OPUS-Richlands

Page 1



Living Refined “We are a family-run company that believes in the value of a promise. From our family to yours, when you choose OPUS Homes to build your home, your faith in us is never taken for granted. You can expect to receive superb, personalized service and prompt responses both before and after your purchase, from someone who cares deeply about your satisfaction.�

Michael Ronco

Andrea DeGasperis-Ronco

Principal, OPUS Homes

Principal, OPUS Homes


The Rich History of Richmond Hill It’s no wonder that Richmond Hill is one of the GTA’s hottest locations. It has been for nearly 200 years! With its close proximity to Toronto and easy access to points northward, it has always been the ‘City to the North’. Here, we celebrate the wonderful, rich history that has made Richmond Hill the great community it is today.

1793

Lt. Governor John Graves Simcoe developed a plan for a Yonge St. settlement, with an eye to developing a route to Georgian Bay

1912

1852

First Annual Richmond Hill Spring Fair

1896 1872

Richmond Hill is officially incorporated as a Village

1820’s

Mile’s Hill is renamed Richmond Hill after Charles Lennox, 4th Duke of Richmond

The first electric train in Richmond Hill opens. The line ran along Yonge Street from Toronto to Richmond Hill. The electric cars shortened the travel time from Toronto's northern limit to Richmond Hill from a three-hour ride by stagecoach to just forty-five minutes

On December 30, 1912 Richmond Hill was lit up by electric streetlights for the first time

1935

1948

Richmond Hill amenities continue to grow with the grand opening of a 600-person movie theatre, aptly named “The Richmond”

David Dunlap Observatory, the second largest telescope in the world, is opened. The observatory is still the largest in Canada


2009

The 631 seat, state of the art Richmond Hill Centre for the Performing Arts is built

1957

Richmond Hill officially incorporated as a Town

1957

Council approves the building of subdivisions, making home builders responsible for paving roads, providing sewage and water hookups. Builders pay the municipality $300 dollars per home built to fund new schools

1978

GO Train service is extended to Richmond Hill making it faster and easier to travel to and from Toronto

1963

York Central Hospital opens. It is renamed the Mackenzie Richmond Hill Hospital in 2012 as part of Mackenzie Health

1984

Based on entries from a contest organized by The Liberal, the new town slogan “A Little North, A Little Nicer� is chosen

2017

OPUS Homes comes to Richmond Hill with an amazing collection of stylish, well crafted homes


Richlands Amenities TON RD BLOOMING Bloomington Downs Golf Course

Oak Ridges Moraine Library

Diamond Back Golf Club

404 ONTARIO

Lake Wilcox

Oak Ridges Community Centre

GO Station

LE RD STOUFFVIL

Bruce’s Mill Conservation Area Bethesda Grange Golf Course

BAYVIEW AVE TMS School Elgin Mills Campus

Elgin Mills Community Research Centre

Richmond Green Secondary School

LS RD E ELGIN MIL

Richmond Green Sports Centre Our Lady Help Michaelle Jean PS Beverley Acres PS of Christians CES Jean Vanier Headwaters CHS Community Park

Shopping

Victoria Square Community Centre Angus Glen Golf Club

York Montessori School Mill Pond

KENNEDY RD

YONGE ST

BATHURST ST

Holy Trinity School

Meadowbrook Golf & Country Club

WARDEN AVE

Richland Academy

19TH AVE

Richmond Hill Centre for the Performing Arts GO Station

Walter Scott Public School

Richmond Hill Public Library

John Tipp Park

Shopping

Richmond Hill Montessori School

LESLIE ST

Bayview Hill Community Centre & Pool

Hillcrest Mall

ZIE DR

Bayview High School (IB)

WOODBINE AVE

Mackenzie Richmond Hill Hospital

ACKEN MAJOR M

Rouge Woods Community Centre

404 ONTARIO

16TH AVE

YMCA of York Region Silver City Richmond Hill

TMS School Bayview Campus GO Bus Terminal

Town of Richmond Hill Municipal Offices

HWY 7

Restaurants

HWY 7

407

Thornlea Secondary School

All map points are designed to give the reader a sense of the community amenities that are available in Richmond Hill. While every effort is made to ensure the accuracy at time of print, actual amenities and locations may vary slightly from those that are shown. E. & O. E.

Mandarin Golf Club

MCCOWAN RD

Summit Golf & Country Club

Saigeon Trail

Phyllis Rawlinson Park


Richlands Community

Covernotes Bookstore

Angus Glen Golf Club

Phyllis Rawlinson Park

Richmond Green Secondary School

Richmond Hill Centre For The Performing Arts

Go Station

Shopping Centre


Green is the New Gold At Richlands, the life you’ll live is golden. There’s so much to see and do and all of York Region and Toronto is close at hand. With the amazing Richmond Green, large scale retail shopping, Highway 404, plus nature trails and parks to escape the bustle of city life, we can’t think of a better place to live.



AT OPUS HOMES WE BELIEVE IN BUILDING ENVIRONMENTALLY FRIENDLY COMMUNITIES THAT ARE A BREATH OF FRESH AIR.

Our innovative homes will save you money, conserve water, promote better health and reduce waste. Programmable thermostats, EnergyStar® qualified lighting, additional exterior insulation and high efficiency mechanical equipment for Energy Savings. Efficient shower heads and low-flow toilets for Less Water Consumption. HRV’s, Humidifiers, Lauzon’s Pure Genius flooring which ‘cleans’ your air, and Low VOC materials for Healthier Indoor Air. A Waste Management Program which uses recycled building materials including the donation of excess materials to Habitat for Humanity’s ReStore to help Preserve our Environment.


Families Helping Families

Earth Rangers

OPUS Homes feels a strong sense of responsibility to those that are most in need of assistance. That is why we created our Families Helping Families program, which supports local charities, with

ETA Vaughan

a donation in lieu of the traditional closing gift. Through this innovative program, our Clients are invited to select a charity to support and a donation is made on their behalf. We are pleased to introduce the addition of our Richmond Hill charity partner 360°kids. Since its’ inception in 2011, we have supported many important services that help our communities thrive.

Carlo DeGasperis - Ride to Conquer Cancer

Aurora Food Pantry

360kids


Signature Architectural Features OPUS Homes Signature Finishes take the ordinary to extraordinary, and our Clients have come to expect nothing less. Our homes always feature 8’ front doors, herringbone and brick detailing, premium brick packages, custom precast moulding, finer decorative details, better builder practices and that’s just the beginning.

Stucco Mouldings

Colour Matched Trim Accents

Premium Brick Packages

Triple Glaze Windows

Architectural Metal Accents

Precast Details


Steeper Roof Pitches

Exterior Sheathing

Finer Details

Steel Insulated Garage Doors

8' Front Doors

Decorative Railings


Signature Interior Finishes Inside an OPUS Home, we take care to select quality standards that add value.

Smooth Tray Ceiling in Master Bedroom

One example of this is our signature light fixtures, which are contemporary and beautiful just as they are. We also build better quality kitchens, designed with standards that other builders call upgrades, such as taller uppers, maple cabinetry, undermount sinks, pull-out faucets and other details. Finally, our luxurious master ensuites are equipped with glass showers and stand alone soaker tubs, and our master retreats feature elegant tray ceilings. These, and a myriad of other small details mean our buyers get a little more, always.

8' Full Panel Doors

Stone Cast Mantels

Hardwood Floors

Larger Windows


Framed Glass Shower

Double Vanity Ensuite Sinks

Interior Door Handles

Nicer Finishing Details

Stand Alone Tub

Granite/Quartz Countertop Undermount Sink Pull-out Faucet

Maple Cabinets


Little Refinements to Make Living Refined FEATURES AND SIGNATURE FINISHES SEMIS, TOWNS & SINGLES

EXTERIOR & STRUCTURAL DESIGN FEATURES 1. F ront facades are a combination of stone, stucco and brick, with precast, brick, stone or metal accents as per plan/elevation. Colour, style, materials and elevations are pre-selected and architecturally controlled to achieve variety within the streetscape. 2. P oured concrete basement floors and foundation walls with damp proofing, weeping tiles and drainage membrane to walls. 3. 2”X 6” exterior framed walls. 4. Advanced floor joist system utilizing “Engineered Floor Joist Technology”. 5. P rominent 8’ Insulated Fiberglass Front Entry Door with satin nickel grip set and deadbolt. 6. Fully Drywalled Garage Walls (taped and primed) excluding concrete block walls. 7. S teel insulated roll-up garage door, with an equivalent R9 Value, complete with complimenting glass inserts assisting to provide an insulated element within the garage area for Elevations A & B. Aluminum garage doors with frosted contemporary style glass panels for Elevation C. 8. I nsulated garage to house access door installed with dead bolt and safety closer, if grading permits. 9. Convenient Cold Cellars with vent chamber, interior light and weather stripped solid core door, as per plan. 10. Colour Coordinated Durable, Maintenance-Free, Pre-Finished Aluminum soffits, fascia, eavestrough and downpipes. 11. C olour coordinated self sealing Limited Lifetime asphalt shingles. 12. Maintenance free exterior aluminum railings for both porch (where required by building code), decorative applications and Juliet balconies. 13. E nergy Star Rated Vinyl Triple-Glaze (with low ‘E’ argon gas filled) Casement Windows Throughout, featuring mullions on front elevations where applicable, complete with screens on operating windows. All door systems include weather stripping. All windows and doors are colour coordinated to match exterior colour packages. 14. Vinyl basement windows, 30” x 16” (min). 15. Tasteful municipal address plaques. 16. F ully graded and sodded lot with precast patio slabs and steps at front walkway. Precast step(s) at rear door, as required by grade. 17. Two coat asphalt paved driveway - base and top coat. The base coat is included at no extra cost, however the top coat paving (installed one year after base) will be charged at closing.

OPUS - GO-GREEN INITIATIVES 1. A ll Opus Homes feature an HRV System (Heat Recovery Ventilator) – distributing fresh air throughout the home and minimizing poor air contaminants. 2. Electronic Thermostats to better regulate temperature distribution and conserve energy. 3. R5 Rigid Insulation Sheathing applied to all exterior walls for additional insulation. 4. Low flow toilets and Moen Eco-Performance faucets and shower heads featured throughout all baths to enhances water conservation. 5. MDF Trim made from a renewable resources. 6. Upgraded Energy Star qualified ceiling fixtures throughout main, upper and lower levels (where applicable), excluding closets. 7. Sealed basement ducts which reduce heat loss at duct joints. 8. All paints used throughout the home release low level VOCs. 9. Engineered hardwoods selected from sustainable forests. 10. Broadloom and adhesives are Green Label Plus certified and are produced using completely recycled materials within an optimized manufacturing facility. 11. S teel insulated roll-up garage door with an equivalent R9 Value for Elevations A & B providing an insulated element within the garage area.

12. I n order to conserve lumber, OPUS has opted not to provide wood decking. Should a client desire to have a deck, an appropriately sized design will be submitted to the municipality for permit. 13. E xpanding foam insulation applied around all windows and doors for draft prevention. 14. R ecycled aggregate materials used for driveway base. 15. A Waste Management Program that is carried out by the construction team includes source separation, lumber and drywall recycling, and the reuse of temporary stairs and railings throughout the construction process.

KITCHEN, BATHS & LAUNDRY DETAILS 1. E xtended Kitchen Upper Cabinets. 2. D esigner finished Maple , Oak, PVC and Melamine cabinetry in Kitchen and Bathrooms in a wide choice of styles and colours from Builder’s standard selections. 3. C hoice of ¾” Granite or Quartz Countertops in Kitchen to be selected from Builder’s standard selections and laminate countertops throughout all bathrooms and finished laundry rooms. 4. U ndermount Stainless Steel Kitchen Sink with Single Lever Pull-Out Faucet. 5. S ingle lever faucets in all bathrooms. 6. Provisional rough-in for future dishwasher within kitchen cabinet space (electrical run from panel to underside of dish-washer space and left in basement). 7. All bathroom tub and shower enclosures to receive mold resistant bathroom drywall board. 8. F ramed Glass Shower Enclosures in Master Ensuite, as per plan. 9. All OPUS homes feature the refined appointment of a Stand Alone Soaker Tub within all master ensuites, as indicated on plans. 10. Low flow toilet systems and Moen’s low flow lav faucets that include Eco-Performance showerheads. 11. B athroom vanities to have a bank of drawers where sizing permits. 12. P edestal sink for powder room. 13. M irrors over vanities in all bathrooms. Powder room to receive an oval beveled mirror. 14. D ue to the variety in options available and personal tastes, bath accessories (towel bars and toilet paper holders), are not provided.

FLOOR COVERINGS 1. A wide assortment of 12”x12” or 13”x13”ceramic tile flooring in foyer, kitchen, breakfast area, all bathrooms, mudroom and finished laundry rooms, from Builder’s standard samples. 2. G lass shower stalls to receive 2”x2” mosaic tiles on floor and 8”x10” ceramic tiles on walls, excluding ceiling, from Builder’s standard samples. 3. Tub/Shower enclosures to receive 8”x10”ceramic wall tiles installed on walls excluding ceiling, from Builder’s standard samples. 4. P refinished 3” Wide Stained Engineered Hardwood throughout main and finished lower floors (where applicable on 3-storey designs), excluding tiled areas. One colour selection of Berber Carpet including underpad throughout upper floor, to be selected from Builder’s standard samples.

INTERIOR DESIGN FEATURES 1. A ll homes feature grand 9’ Ceilings on Main Floor, Upper Floor and Lower Floor (where applicable on 3-storey designs). 2. D irect-Vent 30” Gas fireplace with Elegant Stonecast Mantel, as per plan. 3. K itchen, breakfast area, bathrooms and laundry room to receive smooth ceilings. 4. S pray textured stippled ceilings with 4” smooth border throughout entire home (where smooth ceilings do not apply). 5. E xtended 10’6” High Tray Smooth Ceilings in all Master Bedrooms, unless changed by Architectural Control.


6. W here applicable, interior column profile will be square. All art niches and ledges to have a MDF cap. 7. 4 ¼” Colonial baseboard with 2 ¾” casing throughout within Elevation A & B models. 4 ½” x 2 ½” Flat stock contemporary casing within Elevation C models. 8. All Interior doors to be a 2 panel square top Smooth Doors. 9. S atin Nickel Interior Lever Hardware and Hinges throughout all interior doors. 10. Flat archways to be trimmed and painted, where noted on plan. 11. All homes to receive a natural varnished Oak Main Staircase, complete with oak strip hardwood on landings (excluding basement stairs in nonfinished areas). 12. Railings to be finished with a 2 ¾” handrail and a selection of 1 5 /16” square or round wood picket or straight black metal pickets, complete with 3 ½” x 3 ½” square post, as per plan. All upper hallways to receive ½” oak nosing complete with oak stringers (side of staircase). 13. Thoughtful storage considerations in closets complete with white wire shelving, ideal for expanding shelf accessories. 14. All interior Trim and Doors are Painted White. 15. Selection of one interior paint colour throughout. 16. Professional home cleaning prior to occupancy, including windows and furnace/duct system.

MECHANICAL SYSTEMS 1. A ll Homes feature an HRV System (Heat Recovery Ventilator). 2. An Electronic Programmable Thermostat controlling a Forced Air Hi-Efficiency Gas Furnace (location may vary from plan, and may be moved to optimize performance at Builder’s discretion). 3. E ach home is complete with a Flow Through Humidifier, to help control the humidity levels within your home. 4. R ental gas hot water heater, as per the Agreement of Purchase & Sale. 5. D uctwork is sized to allow for future central air conditioning. 6. S ealed basement ducts. 7. The home will be insulated in accordance with the current Ontario Building Code specifications including expanding foam insulation in all garage ceilings (when finished areas above) and around all windows and doors. 8. F lexible water pipe solution using PEX (polyethylene) to reduce noise & corrosion, and eliminate sodder contaminants within plumbing system. 9. E xhaust fans installed in all finished bathrooms & laundry, vented to the exterior. 10. Stainless Steel Hood Fan over stove, vented (6”) to the exterior. 11. Two Exterior Hose Bibs are provided, one at the rear (or side) and one in garage. 12. L aundry rooms are equipped with Stainless Steel Drop-In Laundry Tub including a base cabinet and hot/cold water connections for main and upper floor laundry rooms, as per plan. Where upper floor laundry rooms apply, a floor drain will be installed. 13. White plumbing fixtures for all bathrooms complete with shut off valves (toilets and sinks). 14. All showers to receive the comfort of pressure balance control valves. 15. 3 Piece Basement Bathroom Rough-In, drain only (location predetermined and may vary from brochure).

ELECTRICAL COMPONENTS pgraded Energy Star Qualified Ceiling Fixtures in all bedrooms, U hallways, side halls, foyer, kitchen, breakfast area, den, dining room, mudroom and family/great/rec room. Living room to receive a switch plug in lieu of a light. Bathrooms to receive a light fixture over the vanity and ceiling fixture (excluding powder room). 2. B lack exterior coach lights on front and rear elevations. 3. 1 00 amp electrical service with breaker panel and copper wiring throughout. 200 amp service for 3-storey Detached designs. 1.

T wo Weatherproofed Exterior Electrical Outlets, one at rear of home and one at the front porch. 5. 2 20 volt receptacle for stove and dryer. 6. G round fault interrupter receptacles, as per Electrical Safety Authority (ESA). 7. S moke detectors located on all floors and in bedrooms. Smoke detectors in all bedrooms are equipped with an alarm and required strobe light as per Ontario Building Code (OBC) requirements. Carbon Monoxide detectors located on main, upper and lower floor hallways (where applicable on 3-storey designs). 8. White Decora Switches and Receptacles throughout. 9. R ough-in for future central vacuum system terminating in the basement, complete with dedicated plug in garage. 10. C onvenient Garage Door Opener Receptacle(s) in the ceiling for a future garage door opener. 11. The added feature of a Holiday Receptacle for Front Porch, on a separate controlled switch. 12. S ingle switch operating all basement lighting. 13. E lectronic door chime with doorbell at front entry. 4.

HOME AUTOMATION/TECH PACKAGES 1. A ll bedrooms and family room / great room / rec room are Pre-Wired for TV with one RG6 Cable and a finished cover plate. 2. T elephone Rough-In in master bedroom and kitchen with a finished cover plate. 3. C at 6 Network Cabling in all bedrooms, family room / great room / rec room and/or den (if applicable). 4. E ach home comes complete with a Security Alarm Rough-In for added protection with 1 keypad location at the front foyer, 1 motion detector on the ground floor, and rough-in for alarm sensor contacts at all basement & main floor windows and doors. 5. All Clients will have a personally scheduled appointment with our Home Automation Contractor to explain and co-ordinate any additional requirements you may desire.

TARION WARRANTY OPUS Homes is dedicated to achieving minimized home deficiencies. We will achieve this through the efforts of our diligent personnel and thorough quality assurance practices. Given that each home is built with over 45 tradespersons, errors are to be expected, however our desire is to showcase a home that both you and your family can all be proud of. Your Tarion Warranty will include: • 1 Year Warranty - covers deficiencies in workmanship and materials. • 2 Year Warranty - covers any defects in work or material which allows water penetration through the building envelope; delivery and distribution of heating, electrical, and plumbing; and all Ontario Building Code violations. • 7 Year Warranty - covers major structural defects. Specifications, Terms & Conditions are subject to change without notice. E. & O.E. OH (Richlands) Inc.


opus townhomes

OPUS 20-4 (END)

OPUS 20-1 (REV'D)

OPUS 20-2

OPUS 20-3 (REV'D)

2 STOREY PLAN

3 STOREY PLAN

3 STOREY PLAN

3 STOREY PLAN

1861 SQ.FT.

2666 SQ.FT.

2683 SQ.FT.

2736 SQ.FT.


ELEVATION B

Artist’s Concept

OPUS 20-3

OPUS 20-2 (REV'D)

OPUS 20-1

OPUS 20-5 (CORNER REV’D)

3 STOREY PLAN

3 STOREY PLAN

3 STOREY PLAN

2 STOREY PLAN

2736 SQ.FT.

2683 SQ.FT.

2666 SQ.FT.

2145 SQ.FT.


opus townhomes

OPUS 20-4 (END)

OPUS 20-1 (REV'D)

OPUS 20-2

OPUS 20-3 (REV'D)

2 STOREY PLAN

3 STOREY PLAN

3 STOREY PLAN

3 STOREY PLAN

1861 SQ.FT.

2666 SQ.FT.

2683 SQ.FT.

2736 SQ.FT.


ELEVATION C

Artist’s Concept

OPUS 20-3

OPUS 20-2 (REV'D)

OPUS 20-1

OPUS 20-5 (CORNER REV’D)

3 STOREY PLAN

3 STOREY PLAN

3 STOREY PLAN

2 STOREY PLAN

2736 SQ.FT.

2683 SQ.FT.

2666 SQ.FT.

2145 SQ.FT.


Opt.

F

Lower Powder 3 Piece Rough-In

H

F

Unfinished Basement

Possible Low Headroom

3 Piece Rough-In

Up

3 STOREY PLAN

3 Piece Rough-In

Opt. Built-ins

Lower Powder

Mud Room

Storage 5'0" x 5'0"

Possible LowLow Headroom

W.I.C.

Steps If Req'd

MudDoor Room Where

Dn

Recycling Area 8'10" x 7'10"

TH-01

Cold Cellar

Half Wall

Railing

Foyer

Up

Up 3 Piece Rough-In

Lower Floor Elevation 'B'

TH-01

ELEVATION B - 2666 SQ.FT. 3 Piece Rough-In

Partial Lower Floor Rec. Room Elevation 'B' & 'C' 8'8" x 12'2" For Opt. 4 Bedroom

Garage 10'10" x 19'1"

Lower Powder

Rec. Room 8'8" x 12'2"

Low Headroom

Dn

O.T.A.

Elevator

Portico

Elevator

O.T.A

W.I.C.

Partial Lower Floor Elevation 'B' & 'C' For Opt. Elevator

Half Wall

Partial Basement Plan Elevation 'B' & 'C' For Opt. Elevator

Lower Bath

Steps If Req'd Door Where Grade Permits

Elevator

Dn

O.T.A

O.T.A.

LOWER Partial Lower Floor Lower FLOOR Floor ELEV. B Elevation 'B' & 'C'

Up

Partial Lower Flo Elevation 'B' & 'C For Opt. 4 Bedro

Recycling 8'10" x 7'10"

Garage 10'10" x 19'1"

Partial Lower Floor Garage 'B' & 'C' Elevation Garden 10'10" x 19'1" For Opt. 4 Bedroom With Door Elevator

ElevationFor'B' Opt. Elevator

Rec. Room 8'8" x 12'2"

Foyer Up

P E Fo

Bedroom 10'0" x 1

Portico

Half Wall

Garage 10'10" x 19'1"

F

Foyer

3 Piece Rough-In

Partial Lower Floor

Lower Powder Portico

Half Wall

ELEVATION C - 2666 SQ.FT.

Elevator

Dn

Low Headroom

TH-01

Bedroom 4 10'0" x 11'0"

Foyer

Elevator

Partial Basement Plan Elevation 'B' & 'C' For Opt. Elevator

M El

W.I.C.

Garden Door

Dn

Basement Plan Elevation 'B' & 'C'

1 Garden Door

Lower Powder

Cold Cellar

Dn

O.T.A

Elevator F

Steps I Door Grade

ELEV. B & C

Lower Floor Elevation 'B'

Portico

F

Basement Plan Elevation 'B' & 'C'

Partial Lower FloorW.I.C. PARTIAL LOWER FLOOR Elevation 'B' & 'C' OPT. 4 BEDROOM For Opt. 4 Bedroom

Railing

Unexcavated

Open To Above

Recycling Area 8'10" x 7'10"

Up

Dn

Basement Plan Elevation 'B' & 'C'

Garage 10'10" x 19'1" Portico

Garage 10'10" x 19'1"

O.T.A

Steps If Req'd Door Where Grade Permits

Half Wall

Low Headroom

Cold Cellar

Up

Open To Above

Storage 5'0" x 5'0"

Recycling Area 8'10" x 7'10"

Dn

Steps If Req'd

Foyer

Unexcavated

Steps If Req'd Door Where Grade Permits

Grade Permits (Sunken If Req'd)

Dn

Headroom

Partial Lower Flo Elevation 'B' & 'C Rec.Lower Room For Opt. 4 Bedro 8'8" xBath17'8"

Garage 10'10" x 19'1"

Steps If Req'd

Up

Lower Powder

B 10

Rec. Room 8'8" x 17'8"

Open To Above

(Sunken If Req'd)

Dn

Dn

Bedroom 4 10'0" x 11'0"

O.T.A

Rec. Room 19'0" x 12'0"

Unexcavated

Opt. Built-ins

HRV

F

Garden Door

Railing

Unfinished Basement

W.I.C.

Recycling Area 8'10" x 7'10"

Dn

Rec. Room 19'0" x 12'0"

Steps If Req'd

Steps If Req'd Door Garden Where Grade Permits Door

Opt. Coffered Ceiling

Garden Door Opt. Gas Fireplace

H

Storage 5'0" x 5'0"

Opt. Coffered Ceiling

Garden Door

Opt. Built-ins

HRV

20-1

Location Of Furnace And Hot Water Heater May Vary

Opt. Built-ins

Low Headroom

Location Of Furnace And Hot Water Heater May Vary

Dn

Opt. Gas Fireplace

opus

Mud Room

(Sunken If Req'd)

Possible Low Headroom

PARTIAL LOWER FLOOR Elevation 'C' ELEV. C

W.I.C.

L B

P


Op

S

Opt. Built-ins

Glass Shower

Raised Ceiling

Raised Ceiling

Freestanding Tub

Freestanding Tub

Master Bedroom 12'0" x 17'0"

Glass Shower

Raised Ceiling

ELEV. Raised B

Master Ensuite

Ceiling

Raised Ceiling

Glass Shower

Raised Ceiling

Master Bedroom 12'0" x 17'0"

Tray Ceiling

Bedroom 2 9'6" x 10'0" Master Ensuite Dn

W

D W

D

Tray Ceiling

Partial Upper Partial Floor Upper Floor Laundry Laundry For Opt. For Master Opt. Ensuite Master Ensuite Master Raised Ceiling Ensuite ElevationElevation 'B' 'B'

Dn

Raised Ceiling

Raised Ceiling

Linen

PARTIAL UPPER FLOOR

Partial Upper Floor OPT. MASTER ENSUITE For Opt. Master Ensuite ELEV. C Elevation 'C' Glass ShowerGlass Shower

Upper Floor Elevation 'C'

Master Master BedroomBedroom 12'0" x 16'0" 12'0" x 16'0"

Elevator

Glass Shower

Dn

Tray Ceiling

Master Ensuite Elevator

Master Ensuite

Dn

Glass Freestanding Freestanding Shower Tub Dn Tub

Dn

ELEV. B Elevation Elevation 'B'

Glass Shower

Raised Ceiling

'B'

Tray Ceiling

Elevation 'C'

Master Ensuite

Raised Ceiling

PARTIAL MAIN FLOOR Partial C Main Partial Floor Main Elevation Floor Elevation 'C' 'C' ELEV.

Raised Ceiling

Raised Ceiling

Freestanding Tub

Freestanding Tub

Master Bedroom Raised Ceiling 12'0" x 17'0"

Raised Ceiling

BedroomBedroom 2 2 9'6" x 10'0" 9'6" x 10'0"

PARTIAL UPPER FLOOR

Partial Upper Partial Upper Elevation Floor Elevation 'C' 'C' ELEV.Floor C

Master Ensuite

Raised Ceiling

Glass Shower

Master Master Bedroom Bedroom 12'0" x 17'0"12'0" x 17'0"

Partial Upper Floor For Opt. Master Ensuite MasterElevation 'C' Raised Ceiling Raised Ceiling Ensuite Tray Ceiling

Master Ensuite

Raised Ceiling

Tray Ceiling

Raised Ceiling

Partial Upper Partial Floor Upper Floor For Opt. For Master Opt.Ensuite Master Ensuite ElevationElevation 'C' 'C'

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, Linen as they include OTB areas. All renderings are artist’s concept. *Colour packages may varyLinen slightly from renderings. Refer to sales representative for details. E. & O. E. 20-01

Powder

Powder

Raised Ceiling

PartialPartial UpperUpper Floor Floor For Opt. Ensuite ForMaster Opt. Master Ensuit Elevation 'B' Elevation 'B'

Tray Ceiling

Opt. Coffered Ceiling Opt. Coffered Ceiling

Sitting Area Sitting Area 7'8" x 4'2" 7'8" x 4'2"

Glass Shower

Partial Upper Floor Elevation 'C' Master Ensuite

Raised Ceiling

Raised Ceiling

Master Master Bedroom Bedroom 12'0" x 17'0"12'0" x 17'0"

Glass Shower

Master Ensuite

Tray Ceiling

Freestanding Tub Glass Shower

Master Ensuite

Tray Ceiling

Raised Ceiling

Up

Dining RoomDining Room 19'0" xPartial 12'0"19'0" x 12'0" Main Floor

Raised Ceiling

Master Bedroom 12'0" x 17'0"

Partial Upper Partial Floor Upper Floor ElevationElevation 'B' & 'C' 'B' & 'C' Master For Opt. Upper For Elevator Opt.FLOOR Elevator Floor Ensuite Upper Floor UPPER

Opt. Coffered Ceiling

Sitting Area 7'8" x 4'2"

Raised Ceiling

Elevator

Raised CeilingRaised Ceiling

Dining Room 19'0" x 12'0"

Tray Ceiling

Make-Up

Linen

Master BedroomB 12'0" x 16' 12

Tray Ceiling

Make-Up

Linen

Partial Upper Floor Elevation 'B' & 'C' For Opt. Elevator

Make-Up

Elevation 'B' & 'C' For Opt. Elevator

Main Floor Main Floor ELEV. B Elevation 'B' Elevation 'B'

Main Master Bath Ensuite

Opt. Uppers Opt. Uppers

Linen

Partial Bedroom 2 Bedroom 2 9'6" x 10'0" 9'6" x 10'0"

Up

Up

Main Bath

Raised Ceiling

Freestanding Tub

Sitting Area Sitting Area Elevator Elevator 7'8" x 5'2" 7'8" x 5'2"

levator

Raised Ceiling

W.I.C.

Raised Ceiling

F

Partial Main Partial Floor Main Floor ElevationElevation 'B' & 'C' 'B' & 'C' For Opt. For Elevator Opt. Elevator MAIN FLOOR

Glass Shower

Master Master Bedroom Bedroom 12'0" x 16'0"12'0" x 16'0"

Tray Ceiling Ceiling Partial UpperTrayFloor PARTIAL UPPEREnsuite FLOOR For Opt. Master OPT. MASTER Elevation 'B' ENSUITE

Make-Up

Master Ensuite

W.I.C.

Dining Room Dining Room 19'0" x 11'0" 19'0" xMain 11'0"Floor Partial

Dn

Glass Shower

Make-Up

Master Ensuite

Glass Shower

Powder

Raised Ceiling

Partial Upper Floor Upper Floor Tray Ceiling Elevation 'B'Tray&Ceiling 'C' Elevation 'B' For Opt. Elevator

Dn

or C' Powder om With Elevator

Make-Up

Open To Below

Freestanding Tub

Glass Shower

Raised Ceiling

Master Ensuite

Raised Ceiling

S

Elevator

Garage 10'10" x 19'1"

Tray Ceiling

Raised Bedroom 3 Bedroom 3 Ceiling 9'2" x 12'2" 9'2" x 12'2"

Opt. Coffered Ceiling

Partial Main Floor Elevation 'C'

Up

Garden Door

Tray Ceiling

Elevator

Upper Floor Upper Floor ElevationElevation 'B' 'B'

Opt. Coffered Opt. Ceiling Coffered Ceiling

Recycling 8'10" x Up 7'10"

Garden Door

Laundry

Master Bedroom 12'0" x 16'0"

Glass Shower

Make-Up

Powder

F

12'0" D x 16'0"

Make-Up

Breakfast Bar

Breakfast Bar

Dining Room

19'0" x 12'0" DW

Sitting Area 7'8" x 4'2"

Laundry

W

Dn Master Master Bedroom Bedroom 12'0" x 16'0"12'0" x 16'0"

Kitchen Kitchen 13'8" x 11'6" 13'8" x 11'6"

Railing

Open To Above

Railing

Open To Above/Below

Open To Above

Open To Above/Below

Steps If Req'd Door Where Grade Permits

DW

D

Master BedroomBedroom 2 2 Ensuite 9'6" x 11'0" 9'6"(14'8") x 11'0" (14'8")

Linen

Pantry

Main Floor Main Floor Elevation 'B' Dn 'B' DnElevation

Lower Bath

Dn Linen

Open To Below

Pantry

Bedroom 4 10'0" x 11'0"

Dn

W

Make-Up

Up

Coffered Ceiling

BreakfastBreakfast Sitting Area 13'8" x 10'0" 7'8"13'8" x 5'2" x 10'0"

Sitting Area 7'8" x 5'2"

Master

Opt. Uppers Bedroom

Opt. Uppers

Glass Shower

Open To Below

Partial Main Floor 'C' For Opt. Elevator Elevation 'B'

Powder

Balcony Balcony 11'0" x 4'10" 11'0" x 4'10"

Bath

Dining Elevation RoomDining Room Main Floor'B' & 19'0" x 11'0"19'0" x 11'0"

Coffered Ceiling

Powder

Linen

Open To Below

Sitting Area 7'8" x 5'2"F

Up

or C' om With Elevator

Linen

Main Bath

S

Opt. Coffered Ceiling DnOpt. Coffered Ceiling

Up

W.I.C.

Gas Fireplace

F

W.I.C.

Open To Below

Coffered Ceiling

Opt. Built-ins

Breakfast Bar

S

Opt. Built-ins

Garage 10'10" x 19'1"

Dining Room 19'0" x 11'0"

Opt. Built-ins

Recycling 8'10" x 7'10"

Powder

DW

Family Room Family Room Kitchen Kitchen 13'8" 11'6"13'8" x 11'6" 19'0" x 12'0" 19'0" xx 12'0" Elevator Open To Above

Open To Above/Below

Door Where Grade Permits

Open To Above

arage " x 19'1" Steps If Req'd

Dn

Gas Fireplace

GardenDW Door

Garden Door

Dn

Exterior Railing Exterior Railing

Bedroom 2 9'6" x 10'0" Main

Opt. Coffered Ceiling

Opt. Waffle Ceiling Opt. Waffle Ceiling

Railing

Lower Bath

Railing

cling Area " x 7'10"

F

Up

Pantry

Breakfast Bar

Pantry

Brea

Op

Breakfast Breakfast 13'8" x 10'0"13'8" x 10'0"

Juliet BalconyJuliet Balcony

S

Kitchen 13'8" x 11'6"

Coffered Ceiling

Railing

Powder

Open To Above

or C' om

Open To Above/Below

Powder

Open To Above/Below

er h

Garage Bedroom 4 x 19'1" 10'10" 10'0" x 11'0"


Opt. Built-ins Opt. Gas Fireplace

H

Unfinished Basement

Opt. Built-ins

20-1

Location Of Furnace And Hot Water Heater May Vary HRV

opus

F

3 STOREY PLAN

Lower Powder 3 Piece Rough-In

Possible Low Headroom

Storage 5'0" x 5'0

Low Headroom

Unexcavated

Up

Fo

ELEVATION B - 2666 SQ.FT.

Cold Cellar

Basement Plan BASEMENT ELEV. B & C 'B' & 'C' Elevation

TH-01

Po

Lower F Elevatio

F

ELEVATION C - 2666 SQ.FT.

3 Piece Rough-In Lower Powder


F

F

Open To Above

Kitchen 13'8" x 11'6"

Garden Door

Bedroom Rec. 4 Room 10'0" x 11'0" 8'8" x 12'2"

Coffered Ceiling

Half Wall

Master Bedroom x 16'0"

Tray Ceiling

Lower Powder

Elevator

W.I.C. Lower Bath

Master Raised Ceiling Ensuite

Raised Ceiling Elevator

Elevator Raised Ceiling

Freestanding Tub

Freestanding Tub

Low Headroom

Low Headroom

Dn

Dn

Steps If Req'd Elevator Door Where Grade Permits

Recycling 8'10" x 7'10"

Dn

Upper Floor O.T.A. Elevation 'B'

W.I.C. Raised Ceiling

Elevator Dn

Glass Show

Tray Ceiling

W.I.C.

Lower Powder

Bedroo Re 10'0"8'8 x

Master Bedroom 12'0" x 16'0"

Glass 12'0" Shower

Dining Room 19'0" x 11'0"

Sitting Area

D

Laundry

Dn

Rec. Room 8'8" x 12'2"

Glass Shower

Elevator 7'8" x 5'2"

D

Garden Door

Master Ensuite

Sitting Area 7'8" x 5'2"

W

Laundry

Dn

Opt. Coffered Ceiling

Up

Lower Powder

Opt. Uppers

W

Open To Below

Open To Above/Below

Railing

Lower Floor S Elevation 'B'

Kitchen 13'8" x 11'6"

Dining Room 19'0" x 11'0"

Opt. Uppers

DW

Lower Floor S Elevation 'B'

Opt. Coffered Ceiling

F

3 Piece Rough-In

Elevator

Main Bath

Make-Up

3 Piece Rough-In

Open To Above

Open To Above/Below

TH-01 TH-01

Dn

Linen

Open To Below

DW

Breakfast Bar

Recycling Area

Up

Main Bath

W.I.C.

Linen

Pantry

8'10" x Basement 7'10" Dn Basement Plan Plan Lower Floor C' 'C' Elevation 'B' & 'C' rageElevation 'B' & Garage Elevation 'B' 10'10" x 19'1" A x 19'1"

F

W.I.C. Half Wall

Portico

Pantry

wer Floor 'B' & 'C' Bedroom

Breakfast 13'8" x 10'0"

Portico PARTIALS FORPortico ELEVATOR OPTION

Cold Cellar

Steps If Req'd Door Where Grade Permits

ing Area x 7'10" Dn

Powder

Breakfast 13'8" x 10'0"

Breakfast Bar

Cold Cellar

Coffered Ceiling

Powder

Half Wall

Lower Bath

Railing

er h

Steps I Door Grade Raised Ceiling

Elevato

Dn

Garage 10'10" x 19'1"O.T.A

O.T.AFloor Upper Elevation 'B'

Maste Ensui

Recy 8'10"

Garag 10'10" x

Partial Up Main Floor Main Floor For Opt. M Elevation 'B' Elevation 'B' PARTIAL PARTIAL Lower LOWER Floor PARTIAL OPT. LOWER t Plan Partial BasementPartial Plan Basement Partial PlanLower FloorPartial Partial Lower Floor Partial Lower FloorPartial Lower Elevation Floor Partial L BASEMENT FOR FLOOR FOR FLOOR FOR C' Elevation 'B' & 'C' Elevation 'B' & Elevation 'C' 'B' & 'C' Elevation 'B' & 'C' Elevation 'B' &OPT. 'C' ELEVATOR Elevation 'B' & 'C' Elevation 'B' & 'C' Elevatio OPT. ELEVATOR OPT. ELEVATOR r For Opt. ElevatorFor Opt. Elevator For Opt. Elevator For Opt. ElevatorFor Opt. Elevator For Opt. 4 Bedroom For With Opt.Elevator 4 Bedroom For Opt Wit O.T.A.

O.T.A.

Up

Up

en r

A

Up Bedroom 2 9'6" x 10'0" Garage 10'10" x 19'1"

Garage 10'10" x 19'1"

Lower Bath

Foyer Powder

Foyer

Bedroom 2 9'6" x 10'0" Garage 10'10" x 19'1"

Foyer Linen

Powder

Linen

Steps If Req'd Door Where Grade Permits

Garage 10'10" x 19'1"

Elevator

Elevator Portico

Dn

Dn

Portico

Elevator Portico

Half Wall

Recycling 8'10" x 7'10"

Half Wall

Dn

Bedroom 4 10'0" x 11'0"

Half Wall

oom 12'2"

Dn

Elevator

Dn

Partial Lower FloorPartial Lower Floor Partial Lower Floor PARTIAL MAIN Floor PARTIAL Upper UPPER Floor Partial Partial Upper Floor wer Floor Partial Main Floor Partial'C' Main Elevation Elevation 'C' Elevation FLOOR FOR FLOOR FOR 'C' Elevation 'B' & 'C'Elevation 'B' & 'C' 'B' & 'C' Elevation 'B' & 'C'OPT. Elevation 'B' & 'C' ELEVATOR OPT. ELEVATOR For Opt. Elevator For Opt. Elevator evator Bedroom With Elevator For Opt. Elevator For Opt. Elevator The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 20-01


F

Possible Low Headroom

Dn

3 Piece Rough-In

F

O.T.A.

Garden Door

Railing

Garden Door

Garage 11'0" x 20'7" Up

Be 10'0

Rec. Room 8'8" x 24'8"

Rec. Room 19'0" x 17'0"

Lower Bath

Rec. Room 8'8" x 24'8"

Steps If Req'd

Dn

Cold Cellar

Steps If Req'd

Unexcavated

Up

Portico

Garage Powder (Sunken If Req'd) 11'0" x 20'7"

Steps If Req'd

Dn

Lower Floor Lower Elevation 'B'

(Sunken If Req'd)

Dn

Up

Steps If Req'd

Portico

HRV

Unexcavated

Half Wall

Cold Cellar

Railing

H

Foyer

F

3 Piece Rough-In

Up Lower Floor Elevation 'B'

Basement Plan Elevation 'B' & 'C'

OPT. 4 BEDROOM ELEV. B & C

Garden Door

Doo

G 11'0

Rec. Room 19'0" x 14'0"

Rec. Room 8'8" x 15'0"

Partial Lower Floor Elevat 'B' & 'C' For Opt. 4 Bedro

Lower Powder

W.I.C.

W.I.C.

Elevator

3 Piece Rough-In

Portico

Lower Powder

W.I.C.

Elevator

Dn LOWER FLOOR

ELEVATION C - 2683 SQ.FT. H

. Built-ins

Location Of Furnace And Hot Water Heater May Vary

Dn

O.T.A.

O.T.A.

Garage 11'0" x 20'7"

Foyer

Door

Up

Garage 11'0" x 20'7"

Door Where Grade Permits

Garage 11'0" x 20'7"

Partial Lower Floor Elevation 'B' & 'C' For Opt. 4 Bedroom With Elevator Garden Door

Portico

Rec. Room 19'0" x 14'0"

Elevator

Garage 11'0" x 20'7" Steps If Req'd

Door Where Grade Permits

Open To Above

Unfinished Basement

Lower Bath

Railing

TH-02

Partial Lower F Elevation 'B' & For Opt. 4 Bed

W.I.C.

