PORTFOLIO

Page 1

SEPIDEH EMAMZADEHEI

PORTFOLIO



CONTENTS Work Experience HMC Architects Serpentine Curtainwall Screen DPW Parking Lot Keynote Generator DPW Landscape Kennedy HS

4 6 8 10 12 14

StereoBot Light Weaver 360 Stage Twilight Stage Gateway 360 Beacon Hallo Curly Cue

18 19 20 21 22 23 24

Design Studios La Passerelle Adaptive Systems Pillow Thoughts Big Dumb Building

26 27 28 29


SERPENTINE Work Experience: Designing, Scripting & Drawings

Programming: Office Renovation Location: Los Angeles Client: HMC Architects Office Layout

Participated in modeling and gave out the initial idea and design with scripting to achieve the most efficient way to maximize the occupancy. Designing, Renderings and Drawings are produced in a combination of Rhino, Grasshopper Scripting and Photoshop.

SEPIDEH EMAMZADEHEI

Grasshopper Script


60.00

60.00

5

15

0.0

0

298.00

15

0.0

0

298.00

60.00

60.00

60.00

60.00

.00

.00

68

60

60.00

60.00

60.00

.00

57

251.00

240.00

5’

3’

150.00

41.3

41.30

°

4’-6

4’-

6”

41.30

41

.30°

4’-6”

°

4’-6”

4’-

.12

10

°

6”

12’-6” ”

41.3

4’-6

30

3’

6”

4’-

6”

4’-

.12°

30

4’-6”

41

6’ 8”

.30

30.12°

°

4’ 10”

5’ 5’

.36°

21

4’-

6”

21

.36°

4’-6

4’-6”

21.36°

7’ 41.30°

2’ 6”

4’-6

41

6”

4’-

°

.30

4’-6”

°

4’-6

60.00

.36° 21

41.30

4’-6”

6”

4’-

21.36°

12’-6” 60.00

21.36°

5’

4’-6

41

4’-6”

0 3.0

.36°

21

.30°

30

41.30°

Curve Study

Different Iterations

60.00

WORK EXPERIENCE


Designing, Scripting & Drawings

CURTAIN WALL SCREEN

Work Experience:

Programming: Screen Panelizing Location: Los Angeles Client: HMC Architects

Kennedy Entrance - Without Screen Panels

By using Rhino Inside Revit, I wrote a script that generates sunscreen panels based on the chosen curtain wall imported to Grasshopper from Revit and given data such as modular pattern, width, length and the gap between panels. Designing, Renderings and Drawings are produced in a combination of Rhino, Grasshopper Scripting and Enscape. SEPIDEH EMAMZADEHEI

Grasshopper Script


7

Kennedy Entrance - With Screen Panels

WORK EXPERIENCE


DPW PARKING LOT Work Experience:

DPW Parking Lot Space

Parking Layout

Programming: Public Work Location: Alhambra Client: Public Work Los Angeles County

Wrote a script in Grasshopper to give the maximum parking stalls (standard, compact and combination) in the parking boundary base on the Median Direction. Scripting was done in Grasshopper.

SEPIDEH EMAMZADEHEI

Grasshopper Scripts


9

Different Iterations

WORK EXPERIENCE


Scripting

KEYNOTE GENERATOR

Work Experience:

Keynote Text File

Programming: Keynote Generating Location: Los Angeles Client: HMC Architects

By using Dynamo, I wrote a script that reads keynote text file and assign the numbers and descriptions to their related elements in Revit in one run and it will also find the elements without keynote. Scripting is done with Dynamo in Revit.

SEPIDEH EMAMZADEHEI

Dynamo Script


11

Assigned Keynote Number and Text to the Elements

WORK EXPERIENCE


DPW LANDSCAPE

. FREMONT AVE, ALHAMBRA, CA 91803

Work Experience:

Construction Document Package Programming: Public Work Location: Alhambra Client: Public Work Los Angeles County

Participated in preparing Construction Document package for LADPW. Participated in modeling of Fences and Trellises and the Bridge. Designing, Renderings and Drawings are produced in a combination of Revit, 3D Max and Photoshop. Render is done by Fransisco Penaloza.

