SEPIDEH EMAMZADEHEI
PORTFOLIO
CONTENTS Work Experience HMC Architects Serpentine Curtainwall Screen DPW Parking Lot Keynote Generator DPW Landscape Kennedy HS
4 6 8 10 12 14
StereoBot Light Weaver 360 Stage Twilight Stage Gateway 360 Beacon Hallo Curly Cue
18 19 20 21 22 23 24
Design Studios La Passerelle Adaptive Systems Pillow Thoughts Big Dumb Building
26 27 28 29
SERPENTINE Work Experience: Designing, Scripting & Drawings
Programming: Office Renovation Location: Los Angeles Client: HMC Architects
Office Layout
Participated in modeling and gave out the initial idea and design with scripting to achieve the most efficient way to maximize the occupancy. Designing, Renderings and Drawings are produced in a combination of Rhino, Grasshopper Scripting and Photoshop.
SEPIDEH EMAMZADEHEI
Grasshopper Script
60.00
60.00
5
298.00 15
0.0
0
298.00
60.00
60.00
60.00
60.00
.00
.00
68
60
60.00
60.00
.00
57
251.00
5’
3’
150.00
41.30°
41.30
°
”
4’-6
4’-6
”
41.30
41
.30°
4’-6”
°
4’-6”
4’-6
10
.12°
”
12’-6”
” ”
4’-6
6’ 8”
”
4’-6
.12°
30
4’-6”
41.30°
4’-6
”
30
3’
41
.30°
30.12°
4’ 10”
5’ 5’
.36°
21
”
4’-6 ”
21
.36°
4’-6
4’-6”
21.36°
7’ 41.30
2’ 6”
°
41 6”
4’-
.30°
4’-6”
5’ 4’-6 .36° 21
41.30°
°
4’-6”
”
21.36
12’-6” 60.00
21.36°
4’-6”
4’-6
”
”
4’-6
41
4’-6”
.36°
21
.30°
41.30°
Curve Study
Different Iterations
60.00
WORK EXPERIENCE
CURTAIN WALL SCREEN Work Experience: Designing, Scripting & Drawings
Programming: Screen Panelizing Location: Los Angeles Client: HMC Architects
Kennedy Entrance - With Screen Panels
By using Rhino Inside Revit, I wrote a script that generates sunscreen panels based on the chosen curtain wall imported to Grasshopper from Revit and given data such as modular pattern, width, length and the gap between panels. Designing, Renderings and Drawings are produced in a combination of Rhino, Grasshopper Scripting and Enscape. SEPIDEH EMAMZADEHEI
Kennedy Entrance - Without Screen Panels
7
Grasshopper Script WORK EXPERIENCE
DPW PARKING LOT Work Experience: Parking Layout
Programming: Public Work Location: Alhambra Client: Public Work Los Angeles County
DPW Parking Lot Space
Wrote a script in Grasshopper to give the maximum parking stalls (standard, compact and combination) in the parking boundary base on the Median Direction. Scripting was done in Grasshopper.
SEPIDEH EMAMZADEHEI
Grasshopper Scripts
9
Different Iterations WORK EXPERIENCE
KEYNOTE GENERATOR Work Experience: Scripting
Programming: Keynote Generating Location: Los Angeles Client: HMC Architects
Keynote Text File
By using Dynamo, I wrote a script that reads keynote text file and assign the numbers and descriptions to their related elements in Revit in one run and it will also find the elements without keynote. Scripting is done with Dynamo in Revit.
Dynamo Script SEPIDEH EMAMZADEHEI
11
Assigned Keynote Number and Text to the Elements
WORK EXPERIENCE
DPW LANDSCAPE
E, ALHAMBRA, CA 91803
Work Experience:
Construction Document Package Programming: Public Work Location: Alhambra Client: Public Work Los Angeles County
Participated in preparing Construction Document package for LADPW. Participated in modeling of Fences and Trellises and the Bridge. Designing, Renderings and Drawings are produced in a combination of Revit, 3D Max and Photoshop. Render is done by Fransisco Penaloza. SEPIDEH EMAMZADEHEI
13
If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.
CL 4 A2.20
5 A2.20
1' - 2"
CL
CL VARIES
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
5 A2.20
4 A2.20
1' - 0" 4"
1' - 2"
EQ
EQ
EQ
EQ
EQ
EQ
11' - 1 3/4"
EQ
EQ
7
EQ
EQ
EQ
EQ
EQ
4 3
EQ
4"
1
3
4
2
4
9' - 0"
TRELLIS DETAIL 2 8' - 10"
9' - 4"
3
2
9' - 0"
9' - 4"
1
8' - 10"
CL
4" 1' - 0"
0' - 6"
EQ
X" MAX.