Up

Steps If Req'd

Partial Lower Floor Elevation 'B' & 'C' For Opt.Garden Elevator Opt. Coffered Ceiling

Opt. Built-ins

Partial Basement Elevation 'B' & 'C' For Opt. Elevator

Opt. Gas Fireplace

Unexcavated

Lower ELEV. B Floor Elevation 'B'

O.T.A.

O.T.A.

Rec. Room

Elevator

Basement Plan Elevation 'B' & 'C'

Bedroom 4 10'0" x 11'6"

Partial Lower Floor 8'8" x 15'0" Elevation 'B' & 'C' For Opt. Elevator

Half Wall

TH-02

Garage 11'0" x 20'7"

Open To Above

F

Door Where Grade Permits

Railing

HRV

Rec. Room 19'0" x 14'0"

Half Wall

H

Partial Basement Elevation 'B' & 'C' For Opt. Elevator

Door

Unexcavated Opt. Gas Fireplace

Location Of Furnace And Hot Water Heater May Vary

Cold Cellar

Opt. Built-ins

Unfinished Basement

Dn Steps If Garden Req'd

Opt. Coffered Ceiling

Opt. Built-ins

ELEVATION B - 2683 SQ.FT.

Foyer

M E

Elevator Dn

Garden Door

Step Req'

Dn

Opt. Coffered Ceiling

Garden Door

Garage 11'0" x 20'7"

Mud

(Sunken

Dn

Opt. Gas Fireplace

Location Of Furnace And Hot Water Heater May Vary

Door Where Grade Permits

Garage 11'0" x 20'7"

Partial Lower Floor Elevation PARTIAL LOWER FLOOR 'B' & 'C' For Opt. 4 Bedroom

Opt. Built-ins

Open To Above

Door Where Grade Permits

Unfinished Basement

Lo Steps If Req'd O.T.A.

Door Where Grade Permits

Basement Plan Elevation 'B' & 'C'

Steps If Req'd

Dn Dn

O.T.A.

Possible Low Headroom

Lower Powder

(Sunken If Req'd)

Open To Above

F

(Sunken If Req'd)

Half Wall

3 Piece Rough-In

Mudroom

(Sunken If Req'd)

Dn

Opt. Built-ins

Possible Low Headroom

Partial Lower 'B' & 'C' For O

Bedroom 4 10'0" x 11'6"

Foyer

HRV

Up

Open To Above

Opt. Built-ins

Opt. Coffered Ceiling

Rec. Room 19'0" x 17'0"

Railing

3 STOREY PLAN

Opt. Gas Fireplace

Opt. Gas Fireplace

HRV

Opt. Coffered Ceiling

Unexcavated

Up

H

Garden Door

Garden Door

Opt. Built-ins

H

Unfinished Basement

Location Of Furnace And Hot Water Heater May Vary

Location Of Furnace And Hot Water Heater May Vary

Dn

Door Where Grade Permits

Opt. Built-ins

20-2 Unfinished Basement

Lower Powder

(Sunken If Req'd) Steps If Req'd

Opt. Built-ins

opus

(Sunken If Req'd)

Dn Steps If Req'd

Partial Lower Floor Elevation 'C'

PARTIAL LOWER FLOOR ELEV. C Rec. Room 8'8" x 15'0"

Be 10'0


Dn

Dn

Dn

Dn

Railing

Opt. Coffered Ceiling

Railing

Railing

Family FamilyRoom Room 19'0" 19'0"xx11'0" 11'0"

Glass Shower

Glass Shower

Up

Breakfast Bar Breakfast Bar

Coffered Ceiling Coffered Ceiling

Breakfast Breakfast Powder 10'6" 10'6"xx10'0" 10'0"

Storage

Bath Bath

Main Floor Elevation 'B'

Main Floor Broom Broom Elevation 'B'

DW DW

Raised Ceiling

Raised Ceiling

SS

Freestanding Tub

Freestanding Tub

Kitchen Kitchen 8'6" 8'6"xx13'0" 13'0"

Upper Floor Elevation 'B'

FF

Raised Ceiling

Master Raised Ceiling Ensuite

Master Ensuite

Powder

mm

q'd) eq'd)

Tray Ceiling

Tray Ceiling

Storage

Open To Below

Opt. Coffered Ceiling

Dining Room 11'0" x 16'0"

Opt. Coffered Ceiling

Dining Room 11'0" x 16'0"

Partial Lower Floor Partial Main Floor Partial Main Floor MAIN FLOOR Elevation 'B' & 'C' Elevation 'B' & 'C' Elevation 'B' & 'C' ELEV. B Elevator For Opt. Elevator Opt. 4 Bedroom With Elevator For Opt. mFor With Elevator Main MainFloor Floor

Opt. Uppers

Raised Raised Ceiling Ceiling

Elevator

Linen

Freestanding Freestanding Tub Tub

Master Bedroom 11'8" x 15'6"

Master Bedroom 11'8" x 15'6" Tray Ceiling

Tray Ceiling

Partial Upper Floor Partial Upper Floor FLOOR Elevation 'B' & 'C' Elevation 'B' & 'C' UPPER B Elevator For Opt. For Opt. Elevator ELEV. Upper UpperFloor Floor

Elevation Elevation'B' 'B'

Railing

Open To Above / Below

Railing

Open To Above / Below

Elevation Elevation'B' 'B'

D

Raised Raised Ceiling Ceiling

Railing

Linen

Opt. Servery

Opt. Servery

Railing

Garage 11'0" x 20'7"

Railing

Open To Below

Door Where Grade Permits

Dn

Dn

Railing

Open To Below

Powder Powder

Laundry

Elevator

Elevator

Elevator

Dn

Dn

D

W

Master Master Ensuite Ensuite

Storage Storage Steps If Req'd

W

Laundry Main Bath

Main Bath

Open To Below

Pantry

F

Breakfast 9'6" x 8'2"

Opt. Uppers

Kitchen 9'6" x 11'4"

Kitchen 9'6" x 11'4"

Tray TrayCeiling Ceiling

Coffered Ceiling

9'6" x 8'2"

Coffered Ceiling Breakfast Bar

S Breakfast

Elevator

Dn

Dining Room 10'8" x 18'6" (19'6") Opt. Coffered Ceiling

Master Bedroom 11'8" x 18'0"(19'0")

Dining Room 10'8" x 18'6" (19'6")

Glass Shower

Opt. Coffered Ceiling Glass Shower

Master Bedroom 11'8" x 18'0"(19'0")

Up

Up

Tray Ceiling

Master Ensuite Storage

Storage

Raised Ceiling

Powder

Powder

PARTIAL MAIN FLOOR ELEV. C

m 44 om 11'6" 11'6"

Freestanding Tub

Partial Main Floor Partial Main Floor

Master Ensuite

Raised Ceiling

Tray Ceiling

Raised Ceiling

Raised Ceiling

Freestanding Tub

Partial Upper

PARTIAL UPPER FLOOR ELEV. C

DW DW

t Bar t Bar

Partial Upper as necessitated by architectural controls and the construction process. The measurements The floor plans and elevations shown or improved Elevation 'C'and may be revised Elevation 'C' are pre-construction Floor Elevation adhere to the rules and regulations of the TARION Warranty Corporation’s official for the of floor 'C' area. Actual useable floor space may vary from the stated floor area, Floormethod Elevation 'C' calculation as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 20-02 g g

O.T.A.

DW

Pantry

Lower Bath

Elevator

Garage 11'0" x 20'7"

Dining DiningRoom Room 10'8" 10'8"xx18'6" 18'6"

Breakfast Bar

DW

F

r Where Grade Permits

Master Master Bedroom Bedroom 11'8" 11'8"xx18'0" 18'0"

Glass Glass Shower Shower

S

Steps If Req'd

Open To Below Open To Below

Open To Above / Below Open To Above / Below Railing Railing

Bedroom 4 10'0" x 11'6"

Up Up

Lower Bath W.I.C.

W.I.C. W.I.C.

Linen Linen

Garden Door

Bedroom 4 10'0" x 11'6" Rec. Room 8'8" x 15'0"

DD

Railing Railing

e Grade ere GradePermits Permits

nn m m

Main MainBath Bath

WW

Opt. Opt.Coffered CofferedCeiling Ceiling

Dn Dn

ge age 20'7" 20'7"

Laundry Laundry

Upper Floor Elevation 'B' Dn Dn

teps StepsIf If Req'd Req'd

Bedroom Bedroom33 9'8" 9'8"xx9'2" 9'2"

Master Master Bedroom Bedroom22 Bedroom Bedroom 9'0" 9'0"xx13'0" 13'0" 11'8" x 18'0" 11'8" x 18'0"

Dining Room 10'8" x 18'6"

Dining Room 10'8" x 18'6"

Up

Garden Garden Door Door

Open To Below

Open To Below

Open To Above / Below

m 44 om Partial Lower Floor Elevation Elevation 11'6" 11'6" & 'C' For Opt. 4 Bedroom 4 'B' Bedroom

W.I.C.

Linen

Linen

Door Where Grade Permits

Garage 11'0" x 20'7"

D

Balcony Balcony 11'0" 11'0"x x4'10" 4'10"

Opt. Uppers

D

W

Laundry

W.I.C.

Opt. Opt.Waffle WaffleCeiling Ceiling

Dn

Opt. Uppers

Exterior ExteriorRailing Railing Laundry Main Bath

Main Bath

F

F

Opt. Coffered Ceiling

Railing

Garage 11'0" x 20'7"

Garden Garden Door Door

Dn

Gas Fireplace Gas Fireplace

O.T.A.

Door Where Grade Permits

Steps If Req'd

Open To Above / Below

Steps If Req'd

W

S

Kitchen 8'6" x 13'0"

Juliet JulietBalcony Balcony

Broom

Broom

Steps If Req'd

S

DW

Opt. Uppers Opt. Uppers

(Sunken If Req'd)

Steps If Req'd

Breakfast 10'6" x 10'0"

Kitchen 8'6" x 13'0"

Mudroom

Mudroom

(Sunken If Req'd)

Breakfast Bar

Breakfast 10'6" x 10'0"

Lower Bath

Lower Bath

DW

Coffered Ceiling Breakfast Bar

Coffered Ceiling

Rec. Room 8'8" x 24'8"


opus Opt. Built-ins

20-2 3 STOREY PLAN

Opt. Gas Fireplace

Unfinished Basement Location Of Furnace And Hot Water Heater May Vary

HRV 3 Piece Rough-In

Opt. Built-ins

H

F

Possible Low Headroom

Railing

Open To Above

Dn

Unexcavated

Up

U

ELEVATION B - 2683 SQ.FT.

Foyer

Cold Cellar

Portico

BASEMENT Basement ELEV. B&C

Lower Floo Elevation '

ELEVATION C - 2683 SQ.FT. Unfinished

ireplace

Opt. Built-ins

Plan Elevation 'B' & 'C'


Up

Garden Garden Door Door

Up

Unexcavated Unexcavated Unexcavated

Up

Gas Fireplace

Up Gas Fireplace

Door

Up

Door

Up

Up

Bedroom 3 Bedroom 3 9'8" x9'8" 9'2"x 9'2"

PARTIALS FOR ELEVATOR OPTION Family Family RoomRoom x 11'0" 19'0"19'0" x 11'0"

Bedroom 2 Bedroom 2 x 13'0" 9'0" x9'0" 13'0"

Foyer

Foyer

Storage

Foyer

Storage Storage

Powder Powder P

Opt. Coffered Opt. Ceiling Coffered Opt. Ceiling Coffered Ceiling Garden Garden Door Door

Opt. Uppers

Bedroom Bedroom 4 Bedroom 4 4 10'0" x 10'0" 11'6" x10'0" 11'6"x 11'6"

Rec. Room Rec. Room Rec. Room 8'8" x 15'0" 8'8" x 8'8" 15'0"x 15'0"

Tray Ceiling Tray Ceiling

DW

Raised Raised Ceiling Ceiling

S

Raised Raised Ceiling Ceiling

Elevator ElevatorElevator

Pantry

F

Pantry

Foyer

Dn

Dn

Dn

Door WhereDoor Grade Where Permits Grade Permits Door Where Grade Permits O.T.A.

O.T.A.

Steps If Steps If Req'd Req'd

Garage GarageGarage 11'0" x 20'7" 11'0" x 11'0" 20'7" x 20'7"

Open To Above / Below

Railing

Railing

Open To Above

Open To Above

F

Foyer

D

Foyer

D

Elevator Elevator

Up

Storage

Storage Storage

Powder Powder P

Dn Railing Railing Linen

Linen

Half Wall

Portico Portico Portico Dining Dining RoomRoom x 16'0" 11'0"11'0" x 16'0"

Half Wall

Half Wall

Railing

Opt. Coffered Opt. Coffered Ceiling Ceiling

Master Bedroom Master Bedroom x 15'6" 11'8"11'8" x 15'6" Tray Ceiling Tray Ceiling

Partial Partial Main Main Floor Partial M Elevation Elevation 'C' 'C' Elevation

Partial Main Floor Partial Upper Floor Partial Main Floor Upper Floor PARTIAL MAIN FLOOR FOR PARTIAL UPPER FLOOR FOR Partial Partial Lower Lower Floor FloorFloor Partial Partial Lower Elevation 'B''C' & 'C' Elevation 'B''C' & 'C' Elevation 'B' & Elevation 'B' & OPT. ELEVATOR OPT. ELEVATOR Elevation Elevation 'C' 'C' 'C' Elevation Elevator For For Opt.Opt. Elevator

Railing

Railing Open To Above / Below

Open To Above / Below

Elevator For For Opt.Opt. Elevator

Dining Dining RoomRoom x 18'6" (19'6") 10'8"10'8" x 18'6" (19'6") Opt. Coffered Opt. Coffered Ceiling Ceiling

Up

Up

Opt. Uppers

W Laundry Laundry

Main Bath Main Bath

W

Opt. Uppers

Coffered Ceiling

Coffered Ceiling

Up

Up

Opt. Servery Opt. Servery

Railing Open To Below

Garage Garage x 20'7" 11'0" 11'0" x 20'7"

F

Partial Main Main Floo Partial Partial Lower Lower Floor Floor Partial Partial Lower Floor PARTIAL OPT. LOWER FLOOR FORPartial Elevation Elevation 'B' & 'B 'C Elevation Elevation 'B' & 'B' 'C' &'B' 'C'& 'C' Elevatio Elevation OPT. ELEVATOR For Opt. For Opt. Elevato Ele For Opt. For Opt. 4For Bedroom 4 Bedroom With With Elevator Elevator For Op Opt. 4 Bedroom With Elevator

Elevator Elevator

Dn Open To Below

DoorGrade WherePermits Grade Permits Door Where

Partial Lower Floor Partial Lower Floor Elevation 'B''C' & 'C' Elevation 'B' & 4 Bedroom Elevator For For Opt.Opt. 4 Bedroom WithWith Elevator

Up Up Breakfast Breakfast 9'6" x9'6" 8'2"x 8'2"

Dn

Dn

Dn Steps If Req'd

GarageGarageGarage 11'0" x 11'0" 20'7" x11'0" 20'7"x 20'7"

Open To Below

F Elevator Elevator

Dn

Steps If Steps If Req'd Req'd

GarageGarageGarage 11'0" x 11'0" 20'7" x11'0" 20'7"x 20'7"

Kitchen Kitchen x 11'4" 9'6" x9'6" 11'4"

W.I.C. W.I.C.

Steps If Steps If Req'd Req'd

O.T.A.

O.T.A. Open To Above

Lower Lower Bath Bath

S

Breakfast Bar

S

DW

Breakfast Bar

Railing

Bedroom 4 Bedroom 4 x 11'6" 10'0"10'0" x 11'6"

Dn

Upper Floor Upper Floor Elevation Elevation 'B' 'B' Door WhereDoor Grade Where Permits Grade Permits Door Where Grade Permits Steps If Req'd

TH-02 TH-02 TH-02

Dn

Dn

O.T.A.

Dn

F Elevator ElevatorElevator

O.T.A.

Dn

KitchenKitchen Ki 9'6" x 11'4" 9'6" x 9'6" 11'4

W.I.C. W.I.C.

Freestanding Freestanding Tub Tub

Partial Partial Lower Lower Floor FloorFloor Partial Lower PARTIAL LOWER FLOOR FOR Elevation Elevation 'B' & 'B' 'C' &'B' 'C'& 'C' Elevation OPT. ELEVATOR For Opt. For Opt. Elevator Elevator For Opt. Elevator

DW

Lower Bath Lower Bath Lower Bath W.I.C.

W.I.C. W.I.C.

Railing

W.I.C.

S

Open To Below

Lower Lower Lower Powder Powder Powder

3 Piece 3 Piece Powder Powder 3 Piece Rough-InRough-In Rough-In

S

Pantry

MasterMaster EnsuiteEnsuite

Railing

StorageStorage

F

For Opt. For Opt. Elevator Elevator For Opt. Elevator

O.T.A.

Garden Door

Open To Above / Below

Opt. Gas Fireplace

Glass Glass Shower

Shower Rec. Room Rec. Room Rec. Room 19'0" x 19'0" 14'0" x19'0" 14'0"x 14'0"

Open To Below

F

Partial Partial Basement Basement Partial Basement PARTIAL BASEMENT FOR Elevation Elevation 'B' & 'B' 'C' &'B' 'C'& 'C' Elevation OPT. ELEVATOR

O.T.A.

Garden Door

HRV

Unexcavated Unexcavated Unexcavated

Dn

Garden Door

Master Master Bedroom Bedroom x 18'0" 11'8"11'8" x 18'0"

Railing

Garden Door

Opt. Built-ins

Opt. Built-ins

Opt. Gas Fireplace

Opt. Gas Fireplace

H

Main Floor Main Floor Elevation Elevation 'B' 'B'

Rec. Rec. RoomRoom x 15'0" 8'8" x8'8" 15'0"

Opt. Uppers

Half Wall

Half Wall

Open To Below

Opt. Built-ins

Opt. Built-ins

Opt. Built-ins

Railing

Up Opt. Built-ins

H

Up

Linen

Linen

Elevator ElevatorElevator

Garden Garden Door Door

Dn Railing Railing

Dn

Dining Dining RoomRoom x 18'6" 10'8"10'8" x 18'6"

Unfinished Unfinished Unfinished Basement Basement Basement

Location Location Of Furnace Of Furnace Location Of Furnace And Hot Water And Hot Heater Water And HotHeater Water Heater May VaryMay Vary May Vary

F

Railing Open To Above / Below

Partial Lower Floor Elevation Partial Lower Floor Elevation 'B''C' & 'C' 4 Bedroom 'B' & For For Opt.Opt. 4 Bedroom

Open To Above / Below

O.T.A.

O.T.A.

Dn

Garage Garage x 20'7" 11'0" 11'0" x 20'7"

HRV

Main Main Floor FloorFlo Main Elevation Elevation 'B' 'B' Elevation

Open To Below

Dn

Req'd Req'd

HRV

D

W.I.C. W.I.C.

F

F

Lower Lower Floor FloorFloor Lower Opt. Coffered Opt.Elevation Coffered Ceiling Elevation 'B' Ceiling 'B' 'B' Elevation

DoorGrade WherePermits Grade Permits Door Where

H

D

W

Railing

Broom Broom

Steps If Steps If Req'd Req'd

Basement Basement Plan PlanPlan Basement Elevation Elevation 'B' & 'B' 'C' &'B' 'C'& 'C' Elevation Steps If Steps If

Open To Below

(Sunken(Sunken If Req'd)If Req'd)

Dn

W Laundry Laundry

Main Bath Main Bath

Kitchen Kitchen x 13'0" 8'6" x8'6" 13'0"

Mudroom Mudroom

Dn

S S Portico Portico Portico Half Wall

Breakfast Breakfast x 10'0" 10'6"10'6" x 10'0"

Breakfast Bar

Cold Cold Cold Cellar Cellar Cellar

DW

DW

Breakfast Bar

Coffered Ceiling

Coffered Ceiling

Lower Lower Bath Bath

Dn

Up

Up

Rec. Rec. RoomRoom x 24'8" 8'8" x8'8" 24'8"

Dn

Ope

Ope

'B' & 'B' 'C' &For 'C'& Opt. For 4For Bedroom 4 Bedroom 'B' 'C' Opt. Opt. 4 Bedroom

GarageGarageGarage 11'0" x 11'0" 20'7" x11'0" 20'7"x 20'7" Garden Garden

Opt.Ceiling Waffle Ceiling Opt. Waffle

Garden Garden Door Door

Bedroom 4 Bedroom 4 x 11'6" 10'0"10'0" x 11'6"

Balcony Balcony 11'0" x11'0" 4'10"x 4'10"

Railing

Railing

Railing

Juliet Balcony Juliet Balcony

Glass Glass Shower Shower

Master Master Bedroom Bedroom x 18'0"(19'0") 11'8"11'8" x 18'0"(19'0")

Up Tray Ceiling Tray Ceiling

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, MasterMaster Refer to sales representative for details. E. & O. E. 20-02 as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Ensuite Ensuite

Raised Ceiling Raised Ceiling


Dn Low Headroom

Railing

Lower Powder

Up

Railing

Up

Up

Dn

Door Where Grade Permits

Opt. Built-ins

F

3 Piece Rough-In

3 STOREY PLAN

Cold Cellar

Up

3 Piece Rough-In

Bedr 10'0" Rec. Room 8'8" x 24'11"(21'5")

Rec. Room 19'0" x 17'5"

Rec. Room Dn 8'8" x 24'11"(21'5")

Up

Dn

Portico

Up

TH-03

Up

Dn

Opt. Built-ins

Location Of Furnace And Hot Water Heater May Vary

3 Piece Rough-In

HRV

F

Cold Cellar

Portico

Unexcavated

Elevator

Basement Plan Elevation 'B' & 'C'

Rec Room 19'0" x 11'8"

Partial Lower Floor Elevation 'B' & 'C' For Opt. 4 Bedroom

Up

Opt. Built-ins

Up

Lower Floor Elevation 'B' & 'C' For Opt. Elevator

Storage

Opt. Bench

Elevator Garage 11'0"(11'10") x 20'0"

Dn

Railing

Up

Dn

Opt. Bench

Garage 11'0"(11'10") x 20'0"

Unexcavated

Rec. Room 8'8" x 16'3"

Lower Powder

Up

Elevation 'B'

Up

Partial Lower Floor Elevation 'B' & 'C' For Opt. 4 Bedroom W

Opt. Bench

Railing

LOWER FLOOR Lower ELEV. B Floor

Low Headroom

Foyer

Location Of Furnace And Hot Water Heater May Vary

3 Piece Rough-In

Garden Door

Portico

Partial Lower Floor Elevation 'B' & 'C' For Opt. 4 Bedroom With Elevator Half Wall

Opt. Built-ins Opt. Built-ins

ELEVATION C - 2736 SQ.FT.

Partial Lower Floor Elevation 'B' & 'C' For Opt. ElevatorOpt. Coffered Ceiling

Opt. Gas Fireplace

Partial Basement Plan Elevation 'B' & 'C' For Opt. Elevator

Unfinished Basement

H

Rec Room Partial 19'0" x 11'8"

Elevator

Low Headroom

Opt. Bench

Door

Half Wall

Portico

Up

Garden Door

Opt. Built-ins

3 Piece Rough-In

HRV

Location Of Furnace And Hot Water Heater May Vary

Elevator

TH-03

Up

Dn

Garage 11'0"(11'10") xGarden 20'0"

Opt. Coffered Ceiling

Opt. Gas Fireplace

Partial Basement Plan 'B' & 'C' For Opt. Elevator

Unfinished Elevation Basement

Basement Plan Elevation 'B' & 'C'

Rai

Railing

Up

ELEVATION B - 2736 SQ.FT.

F

Elevator

Dn

Opt. Bench

Cold Cellar

M El

Lower Powder

Elevator

Headroom

Unexcavated Foyer

H

Opt. Bench

Rec. Room 8'8" x 16'3"

Lower Floor Elevation Low 'B'

Up

TH-03

Steps If Req'd

Storage

Low Headroom

Up

Garden Door

Garage 11'0"(11'10") x 20'0" Half Wall

H

Garden Door

Door Where Grade Permits

Opt. Built-ins

Foyer

Basement

ELEV. B & C

Opt. Coffered Ceiling

Opt. Gas Fireplace

Opt. Bench Unfinished

Steps If Req'd

Railing Partial Lower Floor LOWER FLOOR PARTIAL Elevation 'B' & 'C' OPT. 4 BEDROOM Up For Opt. 4 Bedroom

Garage Dn 11'0"(11'10") x 20'0"

Up

Unexcavated

Door Where Grade Permits

Dn

Lower Floor Elevation 'B'

Railing

Powder

Dn

Opt. Bench

Steps If Req'd

Opt. Bench

Low Bat

Railing

Door Where Grade Permits

Low Headroom

Lower Bath

Foyer

Railing

Lower Powder

Basement Plan Elevation 'B' &Lower 'C'

10'0" x 9'11"

Rec. Room 19'0" x 17'5"

Dn

Low Headroom

F

Garden Door

Garage 11'0"(11'10") x 20'0"

Opt. Gas Fireplace

HRV

Unfinished Basement

Partial Lower Floor Elevation 'B' & 'C' For Opt. 4 Bedroom Bedroom 4

Garden Door

Half Wall

HRV

Opt. Gas Fireplace

H

H

Opt. Built-ins

Location Of Furnace And Hot Water Heater May Vary

Unfinished Basement

Coffered Ceiling

Unexcavated

Opt. Built-ins

20-3

Location Of Furnace And Hot Water Heater May Vary

Opt. Built-ins

opus

Opt. Coffered Ceiling

Opt. Garden Door

Garden Door

Opt. Bench

Steps If Req'd

Opt. Bench

Opt. Bench

Rec Room 19'0" x 11'8"

Partial Garage Lower 11'0"(11'10") x 20'0" 'C' Elevation

Floor

Garden Door

PARTIAL LOWER FLOOR ELEV. C Rec. Room 8'8" x 16'3"

Pa El Fo


Tray Ceiling

Powder

Dn

Powder

Dn

Railing

Railing

Juliet Balcony Juliet Up Balcony Up

Dn Pantry

d

Steps If Req'd

F

Bedroom 4 10'0" x 9'11"

F

Kitchen 15'0" x 10'7"

Storage

Storage

Gas Fireplace

Gas Fireplace

Breakfast Bar

Lower Bath

Dining Room 19'0" x 10'0"

Up

Exterior Railing Balcony Balcony 11'0" xBalcony 4'10" 11'0" x 4'10"

Opt. Uppers Linen

Linen

Main Bath

11'0" x 4'10"

Garden

Opt. Uppers

Door W D Garden W Garden Door Door

Main Bath

Laundry

S

D

Glass Shower

Opt. Waffle Ceiling Powder

Opt. Waffle Ceiling

Tray Ceiling

Raised Ceiling

Up

Tray CeilingTray Ceiling

Raised Ceiling

W.I.C.

Pantry

Steps If Req'd

Main Floor Powder Powder

Main Floor Railing Elevation 'B' Elevation 'B'

Lower Floor n 'B' & 'C' . 4 Bedroom

Dn

Dn

Upper Floor Upper Floor W.I.C. Kitchen S Elevation 'B' Elevation 'B'

F

Railing

Main Bath

W.I.C.

Ra ilin g

DW

Glass MasterMaster Shower Bedroom Bedroom 17'7" 11'10" x11'10" 17'7" xW.I.C.

Partial Upper Floor Elevation PARTIAL 'B' & 'C' UPPER FLOOR OPT. MASTER ENSUITE For Opt. Master Ensuite Tray CeilingTray Ceiling

Partial Upper Partial Upper FloorFloor Elevation Elevation 'B' &'B' 'C'& 'C' For Opt. Master Ensuite For Opt. Master Ensuite

D

Laundry

Breakfast Bar

Pantry Linen

Opt. Coffereded Ceiling Opt. Coffereded Ceiling Juliet Balcony

Opt. Waffle Ceiling

Opt. Waffle Ceiling

Garden Kitchen Kitchen Door 15'0" x15'0" 10'7"x 10'7"

Great Room 19'0" x 11'10"

Powder

Raised Ceiling

Dn

ing

Partial Upper Partial Floor Upper Floor Elevation 'B' & Elevation 'C' 'B' & 'C' Upper FloorFloor Master For Opt. Elevator ForUpper Opt. Elevator

Bedroom

11'10" x 16'3" Elevation Elevation 'B' 'B'

W.I.C. Kitchen S x 10'7" 15'0"

Opt. Coffereded Ceiling

S

Main Bath

Opt. Coffereded Ceiling

Storage

Elevator DW

Main Bath

Elevator

Dn Breakfast Bar

Pantry

Dn

g

Railing

Up

Bedroom 2 9'5" x 12'1" Bedroom 3 Bedroom 3 9'3"(7'8") x 15'0"(10'10") 9'3"(7'8") x 15'0"(10'10")

Dining Room Dining Room Juliet Balcony Juliet Balcony 19'0" x 10'0" 19'0" x 10'0" Waffle Ceiling Opt. WaffleOpt. Ceiling

Raised Ceiling

Main Bath

Bedroom 2 9'5" x 12'1"

Linen

Raised Ceiling

Opt. Waffle Ceiling

Partial Main Floor Elevation 'B' & 'C' For MAIN Opt. Elevator PARTIAL FLOOR Great Room Great Room ELEV. xC 11'10" 19'0" x19'0" 11'10"

Sitting Area Lower Floor 7'8" x 4'2" n 'B' & 'C' . 4 Bedroom With Elevator

W.I.C.

Laundry

ilin

Breakfast Bar

Powder

Laundry

Ra

DW

Opt. Waffle Ceiling Garden Garden Door Door

UPPER FLOOR ELEV. B

Tray Ceiling

F

Kitchen 15'0" x 10'7"

Up

Linen

Raised Ceiling Raised Ceiling Bath

19'0" x 11'10"

Elevation Elevation 'B' 'B'

Railing

Bedroom 2 Bedroom 2 9'5" x 12'1" 9'5" x 12'1"

Dn

Linen Main

Main Bath

MAIN FLOOR ELEV. B Great Room

Partial Main Floor Partial Main Floor Elevation 'B' & Elevation 'C' 'B' & 'C' Main MainFor Floor Opt.Floor Elevator For Opt. Elevator With Elevator

r

Elevator Dn

Opt. Waffle Ceiling Garden Door

. Room x 16'3"

Storage

Upper Floor Elevation 'B' W.I.C.

W.I.C.

Bedroom 3 Bedroom 3 9'3"(7'8") x 15'0"(10'10") 9'3"(7'8") x 15'0"(10'10")

Juliet Balcony

Sitting Sitting Area Area 7'8" x 4'2" 7'8" x 4'2"

F

Tray Ceiling

Railing

Waffle Ceiling Up Opt.Up Waffle Ceiling PantryOpt.

Pantry

Tray Ceiling

Elevator

Dn

Railing

g

Master Bedroom 11'10" x 16'3"

Ra il

Elevator

Master Bedroom 11'10" x 16'3"

Powder

Dining Dining Room Room 19'0" x19'0" 10'0"x 10'0" Elevator

D

Opt. Waffle Ceiling

Main Floor Elevation 'B'

W.I.C.

W D

Laundry Laundry

S

S

Breakfast Bar Breakfast Bar

W.I.C.

Bedroom 3 9'3"(7'8") x 15'0"(10'10")

GreatSitting RoomArea 19'0" x7'8" 11'10" x 4'2" DW

DW

Bedroom 2 9'5" x 12'1"

Main Bath

Main Bath

Dining Room 19'0" x 10'0"

Opt. Uppers Opt. Uppers

W

ing

Garden Door

Storage

Juliet Balcony

Linen

Ra il

F

F

Garden Door

Dn

Dn

Storage

Pantry

Storage

W

15'0" x 10'7"

Up

Up

Sitting Area 7'8" x 4'2"

F Partial Main Floor Partial Elevation Main Floor 'C' Elevation 'C'

Raised Ceiling

Raised Ceiling

Partial Upper Floor Elevation 'B' & 'C' For Opt. Elevator PARTIAL UPPER FLOOR

ELEV. C

Partial Floor Elevation Upper Floor 'C' Elevation 'C' Kitchen Upper Partial

Laundry

S The floor plans and elevations shown are pre-construction may be revised or improved as necessitated by architectural controls and the construction process. The measurements 15'0"and x 10'7" Main Bath Opt. Coffereded adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, Ceiling Storage are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 20-03 as they include OTB areas. All renderings MasterMaster DW

Bedroom Bedroom

Mas Ens

ELEV. B & C

W.I.C.

Opt. Uppers

Linen

Opt. Coffereded Ceiling

Garden Door

Ra ilin g

Door Where Grade Permits

Glass Shower

Dn

W.I.C.

Railing

Sitting Area 7'8" x 4'2"

Garden Door

W.I.C.

Glass Shower

Sitting Area 7'8" x 4'2"Dn

Balcony Balcony 11'0" x 4'10" 11'0" x 4'10"

Master Bedroom 11'10" x 17'7"

Master Master Ensuite Ensuite

Tray 9'5"Ceiling x 12'1"

Dn

Balcony 11'0" x 4'10"

Master Ensuite

Master Ensuite

MasterMaster Bedroom Bedroom Bedroom 2 17'7" 2 11'10" x11'10" 17'7" xBedroom

9'5" x 12'1" Bedroom 3 Bedroom 3 9'3"(7'8") x 15'0"(10'10") 9'3"(7'8") x 15'0"(10'10")

Exterior Railing Exterior Railing Exterior Railing

Garden Door

Freestanding Tub

Master Bedroom 11'10" x 17'7"

Breakfast Bar

Dining Room 19'0" x 10'0"

W.I.C.

Freestanding Freestanding Tub Tub

Laundry

Great Room 19'0" x 16'11"

DW

Great Room Great Room x 16'11" 19'0" x19'0" 16'11"

Dn Railing

Door

Kitchen S 15'0" x 10'7"

DW

. Room 4'11"(21'5")

Opt. Waffle Ceiling

Waffle Ceiling Opt. WaffleOpt. Ceiling Garden Opt. Coffereded Ceiling

Opt. Coffereded Ceiling

Garden Door

Garden Door

W.I.C.

Partial Upper Partial Floor Upper Floor Elevation 'B' & Elevation 'C' 'B' & 'C' For Opt. Master ForEnsuite Opt. Master Ensuite

Ra ilin g

Door Where Grade Permits

Juliet Balcony

Pantry

Gas Fireplace

Garden tsDoor

Dn

W.I.C.

Tray Ceiling

W.I.C.

Exterior Railing Exterior Railing

Dn

W.I.C.

W.I.C.

Ra ilin g

Dn

Tray Ceiling

Tray Ceiling

Ra ilin g

Lower Bath

S


3 STOREY PLAN

Location Of Furnace And Hot Water Heater May Vary H

Opt. Gas Fireplace

20-3

Opt. Built-ins

opus Unfinished Basement

Opt. Built-ins

HRV

F 3 Piece Rough-In

Low Headroom

Lower Powder

Up

Opt. Bench

Unexcavated

ELEVATION B - 2736 SQ.FT.

Fo

Cold Cellar

TH-03 ELEVATION C - 2736 SQ.FT.

Lower F Elevation

Opt. Built-ins

Plan Elevation 'B' & 'C'

s Fireplace

BASEMENT Basement ELEV. B&C

Por


Opt. Waffle Ceiling Garden Door

Garden Door Juliet Balcony

Bedroom 4 10'0" x 9'11"

Lower Bath

Storage

F

F

Half Wall

Opt. Built-ins

3 Piece Rough-In

Up

Elevator

Up

Up

Up

W.I.C.

Linen Garden Door

Opt. Uppers Garden DoorD

Garden Door

Laundry

S

Opt. Uppers

Linen

Bath

Great R 19'0" x

D

W

Rec. Room Rec. Room Rec. Room Laundry 8'8" x 16'3" 8'8" x 16'3" 8'8" x 16'3"

S

Storage Lower Powder

Elevator

Elevator

Low Room Low Low Dining Headroom Headroom Headroom Opt. Waffle Ceiling

19'0" x 10'0"

Dn

Railing

Sitting Area

Low Low Low 7'8" x Headroom 4'2" Up Headroom Headroom

Up

Up

Dn Railing

Bedroom 2 9'5" x 12'1"

Lower Lower Powder 3 Powder Bedroom

Sitting Area 7'8" x 4'2" Unexcavated Unexcavated Unexcavated

Partial Basement Plan Floor Partial Partial Basement Basement Plan Plan PARTIAL BASEMENT FOR Main 'B' & 'C'Elevation 'B' Elevation 'B' Elevation & 'C' 'B' & 'C' OPT. Elevation ELEVATOR ForElevator Opt. Elevator For Opt. ForElevator Opt.

Opt. Bench

Opt. Bench

Opt. Bench

Bedroom 2 Elevator 9'5" x 12'1"

Elevator

Dn

Railing

Raised Ceiling

Up

Dn

Dn

Elevator

Up

Raised Ceiling

Garage Garage Garage 11'0"(11'10") 20'0" 11'0"(11'10") 11'0"(11'10") x 20'0" xUpper 20'0" x Floor

Opt. Bench

Opt. Bench

Lower PartialPartial LowerPartial Lower Floor Floor Floor PARTIAL LOWER FLOOR UpperFOR Floor 'B' & 'C'Elevation 'B' Elevation Elevation 'B' Elevation & 'C' 'B' & 'C' OPT. ELEVATOR ForElevator Opt. Elevator For Opt. ForElevator Opt.

Up

Pantry

Pantry

UpPan

Railing

F

Rec. Room 8'8" x 16'3"

Storage

Storage

Dining R 19'0" x

Master Bedroom 11'10" x 16'3" Foyer

Foyer

Foyer

W.I.C.

Tray Ceiling

Master Bedroom 11'10" x 16'3"

Powder

Sittin Sitting Area Sitting Area 7'8" x 4'2" 7'8" x 4'2"7'8" W.I.C.

Elevator

Dn Powder

Opt. Waffle

W.I.C.

Tray Ceiling

W.I.C. Elevator

Op Storage

Garage Garage Garage 11'0"(11'10") 11'0"(11'10") 11'0"(11'10") x 20'0" x 20'0" x 20'0"

Great Room 19'0" x 11'10"

Rec. Room 8'8" x 16'3"

F

15

Opt. Waffle Ceiling

Dn

Partial PartialPartial Main Floor Main EF

g

Elevator

Dn

ilin

Portico

Ra

Portico

Dn

Half Wall

Up

Pantry

Half Wall

Elevator

Portico

Half Wall

Railing

Railing

Partial Main FLOOR Floor PARTIAL MAIN FOR 'B' & 'C' OPT. Elevation ELEVATOR For Opt. Elevator Partial Main Floor Elevation 'B' & 'C' For Opt. ElevatorF

S

KitchenDW 15'0" x 10'7" Opt. Coffereded Ceiling

S Breakfast Bar

ilin Linen

Main Bath

Partial Upper UPPER Floor FLOOR FOR PARTIAL Elevation 'B' & 'C' OPT. ELEVATOR For Opt. Elevator Partial Upper Floor Elevation 'B' & 'C' For Opt. Elevator Laundry Main Bath

Opt. Coffereded Ceiling

Storage

F

Kitchen 15'0" x 10'7"

Linen

Ra

PartialPartial LowerPartial Lower Floor Lower Floor Floor 'C' Elevation Elevation 'C' Elevation 'C'

Opt. Bench

Storage

Main Bath

Up

Pantry

g

Railing

Railing

Partial Lower Floor Elevation 'B' & 'C' For Opt. 4 Bedroom With Elevator Partial Lower Floor Elevation 'B' & 'C' For Opt. 4 Bedroom With Elevator

Railing

Opt. Bench

Great Room 19'0" x 11'10"

Garden Door

Garden Door

Up

Elevat

Partial Partial Floor Main Floor Main FM PartialPartial LowerPARTIAL Lower Floor Lower Floor OPT. LOWER FLOOR Partial FOR Partial Elevation 'B' & 'C' Elevation Elevation 'B' Elevatio & 'C' 'B' & Elevation Elevation 'B'OPT. & 'C' 'B'ELEVATOR & 'C' ForEleva Opt For4 Opt. 4 Bedroom With Elevator For Opt. ForElevator Opt. For Opt. For4Opt. Bedroom Bedroom With Elevator With Elevator

Garden Door Juliet Balcony

Garden Door

Opt. Bench

Elevator

Opt. Bench

Opt. Waffle Ceiling

Up

Elevator

Elevation 'B'

Juliet Balcony Opt. Opt. Bench Bench

Elevator

W.I.C.

9'3"(7'8") x 15'0"(10'10")

Bedroom 3 9'3"(7'8") x 15'0"(10'10") Railing

Up Dn

W.I.C

W.I.C.

Opt. Waffle Ceiling

Up

Main Floor Elevation 'B'

Elevator

Garden Door

W

DW

Elevator Elevator Elevator

Up

Partial Upper Floor Tray Ceiling W.I.C. Elevation 'B' & 'C' For Opt. Master Ensuite Partial Upper Floor Juliet Bal Elevation 'B' & 'C' For Opt. Master Ensuite

Breakfast Bar

StorageBreakfast Storage Bar

Up

Main Bath

Rec Room Rec RoomRec Room 19'0" x 11'8" 19'0" x 11'8" 19'0" x 11'8" Main

Dining Room 19'0" x 10'0"

Up

Dn

Garden Door

W.I.

Glass Shower

Ra ilin g

W.I.C.

Ra ilin g

Opt. Built-ins

KitchenDW 15'0" x 10'7"

HRV

HRV

HRV

Location Furnace Furnace Of Furnace H Of Location H OfLocation Piece 3 Piece AndHeater Hot Water3 Heater And Hot Water And Heater Hot Water Storage Rough-In Rough-In May Vary May Vary May Vary F

Kitchen

Opt. Coffereded Ceiling 15'0" x 10'7"

Opt. Built-ins

Unfinished UnfinishedUnfinished Basement BasementBasement

Steps If Req'd

Opt. Gas Fireplace

F

Pantry Door Where Grade Permits

Opt. Gas Fireplace

Steps If Req'd

Dn

W.I.C.

Glass Main F Main Floor Main Floor Showe Elevation Elevation 'B' Elevatio 'B'

Tray Ceiling

Opt. Coffered Ceiling Opt. Coffered Opt. Ceiling Coffered Ceiling

Garden Garden Opt. Coffereded DoorCeiling Door

Master Bedroom 11'10" x 17'7"

Glass Shower

Master Ensuite

W.I.C.

