Portfolio

Page 1

SEPIDEH EMAMZADEHEI

PORTFOLIO



CONTENTS Work Experience HMC Architects Serpentine Curtainwall Screen DPW Parking Lot Keynote Generator DPW Landscape Kennedy HS

4 6 8 10 12 14

StereoBot Light Weaver 360 Stage Twilight Stage Gateway 360 Beacon Hallo Curly Cue

18 19 20 21 22 23 24

Design Studios La Passerelle Adaptive Systems Pillow Thoughts Big Dumb Building

26 27 28 29


SERPENTINE Work Experience: Designing, Scripting & Drawings

Programming: Office Renovation Location: Los Angeles Client: HMC Architects

Office Layout

Participated in modeling and gave out the initial idea and design with scripting to achieve the most efficient way to maximize the occupancy. Designing, Renderings and Drawings are produced in a combination of Rhino, Grasshopper Scripting and Photoshop.

SEPIDEH EMAMZADEHEI

Grasshopper Script


60.00

60.00

5

298.00 15

0.0

0

298.00

60.00

60.00

60.00

60.00

.00

.00

68

60

60.00

60.00

.00

57

251.00

5’

3’

150.00

41.30°

41.30

°

4’-6

4’-6

41.30

41

.30°

4’-6”

°

4’-6”

4’-6

10

.12°

12’-6”

” ”

4’-6

6’ 8”

4’-6

.12°

30

4’-6”

41.30°

4’-6

30

3’

41

.30°

30.12°

4’ 10”

5’ 5’

.36°

21

4’-6 ”

21

.36°

4’-6

4’-6”

21.36°

7’ 41.30

2’ 6”

°

41 6”

4’-

.30°

4’-6”

5’ 4’-6 .36° 21

41.30°

°

4’-6”

21.36

12’-6” 60.00

21.36°

4’-6”

4’-6

4’-6

41

4’-6”

.36°

21

.30°

41.30°

Curve Study

Different Iterations

60.00

WORK EXPERIENCE


CURTAIN WALL SCREEN Work Experience: Designing, Scripting & Drawings

Programming: Screen Panelizing Location: Los Angeles Client: HMC Architects

Kennedy Entrance - With Screen Panels

By using Rhino Inside Revit, I wrote a script that generates sunscreen panels based on the chosen curtain wall imported to Grasshopper from Revit and given data such as modular pattern, width, length and the gap between panels. Designing, Renderings and Drawings are produced in a combination of Rhino, Grasshopper Scripting and Enscape. SEPIDEH EMAMZADEHEI

Kennedy Entrance - Without Screen Panels


7

Grasshopper Script WORK EXPERIENCE


DPW PARKING LOT Work Experience: Parking Layout

Programming: Public Work Location: Alhambra Client: Public Work Los Angeles County

DPW Parking Lot Space

Wrote a script in Grasshopper to give the maximum parking stalls (standard, compact and combination) in the parking boundary base on the Median Direction. Scripting was done in Grasshopper.

SEPIDEH EMAMZADEHEI

Grasshopper Scripts


9

Different Iterations WORK EXPERIENCE


KEYNOTE GENERATOR Work Experience: Scripting

Programming: Keynote Generating Location: Los Angeles Client: HMC Architects

Keynote Text File

By using Dynamo, I wrote a script that reads keynote text file and assign the numbers and descriptions to their related elements in Revit in one run and it will also find the elements without keynote. Scripting is done with Dynamo in Revit.

Dynamo Script SEPIDEH EMAMZADEHEI


11

Assigned Keynote Number and Text to the Elements

WORK EXPERIENCE


DPW LANDSCAPE

E, ALHAMBRA, CA 91803

Work Experience:

Construction Document Package Programming: Public Work Location: Alhambra Client: Public Work Los Angeles County

Participated in preparing Construction Document package for LADPW. Participated in modeling of Fences and Trellises and the Bridge. Designing, Renderings and Drawings are produced in a combination of Revit, 3D Max and Photoshop. Render is done by Fransisco Penaloza. SEPIDEH EMAMZADEHEI


13

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

CL 4 A2.20

5 A2.20

1' - 2"

CL

CL VARIES

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

5 A2.20

4 A2.20

1' - 0" 4"

1' - 2"

EQ

EQ

EQ

EQ

EQ

EQ

11' - 1 3/4"

EQ

EQ

7

EQ

EQ

EQ

EQ

EQ

4 3

EQ

4"

1

3

4

2

4

9' - 0"

TRELLIS DETAIL 2 8' - 10"

9' - 4"

3

2

9' - 0"

9' - 4"

1

8' - 10"

CL

4" 1' - 0"

0' - 6"

EQ

X" MAX.