SEPIDEH EMAMZADEHEI

eadquarters


13

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

CL 4 A2.20

5 A2.20

1' - 2"

CL

CL VARIES

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

11' - 1 3/4"

EQ

EQ

7

EQ

EQ

EQ

EQ

EQ

4 3

EQ

4"

1

3

4

2

4

9' - 0"

TRELLIS DETAIL 2 8' - 10"

9' - 4"

3

2

9' - 0"

9' - 4"

1

8' - 10"

X" MAX.

4" 1' - 0"

0' - 6"

EQ

5 A2.20

4 A2.20

1' - 0" 4"

1' - 2"

CL

5

3" = 1'-0"

1' - 0"

633 W. 5TH STREET, THIRD FLOOR LOS ANGELES, CA 90071 T 213 542 8300 / www.hmcarchitects.com

ISSUE:

4"

1

NO.

ISSUED

DATE 07/24/19 09/26/19 10/17/19

0' - 6"

4"

75% CD 95% CD 95% CD RESUBMITTAL

3

2' - 0"

2' - 0"

2308046000

2

TRELLIS EXERCISE AREA SECTION

14

TRELLIS LUNCH EREA SECTION

1/2" = 1'-0"

9

TRELLIS DETAILS 1

1/2" = 1'-0"

4

3" = 1'-0" 29' - 1"

1/2 "

1/4

1/2"

71 /4"

9' - 6

9' EQ

EQ

25' - 7"

4"X6"X.250 HSS STEEL GIRDER, TYP. 4"X4"X.250 HSS STEEL COLUMN, TYP. 4"X4"X.250 HSS STEEL BEAM, TYP. 1.5"X1.5"X.250 PVC SECTION (E) WALL TO REMAIN (N) GUARDRAIL #10X2-1/2" 410 S.S. SCREW

EQ

1"

4"

.I.F . -V 9" TO (E )W AL L

2 1/

EQ

11' 2

21' -

1

5

EQ

2

6

1/2"

3 4

R 41' - 4"

/4" 03

TYP.

1

TYP.

1

TYP.

20' - 5"

EQ

1/2"

1

21' - 2 1/4"

9 11' -

EQ

81' - 4"

-8 14'

TYP.

EQ

-1

1

11' - 1 3/4"

' 14

EQ

R 38' - 0"

EQ

EQ

R 34' - 6"

10' - 2 3/4"

14 '

-8

1/2

"

EQ

11' - 2 3/4"

21' - 5

AIN

62 'R

18

RE M

1/2 "

6' -

-4

EQ

11' -

EQ

EQ

1. 2. 3. 4. 5. 6. 7.

EQ

EQ

EQ

1' 2"

KEYNOTES:

EQ

"

EQ

11'

20'

1/4"

15' - 5 1/2"

10"

EQ

2" +/-

-2 "

13

1/8" = 1'-0"

5' - 5 1/4" 5' - 1 1/2"

1/2"

EQ

-0 11 '

19 '-

9' - 5 1/2"

"

4

"

EQ

"

17 '-

CL

TRELLIS PLAN - AT SMOKING AREA

EQ

/4"

"

1/2

10' - 0"

"

4

10

1/2

'15

'10

3/4

-7

73

' 10

9' - 6 1/2

1/2

1' - 0"

'13

10' - 0"

CL

9' - 6 3/4"

9' - 6

0 3/4"

CL

1' - 0"

"

-2

CL

-4 10'

12 '

A2.20

10' - 2 3/4"

14

11' -

10'

9' - 7 1/2"

9' - 8 1/2"

1/2"

9' - 6 1/4"

9' - 10 2" - 1 1/

A2.20

1 1/2

EQ

0 1/2"

+/-

5" 60' -

EQ

19' -

+/-

14' - 2 1/4"

"

Agency Approval:

10

EQ

01

EQ

'-1 /2"

17'

-4

3/4"

EQ

EQ

13' - 4 1/4"

' 10 -7

EQ

10 4"

PUBLIC WORKS - LOS ANGELES COUNTY 900 S. FREMONT AVE. ALHAMBRA, CA 91803

EQ

Project:

37' - 7" "

PW HEADQUARTERS - LANDSCAPE MASTERPLAN

-3

10 '-

EQ

1"

Sheet:

1'

9' -2

"

10

ENLARGED TRELLIS PLANS

-1 1"