Tray Ceiling

Dn

Opt. Gas Fireplace

Up

Opt. Built-ins

Door Where Grade Permits

Dn

Railing

Opt. Built-ins

Up

Powder

Master Bedroom 11'10" x 17'7"

Glass Shower

Railing

Pantry

Partial Lower Floor Elevation 'B' & 'C' H For Opt. 4 Bedroom Partial Lower Floor Elevation 'B' & 'C' F For Opt. 4 Bedroom

Master Ensuite

Master Bedroom 11'10" x 17'7"

LowerLower Floor Lower Floor Floor Elevation 'B' Elevation Elevation 'B'Dn 'B'

Powder

Railing

Opt. Bench

Portico

Tray Ceiling

Dn

Up

Portico

Half Wall

Great Room Portico 19'0" x 16'11"

TH-03 TH-03 TH-03 Dn

Half Wall

Gas Fireplace

Cold Cellar

Cold Cellar

11'10" x 17'7"

Railing

Opt. Bench

Ensuite

Great Room

Master

Sittin Ensuite Sitting Area Sitting Area 7'8" x 4'2" 7'8" x 4'2"7'8"

Garden Door

Freestanding Tub Master

Master 19'0" x 16'11" PARTIALS FOR ELEVATOR OPTION Bedroom

Lower Basement Plan Basement Basement Bath Plan Plan Dn Elevation 'B' & 'C' Elevation Elevation 'B' & 'C' 'B' & 'C'

Up

Opt. Waffle Garden Door

Opt. Built-ins

Rec. Room 8'8" x 24'11"(21'5")

Cold Cellar

19'0" x

Door

Freestanding Tub

Foyer

Foyer

Garden Door

Bedroom 4 10'0" x 9'11" Rec. Room 8'8" x 24'11"(21'5")

Exterior Railing

Balcony 11'0" x 4'10"Garden

Door

Foyer

Opt. Waffle Ceiling

Gas Fireplace

Garden Door

Exterior Railing

Balcony 11'0" x 4'10"Garden

Laundry

Main Bath

DW Breakfast Bar

Dining Room 19'0" x 10'0"

Bedroom 3

Bedroom 2 9'5" x 12'1"

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements 9'3"(7'8") x 15'0"(10'10") adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, 2 as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales Bedroom representative for details. E. & O. E. 20-03 Raised Ceiling Dining Room Opt. Waffle Ceiling 19'0" x 10'0"

Bedroom 3 9'3"(7'8") x 15'0"(10'10")

9'5" x 12'1"


Half

Sitting Area Second Floor 'B' 7'9" Elevation x 3'0"

Breakfast Bar

Railing

Breakfast 10'0" x 11'4" Master Bedroom 13'0" x 16'0"

DW

F Garden Door

Coffered Ceiling

Location Of Furnace And Hot Water Heater May Vary HRV

D

Breakfast 10'0" x 11'4"

Laundry

Unfinished Raised Ceiling Basement

3 Piece Rough-In

H

Great Room 19'0" x 11'0"

Pantry Tray Ceiling

Opt. Waffle Ceilin S

DW F

Opt. Waffle Ceiling

Master Bedroom 13'0" x 16'0"

Great Room 19'0" x 11'0

F

Great Room 19'0" x 11'0"

Bedroom 3 9'4" x 12'0"

Door Where Grade Permits

3 Piece Rough-In

Steps If Req'd

Powder

artial round Floor Elevation 'C'

Kitchen 9'0" x 11'4"

Door Where Grade Permits

Partial Second Floor Elevation 'C'

Steps If Req'd

Powder

BLKS 263, 264, 277 Linen

Dn

Dn

O.T.A

Dn

O.T.B

Railing

Railing

Opt. Uppers

Up

Up

Half Wall

Up

Cold Cellar

Up

Foyer

Basement Plan Elevation 'B'

Portico

Ground Floor Elevation 'B'

TH-04

Opt. Uppers

(REV’D)

Half Wall

Railing

Foyer

ELEVATION B - 1861 SQ.FT.

Linen

Garage 11'6" x 22'3"

Dn

Garage 11'6" x 22'3"

O.T.A

Low Headroom

Unexcavated

Low Headroom

Unexcavated

Door Whe Grade Perm

Steps If Re PARTIAL FAMILY ROOM Bedroom 3 PARTIAL FAMILY ROOM FIREPLACE LOCATION FOR 9'4" x 12'0" Powder BLKSFIREPLACE 263, 264, 277 LOCATION

O.T.B

W

Sitting Area 7'9" x 3'0"

Railing

F

Breakfast Bar

Opt. Waffle Ceiling

Gas Fireplace

Portico

S

Sitting Area 7'9" x 3'0"

Opt. Uppers

Foyer

Gar Do

Opt. Coffered Ceiling Tray Ceiling

Raised Ceiling

Gas Fireplace

HRV

Railing

Up

Pantry

Kitchen 9'0" x 11'4"

Bedroom 2 Breakfast 10'0" x 11'4" 10'8" x 12'0" (11'2")

Location Of Furnace H And Hot Water Heater UNIT 2 STOREY PLAN May Vary

Sitting Area Sitting7'9" Area x 3'0" 7'9" x 3'0"

Gas Fireplace

O.T.B

O.T.A

20-4 Garage Unfinished 11'6" x 22'3" Basement

END

Garden Door

Coffered Ceiling

opus

Half Wall

W

W

Laundry

Raised Ceiling

D

Laundry

Raised Ceiling

D

Second Floor Eleva

O.T.B

Garage 11'6" x 22'3"

Railing

Unexcavated

Railing

Portico

Half Wall

Half Wall

Cold Cellar

O.T.A

Low Headroom

Unexcavated

ELEVATION C - 1861 SQ.FT.

Partial Basement Plan Elevation 'C'

Portico

Garage 11'6" x 22'3"

Opt. Uppers

Partial PARTIAL MAIN FLOOR Ground ELEV. CFloor Elevation 'C'

W

Laundry

Raised Ceiling

D

O.T.B

Cold Cellar

Second Floor Elevat

Foyer

Railing

ELEV. B

Up

Half Wall

Low Headroom

Ground Floor Elevation 'B' MAIN FLOOR

Half Wall

TH-04

Up

O.T.A

Basement Plan Elevation 'B'

iling

Half Wall

Ground Floor Elevation 'B'

Breakfast Bar

Half

Portico

Partial Second Floor Elev


Sitting Area 7'9" x 3'0" Sitting Area 7'9" x 3'0" Tray Ceiling Tray Ceiling

Breakfast Bar

S

Master Bedroom 13'0" x 16'0"

DW F

Sitting Area 7'9" x 3'0"

Waffle Ceiling

Garden Door

Coffered Ceiling

eat Room 0" x 11'0"

Breakfast Bar

Breakfast 10'0" x 11'4"

Make-Up

Master Bedroom 13'0" x 16'0"

Kitchen 9'0" x 11'4"

Master Ensuite

Master Master Bedroom Bedroom 13'0" x 16'0"

Pantry

Freestanding Tub

Glass Shower

W.I.C.

Glass Shower

Main Bath

Gas Fireplace

Great Room 19'0" x 11'0"

W.I.C. Linen

W.I.C.

Make-Up

Master Glass Ensuite

Master Bedroom 13'0" x 16'0"

Door Where Grade Permits

W.I.C.

Steps If Req'd

Low Headroom

Main Bath

Bedroom 2 10'8" x 11'0"

O.T.B

W.I.C.

Low Headroom

Unexcavated Unexcavated

Railing

Powder

3 Piece Rough-In

Glass Shower

Partial Upper Floor Elevation 'B' & 'C' For Opt. Master Ensuite

Bedroom 3 9'4" x 12'0"

F

Shower 3 Piece Rough-In

Partial Upper Floor Elevation 'B' & 'C' For Opt. Master Ensuite

Main Bath

Dn

H

Location Of Furnace H And Hot Water Heater F May Vary

Glass Shower

Partial Upper FloorFLOOR PARTIAL UPPER Elevation 'B' & 'C' OPT. MASTER ENSUITE ELEV. B& C For Opt. Master Ensuite

W.I.C.

Bedroom 3 9'4" x 12'0"

Location Of Furnace And Hot Water Heater May Vary

Tray Ceiling

Master Ensuite

Master Bedroom 13'0" x 16'0"

DW

Unfinished Basement

Glass Shower

Garage 11'6" x 22'3"

Unfinished Basement

Sitting Area 7'9" x 3'0"

Tray Ceiling

S

Bedroom 3 9'4" x 12'0"

Make-Up

Master Ensuite

13'0" x 16'0"

Sitting Area 7'9" x 3'0"

Opt. Waffle Ceiling

Steps If Req'd

Tray Ceiling

Master Master EnsuiteEnsuite

F Door Where Grade Permits

Tray Ceiling

Freestanding Tub

HRV

Pantry

Kitchen 9'0" x 11'4"

Sitting Area 7'9" x 3'0"

Freestanding Tub

HRV

Garden Door

Sitting Area 7'9" x 3'0"

Linen

Linen

Garage 11'6" x 22'3" Laundry

Raised Ceiling

D

Up

Bedroom 2 10'8" x 11'0"

Cold Cellar

Railing

Railing

Up

Bedroom 2 10'8" x 11'0"

O.T.B

Opt. Uppers

Dn

W

O.T.B

O.T.A

Dn

Railing

Dn

Opt. Uppers

Foyer

W

Cold Cellar

Laundry

Raised Ceiling

D Second Floor Elevation 'B'

Sitting Area 7'9" x 3'0"

Garden Door

Raised Ceiling

Bedroom 2 10'8" x 12'0" (11'2")

D

Ground Floor Elevation 'B'

Breakfast 10'0" x 11'4"

Kitchen 9'0" x 11'4"

Second Floor Elevation 'B'

D

Railing

Portico

O.T.B

Half Wall

ation 'C'

Half Wall

Foyer

Great Room 19'0" x 11'0"

Low Headroom

Laundry

Raised Ceiling

D

Partial Second Floor Elevation 'C' PARTIAL UPPER FLOOR Bedroom ELEV. C 2 10'8" x 12'0" (11'2")

Sitting Area 7'9" x 3'0" Door Where

Grade Permits

Opt. Coffered Ceiling Steps If Req'd

Pantry

S

Up Up

DW F

Garden Great Room Door 19'0" x 11'0"

PARTIAL FAMILY ROOM Powder FIREPLACE LOCATION FOR BLKS 263, 264, 277 Breakfast 10'0" x 11'4"

Unexcavated Unexcavated

Kitchen 9'0" x 11'4"

Opt. Waffle Ceiling

W

Gas Fireplace

Opt. Uppers

Second Floor Elevation 'B'

Breakfast 10'0" x 11'4" Gas Fireplace

O.T.B

Laundry

Raised Ceiling

Bedroom 2 10'8" x 12'0" (11'2")

Railing

Opt. Uppers

O.T.A

Opt. Waffle Ceiling

W

Raised Ceiling

Up

Low Headroom

F Garden Door

Opt. Coffered Ceiling

UPPER FLOOR Garage ELEV. B 11'6" x 22'3"

TH-04 TH-04

S

Sitting Area 7'9" xDW 3'0"

Raised Ceiling

Basement Plan Elevation 'B' BASEMENT ELEV. B Plan Elevation 'B' Basement

Pantry

Breakfast Bar

Laundry

O.T.B

W

Railing

Garage 11'6" x 22'3"

Half Wall

Portico

Opt. Uppers

Half Wall

Opt. Coffered Ceiling

Breakfast Bar

ation 'B'

Door Where Grade Permits

Breakfast Bar

Up

Cold Cellar Cold Cellar Pantry

Kitchen Partial 9'0" x 11'4" Basement Plan Elevation 'C' Partial PARTIAL BASEMENT Basement ELEV. C Plan Elevation 'C' S

Steps If Req'd

Railing

PARTIAL FAMILY ROOM Powder Partial Partial FIREPLACE LOCATION FOR The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements Ground Floor Elevation 'C' Second Floor Elevation 'C' BLKS 263, 264, 277 DW

Ceiling adhere to the rules and regulations of the TARIONRaised Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 20-04 F


Sitting Area 8'2" x 3'2"

opus

Opt. Coffered Ceiling

20-5

French Door

Unfinished Basement CORNER UNIT 2 STOREY PLAN

Great Room 11'10" x 14'0"

Breakfast Bar

Gas Fireplace

Kitchen 9'0" x 14'0" DW

S Coffered Ceiling

3 Piece Rough-In

Location Of Furnace And Hot Water Heater May Vary

Powder

Pantry

F

Breakfast 12'6" x 10'6"

H

Coffered Ceiling

HRV F

Portico

Foyer Opt. Bench Steps If Req'd

Up

Half Wall

Up

Garage 11'10"(11'0") x 19'1"

Unexcavated

ELEVATION B - 2145 SQ.FT. Low

Door Where Grade Permits

(REV’D)

Dn

Headroom

Opt. Door Location Where Grade Permits

French Door

Unfinished Basement

ment Plan Elevation 'B'

-05

Den 9'6"(12'6") x 12'0"(7'10")

MAIN FLOOR Ground ELEV. B Floor Elevation 'B'

ELEVATION B - 2145 SQ.FT. Sitting Area

S


Freestanding Freestanding Tub Tub

Tray CeilingTray Ceiling

Tray CeilingTray Ceiling

Make-Up

Master Master Bedroom Bedroom 14'0" x 14'0" 14'0" x 14'0"

W.I.C.

Master Master Bedroom Bedroom 14'0" x 14'0" 14'0" x 14'0"

Master Master Ensuite Ensuite

Glass Shower Glass Shower

Master Master Ensuite Ensuite

W.I.C.

Make-U

Glass Shower Glass Shower

W.I.C.

W.I.C.

PARTIAL UPPER FLOOR

W

DW

D

Laundry Laundry

W.I.C.

W.I.C.

Unfinished Basement

Railing

Railing

Linen

Raised Ceiling

Linen

Raised Ceiling

Main Bath

Main Bath

Opt. UppersOpt. Uppers

Partial Partial Optional Optional OPT. MASTER ENSUITE ELEV. B Second Second FloorFloor Elevation Elevation 'B' 'B'

3 Piece Rough-In

Location Of Furnace And Hot Water Heater May Vary H

W.I.C.

W.I.C.

Bedroom Bedroom 2 2 9'0" x 13'0" 9'0" x 13'0" Dn

HRV

Cold Cellar

F

Up

Dn

Portico

Half Wall

Unexcavated

Low Headroom

Bedroom Bedroom 3 3 9'6"(12'6") 9'6"(12'6") x 10'11"(7'10") x 10'11"(7'10")

F

Unfinished Basement

Raised Ceiling Raised Ceiling

UPPER FLOOR Second Second Floor Elevation Elevation 'B' ELEV.Floor B

'B'

Basement Plan Elevation 'B'

BASEMENT ELEV. B

TH-05

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 20-05

9'6

Gro


-05 Sitting Area 8'2" x 3'2"

opus

Opt. Coffered Ceiling

20-5

French Door

Great Room 11'10" x 13'10"

Breakfast Bar

Gas Fireplace

Kitchen 9'0" x 14'0"

CORNER UNIT 2 STOREY PLAN

DW

S Coffered Ceiling

3 Piece Rough-In

Location Of Furnace And Hot Water Heater May Vary H

Unfinished Basement

Powder

Pantry

F

Breakfast 12'6" x 10'6"

Half Wall

Coffered Ceiling

HRV F

Foyer Opt. Bench

Covered Porch

Up

Steps If Req'd

Up

Garage 11'10"(11'0") x 19'1"

Unexcavated

ELEVATION C - 2145 SQ.FT.

Door Where Grade Permits

(REV’D)

Dn

Basement Plan Elevation 'C'

Opt. Door Location Where Grade Permits

French Door

Den 8'10"(12'6") x 12'0"(7'10")

MAIN FLOOR ELEV. C

Ground Floor Elevation 'C' ELEVATION C - 2145 SQ.FT.

S


3 Piece Rough-In

Location Of Furnace And Hot Water Heater May Vary H HRV

Freestanding Freestanding Tub Tub

Tray CeilingTray Ceiling

Cold Cellar

F

Portico

Tray CeilingTray Ceiling Up

Master Master Bedroom Bedroom 14'0" x 14'0" 14'0" x 14'0"

Half Wall

Master Master Bedroom Bedroom 14'0" x 14'0" 14'0" x 14'0"

Master Master Ensuite Ensuite

Make-Up Master Master Ensuite Ensuite

Make-U

Unexcavated

Low Headroom

F

Glass Shower Glass Shower

W.I.C.

W

Main Bath

DW

D

W.I.C.

Main Bath

PARTIALPartial UPPER FLOOR Partial Optional Optional OPT. MASTERBasement ENSUITE Plan Elevation 'B' ELEV. C Second Second Floor Elevation 'C' 'C' Floor TH-05 Elevation

Linen

W.I.C.

Railing

Railing

W.I.C.

3 Piece Rough-In

Location Of Furnace And Hot Water Heater May Vary H

W.I.C.

Gro

Laundry Laundry

Linen

Raised Ceiling

W.I.C.

9'6

Glass Shower Glass Shower

W.I.C.

Opt. UppersOpt. Uppers

Raised Ceiling

Unfinished Basement

W.I.C.

Bedroom 2 Bedroom 2 9'0" x 14'0"(13'0") 9'0" x 14'0"(13'0") Dn

Unfinished Basement

Half Wall

HRV F

Cold Cellar

Covered Porch

Up

Dn

Raised Ceiling Raised Ceiling Unexcavated

Bedroom 3 Bedroom 3 9'6"(12'6") x 10'6"(7'10") 9'6"(12'6") x 10'6"(7'10")

Partial Basement Plan Elevation 'C' PARTIAL BASEMENT

ELEV. C

F

8'1

UPPER FLOOR ELEV. C

Second FloorFloor Elevation 'C' 'C' Second Elevation The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 20-05

Gro


opus

20-6

Opt. Waffle Ceiling

Unfinished Basement

Gas Fireplace

May Vary

H

Garden Door

Breakfast 11'0" x 11'1"(14'1")

HRVPLAN CORNER UNIT 2 STOREY Location Of Furnace 282 AndBLOCK Hot Water Heater F

Great Room 13'0"(16'0") x 18'0"

Breakfast Bar

DW S

Kitchen 11'6" x 8'8" F

3 Piece Rough-In

Possible Low Headroom

Portico

Steps If Req'd

Foyer

Dn

Up

Powder (Sunken If Req'd)

(Sunken If Req'd)

Door Where Grade Permits Steps If Req'd Railing

Half Wall

Open To Above

Unexcavated

om

Garage 11'0" x 19'1"

Dn

ELEVATION B - 2047 SQ.FT.

French Door

Den 6'8"(8'2") x 10'0"

Opt. Coffered Ceiling

MAIN FLOOR ELEV. B

evation 'B'

2

Coffered Ceiling

ELEVATION B - 2047 SQ.FT.

Ground Floor Plan Elevation 'B'


Freestanding Tub

Tray Ceiling

Master Ensuite

Location Of Furnace And Hot Water Heater May Vary

Master Bedroom 13'8" x 15'11"

Unfinished Basement

Glass Shower

H

F

3 Piece Rough-In

W.I.C.

Linen

HRV

Cold Cellar

Possible Low Headroom

Up

Bedroom 3 11'0" x 9'8" Main Bath

Open To Below

Unexcavated

Railing

Low Headroom

Dn

Bedroom 2 11'0" x 12'0"

Raised Ceiling

Basement Plan Elevation 'B' W D

Opt. Uppers

Laundry

BASEMENT ELEV. B

TH-06 Block 282

UPPER FLOOR ELEV. B

Second Floor Elevation 'B'

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 20-06


Gas Fireplace

opus Unfinished Basement

Breakfast 7'10" x 10'0"

20-7 Location Of Furnace And Hot Water Heater May Vary

Great Room 10'0" x 17'6"

H

Opt. Waffle Ceiling

Breakfast Bar

HRV

CORNER UNIT 2 STOREY F PLAN BLOCK 276

DW

Kitchen 8'8" x 10'4" 3 Piece Rough-In

Possible Low Headroom

07ELEVATION C - 1948 SQ.FT. ck 276

Railing Open To Above

Mud Rm.

(Sunken If Req'd)

Door Where Grade Permits

Garage 10'10" x 19'1"

Den 11'0"(9'0") x 16'6"(7'10")

Opt. Coffered Ceiling

MAIN FLOOR

Powder (Sunken If Req'd)

French Door

ELEVATION C - 1948 SQ.FT.

nt Plan Elevation 'C'

Dn

Dn

Unexcavated

nfinished asement

Opt. Bench Steps As Req'd

Up

Portico

ow droom

S

F

Foyer

Up

Coffered Ceiling

Garden Door

ELEV. C Ground Floor Elevation 'C'


Coffered Ceiling

Tray Ceiling Tray Ceiling

st '0"

Freestanding Freestanding Tub Tub

Tray Ceiling

Tray Ceiling

Make-Up

Master Ensuite

Master Ensuite

Master Ensuite

Master Master BedroomBedroom 11'6" x 17'8" 11'6" x 17'8"

r

S

Master Master BedroomBedroom 11'6" x 17'8" 11'6" x 17'8"

Glass ShowerGlass Shower Linen

Raised Ceiling

W.I.C. Raised Ceiling

Laundry

W.I.C.

Make-Up

Master Ensuite

W

owder

Glass ShowerGlass Shower

Linen

Laundry DW

D

UPPER FLOOR PartialPARTIAL Partial OPT. MASTER ENSUITE ELEV. C Second Second Floor Elevation Floor Elevation 'C' 'C' For Opt. ForMaster Opt. Master Ensuite Ensuite

Opt. Uppers Opt. Uppers

Dn

Main Bath

Unfinished Basement

Main Bath

H

Location Of Furnace And Hot Water Heater May Vary HRV

Railing

Open To Below

Railing

Open To Below

Ledge

Ledge

ken q'd)

F

3 Piece Rough-In

Dn

BedroomBedroom 2 2 9'8" x 12'4"(11'6") 9'8" x 12'4"(11'6")

Raised Ceiling

Raised Ceiling

Possible Low Headroom

Up

Cold Cellar

Po

Low Headroom

BedroomBedroom 3 3 11'0"(9'0") 11'0"(9'0") x 14'2"(7'10") x 14'2"(7'10")

Unexcavated

Unfinished Basement

UPPER FLOOR ELEV. C

Second Second Floor Elevation Floor Elevation 'C' 'C'

Basement Plan Elevation 'C'

BASEMENT ELEV. C

TH-07 Block 276

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 20-07


opus 28-1 2 STOREY PLAN

LEFT ELEVATION B

RIGHT


2051/2058 SQ.FT. ELEVATION C 2054 SQ.FT.

ELEVATION B

LEFT ELEVATION C

RIGHT


W/ Opt. E W/ Opt. E Opt. Waffle Ceiling Opt. Waffle Ceiling

Gas Gas Fireplace Fireplace

opus

Great Room GreatxRoom 22'3" 12'0" 22'3" x 12'0"

Unfinished Unfinished Basement Basement

28-1L

Location Of Furnace And Hot Water Heater Location Of Furnace May VaryHeater And Hot Water May Vary

Kitchen Kitchen 8'7" x 12'0" 8'7" x 12'0"

F F

Unexcavated Unexcavated

DW DW

S S

Be Be 9' 9'

F F

Opt. Uppe Opt. Uppe

Steps Steps As As Req'd Req'd

D D

Door Door Where Where Grade Grade Permits Permits

HRV HRV

Dinette Dinette 13'8" x 12'0" 13'8" x 12'0"

H H

Powder Powder

Low Headroom Low Headroom

Breakfast Breakfast BarBar

Coffered Ceiling Coffered Ceiling

LEFT SIDE 2 STOREY PLAN

3 Piece Rough-In 3 Piece Rough-In

Glass Shower Glass Shower

Garden Door Garden Door

Laund Laund

Garage Garage 11'0" x 19'7" 11'0" x 19'7"

Dn Dn

Foyer Foyer

Open To Above Open To Above

Up Up

Up Up

Covered Porch Covered Porch

Cold Cellar Cold Cellar

L

Second F Second F R

Basement Floor Elevation 'B-L' & 'C-L' Basement Floor Elevation 'B-L' & 'C-L'

28-01L 28-01L

ELEVATION B - 2051 SQ.FT.

Ground Floor MAIN FLOOR Ground Floor ELEV. B-L Foyer Foyer

Open To Above Open To Above

Elevation 'B-L' Elevation 'B-L'

Garage Garage 11'0" x 19'7" 11'0" x 19'7"

Up Up

Portico Portico

L

ELEVATION C - 2054 SQ.FT.

R

Partial MAIN FLOOR PARTIAL Partial Ground ELEV. C-L Floor Elevation

'C-L' Ground Floor Elevation 'C-L'

Partial Partial Second Second


W/ Opt. Ensuite Layout W/ Layout W/Opt. Opt. Ensuite Ensuite Layout Make-Up

Glass

Shower Glass Glass Partial ShowerSecond Floor Shower Freestanding Freestanding Tub Freestanding W/ Opt. Ensuite TubLayout Tub

Master Master Master Bedroom Bedroom Tray Ceiling 12'0" x 17'0" Bedroom

Freestanding Tub

Master Bedroom 12'0" x 16'0"

Bedroom 4 9'11" x 12'0" Bedroom 4

Opt. Waffle Ceiling

W.I.C. Bath W.I.C.

Bedroom 3 Bedroom 3 9'11" x 9'0" 9'11" x 9'0"

W.I.C.

Dn

Dinette 13'8" x 12'0"

Bedroom 2 11'0" x 12'8"

Open To Below

Dn

F

Barrel Vault Barrel Vault

Powder

Ledge

D

W Bedroom

Railing Railing

DW

S

Bedroom 2 Bedroom 2 11'0" x 10'2" 11'0" x 10'2"

Bedroom 3 9'8" x 9'0"

F

Unfinished Basement

ELEV. B-L

Bedroom 2 11'0" x 14'0"(12'4")

3 Piece Rough-In

W Laundry

Second FloorFor Plan For Second Floor Plan Opt. 4 Bedroom Garage Plan Dn Opt. 4Opt. Bedroom Plan 11'0" 4 Bedroom Plan x 19'7" Bedroom 2 Elevation 'B-L' Elevation 'B-L' Elevation 'B-L' Open To Below 11'0" x 11'6"(9'10")

Raised Ceiling

W.I. Location Of Furnace And Hot Water Heater May Vary

H

F

Foyer Open To Above

11'0" x 14'0"(12'4") Raised Ceiling

Raised Ceiling Raised Ceiling

Raised Ceiling

Cold Cellar

Partial UPPER FLOOR SecondPARTIAL Floor Elevation 'C-L' Partial

Partial ELEV. C-L Second Floor Elevation 'C-L' Second Floor Elevation 'C-L'

Basement Floor Elevation 'B-L' & 'C-L'

Dn Railing

Raised Ceiling

Bedroom 2 2 Bedroom 2 11'0" x Bedroom 14'0"(12'4") 11'0" x 14'0"(12'4")

Partial Raised Ceiling Second Floor Raised Elevation 'C-L' Ceiling

Opt. Uppers

D

Second Floor Plan For

Second UPPER Floor Elevation 'B-L' FLOOR Second Elevation 'B-L' Second Floor Floor Elevation 'B-L'

Up

2 11'0" x 10'2"

FLOOR OPT. Barrel Vault SecondUPPER Floor Plan For Barrel Vault 4 BEDROOM LAYOUT Opt. 4 Bedroom Plan ELEV. B-L Elevation 'B-L' Steps As Req'd

Ledge

Open To Below

W.I.C.

Barrel Vault

Second Floor Elevation 'B-L'

Open OpenToToBelow Below

D D

Open To Below Open To Below Barrel Vault

Barrel Vault Ledge

Raised Ceiling

W W

Kitchen Bedroom 2 Open To Below 8'7" x 12'0"11'0" x 10'2"

Ledge

Open To Below

1

Main Bath

Railing

Barrel Vault Open To Below

Unexcavated

D

HRV

HRV

Open To Below Open To Below

H

Railing

Dn Dn

Bedroom 2 Bedroom 2 11'0" x 12'8" 11'0" x 12'8"

Railing Railing

To Below LocationOpen OfDn Furnace And Hot Water Heater May Vary Railing

W

Door Where Grade Permits

Dn Dn

Bedroom 3 Dn 9'11" x 9'0" Coffered Ceiling

Bedroom 2 11'0" x 12'8"

Railing

Linen

Bedroom 3 9'11" x 9'0"

Master Ensuite

Main Main Bath Bath Linen Linen

Main

Unfinished

Opt. Uppers Opt.Laundry Uppers

DBasement W D W

Glass Shower Freestanding Tub

Gas Fireplace

Linen

W

W.I.C. W.I.C.

Linen

W.I.C.

ELEV. B-L & C-L

W.I.C. Main Bath

Great Room 22'3" x 12'0"

Breakfast Bar

Opt. Uppers

Main Main Bath Bath

Partial Floor PARTIALSecond UPPER FLOOR OPT. MASTER ENSUITE W/ Opt. Ensuite Layout

Garden Door

Bedroom 4 9'11" x 12'0"

Linen Linen

Linen

Main Bath

Bedroom 3 9'8" x 9'0"

28-01L

Make-Up

W.I.C.

Linen

Linen Linen

Bedroom 3 Bedroom 9'8" x 9'0"3 9'8" x 9'0"

e n

12'0" x 16'0" 12'0" x 16'0"

Bedroom 4 9'11" x 12'0" 9'11" x 12'0"

W.I.C.

Laundry

Freestanding Tub

Master Bedroom 12'0" x 17'0"

Bedroom 3 9'8" x 9'0"

D Laundry W

Master Ensuite

Master Master Master Bedroom Bedroom Tray x Ceiling 12'0" 16'0" Bedroom

Master Ensuite

W.I.C. W.I.C.

Opt. Uppers Laundry

Master Master Ensuite Ensuite

Master Ensuite

12'0" x 17'0" 12'0" x 17'0"

Master Ensuite W.I.C.

D

Glass Shower

Tray Ceiling Tray Ceiling

Tray Ceiling

Tub

Master Master Ensuite Master Ensuite Ensuite

Glass Shower Freestanding

Freestanding Tub Freestanding Tub

Tray Ceiling Tray Ceiling Tray Ceiling

Linen

Glass Shower

Glass Shower Glass Shower

Glass Shower

Raised Ceiling Open To BelowOpen To Below

Open To Below

Low Headroom

Unexcavated

Open To Below

Bedroom 2 Bedroom 2 2 11'0" x 11'6"(9'10") 11'0"Bedroom x 11'6"(9'10")

Up

11'0" x 11'6"(9'10")

Raised Ceiling

Partial Second Floor Plan Raised Ceiling For Opt. 4 Bedroom Plan Raised Ceiling Raised Ceiling Elevation 'C-L'

Raised Ceiling Raised Ceiling

Up

Barrel Vault Cold Cellar

Ledge

Covered Porch

FLOOR PartialPARTIAL SecondUPPER Floor Plan OPT. 4 BEDROOM LAYOUT For Opt. 4 Bedroom Plan Partial Second Floor Plan ELEV. C-L Partial Second Floor Plan Elevation 'C-L' 4 Bedroom Plan For Opt.

For Opt. 4 Bedroom Plan Elevation 'C-L' Elevation 'C-L' Ground Floor Elevation 'B-L'

Basement Floor Elevation 'B-L' & 'C-L'

BASEMENT Second Floor Elevation 'B-L' 28-01L ELEV. B-L & C-L

The floor plans and elevations shown are pre-construction and may be revised or improved Garage controls and the construction process. The measurements Open To Below Foyer as necessitated by architectural adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, 11'0" x 19'7" Open To Above as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 28-01L

11'0

R


Opt. Waffle Ceiling

Garden Door Garden Door

Fireplace Gas Gas Fireplace

opus

Opt. Waffle Ceiling

Unfinished Basement Unfinished Basement

Great Room 22'3" 12'0" GreatxRoom 22'3" x 12'0"

28-1R

Coffered Ceiling

F F

S S 3 Piece Rough-In 3 Piece Rough-In

HRVHRV

H

DW

Dinette 13'8" x 12'0" Dinette 13'8" x 12'0"

DW

Kitchen 8'7" x 12'0" Kitchen 8'7" x 12'0" F

LinenLinen

Location Of Furnace And Hot Water Heater Location Furnace MayOf Vary And Hot Water Heater May Vary

H

Breakfast Breakfast Bar Bar

RIGHT SIDE 2 STOREY PLAN

Coffered Ceiling

Low Headroom Low Headroom

Unexcavated Unexcavated

Powder Powder

Steps Steps As As Req'd Req'd

Where DoorDoor Where Grade Permits Grade Permits

F

Garage 11'0" x 19'7" Garage 11'0" x 19'7"

Dn Dn

B 11 B 11 Foyer OpenFoyer To Above Open To Above

Up Up

Up Up

Portico

Cold Cellar

L

Basement Floor Elevation 'B-R' &R 'C-R' Basement Floor Elevation 'B-R' & 'C-R'

28-01R 28-01R

Second F Second F

Portico

Cold Cellar

Ground Floor Elevation 'B-R' MAIN FLOOR Ground Floor Elevation 'B-R' ELEV. B-R

ELEVATION B - 2058 SQ.FT. Garage 11'0" x 19'7" Garage 11'0" x 19'7"

B 11'0"B 11'0

Foyer OpenFoyer To Above Open To Above

Up Up

Portico Portico

L

ELEVATION C - 2054 SQ.FT.

R

Partial PARTIAL MAIN FLOOR Partial Floor Elevation ELEV. C-R Ground 'C-R' Ground Floor Elevation 'C-R'

Partial Partial Second Second


Ensuite Layout W/W/ Opt.Opt. Ensuite Layout Make-Up

Glass

Shower Glass Partial Freestanding SecondShower Floor Glass Shower Tub W/ Freestanding Opt. Ensuite Layout Freestanding Tub Tub

Tray Ceiling

Tray Ceiling

Tray Ceiling

Tray Ceiling

Master

Master Ensuite EnsuiteMaster

Glass Ensuite Shower

Master Master Bedroom Bedroom Master Tray Ceiling 12'0" x 16'0" 12'0" x 16'0" Bedroom

Freestanding Tub

12'0" x 17'0"

W.I.C.

Master Bedroom 12'0" x 17'0"

Main Bath

W.I.C.

9'8" x 9'0" Bedroom 3 9'8" x 9'0"

Great Room 22'3" x 12'0"

W.I.C. W.I.C.

W Uppers D Laundry Opt. W

Coffered Ceiling

3 Piece Rough-In

Dn Railing Dn Railing

Dn Open To Below

S

Railing

D

Laundry

Breakfast Bar

Bedroom 2 11'0" x 14'0"

Bedroom 2 11'0" x 14'0"

D

D

D Laundry

Railing

Bedroom 2 11'0" x 14'0" Bedroom 2 11'0" x 14'0"

Main Bath

Opt. Uppers Laundry

W

Bedroom 4 9'11" x 12'0"

Main Bath Main Bath

D

Opt. Uppers

Dn

W

Dinette 13'8" x 12'0"

DW

D

D W

Dn

W

W

Railing

Bedroom 3 9'8" x 9'0"

Open To Below Open To Below Open To Below

Linen

Unfinished Basement

Main Bath

Steps As Req'd

Door Where Grade Permits

Second Floor Plan For OPT. 4 BEDROOM LAYOUT W.I.C. Opt. 4 Bedroom Plan ELEV. B-R Powder Elevation 'B-R'

Second Floor Plan For Second Floor Plan ForPlan Second Floor For Opt. 4 Bedroom Plan Opt. 4Opt. Bedroom Plan Plan 4 Bedroom Elevation 'B-R' Dn Elevation 'B-R' 'B-R' Elevation

Garage 11'0" x 19'7"

Bedroom 2 11'0" x 11'6"(9'10")

Open To Below

Raised Ceiling

Foyer Raised Ceiling Open To Below Open To Below

Open To Below

Raised Ceiling

Up

Raised Ceiling

3 Piece Rough-In

Laundry

Low Headroom

Unexcavated

Open To Below Open To Below Open To Below Up

Raised Ceiling Raised Ceiling

Partial Second Floor PlanRaised Ceiling For Opt. 4 Bedroom Plan Elevation 'C-R'

Partial Raised Ceiling Second Floor Elevation 'C-R' Raised Ceiling Raised Ceiling

Partial Second Floor Elevation PARTIAL 'C-R' UPPER FLOOR Partial

D

Railing

Bedroom 2 11'0" x 14'0"

11'0" x 11'6"(9'10")

Raised Ceiling

H

W

Dn

Bedroom 2Bedroom 2 Raised Ceiling Open To Below 11'0" x 11'6"(9'10") 11'0"Bedroom x 11'6"(9'10") 2

Open To Above

Opt. Uppers Location Of Furnace And Hot Water Heater May Vary F

Open To Below

Raised Ceiling

Raised Ceiling

Portico

ELEV. C-R Partial Second Floor Elevation 'C-R' Second Floor Elevation 'C-R'

'C-R'

Dn

UPPER FLOOR

Second Floor Elevation 'B-R' UPPER FLOOR Second Floor 'B-R' Second FloorElevation Elevation 'B-R' ELEV. B-R

11'0" x 14'0"(12'8")

Dn Open To Below Railing

11'0" x 11'6"

Second Floor Elevation 'B-R'

Up

W.I.C.

Dn Railing

F

Bedroom 22 Bedroom 11'0" xx14'0"(12'8") 11'0" 14'0"(12'8") Bedroom 2

Bedroom 3 9'11" x 9'0"

Railing

Bedroom 2 11'0" x 11'6" Bedroom 2 11'0" x 11'6" Bedroom 2

Kitchen Open To Below 8'7" x 12'0"

Master Ensuite

Bedroom Bedroom 3 12'0" x 17'0" 9'11" x 9'0" Bedroom 3 9'11" x 9'0"

Bedroom 2 11'0" x 11'6"

Open To Below

Bedroom 2 11'0" x 14'0"(12'8")

Glass Shower Freestanding Tub

Bedroom 3 Master 9'11" x 9'0"

Open To Below

Low Headroom

ELEV. B-R & C-R

Tray Ceiling

Opt. Uppers

W.I.C.

Partial Floor PARTIALSecond UPPER FLOOR OPT. MASTER ENSUITE W/ Opt. Ensuite Layout

W.I.C. Main Bath

Bedroom 3 9'8" x 9'0" W

Bedroom 4 9'11" x 12'0" Bedroom 4 9'11" x 12'0"

W.I.C. W.I.C.

Opt. Waffle Ceiling

Linen

LinenLinen

W.I.C.

Make-Up

Bedroom 4 9'11" x 12'0"

Linen

Main Bath Main Bath

Linen

Main Bath

Garden Door

Gas Fireplace

Linen

LinenLinen Linen

Linen

W.I.C.

Bedroom 3 9'8" xBedroom 9'0" 3

Master Ensuite

Master Ensuite

Master Bedroom 12'0" x 16'0"

W.I.C.

Glass Ensuite Shower

Freestanding Tub

12'0" x 16'0"

Master Ensuite W.I.C.

Glass Shower

Master Ensuite Master

Master Ensuite

LinenLinen

Master Master Bedroom Bedroom Master Tray Ceiling 12'0" x 17'0" 12'0" x 17'0" Bedroom

Freestanding Tub Freestanding Tub

Freestanding Tub

HRV

Tray Ceiling

Glass Shower Glass Shower

Linen

Tray Ceiling

Glass Shower

Ground Floor Elevation 'B-R'

Raised Ceiling Raised Ceiling

Cold Cellar

UPPER FLOOR Partial Second FloorPARTIAL Plan 'B-R' & 'C-R' Second Floor LAYOUT ElevationBasement 'B-R'Floor Elevation BASEMENT OPT. 4 BEDROOM For Opt. 4 Bedroom Plan Partial Second Floor Plan ELEV. B-R & C-R ELEV. C-R 28-01R Partial Second Floor Plan Plan Elevation For'C-R' Opt. 4 Bedroom

For Opt. 4'C-R' Bedroom Plan Elevation Elevation 'C-R'

Bedroom The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and2 the construction process. The measurements adhere to the rules and regulations ofGarage the TARION Warranty Corporation’s Actual useable floor space may Open vary To from the stated floor area, Below Foyer official method for the calculation of floor area. 11'0" x 14'0"(12'8") as they include OTB areas. All renderings artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 28-01R 11'0" xare 19'7" Open To Above Raised Ceiling


opus 28-2 2 STOREY PLAN

LEFT ELEVATION B

RIGHT


2095/2108 SQ.FT. ELEVATION C 2106 SQ.FT.

ELEVATION B

LEFT ELEVATION C

RIGHT


Garden Door

Gas Fireplace Gas Fireplace

Garden Door

opus Unfinished Basement

28-2L

Great Room 22'4" x 12'0" Opt. Waffle Ceiling

Great Room 22'4" x 12'0" Opt. Waffle Ceiling

Unfinished Basement

Coffered Ceiling

Pantry

Location Of Furnace LEFT SIDE 2 STOREY PLAN And Hot Water Heater

H

S

May Vary

3 Piece Rough-In

HRV

3 Piece Rough-In

F H

HRV

Location Of Furnace And Hot Water Heater May Vary

DW

F

S

Breakfast BarBreakfast Bar

Pantry

Coffered Ceiling

Kitchen 8'6"(6'8")DW x 14'0" Kitchen F 8'6"(6'8") x 14'0" F

Low Headroom Low Headroom

Dn

Open To Above Dn

Up Up

Dinette 13'10" x 11'10" Dinette 13'10" x 11'10"

D

Steps As Req'd

Op

Door Where Grade Permits

D

Steps As Req'd

Op

Door Where Grade Permits

Up Open To Above

Garage 11'0" x 20'9"

Unexcavated Up

Unexcavated

Garage 11'0" x 20'9"

W.I.C.

W.I.C. Powder

Opt. Coffered Ceiling

10'

Opt. Coffered Ceiling

Foyer

10'

Powder Foyer

Cold Cellar

Portico

Cold Cellar

Portico

L

Secon

Secon

R

Basement Floor Elevation 'B-L'

Ground Floor Elevation 'B-L'

Basement Floor Elevation 'B-L'

Ground Floor Elevation 'B-L'

28-02L 28-02L

ELEVATION B - 2095 SQ.FT.

Unfinished Basement

Unexcavated Unexcavated

Unfinished Basement

Opt. Coffered Ceiling

Powder

ELEVATION C - 2106 SQ.FT.

