming from the filter of trees which wil be again filtered by material exploration.
11
Ground Floor Plan 1. Cafe 2. Courtyard 3. Performance Space 4. Exhibition Space 5. Admin Office 6. Toilet 7. Kitchen 8. Backyard
Section AA’
Section BB’
Exploration of two diff. Material like stone-modular and steel-longitudinal were executed with layers of levels. Three different spaces - cafe, exhibition space and expression space should be interacted with each other was the challenge. So, giving a percolated roof is the one way to combine the spaces which creates a fluid shadow pattern throughout the day.
35 Thk Granite Stone 50 Thk Box Section Frame 35 Thk Box Section Frame MS Lattice Girder
220*220 MS Column
D ETAI L
13
Lvl +8.25 M
Lvl +7.25 M
Lvl +6.25 M
Lvl +4.3 M Lvl +3.8 M
Lvl +5.5 M Lvl +5.0 M
Lvl +4.5 M
Lvl -0.45 M Lvl +0.0 M
EXPLODED LEVELING
C I R C U LATI O N
15
C L O S E T O NA T U R E
NIR-VAN HOUSING
As name suggests, site was mix of water and densed trees areas which reflect the locality of Valsad where the site was located. Housing for locally settled villagers and also as a weekend house/villa for nearby cities was the basic program.
Housing Studio Magod, Valsad 5500 Sqm
Concept behind this was to create more close to the nature while adapting affordability and privacy.
ની ર - વ ન હા ઉ સીં ગ
17
Basic idea was to giving back to community or site or nature to what contexts have. So, inspired from local culvert, common public areas like Ghats and Community areas like shops were kept near to the lake. Adding to this, lake development and it usage for communal purpose, walkway was introduced on the periphery of the lake. Peripheral circulation for vehicles and pedestrian for internal circulation was also inspired from local settlements of different communities. Keywords : Common Public Area Close to Nature
Shared backyard Vernacular Architecture
PERPHERIAL ROAD LAGOONING
PARKING
COMMUNITY AREA
PARKING
GHAT
PARKING
COMMUNITY AREA PARKING
SITE PLAN
19
C1
MODULE
160 SQM
160 SQM
160 SQM
80 SQM
TYPICAL CONFIGURATION
CLUSTER MODULE
CLUSTER 01
C1
Greenland
C1 C2
C2
C1
C1
A3
CLUSTER 02
C1
C1 C1 C2
C2
Lake
Lake
21
Individual units were designed in such a way that all the spaces get outer connection with surroundings and feel very close to the nature. For that, most of the spaces open into Veranda or Semi open space that can be used throughout the day and still maintain the privacy of individual. Sitting height walls act as a psychical boundary of the unit but yet feel wholeness of the space which also helps to define backyard and frontyard. Double heighted living room connects upper bedroom with climatic responses by sloping roof as context has high precipitation. Locally available materials and vernacular structure and roofing system adapted by the time was kept simple and affordable.
23
M U LTI PU R PO S E ACTIVITY AR EA
SCHOOL OF ARCHITECTURE NU
As name suggests site was itself Nirma university campus. One has to reimagine the school of architecture school with basic function and add ones’s imaginvative ideal school for better architectural future.
Institution Studio Nirma University, Ahemedabad 5100 Sqm
Program includes an architectural school with course of 5 years and what should be other spaces or activity than can enrich the school’s learning atmosphere.
25
Towards C Block
14
1
13
15
13
3 2
4
Floor Plan 1. Entrance 2. Courtyard 3. Admin Area 4. Conference Room 5. Acoustic Lab 6. Activity Area 7. Toilet 8. Climatology Lab 9. Comuter Room 10. Library 11. Corridor 12. Classroom 13. Workshop 14. Construction Yard 15. Auditorium 16. Exhibition Space 17. Lake 18. Cafe 19. Open Ground
7
6
5
11
7
8
2
2
9
16
12
10
2
19
18 MT W I D E
Section
12
12
ROAD
Institution is an always interactive space for sharing ideas and learning from each other, bringing cultural activity and merging with surroundings context and people.
17
For interaction, collaboration and other cultural activites, lake developement and connecting the building with its peripherial spaces like public garden and open ground. 3 different types of exhibition spaces were introduced : • enclosed with brick urved vault, • semi-open space with arch shaped openings • open space.
19
Interaction among students were the major consideration for creating small open courtyard between two classes and studios while is is still connected with corridor and cantilevered balcony.