5

3" = 1'-0"

1' - 0"

633 W. 5TH LOS ANGEL T 213 542 83

ISSUE

4"

1

NO.

IS

0' - 6"

4"

7 9 9

3

2' - 0"

2' - 0"

23080

2

TRELLIS EXERCISE AREA SECTION

14

TRELLIS LUNCH EREA SECTION

1/2" = 1'-0"

9

TRELLIS DETAILS 1

1/2" = 1'-0"

4

3" = 1'-0" 29' - 1"

10' - 0"

1/2 "

1/4

71 /4"

9' - 6

1/2"

9' - 5 1/2"

9' -

EQ

EQ

25' - 7"

4"X6 4"X4 4"X4 1.5"X (E) W (N) G #10X

EQ

1"

4"

.I.F . -V 9" TO (E )W AL L

2 1/

EQ

11' 2

21' -

1

5

EQ

2

6

1/2"

3 4

R 41' - 4"

/4" 03

1/2"

TYP.

1

TYP.

1

TYP.

20' - 5"

EQ

-8

1

21' - 2 1/4"

9 11' -

EQ

81' - 4"

14'

TYP.

EQ

-1

1

11' - 1 3/4"

' 14

EQ

R 38' - 0"

EQ

EQ

R 34' - 6"

10' - 2 3/4"

14 '

-8

1/2

"

EQ

11' - 2 3/4"

21' - 5

AIN

62 'R

18

RE M

1/2 "

6' -

-4

EQ

11' -

EQ

EQ

1. 2. 3. 4. 5. 6. 7.

EQ

EQ

EQ

1' 2"

KEYNO

EQ

"

EQ

11'

20'

1/4"

15' - 5 1/2"

10"

EQ

2" +/-

-2 "

13

1/8" = 1'-0"

5' - 5 1/4" 5' - 1 1/2"

1/2"

EQ

-0 11 '

19 '-

10' - 2 3/4"

"

4

"

EQ

"

17 '-

CL

TRELLIS PLAN - AT SMOKING AREA

EQ

/4"

"

1/2

10

"

4

'-

1/2

'15

10

3/4

-7

73

' 10

9' - 6 1/2

1/2

1' - 0"

'13

10' - 0"

CL

9' - 6 3/4"

9' - 6

0 3/4"

CL

1' - 0"

"

-2

CL

-4 10'

12 '

A2.20

11' -

14

9' - 7 1/2"

9' - 8 1/2"

1/2"

2" - 1 1/

9' - 6 1/4"

9' - 10 10'

A2.20

1 1/2

EQ

0 1/2"

+/-

5" 60' -

EQ

19' -

+/-

14' - 2 1/4"

"

Agency Approval:

10

EQ

01

EQ

'-1 /2"

17'

-4

3/4"

EQ

EQ

13' - 4 1/4"

' 10 -7

EQ

10 '-

Project:

37' - 7" "

PW HE MASTE

-3

10 '-

EQ

1"

Sheet:

1'

9' -2

"

10

ENLAR

-1 1"

"

Facility:

PUBLIC W 900 S. FR

EQ

1/2

10 '

-1

EQ

EQ

8'

8 '-

" 1/4

12 '

EQ

"

13

4"

A2.20 -2

File No.:

5"

2 3/ 4"

14

1'

'-

EQ

23' - 4 3/4"

15

" 1/2

12' -

SUBM

"

42' - 9"

29' - 4 1/2"

Date:

TRELLIS PLAN - AT EAST COURTYARD

11

1/8" = 1'-0" C:\Revit Local Files\2308046000 Headquarters Landscape Masterplan_A19 Central_marine.maroukian.rvt

TRELLIS PLAN

1

1/8" = 1'-0" Please Recycle

WORK EXPERIENCE

Sheet:

10/1


KENNEDY HS Work Experience:

Construction Document Package Programming: Kennedy HS Location: Alhambra Client: LAUSD

Participated in preparing Construction Document package for LADPW. Participated in modeling of Fences and Trellises and the Bridge. Designing, Renderings and Drawings are produced in a combination of Revit, 3D Max and Photoshop. Render is done by Fransisco Penaloza.