5
3" = 1'-0"
1' - 0"
633 W. 5TH LOS ANGEL T 213 542 83
ISSUE
4"
1
NO.
IS
0' - 6"
4"
7 9 9
3
2' - 0"
2' - 0"
23080
2
TRELLIS EXERCISE AREA SECTION
14
TRELLIS LUNCH EREA SECTION
1/2" = 1'-0"
9
TRELLIS DETAILS 1
1/2" = 1'-0"
4
3" = 1'-0" 29' - 1"
10' - 0"
1/2 "
1/4
71 /4"
9' - 6
1/2"
9' - 5 1/2"
9' -
EQ
EQ
25' - 7"
4"X6 4"X4 4"X4 1.5"X (E) W (N) G #10X
EQ
1"
4"
.I.F . -V 9" TO (E )W AL L
2 1/
EQ
11' 2
21' -
1
5
EQ
2
6
1/2"
3 4
R 41' - 4"
/4" 03
1/2"
TYP.
1
TYP.
1
TYP.
20' - 5"
EQ
-8
1
21' - 2 1/4"
9 11' -
EQ
81' - 4"
14'
TYP.
EQ
-1
1
11' - 1 3/4"
' 14
EQ
R 38' - 0"
EQ
EQ
R 34' - 6"
10' - 2 3/4"
14 '
-8
1/2
"
EQ
11' - 2 3/4"
21' - 5
AIN
62 'R
18
RE M
1/2 "
6' -
-4
EQ
11' -
EQ
EQ
1. 2. 3. 4. 5. 6. 7.
EQ
EQ
EQ
1' 2"
KEYNO
EQ
"
EQ
11'
20'
1/4"
15' - 5 1/2"
10"
EQ
2" +/-
-2 "
13
1/8" = 1'-0"
5' - 5 1/4" 5' - 1 1/2"
1/2"
EQ
-0 11 '
19 '-
10' - 2 3/4"
"
4
"
EQ
"
17 '-
CL
TRELLIS PLAN - AT SMOKING AREA
EQ
/4"
"
1/2
10
"
4
'-
1/2
'15
10
3/4
-7
73
' 10
9' - 6 1/2
1/2
1' - 0"
'13
10' - 0"
CL
9' - 6 3/4"
9' - 6
0 3/4"
CL
1' - 0"
"
-2
CL
-4 10'
12 '
A2.20
11' -
14
9' - 7 1/2"
9' - 8 1/2"
1/2"
2" - 1 1/
9' - 6 1/4"
9' - 10 10'
A2.20
1 1/2
EQ
0 1/2"
+/-
5" 60' -
EQ
19' -
+/-
14' - 2 1/4"
"
Agency Approval:
10
EQ
01
EQ
'-1 /2"
17'
-4
3/4"
EQ
EQ
13' - 4 1/4"
' 10 -7
EQ
10 '-
Project:
37' - 7" "
PW HE MASTE
-3
10 '-
EQ
1"
Sheet:
1'
9' -2
"
10
ENLAR
-1 1"
"
Facility:
PUBLIC W 900 S. FR
EQ
1/2
10 '
-1
EQ
EQ
8'
8 '-
" 1/4
12 '
EQ
"
13
4"
A2.20 -2
File No.:
5"
2 3/ 4"
14
1'
'-
EQ
23' - 4 3/4"
15
" 1/2
12' -
SUBM
"
42' - 9"
29' - 4 1/2"
Date:
TRELLIS PLAN - AT EAST COURTYARD
11
1/8" = 1'-0" C:\Revit Local Files\2308046000 Headquarters Landscape Masterplan_A19 Central_marine.maroukian.rvt
TRELLIS PLAN
1
1/8" = 1'-0" Please Recycle
WORK EXPERIENCE
Sheet:
10/1
KENNEDY HS Work Experience:
Construction Document Package Programming: Kennedy HS Location: Alhambra Client: LAUSD
Participated in preparing Construction Document package for LADPW. Participated in modeling of Fences and Trellises and the Bridge. Designing, Renderings and Drawings are produced in a combination of Revit, 3D Max and Photoshop. Render is done by Fransisco Penaloza.
SEPIDEH EMAMZADEHEI
15
If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.