Partial Basement Floor Elevation 'C-L' Partial

Garage 11'0" x 20'9"

Foyer Powder

Cold Cellar Cold Cellar

Garage 11'0" x 20'9"

Opt. Coffered Ceiling

Foyer

L

MAIN FLOOR ELEV. B-L

10'

10'

PARTIAL MAIN FLOOR ELEV. C-L

Portico

R Portico

Parital Ground Floor Elevation 'C-L' Parital

Partial Secon Partial Second


W/ Opt.. EnsuiteW/Layout Opt.. Ensuite Layout

W/ W/ Opt. Opt. Ensuite Ensuite Layout Layout

Freestanding Tub

Tray Ceiling

Garden Garden Door Door

GasFireplace Fireplace Gas

Great Room GreatMaster Room 22'4" 22'4" xx 12'0" 12'0"

Bedroom 16'0" x 15'0"

Master Bedroom 16'0" x 15'0"

Freestanding Freestanding Tub Tub

Tray Ceiling Tray Ceiling

Master Master Bedroom Bedroom 16'0" 16'0" xx 15'0" 15'0"

Master Ensuite

Opt. Waffle Ceiling Opt. Waffle Ceiling

Freestanding Tub

Tray Ceiling

Freestanding Tub

Tray Ceiling

W/ Opt.. Ensuite Layout

Tub

Tray Ceiling

Master Ensuite

Master Bedroom Make16'0" x 13'0" Up

Master Ensuite

Master Master Ensuite Ensuite

Freestanding Freestanding Tub Tub

Tray Ceiling Tray Ceiling Freestanding

MakeUp

Master Ensuite

Master Master Bedroom Bedroom 16'0" 16'0" xx 13'0" 13'0"

Master Master Ensuite Ensuite

Master Ensuite

Master Bedroom 16'0" x 13'0"

Master Ensuite

Coffered Ceiling Coffered Ceiling

W.I.C.

D

W

Up Up

Gas Fireplace

22'4" 12'0" Open ToxBelow

W.I.C. W.I.C.

Main Bath

Dn Garage Garage 11'0" Great Room 11'0" xx 20'9" 20'9"

Opt. Uppers

Make-

Master Ensuite

ing

Master Ensuite

Foyer Foyer

S DW

Linen

Dinette 13'10" x 11'10"

Kitchen Bedroom Portico x 14'0" 8'6"(6'8") Portico

3 10'11"(7'3") x 10'10"(9'0") F

Bedroom 2 11'0"(9'6") x 15'0"(8'6")

W.I.C.

Steps As

Open To Below

Garage 11'0" Freestanding x 20'9"

Garage Second Floor Elevation 'B-L' Garage Opt. Coffered Ceiling Opt. Coffered TrayCeiling Ceiling

Powder Powder

Tub

11'0" 11'0" xx 20'9" 20'9"

W.I.C.

Foyer Foyer Second Floor Elevation 'B-L' Master Bedroom Master Ensuite

Powder

Opt. 4UPPER Bedroom Plan Barrel Vault PARTIAL FLOOR Opt.. Ensuite PLAN Layout OPT.W/ 4 BEDROOM OPT. MASTER ENSUITE Barrel Vault ELEV. B-L & C-L

Open To Below 3 Piece Rough-In

Bedroom Bedroom 22 Bedroom 2 11'0" 11'0" (9'6")x (9'6")x 16'2"(8'0") 16'2"(8'0")

Low Headroom

Raised Ceiling Raised Ceiling

Master Ensuite

Master Bedroom 16'0" x 13'0" Raised Ceiling Raised Ceiling

Bedroom 3 10'11"(7'3") x 10'10"(9'0")

Linen

Second Floor Elevation 'B-L' Bedroom 2 11'0" (9'6")x 16'2"(8'0")

Ground Floor Elevation 'B-L' W Bedroom 3Main Bath 10'11"(7'3") x Ceiling 10'10"(9'0") Raised

Great Room 22'4" x 12'0"

Tray Ceiling

Dn

Master Bedroom Open To Above 16'0" x 15'0" Up

Unexcavated

Coffered Ceiling

W.I.C.

HRV

Breakfast Bar

Partial Plan Dinette Partial Second Second Floor Floor Plan 13'10" x 11'10" FLOOR PARTIAL UPPER For For Opt. Opt. 4 4 Bedroom Bedroom Plan Plan OPT. 4 BEDROOM LAYOUT Elevation 'C-L' Kitchen Elevation 'C-L' 8'6"(6'8") x 14'0" C-L ELEV. S

Opt. Coffered Ceiling

W.I.C. Powder

DW

F

W

F

D

Steps As Req'd

Dn

Foyer Laundry W

Opt. Uppers

Door Where Grade Permits

Portico Dn

Open To Below

Ground Floor Elevation

28-02LRaised Ceiling

11'0" x 20'9"

Dn

PARTIAL UPPER FLOOR Open To Below Bedroom 3 ELEV. C-L

Partial Bedroom 2 Second Floor Elevation 'C-L' 11'0"(9'6") x 15'0"(8'6") Partial Second Floor Elevation 'C-L'

F

Bedroom 2 Raised Ceiling 11'0" x 12'0"(8'6")Raised Ceiling

Second Floor Plan BedroomPlan 2 For Opt. 4 Bedroom x 13'2"(8'0") Bedroom 3 Elevation11'0" 'B-L' Cold Cellar 10'11"(7'3") x 10'10"(9'0") BedroomRaised 2 Ceiling 11'0" x 13'2"(8'0") Bedroom 3 Up Main Basement Floor Elevation 'B-L' 10'11"(7'3") x 10'10"(9'0") Ceiling Bath Raised Unexcavated Garage

Bedroom 2 Raised Ceiling 11'0" (9'6")x 16'2"(8'0")

Opt. Coffered Ceiling

Bedroom 3 Unfinished 10'11"(7'3") Basement x 10'10"(9'0") Powder

ng

10'11"(7'3") x 10'10"(9'0")

W.I.C.

Raised Ceiling

Raili

Raili n

g

Powder

Garage 11'0" x 20'9"

D

H

Par W/

Kitchen 8'6"(6'8") x 14'0"

Bedroom Bedroom 22 11'0" 11'0" xx 13'2"(8'0") 13'2"(8'0")

Up

Raised Ceiling Ceiling

F

Up

Location Of Furnace And Hot Water Heater May Vary Glass Shower

Laundry

Coffered

DW

Open To Above

W.I.C.

Dn Opt. Coffered Raised Ceiling Open To Below

Low Headroom

Bedroom 2 Ceiling Raised 11'0" (9'6")x 16'2"(8'0")

D

Opt. Uppers

Bedroom 4 10'0" x 9'0"

Glass Shower

Opt. Wa

S

H

Barrel Vault

3 Piece Rough-In

Bedroom 3 Parital Parital 10'11"(7'3") x 10'10"(9'0") Ground Elevation 'C-L' Laundry Ground Floor Floor Elevation 'C-L'

Great 22'4"

Opt. Waffle Ceiling Raised Ceiling Raised Ceiling

Unfinished Basement

Partial Partial W.I.C. Second Second Floor Floor Elevation Elevation 'C-L' 'C-L'

Portico

Location Of Furnace And Hot Water Heater May Vary

Garden Door

11'0"(9'6") x 15'0"(8'6")

Pantry

W.I.C.

Garden Door

Pantry

Second Floor Plan Bedroom Bedroom 33 10'11"(7'3") xx 10'10"(9'0") 10'10"(9'0") For Opt. 4 Bedroom Plan10'11"(7'3") ElevationFloor 'B-L'Plan Second Bedroom 3 For Opt. 4 Bedroom Plan 10'11"(7'3") x 10'10"(9'0") Elevation 'B-L'

Tray Ceiling

Bedroom Bedroom 33 10'11"(7'3") 10'11"(7'3") xx 10'10"(9'0") 10'10"(9'0")

Barrel Vault

Linen

D W

Dn

Freestanding Tub

Foyer

Portico Portico

Laundry

2 BedroomBedroom 4 10'0"11'0" x 9'0" x 12'0"(8'6") Second Floor Plan

Raili

ng

UPPER FLOOR ELEV. B-L

Opt. Coffered Ceiling

16'0" x 15'0"

BedroomLinen 2 11'0" x 12'0"(8'6")

W

10'11"(7'3") x 10'10"(9'0")

Dn

Opt. Ensuite Layout Ground 'B-L' Ground Floor Floor Elevation ElevationW/ 'B-L' Up

Glass Shower

Barrel Vault Barrel Vault

Laundry Second Second Floor Floor Elevation Elevation 'B-L' 'B-L' 10'11"(7'3") x 10'10"(9'0") SecondUPPER Floor Plan FLOOR For 4 Plan LAYOUT Main D W For Opt. Opt.OPT. 4 Bedroom Bedroom 4 BEDROOM Unfinished Plan Bath Basement Main Opt. Uppers Bedroom 3 Elevation 'B-L' W.I.C. ELEV. Elevation 'B-L'B-L Bath Partial Second Floor

Dn

Barrel Vault

Bedroom Bedroom 22 11'0" 11'0" xx 12'0"(8'6") 12'0"(8'6")

W.I.C.

D

Laundry

Master Ensuite

Bedroom Bedroom 33 10'11"(7'3") 10'11"(7'3") xx 10'10"(9'0") 10'10"(9'0")

Glass Shower

Glass Bedroom 3 Shower

Glass Shower

Bedroom 3Req'd Door Where 10'11"(7'3") xPartial 10'10"(9'0") Grade Permits Second Floor Barrel Vault Open To Above

ing Linen

Barrel Vault Barrel Vault

Freestanding Tub

Main Bath

Master Bedroom 16'0" x 13'0"

Dn

Rail

Bedroom 2 11'0"(9'6") x 15'0"(8'6")

Rail

Pantry

Open To Below

Bedroom Bedroom 33 10'11"(7'3") 10'11"(7'3") xx 10'10"(9'0") 10'10"(9'0")

ing

Coffered Ceiling

Breakfast Bar

Powder Powder

Open To Below

Rail

Opt. Coffered Ceiling Opt. Coffered Ceiling

Tray Ceiling

Dn

Bedroom 22Up Master Bedroom Ensuite Open To Below 11'0"(9'6") 11'0"(9'6") xx 15'0"(8'6") 15'0"(8'6")

Master Bedroom 16'0" x 15'0"

MakeUp

Main Bath

Open To Below Open To Below

Freestanding Tub

Tray Ceiling

W.I.C.

Dn

Opt. Waffle Ceiling

Open To Below Open To Below

Breakfast Bar

Garden Door

g

Opt. Uppers

Open To Above Open To Above

Second Floor Opt. 4 BedroomMain Plan Main W/ Opt.. EnsuiteBath Layout Bath

Dn Dn

Bedroom 4 10'0" x 9'0"

Dn

Glass Shower

D

Railin

Main Bath

W Laundry

Gas Fireplace

Dn Dn

D

Partial Second Floor Bedroom 4 PARTIAL UPPER FLOOR W.I.C. 10'0" x 9'0" W/ MASTER Opt. Ensuite Layout W.I.C. OPT. ENSUITE Dn ELEV. B-L & C-L

Shower Opt. Uppers Opt. Uppers

D D

W W

WPartial

HRV

Steps As Steps Req'dAs Laundry Req'd Door Where Door Permits Where Grade Grade Permits

Linen

Main Main Bath Bath

D W D Glass W

ing

F F

W.I.C.

Bedroom Bedroom 44 10'0" 10'0" xx 9'0" 9'0" Laundry

Glass Glass Shower Shower

Laundry Laundry

W

Laundry Laundry

W Glass Shower

ng

Linen

Kitchen Kitchen 8'6"(6'8") 8'6"(6'8") xx 14'0" 14'0"

D

D

Laundry

Linen

W.I.C.

Glass Shower

RR ailain ilin gg

DW DW

Linen Linen

W.I.C. W.I.C.

Linen

Laundry

Glass Shower

Raili

Dinette Dinette 13'10" 13'10" xx 11'10" 11'10" W.I.C.

Glass Shower Glass Shower

W.I.C.

Gas Fireplace

Linen Linen

Rail

BreakfastBar Bar Breakfast

S S

Glass Shower

W.I.C. W.I.C.

Linen

RR ailain ilin gg

Pantry Pantry

11

Bedroom 2 11'0" x 13'2"(8'0")

Unexcavated

Foyer

Opt. Coffered Ceiling

Bedroom 3 10'11"(7'3") x 10'10"(9'0") Powder Foyer

Raised Ceiling

Partial Second Floor Plan For Opt. 4BASEMENT Bedroom Plan PARTIAL BASEMENT Bedroom 2 Second Floor Elevation 'BElevation 'C-L' ELEV. B-L Partial Second Floor Plan ELEV. C-L 11'0" x 12'0"(8'6") For Opt. 4 Bedroom Plan Partial Bedroom 3 Partial Second Floor Plan Bedroom 3 10'11"(7'3") x 10'10"(9'0") 10'11"(7'3") x 10'10"(9'0") Elevation 'C-L' Basement Floor Elevation 'B-L' Ground ElevationPlan 'B-L' Second Floor Elevation 'C-L' For Opt. 4 Floor Bedroom Partial Parital The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and 'C-L' the construction The measurements Basement Floor Elevation process. 'C-L' Ground Floor Elevation 'C Elevation adhere to the rules and regulations of the TARION Warranty Corporation’s official method 28-02L for the calculation of floor area. Actual useable floor space may vary from the stated floor area, Foyer

Barrel Vault

Raised Ceiling

Raised Ceiling

Cold Cellar

ColdPortico Cellar

Portico

Portico

as they include Barrel VaultOTB areas. All renderings are artist’s concept. *Colour packages Barrel Vaultmay vary slightly from renderings. Refer to sales representative for details. E. & O. E. 28-02L

Parital

Unexcavated

Opt. Coffered Ceiling

Garage 11'0" x 20'9"

Bedroom 3

11


Garden Door

opus

Great Room 22'4" x 12'0" Great Room Opt. Waffle Ceiling 22'4" x 12'0"

Unfinished Basement Unfinished Basement

Opt. Waffle Ceiling

28-2R

Coffered Ceiling

F

3 Piece Rough-In

Dinette 13'10" x 11'10" Dinette 13'10" x 11'10"

Low Headroom

Door Where Steps As Grade Permits Req'd Door Where Grade Permits

Up

Unexcavated

S DW

S

DW Kitchen 8'6"(6'8") x 14'0" Kitchen 8'6"(6'8") x 14'0"

S

G S

F Dn Dn Open To Above Open To Above

Up Unexcavated

Pantry

F

Steps As Req'd

Low Headroom

Breakfast Bar Breakfast Bar

3 Piece Rough-In

HRV HRV

H

Location Of Furnace And Hot Water Heater May Vary Location Of Furnace And Hot Water Heater May Vary F

F

Pantry

Coffered Ceiling

RIGHT SIDE 2 STOREY PLAN H

Gas Fireplace Gas Fireplace

Garden Door

Up

Garage 11'0" x 20'9" Garage 11'0" x 20'9"

Up

W.I.C.

Opt. Coffered Ceiling Opt. Coffered Ceiling

Foyer

W.I.C.

1

1

Powder Powder

Foyer

Cold Cellar

Covered Porch

Cold Cellar L

Sec

Covered Porch

Sec

R

Basement Floor Elevation 'B-R'

ELEVATION B - 2108 SQ.FT.

28-02R 28-02R

Basement Floor Elevation 'B-R' Unexcavated

Unexcavated

Unfinished Basement Unfinished Basement

Ground Floor Elevation 'B-R'

MAIN FLOOR Ground Floor Elevation 'B-R' ELEV. B-R

Garage 11'0" x 20'9" Garage 11'0" x 20'9"

Opt. Coffered Ceiling Opt. Coffered Ceiling

Foyer

Powder

1

Powder

Foyer

Cold Cellar

Portico

Cold R Cellar

L

ELEVATION C - 2106 SQ.FT.

Partial Basement Floor Elevation 'C-R' Partial

Portico

PARTIAL MAIN FLOOR

Partial ELEV. C-R Ground Floor Elevation 'C-R' Partial

Part Seco Parti

Seco


Partial Second Floor W/ W/ Opt. Ensuite Layout W/ Opt. Ensuite Layout

Freestanding Tub

Tray Ceiling

Freestanding Tub

Freestanding Tub Freestanding Tub

Gas Fireplace Gas Fireplace

Tray Ceiling

Great Room GreatxRoom 22'4" 12'0" 22'4" x 12'0" Opt. Waffle Ceiling Master Opt. Waffle Ceiling Ensuite

Coffered Ceiling Coffered Ceiling

Tray Ceiling

Master Master Ensuite Master Bedroom Ensuite Master 16'0" Bedroom x 15'0"Master 16'0" x 15'0"Ensuite

Master Ensuite Master Ensuite

DW DW

Glass Shower Glass Shower

W.I.C.

Garden Opt. Door

Open To Above

Great Room 22'4" x 12'0"

Dn

ing

Barrel Vault Barrel Vault D

W

Ground Floor Elevation 'B-R'

11'0" x 20'9"

Gas Fireplace

Second Floor ElevationPowder 'B-R' Powder

at Room 4" x 12'0"

Foyer

Foyer Second Floor Elevation 'B-R'

Waffle Ceiling

F

Second Floor Plan Master Bedroom For Opt.Floor 4 Bedroom 13'0" Second Plan16'0" xPlan Bedroom 3 Elevation For Opt. 4'B-R' Bedroom Plan Master

Ensuite Raised Ceiling Raised Ceiling Unfinished Basement

Master Bedroom 16'0" x 15'0" Powder

Portico Portico

Cold Cellar 10"

Partial Partial Second Floor Elevation 'C-R'D W.I.C. Covered Second Floor Elevation 'C-R' Porch

Linen

S DW

F

Bedroom 2

Partial 11'0" (9'6")x 16'2"(8'0") Partial Glass GroundKitchen Floor Elevation 'C-R'2 Bedroom Shower Ground Floor Elevation 'C-R' 8'6"(6'8") x 14'0"

tion 'B-R'

F

As d

Bedroom 3 10'11"(7'3") x 10'10"(9'0") Laundry 11'0" (9'6")x 16'2"(8'0") Bedroom 3 Raised Ceiling Ground Floor Elevation 'B-R' Main 10'11"(7'3") x 10'10"(9'0") W Bath W.I.C.

Raised Ceiling Dn

D

Opt. Uppers

Raised Ceiling

Garage 11'0" x 20'9"

Raised Ceiling

Opt. Coffered Ceiling Open To Below

Powder

Cold Cellar

Second Floor Elevation 'C-R' Powder

Portico

Bedroom 3 10'11"(7'3") x 10'10"(9'0")

Bedroom 2 11'0" x 13'2"(9'8") Raised Ceiling

Opt. Waffle Ceiling

Raised Ceiling

Up Unexcavated

Bedroom 3 10'11"(7'3") x 10'10"(9 Garage 11'0" x 20'9"

Barrel Vault

Glass Shower

F

For Opt. 4 Bedroom Plan Bedroom 3 Elevation 'B-R' Bedroom 4 Cold Cellar 10'11"(7'3") x 10'10"(9'0") 10'0" x 9'0" Bedroom 3 10'11"(7'3") x 10'10"(9'0")

Main Bath

W.I.C.

Dn

Open To Above

Up

Raised Ceiling Garage Basement Floor Elevation 'B-R'

Ground Floor Elevati

11'0" x 20'9"

28-02R Raised Ceiling

Dn

Bedroom 3 Unexcavated Open To Below 10'11"(7'3") x 10'10"(9'0")

W.I.C.

Bedroom 2 11'0" x 13'2"(8'0")

Opt. Coffered Ceiling

Unfinished

Basement Raised Ceiling

Powder

Foyer

Bedroom 2 11'0"(9'6") x 16'2"(9'8")

Bedroom 3 Garage 11'0" x 20'9" 10'11"(7'3") x 10'10"(9

1

Raised Ceiling

Raised Ceiling

Second Floor PlanPARTIAL BASEMENT For Opt. 4 Bedroom Partial Second Floor Plan PlanELEV. C-R Elevation For Opt. 4'C-R' Bedroom Plan Cold Cellar

Bedroom 2 11'0" x 13'2"(9'8")

Elevation 'C-R' 28-02R

Linen

S

Steps As Req'd

Door Where Grade Permits

Up

Partial Floor Elevation 'B-R' Basement

Mas 16

Master Ensuite

Pantry

PARTIAL UPPER FLOOR Dinette 13'10" x 11'10" W.I.C. Partial Second FloorLAYOUT Plan OPT. 4 BEDROOM Partial Second Floor Plan For Opt. 4 Bedroom Plan ELEV. C-R Kitchen For Opt. 4 Bedroom Plan 8'6"(6'8") x 14'0" Elevation 'C-R' Second Floor Plan Elevation 'C-R'

Ceiling

Raised Ceiling

Steps As Req'd Door Where Grade Permits

Low Headroom

ing

Opt. Coffered Ceiling

Linen

Bedroom 2 11'0" (9'6")x 16'2"(8'0")

Open To Below Partial Second Floor Dinette W/ Opt. Ensuite 13'10"Layout x 11'10"

Bedroom 3 Freestanding Bedroom 3 10'11"(7'3") x 10'10"(9'0") Tub 10'11"(7'3") x 10'10"(9'0")

Great Room 22'4" x 12'0"

Rail

W.I.C.

Main

Bath Unexcavated Raised

BASEMENT Partial ELEV. B-R

Bedroom 2

11'0"(9'6") x 16'2"(9'8") Partial Second Floor Elevation 'C-R' Partial

Laundry

Coffered C

DW

W Second Floor Elevation 'B-R' Bedroom 2 11'0" x 13'2"(8'0") Bedroom 2 11'0" x 13'2"(8'0") Raised Ceiling

ing

Rail

Foyer

Up

3 Piece Rough-In

Low Headroom

Dn

PARTIAL UPPER Open To Above Unfinished Basement FLOOR ELEV. C-R

Location Of Furnace And Hot Water Heater MayGlass Vary Shower

H

HRV

Breakfast Bar

Pantry

Dn

Garden Door

Coffered Ceiling

Barrel Vault

fered Ceiling

Raised Ceiling Raised Ceiling

10'11"(7'3") x 10'10"(9'0")

Elevation 'B-R'

Foyer

Glass Shower

3 Piece Rough-In

Bedroom 2 Bedroom 2 11'0" x 13'2"(8'0") 11'0" x 13'2"(8'0")

x1

Opt. Waffle C

Location Of Furnace

H

Tray Ceiling

Linen22'4"

Barrel Vault And Hot Water Heater Barrel Vault May Vary

Bedroom 3

Opt. Coffered Ceiling

Master Ensuite

Open To Below

Freestanding Tub

Raised Ceiling Raised Ceiling

Bedroom 4 10'0" xGreat 9'0"Ro

UPPER FLOOR Second Floor Plan OPT. 4 Bedroom BEDROOM 3 LAYOUT Second Floor Plan W D For Opt. 4 Bedroom Unfinished Plan 10'11"(7'3") x 10'10"(9'0") ELEV. B-R For Opt. 4 Bedroom Main Basement Plan Opt. Uppers Bath Elevation 'B-R' 3 Bedroom Elevation 'B-R' 10'11"(7'3") x 10'10"(9'0")

Bedroom 23 Bedroom 10'11"(7'3") x 10'10"(9'0") 11'0"(9'6") x x16'2"(9'8") 10'11"(7'3") 10'10"(9'0")

W.I.C.

Linen

ing

Bedroom 2 Bedroom 2 11'0" (9'6")x 16'2"(8'0") 11'0" (9'6")x 16'2"(8'0")

Tray Ceiling

Master Ensuite

Rail

Up

Garden Door

Barrel Vault

Laundry Barrel Vault

W

ing

UPPER FLOOR Opt. Coffered CeilingGarage Garage 11'0" x 20'9" Opt. Coffered Ceiling Freestanding ELEV. Garage Tub 11'0" x 20'9"B-R

D

W.I.C.

MakeUp Bar

Laundry

Rail

Up

OPT. MASTER ENSUITE ELEV. B-L & C-R

Open To Above

Barrel Vault

Glass Shower

W.I.C.

Laundry

Bedroom 2 11'0" x 13'2"(9'8") Glass Kitchen Shower Bedroom 2 8'6"(6'8") x 14'0" Covered Glass Shower Porch Covered Floor Elevation 'B-R' 11'0" x 13'2"(9'8") Bedroom Second 3 Porch Second Floor Elevation 'B-R' Main F 10'11"(7'3") x 10'10"(9'0") Bath Steps As Req'd W.I.C. Bedroom 3 Partial Second Floor Door Where Grade Permits 10'11"(7'3") Partial Second Floor xDn10'10"(9'0") Opt 4UPPER Bedroom Plan Dn PARTIAL FLOOR Low Headroom Layout Opt. EnsuitePLAN Layout OPT. W/ 4 BEDROOM Ground Floor Elevation 'B-R' W/ Opt. Ensuite Barrel Vault DW

Bedroom 3 Bedroom 3 10'11"(7'3") x 10'10"(9'0") 10'11"(7'3") x 10'10"(9'0")

Linen

Glass Shower

S

Open To Below

Rail

Dinette 13'10" x 11'10"

Linen

Master Bedroom 16'0" x 13'0"

Bedroom 2 Bedroom 2 11'0" x 13'2"(9'8") Openx To Below 11'0" 13'2"(9'8")

Bedroom 3 Bedroom 3 10'11"(7'3") x 10'10"(9'0") 10'11"(7'3") x 10'10"(9'0")

Pantry

Master Ensuite

Dn

ing

Ceiling

ing

Bedroom 2 11'0"(9'6") x 16'2"(9'8") Bedroom 2 3 Piece Rough-In 11'0"(9'6") x 16'2"(9'8")

Master Bedroom 16'0" x 15'0"

Tray Ceiling

Rail

Rail

Foyer Foyer

Master Ensuite

Open To Below Open To Below

Freestanding Tub

Dn

Master Ensuite

ing Coffered Powder Powder

Main Bath Main Bath

Open To Below

Rail

Opt. Coffered Ceiling Opt. Coffered Ceiling

Partial Second Floor Opt 4 Bedroom Plan BedroomW/ 4 Opt. Ensuite Layout 10'0" x 9'0" Dn Bedroom 4 Dn 10'0" x 9'0"

Tray Ceiling

Main Bath

MakeUp Bar

Bedroom 2 Bedroom 2 11'0"(9'6") x 16'2"(9'8") 11'0"(9'6") x 16'2"(9'8")

Master Opt. Waffle Ceiling W.I.C. Open To Below Ensuite W.I.C.

Bath

Freestanding Tub

Gas Fireplace

MakeUp Bar

Breakfast Bar

Garage Garage 11'0" x 20'9" 11'0" x 20'9"

D

Opt. Uppers

Dn

Bedroom 4 Bedroom 4 10'0" x 9'0" 10'0" x 9'0"

Linen

ingiling RailRa

Up Up

W Linen Linen

Open To Below Main Open To Below

Uppers ingiling RailRa

W

W.I.C. W.I.C.

Laundry

W.I.C.

Linen

D Partial Second PARTIAL UPPERWWFloor FLOOR D Opt. Uppers W/ Opt. Ensuite Layout OPT. MASTER ENSUITE Opt. Uppers ELEV.DnB-L & C-R

D

D

W.I.C. Laundry Laundry

W W

Dn

Laundry W

Main Bath

Main Bath Main Bath

W.I.C. W.I.C.

Laundry

Main Bath Open To Above

D Glass Shower Laundry W Laundry D Laundry Laundry W

Glass Shower

W.I.C.

Dn Dn

W.I.C.

D D

W.I.C.

F F

W.I.C.

Glass Shower Glass Shower

W.I.C. Glass Shower

S S

Kitchen Kitchen 8'6"(6'8") x 14'0" 8'6"(6'8") x 14'0"

Glass Shower

Master Bedroom Master 16'0" Bedroom x 13'0" 16'0" x 13'0"

Glass Shower Linen

Linen

Steps As Req'dAs Steps Glass Req'd Shower Door Where Grade Door Permits Where Grade Permits

Master Ensuite

Master Master Bedroom Ensuite Master 16'0" xEnsuite 13'0" Master Bedroom 16'0" x 13'0"

Linen Linen

Linen

Tray Ceiling Tray Ceiling

MakeUp Bar

Breakfast Bar

Breakfast Breakfast BarBar

Pantry Pantry

Dinette Dinette 13'10" x 11'10" 13'10" x 11'10"

Freestanding Tub Freestanding Tub

MakeUp Bar

Master Bedroom 16'0" x 15'0" Master Bedroom 16'0" x 15'0"

Master Ensuite

Tray Ceiling

Tray Ceiling Freestanding Tray Ceiling Tub

Gas Fireplace

Garden Door Garden Door

hed ment

here rmits

W/ Opt. Ensuite Layout W/ Opt. Ensuite Layout

HRV

Freestanding Tub

Opt. Ensuite Layout Opt 4 Bedroom Plan

Covered Porch

Cold Cellar

Bedroom 3 Partial Floor Elevation 'B-R' Partial 10'11"(7'3") xGround 10'10"(9'0")

Second Floor Elevation 'B

Second Floor Plan

Partial

For Opt. 4The Bedroom Plan The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural and the construction process. measurements Floor Elevation 'C-R' Ground Floor Elevation Second Floor Elevation 'C-R' controls Basement adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from'C-R' the stated floor area, Elevation as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 28-02R

Foyer

Partial

Barrel Vault

Barrel Vault

Unexcavated Unfinished

Garage 11'0" x 20'9"

Opt. Coffered Ceiling

Bedroom 2 11'0" (9'6")x 16'2"(8'0")

1


opus 28-3 2 STOREY PLAN

LEFT ELEVATION B

RIGHT


2155 SQ.FT. ELEVATION C 2161 SQ.FT.

ELEVATION B

LEFT ELEVATION C

RIGHT


Dinette Coffered Ceiling Garden 13'0"(7'3") x 12'0"(15'0")

opus

Coffered Ceiling

Garden Door

Door

Kitchen 9'3" x 12'0" Breakfast Bar

Coffered Ceiling

Coffered Ceiling

Kitchen 9'3" x 12'0"

F S

Breakfast Bar

Dinette 13'0"(7'3") x 12'0"(15'0")

28-3L

DW

Unfinished Basement

HRV

Gas Fireplace

H

Great Room 22'3" x 13'0" Up

Powder

Dn

Steps As Req'd

Unexcavated

Garage 10'10" x 19'7"

Steps As Req'd

Open To Above

Door Where Grade Permits

Dn

Unexcavated

Door Where Grade Permits

Up

Up

Low Headroom

W

W

D

Opt. Waffle Ceiling

F

Open To Above

Low Headroom

Opt. Uppers

Opt. Waffle Ceiling

F

Location Of Furnace And Hot Water Heater May Vary

Up

Great Room 22'3" x 13'0"

Opt. Coffered Ceiling Opt. Uppers

HRV

H

Garage 10'10" x 19'7"

D

Opt. Coffered Ceiling

Location Of Furnace And Hot Water Heater May Vary

Gas Fireplace

F

LEFT SIDE 2 STOREY PLAN

3 Piece Rough-In

S Pantry

DW

Unfinished Basement

3 Piece Rough-In

Pantry

Opt. Coffered Ceiling

Powder

1

Foyer

Opt. Coffered Ceiling

1

Foyer

Cold Cellar

Covered Porch

L

MAIN FLOOR ELEV. B-L

Secon

R

Cold Cellar

Covered

Basement Floor Elevation 'B-L'

Porch Ground Floor Elevation 'B-L'

Basement Floor Elevation 'B-L'

Ground Floor Elevation 'B-L'

ELEVATION B - 2155 SQ.FT.

28-03L 28-03L

Unfinished Basement

Unfinished Basement

Unexcavated

Secon

Garage 10'10" x 19'7"

Powder Opt. Coffered Ceiling

Unexcavated

1

Foyer Powder

Garage 10'10" x 19'7"

PARTIAL MAIN FLOOR ELEV. C-L

Opt. Coffered Ceiling

1

Foyer

L

Cold Cellar

ELEVATION C - 2161 SQ.FT.

Cold Cellar Partial Basement Floor Elevation 'C-L'

R

Covered Porch

Covered Partial Porch Ground Floor Elevation 'C-L'

Partia Secon

Partia


age x 19'7" age x 19'7"

Master Bedroom Master 13'0" x 18'0" Bedroom 13'0" x 18'0"

Glass Shower

Master Ensuite

Opt. Coffered Ceiling

Glass Shower

Opt. MakeOpt. Up

W.I.C. W.I.C.

MakeOpt. Up MakeUp

W.I.C.

Open To Below

W.I.C. W.I.C.

Bedroom 2W.I.C. 11'6" x 14'0" Bedroom 2 11'6" x 14'0"

Railing

Dn Dn

Main Bath

Dn

Open To Below

Bedroom 2 11'6" x 14'0"

Bedroom 3 10'5" x 9'6"(11'2") Bedroom 3 10'5" x 9'6"(11'2") Dn Barrel Vault

Bedroom 2 11'6" x 14'0"

Barrel Vault

Bedroom 3 10'5" x 9'6"(11'2")

Second Floor Elevation 'B-L' Second Floor Elevation 'B-L' Barrel Vault

Bedroom 3 10'5" x 9'6"(11'2")

Barrel Vault

UPPER FLOOR

Bedroom 2 11'6" x 15'2" Bedroom 2 (9'2") 11'6" xx (13'6") 15'2" Raised Ceiling (9'2") x (13'6")

Second ELEV. B-L Floor Elevation 'B-L'

Raised Ceiling

Raised Ceiling

Partial Partial Bedroom 2 Second Floor Elevation 'C-L' 11'6" x 15'2" Second Floor Elevation 'C-L'

Raised Ceiling

Bedroom 3 10'5" x 9'6"(10'6")

Raised Ceiling

Open To Below

Dn Dn

Linen Opt. Uppers

Low Headroom

Up

H

F

Location Of Furnace And Hot Water Heater May Vary

H

F

Unexcavated

Main Bath

Low Headroom

W.I.C. W.I.C.

Unexcavated

Laundry

D

W

W.I.C.

Opt. Uppers Cold Cellar

Bedroom 2 11'6" x 11'0" Bedroom 2 Laundry 11'6" x 11'0" D W

Dn

Open To Below

Bedroom 3 10'5" x 9'6"(11'2") Bedroom 3 10'5" x 9'6"(11'2")

W.I.C. Basement Floor Elevation 'B-L'

Cold Cellar BASEMENT Bedroom28-03L 2 ELEV. B-L

(9'2") x (13'6") Raised Ceiling

Bedroom 2 11'6" x 15'2" (9'2") x (13'6") Raised Ceiling

PARTIAL UPPER FLOOR Partial ELEV. C-L Second Floor Elevation 'C-L'

11'6" x 11'0"

Unexcavated Basement Floor Elevation 'B-L'

Dn

Unfinished Basement

28-03L

Barrel Vault Barrel Vault

Bedroom 2 11'6" x 11'0"

Bedroom 3 10'5" x 9'6"(11'2")

Second Floor Plan For Second Floor Plan For UPPER FLOOR Opt. 4 Bedroom Plan Barrel Vault Opt. 44Bedroom Plan OPT. BEDROOM LAYOUT 3 Elevation 'B-L' Bedroom ELEV. B-L'B-L' Elevation 10'5" x 9'6"(11'2")

Unexcavated

Partial Basement Floor Elevation 'C-L' Cold Cellar

P G

Partial Basement Floor Elevation 'C-L'

P

PARTIAL BASEMENT ELEV. C-L

Raised Ceiling

Raised Ceiling

Second Floor Plan For Opt. 4 Bedroom Plan Elevation 'B-L' Raised Ceiling

Partial Second Floor Plan PARTIAL UPPER FLOOR Partial Second Floor Plan For Opt. 4 Bedroom Plan OPT.Opt. 4 BEDROOM For 4 BedroomLAYOUT Plan Elevation ELEV. C-L 'C-L' Elevation 'C-L' Bedroom 3

Bedroom 2 11'6" x 12'2"(10'6")

10'5" x 9'6"(10'6")

Raised Ceiling

Raised Ceiling

Bedroom 2 11'6" x 12'2"(10'6")

Bedroom 3 10'5" x 9'6"(10'6")

G

Cold Cellar

Second Floor Plan For Opt. 4 Bedroom Plan Bedroom 2 11'6" x 12'2"(10'6") Bedroom 2 Bedroom 3 'B-L' Elevation 11'6" x 12'2"(10'6") 10'5" x 9'6"(10'6") Bedroom 3 10'5" x 9'6"(10'6")

Unfinished Basement

Raised Ceiling

Raised Ceiling

Partial Second Floor Plan For Opt. 4 Bedroom Plan Elevation 'C-L'

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 28-03L

Partial

G

Opt. Uppers

Raised Ceiling

Raised Ceiling

Bedroom 3 10'5" x 9'6"(10'6")

Open To Open Below To Below

Laundry Laundry D W DOpt. Uppers W

Up

Main Bath

Barrel Vault

Second Floor Elevation 'B-L' Bedroom 3 10'5" x 9'6"(10'6") Bedroom 3 10'5" x 9'6"(10'6")

Bedroom 4 9'3" x 9'0" Opt. Coffered Ceiling

Open To Open Below To Below

Main Bath Main Bath

Linen Linen

W.I.C. W.I.C.

Bath

Laundry

Railing Railing

Main Bath Main MainBath

Location Of Furnace And Hot Water Heater May Vary

3 Piece Rough-In

Bedroom 4 Bedroom 4 9'3" x 9'0" Bedroom 4 9'3" x 9'0"9'3" x 9'0"

Opt. Coffered Ceiling

D D

Opt. MakeUp

Opt.Opt. Coffered Ceiling Coffered Ceiling

D

W.I.C. W.I.C. W.I.C.

Laundry Laundry

Railing Railing

W

W

Laundry W

Railing

D

Opt.Opt. Uppers Uppers

Opt. Uppers

Opt. Coffered Ceiling

W

Unfinished Basement

3 Piece Rough-In

HRV

Shower Glass Shower Opt. Coffered Ceiling

Unfinished Basement

Master Bedroom 12'8" x 18'0"

W.I.C.

Glass Opt. Coffered Ceiling

Railing

Master Bedroom 13'0" x 18'0"

Tray Ceiling Master Bedroom 12'8" x 18'0"

Master Bedroom Master 12'8" x 18'0" Bedroom 12'8" x 18'0"

Railing

F F

Master Ensuite

Tray Ceiling Tray Ceiling

Freestanding Tub

Master Ensuite Master Ensuite

Master Ensuite Master Ensuite

Master

EnsuiteCeiling Coffered

Linen

Tub Tub

Tray Ceiling Master Bedroom 13'0" x 18'0"

S S

Master Ensuite

Opt. Coffered Ceiling Opt. Coffered Ceiling Glass Freestanding Opt. ShowerTub Freestanding Tub

Tray Ceiling

HRV

Freestanding Tub

Freestanding Freestanding Freestanding Tub

Tray Ceiling

Opt.Opt. Coffered Ceiling Coffered Ceiling

age x 19'7" age x 19'7"

Glass Shower Glass Shower

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Tray Ceiling

Opt. Coffered Ceiling Freestanding Tub

Opt. Coffered Ceiling

Pantry Pantry

Opt. Coffered Ceiling Opt. Uppers

Ceiling itchen "tchen x 12'0" x 12'0"

Tray Ceiling

Opt. Coffered Ceiling

d Ceiling

Glass Shower

Opt. Coffered Ceiling

Partial Second Floor Plan


opus

S

Pantry

Kitchen 9'3" x 12'0"

Coffered Ceiling Dinette 13'0"(7'3") x 12'0"(15'0")

Dinette 13'0"(7'3") x 12'0"(15'0")

Breakfast Bar

28-3R

DW

Unfinished Basement

F

Opt. MakeUp

Location Of Furnace And Hot Water Heater May Vary

Gas Fireplace

RIGHT SIDE 2 STOREY PLAN Great Room 22'3" x 13'0"

3 Piece Rough-In

Location Of Furnace And Hot Water Heater May Vary

H

Gas Fireplace

HRV

Opt. Waffle Ceiling

F

Great Room 22'3" x 13'0"

3 Piece Rough-In

HRV

Opt. Waffle Ceiling

F

Op

Garden Door

DW S F

Unfinished Basement

H

Op

Coffered Ceiling

Garden Door

Kitchen 9'3" x 12'0" Breakfast Bar

Pantry

Up

W

Open To

Up Above

Garage 10'10" x 19'7"

Steps As Req'd

Door Where Grade Permits

Unexcavated

Low Headroom

Garage 10'10" x 19'7"

Steps As Req'd

Door Where Grade Permits

Up Low Headroom

W

W Up

Unexcavated

Opt. MakeUp

W

Dn

Open To Above

Dn

Powder

Opt. Coffered Ceiling

Powder Foyer Opt. Coffered Ceiling

Foyer

Cold Cellar L

Portico

R

Cold Cellar

Basement Floor Elevation 'B-R'

Ground Floor Elevation 'B-R'

Basement Floor Elevation 'B-R'

Ground Floor Elevation 'B-R'

ELEVATION B - 2155 SQ.FT.

28-03R 28-03R

Unexcavated

Unexcavated

L

MAIN FLOOR ELEV. B-R

Unfinished Basement

Unfinished Basement

Cold Cellar R

ELEVATION C - 2161 SQ.FT. Cold Cellar Partial Basement Floor Elevation 'C-R'

Portico

Secon

Garage 10'10" x 19'7"

Garage 10'10" x 19'7"

PARTIAL MAIN FLOOR ELEV. C-R

Secon

Powder Opt. Coffered Ceiling

Foyer

Powder

Opt. Coffered Ceiling

Foyer Covered Porch

Covered

Porch Partial Ground Floor Elevation 'C-R'

Partia Secon


Opt. Coffered Ceiling Tray Ceiling

Opt.Coffered CofferedCeiling Ceiling Opt.

Tray Ceiling

Master Ensuite

Opt. Coffered Ceiling

Gas GasFireplace Fireplace

Opt. MakeUp

Ensuite

Master Master Ensuite Ensuite

Master Bedroom 12'8" x 18'0"

Master Ensuite

W.I.C.

F

W.I.C.

Powder Powder

Bedroom 2 11'6" x 15'2"

Opt.Coffered CofferedCeiling Ceiling Opt.