18
Keyword : Interactive Collaborative Public Gathering Naturally Ventilated Space Indirect Sunlight
16 16
Enclosed Exhibition Space
1
27
X00
X01
X02
X03
X04
X05
X8
X9
X10
X11
X12
X23 Y20 X22
Y19 60
0
X21 85
07
Y13
12
Y18
90
30 0
8 50
0
60 0
45
8 78 26
0 23
0 30
50 00 15 13 0 30
11
0 67
0
559
23
32 39 0 23
7 67 270 5 75 00
30 14
600
15
71 26
27
X6''
9
UP
X7
18
+1450 +1410
19
47 70 00 50 23
Y14' X13
X20 300
X19
5100 4800
X13' 7500 7200
300
X13'' 5000 4700
300
7100
+750 +825
230
D1 07
D1 25
W1 042
300
1210300
12
96
D3 04
9700
00
10
138°
06
80 14
6° 10
91
°
LVL +600 OTS
+900 +975
4
16
12
00
° 98
1853 LVL +600 OTS
° 91
3801210 380
1
1
1
16840
2200
230 14500
300 2000
500
500
4500
5200 2600
1
1
X01
1
500
2000
16840
5000
500
600 600 600
230 1800
14500
9540
5016
9540
9700
30 58
00
131° 9113
10 55
26
00
0
10
35
0
13107
2258
X27
3 1280
2500
8
22500
X02
X03
X04
X05
X6
X6'
X6''
00
10 95
26 00
10
55
31
58
1
1
2 2 BRICK5 2 BRICK 5 2 BRICK 5 2 BRICK 5 2 BRICK 150 150 150 150 150 150 150 150 500 1330 600 1330 1330 1330 1330 1330 1330 1330 1560 230
2400
22500
X00
W1 033
7579 8033 5
46
230
W1 034
300
230
1
1
8 2 BRICK 5 2 BRICK 5 2 BRICK 5 2 BRICK 5 2 BRICK 8 BRICK 300 150 150 150 150 150 150 150 150 2100 3301330 1330 1330 1330 1330 1330 1330 1330 1930 500
17 2 BRICK
D1 16 D1 17
66
95
380 1652 600 350 2063 220 2442
8722
230 LVL +00
230
D1 13
W1 025
W1 026
3000
5710 6060
10 91
1
W1 027
1500
12 300 265 600 745 1330230
9400
9540
9700
10000
1
9700
9540
39 BRICK
+1050 +1125
OPEN GROUND
1
600
W1 028
66
4166
°
D3 05
1000
3004
1000
5372
600
10 BRICK
4290
+900 +975
670
CLASSROOM 2 7500*10000
2 1351 3504
90
8
230
LVL +00
2243 265
300 745
W1 032 D1 15
10000
1
5 2 BRICK
+1050 +1125
W1 029
17 2 BRICK
CORRIDOR 5000*35000
COMPUTER ROOM 5000*10000
3 2 BRICK 150 230 300 1330 845
W1 030
0
230
300
W1 031
D1 14
1
670
7542
23
45000
9700
3074
12
1330
D1 12
4260
W1 024
230
W1 023
230
W1 022
3 2 BRICK 150 230 300 845 1330
10 BRICK
W1 021
00
X28
COURTYARD 10000*7500
350 230
230
300 745 1330
265 1
300
W1 037
10
+900 +935
3°
OPEN GROUND
265 1330230 745
W1 038
15 3 41 61 17
10567
230 17 2 BRICK
4260
925 150 300 230
D1 20
D1 21
00
103°
2850
+1050 +1125
10
65
ENCLOSED EXHIBITION SPACE
1058
9
350
LVL +00
7500
2981 9540 9840 10000
CLASSROOM 2 7500*10000
LVL +300
17
83
7800
350
1330 150
1330 150 D4 03
STAIRCASE AS PER DETAIL DOWN 2768
D1 19
GREENSCAPE
1330 1330 150 150 9540 9700 12400
1270 2301475 1501476 230
350 230
LVL +600 OTS
W1 052
+1050 +1125
W1 053
W1 036
7496
3900
COURTYARD 10000*7500
W1 051
LIBRARY 10000*10000
W1 054
W1 035
D1 18
7293
2400 925 1330 300 150 2050 230 3502375
D1 11
W1 055
670
2000 1330 600
853500
D4 02
230
1270
230
600 591591300
W1 020
2375 3502050 230
W1 019
670
V1 07
230 1600
4093
D4 01
1270
230 12400
670
V1 06
9700 9540
LVL +00
+1050 +1125
300 925 150 1330 150 1330 150 1330 150 1330 150 1330 150 925 300
600 +900 +975
V1 05
GREENSCAPE
500853 1600
2400
670
CLIMATOLOGY LAB 5000*10000
TOILET-M 4700*10000
W1 018
230
STAIRCASE AS PER DETAIL D2 03
SEMI OPEN EXHIBITION SPA
36
0
D1 10
10
92
+1015 +900
7005
89
11
5502
UP
COURTYARD 10000*7500
PASSAGE 35000*7500
1
+1450 +1410
7500
9
2500
10
27
X7
X8
X9
X10
X11
X12
X13
X7
X8
X9
X10
X11
X12
X13
X14
X15
15M
10
E A301
X00
X01
X02
X03
X04
X05
X6
X6'
X6''
X27
X14
X28
X15
X28
X15
LVL+9350 UNFIN. PARAPET LVL
1300
1718
LVL+11068 UNFIN. TOP LVL
D2 03
LVL+6075 WIN. UNFIN. SILL LVL
W1 023
2975
LVL+5050 FF UNFIN. LVL
LVL+900 GF UNFIN. LVL LVL+00 EXISTING GROUND LINE
Section 0
5
W1 019
W1 020
W1 085
W1 085
W1 085
W1 085
D1 15
W1 020
D1 11
W1 035
W1 036
LVL+1015
X00
10
W1 021
900 1175
LVL+2075 WIN. UNFIN. SILL LVL
W1 022
1025
1975
LVL+8050 WIN. UNFIN. LINTEL LVL
X01
X02
15M
X03
X04
X05
X6
X6'
X6''
X7
X8
X9
X10
X11
X12
00
10
6
9 40
34
7800
27
18
19
7496
19
+2800 +2760
40
3
38
20 6600
9540
1500
3000
X14'
1210
3
300
600
W1 041
1°
5710
3°
265
1330
300 745
1500
X13'' 17200
745
670
D1 24 D2 02
X13
230 1
+1050 +1125
600 D1 08
4490
11
670
17 2 BRICK