"

Facility:

" 1/4

1/2

10 '

-1

EQ

EQ

8'

-8

12 '

EQ

"

' 13

'-

A2.20 -2

File No.:

5"

2 3/ 4"

14

1'

'-

EQ

23' - 4 3/4"

15

" 1/2

12' -

SUBMITTAL

"

42' - 9"

29' - 4 1/2"

Date:

TRELLIS PLAN - AT EAST COURTYARD

11

1/8" = 1'-0" C:\Revit Local Files\2308046000 Headquarters Landscape Masterplan_A19 Central_marine.maroukian.rvt

TRELLIS PLAN

1

1/8" = 1'-0" Please Recycle

Sheet:

10/17/2019

Client Project No.: 2308046000

A2.20

WORK EXPERIENCE


KENNEDY HS Work Experience:

Construction Document Package Programming: Kennedy HS Location: Alhambra Client: LAUSD

Participated in preparing Construction Document package for LADPW. Participated in modeling of Fences and Trellises and the Bridge. Designing, Renderings and Drawings are produced in a combination of Revit, 3D Max and Photoshop. Render is done by Fransisco Penaloza.

SEPIDEH EMAMZADEHEI


15

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

WIC440

WIC440

WIC440

42 84 24

42 84 24

42 84 24

42 84 24

B.1

PL1 TYP.

11.25

PL2

ONE LAYER 5/8 GYP ADDED TO ALL SIDES TO REACH 1H PROTECTION

B.2 08.30

B.C WIC102

WIC102

WIC102

42 33 24

42 33 24

42 33 24

42 33 24

1H

12.34

10.30 02.12

WORK ROOM B-100D

GLAZING B-100B

5'-5 1/2"

22.22

11.31

3'-0"

PL1 TYP 7'-0"

PL2

PL1

CUSTOM01

30 84 24

30 84 24

33 84 24

1G

INT. ELEV. - WORK ROOM B-100D EAST

1/4" = 1'-0"

1F

WIC102

WIC102

34 33 24

34 33 24

18 A10.63

CASEWORK:

_____________________

11.24

CASEWORK TYPE

1/4" = 1'-0"

WIC# # # #

35 30 12

CUSTOM01

2'-0"

12.24 12.26 1B/ AB7.52

1'-8"

2'-6"

PL1

PL1 TYP.

PL2

TYP. TYP.

29 34 24

B.E 12.34 CERAMICS B-100

1D

INTERIOR ELEVATION - CERAMICS B-100 - SOUTH

1/4" = 1'-0"

1C

10.61

EQ

10.54

10.44

TYP.

TYP.

10.30

SS1 SS1

WIC102

36 34 24

36 34 24

WIC154C

3'-3 1/2"

WIC154C

36 33 24

12.07

1B

10.61

6"

TYP.

12.41 TYP.

4'-3"

4'-3"

1H/ AB7.52 1J/ AB7.52

SUPPLY STORAGE B-100A

4'-3"

12.41 TYP. 0"

EQ

3'-4"

02.09

J-6

2'-9"

1/4" = 1'-0"

EQ

15'-10"

1 A10.91

_____________________

INTERIOR ELEVATION - CERAMICS B-100 - WEST

CL

1C/ AB7.52

4'-0"

36 33 24

3'-0" MIN. CLR.

1G/ AB7.52

WIC102

36 34 24

9'-5"

WIC102

36 34 24

B.F

11.14

2'-9"

WIC152

PL1

2'-10"

09.05

OPEN

22.22

6"

PL1

EQ 2'-0"

1'-0"

EQ

22.20

1/4" = 1'-0"

15'-0"

INTERIOR ELEVATION - GLAZING B-100B WEST

23'-0"