WIC402
WIC402
WIC402
WIC440
WIC440
WIC440
WIC440
30 84 24
30 84 24
30 84 24
42 84 24
42 84 24
42 84 24
42 84 24
B.1
PL1 TYP.
11.25
PL2
ONE LAYER 5/8 GYP ADDED TO ALL SIDES TO REACH 1H PROTECTION
NO. 02.09 02.12 06.24 08.30 09.05 10.01
B.2 08.30
B.C WIC102
WIC102
WIC102
42 33 24
42 33 24
42 33 24
42 33 24
INTERIOR ELEVATION - SUPPLY STORAGE B-100A NORTH
1H
12.34
10.30 02.12
1/4" = 1'-0"
1D/ AB7.52
1J
1/4" = 1'-0"
11.27 11.30 11.31 11.32 11.33 12.07 12.24 12.25 12.26 12.34 12.41 22.20
1F/ AB7.52 1E/ AB7.52
WORK ROOM B-100D
GLAZING B-100B
3'-11"
5'-5 1/2"
INTERIOR ELEVATION - SUPPLY STORAGE B-100A SOUTH
10.30 10.44 10.54 10.61 11.11 11.14 11.24 11.25
KILNS B-100C
09.05
8'-8"
WIC102
Agency Approval:
KEYNOTES
11.11
12.34
3'-11"
22.22
DESCRIPTION. EXISTING RELOCATED LOCKERS (E) KILNS TO REMAIN SHELVING/ PONY WALL FOR POWER AND WORK DISPLAY (E) LOUVER 4" BASE - REFER TO FINISH PLANS & SCHEDULE OF FINISHES MARKERBOARD (16'-0" LENGTH X 4'-0" HIGH), LAUSD INSTALLER RESPONSIBILITY (N) 24" DEEP COUNTERTOP LIQUID SOAP DISPENSER SURFACE MOUNTED PAPER TOWEL DISPENSER WALL MOUNTED SHORT THROW DIGITAL PROJECTOR, O.F.O.I., REFER TO ELECTRICAL DRAWINGS FOR MOUNTING DETAILS ENAMELING OVEN COMPUTER (TEACHER), O.F.O.I. BAT MOBILE, O.F.O.I. GLAZING BOOTH W/ EXHAUST(24"X44"X26"), 10.13 4'X4' MARKERBOARD, LAUSD INSTALLER RESPONSIBILITY WEDGING TABLE, O.F.O.I. SLAB ROLLER, O.F.O.I. HAND EXTRUDER, O.F.O.I. CLAY TANK, O.F.O.I. CLOCK MOUNTED @ 102" A.F.F. , U.N.O TEACHER DESK (60"X30"), PEDESTAL FILE & CHAIR, O.F.O.I. STOOLS, O.F.O.I. STOOLS (24" HIGH), O.F.O.I. CERAMIC STUDIO STUDENT BENCHES (72"X60"), O.F.O.I. WORK BENCH (36"X60"X34"H), O.F.O.I. METAL SHELVING, REFER TO SPECS., CFCI 24"X18" ACCESSIBLE COUNTERTOP LAVATORY W/ CLAY TRAP, REFER TO PLUMBING DWG 24"X18"X12" DEEP COUNTERTOP LAVATORY W/ CLAY TRAP, REFER TO PLUMBING
11.31
3'-0"
PL1 TYP
22.20
7'-0"
PL1
CUSTOM01
30 84 24
33 84 24
1G
INT. ELEV. - WORK ROOM B-100D EAST
1/4" = 1'-0"
1F
34 33 24
34 33 24
XX# 11.27
18 A10.63
CAS
_____________________
1E
INT. ELEV. - GLAZING B-100B NORTH
1/4" = 1'-0"
LEG
11.32
11.24 13'-0"
WIC402
30 84 24
WIC102
ISSUE NO.
DF
INT. ELEV. - SUPPLY STORAGE B-100A WEST
WIC402
WIC102
633 W. 5TH LOS ANGE T 213 542
ELECTRICAL POWER
10.30
PL2
33300
B.D
12.41
FE
File No.:
1/4" = 1'-0" 12.25 TYP. 06.24
WIC302
WIC302
WIC302
33 30 12
35 30 12
35 30 12
35 30 12
CUSTOM01
12.24 12.26 1B/ AB7.52
2'-0"
2'-6" 1'-8"
PL1 TYP.
GENE
11.30
48 84 24
PL1
PL2
TYP. TYP.