Railing

Bedroom 22 Bedroom 11'6" xx 15'2" 15'2" 11'6"

Dn

Open To Below

Bedroom 33 Bedroom 10'5" x 9'6" Dn 10'5" x 9'6"

yer yer

Bedroom 2 11'6" x 15'2"

Bedroom 3 10'5" x 9'6"

co co

Bedroom 3

Second Floor Floor Elevation Elevation 'B-R' 'B-R' 10'5" x 9'6" Second

UPPER FLOOR ELEV. B-R Bedroom 22 Bedroom 11'6" xx 15'2" 15'2" 11'6" (9'2") (13'6") (9'2") xx (13'6")

Powder Powder

Opt.Coffered CofferedCeiling Ceiling Opt.

RaisedCeiling Ceiling Raised

Bedroom 33 Bedroom 10'5" xx 9'6"(10'6") 9'6"(10'6") 10'5"

Second Floor Elevation 'B-R'

RaisedCeiling Ceiling Raised

Bedroom 3 10'5" x 9'6"(10'6")

Raised Ceiling Partial Partial Second Floor Floor Elevation Elevation 'C-R' 'C-R' Second

Bedroom 2 11'6" x 15'2" (9'2") x (13'6") PARTIAL UPPER FLOOR

ELEV. C-R

Raised Ceiling

Linen

Linen Linen

DD

Opt.Uppers Uppers Opt.

W.I.C.

Laundry

Open Open To To Below Below

D

W

Dn Dn Opt. Uppers

Laundry

Bedroom 22 Bedroom 11'6" xx 12'2" 12'2" 11'6" W.I.C.

Dn

D

W

Opt. Uppers

Bedroom 2 11'6" x 12'2"

Bedroom 33 Bedroom 10'5" xx 9'6" 9'6" 10'5"

Dn

Bedroom 2 11'6" x 12'2"

Second Floor Floor Plan Plan For For Second Opt. 44 Bedroom Bedroom Plan Plan Opt. Elevation 'B-R' 'B-R' Elevation

RaisedCeiling Ceiling Raised

3 Piece Rough-In

F

Up

Low Headroom

Low Headroom

Unexcavated

Open To Below

BASEMENT ELEV. B-R

Open To Below

Basement Floor Elevation 'B-R'

28-03R

Cold Cellar

Unexcavated

28-03R

Unexcavated

Cold Cellar

Bedroom Partial 3 Basement Floor Elevation 'C-R' 10'5" x 9'6"

P G

Partial Basement Floor Elevation 'C-R' PARTIAL BASEMENT

P G

ELEV. C-R

Bedroom 33 Bedroom 10'5" xx 9'6"(10'6") 9'6"(10'6") 10'5"

Second Floor Plan For Opt. 4 Bedroom Plan Elevation 'B-R'

RaisedCeiling Ceiling Raised

Raised Ceiling

Bedroom 3 10'5" x 9'6"(10'6")

11'6" x 12'2"(10'6") Raised Ceiling

Partial Second Second Floor Floor Plan Plan Partial For Opt. Opt. 44 Bedroom Bedroom Plan Plan For Elevation 'C-R' 'C-R' Bedroom 2 Elevation

11'6" x 12'2"(10'6") Raised Ceiling

Raised Ceiling

Bedroom 3 10'5" x 9'6"(10'6")

Raised Ceiling

Bedroom 3 10'5" x 9'6"(10'6")

Raised Ceiling

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 28-03R

Partial Second Floor Elevation 'C-R'

Partial Second Floor Plan For Opt. 4 Bedroom Plan

G

Unfinished Basement

Cold Cellar

PARTIAL FLOOR Plan Opt.UPPER 4 Bedroom OPT.Elevation 4 BEDROOM LAYOUT 'B-R' Bedroom 2 ELEV. C-R

G

Cold Cellar

Unfinished Basement Floor Elevation 'B-R' Basement

Bedroom 3 10'5" x 9'6"

UPPER FLOOR OPT. 4 BEDROOM LAYOUT ELEV. B-R

Bedroom 22 Bedroom 11'6" xx 12'2"(10'6") 12'2"(10'6") 11'6"

Up

Bedroom 4 10'5" x9'0"

Laundry Laundry W W

3 Piece Rough-In

Second Floor Plan For

Second Floor Elevation 'B-R' Bedroom 2 11'6" x 15'2" (9'2") x (13'6")

W.I.C. W.I.C.

Location Of Furnace And Hot Water Heater May Vary

H

Unexcavated

Opt. Railing Opt.Coffered CofferedCeiling Ceiling

Open To Dn Dn Below

W.I.C.

D

Main Bath

Bedroom 4 10'5" x9'0"

Railing

Main Bath

Open Open To To Below Below

W

Opt. Opt.Coffered CofferedCeiling Ceiling

Railing Railing

en To n To ove ove

Railing

W.I.C.

Laundry

Bedroom 44 Bedroom 10'5" x9'0" x9'0" 10'5"

Main Bath

Linen

D

Main Main Bath Bath

Railing Railing

Main Main Bath Bath

Main Bath

W.I.C. W.I.C.

Opt. Opt.Uppers Uppers

W

Opt. Uppers

Laundry

W W

Opt. Coffered Ceiling Opt. Coffered Ceiling Opt. Uppers

Laundry Laundry

DD

W.I.C.

Unfinished

Location Of Furnace Basement And Hot Water Heater May Vary

H

Glass Shower

W.I.C. W.I.C.

W.I.C.

Unfinished Basement

W.I.C. W.I.C.

Opt. Coffered Ceiling Opt. MakeUp

Glass Shower

Freestanding Tub

Master Master Bedroom Bedroom 12'8" 18'0" 12'8" xx 18'0"

Master Bedroom 13'0" x 18'0"

Glass Glass Shower Shower

Opt.Coffered CofferedCeiling Ceiling Opt. Opt. Opt. MakeMakeUp Up

Master Bedroom 12'8" x 18'0"

Master Master Bedroom Bedroom 13'0" xx 18'0" 18'0" 13'0"

Glass Shower

Glass Glass Shower MasterCeiling Opt. Coffered Shower

Tray Ceiling

Master Bedroom 13'0" x 18'0"

Master Master Ensuite Ensuite

Freestanding Freestanding Tub Tub

TrayCeiling Ceiling Tray

Opt. Coffered Ceiling Opt. Coffered Ceiling

Master Ensuite

TrayCeiling Ceiling Tray

HRV

Freestanding Tub

Freestanding Freestanding Tub Tub

Opt. Coffered Ceiling

0"(15'0") 0"(15'0")

yer yer

Tray Ceiling

Opt.Coffered CofferedCeiling Ceiling Opt.

Ceiling Ceiling

Glass Shower

Freestanding Tub

HRV

Freestanding Tub

Opt. Coffered Ceiling


opus

36-1

ELEVATION A, B & C

2522

SQ.FT.

2 STOREY PLAN

ELEVATION A


ELEVATION B

ELEVATION C


Opt. Waffle Ceiling

Opt. Waffle Ceiling

2 STOREY PLAN Location Of Furnace

And Hot Water Heater May Vary

Gas Fireplace

Location Of Furnace And Hot Water Heater May Vary

Great Room 14'0" x 20'6"(17'6")

Gas Fireplace

Great Room W.I.C. 14'0" x 20'6"(17'6")

W.I.C.

HRV

F

Powder

W.I.C.

Low Headroom

Opt. Coffered Ceiling

Powder

Unexcavated

Door Where Grade Permits

F

Powder

Steps As Req'd

Ensuite 2

Garage 18'3"(19'2") x 19'8"

Cold Cellar

Basement Plan Elevation 'A', 'B' & 'C'

Basement Plan Elevation 'A', 'B' & 'C'

Foyer

Opt. Coffered Ceiling Railing

Open To Below Dn

Garage 18'3"(19'2") x 19'8"

Railing

Open To Raised Ceiling Below

Open To Above

Portico

B 12'2"

Raised Ceiling

MAIN FLOOR ELEV. A Portico

Ground Floor Elevation 'A'

36-01

Second Floor Elevation 'A'

Portico

Ground Floor Elevation 'A'

36-01

Second Floor Elevation 'A'

Garage 18'3"(19'2") x 19'8"

Open To Below

Foyer Open To Above

Ground Floor Elevation 'A' x 19'8" 18'3"(19'2") Garage

Up

36-01

Open To Above

Up

Portico

Half Wall

Half Wall

PartialPortico Ground Floor Elevation 'B' Foyer

PARTIAL MAIN FLOOR 18'3"(19'2") x 19'8" ELEV. B

Open To Above

Partial Ground Floor Up Elevation 'B'

Garage 18'3"(19'2") x 19'8"

Foyer

Barrel Vault

Partial Second Floor Elevation 'B'

Partial Second Floor B Elevation 'B' 12'2" Open To Below

Open To Above

Raised Ce

Half Wall

Foyer

Up

Covered Porch

Portico

Half Wall

Garage 18'3"(19'2") x 19'8"

Up

Open To Above

B 12

B 12

Open To Below Barrel Vault

Foyer

Garage

ELEVATION C - 2522 SQ.FT.

B 12'2"

Up

Up

Half Wall

ELEVATION B - 2522 SQ.FT.

Garage 18'3"(19'2") x 19'8"

W.I.C. Dn

Open To Above

Up Cold Cellar

Cold Basement Cellar Plan Elevation 'A', 'B' & 'C'

Opt. Coffered Ceiling

Foyer

Up

W.I.C.

Half Wall

Up

Bedroom 4 10'5" x 10'0" Ensuite 2

S

F

Door Where Grade Permits

Foyer

ELEVATION A - 2522 SQ.FT.

S

Kitchen 13'7" x 11'4"

Open To Above

Up

Bedroom 4 10'5" x 10'0"

DW

Dn

Unexcavated

S

F

Breakfast Bar

Steps As Req'd

Dn

Dn

DW

Master Bedroom 16'0" x 14'0"

Kitchen 13'7" x 11'4"

Steps As Req'd Kitchen 13'7" x 11'4"

Door Where Pantry Grade Permits

H

3 Piece Rough-In

Tray Ceiling

DW

Dining Room 13'8" x 14'0"(16'11")

Pantry

Master Bedroom 16'0" x 14'0"

Breakfast Bar

Pantry

Opt. Coffered Ceiling

HRV

F Location Of Furnace And Hot Water Heater May Vary

Unexcavated

Coffered Ceiling Dining Room 13'8" x 14'0"(16'11")

French Door

Breakfast Bar

H

Opt. Coffered Ceiling

HRV

F

3 Piece Rough-In

Low Headroom

Tray Ceiling

Opt. Waffle Ceiling

H

Unfinished Basement

Unfinished Basement

Low eadroom

Coffered Ceiling French Door

Opt. Coffered Ceiling

Gas Fireplace

36-1 Unfinished Basement

Dining Room 13'8" x 14'0"(16'11")

Great Room 14'0" x 20'6"(17'6")

Opt. Coffered Ceiling

opus 3 Piece Rough-In

Coffered Ceiling French Door

Raised Ceiling Open To Below

PARTIAL MAIN FLOOR ELEV. C

Partial Ground Floor

B 12'2"

Raised Ce

Raised Ceiling

Partial Second Floor


Glass Shower

Master Ensuite

Master

Master Bedroom Bedroom 16'0" x 14'0" 16'0" x 14'0"

)

Master Ensuite

Master Ensuite

Master Ensuite

Make-up Glass Shower

Opt. Coffered Ceiling

W.I.C.

W.I.C. 2 Bedroom 11'1" x 9'7"

Linen

Opt. Coffered Ceiling

Opt. Uppers

W

Bedroom 3 12'2" x 11'9"(10'6")

Second Floor Opt. Master Ensuite Elevation 'A', 'B', & 'C' D

Shared Bath

Laundry

Shared Bath

Shared Bath

W.I.C.

Railing

Railing

D

Laundry

D

Laundry Railing

Dn

W

Shared Bath

Laundry

Opt. Master Ensuite Second Floor Elevation 'A', 'B', & 'C' Opt. Master Ensuite Elevation 'A', 'B', & 'C'

Opt. Uppers

D

Dn

Opt. Coffered Ceiling Railing

Open To

W.I.C. Second Floor Opt. Master Ensuite Elevation 'A', 'B', & 'C'

W

Opt. Uppers

W

Make-up

Opt. Uppers

Opt. Coffered Ceiling

Dn

Dn Below

Bedroom 2 11'1" x 9'7"

Linen

Ensuite 2

Opt. Coffered Ceiling

Ensuite 2

Bedroom 2 11'1" x 9'7"

Linen

W.I.C.

Ensuite 2

W.I.C.

Bedroom 2 11'1" x 9'7"

Linen

Bedroom 4 10'5" x 10'0"

PARTIAL UPPER FLOOR OPT. MASTER ENSUITE ELEV. A, B&C Second Floor

Master Ensuite W.I.C.

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Bedroom 4 10'5" x 10'0"

W.I.C.

Glass Shower Make-up

Master Ensuite W.I.C.

Bedroom 4 10'5" x 10'0"

W.I.C.

Master Ensuite

Glass Shower

Master Bedroom 16'0" x 14'0"

Bedroom 4 10'5" x 10'0"

W.I.C.

W.I.C.

Freestanding Tub

Tray Ceiling

W.I.C.

Make-up

Glass Shower

Master Ensuite

Master Bedroom 16'0" x 14'0"

Ensuite 2

Glass Shower Glass Shower

Freestanding Tub

Tray Ceiling

Opt. Coffered Ceiling

Open To Bedroom Below 3

Bedroom 3 12'2" x 11'9"(10'6") W.I.C.

Bedroom 3 W.I.C. 12'2" x 11'9"(10'6")

12'2" x 11'9"(10'6")

Open To Below Raised Ceiling

Open To Below

W.I.C. Unfinished Basement Raised Ceiling

Raised Ceiling

Raised Ceiling

Second Floor Elevation 'A'

Second Floor Elevation 'A' Open To Below

Location Of Furnace And Hot Water Heater May Vary

UPPER FLOOR ELEV. A

H

3 Piece Rough-In HRV

"

Tray Ceiling

Tray Ceiling

Glass Shower

Freestanding Tub

Freestanding Tub

Bedroom 3 12'2" x 11'9"

F

W.I.C.

Second Floor Elevation 'A' Bedroom 3 12'2" x 11'9"

Open To Below Barrel Vault

W.I.C.

Second Floor Elevation 'A' PARTIAL UPPER Open To ELEV. BBelow

Barrel Vault

Partial Second Floor Elevation 'B' Open To Below Second Floor

Partial Elevation 'B'

Bedroom 3 12'2" x 11'9"

Unexcavated

W.I.C.

W.I.C. Up

Bedroom 3 Vault Barrel 12'2" x 11'9"(10'6")

Open To Below

Low Headroom

Bedroom 3 12'2" x 11'9" FLOOR

W.I.C.

BASEMENT ELEV. A, B & C

Raised Ceiling

Open To Raised Ceiling Below

Bedroom 3 12'2" x 11'9"(10'6") W.I.C.

Barrel Vault

Cold Cellar

Raised Ceiling

PARTIAL UPPER FLOOR ELEV. C

Raised Ceiling

Partial Second Floor Elevation 'B'

Basement Plan Elevation 'A', 'B' & 'C'

Second Floor The Partial floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules Elevation 'C' and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 36-01

Partial Second Floor

G

3


opus

36-2

ELEVATION A, B & C

2562

SQ.FT.

2 STOREY PLAN

ELEVATION A


ELEVATION B

ELEVATION C


Coffered Ceiling

French Door

Great Room 15'4" x 17'11" (7'10") x (14'11")

Gas Fireplace

opus

36-2 Unfinished Basement

Coffered Ceiling

Coffered Ceiling / Opt. Waffle Ceiling

French Door

F Unfinished Basement

Breakfast Area Breakfast Bar 7'10" (10'6")x 9'4" DW

Great Room 15'4" x 17'11" Upx (14'11") (7'10")

DW

Kitchen 12'6" x 8'7" Kitchen 12'6" x 8'7"

F

HRV

W.I.C.

Unexcavated

Powder Dn

Cold Cellar

Cold Cellar

Coffered Ceiling

Foyer

Cold Cellar

Recycle Area

Garage 18'3" (19'5") x 19'0"

Cold Cellar

Shared Bath

Railing

Bedroom 3 9'4" x 11'5" (9'3")

MAIN FLOOR ELEV. A

Portico

Second Floor Elevation 'A'

Recycle Area

Steps If Req'd

Recycle Area

Steps If Req'd

Foyer

(Sunken If Req'd)

Recycle Area

Powder

Covered Porch

Coffered Ceiling

Garage 18'3" (19'5") x 19'0"

PARTIAL MAIN FLOOR ELEV. B

Shared Bath

Powder

Barrel Vault

Partial Second Floor Elevation 'B'

(Sunken If Req'd)

Unexcavated

Bedroom 3 Vault(9'3") 9'4" xBarrel 11'5"

Steps If Req'd

Recycle Area

Powder

Covered Recycle PorchArea

Steps If Req'd

Garage 18'3" (19'5") x 19'0" Garage 18'3" (19'5") x 19'0"

Coffered Ceiling

Foyer

(Sunken If Req'd) Steps If Req'd Coffered Ceiling

ELEVATION Partial Basement Floor C - 2562 SQ.FT. Elevation 'B' Cold

Bedroom 3 9'4" x 11'5" (9'3")

Foyer

Partial Ground Floor Elevation 'B'

Low Headroom If Required

Shared Bath

Garage 18'3" (19'5") x 19'0"

(Sunken If Req'd)

Covered Porch

Unexcavated

Garage 18'3" (19'5") x 19'0"

Ground Floor Elevation 'A'

Partial Basement Floor Elevation 'B'

Partial Basement Floor

Railing

Bedroom 3 9'4" x 11'5" (9'3")

If Req'd)

Partial Ground Floor Elevation 'B' Foyer

Cellar

Dn

Opt. Coffered Ceiling

Shared Bath

Area

Partial Basement Floor Elevation 'B'

Cold Cellar

Ensuite 2

Dn

(Sunken If Req'd)

Powder

Low Headroom If Required

Low Headroom If Required

Garage 18'3" (19'5") x 19'0"

Foyer

Powder

Unfinished Basement

Ensuite 2

Ground Floor Elevation 'A' Unexcavated

Low Headroom If Required

Unfinished Basement

Opt. B.I.

Foyer

Steps If Req'd (Sunken

Cold Cellar

Low Headroom If Required

Bedroom 4 11'0" x 11'0" (13'4")

Opt. B.I.

Ground Floor Elevation 'A'

Unexcavated ELEVATION B - 2562 SQ.FT.

Unfinished Basement

Bedroom 4 11'0" x 11'0" (13'4")

Second Floor Elevation 'A'

Unexcavated

Unfinished Basement

Opt. B.I.

StepsRecycle If Req'd

Steps If Req'd

Portico

Basement Floor Elevation 'A'

36-02

M

Opt. B.I. Opt. B.I.

Garage 18'3" (19'5") x 19'0"

Recycle Area

(Sunken If Req'd)

Cold Cellar

Basement Basement Floor ElevationUnfinished 'A'

Master Ensuite

S

Portico

36-02 Basement Floor Elevation 'A'

36-02

Coffered CeilingCoffered Ceiling

Low Headroom If Required

Door Where Grade Permits

Dn

Dn

Powder

Steps If Req'd

F

Coffered CeilingCoffered Ceiling

Low Headroom If Required

Low Headroom If Required

M

Opt. Coffered Ceiling

Powder

ELEVATION A - 2562 SQ.FT.

Master Ensuite

Opt. Coffered Ceiling Opt. Coffered Ceiling

Low Headroom

Freestanding Tub

Open To Below Open To Below

Unexcavated

Glass Shower

Freestanding Tub

Up

Unexcavated Low Headroom

Dining Room 17'0" x 10'6"

Door Where Door Where Grade Permits Grade Permits

Low Headroom

Dining Room 17'0" x 10'6"

Steps If Req'd Steps If Req'd

HRV

Up

Up

Open To AboveOpen To Above

3 Piece Rough-In

Coffered Ceiling / Opt. Waffle Ceiling

Open To Above

H Location Of Furnace And Hot Water Heater May Vary F H

3 Piece Rough-In

Opt. B.I.

Breakfast Bar

F

W.I.C.

Chef’s Desk

Glass Shower

Dining Room S 17'0" x 10'6"

Coffered Ceiling / Opt. Waffle Ceiling

Location Of Furnace And Hot Water Heater May Vary

Chef’s Desk

Coffered Ceiling

Great Room 15'4" x 17'11" (7'10") x (14'11")

Gas Fireplace Gas Fireplace

H

Breakfast Area 7'10" (10'6")x 9'4"

French Door

W.I.C.

HRV

Unfinished Basement

Up

S

DW

F

Location Of Furnace And Hot Water Heater May Vary

Up

Breakfast Bar

Kitchen 12'6" x 8'7"

2 STOREY PLAN

3 Piece Rough-In

Chef’s Desk

Breakfast Area 7'10" (10'6")x 9'4"

Foyer

(Sunken If Req'd)

PARTIAL MAIN FLOOR ELEV. C

Partial Ground Floor Elevation 'B' Covered Porch

Covered Porch

Partial Ground Floor

Partial Second Floor Elevation 'B' Shared Bath

Bedroom 3 9'4" x 9'3" (8'3") Bedroom 3 9'4" x 9'3" (8'3")

Partial Second Floor Elevation 'C' Partial Second Floor Elevation 'C'

Shared Bath


Glass Shower

Freestanding Tub

Freestanding Tub

Tray Ceiling

Tray Ceiling

Master Ensuite

Master Ensuite

S

Master Bedroom 16'0" x 15'0"

Master Bedroom 16'0" x 15'0"

19'0"

Tray Ceiling

Master Ensuite

Make-Up

MasterBedroom Bedroom 16'0" 15'0" Tray x Ceiling

4 11'0" x 11'0" (13'4") W.I.C.

Ensuite 2

Master Bedroom 16'0" x 15'0"

Ensuite 2

Glass Shower

W.I.C.

Dn

Opt. Coffered Ceiling

Railing

Opt. Coffered Ceiling

D

Dn

W

Low Headroom

Unfinished Basement

W.I.C.

Shared Bedroom 2 Bath 12'0" x 12'0"(10'6)

3 Piece Rough-In

Up

Second Floor Elevation 'A'Second

Up

H

W.I.C.

F

Floor Elevation 'A'

Shared Bath

Dining Room 17'0" x 10'6"

Opt. B.I.

Open To Above

UPPER FLOOR ELEV. A

Basement Floor Elevation 'A'

36-02

Low Headroom

Low Headroom

Unexcavated

Shared Bath Barrel Vault

Steps If Req'd

Bedroom 2 12'0" x 12'0"(10'6)

Low Headroom If Required

Barrel Vault

Shared Bath

Cold Barrel Vault Cellar

ELEV.9'4" B x 11'5" (9'3")

Barrel Vault

Bedroom 2 12'0" x 12'0"(10'6)

Shared Bath

Bedroom 3 Barrel Vault 9'4" x 9'3" (8'3")

36-02

Raised Ceiling

36-02

Raised Ceiling

Elevation 'B'

PARTIAL BASEMENT Low Headroom If Required ELEV. B

Cold Cellar

Portico

Recycle Area

G

Unexcavated Garage 18'3" (19'5") x 19'0"

Unexcavated Steps If Req'd

Foyer Low Headroom (Sunken If Req'd) If Required

Low Headroom If Required

PARTIAL FLOOR PartialUPPER Second Floor ELEV. C

BASEMENT ELEV. A

Unfinished Basement Powder

Unfinished Basement

Bedroom 2 12'0" x 12'0"(10'6) Shared Bath

Cold Cellar

Basement Floor Elevation 'A' Unexcavated

Unfinished Basement

Low HeadroomFoyer If Required (Sunken If Req'd)

Partial Basement Floor Ground Elevation 'B' Floor Elevation 'A'

Basement Floor Elevation 'A'

Barrel Vault

Low Headroom If Required

Cold Cellar

Bedroom 2 PARTIALBedroom UPPER3 FLOOR12'0" x 12'0"(10'6) Shared Bath

Garage 18'3" (19'5") x 19'0" Unexcavated

Recycle Area

Powder

Barrel Vault

Bedroom 3 9'4" x 11'5" (9'3")

Bedroom 3 Partial Second Floor 9'4" x 11'5" (9'3") Elevation 'B'

Unexcavated

Dn

Unfinished Basement

Bedroom 2 12'0" x 12'0"(10'6)

Bedroom 3 9'4" x 11'5" (9'3")

Opt. B.I.

Up

F

Second Floor Elevation 'A'

Partial Second Floor Elevation 'C'

Coffered Ceiling / Opt. Waffle Ceiling

Low Headroom If Required

Bedroom 2 12'0" x 12'0"(10'6)

Bedroom 3 9'4" x 9'3" (8'3")

S

Unexcavated

Cold Cellar

Second Floor Elevation 'A'

Partial Second Floor Elevation 'B'

Breakfast Bar

DW

3 Piece Rough-In

H

3 9'4" x 11'5" (9'3")

Chef’s Desk

Location Of Furnace And Hot Water Heater F May Vary

Location Of Furnace And Hot Water Heater May Vary

Bedroom 3 Shared 9'4" x 11'5" (9'3") Bath

Breakfast Area 7'10" (10'6")x 9'4"

Kitchen 12'6" x 8'7"

Bedroom 2 12'0" x 12'0"(10'6)

Bedroom 3 Bedroom 9'4" x 11'5" (9'3")

Barrel Vault

Great Room 15'4" x 17'11" (7'10") x (14'11")

F

Coffered Ceiling

Unfinished Basement

W.I.C.

D

Bedroom 2 12'0" x 12'0"(10'6)

Shared Bath

W.I.C.

Opt. Uppers

Shared Bath

H

3 Piece Rough-In

Up

French Door

Bedroom 2 12'0" x 12'0"(10'6)

Bedroom 3 9'4" x 11'5" (9'3")

D

Opt. Uppers

Second W FloorD Opt. Master Ensuite Elevation 'A', 'B' & 'C' Opt. Uppers

Linen

Laundry W.I.C.

Linen

Opt. Coffered Ceiling

W

Opt. Uppers

Linen

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Railing

Ensuite 2

Laundry W.I.C.

W

Location Of Furnace And Hot Water Heater May Vary

HRV

Dn

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Railing

Open To Below

Open To Below

Railing

Dn

Open To Below

Opt. Coffered Ceiling

Bedroom 4 11'0" x 11'0" (13'4")

Laundry

Opt. Coffered Ceiling

Linen

Ensuite 2

Laundry

Second Floor Opt. Master Ensuite Elevation 'A', 'B' & 'C'

Opt. Coffered Ceiling

Bedroom 4 11'0" x 11'0" (13'4")

'A', 'B' & 'C'Unfinished Second FloorElevation Opt. Master Ensuite Basement Elevation 'A', 'B' & 'C'

W.I.C.

Master

Glass Ensuite Shower

HRV

Freestanding Tub

HRV

Master Ensuite

Glass Shower

Bedroom 4 11'0" x 11'0" (13'4")

Opt. B.I.

PARTIAL UPPER FLOOR OPT. MASTER ENSUITE Second Floor ELEV. A, B Opt. & C Master Ensuite

Master Ensuite

Opt. Coffered Ceiling

Opt. B.I.

Make-Up

Freestanding Tub

Gas Fireplace

Glass Shower

Coffered Ceiling

19'0"

Glass Shower

Glass Shower

Open To Below

19'0"

Master Ensuite

Master Ensuite

chen x 8'7"

eiling

Make-Up

Make-Up

Steps If Req'd

Glass Shower

Coffered Ceiling

ast Area 0'6")x 9'4"

Chef’s Desk

Door Where Grade Permits

eiling

Cold Covered Cellar Porch

PARTIAL BASEMENT ELEV. C

Cold

Bedroom 2 Cellar Partial Floor Partial Basement Floor PartialGround Basement Floor Partial Second Floor 12'0" x 12'0"(10'6) 'B' Elevation 'B' Partial Second Floor TheElevation floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and Elevation the construction process. The measurements Elevation 'C' 'C' adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, Shared Elevation as they include OTB 'B' areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 36-02 Bath Raised Ceiling

Unexcavated

Partial Basement Floor

Garage

Pa


opus

36-3

ELEVATION A, B & C

3601

SQ.FT.

3 STOREY PLAN

ELEVATION A


ELEVATION B

ELEVATION C


Low Headroom If Required Low Headroom If Required

Low Headroom

Dn Railing

Low Headroom

HRV

Up

Opt Built-ins

Railing

Up

Garage

18'3"Area x 20'6" Recycle 10'0" xGarage 5'4"

W.I.C.

18'3" x 20'6"

W.I.C.

Rec. Room 17'7" x 14'7"

Foyer

Cold Cellar

Foyer

Open To Above

Mudroom

Lower Powder

Portico

Reverse Door Swing If Sunken

36-03 36-03

Low Headroom If Required

Low Headroom

Low Headroom If Required

Tandem Garage 10'0" x 18'0"

Portico

Sunken If Req'd

Dn

Steps If Req'd

Lower Floor Elevation 'A' Lower Floor Elevation 'A' Door Where Grade Permits

Railing Open To Above

Dn Railing

Low Headroom

Door Where Grade Permits

Dn

Open To Above Door Where Grade Permits

Railing

Up

Railing

Up

Door Where Grade Permits

Up

Basement Floor Elevation 'A', 'B' & 'C' Basement Floor Elevation 'A', 'B' & 'C'

Railing

Door Where Grade Permits

Open To Above

Cold Cellar

Low Headroom

Door Where Grade Permits

Up

Unexcavated

F

Low Headroom If Required

Garden Door

Unexcavated

H

3 STOREY PLAN

Steps If Req'd

Open To Above

Opt. Gas Fireplace

36-3

Location Of Furnace And Hot Water Heater May Vary

Dn

Railing

Opt Built-ins

Unfinished Basement

opus

Reverse Door Swing If Sunken

10'0" x 18'0"

Steps IfMudroom Req'd

Sunken If Req'd

Open To Above Railing

3 Piece Rough-In

Reverse Door Swing If Sunken

Lower Powder

Open To Above

Up

Up

Railing

Unexcavated

Up Elevator Elevator

Up

Unexcavated Unexcavated

Elevator

Garage Garage 18'3" x 20'6" 18'3" x 20'6" Garage 18'3" x 20'6"

Elevator

W.I.C.

Unfinished Basement

Foyer

Open To Above

Unfinished Basement

Foyer

Open To Above

ELEVATION A - 3601 SQ.FT.

Partial Basement Floor For Opt. Elevator Partial Basement Floor For Opt. Elevator

Partial Lower Floor For Opt. Elevator Partial Lower Floor For Opt. Elevator

Foyer

Open To Above

Garage 18'3" x 20'6" Garage 18'3" x 20'6"

W.I.C.

W.I.C.

Cold Cellar

Portico Foyer

Open To Above

Foyer

Open To Above

asement Floor evation 'A', 'B' & 'C'

ELEVATION B - 3601 SQ.FT.

6-03

LOWER FLOOR ELEV. A

Lower Floor Elevation 'A'

Portico

PARTIAL LOWER FLOOR ELEV. B

Portico

Partial Lower Floor Elevation 'B' Partial Lower Floor Elevation 'B'

Low Headroom If Required

Garage 18'3" x 20'6"

Low Headroom

Dn

W.I.C.

Garage 18'3" x 20'6"

Door WhereW.I.C. Grade Permits

Railing Open To Above

Foyer

Open To Above

Railing

Foyer

Up

ELEVATION C - 3601 SQ.FT. Elevator

Open To Above

Up

Unexcavated

Elevator

Garage Covered Porch 18'3" x 20'6" Covered Porch

Partial

PARTIAL LOWER FLOOR ELEV. C


Open To Below

Breakfast Bar Breakfast Bar

g

ilin

Open To Below

Garage 18'3" x 20'6"

Opt. Uppers

Opt. Uppers

W

Opt. Opt. Uppers

Linen

g

Linen

Linen

Linen Linen Linen

g Railin

PARTIAL UPPER FLOOR B

Laundry Laundry W

Living / Dining Room Partial 22'2" x 14'3"(15'1")

Upper Floor Elevation 'B'

W.I.C.

Dn Partial Bedroom 3

Dn

12'6" x 10'7"(9'9") Upper Floor Elevation

Raised Ceiling

'B'

Ensuite 2

Bedroom 3 12'6" x 10'7"(9'9") Raised Ceiling

Ledge

Living / Dining Room 22'2" x 14'3"(15'1")

Raised Ceiling

Bedroom 4 9'4" x 12'9"

Railin g

Living / Dining Room

22'2" x 14'3"(15'1") PARTIAL MAIN FLOOR ELEV. C

W.I.C.

Open To Below

Raised Ceiling

g

Bedroom 4 9'4" x 12'9"

Open To Below

Open To Below

Railin

g

g

in

Railin

Oval Window

il Ra

g

Barrel Vault

Partial ELEV. Upper Floor Elevation 'B'

Partial Upper Floor Elevation 'B'

Ensuite 2

Storage

Ledge

Railin

Opt. Uppers

g

Railin g

g

g

in

Open To Below

Up

Bedroom 3 12'6" x 10'9"(9'9")

Bedroom Oval 4 Window 9'4" x 12'9"

W.I.C.

Main Floor Elevation 'B'

Garage 18'3" x 20'6"

W.I.C.

Ensuite 2

Barrel Vault

Ledge

Storage

Bedroom 3 12'6" x 10'9"(9'9")

ilin

Storage

Living / Dining Room Partial 22'2" x 14'3"(15'1")

il Ra

Open To Above

Oval Window

Upper FloorFloor Elevation 'A' 'A' Upper Elevation

Main Floor Elevation 'B'

Ledge

Powder Powder

Barrel Vault

Bedroom Oval 4 Window 9'4" x 12'9"

Bedroom 4 9'4" x 12'9"

PARTIAL MAIN FLOOR B Partial

Partial ELEV. Main Floor Elevation 'B'

Storage

Bedroom 3 12'6" x 10'9"(9'9")

W.I.C.

Ensuite 2

Open To Below

Partial Main Floor Elevation 'B'

Ensuite 2

Ra

Open To Below

Garage 18'3" x 20'6"

Dn Partial W.I.C. Dn Lower Floor Elevation 'B'

Railin

Opt. Uppers

Linen

g

Bedroom 4 9'4" x 12'9"

W.I.C.

Portico

Garage 18'3" x 20'6"

12'6" x 10'9"(9'9")

g

Partial Lower Floor Elevation 'B'

Partial W.I.C. Std. & Opt. Upper Floor ForBedroom Opt. Elevator 3

ilin

g

ilin

Foyer

Open To Above

UPPER FLOOR ELEV. A

Barrel Vault

Ledge

Ra

Main Main FloorFloor Elevation 'A' 'A' Elevation

Railin

Bedroom 4 9'4" x 12'7"(10'3")

Living / Dining Room 22'2"(11'4") x 14'3"(15'1")

Portico

Up

Partial Ensuite 2 Std. & Opt. Upper Floor For Opt. Elevator

9'4" x 12'7" 9'4" x 12'7"

Open To Below

Storage

Ledge

Foyer

Partial Ensuite 2 Std. & Opt. Upper Floor Bedroom 4 Bedroom 4 For Opt. Elevator

Ensuite 2

Living / Dining Room 22'2"(11'4") x 14'3"(15'1")

W.I.C.

18'3" x 20'6"

Elevator

Ra

g

ilin

Ra Open To Below

Storage

Bedroom 3 Bedroom 3 12'6"(11'4") x 10'7" x 10'7" 12'6"(11'4")

9'4" x 12'7"(10'3")

Elevator

Ledge

Garage 18'3" x 20'6"

Foyer

Ensuite 2

Ensuite Ensuite 2 Bedroom 4 2

Partial W.I.C. Storage Storage Living / Dining Room Living / Std. Dining & Room Partial Partial Opt. Upper Floor 22'2"(11'4") x 14'3"(15'1") 22'2"(11'4") x 14'3"(15'1") Main Floor For Opt. Elevator Main Floor For Opt. Elevator For Opt. Elevator

Open To Above

Open To Above/ Open To Below

Open To Below

Ensuite 2

MAIN FLOOR ELEV. A

Ledge

Open To Above/ Open To Garage Below

W.I.C.

To Below

Bedroom 4 9'4" x 12'7"(10'3")

Open To Below

Garage 18'3" x 20'6"

PartialW.I.C. Lower Floor For Opt. Elevator

Garage 18'3" x 20'6"

W.I.C. Open

Ensuite 2

W.I.C.

Bedroom 3 12'6" x 10'7"(9'9")

Raised Ceiling

Linen

Foyer

Open To Above Open To Below Open To Below

PartialLedge Main Floor For Opt. Elevator Ra

g

ilin

Ra

PartialLedge Main Floor For Opt. Elevator

Living / Dining Room 22'2" (11'4") x 13'11"(15'1")

Elevator

Laundry

W

Dn

g

g

Partial Lower Floor For Opt. Elevator

Living / Dining Room 22'2" (11'4") x 13'11"(15'1")

Elevator

ilin

g

ilin

Ra

Ra

Elevator

Garage 18'3" x 20'6"

Shared Shared Bath Bath

Elevator

Bedroom 4 9'4" x 12'7"(10'3")

Open To Below

Open To Below

Dn

ilin

g

Up

Open To Below

Dn

Upper Floor Elevation 'A'

Elevator

Ra

ilin

Ra

Up

Open To Above

Ledge

Laundry

W

Linen

Ledge

Open To Above/ Open To Below

Living / Dining Room 22'2" (11'4") x Powder 13'11"(15'1")

Railin

g

Living /Living Dining/ Room Dining Room 22'2"(11'4") x 13'11"(15'1") 22'2"(11'4") x 13'11"(15'1")

Up Foyer

Opt. Uppers

Dn

Elevator

g

Open To Above/ Open To Below

Living / Dining Room 22'2" (11'4") x Powder 13'11"(15'1")

Laundry

W

Railin

Dn

Elevator

Ledge

Ledge

Open To Below

Opt. Uppers

Storage Storage Open

Open To Below

Linen

Powder

12'0" x 12'0" 9'0" x 9'0"

Dn

Upper Floor Elevation 'A'

Up

g

Door Where Grade Permits

Railing

2 Bedroom 2 Upper Floor ElevationBedroom 'A'

Railin g

Open To Above/ Open To Below

Glass Shower

W

Laundry

W

g

Powder

g

Garage 18'3" x 20'6"

Dn

Bedroom 3 12'6"(11'4") x 10'7"

Bedroom 4 9'4" x 12'7"

D Laundry Laundry

Open DnTo Below

Dn

Up

To Above

Garage '3" x 20'6"

Opt. Uppers

Opt. Sink

Up

Elevator

W

Railin

Open To Above/ Open To Below

Railin

Door Where Grade Permits

Bedroom 4 D 9'4" x 12'7"

Upper Floor Elevation 'A'

Main Floor Elevation 'A'

g

Grade Permits

Opt. Sink

Pantry Servery Servery

Dn

Up

Garage '3" x 20'6"

Pantry

Main Floor Elevation 'A'

Open To Above

Up

Main Floor Elevation 'A'

Railin

Railin

Railing

F

S

Open To Below

Dn

g

g

Grade Permits

'A' Door Where

Ensuite 2

Bedroom 3 12'6"(11'4") x 10'7"

Dn

Open To Open To Above/ Above/ Dn Open To Open To Below Elevation Below Lower Floor

Railin

A' Door Where

F

Powder Powder

Ensuite Ensuite

g

Dn

Portico

S

KitchenKitchen 14'7" x 14'7" 9'11" x 9'11"

Main Floor Elevation 'A'

Lower Floor Elevation 'A'

Bedroom 3 Master Master Shared 12'6"(11'4") x 10'7" Bath

ilin Ra

A'

Ensuite 2

Upper Floor Opt. Master Ensuite W.I.C. Elevation 'A', 'B' & 'C'

Glass Shower

DW

Open To Below

Railin

Ensuite 2

g

Foyer

Open To Above

Laundry

W.I.C.

Ledge

ilin Ra

DW

Portico

W

Bedroom 4 9'4" x 12'7"

W.I.C.

Living / Dining Room 22'2"(11'4") x 13'11"(15'1")

Linen

Ledge

Railin

Storage

Living / Dining Room 22'2"(11'4") x 13'11"(15'1")

W.I.C.

Bedroom 3 Shared 12'6"(11'4") x 10'7" Bath

Bedroom 4 9'4" x 12'7"

Open To Below

Storage

Opt. Uppers

Gas Fireplace

Garage 18'3" x 20'6"

g

Open To Above

W.I.C.

Open To Below

Ensuite 2

Master Master Bedroom Bedroom 15'0" x 15'0" 14'0" x 14'0"

ilin Ra

Up

g

Great Room Great Room Foyer 13'3" x 13'3" 19'9" x 19'9"

To Below

g

Above/ Open To Below

D Shared Bath

Freestanding Bedroom 2 Freestanding Tub 12'0" x 9'0" Tub

Dn

W.I.C.

Opt. Sink

Living / Dining Room Pantry 22'2"(11'4") x 13'11"(15'1") OpenServery

Powder

g

Ledge

ilin Ra

Up

Bedroom 2 12'0" x 9'0"

Tray CeilingTray Ceiling

g

Breakfast Breakfast 14'7" x 14'7" 12'0" x 12'0" Up

W.I.C.

Opt. Sink Open To Servery

Laundry

Garden Door

Glass Shower

Railin

Storage

Open Glass To Shower Below

Shared D Bath

GardenW Door

Dn

Opt. Uppers

Ledge

S

F

Railin

Open To Above

Open Servery To Below

Dn

Living / Dining Room Pantry 22'2"(11'4") x 13'11"(15'1")

Opt.

Opt.

F

Powder

Open To Above/ Open To Below

D

KitchenLaundry W x 9'11" 14'7"

Up

Dn

Storage

Door Where Grade Permits

Railing

Pantry

15'0" x 14'0"

Upper Floor Opt. Master Ensuite Elevation 'A', 'B' & 'C'

Dn

Balcony Balcony 14'0" x 3'10" 14'0" x 3'10"

Laundry Ensuite Master Bedroom

W

Bedroom 2 12'0" x 9'0"

Opt. Sink

Linen

Door

Garage 18'3" x 20'6"

S

Kitchen

Coffered Ceiling 14'7" xCeiling 9'11" Coffered

UpGarden

DW

Opt. Uppers

Garden Door

DW

Powder

g

Open To Servery Above/ Open To Below

Railin

Below

Door Swing If Sunken

W.I.C.