SEPIDEH EMAMZADEHEI


15

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

WIC402

WIC402

WIC402

WIC440

WIC440

WIC440

WIC440

30 84 24

30 84 24

30 84 24

42 84 24

42 84 24

42 84 24

42 84 24

B.1

PL1 TYP.

11.25

PL2

ONE LAYER 5/8 GYP ADDED TO ALL SIDES TO REACH 1H PROTECTION

NO. 02.09 02.12 06.24 08.30 09.05 10.01

B.2 08.30

B.C WIC102

WIC102

WIC102

42 33 24

42 33 24

42 33 24

42 33 24

INTERIOR ELEVATION - SUPPLY STORAGE B-100A NORTH

1H

12.34

10.30 02.12

1/4" = 1'-0"

1D/ AB7.52

1J

1/4" = 1'-0"

11.27 11.30 11.31 11.32 11.33 12.07 12.24 12.25 12.26 12.34 12.41 22.20

1F/ AB7.52 1E/ AB7.52

WORK ROOM B-100D

GLAZING B-100B

3'-11"

5'-5 1/2"

INTERIOR ELEVATION - SUPPLY STORAGE B-100A SOUTH

10.30 10.44 10.54 10.61 11.11 11.14 11.24 11.25

KILNS B-100C

09.05

8'-8"

WIC102

Agency Approval:

KEYNOTES

11.11

12.34

3'-11"

22.22

DESCRIPTION. EXISTING RELOCATED LOCKERS (E) KILNS TO REMAIN SHELVING/ PONY WALL FOR POWER AND WORK DISPLAY (E) LOUVER 4" BASE - REFER TO FINISH PLANS & SCHEDULE OF FINISHES MARKERBOARD (16'-0" LENGTH X 4'-0" HIGH), LAUSD INSTALLER RESPONSIBILITY (N) 24" DEEP COUNTERTOP LIQUID SOAP DISPENSER SURFACE MOUNTED PAPER TOWEL DISPENSER WALL MOUNTED SHORT THROW DIGITAL PROJECTOR, O.F.O.I., REFER TO ELECTRICAL DRAWINGS FOR MOUNTING DETAILS ENAMELING OVEN COMPUTER (TEACHER), O.F.O.I. BAT MOBILE, O.F.O.I. GLAZING BOOTH W/ EXHAUST(24"X44"X26"), 10.13 4'X4' MARKERBOARD, LAUSD INSTALLER RESPONSIBILITY WEDGING TABLE, O.F.O.I. SLAB ROLLER, O.F.O.I. HAND EXTRUDER, O.F.O.I. CLAY TANK, O.F.O.I. CLOCK MOUNTED @ 102" A.F.F. , U.N.O TEACHER DESK (60"X30"), PEDESTAL FILE & CHAIR, O.F.O.I. STOOLS, O.F.O.I. STOOLS (24" HIGH), O.F.O.I. CERAMIC STUDIO STUDENT BENCHES (72"X60"), O.F.O.I. WORK BENCH (36"X60"X34"H), O.F.O.I. METAL SHELVING, REFER TO SPECS., CFCI 24"X18" ACCESSIBLE COUNTERTOP LAVATORY W/ CLAY TRAP, REFER TO PLUMBING DWG 24"X18"X12" DEEP COUNTERTOP LAVATORY W/ CLAY TRAP, REFER TO PLUMBING

11.31

3'-0"

PL1 TYP

22.20

7'-0"

PL1

CUSTOM01

30 84 24

33 84 24

1G

INT. ELEV. - WORK ROOM B-100D EAST

1/4" = 1'-0"

1F

34 33 24

34 33 24

XX# 11.27

18 A10.63

CAS

_____________________

1E

INT. ELEV. - GLAZING B-100B NORTH

1/4" = 1'-0"

LEG

11.32

11.24 13'-0"

WIC402

30 84 24

WIC102

ISSUE NO.

DF

INT. ELEV. - SUPPLY STORAGE B-100A WEST

WIC402

WIC102

633 W. 5TH LOS ANGE T 213 542

ELECTRICAL POWER

10.30

PL2

33300

B.D

12.41

FE

File No.:

1/4" = 1'-0" 12.25 TYP. 06.24

WIC302

WIC302

WIC302

33 30 12

35 30 12

35 30 12

35 30 12

CUSTOM01

12.24 12.26 1B/ AB7.52

2'-0"

2'-6" 1'-8"

PL1 TYP.

GENE

11.30

48 84 24

PL1

PL2

TYP. TYP.