18 34 24
36 33 24
18 34 24
48 34 24
29 34 24
B.E
09.05 12.34 CERAMICS B-100
1D
INTERIOR ELEVATION - CERAMICS B-100 - SOUTH
1/4" = 1'-0"
1C
10.61
EQ
10.54
10.44
TYP.
TYP.
10.30
SS1 SS1
WIC102
36 34 24
36 34 24
WIC154C
3'-3 1/2"
WIC154C
36 33 24
12.07
1B
10.61
6"
TYP.
12.41 TYP.
4'-3"
4'-3"
1H/ AB7.52 1J/ AB7.52
SUPPLY STORAGE B-100A
4'-3"
12.41 TYP. 0"
EQ
3'-4"
02.09
J-6
2'-9"
1/4" = 1'-0"
CL
15'-10"
1 A10.91
_____________________
INTERIOR ELEVATION - CERAMICS B-100 - WEST
EQ
1C/ AB7.52
4'-0"
36 33 24
3'-0" MIN. CLR.
1G/ AB7.52
WIC102
36 34 24
9'-5"
WIC102
36 34 24
B.F
11.14
2'-9"
WIC152
PL1
2'-10"
09.05
OPEN
22.22
6"
PL1
EQ 2'-0"
1'-0"
EQ
22.20
1/4" = 1'-0"
15'-0"
INTERIOR ELEVATION - GLAZING B-100B WEST
23'-0"
WIC180
G-4A
WIC180
2'-0" EQ
WIC101
10'-0"
WIC102
REFER T SEE PLU ACCESS ASSEMB SYSTEM SEE ME DISTRIB 4. SEE ELE DISTRIB 5. SEE WIN 6. EXTEND ACCESS 7. ALL DOO 8. PROVID FOR RO 9. PROVID HEIGHT 10. FOR WA 11. FOR EQ FOR LO 12. SEE DET 13. MARKER 14. MARKER 15. PAINT E 16. PAINT W 17. PAINT S 18. REFER T SCREEN 19. REFER T 20. MARKER MOUNTE 21. FOR WA 22. WRAP A DRAWIN 3.
7'-0"
5'-4"
2'-10"
PL1
WIC101
1. 2.
1A/ AB7.52
WIC302
33 30 12
2'-0"
WIC302
Facility:
11.33
CL
2'-0"
J-6
14'-0"
7'-6"
KENNE 11254 G GRANA
B.G
Project:
KHS-B
PL1 7'-0"
8'-0"
10.01
Sheet:
3'-0"
BUILD
N 09.05
WIC410
WIC410
42 84 24
42 84 24
INTERIOR ELEVATION - CERAMICS B-100 - EAST
Date:
1A
1/4" = 1'-0"
BIM 360://3330041101 LAUSD Kennedy HS Renovation/3330041-AR-PKG4.rvt
100%
BUILDING B- FLOOR PLAN-1ST FLOOR - CERAMICS B-100
1
Sheet:
1/4" = 1'-0" Please Recycle
WORK EXPERIENCE
08
If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.
B.1
B.2
B.3
B.4
B.5
NO. 02.44 08.28 09.08
BUILDING E
11.14 12.36 12.37 12.39 12.40 12.41 22.03
CANOPY ABOVE 136'-8" 28'-7"
12'-0"
27'-9"
39'-9"
28'-7"
26.05
1
1 AB7.51
1 AB7.56
___________________________________ __________________________ _____
08.28
C-2.5
B-108A
33
633 LOS T2
ART CLASSROOM B-107
WORK ROOM B-107A
B-4
B-118
B.A
B-107A
G-6
G-6
CORRIDOR B-118B ELEC. B-118
SPECIAL ED II SUPPORT B-108A G-6
18'-8"
SPECIAL ED II B-108
STAIR B-2
2 AB7.54
___________________________________ __________________________ _____
GENDER NEUTRAL B-115
COUGAR CAFE B-106C
B-106C STORAGE B-113
JANITOR B-114
B-113
A-6
GIRLS RESTROOM B-110
B-110
B-109
G-4A
10'-0" 27'-3"
6.
J-6
1 AB7.53
G-4AA
B-104F
21'-10"
11. 12.
13.
B.G
14. 15. 16. 17. 18.
B.H EXISTING TO REMAIN WALL/CEILING ANCHORED TRACK ABOVE
09.08
WORKROOM B-103A
10.
A-4
B-104A
G-4A
9.
B8
B-4
4'-0"
FILE ROOM B-104A
19.