Gas Fireplace

Gas Fireplace

Railin

Mudroom

Dn

Garage 18'3" x 20'6"

Pantry

Powder Tandem Open Garage To Juliet Balcony Juliet Balcony Above/ 10'0" x 18'0" Open To

Breakfast Bar

Bedroom 15'0" x 14'0"

Exterior Railing Exterior Railing

Dn

Dn

Laundry Ensuite Master

W

Bedroom 2 12'0" x 9'0"

F

Opt. Sink

Railin

Garage 18'3" x 20'6"

Great Room 13'3" x 19'9"

F

Dn

Sunken If Req'd

Up

Door Where Grade Permits

Great Room 13'3" x 19'9"

g

Tandem Garage Open 10'0" xTo18'0" Above

Laundry Kitchen Master Bedroom 14'7" x 9'11" 12'0" W x 14'7" 15'0" x 14'0"

Breakfast Bar

Door Where Grade Permits

Steps Opt. Waffle Opt. Ceiling Waffle Ceiling If Req'd Reverse

Steps If Req'd

B'

Gas Fireplace

Dn Railing

Lower Powder

Sunken If Req'd

Kitchen 14'7" xx 9'11" 12'0" 14'7"

Steps If Req'd

g

Mudroom

Door Swing If Sunken

Railin

Door Where Grade Permits

B'

Rec. Room Reverse 17'7" x 14'7"

Opt. Gas Fire

Steps If Req'd

Opt Built-ins

"

Bedroom 3 PARTIAL 12'6" UPPER FLOOR x 10'7"(9'9") ELEV. C Ensuite Raised Ceiling

2

g in

il Ra

g in

il Ra

Raised Ceiling

Raised Ceiling

Covered Porch The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and theBedroom construction process. The measurements Bedroom 4 4 Living /Living / TARION Warranty Corporation’s official method for the calculation adhere toFoyer the rules and regulations of the floor area. Actual useable floor 9'4" xof 12'9" 9'4" xspace 12'9" may vary from the stated floor area, Elevator Elevator Elevator Open To Above Open To Below Open To Below Elevator Dining Dining Room as they include OTB areas. AllRoom renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 36-03

Partial

22'2" (11'4") 22'2" x(11'4") x 13'11"(15'1") 13'11"(15'1") Partial Main Floor Elevation 'C'

Partial Main Floor Elevation 'C' Partial Upper Floor Elevation 'C'

Partial Upper Floor Elevation 'C'

W


Unfinished Basement Location Of Furnace And Hot Water Heater May Vary

H

Opt Built-ins

HRV

36-3

Garden Door

Opt. Gas Fireplace

opus

Opt Built-ins

3 Piece Rough-In

F

Lower Powder Low Headroom If Required

3 STOREY PLAN

Low Headroom

Ra

Railing

Up

Unexcavated W.I.C.

Fo

Open T

Cold Cellar

ELEVATION A - 3601 SQ.FT.

Po

Basement Floor BASEMENT Elevation ELEV. A, 'A', B &'B' C & 'C'

Lower Floo

36-03

Low Headroom If Required

MASTER ENSUITE OPTION

Low Headroom

R

Railing

Exterior Railing

Exterior Railing

Balcony 14'0" x 3'10"

Balcony 14'0" x 3'10"

Up

Elevator

Garden ELEVATION Door B - 3601 SQ.FT. Freestanding Tub

Tray Ceiling

W.I.C.

Unfinished Basement

Master Ensuite

Master Bedroom 15'0" x 14'0"

Elevator

Garden Door

Make-up

Tray Ceiling

Unexcavated

Master Bedroom 15'0" x 14'0"

Partial Basement Floor For Opt. Elevator

Master Ensuite

Glass Shower Opt. Uppers

Opt. Uppers

W

Laundry

Bedroom 2 ELEVATION C - 3601 SQ.FT. Dn

12'0" x 9'0"

Partial Low For Opt. E

W.I.C.

Glass Shower

D

Op

D W

Laundry

Bedroom 2 12'0" x 9'0" W.I.C.

PARTIAL UPPER FLOOR Upper Floor ENSUITE Opt. Master OPT. MASTER ELEV. Ensuite A, B & C

Elevation 'A', 'B' & 'C'


Pantry

Low Headroom If Required

O

Low Headroom

Linen Railin g

Dn

Ra

g ilin

g ilin

Ra

Elevator

Unexcavated

Foyer

Foyer

Open To Above

Open To Above

PARTIAL BASEMENT

PARTIAL LOWER FLOOR FOR OPT. ELEVATOR Upper Floor Upper Floor Elevation 'A'

FOR OPT. Main Floor Elevation 'A' Main Floor Elevation 'A'ELEVATOR

Partial Partial Basement Floor Basement Floor For Opt. Elevator For Opt. Elevator

Opt. Uppers

Opt. Uppers

g

Open To Below

W.I.C.

Elevator Foyer

Open To Above

Ledge

Ledge

Dn

Garag 18'3" x 2

Garage 18'3" x 20'6"

Open To Below

Railin g

g

Railin

W.I.C.

Living / Dining Room 22'2" (11'4") x 13'11"(15'1")

Living / Elevator Dining Room 22'2" (11'4") x 13'11"(15'1")

Elevator

Laundry

W

Dn

Up

Up

Elevator Foyer

Open To Above

Ensuite 2

Ensuite 2

Ra

g

g

ilin

ilin

Ra Open To Below

Laundry

W

Powder

Powder

Open To Above/ Open To Below

Railin

Open To Above/ Open To Below

Elevation 'A'

Partial Lower Floor Partial Lower Floor For Opt. Elevator For Opt. Elevator

Dn

Dn

Garage 18'3" x 20'6"

Garage 18'3" x 20'6" Elevator

Elevator

Unfinished Basement

Unfinished Basement

Up

Up

Unexcavated Elevator

Door Where Grade Permits

Bedroom 4 9'4" x 12'7"

Bedroom 4 9'4" x 12'7"

Up

Up

B 3 12'6"(11'4") x 10'7" 12'6

Open To Above

Open To Above

Open To Below

Open To Below

Ensuite 2 Bedroom

Door Where Railing Grade Permits

Railing

Railing

Railing

Dn

Ensuite 2

Ledge

Ledge

Linen

Low Headroom

Shar Bat

W.I.C.

W.I.C.

Living / Dining Room Living / Dining Room 22'2"(11'4") x 13'11"(15'1") 22'2"(11'4") x 13'11"(15'1")

Linen Railin g

Low Headroom Storage If Required

Storage

Shared Lower Floor Lower Floor Elevation 'A' Elevation 'A' Bath

Up

Up

Open To Below

Below

Railin g

g

Railin

Railin

g

Basement Floor Basement Floor Elevation Elevation 'A', 'B' & 'C' 'A', 'B' & 'C'

36-03 36-03

Opt. Sink

Servery PARTIALS Servery FOR ELEVATOR OPTIONOpen To Powder Pantry

Powder

Dn

Dn Opt. Sink

Bedro 12'0" x

Bedroom 2 12'0" x 9'0"

Portico

Dn

Open To Above/ Open To Below

W

Portico

F

F

Dn

Open To Above/ Open To Below

W

Linen

Cold Cellar

Cold Cellar

14'7" x 9'11"

O

14'7" x 9'11"

Open To Below

PARTIAL MAIN FLOOR FOR OPT. ELEVATOR

Partial Partial Floor For Opt. Elevator Main Floor For Main Opt. Elevator

Bedroom 4 9'4" x 12'7"(10'3")

Bedroom 4 9'4" x 12'7"(10'3")

Portico Portico& OPT. UPPER PARTIAL STD. FLOOR FOR OPT. ELEVATOR

Partial Partial Std.Floor & Opt. Upper Floor Std. & Opt. Upper For Opt. Elevator For Opt. Elevator Partial Partial Lower Floor Lower Floor Elevation 'B' Elevation 'B'

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, Garage as they include OTB areas. All renderings sales representative for details. E. & O. E. 36-03 Storage are artist’s concept. *Colour packages may vary slightly from renderings. Refer toW.I.C. Storage W.I.C.

Living / Dining Room Living / Dining Room 22'2"(11'4") x 14'3"(15'1") 22'2"(11'4") x 14'3"(15'1")

18'3" x 20'6"

Garag 18'3" x 2


opus

36-4

ELEVATION A, B & C

3661

SQ.FT.

3 STOREY PLAN

ELEVATION A


ELEVATION B

ELEVATION C


O Opt. Built-ins

Railing

Door Where Grade Permits

Unexcavated

36-04

Basement Floor Elevation 'A', 'B' & 'C'

36-04

Foyer

Mudroom

Storage

Lower Floor Elevation 'A' Portico

Main Floor Elevation Opt. Waffle Ceiling

Lower Floor Elevation 'A' Dn Door Where Grade Permits

Cold Cellar

Elevator

Low Headroom

Opt. Built-ins

Elevator

Garage 18'3" x 21'0"

Sunken If Req'd Reverse Door Swing If Sunken

Rec. Room 18'1" x 16'0"

Steps If Req'd

Great Room 15'0" x 16'0"(20

Elevator

Dn

Dn

Lower Powder Railing

Elevator

Elevator

Door Where Grade Permits

Mudroom

Low Headroom

Railing

Steps If Req'd

Garage 18'3" x 21'0"

Dn

Up

Elevator

Sunken If Req'd

Reverse Open Door Swing If Sunken To Above

ELEVATION A - 3661 SQ.FT.

Dn

Door Where Grade Permits

Up

Up

Foyer

Open To Above

Partial Basement Floor For Opt. Elevator

Partial Lower Floor For Opt. Elevator

Partial Basement Floor For Opt. Elevator

Partial Lower Floor Lower For Powder Opt. Elevator

Up

t Floor Elevation 'A', 'B' & 'C'

ELEVATION B - 3661 SQ.FT.

Garage 18'3" x 21'0"

Partial Main Floor

For Opt. Elevator LOWER FLOOR Up ELEV. A

Up

Portico Garage 18'3" x 21'0"

Foyer

Lower Floor Elevation 'A' Lower Powder

Partial Main Floor For Opt. Elevator

Den 9'4" x 12'9"(16'0")

Garage 18'3" x 21'0" Den 9'4" x 12'9"(16'0")

Covered Porch Foyer

PARTIAL LOWER FLOOR B

ELEV. Partial Covered Porch Lower Floor Elevation 'B'

Partial Main Floor Elevation

Partial Lower Floor Elevation 'B' Lower

Partial Main Floor Elevation

Powder

Garage 18'3" x 21'0"

Den 9'4" x 13'10"(12'9") Foyer Lower Powder

Opt. Built-ins

4

Opt. Built-ins

Unexcavated

Mudroom

Great Room 15'0" 16'0"(20 Opt.xWaffle Ceiling

Open To Above

n

Rec. Room 18'1" x 16'0"

Up

Unfinished Basement

Railing

Steps If Req'd

Open To Above

Up

Open To Above

Main Floor Elevation

Sunken If Req'd

Reverse Door Swing If Sunken

Railing

Unfinished Basement

Open To Below

Tandem Garage 9'6" x 18'0"

Open To Above

Low Headroom If Required

Den 9'4" x 11'9"(14'0")

Portico

Open To Below

HRV

Cold

Cellar F 3 STOREY PLAN

Cold Cellar

Railing

Foyer

Lower Powder

3 Piece Rough-In

Basement Floor Elevation 'A', 'B' & 'C'

Up

Den 9'4" x 11'9"(14'0")

18'3" x 21'0"

Railing

H

Rec. Room 18'1" x 16'0" Garage

Up

Open To Above

Opt. Built-ins Lower Powder

Up

Open To Below

Location Of Furnace And Hot Water Heater May Vary

Up

Recycle Area 9'6" x 5'10"

Garage 18'3" x 21'0"

Open To Above

Railing

Dn

Door Where Grade Permits

Up

Opt. Gas Fireplace

36-4 3 Piece Rough-In

Railing

Door Where Grade Permits

Garden Door

Dn

Opt. Built-ins

Unfinished Basement

Unexcavated

Steps If Req'd

Railing

opus Low Headroom

Sunken If Req'd

Reverse Door Swing If Sunken

Open To Above

Open To Below

Low Headroom If Required

Dn

Mudroom

StorageRailing

Up

Tandem Garage 9'6" x 18'0"

Dn

Gas Fireplace

F

Steps If Req'd

Gas Fireplace

HRV

Low Headroom

Sunken If Req'd

Reverse Door Swing If Sunken

Great Room 15'0" x 20'8"

Gas Fire

Mudroom

Storage

Low Headroom Location Of Furnace If Required H And Hot Water Heater May Vary

Unfinished Basement

ELEVATION C - 3661 SQ.FT.

Garage Rec. Room 18'3" x 21'0" LOWER FLOOR 18'1" PARTIAL x 16'0"

ELEV. C

Den 9'4" x 13'10"(12'9")

Portico Foyer

Elevator

Mudroom

Sunken If Req'd Reverse

Door Swing Partial Lower Floor Elevation 'C' If Sunken

Steps If Req'd

Partial Main Floor Ele


Dn

Pantry

Den 9'4" x 11'9"(14'0")

Opt. Coffered

Linen

Opt. Coffered

Opt. Coffered Ceiling

Linen

Open To Below

Opt Coffered Ceiling Bedroom 4 9'4" x 10'6"(11'8")

Great Room Room 15'0" x 20'8"18'2"Dining x 15'2" (13'6")

Opt. Waffle Ceiling

Master Ensuite

Master Ensuite

Opt. Waffle Ceiling

Up

Dining Room 18'2" x 13'6"(12'0")

18'2" x 13'6"(12'0")

Opt. Waffle Ceiling

in Floor Main Elevation Floor'A' Elevation 'A'

Dining Room 18'2" x 13'6"(12'0")

Dining Room 18'2" x 13'6"(12'0")

Den Opt. Waffle Ceiling 9'4" x 12'9"(16'0")

Opt. Waffle Ceiling

Gas Fireplace

Gas Fireplace

Partial Main Floor Elevation 'B'

Opt. Coffered Ceiling

Great Room Great Room Dining Room 18'2" x 13'6"(12'6") 15'0" x 16'0"(20'8") 15'0" x 16'0"(20'8") Den Waffle Ceiling 9'4" Opt. x 13'10"(12'9")

Opt. Waffle Ceiling

Waffle Ceiling 9'4" Opt. x 13'10"(12'9")

Opt. Waffle Ceiling

Opt. Coffered Ceiling

Linen

D

Dn

Railing

Ensuite Bedroom 2 2 9'6" x 10'6"

Partial Upper Floo Dn Opt. Master Ensui W/ Opt.Open Elevator

Linen

Opt. Coffered Ceiling

Partial Upper Floor Opt. Master Ensuite W/ Opt. Elevator UPPER

To Below

Partial Upper Floor Bedroom 3 For Opt. Elevator 12'5" x 11'7"

Shared Bath

Bedroom 3 12'5" x 11'7"

Shared Bath

Bedroom 4Barrel Vault 9'4" x 11'6"(13'0")

Barrel Vault Oval Window

Upper FloorUpper Elevation Floor'A' Elevation 'A' Bedroom 3 Bedroom 3 12'5" x 11'7"

Shared Bath

Barrel Vault

Shared Bath

12'5" x 11'7"

Bedroom 4Barrel Vault 9'4" x 11'6"(13'0")

Barrel Vault Oval Window

Barrel Vault

Bedroom 3 12'5" x 10'7"

Shared Bath Raised Ceiling

Shared Bath Raised Ceiling

Raised Ceiling Bedroom

4 9'4" x 11'6"

Bedroom 3 W.I.C.

12'5" x 10'7"

Raised Bedroom Ceiling

4 9'4" x 11'6"

Railing

Railing

14'0" x 3'10" Balcony

14'0" x 3'10" Balcony

PARTIAL UPPER FLOOR ELEV. B

Opt. Coffered Ceiling Opt. Coffered Ceiling Garden Glass Shower Door Freestanding Freestanding Tub Floor Elevation 'B' Tub

Master Ensuite Bedroom 3 12'5" x 10'7"

Shared Bath Raised Ceiling

Garden Door Tray Ceiling

Tray Ceiling

Master BedroomMaster Bedroom 14'6" x 14'5" 14'6" x 14'5"

Raised Ceiling

Opt. Coffered Ceiling

Opt. Coffered Ceiling

W.I.C. Shared 12'5" x 10'7" FLOOR PARTIAL UPPER Bath ELEV. C Bedroom 3

Raised Ceiling

Raised Ceiling

D

D

Partial Upper Floor Elevation 'C' Upper Floor Elevation 'C' Partial

Bedroom 2 9'6" x 10'6"

Ensuite 2

Partial Upper Floor Opt. Master Ensuite W/ Opt. Elevator FLOOR

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements Laundry Laundry adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, W details. E. & O. Elevator as they include WE. 36-04 Elevator OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Elevator Refer to sales representative for Elevator Partial Main Floor Elevation 'C' Main Floor Elevation 'C' Partial

Opt. Coffe

Bedroom 2 9'6" x 10'6"

Railing

Opt. Uppers

Elevator W.I.C.

Railing

To Below

Ensuite 2

Partial Partial Upper Floor Elevation 'B' Upper Floor Elevation 'B'

Bedroom 4 9'4" x 11'6"

W

Master Ensuite

Master Bedroom 14'6" x 14'5"

ELEV. A

Oval Window

Dining Room

18'2" x 13'6"(12'6") PARTIAL MAIN FLOOR18'2" x 13'6"(12'6") Den ELEV. C

D

Partial Upper Floor Dn Opt. Master Ensuite W/ Opt.Open Elevator

Opt Coffered Ceiling

Bedroom 4 9'4" x 11'6"(13'0")

Bedroom 4 9'4" x 11'6"

Opt. Coffered Ceiling

Open To Below

Railing

Opt. Uppers

Bedroom 2 2 Ensuite 9'6" x 10'6"

Master Ensuite Dining Room 18'2" x 13'6"(12'6")

W.I.C.

Laundry

Dn

Opt. Coffered Ceiling

Oval Window

Barrel Vault

W

Tray Ceiling Opt. Cof Glass Shower

Bedroom 3Laundry BedroomOpen3 Shared Open To W Elevator To BathBelow Elevator Opt. Coffered Ceiling 12'2"(9'4") x 13'3"(11'7") Below 12'2"(9'4") x 13'3"(11'7"

Shared Bath

Opt. Coffered Ceiling

14'6" x 14'5

Opt. Coffered Ceiling

W.I.C.

Partial Upper Floor For Opt. Elevator

Partial Upper Floor Elevation 'B' Upper Partial

Dining Room

Den 9'4" x 13'10"(12'9")

Ensuite 2

Glass Shower

Main Floor Elevation 'B'

Partial Main Floor Elevation 'B'

Ensuite Bedroom 2 2 9'6" x 10'6"

Elevator

Opt Coffered Ceiling

Barrel Vault

PARTIAL MAIN FLOOR Opt. WaffleELEV. Ceiling Partial B

Partial Main Floor Elevation 'B'

Den 9'4" x 13'10"(12'9")

Opt. Waffle Ceiling

D

Master Ensuite

Master Bedroom 14'6" x 14'5"

Bedroom 4 Bedroom 4 Linen 9'4" xDn10'6"(11'8") 9'4" x 10'6"(11'8")

Linen

Bedroom 4 9'4" x 11'6"(13'0")

Den Opt. Waffle Ceiling 9'4" x 12'9"(16'0")

Den 9'4" x 12'9"(16'0")

Partial Upper Floor For Opt. Elevator

Linen

Laundry

Railing

Maste 14'0" x 3'10" Ensuit Balcony

Master 2 Bedroo Ensuite

Opt. Coffered Ceiling

Bedroom 2 9'6" x 10'6"

t. Coffered Ceiling

Den 9'4" x 12'9"(16'0")

Opt. Uppers

Elevator

MAIN FLOOR ELEV. A

Partial Main Floor For Opt. Elevator Dining Room

D W

Opt. Coffered Ceiling

Bedroom 2 9'6" x 10'6"

Open To Below

Railing

Open To Below

W

Opt Coffered Ceiling

Partial Main Floor For Opt. Elevator

Tray Ceiling

Opt Coffered Ceiling Laundry Opt Coffered Ceiling

Dn

Opt. Coffered Ceiling

Partial Upper Floor For Opt. Elevator

Partial Main Floor For Opt. Elevator

Up

D

Laundry

Opt Coffered Ceiling Railing

Opt. Waffle Ceiling

Open To Below

Open To Above

Railing

Opt. Waffle Ceiling

Elevator W.I.C.

Linen

Dn

Pantry

Railing

Open To Above

Railing

Open To Below

Up

Partial Main Floor For Opt. Elevator

Dn

Elevator

Dn

Pantry

Up Open To Above

Open To Below

Den Den 9'4" x 11'9"(14'0") 9'4" x 11'9"(14'0") Dn Open To Below

Dining Room Dining Room Dn Pantry 18'2" x 15'2" (13'6") 18'2" x 15'2" (13'6") Elevator

Railing

Open To Above

Open To Below

Elevator

Pantry

W

Opt. Coffered Ceiling

W.I.C. Dn

D Laundry

Opt. Uppers

Opt. Coffered Ceiling

Elevator

Elevator

Master Bedroom 14'6" x 14'5"

Glass Shower

Garden Door

Glass Shower W.I.C.

Master Ensuite

Opt. Coffered Ceiling

Elevator

Great Room 15'0" x 16'0"(20'8")

Tray Ceiling

Ensuite 2

W.I.C. Master Ensuite

Gas Fireplace

Gas Fireplace

Great Room Up 15'0" x 16'0"(20'8")

Freestanding Tub

Garden Door

Tray Ceiling Opt. Coffered Ceiling

W.I.C.

Up

Open To Below

Freestanding Tub Opt. Coffered Ceiling

Master Ensuite

Master Bedroom 14'6" x 14'5"

Opt. Coffered Ceiling

Glass Garden Shower Door

Opt. Coffered Ceiling

Powder

Master Bedroom 14'6" x 14'5"

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Powder

Glass Servery Shower

Railing

Servery

14'0" x 3'10" Balcony

Glass Shower

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Railing

Opt. Coffered Ceiling

14'0" x 3'10" BalconyEnsuite Master

Master Ensuite

Open To Below

Railing

Great Room 15'0" x 16'0"(20'8") Opt. Waffle Ceiling

Opt. Sink

Railing

Gas Fireplace

Open To Above

Open To Below

Railing Gas Fireplace

Open To Above

Open To Below

Great Room 15'0" x 16'0"(20'8") Opt. Waffle Ceiling

Opt. Sink

Garden Door

Dn Tray Ceiling

Railing

Railing

14'0" x 3'10" Balcony

Railing

Garden Door

Freestanding Tub Tray Ceiling

Tub

Opt. Uppers

Opt. Coffered Ceiling Glass Opt. Coffered Ceiling 'A' Glass Garden Elevation Floor UpperShower Floor Elevation 'A' UpperShower Dn Door Freestanding

F

Bedroom 2 10'0" x 10'6"

Opt. Uppers

Pantry

F

14'0" x 3'10" Balcony

Bedroom 2 x 10'6"

W.I.C. 10'0"

Opt. Uppers

14'0" x 3'10" Balcony

W.I.C. Railing

Make-up

Railing

Opt. Coffered Ceiling

S

Kitchen Kitchen 12'10" x 13'4" 12'10" x 13'4"

Pantry

Laundry

Make-up

Laundry

Upper Floor Elevation 'A' Upper Floor Elevation 'A' S

Opt. Waffle Ceiling Opt. Waffle Ceiling'A' Main Dn Floor Elevation 'A'Dn Main Floor Elevation

W

D

Opt. Coffered Ceiling

Breakfast Bar

Breakfast Bar

Bedroom 4 W D 9'4" x 10'6"(11'8")

Bedroom 4 9'4" x 10'6"(11'8")

Opt. Waffle Ceiling

t. Coffered Ceiling Opt. Uppers

DW

Main Floor Elevation 'A'

Opt. Opt. CofferedOpt. Ceiling Opt. Coffered Ceiling Shelv. Shelv. Shared Bedroom 3 Bedroom 3 12'2"(9'4") x 13'3"(11'7") 12'2"(9'4") x 13'3"(11'7") Bath Opt. Uppers Opt. Uppers

Shared Bath

Linen

DW

Railing

Tray Ceiling

Opt Coffered Ceiling Bedroom 4 9'4" x 10'6"(11'8")

Dining Room 18'2" x 15'2" (13'6")

Opt. Waffle Ceiling

Main Floor Elevation 'A'

Partial Upper Floor Elevation 'A', 'B' & ' Opt. Master Ensuite

Master BedroomMaster Bedroom 14'6" x 14'5" 14'6" x 14'5"

Bedroom 3 12'2"(9'4") x 13'3"(11'7")

Opt. Coffered Ceiling

Den 9'4" x 11'9"(14'0")

10'0" x 10'6"

Ensuite 2

Ensuite 2

Up

Den 9'4" x 11'9"(14'0")

Railing

Bedroom 2 10'0" x 10'6" Partial Upper Floor Opt. Coffered Ceiling Garden Garden Door Elevation 'A', 'B' Door & 'C' Freestanding Opt. Master Ensuite Tub Tray Ceiling

Bedroom 3 Shared 12'2"(9'4") x 13'3"(11'7") Bath

Shared Bath

Laundry W.I.C.Balcony

Opt. Coffered Ceiling

Opt Coffered Ceiling

Linen

Gas Fireplace

Servery

Room 18'2" x 15'2" (13'6") Breakfast

12'10" x 12'6" 12'10" x 12'6"

Den 9'4" x 11'9"(14'0")

Great Room 15'0" x 20'8"

Dining Powder

Opt. Coffered Ceiling

Railing

Servery

Open To Below

Railing

Open To Above

Opt. Sink

Opt. Sink

Dining Room 18'2" x 15'2" (13'6") Breakfast

Powder

Up

Gas Fireplace

Open To Below

Railing

Open To Above

Open To Below

Opt Coffered Ceiling

Balcony

Ensuite 2

Bedroom 2 W.I.C. 10'0" x 10'6" Opt. Coffered Ceiling Glass Glass Shower Shower Freestanding Dn Tub

W.I.C.

Dn

F

Laundry

Opt. Coffered Ceiling

Ensuite 2

Railing

S

Laundry

Opt. Coffered Ceiling

Linen Open To Below

Servery

Coffered Ceiling Coffered Ceiling Powder Kitchen Garden 12'10" x 13'4" Door

Up

Dn

Laundry Opt. Sink

Opt. Uppers Opt. Uppers Partial Upper Floor Partial Upper Floor W D W D Exterior Railing Elevation 'A',Railing 'B' & 'C' Exterior Elevation 'A', 'B' & Opt. Coffered Opt. Coffered Opt. Master Ensuite Opt. Master Ensuite Ceiling 14'0" x 3'10" Ceiling 14'0" x 3'10" Bedroom 2

W

D

Opt. Coff

Opt. Coffered Ceiling

Bedroom 2 10'0" x 10'6"

W.I.C.

10'0" x 10'6"

Railing

F

S

Opt. Uppers

Dn

Juliet Baclony

Opt. Sink

W.I.C.

W

D

Opt. Coffered Ceiling

Servery

Kitchen Garden 12'10" x 13'4" Door

Breakfast Bar

F

Juliet Baclony

Kitchen DW 12'10" x 13'4"

Opt. Opt. Coffered Ceiling Shelv. Bedroom 2

Opt. Coffered Ceiling

Railing

Pantry

Up

Pantry

Opt. Uppers

Railing

Railing Powder

Opt. Waffle Ceiling

Dn

Breakfast Bar Open To Above

F

Dn

Open To Below

Railing

Open To Above

Open To Below

Railing Opt. Waffle Ceiling

Pantry

Opt. Shelv.

S

Kitchen DW 12'10" x 13'4"

Railing

Dn

Railing

Railing

m Garage x 18'0"

S

Linen Open To Below

Great Room 15'0" x 20'8"

Gas Fire

Gas Fire

Great Room 15'0" x 20'8"

Bedroom 2 9'6" x 10'6"


opus

Unfinished Basement

36-4

HRV

Location Of Furnace And Hot Water Heater May Vary

3 STOREY PLAN

H

F

Low Headroom If Required

Low Headroom

Up

Unexcavated

3 Piece Rough-In

BASEMENT ELEV. A, B & C

Cold Cellar

ELEVATION A - 3661 SQ.FT.

Basement Floor Elevation 'A', 'B' & 'C'

36-04

MASTER ENSUITE OPTION

Coffered Ceiling

Garden Door

Garden Door Tray Ceiling

Unfinished Master Basement

Glass Shower

Ensuite

Master Bedroom 14'6" x 14'5"

Tray Ceiling Make-up

ELEVATION B - 3661 SQ.FT.

aster Ensuite

Dn

Exterior Railing

14'0" x 3'10" Balcony

Opt. Coffered Ceiling

Freestanding Tub

Exterior Railing

14'0" x 3'10" Balcony

Master Bedroom 14'6" x 14'5"

Elevator

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Low Opt. Uppers Headroom

D

W

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Laundry

W.I.C.

Bedroom 2 10'0" x 10'6"

ELEVATION C - 3661 SQ.FT. Opt. Coffered Ceiling

Up Partial Upper Floor Elevation 'A', 'B' & 'C' Opt. Master Ensuite

W.I.C.

Partial Basement Floor

Bedroom 2 10'0" x 10'6"

PARTIAL UPPER FLOOR OPT. MASTER ENSUITE ELEV. A, B & C


Opt. Coffered Ceiling

Garden Door Opt. Shelv.

TrayOpt. Ceiling Coffered Ceiling

Linen

Linen

Unfinished Basement W.I.C. Servery

Opt. Coffered Ceiling Opt. Sink

Bedroom 2 10'0" x 10'6"

Bedroom 4 9'4" x 10'6"(11'8")

Room 18'1" x 16'0"

Mudroom

Sunken If Req'd Reverse Door Swing If Sunken

Dn Door Where Grade Permits

Railing

To Above

Garage 18'3" x 21'0" Up

Partial Lower Floor Partial Lower Floor PARTIAL LOWER FLOOR FOR For Opt. Elevator For Opt. Elevator

OPT. ELEVATOR

Upper Floor Elevation 'A' Lower Powder

Lower Powder

RailingGarage

Opt. Coffered Ceiling

Garden Glass Door Shower

Freestanding Tub

14'0" x 3'10" Balcony

Garden Door

Foyer

Freestanding Tub

Tray Ceiling

Garden Door

Foyer Tray Ceiling Glass Shower

Railing

Railing

Open To Below

Dn

Bedroom 2 9'6" x 10'6"

Opt. Coffered Ceiling

18'3" x 21'0" Ensuite 2

Opt. Coffered Ceiling

Open To Below

Partial Upper Floor Portico

PARTIAL UPPER FLOOR FOR For Opt. Elevator For Opt. Elevator OPT. ELEVATOR

Master Bedroom

D W

D Laundry

Dn

Open To Below

W

Bedroom 2 9'6" x 10'6"

Ensuite 2

PARTIAL UPPER FLOOR Partial Upper Floor Portico FOR MASTER Opt. OPT. Master Ensuite ENSUITE OPT. ELEVATOR W/ Opt. Elevator ELEV. A, B & C

Partial Lower Floor Elevation 'C' Partial Lower Floor Elevation 'C' Shared Bath

18'2" x 13'6"(12'0") Bedroom 4 9'4" x 11'6"(13'0")

Opt. Waffle Ceiling

Bedroom 3 12'5" x 11'7"

Shared Bath

Bedroom 4 Barrel Vault 9'4" x 11'6"(13'0") Oval Window

Bedroom 3 12'5" x 11'7" Barrel Vault

Oval Window

The floor plans and elevations shown are pre-constructionShared and may be revised or improved as necessitated by architectural controls and the construction process. The measurements Bedroom 3 Barrel Vault Barrel Vault Bath adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, 12'5" x 11'7" as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 36-04 Bedroom 4 9'4" x 11'6"(13'0")

Barrel Vault

Bedr 9'6" x

Garage Opt. Coffered Ceiling 18'3" x 21'0"

Partial Upper Floor Linen Opt. Master Ensuite W/ Opt. Elevator

Opt. Coffered Ceiling

Elevat

Linen

Foyer

Dn

Opt Coffered Ceiling

Partial Upper Floor For Opt. Elevator Dining Room

Den Opt. Waffle Ceiling 9'4" x 12'9"(16'0")

Lower PowderLaundry Garage

Elevator

Ensuite 2

W.I

Elevator

Opt. Coffered Ceiling

Bedroom 2 9'6" x 10'6"

Linen

Ensuite 2

Partial Upper Floor

Opt Coffered Ceiling

W.I.C.

Foyer

Opt. Coffered Ceiling

Partial Main Floor PARTIAL MAIN FLOOR FOR For Opt. Elevator

W

W.I.C.

Partial 14'6" x 14'5" Lower Floor Elevation 'B'

Lower Powder

Opt Coffered Ceiling

Dining Room 18'2" x 13'6"(12'0")

Bedroom 2 9'6" x 10'6"

Linen

Up

OPT. ELEVATOR

Elevator

Laundry

Tray Ceiling Opt. Coffered Ceiling

Opt. Coffered Ceiling

W

W

Linen

Railing

Laundry

Dn

Laundry

Partial Lower Floor ElevationD'B'

Master Ensuite

Railing

Dn

D

Open To Below

Elevator Railing

Open To Above

Open To Below

Pantry Opt. Coffered Ceiling

Dn

Opt. Uppers

W.I.C.

Pantry

Master 14'6"

Opt. Uppers

Elevator

Opt. Coffered Ceiling

D

Opt. Uppers

Master Bedroom 14'6" x 14'5" Opt. Coffered Ceiling

Elevator

Glass Shower

Make-up

Opt. Coffered Ceiling

W.I.C.

Opt. Coffered Ceiling

TrayOpt. Ceiling Coffered Ceiling

W.I.C. Master Ensuite

Tray

Glas Show

Garden Door

Opt. Uppers

Freestanding Tub

Master 14'0" x 3'10" Ensuite Balcony

Master Bedroom 14'6" x 14'5" Covered Porch

Garden Door

Opt. Coffered Ceiling

Shower

Railing

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Railing

Great Room 15'0" x 16'0"(20'8") Glass

Master Ensuite

Master Bedroom 14'6" x 14'5" Covered Porch

Open To Below

Gas Fireplace

14'0" x 3'10" Master Ensuite Balcony

R

14'0 Ba

Make-up

Opt. Coffered Ceiling

Glass Shower

Garage 18'3" x 21'0"

18'3" x 21'0"

14'0" x 3'10" Balcony

Opt. Coffered Ceiling

Railing

oom 0"(20'8")

Steps If Req'd

Bedroom 3 12'2"(9'4") x 13'3"(11'7")

Upper Floor Elevation 'A'

Upper Floor Elevation 'A'

10'0" x 10'6"

Rec. W.I.C.

Up

Up

Opt. Waffle Ceiling

Partial U Elevatio Opt. Ma

Ensuite 2

Garage 18'3" x 21'0"

Opt. Waffle Ceiling

Main Floor Elevation 'A'

Bed

Laundr 10'0"

W.I.C.

Bedroom 3 12'2"(9'4") x 13'3"(11'7") Open

Shared Bath

Bedroom 4 9'4" x 10'6"(11'8")

OPT. ELEVATOR

Ceiling

oom "(12'0")

Opt. Coffered Ceiling

Door Where Grade Permits

Bedroom 3 12'2"(9'4") x 13'3"(11'7") Open

Shared Bath

Bedroom 4 Partial Basement 9'4" Floor x 10'6"(11'8")Partial Basement Floor PARTIAL BASEMENT FOR For Opt. Elevator For Opt. Elevator

ion 'A'

Master Bedroom Opt. Coffered 14'6"Ceiling x 14'5"

Partial Upper Floor Elevation 'A', 'B' & 'C' Opt. Master Ensuite Bedroom 2

Dn Railing

Shared Bath

Waffle Ceiling

D

Opt Coffered Ceiling

Dining Room 18'2" x 15'2" (13'6")

Up

Opt. U

Railing

Opt. Waffle Ceiling

oom (13'6")

W

Partial Upper Floor Mudroom Sunken 'A', If Req'd 'B' & 'C' Elevation Elevator Reverse Steps Master Ensuite DoorOpt. Swing If Req'd If Sunken

Ensuite 2

Low Headroom

Opt Coffered Ceiling

Bedroom 2 10'0" x 10'6"

Opt. Uppers

To Above

Den 9'4" x 11'9"(14'0")

W

D

Opt. Uppers

Dining Room 18'2" x 15'2" (13'6")

Railing

Servery

Open To Below

Opt Coffered Ceiling Opt. Coffered Ceiling

Low Headroom

TrayOpt. Ceiling Coffered Ceiling

Opt. Coffered Ceiling

W.I.C.

Ensuite 2

Up Opt. Sink

Master 14'6"

Opt. Uppers

Laundry

Rec. Room Laundry Coffered Ceiling 18'1" Opt. x 16'0"

Elevator

Elevator

Dn

Master Ensuite

Dn

Railing

Powder

Elevator

Bedroom 2 10'0" x 10'6"

W.I.C.

Dn

F

Linen

Sink

Servery

Laundry

D

Open To Below

Powder

Kitchen '10" x 13'4"

Unfinished BasementOpt. Railing

Open To Above

S

Pantry Laundry

Opt. Coffered Ceiling

Dn

F

Open To Below

Pantry

Kitchen 12'10" x 13'4"

W

D

S

W

D

Master Bedroom 14'6" x 14'5"

Laundry

Opt. Coffered Ceiling

Opt. Uppers

Railing Kitchen 12'10" x 13'4"

W

D

Breakfast Bar

Breakfast Bar

Opt. Shelv.

S

DW

DW

Master Ensuite

Glass Shower

Opt. Uppers

Opt. Coffered Ceiling

DW

Opt. Coffered Ceiling

PARTIALS FOR ELEVATOR OPTION Opt. Uppers

akfast " x 12'6"

Glas Show

Garden Door

Opt. Shelv.

Make-up

Freestanding Tub

Opt. Coffered Ceiling

Glass Shower

Ensuite Balcony

Master Bedroom 14'6" x 14'5"

Opt. Built-ins

Great Room 15'0" x 20'8"

Master Bedroom 14'6" x 14'5"

Opt. Coffered Ceiling

Gas Fireplace

Coffered Ceiling

oom 20'8"

Glass

Make-up

36-04

Exterior Railing

Shower Lower Floor Elevation 'A' 14'0"Master x 3'10"

Master Ensuite

Railing

t Baclony

Lower Floor Elevation 'A'

14'0" x 3'10" Master Ensuite Balcony

Breakfast 12'10" x 12'6"

Opt. Built-ins Open To Below

36-04 Breakfast 12'10" x 12'6"

Opt. Coffered C

Exterior Railing Basement Floor Elevation 'A',Basement 'B' & 'C' Floor Elevation 'A', 'B' & 'C'

Partial Opt. M W/ Opt


opus

36-5

ELEVATION A, B & C

3051

SQ.FT.

2 STOREY PLAN

ELEVATION A


ELEVATION B

ELEVATION C


opus

36-5

Opt. Waffle Ceiling

2 STOREY PLAN

Coffered Ceiling French Door

Gas Fireplace

Dining Room 17'4" x 12'0" (7'10") x (15'0")

Great Room 15'0"x 16'0" (18'0") x (19'0")

Pantry

Location Of Furnace And Hot Water Heater May Vary

F

Foyer

Portico

S

Kitchen 13'6" x 12'0" F

Up

Up

DW

Coffered Ceiling

Opt. Coffered Ceiling

H

HRV

3 Piece Rough-In

Breakfast Bar

Unfinished Basement

Dn

Door Where Grade Permits

Railing

Steps As Req'd

Low Headroom

ELEVATION A - 3051 SQ.FT. Unexcavated

Powder

Opt. Wet Bar

Garage 18'3" x 19'1"

Den/Office/ Formal Room 10'5" x 15'10" (13'6") x (12'10")

Opt. Waffle Ceiling

ELEVATION sement Floor Elevation 'A'

B - 3051 SQ.FT.

6-05

MAIN FLOOR GroundA Floor Elevation 'A' ELEV.

Opt. Waffle Ceiling

Coffered Ceiling French Door

Gas Fireplace

ELEVATION C - 3051 SQ.FT.

Great Room 15'0"x 16'0" (18'0") x (19'0")

Dining Room 17'4" x 12'0" (7'10") x (15'0")


Opt. Coffered Ceiling

Sitting 7'10" x 3'0"

Freestanding Tub Glass Shower

His W.I.C.

Tray Ceiling

Master Ensuite

Master Bedroom 15'0" x 16'0"

Sitting 3'0" x 7'10" Raised Ceiling

Unfinished Basement

Hers W.I.C.

Bedroom 2 9'6" x 11'0"

Linen

Cold Cellar

W

H

HRV

Opt. Uppers

D

3 Piece Rough-In

Location Of Furnace And Hot Water Heater May Vary

F

Up

Railing

Dn

Opt. Coffered Ceiling

Laundry

Shared Bath

W.I.C.

Low Headroom

Unexcavated

Ensuite 2 Raised Ceiling

Bedroom 3 12'0" x 15'4"

Bedroom 4 10'5"(6'5") x 18'9"(15'9")

W.I.C. Raised Ceiling

Basement Floor Elevation 'A' BASEMENT

ELEV. A

36-05

UPPER FLOOR

Second ELEV. A Floor Elevation 'A'

Sitting 6'0" x 2'1"

His W.I.C.

Opt. Coffered Ceiling

Tray Ceiling

Freestanding Tub

Barrel Vault

Barrel Vault

Master Ensuite

Glass Shower

Master Sitting Bedroom 2'1" x 6'0" 15'0" x 16'0" The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements Barrel adhereVault to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 36-05 Hers


Coffered Ceiling

Opt. Waffle Ceiling

French Door

Gas Fireplace

Dining Room 17'4" x 12'0" (7'10") x (15'0")

Great Room 15'0"x Opt. Waffle16'0" Ceiling (18'0") x (19'0")

2 STOREY PLAN

Breakfast Bar

F

Door Where Grade Permits Steps As Req'd

S

S

S

Kitchen 13'6" x 12'0"

DW

Kitchen 13'6" x 12'0"

Dn Opt. Wet Bar

Door Where Grade Permits Steps As Req'd

Garage 18'3" x 19'1"

Railing

Powder

S

F

Up

Unexcavated

Breakfast Bar

Dn

Foyer

Powder

DW

Coffered Ceiling

Up

Pantry

Foyer

Opt. Coffered Ceiling

Covered Porch

Dining Room 17'4" x 12'0" (7'10") x (15'0")

Pantry

Opt. Coffered Ceiling

Railing

36-5

Great Room 15'0"x 16'0" (18'0") x (19'0")

Covered Porch

French Door

Coffered Ceiling

opus

Coffered Ceiling Gas Fireplace

Den/Office/ Formal Room Opt. Wet Bar 10'5" x 15'10" (13'6") x (12'10")

Garage 18'3" x 19'1"

Unfinished Basement Den/Office/ Opt. Waffle Ceiling Formal Room 10'5" x 15'10" (13'6") x (12'10")

Unexcavated

Unfinished Basement

Partial Basement Floor Elevation 'B'

Ground Elevation 'B' Opt.Floor Waffle Ceiling

Partial Basement Floor Elevation 'B'

Ground Floor Elevation 'B'

ELEVATION A - 3051 SQ.FT.