WIC180

48 34 24

G-4A

WIC180

18 34 24

2'-0" EQ

WIC101

36 33 24

REFER TO SHEET G0.01 FOR TYPICAL SYMBOLS AND ELEVATIONS. SEE PLUMBING AND ELECTRICAL DRAWINGS AND SCHEDULE FOR FIXTURES, ACCESSORIES, AND ASSOCIATED PIPING. PATCH PENETRATIONS OF RATED ASSEMBLIES WITH EQUAL OR HIGHER RATED UL TESTED FIRESTOPPING SYSTEMS. SEE MECHANICAL DRAWINGS FOR HVAC EQUIPMENT AND ASSOCIATED DISTRIBUTION SYSTEMS. 4. SEE ELECTRICAL DRAWINGS FOR FIXTURES, DEVICES AND ASSOCIATED DISTRIBUTION SYSTEMS. 5. SEE WINDOW & DOOR SCHEDULE FOR ALL WINDOW AND DOOR TYPES. 6. EXTEND FIRE RATING ASSEMBLY AROUND RECESSED EQUIPMENT AND ACCESSORIES IN ORDER TO MAINTAIN INTEGRITY OF RATED WALL ASSEMBLY. 7. ALL DOOR OPENING TO BE 5 INCHES FROM INTERSECTING WALL, U.N.O. 8. PROVIDE ROOM IDENTIFICATION SIGNS, TYP. COORDINATE WITH OWNER FOR ROOM NAMES. 9. PROVIDE MOISTURE RESISTANT GYP BD AT SINK WALL FROM FLOOR TO A HEIGHT OF 4'-0" A.F.F. 10. FOR WALL TYPES SEE SHEET A10.11 11. FOR EQUIPMENT INFORMATION, REFER TO MFR'S ANCHORAGE INFORMATION FOR LOCATION OF BACKING PLATES PER AV DRAWINGS, WHERE REQUIRED. 12. SEE DETAIL A10.71 FOR TYPICAL MOUNTING HEIGHTS, U.O.N. 13. MARKERBOARDS TO BE MG1, U.O.N. 14. MARKERBOARDS TO BE CENTERED ON WALL, U.N.O. 15. PAINT EXPOSED STRUCTURE P1, U.N.O. 16. PAINT WALLS P1, U.N.O. 17. PAINT SOFFITS P1, U.N.O. 18. REFER TO AV SHEETS FOR ELECTRONIC EQUIPMENT AND PROJECTOR SCREEN MOUNTING HEIGHTS. 19. REFER TO FINISH SCHEDULE ON A9.30 SHEETS FOR INTERIOR FINISHES. 20. MARKERBOARDS TO BE MOUNTED 3'-0" A.F.F., U.N.O AND IN SPECIAL ED TO BE MOUNTED 2'-0" A.F.F. , U.N.O 21. FOR WALL TYPES REFER TO FLOOR PLANS 22. WRAP ALL EXPOSED WATER AND TRAP PIPING, REFER TO MECHANICAL DRAWINGS 3.

09.05

10'-0"

WIC102

1. 2.

7'-0"

5'-4"

2'-10"

PL1

18 34 24

CASEWORK WIDTH

GENERAL NOTES:

11.30

48 84 24

WIC101

CASEWORK HEIGHT (A.F.F.)

1A/ AB7.52

WIC302

35 30 12

2'-0"

WIC302

35 30 12

REFER TO CASEWORK LEGEND ON SHEET A9.31

CASEWORK DEPTH

TYP. WIC302

33 30 12

DATE 11/22/2019 05/01/2020 08/14/2020

FINISH CALLOUT TAG

06.24

WIC302

33 30 12

R

FINISH TYPE

12.25

WIC302

FO CAL I

FINISH # XX#

11.27

1E

I

LEGEND:

11.32

INT. ELEV. - GLAZING B-100B NORTH

1/4" = 1'-0"

RENEWAL DATE

OF

ISSUED 100% DESIGN DEVELOPMENT 50% CONSTRUCTION DOCUMENTS 100% CONSTRUCTION DOCUMENTS

13'-0"

WIC402

DF

INT. ELEV. - SUPPLY STORAGE B-100A WEST

WIC402

NO.