B.J
12.41 B-104BA
ART CLASSROOM B-103
8.
BROADCAST/VIDEO PRODUCTION STUDIO B-104
___________________________________ __________________________ _____
B-103B
FE
B-104CC
B.F
C-2.5
12.37 CORRIDOR B-117C
7.
G-4AA
VESTIBULE B-104E
11'-0"
SLC LEAD OFFICE B-101C
08.28
17'-11"
B-104
J-6
B-105A
B-103C
B-117B
B-120 EQ
AA-6
12.39
B-103A
B-119
4. 5.
B-104EA
CONTROL ROOM B-104C
FE
TYP.
J-6
B-104BB
EQ
CL
G-4AA
12.40
CORRIDOR B-118D
STAIR B-1
S-2.5
G-4AA
12.36
12.37
SOUND ISOLATION B-104F
EQ EQ
CANOPY ABOVE
HEATER R.M B-120
G-4A
1 AB7.54
___________________________________ __________________________ _____
B4
EDITING B-104D
B-104CB
J-6
B-104D
TYP.
11.14
COUNSELOR ASSISTANT LEAD OFFICE OFFICE B-101E B-101D
FE
3.
2 AB5.11
R E R TY FI C R FR R R A R A P S R IN P TO R IN R D D R E R R D S E R D A A A IN S FI R A S W S A S D S D
10'-0"
11.14
TYP.
B-102
STORAGE B-119
2.
B.E
18'-8"
B4
12.37
CORRIDOR B-118C
1.
SPED II SUPPORT B-106A
A-6
09.08
2 AB7.53
DF
ELEVATOR
SPED II SUPPORT B-106B
___________________________________ __________________________ _____
26.05
B-101C
12.39
SUPPLY STORAGE B-100A
CORRIDOR BETWEEN BLD B AND C
CORRIDOR B-117D EXISTING LOCKERS TO BE INSTALLED HERE
B-104EB
B-101D
B-101E
B-100A
B4
CORRIDOR B-118D
B-105B
B-4
B-104CA
12.36 J-6
J-6
09.08
2D/ AB7.56
ADMIN B-101 12.36
ART STORAGE B-102
FILM MAKING COMPUTER LAB B-105
B3
B-101B
B-101AB
ALIGN
B-101
B-100F
3 AB5.11
C-4
______________________
B3
B.J
______________________
B-106 B-112
G-4A
B.3
B.K
G-4A
2 AB7.56
09.08
GE
C-4
ELECTRICAL B-112 J-6
CONFERENCE ROOM B-101B
G-4A
CONFERENCE ROOM B-101A
___________________________________ __________________________ _____
4 AB5.11
1 / AB2.11
1 AB7.11
___________________________________ __________________________ _____
B-101AA
______________________
J-6
B-111
153'-4"
S-4 G-4A
CERAMICS B-100
08.28
1 AB7.55
___________________________________ __________________________ _____
2 AB7.11
B-106B
RSP #3 B-109
22.03
J-6
BOYS RESTROOM B-111
C-4
CORRIDOR B-117B
B.2
B.D
SPECIAL ED II B-106
09.08
___________________________________ __________________________ _____
B-106A
EQ EQ
AB6.11
G-4A
G-4A
C-4
DF
2
LE
08.28 18'-0"
TYP.
C-2.5
S-4
B-100E
09.08
C-2.5
B-114
B-115
B-116
GENDER NEUTRAL B-116
ALIGN
02.44
CL
B.C
S-2.5
B-106CA
3 AB7.11
___________________________________ __________________________ _____
4'-7"
FE
3 AB7.13
___________________________________ __________________________ _____
B-100D
B-100B
B-100C
FE
2'-8 1/2" 5'-10"
ALIGN
WORK ROOM B-100D
B-107C
FE
G-4
CORRIDOR B-117A
GLAZING B-100B
09.08
B-107B
09.08 FE
KILNS B-100C
NO.