18 34 24

36 33 24

18 34 24

48 34 24

29 34 24

B.E

09.05 12.34 CERAMICS B-100

1D

INTERIOR ELEVATION - CERAMICS B-100 - SOUTH

1/4" = 1'-0"

1C

10.61

EQ

10.54

10.44

TYP.

TYP.

10.30

SS1 SS1

WIC102

36 34 24

36 34 24

WIC154C

3'-3 1/2"

WIC154C

36 33 24

12.07

1B

10.61

6"

TYP.

12.41 TYP.

4'-3"

4'-3"

1H/ AB7.52 1J/ AB7.52

SUPPLY STORAGE B-100A

4'-3"

12.41 TYP. 0"

EQ

3'-4"

02.09

J-6

2'-9"

1/4" = 1'-0"

CL

15'-10"

1 A10.91

_____________________

INTERIOR ELEVATION - CERAMICS B-100 - WEST

EQ

1C/ AB7.52

4'-0"

36 33 24

3'-0" MIN. CLR.

1G/ AB7.52

WIC102

36 34 24

9'-5"

WIC102

36 34 24

B.F

11.14

2'-9"

WIC152

PL1

2'-10"

09.05

OPEN

22.22

6"

PL1

EQ 2'-0"

1'-0"

EQ

22.20

1/4" = 1'-0"

15'-0"

INTERIOR ELEVATION - GLAZING B-100B WEST

23'-0"

WIC180

G-4A

WIC180

2'-0" EQ

WIC101

10'-0"

WIC102

REFER T SEE PLU ACCESS ASSEMB SYSTEM SEE ME DISTRIB 4. SEE ELE DISTRIB 5. SEE WIN 6. EXTEND ACCESS 7. ALL DOO 8. PROVID FOR RO 9. PROVID HEIGHT 10. FOR WA 11. FOR EQ FOR LO 12. SEE DET 13. MARKER 14. MARKER 15. PAINT E 16. PAINT W 17. PAINT S 18. REFER T SCREEN 19. REFER T 20. MARKER MOUNTE 21. FOR WA 22. WRAP A DRAWIN 3.

7'-0"

5'-4"

2'-10"

PL1

WIC101

1. 2.

1A/ AB7.52

WIC302

33 30 12

2'-0"

WIC302

Facility:

11.33

CL

2'-0"

J-6

14'-0"

7'-6"

KENNE 11254 G GRANA

B.G

Project:

KHS-B

PL1 7'-0"

8'-0"

10.01

Sheet:

3'-0"

BUILD

N 09.05

WIC410

WIC410

42 84 24

42 84 24

INTERIOR ELEVATION - CERAMICS B-100 - EAST

Date:

1A

1/4" = 1'-0"

BIM 360://3330041101 LAUSD Kennedy HS Renovation/3330041-AR-PKG4.rvt

100%

BUILDING B- FLOOR PLAN-1ST FLOOR - CERAMICS B-100

1

Sheet:

1/4" = 1'-0" Please Recycle

WORK EXPERIENCE

08


If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

B.1

B.2

B.3

B.4

B.5

NO. 02.44 08.28 09.08

BUILDING E

11.14 12.36 12.37 12.39 12.40 12.41 22.03

CANOPY ABOVE 136'-8" 28'-7"

12'-0"

27'-9"

39'-9"

28'-7"

26.05

1

1 AB7.51

1 AB7.56

___________________________________ __________________________ _____

08.28

C-2.5

B-108A

33

633 LOS T2

ART CLASSROOM B-107

WORK ROOM B-107A

B-4

B-118

B.A

B-107A

G-6

G-6

CORRIDOR B-118B ELEC. B-118

SPECIAL ED II SUPPORT B-108A G-6

18'-8"

SPECIAL ED II B-108

STAIR B-2

2 AB7.54

___________________________________ __________________________ _____

GENDER NEUTRAL B-115

COUGAR CAFE B-106C

B-106C STORAGE B-113

JANITOR B-114

B-113

A-6

GIRLS RESTROOM B-110

B-110

B-109

G-4A

10'-0" 27'-3"

6.

J-6

1 AB7.53

G-4AA

B-104F

21'-10"

11. 12.

13.

B.G

14. 15. 16. 17. 18.

B.H EXISTING TO REMAIN WALL/CEILING ANCHORED TRACK ABOVE

09.08

WORKROOM B-103A

10.

A-4

B-104A

G-4A

9.

B8

B-4

4'-0"

FILE ROOM B-104A

19.