MAIN FLOOR ELEV. B

Coffered Ceiling

Opt. Waffle Ceiling

French Door

Gas Fireplace

Dining Room 17'4" x 12'0" (7'10") x (15'0")

Great Room 15'0"x Opt. Waffle16'0" Ceiling (18'0") x (19'0")

Dn

ELEVATION B - 3051 SQ.FT.

Cold Cellar

Low Headroom

Covered Porch

Railing

Opt. Coffered Ceiling

Steps As Req'd

Foyer

Up

Up

S 3'0" S

S

S

S

R C

Kitchen 13'6" x 12'0"

DW

Kitchen 13'6" x 12'0" F

Dn Opt. Wet Bar

Door Where Grade Permits

Ra Ce

Steps As Req'd

Railing

Powder

F

Door Where Grade Permits Coffered Ceiling

Up

Up

Breakfast Bar

Foyer

Covered Porch

DW

Coffered Ceiling

Opt. Coffered Ceiling

Pantry

Cold Cellar

Dining Room 17'4" x 12'0" (7'10") x (15'0")

Pantry

Great Room 15'0"x 16'0" (18'0") x (19'0")

R C

French Door

Breakfast Bar

Unfinished Basement

Unfinished Basement

S 3'0"

Coffered Ceiling Gas Fireplace

Garage 18'3" x 19'1"

Low Headroom

Powder

Den/Office/ Formal Room Opt. Wet Bar 10'5" x 15'10" (13'6") x (12'10")

Den/Office/ Opt. Waffle Ceiling Formal Room 10'5" x 15'10" (13'6") x (12'10")

ELEVATION C - 3051 SQ.FT. Partial Basement Floor Elevation 'C'

Ground Floor Elevation 'C' Opt. Waffle Ceiling

Ra Ce

Garage 18'3" x 19'1"

MAIN FLOOR ELEV. C


Sitting 6'0" x 2'1"

S

Hers W.I.C.

Master Bedroom 15'0" x 16'0"

Sitting 2'1" x 6'0" S

Opt. Uppers

Barrel Vault

D

Master Ensuite

W Hers W.I.C.

D

Linen

Railing

W

Opt. Coffered Ceiling

Opt. Uppers

W.I.C.

Opt. Coffered Ceiling

Dn S

Glass Shower

Bedroom 2 9'6" x 11'0"

Linen

Laundry

S

Master Freestanding Tub

His W.I.C.

Tray Ceiling

Opt. Coffered Ceiling

Barrel Vault

Glass Shower

Ensuite Barrel Vault

Master Bedroom 15'0" x 16'0" Barrel Vault

Sitting 2'1" x 6'0" French Door

Freestanding Tub

His W.I.C.

Tray Ceiling

Opt. Coffered Ceiling

Barrel Vault French Door

W.I.C.

Bedroom 2 9'6" x 11'0"

Shared Bath

Laundry Dn Ensuite 2

Railing

Barrel Vault

Ensuite 2

Unexcavated

Bedroom 3 12'0" x 15'4" Unfinished Basement

W.I.C.

Bedroom 4 10'5"(6'1") x 17'9"(15'9")

Barrel Vault

Shared Bath

Bedroom 3 12'0" x 15'4"

Unfinished Basement

W.I.C.

Bedroom 4 10'5"(6'1") x 17'9"(15'9") Barrel Vault

Unexcavated

PARTIAL BASEMENT

Partial Basement FloorBElevation 'B' ELEV.

Second Floor Elevation 'B'

UPPER FLOOR ELEV. B

Barrel Vault

Partial Basement Floor Elevation 'B'

Second Floor Elevation 'B' Opt. Coffered Ceiling

Sitting 7'10" x 3'0"

Freestanding Tub Glass Shower

French Door

His W.I.C.

Tray Ceiling

Master

Unfinished Basement

EnsuiteCeiling Opt. Coffered Sitting 7'10" x 3'0" Master

Sitting 3'0" x 7'10" Raised Ceiling

French Door

S

Glass Shower

His W.I.C.

Tray Ceiling

Hers W.I.C.

Master Bedroom 15'0" x 16'0"

Sitting 3'0" x 7'10" S

Freestanding Tub

Bedroom 15'0" x 16'0"

Raised Ceiling

Opt. Uppers

D

Linen

Up

W

Linen

Railing

W

Opt. Coffered Ceiling

Dn

D

Cold Cellar

Hers W.I.C.

Opt. Uppers

S

Cold Cellar

Bedroom 2 9'6" x 11'0"

Laundry

W.I.C.

Bedroom 2 9'6" x 11'0"

Up Shared Bath

Low Headroom

Ensuite 2

Dn

Raised Ceiling

Raised Ceiling

Ensuite 2 Storage

Bedroom 4 10'5"(6'5") x 18'9"(16'1")

Opt. Coffered Ceiling

Laundry

Railing

S

Unfinished Basement

Master Ensuite

Low Headroom Shared Bath

W.I.C.

Bedroom 3 12'7" x 15'4"(14'4")

PARTIAL BASEMENT ELEV. C

W.I.C. Raised Ceiling

Bedroom 3 12'7" x 15'4"(14'4") Storage

Bedroom 4 10'5"(6'5") x 18'9"(16'1")

W.I.C.

UPPER FLOOR ELEV. C

Raised Ceiling

Partial Basement Floor Elevation 'C'

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements Second Floor Elevation 'C' Corporation’s official method for the calculation of floor area. Partial Basement Elevation adhere to the rules and regulations of the TARION Warranty Actual useable Floor floor space may'C' vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 36-05


opus

43-1

ELEVATION A, B & C

3179

SQ.FT.

2 STOREY PLAN

ELEVATION A


ELEVATION B

ELEVATION C


Opt. Built-in Bench

Garden Door

Breakfast 9'4"x 9'4"x 16'0" (19'0") Opt. Built-in Bench

Location Of Furnace And Hot Water Heater

Dw

Coffered Ceiling

Opt Waffle Ceiling

Dn

(If Req'd)9'0"

HRV

Up

Gas Fireplace

F

Low Headroom If Required

Great Room 16'4" x 16'0" Open To Above

Up Low Headroom If Required

H 3 Piece Rough-In

Steps If Req'd

Sunken If Req'd

Dn

(If Req'd)

Opt. Wet Bar

F

Open To Above Dining Room Opt. Wet

11'0" x 15'2"

Low Headroom

Mudroom

Dn

Steps If Req'd

Tray Ceiling

Kitchen x 16'0" (18'0") F

Dn

S

Pantry

Sunken If Req'd

Dn

F

Master Bedroom 15'4" x 16'8"

Steps If Req'd

Open To Below

Pantry

Mudroom

Dn

Sunken If Req'd

Sunken If Req'd

Walk In Linen

F

Steps If Req'd

(If Req'd)

Bar

Dw

Dw

Door Where Grade Permits

Dn Dn

Master Bedroom 15'4" x 16'8"

(If Req'd)

Steps (If Req'd) If Req'd Up

Unexcavated

(If Req'd)

Open To Above

Up Low Headroom If Required

iece gh-In

Up

Steps If Req'd

Mudroom

Dn

Location Of Furnace And Hot Water Heater May Vary HRV

Low Headroom

Breakfast 9'4"x 16'0" (19'0")

Dn

Opt. Coffered Ceiling

HRV

2 STOREY Unfinished PLAN Basement

H

S

Garden Door

May Vary Location Of Furnace And Hot Water Heater F May VaryH

Up

Tray Ceiling

Breakfast Bar

Breakfast 16'0" (19'0")S

Great Room x 16'0"

Great Room 16'4" 16'4" x 16'0"

Breakfast Bar

Unfinished Basement

Breakfast Bar

Gas Fireplace

Kitchen 9'0" x 16'0" (18'0")

Gas Fireplace

43-1 Unfinished Basement

Coffered Ceiling

Opt Waffle Ceiling

Garden Door

Kitchen 9'0" x 16'0" (18'0")

Opt. Coffered Ceiling

opus

Coffered Ceiling

Opt. Built-in Bench

Door Where Grade Permits

Ensuite 2

Opt. Coffered Ceiling

Opt Waffle Ceiling

Pantry

Sunken If Req'd

Sunken If Req'd

Garage 18'7" x 20'7"

Open To Below

Dn

Door Where Grade Permits

W.I.C.

Walk In Linen

Dining Room 11'0" x 15'2"

Unexcavated Unexcavated

Cold Cellar

PowderDining

Room 11'0" x 15'2"

43-01 ELEVATION A - 3179 SQ.FT.

Ground Floor Elevation 'A' Foyer

Dining Room 11'0" x 15'2"

Powder

Ensuite 2

Garage 18'7" x 20'7"

W.I.C.

Foyer

Basement Floor Elevation 'A'

Ground Floor Elevation 'A' Unexcavated

Cold Cellar

Dining Room 11'0" x 15'2" Opt. Detailed Ceiling

Bedroom 4 15'4" (9'6") x 13'0" (14'8")

Ensuite 2

Garage 18'7" x 20'7"

Covered Porch

W.I.C.

Barrel Vault

Powder

Partial Basement Floor Elevation 'B'

Foyer

Partial Ground Floor Elevation 'B' PARTIAL Dining Room 11'0" x 15'2" ELEV. B

ELEVATION B - 3179 SQ.FT. Unexcavated

MAIN FLOOR

Opt. Detailed Ceiling Covered

Cold Cellar

Unfinished Basement

MAIN FLOOR ELEV. A Second Floor Elev

Ground Floor Elevation 'A'

43-01

Elev

Raised Ceiling

Portico

Opt. Detailed Ceiling

Unfinished Basement

Unfinished Basement

Bedroom 4 Second Floor 15'4" (9'6") x 13'0"(14'8")

Portico

Basement Floor Elevation 'A'

W.I.C.

Foyer

Powder

Cold Cellar

Unexcavated

Bedroom 4 15'4" (9'6") x 13'0"(14'8")

Ensuite 2

Raised Ceiling

Opt. Detailed Ceiling Portico

Powder

43-01

Garage 18'7" x 20'7"

Garage 18'7" x 20'7"

Opt. Detailed Ceiling

Basement Floor Elevation 'A'

Cold Cellar

Foyer

Opt. Coffered Ceiling

Opt. Detailed Ceiling

3 Piece Rough-In

Opt. Coffered Ceiling

Opt. Wet Bar

Garage 18'7" x 20'7"

Bedroom 4

Partial Second Elevatio 15'4" (9'6") xFloor 13'0" (14'8")

Porch

Barrel Vault

Partial Basement Floor Elevation 'B' Unexcavated

Powder

Partial Ground FloorFoyer Elevation 'B'

Dining Room 11'0" x 15'2"

Garage 18'7" x 20'7"

Opt. Detailed Ceiling

Partial Second Floor Elevatio Ensuite 2 W.I.C.

Unfinished Basement

Cold Cellar

Powder

Unexcavated Cold Cellar Unfinished Basement

Partial Basement Floor Elevation 'C'

Covered Porch

PARTIAL MAIN FLOOR ELEV.Garage C

Dining Room 11'0" x 15'2" Opt. Detailed Ceiling

Partial Basement Floor Elevation 'B'

ELEVATION C - 3179 SQ.FT.

Foyer

Covered Porch

18'7" x 20'7"

Partial Ground Floor Elevation 'B' Powder

Bedroom 4 15'10" (10'0") x 13'0"(14'8") Ensuite 2 W.I.C.

Raised Ceiling

Foyer

Partial Ground Floor Elevation 'C'

Bedroom 4 15'10" (10'0") x 13'0"(14'8")

Partial Second Floor Elevation


Open To Below Dn

Garage 18'7" x 20'7"

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Ensuite 2

Walk In Linen

W.I.C.

W

Dn

Laundry

Bedroom 3 W13'0" x D 12'6"

Shared Bath

Shared Bath

Laundry

Walk In Linen Opt. Uppers

Bedroom 4 W.I.C. 15'4" (9'6") x 13'0"(14'8")

Opt. Coffered Ceiling

W

Raised Ceiling

W.I.C.

W.I.C.

Bedroom 3 W.I.C. 13'0" x 12'6"

Shared W.I.C. Bath

Make-up

Make-up

Unfinished Upper Floor Opt. Master Basement Ensuite Elevation W.I.C. 'A', 'B' & 'C' Location Of Furnace And Hot Water Heater May Vary

D

Upper Floor Opt. Master Ensuite Elevation 'A', 'B' & 'C'

Shared Bath 3 Bedroom

W.I.C.

H

Upper Floor Opt.UpMaster Ensuite Elevation 'A', 'B' & 'C' Unfinished Basement

Raised Ceiling

Low Headroom H If Required

3 Piece Rough-In

F

Low Headroom

Low Headroom

W.I.C.

Bedroom 3 13'0" x 12'6"

If Required Unexcavated

Low Headroom 3 Piece Rough-In

Second Floor Elevation 'A'

Bedroom 4 15'4" (9'6") x 13'0"(14'8")

W.I.C.

3 Piece Rough-In

Unexcavated

Raised Ceiling

Unexcavated

Second Floor Elevation 'A'

Cold Cellar

UPPER FLOOR ELEV. A

Raised Ceiling

Basement Floor Elevation 'A'

Ensuite 2

W.I.C.

Shared W.I.C. Bath

Bedroom 3 13'0" x 12'4"

Second Floor Elevation 'A'

W.I.C.

Shared Bath

Basement Floor Elevation 'A'

Unfinished Basement Basement

Floor Elevation 'A'

W.I.C.

Unexcavated

Barrel Vault

Unfinished Basement Cold Cellar

oor Elevation 'B' Second Floor Elevation 'B' Partial

Partial Second Floor Elevation 'B'

Ensuite 2

Partial Second Floor Elevation 'B'

PARTIAL Partial Basement Floor Elevation 'B' Cold Cellar

W.I.C. Shared Bath

Ensuite 2 Ensuite 2

W.I.C.

Bedroom 4 15'4" (9'6") x 13'0" (14'8")

Bedroom 3 13'5" x 12'0" (13'6")

W.I.C.

Bedroom 4 Raised Ceiling 15'10" (10'0") x 13'0"(14'8") Shared Bath

Barrel Vault

Bedroom 3 13'5" x 12'0" (13'6")

W.I.C.

PARTIAL UPPER FLOOR ELEV. C Raised Ceiling

Raised Ceiling

BASEMENT

Partial Basement Floor Elevation 'B' W.I.C. Bedroom 3 13'5" x 12'0" (13'6")

Ensuite 2

Bedroom 4 15'10" (10'0") x 13'0"(14'8") W.I.C.

ELEV. B

Cold Cellar

Bedroom 3 13'0" x 12'4" Shared W.I.C. Bath

Unexcavated

Unfinished Basement

PARTIAL UPPER FLOOR ELEV. B

Barrel Vault

Unexcavated

43-01

Bedroom 3 13'0" x 12'4"

Bedroom 4 15'4" (9'6") x 13'0" (14'8")

BASEMENT ELEV. A

43-01

Bedroom 4Shared 15'4" (9'6") x 13'0" Bath (14'8")

Barrel Vault

Cold Cellar

Cold Cellar W.I.C.

Bedroom 4 15'4" (9'6") x 13'0" (14'8")W.I.C.

43-01

Bedroom 3 13'0" x 12'4"

Ensuite 2

Raised Ceiling

F H Location Of Furnace And Hot Water Heater May Vary

Up

Raised Ceiling

Bedroom 4 15'10" (10'0") x 13'0"(14'8")

Location Of Furnace And Hot Water Heater May Vary

Low Headroom

D

Raised Ceiling

Second Floor Elevation 'A'

Garage 18'7" x 20'7"

Low Headroom If Required

Raised Ceiling

Bedroom 4 15'4" (9'6") x 13'0"(14'8")

Garage 18'7" x 20'7"

F

Unfinished Basement

Up

Raised Ceiling

Ensuite 2

PARTIAL UPPER FLOOR OPT. MASTER ENSUITE ELEV. A, B & C

Opt. Uppers

13'0" x 12'6"

Bedroom 4 Uppers 15'4" (9'6")Opt. x 13'0"(14'8")

Ensuite 2

W

Glass Shower

Upper Floor Opt. Master Ensuite Elevation 'A', 'B' & 'C'

Laundry

Walk In Linen

Ensuite 2

Walk In Linen

W.I.C.

D

Opt. Coffered Ceiling

Ensuite 2

Elevation 'A'

on 'C'

Dn

W.I.C.

Laundry

Opt. Uppers Opt. Coffered Ceiling

W.I.C.

W.I.C.

Glass Shower

HRV

Door Where Grade Permits

Open To Below

Open To Below

Glass Shower

Opt. Coffered Ceiling

Dn

Opt. Coffered Ceiling

Sunken If Req'd

Sunken If Req'd

W.I.C.

W.I.C.

Glass Shower

Opt. Coffered Ceiling

Opt. Coffered Ceiling

Pantry

Opt. Coffered Ceiling

Mudroom

Steps If Req'd

Glass Shower

W.I.C.

Opt. Coffered Ceiling

Dn

(If Req'd)

Open To Below

W.I.C.

Opt. Coffered Ceiling

Steps If Req'd

Master EnsuiteW.I.C.

Master Bedroom 14'6" x 16'8"

Master Ensuite

Master Bedroom 14'6" x 16'8"

Seat

Glass Shower Glass Shower

(If Req'd) Master

Master Ensuite

Master Bedroom 14'6" x 16'8"

HRV

Bedroom F 15'4" x 16'8"

Tray Ceiling

Tray Ceiling

HRV

Dn

11'0" x 11'6"

Bedroom 2 W.I.C. 11'0" x 11'6"

Glass Shower Master Ensuite

Master Bedroom 2 Ensuite 11'0" x 11'6"

Make-up

Freestanding Tub

Master Bedroom 15'4" x 16'8"

Master BedroomBedroom 2 14'6" x 16'8"

Master MasterBedroom Ensuite 15'4" x 16'8"

S

TrayDw Ceiling

Master Ensuite

Tray Ceiling

Seat

Breakfast 9'4"x 16'0" (19'0")

Bedroom 2 11'0" x 11'6"

Master Ensuite

Seat

Breakfast Bar

Master Bedroom 15'4" x 16'8"

Tray Freestanding Ceiling Tub

Freestanding Tray Ceiling Tub

Kitchen Tray Ceiling 9'0" x 16'0" (18'0")

Seat

Freestanding Tub

Garden Tray Ceiling Door

Opt. Coffered Ceiling

Coffered Ceiling

Make-up

Opt. Built-in Bench

Shared Bath

W.I.C.

Partial Basement Floor Elevation 'B'

Unexcavated

Unfinished Basement

Raised Ceiling

Unexcavated

Unfinished Basement Cold Cellar

PARTIAL BASEMENT ELEV.Unexcavated C

Unfinished Basement

Partial Second Floor Elevation 'C' Partial Second Floor Elevationpre-construction 'B'Second Floor Partial Basement Floor Elevationprocess. 'C' 'C' The floor plans and elevations shown arePartial andElevation may be revised or improved as necessitated by architectural controls and the construction The measurements Cold Raised Ceiling Cellar adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from the stated floor area, as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 43-01 Cold Cellar

P


opus

43-2

ELEVATION A, B & C

3233

SQ.FT.

2 STOREY PLAN

ELEVATION A


ELEVATION B

ELEVATION C


Opt. Built-in Bench

Coffered Ceiling

Chef’s Prep Area 7'10" x 7'0"

F

H

Servery Servery

Steps If Req’d

Opt. Waffle Ceiling Door Where Grade Permits

Pantry

Powder

Opt. Coffered Ceiling

Powder

Opt. Coffered Ceiling

Dining Room 11'0" x 16'0"

Door Where Grade IfPermits Steps Req’d Door Where Grade Permits

Dining Room 11'0" x 16'0" Dining Room 11'0" x 16'0" Unexcavated

French Door

Steps If Req’d

Opt. Detailed Ceiling

Opt Built-in Opt Built-in

Opt. Waffle Ceiling

Master Ensuite Master Ensuite

Opt. Coffered C

Opt. Coffered C

W.I.C. W.I.C.

Opt. B.I.

Opt. B.I.

Walk In Linen

Opt. B.I.

Walk In Linen

Ensuite 2 Opt. B.I. Opt. B.I.

Ensuite 2

W.I.C. W.I.C.

Bedroom 4 11'6" x 13'0" Bedroom 4 11'6" x 13'0"

Opt. Detailed Ceiling

Low Headroom Low Headroom

ELEVATION A - 3233 SQ.FT.

Dn

Dn

Dn

Dn

Foyer

Up

Up

Up

Open To Above

Up

Up

Open To Above

Railing Railing Open To Below

Foyer

Open To Above

Open To Below

Foyer

Raised Ceiling

MAIN FLOOR ELEV. A

Cold Cellar Cold Cellar

Cold Cellar

Raised Ceiling

Portico Portico

Basement Plan Elevation 'A' & 'B' Basement Plan Elevation 'A' & 'B'

43-02

43-02'A' & 'B' Basement Plan Elevation

43-02

Portico

Ground Floor Elevation 'A' Ground Floor Elevation 'A'

Second Floor Second Floor

Ground Floor Elevation 'A' Garage 18'7" x 20'3" Garage 18'7" x 20'3"

Dn Dn

Dn Dn

Railing Railing Open To Below

Foyer

Up

Open To Above

Up

Open To Above

Dn

Portico Portico

Up

Foyer

Up

Dn

Unfinished Basement Unfinished Basement

ELEVATION C - 3233 SQ.FT.

Garage 18'7" x 20'3" Garage 18'7" x 20'3"

Dn Dn

Unexcavated

Foyer

Up

Open To Above

Up

Open To Above

Railing

Open To Below

Foyer

Partial Ground Floor Elevation 'B'

PARTIAL MAIN FLOOR ELEV. C

Covered Porch

Raised Ceiling Raised Ceiling

Covered Porch

Dn

Partial Basement Plan Elevation 'C'

Partial Second Partial Second

Railing Open To Below

Up

Cold Cellar Cold Cellar

Portico

Dn

Barrel Vault

Open To Above

Unexcavated Unexcavated

Barrel Vault

PARTIAL MAIN FLOOR ELEV. B

Partial Ground Floor Elevation 'B' Partial Ground Floor Elevation 'B'

Low Headroom Low Headroom

Open To Below

Garage 18'7" x 20'3"

Foyer

ELEVATION B - 3233 SQ.FT.

Unfinished

Freestanding Tub

Opt. B.I.

Den/Office 10'0" x 10'0"

Garage 18'7" x 20'3" Garage 18'7" x 20'3"

Dn

Opt.Freestanding Coffered Ceiling Tub

Glass Shower

Garage 18'7" x 20'3"

Unexcavated Opt. Detailed Ceiling

French Door

Opt. Coffered Ceiling

Glass Shower

Den/Office 10'0" x 10'0" Den/Office 10'0" x 10'0"

French Door

Opt. Coffered Ceiling

HRV HRV

Location Of Furnace And Hot Water Heater MayOf Vary Location Furnace And Hot Water Heater May Vary F H

Opt. Sink

Opt. Waffle Ceiling

Pantry

F

Opt. Sink

Unexcavated

Opt. Coffered Ceiling

Gas Fireplace Gas Fireplace

Servery

Great Room 15'1" (16'6") x 15'0" Great Room 15'1" (16'6") x 15'0"

Breakfast 9'2" x 15'0" Breakfast 9'2" x 15'0" Powder

Opt Built-in Opt Built-in

Breakfast Breakfast Bar Bar

DW

Kitchen 9'0" x 11'0" (15'0") Kitchen 9'0" x 11'0" (15'0")

H

F

Garden Door

Pantry

Opt. Coffered Opt. Coffered CeilingCeiling

HRV

F

S

Opt. Waffle Ceiling

DW

Opt. Sink S

Opt. Waffle Ceiling

Garden Door

Coffered Ceiling Chef’s Prep Area 7'10" x 7'0" Chef’s Prep Area F 7'10" x 7'0"

Opt. Coffered Opt. Coffered CeilingCeiling

Kitchen Coffered Ceiling 9'0" x 11'0" (15'0")

Opt. Built-in Bench

Location Of Furnace And Hot Water Heater Unfinished May Vary

Up

Great Room 15'1" (16'6") x 15'0"

Breakfast 9'2" x 15'0"

Opt. Built-in Bench

2 STOREY PLAN

3 Piece Rough-In 3 Piece Rough-In

Gas Fireplace

S

Opt Built-in

43-2

Breakfast Bar

DW

Unfinished Basement

Basement Unfinished Basement

Opt Built-in

opus

Opt. Waffle Ceiling Garden Door

Partial Ground Floor Elevation 'C'

Garage 18'7" x 20'3"

Partial Second Floor Elevatio


Opt. Coffered Ceiling

W.I.C.

Ensuite 2

W.I.C.

Opt. B.I.

Bedroom 4 11'6" xBedroom 13'0"

4 11'6" x 13'0"

Opt. Uppers

Laundry

Dn

W.I.C.

D

W

Shared Open To Below

Shared Bath

Partial Second Floor Opt Master Ensuite Elevation 'A', 'B' & 'C' Partial Second Floor Opt Master Ensuite Elevation 'A', 'B' & 'C'

Dn

Railing

Raised Open ToCeiling Below

Make-up

Bedroom 3 (18'6")13'0" x 13'8" (12'0")

Bedroom 3 (18'6")13'0" x 13'8" (12'0")

Railing

H

Unexcavated

Bedroom 3 (18'6")13'0" x 13'8" (12'0")

Dn

F

W.I.C.

Railing Open To Below

Location Of Furnace And Hot Water Heater May Vary

Unfinished Basement

Raised Ceiling

Opt. Uppers

W.I.C.

3 Piece Rough-In

D

W.I.C.

Dn

Partial Second Floor Opt Master Ensuite Elevation 'A', 'B' & 'C'

D

Bath

Opt. Uppers

W

Unfinished Basement

Bedroom 3 Shared (18'6")13'0" x 13'8" (12'0") Bath

Laundry Shared Bath Railing

Laundry Opt. Uppers

Opt. Coffered Ceiling

UPPER FLOOR PartialPARTIAL Second Floor Opt Master OPT. Ensuite MASTER ENSUITE Elevation 'A', A, 'B' & ELEV. B 'C' &C

W.I.C.

D

W

Bedroom 2 13'8" (11'10")x 12'2"

W

Bedroom 4 11'6" x 13'0"

vation 'A'

Low Headroom

Second Floor Elevation 'A'

Location Of Furnace And Hot Water Heater May Vary

Up

F

H

Open To Below Raised Ceiling

Garage 18'7" x 20'3"

Raised Ceiling

Bedroom 3 (18'6")13'0" x 12'2" (10'6")

Dn Railing

UPPER FLOOR ELEV. A

Second Floor Elevation 'A' Barrel Vault

Second Floor Elevation 'A'

Unexcavated

Basement Plan Elevation 'A' & 'B' Low Headroom

Bedroom 3 (18'6")13'0" x 12'2" (10'6")

Dn

Cold Cellar

3 Piece Rough-In

Barrel Vault

Open To Below

43-02

Railing

Dn

Barrel Vault 3 Bedroom (18'6")13'0" x 12'2" (10'6")

Open To Below

Up

Second Floor Elevation 'A' Railing

or Elevation 'B'

'

W.I.C.

Opt. Coffered Ceiling Opt. Coffered Ceiling

Opt. B.I.

Garage 18'7" x 20'3"

Bedroom 2 Laundry 13'8" (11'10")x 12'2"

Bedroom 4 Bedroom 2 11'6" x 13'0" 13'8" (11'10")x 12'2"

W.I.C.

Opt. Coffered Ceiling

Opt. Shelves

W.I.C.

W.I.C.

HRV

W.I.C.

Make-up

Gas Fireplace Walk In Linen

Master Ensuite

HRV

Opt Built-in

W.I.C.

Ensuite 2

Bedroom 2 Opt. Shelves 13'8" (11'10")x 12'2"

Master Bedroom W.I.C. 17'0" x 15'0"

Opt. Coffered Ceiling

Walk In Linen

W.I.C.

Master Ensuite

Make-up

Master Bedroom 17'0" x 15'0"

W.I.C.

Opt. B.I.

Opt. Shelves Opt. Coffered Ceiling

Glass Shower

Ensuite 2

W.I.C.

Opt. Coffered Ceiling

Walk In Linen Tray Ceiling

Walk In Linen

Opt. B.I.

Glass Shower

Opt. Coffered Ceiling

Tray Ceiling

Ensuite 2

Make-up

Opt Built-in

Opt Built-in Opt Built-in

W.I.C.

Door Where Grade Permits

Opt. B.I.

Opt. Shelves Opt. Coffered Ceiling

Master Bedroom 17'0" x 15'0"

Opt. Coffered Ceiling

Master Ensuite Opt. Coffered Ceiling

W.I.C.

Steps If Req’d

Master Ensuite

Opt. Coffered Ceiling

Den/Office 10'0" x 10'0"

French Door

Master Ensuite

Master Bedroom 17'0" x 15'0"

W.I.C.

Opt Built-in

offered Ceiling

Tray Ceiling

Opt. Coffered Ceiling Opt. B.I. Master Freestanding Tub Ensuite

Opt. Waffle Ceiling Glass Shower

Tray Ceiling

Master Ensuite

Freestanding Tub

Opt. Coffered Ceiling

Glass Shower

Master Ensuite

Opt. Coffered Ceiling

Glass Shower

Opt. Coffered Ceiling

Glass Shower

Freestanding Tub

Freestanding Tub

Opt Built-in

Great Room 15'1" (16'6") x 15'0"

Opt. Coffered Ceiling

Glass Shower

Opt. Coffered Ceiling

Glass Shower

Opt. Coffered Ceiling

Opt. Waffle Ceiling

Barrel Vault

Cold Cellar

Barrel Vault

Garage 18'7" x 20'3"

BASEMENT ELEV. A & B

Partial Second Floor Elevation 'B'

Barrel Open ToVault Below

Bedroom 3

Dn

Bedroom 3 (18'6")13'0" x 12'0" (11'0") PARTIAL DnUPPER FLOOR (18'6")13'0" x 12'2" (10'6") ELEV. B Railing

Railing

Raised Ceiling

Basement Plan Elevation 'A' & 'B'

Open To Below

Partial Second Open Floor Elevation 'B' To Below

Barrel Vault

43-02

Raised Ceiling

Partial Second Floor Elevation 'B' Barrel Vault

Dn Railing

Dn

Low Headroom

Raised Ceiling

Unfinished Basement

Bedroom 3 (18'6")13'0" x 12'0" (11'0")

Open To Below Railing Raised Open ToCeiling Below

Unexcavated

Bedroom 3 (18'6")13'0" x 12'0" (11'0")

Up

Raised Ceiling

Partial Second Floor Elevation 'C'

PARTIAL UPPER FLOOR ELEV. C

Raised Ceiling

Cold Cellar

PARTIAL BASEMENT ELEV. C

Partial Second Floor Elevation 'B' Partial Basement Plan Elevation 'C'

Partial Second Floor Elevation 'C'

Low

Unexcavated

Headroom The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements Bedroom 3 Partial Second Elevation 'C' adhere to the rules Floor and regulations official method space may vary from the stated floor area, Dn of the TARION Warranty Corporation’s (18'6")13'0" x 12'0" (11'0")for the calculation of floor area. Actual useable floor Unfinished as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 43-02 Basement

Railing

Raised Ceiling

Up

P


opus

43-3

ELEVATION A, B & C

3883

SQ.FT.

3 STOREY PLAN

ELEVATION A


ELEVATION B

ELEVATION C


Unexcavated Up

Garage 19'1" x 23'9"

Up

Powder

Unexcavated

Garage 19'1" x 23'9"

W.I.C.

3 STOREY PLAN

Basement Plan Elevation 'A', 'B', 'C'

43-03

Portico

HRV

HRV

Rec. Room Up 20'0" (9'6") x 14'0" (18'6")

Dn

Unexcavated Up

Elevator

3 Piece Rough-In

Lower Powder

Portico

A - 3883 SQ.FT. 'C'

Partial Lower Floor For Opt. Elevator

Lower Floor Elevation 'A' Garage 19'1" x 23'9"

W.I.C.

Rec. Room 20'0" (9'6") x 14'0" (18'6")

Door Where Grade Permits

Opt. Coffered Ceiling Foyer

Covered Porch

Up

ELEVATION B - 3883 SQ.FT. Unexcavated

Dn

Partial Lower Floor Elevation 'B'

W.I.C.

Garage 19'1" x 23'9"

Powder

Den / Offic 14'4"(8'10") x 14'6"(1

Den / Offic 14'4"(8'10") x 14'6"(1

Garage 19'1" x 23'9"

W.I.C.

Lower Powder

Partial Main Floor Elevati

Partial Main Floor Elevati Garage 19'1" x 23'9"

W.I.C.

l ment Plan ELEVATION pt. Elevator

Powder

PARTIAL LOWER FLOOR ELEV. B

Partial Lower Floor Elevation 'B'

Unfinished Basement

Den / Offic 14'4" x 13'0" (1

Covered Porch Up

Elevator

Elevator

Elevat

Steps As Req'd

Lower Powder

w room

Piece ugh-In

Garage 19'1" x 23'9"

Foyer Lower Powder

H

Storage

Partial Main Floor For Opt. Elevator Partial Main Floor For Opt. Elevator

Foyer

ocation Of Furnace nd Hot Water Heater May Vary F

Elevat

LOWER FLOOR ELEV. A

Partial Lower Floor For Opt. Elevator

W.I.C.

Storage

Den / Offic 14'4" x 13'0" (1

Foyer

Unfinished Basement

-03

16'0" x

Foyer

Lower Powder

Cold

ment

Garage 19'1" x 23'9"

W.I.C.

Lower Powder

Partial Cellar Basement Plan ELEVATION For Opt. Elevator Partial Basement Plan Opt. Elevator PlanFor Elevation 'A', 'B',

Opt. Built-in Great

Opt. Built-in

Garage 19'1" x 23'9"

Up

Elevator

W.I.C.

Unfinished Basement

Garage 19'1" x 23'9"

Steps As Req'd

Unexcavated Elevator

Great 16'0" x

Up Dn

W.I.C.

Elevator

Piece ugh-In

Door Where Grade Permits

Door Where Grade Permits

Opt. Coffered Ceiling

Up

3 Piece Rough-In

Main Floor Eleva

Steps As Req'd

Opt. Coffered Ceiling

H

Low Headroom

Main Floor Eleva

Door Where Grade Permits

Lower Floor Elevation 'A'

Up

F Low Headroom

Den / Offic 14'4" x 13'0" (1

Tandem Garage 10'0" x 14'9"

Steps As Req'd

Location Of Furnace And Hot Water Heater May Vary

Unexcavated

Den / Offic 14'4" x 13'0" (1

Portico

Lower Floor Elevation 'A'

Rec. Room Dn 20'0" (9'6") x 14'0" (18'6")

H F Location Of Furnace And Hot Water Heater May Vary

Recycle 3'5"x14'9"

Opt Built-in

43-03 H

Opt Built-in

Foyer

Lower Powder

Door Where Grade Permits

Opt. Built-in

Basement Plan Elevation 'A', 'B', 'C'

w room

Rec. Room 20'0" (9'6") x 14'0" (18'6")

Cold Cellar

ocation Of Furnace nd Hot Water Heater May Vary F

Foyer

Lower Powder

Opt. Gas Fireplace

43-3 Cold Cellar

Garden Door

Opt Built-in

opus

Unfinished Basement

Opt. Coffered Ceiling

W.I.C.

Opt Built-in

3 Piece Rough-In

Railing

Powder

Opt Built-in

3 Piece Rough-In

Railing

Opt. Built-in

Low Headroom

Powder

Powder

Den / Office 14'4" x 13'0" (1 Foyer

Foyer

Lower Powder Foyer

Pa M Fo

Den / Office 14'4" x 13'0" (1

PARTIAL LOWER FLOOR ELEV. C

Lower Powder

C - 3883 SQ.FT.

Covered Porch Partial Lower Floor For Opt. Elevator Covered Porch

Partial

Partial


French/ Office French Den / Office Den Doors Doors 14'4" x 13'0"14'4" (12'0") x 13'0" (12'0")

Garden Door

D

Pantry

Garden Door

Opt. Waffle Ceiling Opt. Waffle Ceiling

D

Balcony Balcony 14'0" x 3'10" 14'0" W x 3'10" Laundry

Bedroom 4 Bedroom 4 14'4" (8'10") x14'4" 10'6"(9'6") (8'10") x 10'6"(9'6")

Coffered Ceiling Coffered Ceiling

Bedroom 3 Bedroom 3 W 12'0(8'8") x 12'0" 12'0(8'8") (13'0")x 12'0" (13'0")

Bedroom 3 Bedroom 3 W 12'0(8'8") x 12'0" 12'0(8'8") (13'0") x 12'0" (13'0")

Laundry D Garden Door

Ceiling Bedroom Raised 4 Bedroom 4 Tray Ceiling Raised Ceiling 14'4" (8'10") x 14'4" 10'6"(9'6") (8'10") x 10'6"(9'6")

Opt. Uppers

W

Laundry ExteriorLaundry Railing Exterior Railing

Opt. Waffle Ceiling Opt. Waffle Ceiling

Den / Office Den / Office 14'4" x 13'0"14'4" (12'0") x 13'0" (12'0")

Opt. Built-in

D

Opt. Coffered Ceiling Opt. Coffered Ceiling

Garden Door

Freestanding Tub

Tray Ceiling

Freestanding Tub

Great Room Great Room 16'0" x 18'2" 16'0" x 18'2"

Breakfast Breakfast 9'2" x 16'8"9'2" x 16'8" DW

Dn

Dn W.I.C.

Dn

Storage

French French Doors Storage Elevator French Doors Elevator French

Elevator

Door

Dining Dining Room Room 12'0" x 19'0" 12'0" x 19'0" Opt. Coffered Ceiling Opt. Coffered Ceiling

Dining Dining Room Room 12'0" x 19'0"12'0" x 19'0"

Door

Den / Office Den / Office 14'4" x 13'0"14'4" (12'0") x 13'0" (12'0")

French Den / OfficeDen / Office Door 14'4" x 13'0" (12'0") 14'4" x 13'0" (12'0")

Powder

Ensuite 2

Ensuite 2

Bedroom 4

Railing

W Laundry

Elevator

W

Ensuite 2

W

Laundry D

Bedroom 4

D

Bedroom 4 Bedroom 4W Laundry Laundry 14'4" (8'10") 14'4" x 10'6"(9'6") (8'10") x 10'6"(9'6")

Powder

Bedroom 4

D

Bedroom 4

Partial Partial Raised Ceiling Std.Upper & Opt.Floor Upper Floor MAIN FLOOR Std. & Opt. For Opt. For Elevator Opt. Elevator ELEV. A Partial Partial Std. & Opt. Std.Upper & Opt.Floor Upper Floor For Opt. For Elevator Opt. Elevator

Partial Partial Main Floor Main Floor For Opt. For Elevator Opt. Elevator Partial Partial Main Floor Main Floor For Opt. For Elevator Opt. Elevator

Linen

Linen

W.I.C.

Ensuite 2

Laundry Opt. Waffle Ceiling Opt. Waffle Ceiling

Powder

W.I.C. W.I.C.

W.I.C. Ensuite 2

Elevator

Elevator

Powder

French Door

Den / Office Den / Office 14'4" x 13'0"14'4" (12'0") x 13'0" (12'0")

Ensuite 2

Elevator

W.I.C.

W D

D

Bedroom 3 Bedroom 3 12'0(8'8") x 12'0" (13'0") 12'0(8'8") x 12'0" (13'0")

W

Laundry

D

Opt. Uppers

Up

Storage Elevator

Dining Room Dining Room 18'10" (12'0") x 19'0" (12'4") 18'10" (12'0") x 19'0" (12'4")

W.I.C.

Shared Bath

Dn

Railing

Up

Storage

Dn

Railing

Powder

Up Opt. Dn Sink

Railing

Opt. Waffle Ceiling Opt. Waffle Ceiling Opt. Sink Opt. Coffered Ceiling Opt. Coffered Ceiling Servery Servery

Up Dn

Opt. Uppers

W.I.C.

F

Opt. Uppers

F Servery

Railing

Shared W.I.C. Bath

W.I.C.

Opt. Uppers

Servery

Opt. Waffle Ceiling Opt. Waffle Ceiling

Opt. Uppers

Opt. Sink

Railing

KitchenF KitchenF 8'6" x 18'8" 8'6" x 18'8"

Dn

W.I.C.

Linen

W.I.C.

Linen

Servery

Railing

Opt. Built-in Opt. Built-in

Servery

Linen

Dn

Opt. Built-in

W.I.C.

F

Linen

Dn

Opt. Built-in

Raised Ceiling

UPPER FLOOR ELEV. A

Upper Floor Elevation 'A' Upper Floor Elevation 'A'

Opt. Sink

Servery

Storage PowderElevator Powder Elevator

Powder

French

Powder Doors French Door

French Door

French Doors

Den / Office / Office Powder Den Den / Office Den French/ Office French Doors Doors 14'4" x 13'0" 14'4" x 14'4" 13'0" 14'4" x(12'0") 13'0" (12'0") x (12'0") 13'0" (12'0")

W.I.C.

Dining Dining Room Room 12'0" x 19'0" 12'0" x 19'0"

Barrel Vault

Dn

Opt. Uppers

Opt. Uppers

Barrel Vault

Barrel Vault

Dn

Partial Partial Upper Floor Upper Elevation Floor Elevation 'B' 'B'

Partial Partial Upper Floor Upper Elevation Floor Elevation 'B' 'B'

Dining RoomDining Room 18'10" (12'0") x 17'8" (12'0") 18'10" (12'0") x 17'8" (12'0")

Ensuite

Dining RoomDining Room 18'10" (12'0") x 17'8" (12'0") 18'10" (12'0") x 17'8" (12'0")

Ensuite

W.I.C. Ensuite

Elevator

W.I.C.