G-4A
B-108C
B-108
B-117A
1 AB7.52
___________________________________ __________________________ _____
IS
B.B
SPECIAL ED II SUPPORT B-108B
B-108B
CORRIDOR B-118A
File
AB6.11
08.28
___________________________________ __________________________ _____
DESCRIPTION. (E) LOCKERS TO REMAIN, PREP & PRIME FOR NEW PAINT FINISH (E) OPERABLE WINDOW MATCH FINISHED WALL THICKNESS TO EXISTING - ADD SHEETING LAYERS OR SHIMS AS REQUIRED COMPUTER (TEACHER), O.F.O.I. FILE CABINET (4 DRAWER) O.F.O.I. DESK AND TASK CHAIR, O.F.O.I. GUEST CHAIR, O.F.O.I. CREDENZA, O.F.O.I. METAL SHELVING, REFER TO SPECS., CFCI (N) DRINKING FOUNTAIN W. SIDE RAILS, REFER TO DETAIL SHEET A10.90 (E) IDF TO REMAIN
3
1 AB5.11
______________________
AB6.11
Ag Ap
KEYNOTES
B.6
VESTIBULE B-104B
Fac
B.K
C.A BUILDING C
CANOPY ABOVE
08.28
KE 11 GR
Pro
3 AB5.11
KH
______________________
2 / AB2.11
Sh
BU FL
N
10
Da
BUILDING B- REMODEL FLOOR PLAN 1ST FLOOR - ELEVATOR BIM 360://3330041101 LAUSD Kennedy HS Renovation/3330041-AR-PKG4.rvt
SEPIDEH EMAMZADEHEI
2
1/8" = 1'-0"
BUILDING B- REMODEL FLOOR PLAN-1ST FLOOR
Sh
1
1/8" = 1'-0" Please Recycle
17
If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.
Agency Approval:
BUILDING E
File No.:
B.2
B.3
B.4
EXISTING CANOPY 28'-7"
B.5
136'-8"
12'-0"
27'-9"
39'-9"
SPECIAL ED II SUPPORT B-108A 9'-0" P1
SPECIAL ED II B-108 9'-0" ACT 1
6'-1 1/2"
3'-0"
7'-0" P1
2'-0" FL
SD
CO
FS
CO
FS
8'-0" P5
FL
SD
SD
FL
CONFERENCE ROOM 9'-0" ACT 1 B-101A
SD
CO
ART CLASSROOM B-103 9'-0" ACT 1
SD FS 2'-0"
SD
SD
9'-0" ACT 2
SD
8'-0" P5
6'-0"
9'-0" ACT 2 SLC LEAD OFFICE B-101C
7'-0" P2
CORRIDOR B-117C 9'-0" ACT 1
FL
SD
SD
8'-0" P5
9'-0" ACT 1
CONTROL ROOM B-104C
FS FL 9'-0" ACT 1
8'-0" P5
8'-0" P5
FS
SD
FL
B.G
SD
FS
8'-0" P5
20'-1"
2'-0"
SD
EXISTING CANOPY SD
ELEVATOR
SD
FL
CO
SD
FS
FS
FL
FL
CO
1. 2.
FL
EXISTING CEILING
7'-0" P1
B.F
CO
7'-0" P2
B.K
15 39
VESTIBULE B-104E 9'-0" ACT 1
FL
BROADCAST/VIDEO PRODUCTION STUDIO B-104
1 / AB3.11
SOUND ISOLATION B-104F 9'-0" ACT 1
SD FL
FL
B.E
7'-0" P1
FL
ASSISTANT LEAD OFFICE B-101D
COUNSELOR OFFICE B-101E
FL FS
FL
SD
2'-0"
9'-0" ACT 2
CORRIDOR B-117D 9'-0" ACT 1
CO
SD 4'-0"
7'-0" P1
SD
9'-0" ACT 1
FS
FL
SD
SD
FILM MAKING COMPUTER LAB B-105 FL
21'-6"
ART STORAGE B-102
FL
FS
SD
SD
CO FL
FS
1'-0"
FS
SPED II SUPPORT B-106B
9'-0" P1
SPED II SUPPORT B-106A 9'-0" P1
FS
17'-11"
3'-6" 7'-0" P1
FL
ADMIN B-101 9'-0" ACT 1
2'-0"
SD EXISTING CEILING
SD
9'-0" ACT 1 FL
7'-0" P1
FL
EDITING B-104D
7'-0" P1
SD
6'-6" P5
SD
CONFERENCE ROOM 9'-0" ACT 1 B-101B
8'-0" P5
7'-0" P1
SD
7'-0" P1
SD SD
CO
9'-0" ACT 1
3'-6"
7'-0" P1
FL
CORRIDOR B-117B 9'-0" ACT 1
18'-0" 27'-3"
SD 9'-0" P1
11'-0"
SD
SUPPLY STORAGE B-100A
CO
FL
ELECTRICAL B-112
3'-6" CO FL
B.J
SD
FL
SD 2'-0"
4'-0"
10'-0"
SD
SD
REMOD
B.D
CO
FS
7'-0" P1
SD
3. 4.