B.J

12.41 B-104BA

ART CLASSROOM B-103

8.

BROADCAST/VIDEO PRODUCTION STUDIO B-104

___________________________________ __________________________ _____

B-103B

FE

B-104CC

B.F

C-2.5

12.37 CORRIDOR B-117C

7.

G-4AA

VESTIBULE B-104E

11'-0"

SLC LEAD OFFICE B-101C

08.28

17'-11"

B-104

J-6

B-105A

B-103C

B-117B

B-120 EQ

AA-6

12.39

B-103A

B-119

4. 5.

B-104EA

CONTROL ROOM B-104C

FE

TYP.

J-6

B-104BB

EQ

CL

G-4AA

12.40

CORRIDOR B-118D

STAIR B-1

S-2.5

G-4AA

12.36

12.37

SOUND ISOLATION B-104F

EQ EQ

CANOPY ABOVE

HEATER R.M B-120

G-4A

1 AB7.54

___________________________________ __________________________ _____

B4

EDITING B-104D

B-104CB

J-6

B-104D

TYP.

11.14

COUNSELOR ASSISTANT LEAD OFFICE OFFICE B-101E B-101D

FE

3.

2 AB5.11

R E R TY FI C R FR R R A R A P S R IN P TO R IN R D D R E R R D S E R D A A A IN S FI R A S W S A S D S D

10'-0"

11.14

TYP.

B-102

STORAGE B-119

2.

B.E

18'-8"

B4

12.37

CORRIDOR B-118C

1.

SPED II SUPPORT B-106A

A-6

09.08

2 AB7.53

DF

ELEVATOR

SPED II SUPPORT B-106B

___________________________________ __________________________ _____

26.05

B-101C

12.39

SUPPLY STORAGE B-100A

CORRIDOR BETWEEN BLD B AND C

CORRIDOR B-117D EXISTING LOCKERS TO BE INSTALLED HERE

B-104EB

B-101D

B-101E

B-100A

B4

CORRIDOR B-118D

B-105B

B-4

B-104CA

12.36 J-6

J-6

09.08

2D/ AB7.56

ADMIN B-101 12.36

ART STORAGE B-102

FILM MAKING COMPUTER LAB B-105

B3

B-101B

B-101AB

ALIGN

B-101

B-100F

3 AB5.11

C-4

______________________

B3

B.J

______________________

B-106 B-112

G-4A

B.3

B.K

G-4A

2 AB7.56

09.08

GE

C-4

ELECTRICAL B-112 J-6

CONFERENCE ROOM B-101B

G-4A

CONFERENCE ROOM B-101A

___________________________________ __________________________ _____

4 AB5.11

1 / AB2.11

1 AB7.11

___________________________________ __________________________ _____

B-101AA

______________________

J-6

B-111

153'-4"

S-4 G-4A

CERAMICS B-100

08.28

1 AB7.55

___________________________________ __________________________ _____

2 AB7.11

B-106B

RSP #3 B-109

22.03

J-6

BOYS RESTROOM B-111

C-4

CORRIDOR B-117B

B.2

B.D

SPECIAL ED II B-106

09.08

___________________________________ __________________________ _____

B-106A

EQ EQ

AB6.11

G-4A

G-4A

C-4

DF

2

LE

08.28 18'-0"

TYP.

C-2.5

S-4

B-100E

09.08

C-2.5

B-114

B-115

B-116

GENDER NEUTRAL B-116

ALIGN

02.44

CL

B.C

S-2.5

B-106CA

3 AB7.11

___________________________________ __________________________ _____

4'-7"

FE

3 AB7.13

___________________________________ __________________________ _____

B-100D

B-100B

B-100C

FE

2'-8 1/2" 5'-10"

ALIGN

WORK ROOM B-100D

B-107C

FE

G-4

CORRIDOR B-117A

GLAZING B-100B

09.08

B-107B

09.08 FE

KILNS B-100C

NO.