D A RC H

06/30/2021 06/30/2019

E

ISSUE:

ELECTRICAL POWER

10.30

SE

VIRGINIA ELAINE MARQUARDT No. C-33423

633 W. 5TH STREET, THIRD FLOOR LOS ANGELES, CA 90071 T 213 542 8300 / www.hmcarchitects.com

B.D

12.41

FE

22.20

EN

T

12.34

3'-11"

C

3330041000 A

3'-11"

11.11

ST

1D/ AB7.52

1/4" = 1'-0"

T

1/4" = 1'-0"

11.27 11.30 11.31 11.32 11.33 12.07 12.24 12.25 12.26 12.34 12.41 22.20

1F/ AB7.52 1E/ AB7.52

File No.:

EC

1J

INTERIOR ELEVATION - SUPPLY STORAGE B-100A NORTH

DESCRIPTION. EXISTING RELOCATED LOCKERS (E) KILNS TO REMAIN SHELVING/ PONY WALL FOR POWER AND WORK DISPLAY (E) LOUVER 4" BASE - REFER TO FINISH PLANS & SCHEDULE OF FINISHES MARKERBOARD (16'-0" LENGTH X 4'-0" HIGH), LAUSD INSTALLER RESPONSIBILITY (N) 24" DEEP COUNTERTOP LIQUID SOAP DISPENSER SURFACE MOUNTED PAPER TOWEL DISPENSER WALL MOUNTED SHORT THROW DIGITAL PROJECTOR, O.F.O.I., REFER TO ELECTRICAL DRAWINGS FOR MOUNTING DETAILS ENAMELING OVEN COMPUTER (TEACHER), O.F.O.I. BAT MOBILE, O.F.O.I. GLAZING BOOTH W/ EXHAUST(24"X44"X26"), 10.13 4'X4' MARKERBOARD, LAUSD INSTALLER RESPONSIBILITY WEDGING TABLE, O.F.O.I. SLAB ROLLER, O.F.O.I. HAND EXTRUDER, O.F.O.I. CLAY TANK, O.F.O.I. CLOCK MOUNTED @ 102" A.F.F. , U.N.O TEACHER DESK (60"X30"), PEDESTAL FILE & CHAIR, O.F.O.I. STOOLS, O.F.O.I. STOOLS (24" HIGH), O.F.O.I. CERAMIC STUDIO STUDENT BENCHES (72"X60"), O.F.O.I. WORK BENCH (36"X60"X34"H), O.F.O.I. METAL SHELVING, REFER TO SPECS., CFCI 24"X18" ACCESSIBLE COUNTERTOP LAVATORY W/ CLAY TRAP, REFER TO PLUMBING DWG 24"X18"X12" DEEP COUNTERTOP LAVATORY W/ CLAY TRAP, REFER TO PLUMBING

T

INTERIOR ELEVATION - SUPPLY STORAGE B-100A SOUTH

10.30 10.44 10.54 10.61 11.11 11.14 11.24 11.25

KILNS B-100C

09.05

8'-8"

WIC102

Agency Approval:

KEYNOTES NO. 02.09 02.12 06.24 08.30 09.05 10.01

IA

WIC440

30 84 24

N

WIC402

30 84 24

I

WIC402

30 84 24

L

WIC402

Facility:

11.33

CL

2'-0"

J-6

14'-0"

7'-6"

KENNEDY HIGH SCHOOL 11254 GOTHIC AVE. GRANADA HILLS, CA 91344

B.G

Project:

KHS-BLDG L&B - PACKAGE 4

PL1 7'-0"

8'-0"

10.01

Sheet:

3'-0"

BUILDING B-ENLARGED ROOM-1ST FLOOR

N 09.05

WIC410

WIC410

42 84 24

42 84 24

INTERIOR ELEVATION - CERAMICS B-100 - EAST

Date:

1A

1/4" = 1'-0"

BIM 360://3330041101 LAUSD Kennedy HS Renovation/3330041-AR-PKG4.rvt

100% CD SUBMITTAL

BUILDING B- FLOOR PLAN-1ST FLOOR - CERAMICS B-100

1

Sheet:

1/4" = 1'-0" Please Recycle

08/14/2020

Client Project No.:

10368160 333041000

AB7.52

WORK EXPERIENCE


If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

B.3

B.4

B.5

B.6

NO. 02.44 08.28 09.08

BUILDING E

11.14 12.36 12.37 12.39 12.40 12.41 22.03

CANOPY ABOVE 136'-8" 28'-7"

12'-0"

27'-9"

39'-9"

28'-7"

26.05

1

1 AB7.51

AB6.11 1 AB7.56

___________________________________ __________________________ _____

08.28

___________________________________ __________________________ _____

File No.:

3

1 AB5.11

______________________

AB6.11

Agency Approval:

DESCRIPTION. (E) LOCKERS TO REMAIN, PREP & PRIME FOR NEW PAINT FINISH (E) OPERABLE WINDOW MATCH FINISHED WALL THICKNESS TO EXISTING - ADD SHEETING LAYERS OR SHIMS AS REQUIRED COMPUTER (TEACHER), O.F.O.I. FILE CABINET (4 DRAWER) O.F.O.I. DESK AND TASK CHAIR, O.F.O.I. GUEST CHAIR, O.F.O.I. CREDENZA, O.F.O.I. METAL SHELVING, REFER TO SPECS., CFCI (N) DRINKING FOUNTAIN W. SIDE RAILS, REFER TO DETAIL SHEET A10.90 (E) IDF TO REMAIN

08.28

C-2.5

18'-8"

G-6

G-6 B-4

JANITOR B-114

B-113

A-6

GIRLS RESTROOM B-110

B-110

B-109

S-4

G-4A

09.08

B-105B

18'-0" 27'-3" AA-6

4. 5. 6.

B-105A

B-104

1 AB7.53

B-4

4'-0"

EXISTING TO REMAIN WALL/CEILING ANCHORED TRACK ABOVE

09.08

WORKROOM B-103A

13.

21'-10"

B.G

14. 15.

FILE ROOM B-104A

16. 17. 18. 19.

REFER TO SHEET G0.01, A10.71, A10.80 FOR TYPICAL SYMBOLS AND ELEVATIONS REFER TO DIMENSION PLANS FOR INTERIOR WALL DIMENSIONS AND WALL TYPES INFILL WALLS AT EXISTING OPENINGS ARE TO MATCH WIDTH AND FINISH OF EXISTING WALLS THAT ARE EXPOSED IN THE FINISHED CONSTRUCTION. REFER TO STRUCTURAL PLANS FOR WALL FRAMING AND SOFFIT FRAMING DETAILS, AND CMU INFILL DETAILS REFER TO REMODEL PLAN SHEETS A2.11, A2.21 FOR WALL RATINGS REFER TO REFLECTED CEILING PLANS A3.11, A3.21 FOR CEILING LAYOUT AND MATERIALS INFORMATION REFER TO WALL TYPES DETAILS, SHEETS A10.11, 10.12, 10.13. 10.14 FOR WALL ASSEMBLY DETAILS. PENETRATIONS OF RATED ASSEMBLIES ARE TO BE PATCHED WITH EQUAL OR HIGHER RATED UL TESTED FIRESTOPPING SYSTEMS. FIRE RATED ASSEMBLIES ARE TO BE EXTENDED AROUND RECESSED EQUIPMENT AND ACCESSORIES IN ORDER TO MAINTAIN INTEGRITY OF RATED WALL ASSEMBLIES PROVIDE MOISTURE RESISTANT GYP BD BEHIND SINK WALLS FROM FLOOR TO A HEIGHT OF 6'-0" A.F.F. REFER TO SLAB PLANS SHEETS A2.41, A2.43 FOR RESTROOM SLAB INFORMATION REFER TO DOOR /WINDOW SCHEDULES SHEETS A9.10, A9.11, A 9.12 FOR DOOR AND WINDOW AND FRAMES SIZES, DIMENSIONS AND DETAILS. ALL DOOR OPENING TO BE 5 INCHES FROM INTERSECTING WALL, U.N.O. REFER TO A7 SERIES SHEETS FOR ENLARGED ROOM PLANS AND INTERIOR ELEVATIONS REFER TO SHEET A9.30 FOR INTERIOR FINISH SCHEDULE REFER TO CASEWORK DETAILS, SHEETS A10.60, A10.61, A10.62, A10.63 FOR DIMENSIONS AND DETAILS. CONTRACTOR IS TO VERIFY MEASUREMENTS ON SITE FIELD PRIOR TO INSTALLATION OF CASEWORK AND WALL MOUNTED EQUIPMENT. REFER TO PAGE A10.90, PAGE 10.71 AND CASEWORK SHEETS FOR BACKING DETAILS FOR AV AND OTHER EQUIPMENT, MARKERBOARDS AND ACCESSORIES. FOR EQUIPMENT MOUNTING INFORMATION, REFER TO MFR'S ANCHORAGE DETAILS. MARKERBOARDS TO BE MOUNTED 3'-0" A.F.F., U.N.O., AND BE CENTERED ON WALL AT MOUNTING LOCATIONS OR AS SHOWN ON INTERIOR ELEVATION. SEE DETAIL SHEETS A10.71 AND A10.80 FOR TYPICAL MOUNTING HEIGHTS OF FIXTURES, SIGNAGE AND EQUIPMENT REFER TO INTERIOR ELEVATIONS AND ELECTRICAL PLANS FOR LOCATION AND MOUNTING OF AV AND RELATED ELECTRONIC EQUIPMENT SEE INTERIOR ELEVATIONS FOR TYPES, SIZES, LOCATION, PLACEMENT OF WALL GRAPHICS SEE PLUMBING AND ELECTRICAL DRAWINGS FOR FIXTURES, ACCESSORIES, AND ASSOCIATED PIPING. SEE MECHANICAL DRAWINGS FOR HVAC EQUIPMENT AND ASSOCIATED DISTRIBUTION SYSTEMS. SEE ELECTRICAL DRAWINGS FOR FIXTURES, DEVICES AND ASSOCIATED DISTRIBUTION SYSTEMS.