B.H
FL
5. 6. 7. 8. 9. 10.
B.J
11.
CO
SD FS
FL FS FL
SD
12. 13. 14. 15. 16.
FL
17. 18.
SD
CORRIDOR B-118D
16 40
ART CLASSROOM B-103 9'-0" ACT 1
2 / AB3.11 EXISTING CANOPY
WORKROOM B-103A 9'-0" ACT 1
2'-0"
FILE ROOM B-104A 9'-0" ACT 1
GENE
INDIC 1'-0" THE FIN LOCATION O FIRE ALARM BY THE ARC CENTER ALL SEE FLOOR FIXTURES A LOCATIONS REFER TO T WITHOUT CE LOCATION O ARCHITECT. SEE ELECTR SEE ELECTR ALARMS DEV SEE SHEET STRUCTURA SYSTEMS AR OCCUPIED S LOCATE ELE WITHOUT CE UNDERSIDE ALL GYP. BD REFER TO S REFER TO A SEE SPECIF DIVISION 9 F ACOUSTICA ALL SOFFITS FRONTS AND
Facility:
B.K
KENNEDY 11254 GO GRANADA Project:
KHS-BL
41 17 18 42 C.A BUILDING C
Sheet:
BUILDIN FLOOR
ELEVATOR
100% C
N
Date:
BUILDING B ELEVATOR - REMODEL REFLECTED CEILING PLAN - 1ST FLOOR BIM 360://3330041101 LAUSD Kennedy HS Renovation/3330041-AR-PKG4.rvt
2
1/8" = 1'-0"
IS 10 50 10
SPECIAL ED II B-106 9'-0" ACT 1
FL
SD
FL
7'-0" P1
7'-4" P2
7'-7"
FS
BOYS RESTROOM B-111 9'-0" P1
4'-1"
SD
CERAMICS B-100
7'-0"
SD
FS
FL
B.C
COUGAR CAFE B-106C 9'-0" ACT 3
FS
SD
9'-0" ACT 1
SD 2'-0"
FL
7'-4" P2 GIRLS RESTROOM B-110 9'-0" P1
RSP #3 B-109
8'-0" P1 7'-0" P1
8'-0" P5
HD
FL
FL
8'-0" P5 FS
SD
153'-4"
FL
7'-0" P1
21'-10"
GENDER NEUTRAL B-116 9'-0" P1
8'-0" P5
8'-0" P5
FL
JANITOR B-114 9'-0" P1
9'-0" P1
SD
8'-0" P1
SD
NO.
10'-0"
SD
7'-0" P1
ISSUE:
B.B
8'-0"
18'-8"
WORK ROOM B-100D
9'-9" ACT 1
14 38
633 W. 5TH S LOS ANGELE T 213 542 830
CO
FL
GENDER NEUTRAL B-115
FL
SD FS
B.3
333004
2'-0"
SD
FS
CO
9'-0" P1
CORRIDOR B-117A 9'-0" ACT 1
SD
FL
SD
CO
13 B.2 37
FL
SD
2'-0"
FS
FL
9'-0" ACT 1
SD
2'-0"
8'-8"
FL
FL
SD
SPECIAL ED II SUPPORT B-108B
8'-0" P5 KILNS B-100C
5'-6"
7'-0" P1
FS
7'-0" P1
SD
FL
7'-0" P2
1'-0"
SD
FL
10'-2 1/2"
3'-0"
2'-0"
EXISTING CANOPY
SD
B.A
7'-6"
SD
18'-0"
SD
FS
ART CLASSROOM B-107 9'-0" ACT 1
6'-6"
SD FL
7'-0" P1
28'-7"
WORK ROOM B-107A 9'-0" 1'-0" ACT 1
2'-0"
2'-0"
7'-0" P2
GLAZING B-100B 9'-0" ACT 1
B.6
18'-8"
B.1
BUILDING B - REMODEL REFLECTED CEILING PLAN - 1ST FLOOR
1
1/8" = 1'-0"
Please Recycle
WORK EXPERIENCE
Sheet:
08/14
LIGHT WEAVER Work Experience: Drawings, Assembly & Fabrication
Programming: Festival Location: Detroit Client: Detroit Luminosity
Made the installation and assembly files ready and lead the installation and fabrication on the site. The process is done in a combination of Rhino, Grasshopper Scripting and Adobe Suite. Photo is taken by Joshua White.