G-4A

B-108C

B-108

B-117A

1 AB7.52

___________________________________ __________________________ _____

IS

B.B

SPECIAL ED II SUPPORT B-108B

B-108B

CORRIDOR B-118A

File

AB6.11

08.28

___________________________________ __________________________ _____

DESCRIPTION. (E) LOCKERS TO REMAIN, PREP & PRIME FOR NEW PAINT FINISH (E) OPERABLE WINDOW MATCH FINISHED WALL THICKNESS TO EXISTING - ADD SHEETING LAYERS OR SHIMS AS REQUIRED COMPUTER (TEACHER), O.F.O.I. FILE CABINET (4 DRAWER) O.F.O.I. DESK AND TASK CHAIR, O.F.O.I. GUEST CHAIR, O.F.O.I. CREDENZA, O.F.O.I. METAL SHELVING, REFER TO SPECS., CFCI (N) DRINKING FOUNTAIN W. SIDE RAILS, REFER TO DETAIL SHEET A10.90 (E) IDF TO REMAIN

3

1 AB5.11

______________________

AB6.11

Ag Ap

KEYNOTES

B.6

VESTIBULE B-104B

Fac

B.K

C.A BUILDING C

CANOPY ABOVE

08.28

KE 11 GR

Pro

3 AB5.11

KH

______________________

2 / AB2.11

Sh

BU FL

N

10

Da

BUILDING B- REMODEL FLOOR PLAN 1ST FLOOR - ELEVATOR BIM 360://3330041101 LAUSD Kennedy HS Renovation/3330041-AR-PKG4.rvt

SEPIDEH EMAMZADEHEI

2

1/8" = 1'-0"

BUILDING B- REMODEL FLOOR PLAN-1ST FLOOR

Sh

1

1/8" = 1'-0" Please Recycle


17

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Agency Approval:

BUILDING E

File No.:

B.2

B.3

B.4

EXISTING CANOPY 28'-7"

B.5

136'-8"

12'-0"

27'-9"

39'-9"

SPECIAL ED II SUPPORT B-108A 9'-0" P1

SPECIAL ED II B-108 9'-0" ACT 1

6'-1 1/2"

3'-0"

7'-0" P1

2'-0" FL

SD

CO

FS

CO

FS

8'-0" P5

FL

SD

SD

FL

CONFERENCE ROOM 9'-0" ACT 1 B-101A

SD

CO

ART CLASSROOM B-103 9'-0" ACT 1

SD FS 2'-0"

SD

SD

9'-0" ACT 2

SD

8'-0" P5

6'-0"

9'-0" ACT 2 SLC LEAD OFFICE B-101C

7'-0" P2

CORRIDOR B-117C 9'-0" ACT 1

FL

SD

SD

8'-0" P5

9'-0" ACT 1

CONTROL ROOM B-104C

FS FL 9'-0" ACT 1

8'-0" P5

8'-0" P5

FS

SD

FL

B.G

SD

FS

8'-0" P5

20'-1"

2'-0"

SD

EXISTING CANOPY SD

ELEVATOR

SD

FL

CO

SD

FS

FS

FL

FL

CO

1. 2.

FL

EXISTING CEILING

7'-0" P1

B.F

CO

7'-0" P2

B.K

15 39

VESTIBULE B-104E 9'-0" ACT 1

FL

BROADCAST/VIDEO PRODUCTION STUDIO B-104

1 / AB3.11

SOUND ISOLATION B-104F 9'-0" ACT 1

SD FL

FL

B.E

7'-0" P1

FL

ASSISTANT LEAD OFFICE B-101D

COUNSELOR OFFICE B-101E

FL FS

FL

SD

2'-0"

9'-0" ACT 2

CORRIDOR B-117D 9'-0" ACT 1

CO

SD 4'-0"

7'-0" P1

SD

9'-0" ACT 1

FS

FL

SD

SD

FILM MAKING COMPUTER LAB B-105 FL

21'-6"

ART STORAGE B-102

FL

FS

SD

SD

CO FL

FS

1'-0"

FS

SPED II SUPPORT B-106B

9'-0" P1

SPED II SUPPORT B-106A 9'-0" P1

FS

17'-11"

3'-6" 7'-0" P1

FL

ADMIN B-101 9'-0" ACT 1

2'-0"

SD EXISTING CEILING

SD

9'-0" ACT 1 FL

7'-0" P1

FL

EDITING B-104D

7'-0" P1

SD

6'-6" P5

SD

CONFERENCE ROOM 9'-0" ACT 1 B-101B

8'-0" P5

7'-0" P1

SD

7'-0" P1

SD SD

CO

9'-0" ACT 1

3'-6"

7'-0" P1

FL

CORRIDOR B-117B 9'-0" ACT 1

18'-0" 27'-3"

SD 9'-0" P1

11'-0"

SD

SUPPLY STORAGE B-100A

CO

FL

ELECTRICAL B-112

3'-6" CO FL

B.J

SD

FL

SD 2'-0"

4'-0"

10'-0"

SD

SD

REMOD

B.D

CO

FS

7'-0" P1

SD

3. 4.