B.J

12.41 TYP.

CORRIDOR B-118D

11. 12.

B.H

B-104BA

ART CLASSROOM B-103

10.

A-4

B-104A

G-4A

9.

B8

BROADCAST/VIDEO PRODUCTION STUDIO B-104

___________________________________ __________________________ _____

B-103B

FE

8.

C-2.5

12.37 CORRIDOR B-117C

B-104CC

B.F

11'-0"

SLC LEAD OFFICE B-101C

7.

G-4AA

17'-11"

12.39

B-103C

B-117B

3.

2 AB5.11

B-104EA

12.40

B-103A

B-119

B.E

08.28

VESTIBULE B-104E

G-4AA

J-6

J-6

G-4AA

EQ EQ

B-120 EQ

S-2.5

CONTROL ROOM B-104C

12.36

12.37

SOUND ISOLATION B-104F G-4AA

1 AB7.54

___________________________________ __________________________ _____

B4

EDITING B-104D

B-104CB

J-6

B-104D

FE

J-6

B-104BB

EQ

CL

2.

B-104F

2 AB7.53

DF

STAIR B-1

A-6

09.08

TYP.

11.14

COUNSELOR ASSISTANT LEAD OFFICE OFFICE B-101E B-101D

FE

CORRIDOR B-118C

1.

SPED II SUPPORT B-106A

10'-0"

B4

12.37

B-102

GENERAL NOTES

18'-8"

11.14

TYP.

CANOPY ABOVE

HEATER R.M B-120

SPED II SUPPORT B-106B

___________________________________ __________________________ _____

26.05

B-101C

12.39

SUPPLY STORAGE B-100A

STORAGE B-119

CORRIDOR B-117D EXISTING LOCKERS TO BE INSTALLED HERE

G-4A

FILM MAKING COMPUTER LAB B-105

B-4

B-104EB

B-101D

B-101E

B-100A

B4

ELEVATOR

C-4

B-104CA

12.36 J-6

CORRIDOR B-118D

B-112

2D/ AB7.56

ADMIN B-101 12.36

CORRIDOR BETWEEN BLD B AND C

SOLATUBE ABOVE

B-106

ELECTRICAL B-112

B3

B-101B

B-101AB

ALIGN

B-101

B-100F

______________________

1 AB7.11

______________________

B3

B.J

J-6

NEW FIRE EXTINGUISHER

___________________________________ __________________________ _____

G-4A

B.3

ART STORAGE B-102

G-4A

2 AB7.56

B.K

B-111

J-6

CONFERENCE ROOM B-101B

G-4A

CONFERENCE ROOM B-101A

___________________________________ __________________________ _____

09.08

3 AB5.11

FF&E, O.F.O.I.