CLASSROOM 1 7500*10000
+900 +975
4260
CORRIDOR 5000*35000
2880
300
1868
W1 0171760
D1 23
+1050 +1125
+900 +975
V1 02
W1 040
W1 039
D1 22
+750 +825
ACOUSTIC LAB 5000*10000
TOILET-F 4700*10000
V1 03
ACTIVITY SPACE 35000*15000
2000 1330 600
265 1330230
W1 016
5000 4700
300
X28
X27
230
D1 06
X15 7500 7200
300
CORRIDOR 5000*70000
250 4880
X14' 5000 4700
300
230
1101330 230
2860
X14 50100
7500 7200
300
Y14
670
600
110
0
30
59 40 62 40
Y14
127°
D1 05
Y16
Y15
+2800 +2760
19
10
54
+750 +825
Y14'
500
7500
Y17
9
230
3000 500
Y18
0
26
26 489
14140
2500
X6'
34 69
40 62 600
25 00
1488 1736 1985
5553
5070 670
670
6 13 627 30
10 00 0
11 53 5
135°
651 1500
135°
1550 13301501330 710
13 30
15 13 0 30
25 00
10 00 0 135°
977 135° 1856
17 67
990 230 1330280 1860
8150
1960 1500
12 50 0
17 67
13 48 30 64
13 30
80 13 84 30 13 30
20 57
90°
20 47 2270 4320
1 1 1 1
230
8 2 BRICK 8 BRICK
3272 3133
1490 480 1490 480 1490
9540
3295
230
27
600
1
230
300 2020
2 BRICK 2 BRICK
V1 04
18 2 BRICK
5000
5000 300 10 BRICK
2880
W1 015
2 BRICK 4 BRICK 10 BRICK
5300
500 1930
150 150 150 150 150 150 150 150 500 230 500 1330 1330 1330 1330 1330 1330 1330 1330 1330 600
2 BRICK
230
Y15
1
2000 70 1330 600
5515
230 1830 110
10 BRICK 4 BRICK
2630
250 1885
1
7070
1
5 2 BRICK 5 2 BRICK 5 2 BRICK 150 150 150 150 150 150 150 150 1330 1330 1330 1330 1330 1330 1330 1660 500
CORRIDOR 5000*50000
25000 9000
X6
600 591591
7500
50
1288
15000
300 230
230 9700
D1 26
W1 048
W1 049
1399
9540 150 150 150 150 1330 1330 1330 2405
D3 03
15 41 00 71 12
3660
2405
03
1014
230
W1 050
STAIRCASE AS PER DETAIL
2500
5
14
D1 29
0 1588 4147
300
D3 01
1
LVL +00 OTS
500
0
07
+900 +975
+900 +975
+1050 +1125
230
Floor Plan
55
GREEN ROOM
COURTYARD 25000*22500
500
Y20
Y19
1014
Y00
0
3655
Y01
127°
W1 044
Y12
D5 03
W1 013
00 60
X21
W1 043
1
W1 014
60 24 06 00 006
W1 046
STORE ROOM 4500*7600
670
7500
0
53°
D3 02
Y10
2591 600600 3791
CONFERENCE ROOM 10000*10000
D5 02
50
600
W1 06
500
5 2 BRICK
6813 2655 150 150 150 150 1330 1330 1330 2405
670
W1 07
D5 01
10 BRICK
72700 230
1035 300 2405
7500
7800 9700
9540 230 150 150 150 150 300 1330 1330 1330 2405 1035 1490
W1 08
50 30 0 0 2
+900 +1000
1014
2405
1010
20 750 00 0
67°
230
LVL +600
00
AUDITORIUM 17000*21500
24825
7800
W1 09
8 BRICK
1950 300 2040
5300
W1 010
D1 04
D1 03
D1 02
COURTYARD 4500*8000
50 30 0 0 25
+900 +975
W1 047
Y11
670
0
35
1
+900 +975
UP
2591
2073 70
X19
25
18
0 15 0 21 0
64
D A201
1110 1110
5 2 BRICK 5 2 BRICK 5 2 BRICK
2819
2591
X24' W1 05
30
D1 28
WORKSHOP 03 5000*11000
WORKSHOP 01 9600*16700
28
Y02
+1050 +1125 4913 1330
13
7
17 170 50 00 0
50 00 50 00 70
47
W1 052
X24
3927
5
53°
Y03
W1 04
230 580 1440
1101498 370
W1 011
Y09'
D1 27
600
Y13
135°
7400 100 150 2810 23070 5100 4240 150 150 150 150 150 150 150 1330 1330 1330 1330 1330 1330 1330300 600
70 2709
LVL+900
ADMIN 15000*22500
4670 4210 3510
230 580
LVL+900
X23
X22
33
0
50 76 0 1 9 50 485
127°
135°
E A301
1330
95
W1 045
8 44 12
Y04
00
01
W1 053
W1 051
5278 150 500 1930 1501330 1218
37
12646
25
00 25
Y05
74 00
84 51
Y06
X24
2000
X25
W1 03
D1 01
D2 01
3357
135°
Y08
W1 02
2900
UP
00 25 2 7 2 29 47
Y08'
W1 01
0 60
78 42
LVL+600 135°
00
3927
LVL+900
X26
80
X20
40
223 500
50
60
51
60 0 41 00 47 00 60 0
0 30
135°
LVL+450
LVL+600
135°
V1 01
19 84
30 0
600
UP
135°
Y09'
W1 012
97
36 32
3812 2456
757
00
35
Y09''
Y09
X24'
45
41
+750 +825
Y16
3 1 15 094 0 13 0 30 30 11 0 60 1 5 13 0 30
1
91 00 10 60 0
22 27
Y10
0
CONSTRUCTION YARD 13000*7500
0 71 19
11 46 722 6 00 25
UP
10 00 0
X25
00 15
LVL+00 Y11
50
04
14 70 0
ENTRY
20 31 69 45
01
0
60 0
X26
15 0 19 1
35 00
41 00
00
Y17
40
Y12
X13
X27
X14
1000
3
Exploring with exposed brick and concrete was the main idea for construction drawings and further on experimenting with brick curved vault spanning 6 meter was taken as a challenge. This compilation contains basic floor plan, section, typical wall section and other detailed work of the design proposal and adding to this toilet and staircase detail.