B.H

FL

5. 6. 7. 8. 9. 10.

B.J

11.

CO

SD FS

FL FS FL

SD

12. 13. 14. 15. 16.

FL

17. 18.

SD

CORRIDOR B-118D

16 40

ART CLASSROOM B-103 9'-0" ACT 1

2 / AB3.11 EXISTING CANOPY

WORKROOM B-103A 9'-0" ACT 1

2'-0"

FILE ROOM B-104A 9'-0" ACT 1

GENE

INDIC 1'-0" THE FIN LOCATION O FIRE ALARM BY THE ARC CENTER ALL SEE FLOOR FIXTURES A LOCATIONS REFER TO T WITHOUT CE LOCATION O ARCHITECT. SEE ELECTR SEE ELECTR ALARMS DEV SEE SHEET STRUCTURA SYSTEMS AR OCCUPIED S LOCATE ELE WITHOUT CE UNDERSIDE ALL GYP. BD REFER TO S REFER TO A SEE SPECIF DIVISION 9 F ACOUSTICA ALL SOFFITS FRONTS AND

Facility:

B.K

KENNEDY 11254 GO GRANADA Project:

KHS-BL

41 17 18 42 C.A BUILDING C

Sheet:

BUILDIN FLOOR

ELEVATOR

100% C

N

Date:

BUILDING B ELEVATOR - REMODEL REFLECTED CEILING PLAN - 1ST FLOOR BIM 360://3330041101 LAUSD Kennedy HS Renovation/3330041-AR-PKG4.rvt

2

1/8" = 1'-0"

IS 10 50 10

SPECIAL ED II B-106 9'-0" ACT 1

FL

SD

FL

7'-0" P1

7'-4" P2

7'-7"

FS

BOYS RESTROOM B-111 9'-0" P1

4'-1"

SD

CERAMICS B-100

7'-0"

SD

FS

FL

B.C

COUGAR CAFE B-106C 9'-0" ACT 3

FS

SD

9'-0" ACT 1

SD 2'-0"

FL

7'-4" P2 GIRLS RESTROOM B-110 9'-0" P1

RSP #3 B-109

8'-0" P1 7'-0" P1

8'-0" P5

HD

FL

FL

8'-0" P5 FS

SD

153'-4"

FL

7'-0" P1

21'-10"

GENDER NEUTRAL B-116 9'-0" P1

8'-0" P5

8'-0" P5

FL

JANITOR B-114 9'-0" P1

9'-0" P1

SD

8'-0" P1

SD

NO.

10'-0"

SD

7'-0" P1

ISSUE:

B.B

8'-0"

18'-8"

WORK ROOM B-100D

9'-9" ACT 1

14 38

633 W. 5TH S LOS ANGELE T 213 542 830

CO

FL

GENDER NEUTRAL B-115

FL

SD FS

B.3

333004

2'-0"

SD

FS

CO

9'-0" P1

CORRIDOR B-117A 9'-0" ACT 1

SD

FL

SD

CO

13 B.2 37

FL

SD

2'-0"

FS

FL

9'-0" ACT 1

SD

2'-0"

8'-8"

FL

FL

SD

SPECIAL ED II SUPPORT B-108B

8'-0" P5 KILNS B-100C

5'-6"

7'-0" P1

FS

7'-0" P1

SD

FL

7'-0" P2

1'-0"

SD

FL

10'-2 1/2"

3'-0"

2'-0"

EXISTING CANOPY

SD

B.A

7'-6"

SD

18'-0"

SD

FS

ART CLASSROOM B-107 9'-0" ACT 1

6'-6"

SD FL

7'-0" P1

28'-7"

WORK ROOM B-107A 9'-0" 1'-0" ACT 1

2'-0"

2'-0"

7'-0" P2

GLAZING B-100B 9'-0" ACT 1

B.6

18'-8"

B.1

BUILDING B - REMODEL REFLECTED CEILING PLAN - 1ST FLOOR

1

1/8" = 1'-0"

Please Recycle

WORK EXPERIENCE

Sheet:

08/14


LIGHT WEAVER Work Experience: Drawings, Assembly & Fabrication

Programming: Festival Location: Detroit Client: Detroit Luminosity

Made the installation and assembly files ready and lead the installation and fabrication on the site. The process is done in a combination of Rhino, Grasshopper Scripting and Adobe Suite. Photo is taken by Joshua White.