Ensuite 2

Powder

D

PARTIAL UPPER FLOOR ELEV. B

W.I.C.

Barrel Vault

Opt. Waffle Ceiling Opt. Waffle Ceiling

Opt. Coffered Ceiling Opt. Coffered Ceiling

Partial Partial Main Floor Main Elevation Floor Elevation 'B' 'B'

Laundry D

Barrel Vault 3 Bedroom Barrel Vault 3 Bedroom 12'0 x 12'0" 12'0 x 12'0"

Bedroom 4 Bedroom 4 14'4" (8'10")14'4" x 11'10"(10'6")(9'6") (8'10") x 11'10"(10'6")(9'6") Barrel Vault Barrel Vault

Servery

Partial Partial Up Main Floor Main Elevation Floor Elevation 'B' Up 'B'

W

W.I.C. Ensuite

Elevator

Ensuite 2 Laundry W.I.C.

W

Laundry D W

Opt. Waffle Ceiling Opt. Waffle Ceiling

Laundry

Bedroom 4 Bedroom 4 Bedroom 4 Bedroom 4 14'4" (8'10")x 10'6" (9'6") 14'4" (8'10")x 10'6" (9'6")

Laundry D

W

W.I.C.

W.I.C.

Bedroom 3 Bedroom 3 x 12'2" (10'8") 12'0 x 12'2" 12'0 (10'8") Bedroom 3 Bedroom 3 Raised Ceiling 12'0 x 12'2" 12'0 x 12'2" (10'8") W W (10'8")

D Raised Ceiling W Laundry

D Raised Ceiling

Laundry D

Raised Ceiling

D

Opt. Uppers

Dn Sink

D

Linen

Opt.

Dn

Storage

Laundry

Bedroom 4 Bedroom 4 14'4" (8'10")14'4" x 11'10"(10'6")(9'6") (8'10") x 11'10"(10'6")(9'6")

PARTIAL MAIN FLOOR F F ELEV. B

Opt. Built-in

D W

Opt. Uppers

Opt. Built-in

Kitchen Kitchen 8'6" x 18'8"8'6" x 18'8"

W.I.C.

Linen

16'0" x 18'2" 16'0" x 18'2"

Ensuite W.I.C. 2

Opt. Uppers

Den / Office Den / Office 14'4"(8'10") 14'6"(13'0")(12'0") 14'6"(13'0")(12'0") Great x14'4"(8'10") Room Greatx Room

Opt. Waffle Ceiling Opt. Waffle Ceiling

Ensuite 2

Bedroom 3 Bedroom 3 12'0 x 12'0" 12'0 x 12'0"

W

Laundry

Opt. Uppers

Opt. Waffle Ceiling Opt. Waffle Ceiling

W Laundry

Opt. Uppers

Dining RoomDining Room 18'10"(12'0")18'10"(12'0") x 19'0"(12'0") x 19'0"(12'0")

W.I.C.

Opt. Uppers

Powder

French Doors

Den / Office Den French/ Office French Doors Doors 14'4"(8'10") 14'4"(8'10") x 14'6"(13'0")(12'0") x 14'6"(13'0")(12'0")

Opt. Built-in

Opt. Built-in

Powder

French Doors

Ensuite W.I.C. 2

Railing

Main Floor Elevation 'A' Main Floor Elevation 'A'

Ensuite 2

Opt. Uppers

Dining RoomDining Room 18'10"(12'0")18'10"(12'0") x 19'0"(12'0") x 19'0"(12'0")

Opt. Uppers

Powder

Railing

Powder

Opt. Waffle Ceiling Opt. Waffle Ceiling

Den / Office Den / Office 14'4" x 13'0"14'4" (12'0") x 13'0" (12'0")

Partial Partial Main Floor Main Floor For Opt.For Elevator Opt. Elevator

PARTIAL MAIN FLOOR ELEV. C

4 Ceiling BedroomRaised 4 Bedroom Ceiling Raised 14'4" (8'10")x 14'4" (8'10")x 10'6" (9'6") 10'6" (9'6")

Partial Partial Std. & Opt. Std.Upper & Opt.Floor Upper Floor For Opt.For Elevator Opt. Elevator Raised Ceiling

PARTIAL UPPER FLOOR ELEV. C

Raised Ceiling

The floor plans by architectural controls and the construction process. The measurements Partial Partialand elevations shown are pre-construction and may be revised or improved as necessitated Partial of floor area. Actual useable floor space may vary from the stated floor area, adhere to the rules and regulations of the TARION Warranty Corporation’s official method forPartial the calculation Main Floor Main Elevation Floor Elevation 'C' 'C' as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Upper Floor Upper Elevation Floor Refer Elevation 'C' to sales 'C'representative for details. E. & O. E. 43-03

Partial

Partial

Glass Shower

Bedroom 2 Bedroom 2 12'2" x 10'0"12'2" x 10'0"

Kitchen Kitchen 8'6" x 18'8" 8'6" x 18'8"

Opt. Sink

Opt. Sink

Glass Shower

S

W.I.C. F

Great Opt.Room Built-in Great Room 16'0" x 18'2"16'0" x 18'2" Up Up

Railing

S

Opt. Uppers

Opt. Built-in

Opt. Built-in Opt. Built-in

Opt. Built-in

Upper Floor Upper Elevation Floor Elevation 'A' 'A'

DW

Kitchen Kitchen 8'6" x 18'8"8'6" x 18'8"

Opt. Built-in

Great RoomGreat Room 16'0" x 18'2"16'0" x 18'2" Opt. Dn Dn Sink

Master Bedroom Master Bedroom Raised Ceiling 19'0" x 13'0"19'0" x 13'0"

Raised Ceiling

Upper Floor Upper Elevation Floor Elevation 'A' 'A'

Main Floor Main Elevation Floor Elevation 'A' 'A' Opt. Built-in

Breakfast Bar

Gas Fireplace

Master EnsuiteMaster Ensuite Breakfast Bar

Opt. Built-in Gas Fireplace

W.I.C.

Juliet Balcony

Main Floor Main Elevation Floor Elevation 'A' 'A'

Opt. Built-in

Ensuite 2

W.I.C. Ensuite 2

Opt. Uppers

Juliet Balcony

Powder

W.I.C.

Opt. Uppers

French Doors

Opt. Waffle Ceiling Opt. Waffle Ceiling

W.I.C. Ensuite 2

Dining RoomDining Room 18'10" (12'0") 18'10" x 19'0" (12'0") (12'4") x 19'0" (12'4")

Powder French Doors

Ensuite 2

Opt. Uppers

Powder

18'10" (12'0") 18'10" x 19'0" (12'0") (12'4") x 19'0" (12'4")

Railing

Pantry

Railing

Partial

Partial


opus

43-3 3 STOREY PLAN

Unfinished Basement

HRV

Location Of Furnace And Hot Water Heater May Vary F

H

Low Headroom

Up Unexcavated

ELEVATION A - 3883 SQ.FT.

3 Piece Rough-In

BASEMENT ELEV. A, B & C

Cold Cellar

Basement Plan Elevation 'A', 'B', 'C'

43-03 ELEVATION B - 3883 SQ.FT. HRV

Location Of Furnace And Hot Water Heater May Vary F

H

Low Headroom

Up Unexcavated Elevator

ELEVATION C - 3883 SQ.FT. 3 Piece Rough-In

Unfinished Basement


H

Dining Room Dining Room 18'10" (12'0") x 19'0" (12'4")18'10" (12'0") x 19'0" (12'4")

Ensuite 2

Low Headroom

Up

French Doors

W.I.C.

Ensuite 2

Opt. Waffle Ceiling

3 Piece

Bedroom 4 Elevator 14'4" (8'10") x 10'6"(9'6")

Unfinished Basement

W.I.C. Raised Ceiling

Up

Storage

Elevator

Opt. Waffle Ceiling Opt. Sink

W.I.C.

W.I.C.

W.I.C.

Opt. Waffle Ceiling

Dining Room 12'0" x 19'0"

Lower Powder

Den / Office 14'4" x 13'0" (12'0")

Partial Partial Main Floor Main Floor For Opt. Elevator For Opt. Elevator

Ensuite 2

Powder

Covered Porch W Laundry

Powder

Bedroom 4

Dining Room Dining Room 18'10"(12'0") x 19'0"(12'0") 18'10"(12'0") x 19'0"(12'0")

D

Bedroom 4

W Laundry D

Partial Partial PARTIAL UPPER FLOOR FOR Lower Floor Elevation 'B' Lower Floor Elevation 'B' OPT. ELEVATOR Partial Partial Std. & Opt. Upper Floor Std. & Opt. Upper Floor For Opt. Elevator For Opt. Elevator Garage 19'1" x 23'9"

W.I.C.

Powder

Linen

Elevator

Covered Porch

PARTIAL MAIN FLOOR FOR OPT. ELEVATOR

W.I.C.

Foyer

Elevator

French Door

DenPowder / Office 14'4" x 13'0" (12'0")

W.I.C.

Lower Powder

Ensuite 2 French Door

Gara 19'1" x

Dn

Foyer

Opt. Coffered Ceiling

Dining Room 12'0" x 19'0"

Elevator

Garage 19'1" x 23'9"

W.I.C.

Dn

Servery

Up Opt. Coffered Ceiling

Storage

F

Railing

Servery

PARTIAL LOWER FLOOR FOR

OPT. ELEVATOR Partial Partial Lower Floor For Opt. Elevator Lower Floor For Opt. Elevator

Kitchen 8'6" x 18'8"

F

Dn

Foyer

Linen

Opt. Sink

Garage 19'1" x 23'9"

Raised Ceiling

Railing

Opt. Built-in

Opt. Built-in

Kitchen Great Room 8'6" x 18'8" 16'0" x 18'2"

Dn

D

Ensuite 2

W.I.C.

Ensuite 2

W.I.C. Foyer

W.I.C. W Foyer

Bedroom 3 12'0 x 12'0"W

French Laundry Laundry The floor plans and French elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements Lower Doors Doors Lower Powder adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable Powder floor space may vary from the stated floor area, D D Barrel Vault as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 43-03

Den / Office

Den / Office

1

Lower Lower Upper Floor 'A'Powder Upper Floor Elevation 'A' Powder Elevation

Main Floor Elevation 'A' Floor Elevation 'A' Main PARTIAL BASEMENT FOR Partial Partial Basement Plan Basement Plan OPT. ELEVATOR For Opt. ElevatorFor Opt. Elevator

Opt. Built-in

Laundry

Bedroom Elevator4 14'4" (8'10") x 10'6"(9'6")

Foyer

Great Room 16'0" x 18'2"

Bedroom 3 W 12'0(8'8") x 12'0" (13'0")

Garage 19'1" x 23'9"

Opt. Waffle Ceiling

W.I.C.

Rough-In Unfinished Basement

Up D

Unexcavated

Den / Office Elevator 14'4" x 13'0" (12'0")

Opt. Built-in

Dn

Laundry

Up

Unexcavated

3 Piece Rough-In

Dn

W

French Up Doors

Den / Office 14'4" x 13'0"Elevator (12'0")

W.I.C.

Steps As Req'd

Opt. Waffle Ceiling

Opt. Waffle Ceiling

Opt. Uppers

Low Headroom

Door Where Grade Permits

Steps As Req'd Opt. Coffered Ceiling

Opt. Coffered Ceiling

W.I.C.

Gara 19'1" x

Opt. Uppers

Powder

Shared Bath

Door Where Grade Permits

Railing

F

Opt Built-in Railing

Up

Linen

Powder

Dn

Rec. Room Rec. Room 20'0" (9'6") x 14'0" (18'6") 20'0" (9'6") x 14'0" W.I.C. (18'6")

Opt. Uppers

H

Dn

Servery

Opt. Uppers

Railing

F

Opt. Sink

Dn

Servery

Location Of Furnace And Hot Water Heater May Vary

HRV

HRV

Up

Opt. Sink

Bedro 12'2" x

W.I.C. Elevation W.I.C. Lower Floor Lower'A' Floor Elevation 'A'

Railing

Dn

F

Bedroom 2 12'2" x 10'0"

Opt. Uppers

43-03

F

Opt. Built-in

Location Of Furnace And Hot Water Heater May Vary

Portico

Linen

43-03

Glass Shower

Portico

S

Kitchen 8'6" x 18'8"

Basement Plan Elevation 'A', 'B',Elevation 'C' Basement Plan 'A', 'B', 'C' Opt. Built-in

DW

Opt. Uppers

Kitchen 8'6" x 18'8"

Master

Master Bedroom 19'0" x 13'0"

Opt Built-in

S

Master Ensuite

Master Bedroom 19'0" x 13'0"

Breakfast Bar

Breakfast 9'2" x 16'8"

DW

Lower Powder

PARTIALS FOR ELEVATOR OPTION

Opt. Built-in

Opt. Built-in

Gas Fireplace

Great Room Breakfast 16'0" x 9'2" 18'2"x 16'8" Cold Cellar

Breakfast Bar

Op

Op

Great Room 16'0" x 18'2" Cold Cellar

Gas Fireplace

m ge 14'9"

Lower Powder


opus

43-4

ELEVATION A, B & C

4420

SQ.FT.

Incl. Approx. 353 Sq. Ft. Opt. Master Ensuite Plan

3 STOREY PLAN

ELEVATION A


ELEVATION B

ELEVATION C


H

F

H

HRV

Low Headroom

F

Pantry

Mudroom

Storage

Location Of Furnace And Hot Water Heater May Vary

F

Opt. Bench

H

Pantry

Steps As Req'd

Mudroom

Dn

Storage

Door Where Grade Permits

Dn

Railing

Railing

43-4

Unexcavated

Unfinished 3 Piece Basement Rough-In

H

43-04

Unexcavated

May Vary

HRV

Rec. Room 21'0" x 16'0" (16'10")

F

Up

Rec. Room 21'0" x 16'0" (16'10")Opt. Bench

HRV

Elevator

Dn

Foyer

Open To Above

Railing

Low Headroom

Dn Open To Above

Lower Powder

Basement Plan Elevation 'A'

Recycle Area Steps As Req'd 4'0" x 10'6"

Open To Above / Below

Portico

Lower Floor Elevation 'A'

Open To Above / Below

Railing

Unexcavated Unfinished Basement

3 Piece Rough-In

Railing

Foyer Open To Above

Unfinished Basement

3 Piece Rough-In

Elevation 'A', 'B' For Opt. Elevato Partial Main Floo Elevation 'A', 'B' For Opt. Elevato

Garage 19'5" x 21'2"

Lower Lower Floor ElevationPowder 'A'

Unexcavated

Garage 19'5" x 21'2"

Lower Powder

Open To Bel

Foyer

Open To Bel

Open To Above

Rec. Room 21'0" x 16'0" (16'10")

Opt Built-ins

Unfinished Basement

Cold Cellar

Led

Covered Porch

Location Of Furnace And Hot Water Cold Heater MayCellar Vary

ELEVATION B - 4420 Sq.FT. F

Dn

LOWER FLOOR ELEV. A Partial Main Floo

Lower Floor Elevation 'A' Half Wall

Approx. 353 Sq. Ft. Opt. Master Ensuite Plan

Dn

Door Where Grade Permits

Recycle Area 4'0" x 10'6"

Open To Above

F

Elevator

Steps As Req'd Mudroom

Door Where Grade Permits

Railing

Basement Plan Elevation 'A'

Elevator

Mudroom Opt. Bench

ELEVATION A - 4420 SQ.FT.

F

Kitchen 9'8" x 16'10"

Railing

Elevator

Location Of Furnace And Hot Water Heater May Vary F

Kitchen 9'8" x 16'10"

Garage 19'5" x 21'2"

Half Wall

Unfinished Location Of Furnace Basement And Hot Water Heater

Elevator Low Headroom

Railing

Recycle Area 4'0" x 10'6"

Railing

Unfinished Basement

Up

Cold Incl. Cellar

Storage Area 3'5" x 23'1"

Railing

Lower Floor Elevation 'A'

Opt Built-ins

Railing

Door Where Grade Permits

Open To Above

Elevator

Main Floor Eleva

Steps As Req'd

Dn

ment Plan Elevation 'A'

04

Portico

Lower Floor Elevation 'A'

Basement Plan Elevation 'A'

3 Piece Rough-In

Opt Built-ins Half Wall

Basement Plan Elevation 'A'

Main Floor Eleva

Mudroom

Storage

Cold Cellar

43-04

Opt. Bench

Portico

Railing

F

Open To Bel

Half Wall

3 STOREY PLAN

Foyer

Open To Bel

Tandem Garage 10'0" x 23'1"

Half Wall

Cellar

Lower Powder

Up

Up

Open To Above

Half Wall

HRV

Location Of Furnace And Hot Water Heater ColdMay Vary

Foyer

Opt Built-ins

3 Piece Rough-In

Railing Open To Above

Open To Above / Below

Garage 19'5" x 21'2"

Lower Rec.Powder Room 21'0" x 16'0" (16'10")

Up

Door Where Grade Permits

Garage 19'5" x 21'2"

Recycle Area 4'0" x 10'6"

Up

Dn

Railing

Unexcavated

Open To Above

Open To Above / Below

Door Where 4'0" x 10'6" Grade Permits

Garden Door

Railing

Opt Built-ins

opus Up

Up

w oom

Steps As Req'd Area Recycle

Dn Open To Above

Opt. Gas Fireplace

Railing

Railing

Low Headroom

Opt. Bench

Covered Porch

PARTIAL LOWER FLOOR ELEV. B

Led

Incl. Approx. 353Plan Sq.Elevation Ft. Opt. 'B' Master Ensuite Plan Partial Basement

Partial Lower Floor Elevation 'B'

Partial Main Floor

w oom

Partial Basement Plan Elevation 'B'

As Req'd Dn Partial Lower Floor ElevationSteps 'B' Door Where

Partial Main Floor

HRV

vator

Elevator

Mudroom

Grade Permits

Railing

Railing

Unexcavated

3 Piece Rough-In

Unfinished Basement

Railing

Unexcavated

Unfinished Basement

ment Plan Elevation 'A' 3 Piece Rough-In

Open To Above Foyer

Open To Above

Recycle Area 4'0" x 10'6"

Lower Powder

Garage 19'5" x 21'2"

Lower Powder W.I.C.

Lower Floor Elevation 'A'

Open To Below

Open To Above

Cold Cellar

Incl. Approx. 353 Sq. Ft. Opt. Master Ensuite Plan Unexcavated

Partial Basement Plan Elevation 'C' Unfinished Basement

Open To Below

Foyer

PARTIAL LOWER FLOOR ELEV. C

W.I.C.

Cold ELEVATION C - 4420 SQ.FT. Cellar

Garage 19'5" x 21'2"

Covered Porch

Railing

Covered Porch

Partial Lower Floor Elevation 'C' Partial

Lower Powder

Garage 19'5" x 21'2"

Partial Main Floor Elev Partial


Pantry

Pantry Dn

Powder Servery Opt.

Opt. Sink

Servery

Opt. Detailed Ceiling Opt. Detailed Ceiling

Sink

Opt. Built-ins

Walk-in Linen

Walk-in Linen

Walk-in Dn Linen

Opt. Sink

W.I.C. W.I.C. Exterior Railing Exterior Railing Dn

BreakfastBreakfast 12'0" x 16'10" 12'0" RailingDen / Officex 16'10" Den / Office

Railing

11'0" x 12'2" 11'0" x 12'2"

Kitchen Kitchen 9'8" x 16'10" 9'8" x 16'10" Open To Below

F

Opt. Waffle Ceiling

Opt. Waffle Ceiling

Open To Below

Open To Below

Great Room Great Room 13'0" x 19'0" 13'0" x 19'0"

Up

DW

Ledge Ledge Opt. Waffle Ceiling Opt. Waffle Ceiling

(Open To Above (Open For To Above For

Area Sitting Area PlanSitting Standard Standard Only) Plan Only) 12'0" x 7'5"(6'3") 12'0" x 7'5"(6'3")

Railing

Opt. Uppers

Open To Below

Garden Tray Ceiling W Door

D

W

Freestanding Freestanding Tub Tub

D

Shared Bath

W

Master Ensuite

Laundry D

Garden Door

Laundry

Laundry

Laundry

Raised CeilingRaised Ceiling

Bedroom 4 Bedroom 4 12'8" x 12'0" 12'8" x 12'0"

Sitting Area Sitting Area 12'0" x 7'5"(6'3") 12'0" x 7'5"(6'3")

Ensuite 2

Shared Bath

Master Ensuite

Bedroom 3 Open To Below Open To Below Bedroom 3 12'0" x 12'5" (11'3") 12'0" x 12'5" (11'3")

D

Bedroom 3 Bedroom 3 12'0" x 12'5" (11'3") 12'0" x 12'5" (11'3")

Ensuite 2

Bedroom 4 Bedroom 4 12'8" x 12'0" 12'8" x 12'0"

Open To Below

Glass Shower Glass Shower

Ledge

Opt. Built-ins Opt. Built-ins

Pantry Main Floor 'A' Elevation 'A' Main Floor Elevation

Pantry

Opt. Detailed Ceiling Opt. Detailed Ceiling

Powder

Servery

Opt. Sink

Opt. Sink

Servery

Dn

Dn

Dining Room Dining Room 12'0" x 18'0" 12'0" x 18'0"

Open To Below

Open To Below

Ledge

Opt. Coffer Ceiling

Opt. Coffer Ceiling

Open To Below

Laundry

D

BedroomBedroom 3 3 12'0" x 12'5" 12'0"(11'3") x 12'5" (11'3")

W.I.C.

Ensuite 2 Ensuite 2

W.I.C.

Dn Bedroom 4 Bedroom 4 12'8" 12'8"Linen x 12'0" Linen x 12'0"

Dn

Open To Below

Open To Below

Dn

Laundry

Opt. Uppers

Dn Ledge

D

Laundry

MAIN FLOOR Laundry Laundry & Alt. Upper Floor & Alt.Std. Upper Floor ELEV. A Partial Std.Partial

Partial Partial Main FloorMain Floor Elevation 'A', 'B' & 'C' Elevation 'A', 'B' & 'C' For Opt. Elevator For Opt. Elevator Partial Floor Main Main Partial Floor MainMain Elevation Floor Elevation 'A'Floor'A' Elevation 'A', Elevation 'B' & 'C' 'A', 'B' & 'C' Railing For Opt. Elevator For Opt. Elevator RailingDen / Office

Shared Bath

W

Laundry

Opt. Uppers

Open To Above / Below

Opt. Coffer Ceiling

Elevator Dn

Railing

Railing

Dn

Elevator

W

Linen

Linen

Opt. Coffer Ceiling

Shared Bath

W.I.C.

W.I.C.

Opt. Uppers

Open To Above / Below

Open To Above / Below

Railing

Open To Above / Below

Sitting Area Sitting Area 12'0" x 7'5"(6'3") 12'0" x 7'5"(6'3")

Opt. Waffle Ceiling Opt. Waffle Ceiling Dn Powder Powder Railing

Elevator Dn Open To Below Open To Below

Railing

Elevator

Elevator

Elevator Powder

Powder

Railing

F

Opt. Uppers

Elevator

F

Railing

Elevator

Open To Below

Master Bedroom Master Bedroom 14'6" x 16'10" 14'6" x 16'10"

Den / Office Den / Office 11'0" x 12'2" 11'0" x 12'2"

KitchenRailing Kitchen Railing 9'8" x 16'10" 9'8" x 16'10"

BedroomBedroom 2 2 11'8" x 11'6" 11'8" x 11'6"

Dn

Master Bedroom Master Bedroom 14'6" x 16'10" 14'6" x 16'10"

F

Up

Railing

French Doors French Doors

Kitchen Kitchen 9'8" x 16'10" 9'8" x 16'10" F Up

W.I.C.

Upper Floor Upper Elevation Floor 'A' Elevation 'A'

Railing

Open To Above / Below

W.I.C.

Linen

Opt. Coffered Opt. Ceiling Coffered Ceiling

Railing

Open To Above / Below

Railing

Dn

Linen

Opt. Uppers

Main FloorMain Elevation Floor 'A' Elevation 'A'

Upper Floor 'A' Elevation 'A' Upper Floor Elevation Walk-in Walk-in

Railing Opt. Uppers

Powder

UPPER FLOOR ELEV. A

For Opt. Elevator For Opt. Elevator

Partial Std.Partial & Alt.Std. Upper & Alt. Floor UpperElevation Floor Upper Upper Floor Elevation Floor 'A' For Opt. Elevator For Opt. Elevator

'A'

Den / Office 11'0" x 12'2" 11'0" x 12'2"

Railing

Railing

Open To Below

Open To Below

Den / Office Den / Office 11'0" x 12'2" 11'0" x 12'2" Opt. Waffle Ceiling Opt. Waffle Ceiling

Ledge Ledge Opt. Waffle Ceiling Opt. Waffle Ceiling Open To Below

Bedroom 4 Bedroom 4 12'8" x 12'0" (13'2") 12'8" x 12'0" (13'2")

Sitting Area Sitting Area Opt. Detailed Ceiling Opt. Detailed Ceiling

12'0" x 8'1"(6'3") 12'0" x 8'1"(6'3")

Ledge Ledge

Ledge

Barrel Vault

Opt. Detailed Ceiling Opt. Detailed Ceiling Ledge

Barrel Vault

F

Ledge

Ledge

PARTIAL MAIN FLOOR ELEV. B

Ensuite 2

Ensuite 2

Ensuite 2

Ensuite 2

Bedroom 3 Bedroom 3 Barrel Vault Vault 12'0" xBarrel 12'3" (11'3") 12'0" x 12'3" (11'3")

Barrel Vault

Barrel Vault

Master Bedroom Master Bedroom 14'6" x 16'10" 14'6" x 16'10"

PARTIAL UPPER FLOOR ELEV. B W.I.C. Partial Elevator Elevator Partial Std & Alt. Upper Floor 'B' Elevation 'B' Std & Alt. Upper Floor Elevation

Partial MainPartial Floor Main Elevation Elevation 'B' Dn Dn Floor'B'

Partial Partial Std & Alt. Std Upper & Alt. Floor Upper Elevation Floor Elevation 'B' Dn Dn 'B' Open To Below

Sitting Area Sitting Area 12'0" x 7'5"(6'3") 12'0" x 7'5"(6'3")

Den / Office Den / Office 11'0" x 11'6" (15'2") 11'0" x 11'6" (15'2")

Ledge

PartialPartial Main Floor Main Floor Elevation Elevation 'A', 'B''A', & 'C' 'B' & 'C' For Opt. ForElevator Opt. Elevator

Ledge Opt. Waffle Ceiling

Bedroom 4 Bedroom 4 14'8"(10'6") (9'6") x 12'0" (10'6") 14'8" (9'6") x 12'0" Ensuite 2

Opt. Detailed Ceiling Opt. Detailed Ceiling

Sitting Area Sitting Area 12'0" x 7'5"(6'3") 12'0" x 7'5"(6'3")

Opt. Waffle Ceiling

Ledge

Railing

Railing

Ledge Opt. Waffle Ceiling

Laundry

Bedroom 3 Bedroom 3 12'0" x 11'3" (12'5") 12'0" x 11'3" (12'5") Laundry

Ensuite 2

Bedroom 3 Bedroom 3 12'0" x 11'3" (12'5") 12'0" x 11'3" (12'5")

Bedroom 4 Bedroom 4 14'8" (9'6") x 12'0" 14'8"(10'6") (9'6") x 12'0" (10'6") Ensuite 2

PartialPartial Std. &Std. Alt. Upper & Alt. Upper FloorEnsuite Floor 2 For Opt. ForElevator Opt. Elevator PARTIAL UPPER FLOOR ELEV. C

Open To Below

Open To Below

Open To Below

W.I.C.

Linen

Opt. Uppers

Den / Office 11'0" x 11'6" (15'2") 11'0" x 11'6" (15'2")

Railing Opt. Uppers

Opt. Opt. Coffer Coffer Office Ceiling Den /Ceiling

Open To Below

Open To Below

Linen

Railing

Open To Above / Below

Railing

Open To Above / Below

Railing

Elevator

Barrel Vault

Barrel Vault

Floor Elevation 'B' Partial MainPartial Floor Main Elevation 'B' Powder Powder

Elevator

Bedroom 3 Bedroom 3 12'0" x 12'3" (11'3") 12'0" x 12'3" (11'3")

Bedroom 4 Bedroom 4 12'8" x 12'0" (13'2") 12'8" x 12'0" (13'2")

Open To Below

Kitchen Kitchen 9'8" x 16'10" 9'8" x 16'10" F

Sitting Area Sitting Area 12'0" x 8'1"(6'3") 12'0" x 8'1"(6'3")

Opt. Detailed Ceiling Opt. Detailed Ceiling

PARTIAL MAIN FLOOR ELEV. C Opt. Waffle Ceiling

Den / Office Den / Office 11'0" x 12'2" 11'0" x 12'2"

The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements Partial Partial Partial Partial adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual useable floor space may vary from theBedroom stated floor area,3 Bedroom 3 Main Floor Elevation 'C' Std. & Alt. Upper Floor Elevation 'C' Main Elevation 'C' All renderings are artist’s concept. *Colour packages may vary Std.slightly & Alt. from Upper Floor Elevation as theyFloor include OTB areas. renderings. Refer to'C' sales representative for details. E. & O. 12'0" E. 43-04 x 12'3" 12'0"(11'3") x 12'3" (11'3")

Partial

Partial

Opt. Waffle Ceiling Opt. Waffle Ceiling

Sitting Area Sitting Area 12'0" x 8'1"(6'3") 12'0" x 8'1"(6'3")

Partial

Partial

Ensuite 2 Ensuite 2

Walk-in Linen

Partial Alt.Partial UpperAlt Fl

Shared Bath

Shared Bath

Master Bedroom Master Bedroom 14'6" x 16'10" 14'6" x 16'10"Ensuite 2 Ensuite 2

F Ledge

Dn

Tray W Ceiling

Gas Fireplace

Breakfast Bar

Up

DW

Breakfast Bar

S

French Doors

/ Office Den / Office 11'0" x 12'2" 11'0" x 12'2"

Open To Below

RailingDen

Railing

S

Dining Room Dining Room 12'0" x 18'0" 12'0" x 18'0"

Open To Below

Dn

Walk-in Linen

Partial Alt.Partial UpperAlt Fl

Bedroom 2 Bedroom 2 11'8" x 11'6" 11'8" x 11'6"

Balcony Balcony 14'0" x 3'10" 14'0" x 3'10"

Opt. Uppers

French Doors

Up

Open To Below

Opt. Waffle Ceiling Opt. Waffle Ceiling

Gas Fireplace

Up

Railing

Open To Above / Below

Railing

Open To Above / Below

Dining Room Dining Room 12'0" x 18'0" 12'0" x 18'0"

French Doors Opt. Coffered Ceiling Opt. Coffered Ceiling French Doors

Garden Door

Railing

Dn

Railing

Open To Above /

Dn

Railing

Open To Above /

Bedroom 2 2 11'8" x 11'6" 11'8" x 11'6"

Glass ShowerBedroom

Glass Shower

Juliet BalconyJuliet Balcony

Below Coffered Ceiling Coffered Ceiling Below Garden Door

W.I.C.

W.I.C.

Opt. Built-ins

Opt. Detailed Ceiling Opt. Detailed Ceiling Dn Ceiling Opt. Coffered Ceiling Powder Opt. CofferedPowder Servery Servery Opt. Sink

Walk-in Linen

Opt. Uppers

Powder

Opt. Uppers

F

Railing

Pantry

F

Railing

Pantry


Storage

HRV

Location Of Furnace And Hot Water Heater May Vary

Low Headroom

F

H

Storage

Dn Railing

Low Headroom Railing

Open To Above

Up

Unexcavated Railing

Up

Unexcavated

Unfinished Basement

Railing

3 Piece Rough-In

Foy Open To

3 Piece Rough-In

Foy Open To

Location Of Furnace And Hot Water Heater May Vary

Cold Cellar

F

H

Half Wall

3 STOREY PLAN

HRV

Cold Cellar

Low Headroom

Half Wall

43-4

Railing

opus

Dn

Open To Above Railing

Basement Plan Elevation 'A'

Lower Floor E

43-04 Basement Plan Elevation 'A'

Lower Floor E

Railing

43-04

Location Of Furnace And Hot Water Heater May Vary HRV

Elevator

Unexcavated

Elevator

F Location Of Furnace And Hot Water Heater May Vary HRV

3 Piece Elevator Rough-In

Low Headroom

R 21'0"

Opt Built-ins

Unfinished Basement

R 21'0"

Opt Built-ins

Unfinished Basement Up

Elevator

F

Dn Railing

Low Headroom

ELEVATION A - 4420 SQ.FT. Incl. Approx. 353 Sq. Ft. Opt. Master Ensuite Plan

Dn

BASEMENT ELEV. A

Lower Floor E

Basement Plan Elevation 'A'

Lower Floor E

Cellar

43-04 3 Piece Rough-In

3 Piece Rough-In

Railing

Unexcavated Railing

Unfinished Basement

Unexcavated

Foy Open To

Unfinished Basement

Foy Open To

Unfinished Basement Cold Cellar

Incl. Approx. 353 Sq. Ft. Opt. Master Ensuite Plan

Open To Above

Cold Basement Plan Elevation 'A'

Basement Plan Elevation 'A'

Elevator

Location Of Furnace And Hot Water Heater May Vary

Cold Cellar

HRV

ELEVATION B - 4420 Sq.FT.

Open To Above Railing

PARTIAL BASEMENT ELEV. B

F

Partial Basement Plan Elevation 'B'

Partial Lower

Low

Headroom Partial Basement Plan Elevation 'B'

Partial Lower Railing

Unexcavated

3 Piece Rough-In

Unfinished Basement

Railing

Unexcavated

Foyer

Open To Abo

Unfinished Basement Plan Elevation 'A' Basement 3 Piece

Foyer

Open To Abo

Rough-In

PARTIAL BASEMENT ELEV. C

Cold Cellar Cold Cellar

ELEVATION C - 4420 SQ.FT. Incl. Approx. 353 Sq. Ft. Opt. Master Ensuite Plan

Unexcavated

Partial Basement Plan Elevation 'C' 3 Piece Rough-In

Unfinished Basement

Partial Basement Plan Elevation 'C'

Partial Lower Floor E

Partial Lower Floor E


Location Of Furnace And Hot Water Heater May Vary HRV

HRV

F

H

F

Opt. Bench

H

Tandem Garage 10'0" x 23'1"

Opt. Bench

Mudroom Storage

Storage

Storage Area

Storage Area 3'5" x 23'1"

Opt Built-ins

MASTER ENSUITE OPTION Location Of Furnace And Hot Water Heater May Vary

21'0" x 16'0" (16'10")

Opt. Gas Fir

21'0" x 16'0" (16'10")

Opt. Gas Fir

Unfinished Basement Opt Built-ins

Unfinished Basement

Mudroom

Exterior Railing

Balcony 14'0" x 3'10"

Railing

Basement Plan ElevationBasement 'A' Plan Elevation 'A' PARTIALS

Sitting Area 12'0" x 7'5"(6'3")

Opt. Waffle Ceiling

Opt. Waffle Ceiling

g Fr ee s Tu tan b din

Dining Room 12'0" x 18'0"

Sitting Area 12'0" x 7'5"(6'3")

HRV

F Elevator

F

Cold Cellar

Half Wall

Recycle Area 4'0" x 10'6"

Mudroom

Steps As Req'd

Dn

Railing

Open To Above

Door Where Grade Permits

Recycle Area 4'0" x 10'6"

Master Bedroom 14'6" x 16'10"

Railing

Unexcavated

Garage 19'5" Lower x 21'2"

Lower Powder

Powder

Elevator W.I.C.

Elevator

W.I.C.

Foyer

Foyer

Open To Above

Open To Below

Covered Porch

Linen

Open To Above

Linen

Dn

Dn Opt. Coffer Ceiling

Cold Cellar

Open To Below

Laundry

Laundry

Covered Porch

PARTIAL MAIN FLOOR FOR PARTIAL STD. & OPT. UPPER FLOOR FOR OPT. ELEVATOR OPT. Main Floor Partial Std. & Alt. Upper Floor Partial Main Floor Partial PartialELEVATOR Std. & Alt. Upper Floor Elevation 'A', 'B' & 'C' Elevation 'A', 'B' & 'C' For Opt. Elevator For Opt. Elevator For Opt. Elevator For Opt. Elevator The floor plans and elevations shown are pre-construction and may be revised or improved as necessitated by architectural controls and the construction process. The measurements Partial Basement Plan Elevation Partial 'B' Warranty PlanCorporation’s Elevation 'B' Partial Lower Floor Elevation Partial 'B' Lower Floor 'B' area, adhere to the rules and regulations of the Basement TARION official method for the calculation of floor area. Actual useable floor space may vary from Elevation the stated floor as they include OTB areas. All renderings are artist’s concept. *Colour packages may vary slightly from renderings. Refer to sales representative for details. E. & O. E. 43-04 Railing

Railing

Den / Office

12

PARTIAL LOWER FLOOR FOR OPT. ELEVATOR Lower Floor Elevation 'A' Lower Floor Elevation 'A' Master Bedroom 14'6" x 16'10"

Railing

Open To Above / Below

Opt. Coffer CeilingOpen To Above / Below

Ensuite 2

Opt. Bench

Door Where

Railing

Dn

Dn

Bedroom 3 12'0" x 12'5" (11'3")

Bedroom 4 12'8" x 12'0"

Steps As Req'd

Dn

Unfinished BasementPowder

3 Piece Powder Rough-In

Laundry

Rec. Room Ensuite 21'0"2 x 16'0" (16'10")

Railing

Elevator

Shared Bath

Elevator Mudroom

Opt. Uppers

Unfinished Basement

Elevator

Bed 11'8"

D

Permits Elevation 'A' Upper Upper Floor Elevation 'A'GradeFloor

Unexcavated

3 Piece Rough-In

Half Wall

Bedroom 4 12'8" x 12'0"

Elevator

F

PARTIAL BASEMENT FOR OPT. Basement Plan Elevation Basement 'A' ELEVATOR Plan Elevation 'A'

F

Laundry

D

Rec. Room 21'0" x 16'0" (16'10")

Open To Above

Kitchen 9'8" x 16'10"

Portico

Opt. Bench

Main Floor ElevationMain 'A' Floor Elevation 'A'

Kitchen 9'8" x 16'10"

Dn

Open To Below

Location Of Furnace LedgeHeater And Hot Water May Vary

Low Headroom

Low Headroom

Open To Below

Bedroom 2 11'8" x 11'6"

Floor Elevation 'A' Lower Floor Elevation W 'A' ELEVATORLower OPTION W

Open To Below

Location Of Furnace And Hot Water Heater Ledge May Vary

Elevator

PARTIAL UPPER FLOOR OPT. MASTER ENSUITE ELEV.Portico A, B & C Dn

W.I.C.

W.I.C.

Walk-in Linen

Walk-in Linen

Den / Office 11'0" x 12'2"

Unfinished Basement

Open To Below

Glass Shower

Opt. Uppers

Bedroom 3 12'0" x 12'5" (11'3") Unfinished Basement

Foyer

Bedroom 2 11'8" x 12'11"

Up

Railing Den / Office 11'0" x 12'2"

Railing

1

Lower Powder

Railing

43-04

Up

Raised Ceiling Open To Below

Open To Above Glass Shower

Opt Built-ins

43-04

FOR

Master Garage Ensuite 19'5" x 21'2"

Up

Railing

Dining Room 18'0"

French Doorsx 12'0"

Freestanding Recycle Area Tub 4'0" x 10'6"

Half Wall

Gas Fireplace

Opt. Coffered Ceiling

Open To French Doors Above / Below

HRV

2

Dn

Opt. Detailed Ceiling

Servery

Opt. Sink

Partial Cold Alt. Upper Floor

Railing

Garage 19'5" x 21'2"

Powder

Cellar Opt. Coffered Ceiling

Railing

Open To Above / Below

Servery

Opt. Sink

Garden Door

Lower Powder

Glass Shower

Opt. Uppers

Powder

Hers W.I.C.

Door Where Grade Permits

Opt. Built-ins

Opt. Built-ins Opt. Detailed Ceiling

Steps As Req'd

Master Bedroom 14'6" x 16'10" Railing

Foyer

Pantry

Cold Cellar Dn

Shared Bath

Up

Open To Above

Walk-in Linen

Bedroom 2 Pantry 11'8" x 11'6"

Master Ensuite

Master Bedroom Railing 14'6" x 16'10"

3 Piece Rough-In F

F

TrayArea Ceiling Recycle Freestanding OpenTub To 4'0" x 10'6"Above

Master Ensuite

His W.I.C.

Kitchen 9'8" x 16'10"

Kitchen 9'8" x 16'10" 3 Piece Rough-In

Standard Plan Only)

(Open To Above For Standard Plan Only)

Garden Door

MakeUp

Railing

ower

S

Tray Ceiling Open To Above

Great Room 13'0" x 19'0" Unexcavated

Great Room Master Bedroom Unexcavated Breakfast 13'0" x 19'0" 15'0"12'0" x 16'10" x 16'10" (Open To Above For

Balcony Dn 14'0" x 3'10" Railing

Railing

Tandem Garage 10'0" x 23'1"

DW

Up Breakfast DW 12'0" x 16'10"

Door Where Grade Permits

Half Wall

Storage Area 3'5" x 23'1"

S

Up

Steps As Req'd

Railing

Opt. Waffle Ceiling

Sitting Area 8'0" x 9'3" Breakfast Bar

Raised Ceiling Open To Below

Garden Door

Railing

r e

Breakfast Bar

Railing

Door Where Grade Permits

Tray Ceiling

Coffered Ceiling

Garden Door

Opt. Coffered Ceiling

Garden Opt. Door Waffle Ceiling

Gas Fireplace

Coffered Ceiling

Juliet Balcony

Opt Built-ins

anding b

Exterior Railing

Exterior Railing

Balcony Dn x 3'10" 14'0"

Opt. Uppers

Low HeadroomJuliet Balcony

Opt. Wet Bar

Low Headroom

Den / Office

1


Thank you from our OPUS Homes team Our exceptional team works tirelessly to deliver the OPUS Homes Living Refined Promise to you. From your first experience in our Presentation Boutique, to selecting your finishes in our Decor Studio, and long after your move-in date, we take pride in a job well done and a satisfied client!



opushomes.com richlands@opushomes.com | 416-716-2813 | 10961 Leslie Street Richmond Hill


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.