Y09''
14922
Material Palette Brick Concrete Mild Steel
Y09
OPEN GORUND 15000 R CIRCLE LVL +00
Y08'
X16
X16'
X17
X18
X17'
25300 230
7340 300 2200
3001900
600
5000
230
4700
6001900
4097
Y08
7500 7340 300 2200
3001900
600
230
6001900
+1050 +1125
13300
Y06
00
10
2193
36°
96
35
X15'
X16'
0
5800
5300
500
4800
500
+1050 +1125
Y07 5000
CAFE 20000*5000
KITCHEN 5000*5000
793 1200 300 300 5000
600
2270
1401
1200 500600
4770 4540 7500 7200
300
7500
230
4771
600 2270
7500
Y07 X15'
5000 3600
6001500 800 1500
2500
230
230
Wood Kota Stone Tensile Wire
Y05
X17'
0 10
Y04'
Y04
10 THK CHINA MOSAIC 15 THK BASE COAT 1 BRICK THK VAULT
OPEN EXHIBITION SPACE
ACE
LVL +150 OTS
Y03
36
17
29
62
10
10
06
5
Y02
61
1000
1
48°
3004
4181
2
D' A201
Y01
Y00
LVL+5015
X16
X17
X18
LVL+1015
X16
X17
X18
X16
X17
X18
150 THK R.C.C. PARAPET 10 THK CHINA MOSAIC 15 THK BASE COAT 75 THK BEDING LAID ON SLOPE 2 THK WATERPROOFING LAYER 150 THK R.C.C. SLAB 300*850 R.C.C. BEAM 150*650 R.C.C. BEAM 75*75 VATA 100 THK R.C.C. HORIZONTAL FINS 150 THK R.C.C. VERTICAL FINS 230 THK EXPOSED BRICKWORK METAL FRAME WOODEN PLANK WINDOW 100 THK R.C.C. HORIZONTAL FINIS 15 THK POLISHED KOTA STONE 25 THK BASE COAT 75 THK BEDING MORTAR LAID ON SLOPE 150 THK .R.C.C. SLAB 300*850 R.C.C. BEAM 100 THK R.C.C. HORIZONTAL FINS 150 THK R.C.C. VERTICAL FINS 230 THK EXPOSED BRICKWORK METAL FRAME WOODEN PLANK WINDOW 100 THK R.C.C. HORIZONTAL FINIS 15 THK POLISHED KOTA STONE 150 THK R.C.C. SLAB 120 THK P.C.C. 150 THK RUBBLE SOILING 300*850 R.C.C. PLINTH BEAM 150 THK P.C.C. COMPACTED EARTH
29
10 THK CHINA MO
15 THK BASE CO
LVL+11093 FIN. TOP LVL 1520
1 BRICK THK EXP
262
LVL+9350 FIN. PARAPET LVL
LVL+9230
60*40 POWDER C WINDOW FRAME PIVOT 10 THK CLEAR GL
40*40 POWDER C AL PANEL FRAME
1723
872
LVL+9050 UNFIN. TERRACE LVL LVL+8050 WIN. FIN. LINTEL LVL
150 THK R.C.C. PARAPET 10 THK CHINA MOSAIC 15 THK BASE COAT 75 THK BEDING LAID ON SLOPE 2 THK WATERPROOFING LAYER 75*75 VATA 600*150 R.C.C. OVERHANG 3 THK MS WINDOW FRAME 3 THK L SECTION MS PANEL FRAME 30 THK WOODEN PLANK
894
LVL+6075 WIN. FIN. SILL LVL LVL+5015
LVL+5050 FF UNFIN. LVL 872
10 THK SKIRTING 15 THK POLISHED 25 THK BASE CO 75 THK BEDING L 150 THK R.C.C. S 150*600 R.C.C. BE 150*850 R.C.C. BE
1723
LVL+4050 WIN. FIN. SILL LVL
1025
LVL+2075 WIN. FIN. SILL LVL
LVL+1015
10 THK SKIRTING 15 THK POLISHED 25 THK BASE CO 75 THK BEDING L 150 THK R.C.C. S 120 THK PC.C. 150 THK RUBBLE COMPACTED EAR
785
LVL+900 GF UNFIN. LVL
230 THK BRICK WALL 75*75 VATA 15 THK HONED KOTA STONE 15 THK BASE COAT LIGHT WEIGHT CINDER FILLING 120 THK P.C.C.
LVL+00 EXISTING GROUND LINE
300*850 R.C.C. PLINTH BEAM 10 THK WATERPROOFING 120 THK P.C.C. 2200 WIDE ISOLATED R.C.C. FOUNDATION 120 THK P.C.C. 300 THK RUBBLE SOILING
Typical Wall Section 0
1
2
4M
R.C.C. KEY STONE LVL+7695 FIN. TOP LVL
10 THK CHINA MOSAIC 15 THK BASE COAT 1 2
1 THK EXPOSED BRICK VAULT
3 THK A CURVED 40*350 T WINDOW 40 THK W PANEL F
3096
VATA 380*400 R.C.C. BEAM 75*75 VATA
LVL+4145 BEAM BOTTOM LVL
10 THK WATERPROOFING 350
10 THK W PIVOT DRIP MO 100 THK LIGHTIN
1 21 THK EXPOSED BRICK WALL 75*75 VATA
2525
LVL+3795 SILL TOP LVL
15 THK HONED KOTA STONE 15 THK BASE COAT
LVL+900 GF UNFIN. LVL
10 THK W VATA 110 *75 B 20 THK BA 100 THK AGGREG COMPAC 150*600 120 THK
LVL+1015
785
LIGHT WEIGHT CINDER FILLING
LVL+00 EXISTING GROUND LINE
150*600 R.C.C. TIE BEAM 300*700 R.C.C. PLINNTH BEAM 120 THK P.C.C.
2200 WIDE ISOLATED R.C.C. FOUNDATION 150 THK P.C.C. 300 THK RUBBLE SOILING
Wall Section - Exhibition Space 0
1
2
4M
15 THK HONED KOTA STONE 25 THK BASE COAT 75 THK BEDING LAID ON SLOPE 150 THK R.C.C. GRADE SLAB 120 THK P.C.C. 150 THK RUBBLE SOILING
10 THK CHINA MOSAIC 15 THK BASE COAT 1 BRICK THK EXPOSED VAULT
OSAIC
OAT
POSED VAULT
COATED AL E
10 THK CHINA MOSAIC 15 THK BASE COAT 75 THK BEDING LAID ON SLOPE 2 THK WATERPROOFING LAYER 75*75 VATA
LASS
COATED E
U-BOLT 100*100 WOODEN FRAME 80 DIA- 3 THK MS RAILING
15 THK POLISHED KOTA STONE 25 THK BASE COAT 75 THK BEDING LAID ON SLOPE 150 THK R.C.C. SLAB 150*850 R.C.C. BEAM 10 THK SKIRTING 1 BRICK THICK EXPOSED WALL 15 THK KOTA STONE COPING TURNBUCKLE
G D KOTA STONE OAT LAID ON SLOPE SLAB EAM EAM
15 THK POLISHED KOTA STONE 25 THK BASE COAT 75 THK BEDING LAID ON SLOPE 150 THK R.C.C. SLAB 120 THK PC.C. 150 THK RUBBLE SOILING COMPACTED EARTH
G D KOTA STONE OAT LAID ON SLOPE SLAB
300*850 R.C.C. PLINTH BEAM 10 THK WATERPROOFING 120 THK P.C.C. 15 THK HONED KOTA STONE LIGHT WEIGHT CINDER FILLING
E SOILING RTH
Wall Section - Corridor 0
1
2
4M
10 THK CLEAR GLASS 60*40 POWDER COATED AL PANEL FRAME PIVOT 40*40 POWDER COATED AL WINDOW FRAME 15 THK KOTA STONE 4 BRICK COURSE PLINTH FOR BASE 10 THK CHINA MOSAIC 15 THK BASE COAT 75 THK BEDING LAID ON SLOPE 75*75 VATA 2 THK WATERPROOFING LAYER
600
300
110
150
700
HERRING BOND BRICK PAVING 20 THK BEDING MORTAR 100 THK RUBBLE SOILING 150*800 THK PLINTH BEAM 150*600 THK PCC COMPACTED EARTH