SEPIDEH EMAMZADEHEI


360 STAGE

19

Work Experience: Programming: Festival Location: Coachella Client: Coachella Festival

Participated in modeling and gave out the initial idea and design. helped with preparing the mesh by Grasshopper scripting. Designing, Renderings and Drawings are produced in a combination of Rhino, Grasshopper Scripting, Vray Rendering and Adobe Suits. Photo is taken by Joshua White. WORK EXPERIENCE


TWILIGHT STAGE Work Experience: Drawings, Assembly & Fabrication

Programming: Twilight Concerts Location: Santa Monica Client: City of Santa Monica

Participated in assembly and installation. Lead the fabric printing and assembly. The process is done in a combination of Rhino, Grasshopper Scripting and Adobe Suite. Photo is taken by Eiko.

SEPIDEH EMAMZADEHEI


GATEWAY

21

Work Experience:

Assembly & Fabrication Programming: Festival Location: Detroit Client: Detroit Luminosity

Participated in proposal presentation, assembly and installation. Design is done in Rhino with Grasshopper Scripting. Drawings and Renderings are produced in Rhino, Vray Rendering and Adobe Suits. Photo is taken by Joshua White. WORK EXPERIENCE


360 BEACON Work Experience: Drawings, Assembly & Fabrication

Programming: Vidcon Location: Anaheim Client: Vidcon

Participated in assembly and installation. The process is done in a combination of Rhino, Grasshopper Scripting and Adobe Suite. Photo is taken by Joshua White.

SEPIDEH EMAMZADEHEI


HALLO

DIMENSIONS 23

Work Experience:

Assembly & Fabrication Programming: Festival Location: Detroit Client: Detroit Luminosity

Participated in proposal presentation, assembly and installation. Design is done in Rhino with Grasshopper Scripting. Drawings and Renderings are produced in Rhino, Vray Rendering and Adobe Suits. Photo is taken by Joshua White. WORK EXPERIENCE


CURLY CUE Work Experience:

Assembly & Fabrication Programming: US National Drone Racing Championship Location: Governors Island,NY Client: GoPro NYC

Participated in proposal presentation, assembly and installation. Design is done in Rhino with Grasshopper scripting. Drawings and Renderings are produced in Rhino, Vray Rendering and Adobe Suits. Photo is taken by Joshua White. SEPIDEH EMAMZADEHEI


25

WORK EXPERIENCE


LA PASSERELLE Advisor: Jakob & Macfarlane

Spring 2018

To connect the former industrial zone back to the city, I used these organic Shapes to define and adapt the multipurpose site to its diverse surroundings. The form constantly shifting slightly vertically allowing for more public aspects to penetrate into the building and create visual experience for people. The sense of speed is enhanced in the treatment of skin in order to emanate the highway experience into the massing by using grasshopper. It defines the public program to create a semipublic outdoor space at specific levels. It’s the piece that reflects the movement of the cars. SEPIDEH EMAMZADEHEI


ADAPTIVE SYSTEMS

27

Instructor: Alexis Rochas Autumn 2017

The exercises were based on spaceframe, parametric design and analysis techniques including: linear development (space truss), surface development (double layer space frames), volume development (3D lattices), and structural patterns (event sequencing) by using grasshopper scripts. The projects were grasshopper animations which were picturing spaceframes, parametric designs and analysis techniques of each exercise by writing a specific script.

DESIGN STUDIO


PILLOW THOUGHTS Advisor: Kerenza Harris Spring 2018

This course aimed at giving computational tools out to facilitate the practical implementation of performance goals in every day practice and allow to seamlessly integrate parametric intelligence into existing, more intuitive design processes. By using CATIA, one of the most powerful and widely used platforms in the industry, creates an opportunity to incorporate performance data early in the design process while maintaining the flexibility of design iteration/ideas.

SEPIDEH EMAMZADEHEI


BIG DUMB BUILDIN

29

Instructor: Emmett Zeifman Spring 2017

The focus in this studio was moving from the scale of a building project to the scale of urbanism, a number of new different enters into the determination of site and program. The design process started by choosing a generic plan, scale and transform based on general guidelines regarding size, density and program mix in Rhino. The patterns on the facade were generated with grasshopper script by framing and bringing the city into the building by transforming one linear courtyard-based plan.

DESIGN STUDIO


CONCEPT ART SEPIDEH EMAMZADEHEI


31

MINIATURES



Sepideh Emamzadehei s.emamzadehi@gmail.com Thank You



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.