SEPIDEH EMAMZADEHEI
360 STAGE
19
Work Experience: Programming: Festival Location: Coachella Client: Coachella Festival
Participated in modeling and gave out the initial idea and design. helped with preparing the mesh by Grasshopper scripting. Designing, Renderings and Drawings are produced in a combination of Rhino, Grasshopper Scripting, Vray Rendering and Adobe Suits. Photo is taken by Joshua White. WORK EXPERIENCE
TWILIGHT STAGE Work Experience: Drawings, Assembly & Fabrication
Programming: Twilight Concerts Location: Santa Monica Client: City of Santa Monica
Participated in assembly and installation. Lead the fabric printing and assembly. The process is done in a combination of Rhino, Grasshopper Scripting and Adobe Suite. Photo is taken by Eiko.
SEPIDEH EMAMZADEHEI
GATEWAY
21
Work Experience:
Assembly & Fabrication Programming: Festival Location: Detroit Client: Detroit Luminosity
Participated in proposal presentation, assembly and installation. Design is done in Rhino with Grasshopper Scripting. Drawings and Renderings are produced in Rhino, Vray Rendering and Adobe Suits. Photo is taken by Joshua White. WORK EXPERIENCE
360 BEACON Work Experience: Drawings, Assembly & Fabrication
Programming: Vidcon Location: Anaheim Client: Vidcon
Participated in assembly and installation. The process is done in a combination of Rhino, Grasshopper Scripting and Adobe Suite. Photo is taken by Joshua White.
SEPIDEH EMAMZADEHEI
HALLO
DIMENSIONS 23
Work Experience:
Assembly & Fabrication Programming: Festival Location: Detroit Client: Detroit Luminosity
Participated in proposal presentation, assembly and installation. Design is done in Rhino with Grasshopper Scripting. Drawings and Renderings are produced in Rhino, Vray Rendering and Adobe Suits. Photo is taken by Joshua White. WORK EXPERIENCE
CURLY CUE Work Experience:
Assembly & Fabrication Programming: US National Drone Racing Championship Location: Governors Island,NY Client: GoPro NYC
Participated in proposal presentation, assembly and installation. Design is done in Rhino with Grasshopper scripting. Drawings and Renderings are produced in Rhino, Vray Rendering and Adobe Suits. Photo is taken by Joshua White. SEPIDEH EMAMZADEHEI
25
WORK EXPERIENCE
LA PASSERELLE Advisor: Jakob & Macfarlane
Spring 2018
To connect the former industrial zone back to the city, I used these organic Shapes to define and adapt the multipurpose site to its diverse surroundings. The form constantly shifting slightly vertically allowing for more public aspects to penetrate into the building and create visual experience for people. The sense of speed is enhanced in the treatment of skin in order to emanate the highway experience into the massing by using grasshopper. It defines the public program to create a semipublic outdoor space at specific levels. It’s the piece that reflects the movement of the cars. SEPIDEH EMAMZADEHEI
ADAPTIVE SYSTEMS
27
Instructor: Alexis Rochas Autumn 2017
The exercises were based on spaceframe, parametric design and analysis techniques including: linear development (space truss), surface development (double layer space frames), volume development (3D lattices), and structural patterns (event sequencing) by using grasshopper scripts. The projects were grasshopper animations which were picturing spaceframes, parametric designs and analysis techniques of each exercise by writing a specific script.
DESIGN STUDIO
PILLOW THOUGHTS Advisor: Kerenza Harris Spring 2018
This course aimed at giving computational tools out to facilitate the practical implementation of performance goals in every day practice and allow to seamlessly integrate parametric intelligence into existing, more intuitive design processes. By using CATIA, one of the most powerful and widely used platforms in the industry, creates an opportunity to incorporate performance data early in the design process while maintaining the flexibility of design iteration/ideas.
SEPIDEH EMAMZADEHEI
BIG DUMB BUILDIN
29
Instructor: Emmett Zeifman Spring 2017
The focus in this studio was moving from the scale of a building project to the scale of urbanism, a number of new different enters into the determination of site and program. The design process started by choosing a generic plan, scale and transform based on general guidelines regarding size, density and program mix in Rhino. The patterns on the facade were generated with grasshopper script by framing and bringing the city into the building by transforming one linear courtyard-based plan.
DESIGN STUDIO
CONCEPT ART SEPIDEH EMAMZADEHEI
31
MINIATURES
Sepideh Emamzadehei s.emamzadehi@gmail.com Thank You