150
150*850 R.C.C. BEAM
110
150 THK R.C.C. SLAB
ALUMINIUM D PANEL THK WOODEN W FRAME WOODEN FRAME
Brick Paving End Junction 209
Skylight Vault Bottom Detail
1254
G. L.
RCC PERFORATED COVER SLAB
WOODEN PANEL 1881
AIR VENT 200 THK SAND LAYER 200 THK PEBBLE LAYER
418
418
15 THK KOTA STONE COPING 15 THK KOTA STONE SKIRTING 15 THK POLISHED KOTA STONE 35 THK BAS COAT 75 BEDING MORTAR LAID ON SLOPE 150 THK R.C.C. SLAB
4500
80 DIA- 3 THK MS RAILING U-BOLT TURNBUCKLE GRIP BOLT 100*100 WOODEN FRAME 300*450 R.C.C. INVERTED BEAM
OULD K R.C.C. BEND NG FIXTURE GAP
120 DIA PERCOLATED PIPE UPTO 9000 DEPTH 100 THK PEBBLE PACKING COMPACTED EARTH
209
WATERPROOFING
BRICK ASE SAND COAT K COMPACTED GRATE BED CTED EARTH TIE BEAM K P.C.C.
Corridor Railing Detail
Percolation Pit Detail 1 12 EXPOSED BRICK VAULT 380*400 R.C.C. BEAM
GROUND LEVEL 150 75
10 THK COLORED CHINA MOSAIC 15 THK BASE COAT
75 THK. BRICK CURBING WALL 150 THK. RCC RETAINING WALL
75*75 VATA 10 THK WATERPROOFING R.C.C. WATER CHANNEL
3 THK ALUMINIUM CURVED PANEL 40*350 THK WOODEN WINDOW FRAME 40 THK WOODEN PANEL FRAME 10 THK WOODEN PANEL
BRICK AT 450 PIVOT
120
SCREW FOR FIXING AL PANEL 600*100 THK R.C.C. BEND LIGHTING FIXTURE GAP 1 12 THK EXPOSED BRICK WALL
Vault Skylight Detail 0
0.4
0.8
42
DRIP MOULD
Brick Curbing Wall Detail
1.6M
Typical Building Detail
Site Level Detail
31
19 20 21 22 23 24 25 26 27
UP
+1450 +1410
9 RISER
3000
9 RISER
+1015 +900
900
19 20 21 22 23 24 25 26 27
+4150 +4110 THIRD LANDING
610 230 600
9 RISER
3682
230
2500
6978
4892
500
4500
9378
500
5000
250
22500
Plan - Staircase
Sitting Deta 4M
2
X01
B'
X01
X03
X05
X02'
X03
X05
0
LVL+8050 WIN. UNFIN. LINTEL LVL
LVL+1015 GF FIN. LVL LVL+00 EXISTING GROUND LINE
1
01
1350 900
LVL+1015 GF FIN. LVL LVL+00 EXISTING GROUND LINE
X02'
X03
X05
Section B - Staircase
4M
2
1350
LVL+2465 FIN. FIRST LANDING LVL
X01
Section A - Staircase 0
LVL+3815 FIN. MID LANDING LVL
1015 1450
1015 1450
LVL+2465 FIN. FIRST LANDING LVL
LVL+5165 FF FIN. LVL
C
9 RISER
1350
LVL+3815 FIN. MID LANDING LVL
LVL+6065 RAILING FIN. LVL
9 RISER
1350 900
LVL+5165 FF FIN. LVL
9 RISER
LVL+6065 RAILING FIN. LVL
0.3
1985
1985
LVL+8050 WIN. UNFIN. LINTEL LVL
0.15
LVL+9350 FIN. PARAPET LVL
1300
LVL+9350 FIN. PARAPET LVL
X02'
1300
1
Y03
5500
14500
0
Railing Deta
A'
2500 2500 7800 8100
2500
SECOND LANDING +2800 +2760
9 8 7 6 5 4 3 2 1
FIRST LANDING
300 600 1800 100 230 2400 100 150
18 17 16 15 14 13 12 11 10
Y04
300 100 1800 600 100 2400 230 150
600
X05
THIRD LANDING +4150 +4110
600
230 7500 230
Y03
1035 1490 480 1490 480 1490 1035 300 150 4 BRICK 2 BRICK 2 BRICK 4 BRICK
7800
8100
A
X03
300
Y04
X02'
175 150 150
B
X01
1
0
02
03
04
05
06
07
4M
2
08
09
10
D1 11
20 THK GROVE ABOVE DADO
20 THK GROVE ABOVE DADO
20 THK GROVE ABOVE DADO
5 THK 900*1600 MIRROR 7
R
R
7
R
6
R
R
6
R
R
R
R
R
R
R
R
R
R
7
R
R
R
R
R
R
R
R
R
R
6
R
R
R
R
R
R
R
R
R
R
5
R
R
R
R
R
R
R
R
R
R
R
R
2
4
R
3
R
5
R
R
R
R
4
R
R
R
R
3
R
R
R
R
2
3
4
2
R
5
2
R
R
2
3
2521
2521
600*300 VITRIFIED TILES (01) (AS PER SPEC.)
4
1
01
SP
R
02
R
03
Folded Elevation - Toilet Male 0
1
2
4M
1
SP
BC
BC
BC
WB
WB
WB
BC
4
3
600*300 VITRIFIED TILES (02) (AS PER SPEC.)
25 THK GRANITE COUNTER TOP
R
R
R
R
R
R
4
R
R
R
R
R
R
R
3
R
R
R
R
R
R
R
2
R
R
R
BT
R
R
04
SP
BT 3
4
BT 5
BT
R
R
600*300 VITRIFIED TILES (01) (AS PER SPEC.)
6
BT
2
R
05
TPH
CONCEALED CISTERN
CONCEALED CISTERN
TPH
TPH HF
HF
7
R
WA
WA
WB R
5
2
R
BC
WB
189
600*300 VITRIFIED TILES (02) (AS PER SPEC.)
134
R
R
1512
5
1378
R
HAND DRYER
315
HAND DRYER
SP
R
06
SP
EWC
2 BC
EWC
2 BC
3 10 MM TILE DROP R
R
07
R
R
1
R
R
08
09
10
SP
30 THK AL STAND FOR PARTITION
252
R
X01
X02
16283 250
3170
386
185 386
4789
252
2235
386
185
252
2235
185
4722
252
2235
252
2235
2302
252
386
2235
252
386
1512
2235
Y04
01
504
80
80
12309
3142 840
02
Y04
02
01
80 DIA 3 THK MS CYLINDRICAL SECTION
WATER COOLER 900*750
1:
10
0 600*600 VITRIFIED TILES FLOORING (AS PER SPEC.)
+5570
1025
50
600*600 VITRIFIED TILES FLOORING (AS PER SPEC.)
50
1008
HAND DRYER
DUSTBIN
2235
TOILET FEMALE 4400*7000 600*600 VITRIFIED TILES FLOORING (AS PER SPEC.)
HAND DRYER
HAND DRYER
+5000 +5120
TOILET MALE 4400*7000
600*600 VITRIFIED TILES FLOORING (AS PER SPEC.)
+5000 +5120
230 THK BRICK WALL 20 THK WOODEN PLY 5 THK 900*1600 MIRROR 15 THK GRANITE COUNTER
50 THK WOODEN PARTITION 10 THK VITRIFIED TILES 20 THK MORTAR 110 THK BRICK WALL 15 THK KOTA STONE BEND PLUMBING WALL
1009
16300
0
84
1: 10
2554
E
2235
V1 01
1344
125
16804
14462
252
672
1008
672
1008
300
4907
1847
W1 89
DUSTBIN
3473
Elevation
06
HAND DRYER
05
04
4772
SL
OP
+6170
OP
SL
+5570 1344
5446
1344
EQ
10 MM TILE DROP
+5570
588 EQ
2638
10 MM TILE DROP
739
SL
05
06 +4970
EQ
252
110 THK BRICK WALL 10 THK VITRIFIED TILES 20 THK MORTAR 50 THK WOODEN PARTITION
0
10
1:
1344
1848
E
OP
739
2235
V1 02
1344
1344
EQ
1344
1848
252 11687
11880
+4970 1280
00 1:1 PE
SLO
OP
E
1:
10
0
1210
+4970
0
10
10
E 1:
+5420
0
OP
SL
+6170
947
947
04
03
+6170
386
504
+6170
840
2235
386
252
2638
250
Y05
V1 05
V1 04
386
386
07
08
Y03
10 MM TILE DROP
1871
1:
SL
1955
2638
10 MM TILE DROP
E
OP
924
2638
+5420
2100 15 MM TILE DROP
10 MM TILE DROP
1344
1753 TPH
0
10
1:
A A201
+5570
1871
OP
SL
1871
2638 E
09
829
10
+4970 924
443
+5420
+6170
DUCT 1250*2500
84
4159
924
GT 03 300*300
10 MM TILE DROP
924
0.6M
386
SL
10 MM TILE DROP
1344
1848
ail Y05
+5420
SL
EQ
V1 03
4041
A A201
2638
GT 02 300*300
2204
588
GT 01 300*300 +4970
10
1:
0 10
E
OP
0
1:
+5420
2638
E OP
MANHOLE 600*600
SL
230 THK BRICK WALL
EQ
700
E
OP
0
10
1:
SL
+5420
150 THK R.C.C. LANDING SLAB CINDER FILLING 300*700 R.C.C. INVERT BEAM
150
2638
SLOPE 1:100
15 THK KOTA STONE 25 THK BASE COAT 75 THK BEDING MORTAR LAID ON SLOPE
2235
252
2991
185
2235
252
2100
2235
386
252
2588
3170
2235
252
2033
2235
252
2588
386
12309
386
16283
Y04
X01
X02
First Floor Plan - Toilet Male 1
0
4M
2
X01
X02
2887
LVL+11068 UNFIN TOP LVL
O.H.T. 3*4.5*3 M
LVL+9350 FIN. PARAPRT LVL
2185
807
1176
LVL+8050 FIN. LINTEL LVL
D1 04
LVL+7350 FIN. SILL LVL
230 THK BRICK WALL 20 THK MORTAR
471
2588 20 THK MALA PLASTER
50 THK WOODEN PARTITION
50 THK WOODEN PARTITION 15 THK POLISHED KOTA STONE
150 THK R.C.C. PROJECTION FOR SERVICE
2521 1008
3495
504
10 THK VITRIFIED FLOORING TILES 20 THK MORTAR
1176 LVL+5105
30 THK AL STAND FOR PARTITION LVL+5115
336
556
1168
235
LVL+5115
LVL+5105
252
30 THK AL STAND FOR PARTITION
533
556
1176 235
533
EWC
1168 269
252
EWC
UR
2033
504
891
504
891
600*300 VITRIFIED TILES (01) (AS PER SPEC.)
420
420
2033
TPH
LVL+5160 FF FIN. LVL
600*300 VITRIFIED TILES (02) (AS PER SPEC.)
WA 600*300 VITRIFIED TILES (01) (AS PER SPEC.)
168
WA
2033
PLUMB WALL
252 600*300 VITRIFIED TILES (02) (AS PER SPEC.)
3294
252
3495
PLUMB WALL
1008
20 THK MORTAR
15 THK POLISHED KOTA STONE
LVL+6370 FIN. PLUMBING WALL LVL
600*1500 POLISHED KOTA STONE
10 THK VITRIFIED TILES
2588
20 THK MORTAR
269
Y04
10 THK VITRIFIED TILES
1009
230 THK BRICK WALL
10 THK VITRIFIED TILES
3294
Y03
1647
230 THK BRICK WALL
100 THK PCC 75 THK BEDING MORTAR LAID ON SLOPE 150 THK R.C.C. SLAB
01
1865
807
LVL+4050 FIN. LINTEL LVL
10 THK AL HANGER
1176
150 THK R.C.C. SLAB
168
1008
168
600*600 GLASS VENTILATOR
1008
LVL+3350 FIN. SILL LVL
3134
R
7
R
R
6
R
R
R
15 THK KOTA STONE BEND R PLUMBING WALL
5
R
R
4
R
R
3
R
7
3672 600*300 VITRIFIED TILES (02) (AS PER SPEC.)
155
R WA
WA
CONCEALED CISTERN
2033
CONCEALED CISTERN TPH
R
R
R
2 BC
556
2 2
235
269
2 BC
EWC
R
1
600*300 VITRIFIED TILES (01) (AS PER SPEC.) R
3
4
LVL+5115
LVL+1165 GF FIN. LVL
1382
HF
HF EWC
600*300 VITRIFIED TILES (02) (AS PER SPEC.)
600*300 VITRIFIED TILES (01) (AS PER SPEC.)
3260
6
5
6
7
8
GT 01 300*300
9
SP
GT 02 300*300
1957
5
W1 89
168
50 THK WOODEN PARTITION 15 THK KOTA STONE 10 THK VITRIFIED TILES 20 THK MORTAR 110 THK BRICK WALL
521
1025
0
+5420
10 1:
689
E
+6170
15 THK KOTA STONE SKIRTING 15 THK KOTA STONE 230 THK BRICK WALL 15 THK KOTA STONE SKIRTING
16804
184
+6170
03
ail
4226
OPE
4226
4226
4419
4154
SL
252
150
+5000 +5120
+5000 +5120
252
15 THK KOTA STONE 25 THK BASE COAT D 50*50*10 MS SHEET WELDED TO REINFORCEMENT INSITU 150*325 THK R.C.C. INVERT BEAM 150 THK CINDER FILLING 175 THK R.C.C. LANDING SLAB
JANITOR ROOM 2800*2800
DRINKING WATER 2800*2800 4041
1010
R 10*10 THK MS DQUARE BAR WELDED TO MS SHEET
01
LVL+00 EXISTING GROUND LVL
Section - Toilet Male X01
0
1
2
X02
4M
33
The Edge - Solar decathlon India Location : Gift City, Gandhinagar Site Area : 1300 Sqm Built up Area : 3290 Sqm (470*7 floor) We as a team have come together with GIFT City as our project partner in the competition and are designing an OFFICE BUILDING SPACE for them. Solar Decathlon India 2021 is a design competition challenge design net-zero-energy-water buildings, contributing to real projects, while partnering with the leaders in real estate development. Solar Decathlon India helps students stay a step ahead and introduce innovative and affordable market-ready solutions.
A
Cabins
4000X3000
Elevator 2450x1975
Wind Tower WorkingSpace
B
2450x1975
Gents Washroom
Janitor Room
2000X2000
Pantry
Elevator
3500x3500
3000x1500
WorkingSpace 14000X8000
Ladies Washroom 3500x3500
14000X4000
MainCorridor
Conference Room
15000x4000
B'
CPU Room 4000X3500
4000X5500
Staircase W - 1250 T - 300
Staircase W - 1250 T - 300
A' Typical Floor Plan
Auditorium / Amphitheatre Kitchen Cafe-Sitting Space Working Area Circulation Services
Section BB’
N
0
2
4
8
M
Lux Light In Section
Lux Light In Model
Daylight Simulation
Wind Tower Cross Section
Stack Effect Cross Section
35
Climatic responsive Strategies : 1. Creating shaded staircase section which also acts a buffer to the working space and reduces the solar gain inside the working spaces. 2. Shading on west and east significantly reduces the solar heat gain. 3. Installed solar panels on the roof vertical garden on the south facade provides shading and insulation to the building envelope. 4. Solar Panels lifted to be able to use the terrace freely.
Egg-Crete
900
900 200*350 T SHAPED R.C.C. BEAM 200*350
550 350 900
1200
2275
100 550 100 550 100 550 100
750
1200
2275
INSIDE
750
1550
INSIDE
100 550 100 550 100 550 100
100 450 100 450 100 450 100
OUTSIDE 460 MM THK CAVITY BRICK WALL 460 MM THK CAVITY BRICK WALL 100 MM THK R.C.C. FINS 100 MM THK R.C.C. FINS
100 MM THK HORIZONTAL FINS 100 MM T
DOUBLE GLAZED GLASS
DOUBLE
460 MM THK CAVITY BRICK WALL 460 MM T
550 350 900
TYPICAL EAST-WEST WALL PLAN TYPICAL EAST-WEST WALL PLAN
Typical East-West Wall Plan
Typical East-West Wall Section
Advantage of Pre-Cast Technology
TYPICAL EAST-WEST WALL SECTION TYPICAL
15 MM THK KOTA STONE COPING
Energy Efficiency No Skilled Labour Required TIme Saving Easy Installation Cost Saving Durable and Good Quality Aesthetics High U-Value
20 MM THK LIME PLASTER 110 THK BRICK WALL 10 MM THK CHINA MOSAIC 15 MM BASE COAT 75 MM BEDING MORTAR WATERPROOFING LAYER 75 MM VATA BEDING MORTAR 25 MM THK PRECAST FERROCEMENT CHANNEL
For more Info : https://issuu.com/nikeeshah/ docs/d4_off_soleil_alt_e
300 DIA SERVICE SHAFT
https://issuu.com/nikeeshah/ docs/d4_off_soleil_alt_e_appendix
200*350 T SHAPED R.C.C. BEAM
350*500 R.C.C. COLUMN
Pre-Cast FC Channel Slab Detail
Wind Rose Diagram 80
Ventilation 73.5
Percentage %
75 70 60 50
43
40
Wind Analysis
Designwithout withoutfins fins Design
FRESHWATER TANK
5.3X5.3 m
FRESHWATER TANK
PROCESS TANK
Design with fins fins design with
EXTRA STORAGE TANK FIRE TANK
6.5X6.5 m
FIRE SAFETY TANK
5.3X5.3 m 7x7 m
3.5X3.5 m
RAINWATER TANK
SEPTIC TANK
3x5 m
6x6 m
Water Cycle
Cafeteria
Informal Gethering Co-working Space
Conference Room
Corridor Space
37
Moner Jangla (Man Ki Khidaki) Location : Satlejia, West Bengal
Design Features
With the tropical cyclones being critical natural hazard to the Indian subcontinent, especially the coastal Bay of Bengal in India and Bangladesh. And the challenge was to design a Homestead for a family in the Sunderbans. KeyWords: Resilient Sustainable Creative Affordable Implementable.
1. Living Area 2. Bedroom 3. Toilet 4. Backyard 5. Cow Shelter 6. Storage 7. Shop 8. Road 9. Pond 8 10. Garden
Bamboo Joinery At The Top At the top there is the steel gazzete plate with t-angle clit at for sides to which the bamboo is attched and screwed. This creates the storng connection at The top.
7
5
9
10
1 2
6
2
4
3
Site Plan
Layers Of Roof (Botton-Top) 1. Bamboo post 200*200mm 2. Bamboo beam 200*200mm 3. Bamboo rafter 200*100mm 4. Bamboo purlin 100mm dia, 600mm c/c 5. Tarpoline sheet for waterproofing 3mm 6.Bamboo mesh 10mm thick 7. Thatch around 130mm thck
Section AA’
Section BB’
Bamboo Joinery Of Beam, Post, Rafter And Purlin Bamboos joined with cutiing at endge to rest the other members. Fixed with jute rpoes and screws for better holding and connection with each other. Bamboo mesh is simply ties with thin jute ropes with the purlins at every 30-40mm distance.
ANDC Trpohy | NASA
ilt
bu Un ilt-
Location : Rathkuria, Rajasthan
Bu The Concept is inspired from forest, in which trees are located at different proximities creating voids in organic fabric of different sizes. Forest trees are then simplified into tree clusteer, which becomes the inspiration for the roofing of bus stop shelter. The roofing was further modified into singular organic canopy with structural columns on the opposite two sides to free the space in between. A vitruvian man is imagined in a glass sphere put right next to each other to derive anthropometric relation of spaces, while circular demarcations on the floor restricts social gathering and defines walkways. The shops, toilets and ticket counter are of cylindrical forms: Singular and in pair of different diameter made from sun dreis bricks to correspond the organic nature of the shelter.
Expansion
g ldin
Bu
Use
Major Route
ork etw N d
a Ro
Connecting Landmarks
n
tio eta Veg
Wind Trap
Site Analysis
Public Spaces
39
Installation - Courtyard, C Block, NU Canopavilion | 2020 Communication is the major aspect in field of architecture weather it is with professionals or senior - junior. Idea was to create an perforated canopy with explorations of material with different properties like BAMBOO and TENSILE WIRE. Tensile fabric was added for indirecting intengible light on the steps and sittings. Creating double curved arch with 16 members of different sizes and intersecting each other while resting one on the above. Arch was inspired from the existing building expression of the building.
Tensigrity Dome | 2019
Courtyard of the institution building is the most used space for education and learning from each other. This is the place where one can see their both past and present at a time. Exploring circular shape in response to sqaure shaped courtyard for centrality using bamboo and tensile wire. Basically two modules, one pentagon and triangle shaped for achieving spherical shape of the dome and major challenge was to rest it on the ground. So, another module of 4 bamboos were introduced and tied with peripherial wire.
Joinery of the bamboo with wire was kept very simple and affordable. Steel glass with rubber gasket was used for passing out the wire from the bamboo and stucked with epoxy.
41
Measure Drawing - Dhal Ni Pol, Ahmedabad 22971 3915
5546
799
1039
2062
2204
3243
1949
D'
2221 D06
D05
W01
D04
W02
W03
W04
1831
D07
704
D03
845
D02
D11
D10
D09
D08
D12
D01
W01
A
W03
W02
D03
D09
D08
D10
A'
4516
D07
D06
D05
D04 D02 D01
4255
1856
1211
947
2134
3252
16244
D
Ground Floor Plan
20504 3832
2655
3285
2727
3911
3246
D'
2660
D21
D18
W18
D20
W13
W10
W11
D19
W07
2529
W12
D17 W08
D16
W14
D15 W06
D14
D13
W09
W05
W15
D22
W17
W16
1263
798 D14
W10
W09
D13
W07
W08
A
A'
D11
4152
W06 W05
1059
D12
W04
D
854
First Floor Plan
3875
5574 21227
Elevation
Section DD’
Section AA’
Wooden Carving Detail
43
Miscellaneous Work This is a compilation of all the other work related to architecture, art and graphics based learnings. - Handmade Model - Digital 3D Model - Handmade Model Using Laser Cut Machine - Illustrations for exploring software and understanding of Architecture of the project
Crust Cafe Handmadde Model : Semester 3
Mill Owner’s Association Building, Ahmedabad Software Based 3D Model (Rhino)
Ilusionoist Pattern Laser Cut Model : Semester 3
Bamboo Workshop | 2018 P.P. Savani University. Surat
Tagore Memorial Hall Project By : Vastushilpa Foundation, Ahmedabad
Gujarati Sahitya Parishad Project By : HCP Architecture, Ahmedabad
ખડકી
Project By : Compartment S4, Ahmedabad
45
GUJARAT COLLEGE Ahmedabad. 2020
Jaisalmer. 2018
રંગિવિહન રંગ
Surat. 2018
સંબંધ
Surat. 2018
PRATHAMA BLOOD CENTRE Ahmedabad. 2019
AMITY UNIVERSITY Mumbai. 2019
Surat. 2018
47
RUTU KEVADIYA (+91) 7046194698 ruttukevadiya502@gmail.com 18bar056@nirmauni.ac.in