1 AB7.55

___________________________________ __________________________ _____

FE

B-101AA

4 AB5.11

1 / AB2.11

B.D

SPECIAL ED II B-106

2 AB7.11

___________________________________ __________________________ _____

C-4

G-4A

______________________

J-6

NEW WALL

153'-4"

CORRIDOR B-117B

08.28

1-HOUR RATED EXISTING WALL TO REMAIN

NEW 1 HR WALL

B-106B

RSP #3 B-109

22.03

J-6

BOYS RESTROOM B-111

C-4

CERAMICS B-100

B.2

G-4A

B-106A

EQ EQ

AB6.11

DATE 11/22/2019 05/01/2020 08/14/2020

C-4

DF

2

R

EXISTING CMU WALL - MIN. 1HR RATED TO REMAIN

G-4A

09.08

FO CAL I

EXISTING CONSTRUCTION TO REMAIN

08.28

B-106CA

STORAGE B-113

RENEWAL DATE

OF

ISSUED 100% DESIGN DEVELOPMENT 50% CONSTRUCTION DOCUMENTS 100% CONSTRUCTION DOCUMENTS

10'-0"

B-107B

B-106C

I

LEGEND

B.C

COUGAR CAFE B-106C

TYP.

C-2.5

S-4

B-100E

CL

ALIGN

GENDER NEUTRAL B-115

02.44

09.08

C-2.5

B-114

B-115

B-116

GENDER NEUTRAL B-116

2 AB7.54

___________________________________ __________________________ _____

ALIGN

4'-7"

S-2.5

FE

3 AB7.13

___________________________________ __________________________ _____

B-100D

B-100B

B-100C

FE

2'-8 1/2" 5'-10"

___________________________________ __________________________ _____

3 AB7.11

B-108C

B-108

B-117A

WORK ROOM B-100D

GLAZING B-100B

B-107C

FE

G-4

CORRIDOR B-117A

NO.

G-4A

09.08

H

06/30/2021 06/30/2019

E

T

09.08 FE

KILNS B-100C

ISSUE:

B.B

SPECIAL ED II SUPPORT B-108B

B-108B

CORRIDOR B-118A

1 AB7.52

___________________________________ __________________________ _____

D A RC

T

633 W. 5TH STREET, THIRD FLOOR LOS ANGELES, CA 90071 T 213 542 8300 / www.hmcarchitects.com

ART CLASSROOM B-107

WORK ROOM B-107A

SE

VIRGINIA ELAINE MARQUARDT No. C-33423

A

B-118

EN

3330041000 ST

CORRIDOR B-118B ELEC. B-118

C

L

I

B.A

B-107A

EC

B-108A

T

SPECIAL ED II B-108

STAIR B-2

SPECIAL ED II SUPPORT B-108A G-6

IA

B.2

N

B.1

KEYNOTES

VESTIBULE B-104B

Facility:

B.K

C.A BUILDING C

CANOPY ABOVE

08.28

KENNEDY HIGH SCHOOL 11254 GOTHIC AVE. GRANADA HILLS, CA 91344 Project:

3 AB5.11

KHS-BLDG L&B - PACKAGE 4

______________________

2 / AB2.11

Sheet:

BUILDING B-REMODEL FLOOR PLAN-1ST FLOOR

N

100% CD SUBMITTAL Date:

BUILDING B- REMODEL FLOOR PLAN 1ST FLOOR - ELEVATOR BIM 360://3330041101 LAUSD Kennedy HS Renovation/3330041-AR-PKG4.rvt

SEPIDEH EMAMZADEHEI

2

1/8" = 1'-0"

BUILDING B- REMODEL FLOOR PLAN-1ST FLOOR

Sheet:

1

1/8" = 1'-0" Please Recycle

08/14/2020

Client Project No.:

333041000 10368160

AB2.11


17

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Agency Approval:

BUILDING E

File No.:

B.3

B.4

EXISTING CANOPY

136'-8"

12'-0"

27'-9"

39'-9"

SPECIAL ED II SUPPORT B-108A 9'-0" P1

SPECIAL ED II B-108 9'-0" ACT 1

6'-1 1/2"

3'-0"

7'-0" P1

L

I

6'-6"

2'-0"

SD

CO

FS

SD

SD

FL

SD

SD

FL

SD CO

CONFERENCE ROOM 9'-0" ACT 1 B-101A

SD

CO

FL ART CLASSROOM B-103 9'-0" ACT 1

2'-0"

21'-6"

ART STORAGE B-102

FS

9'-0" ACT 2

SD

FS

FL

SD

8'-0" P5

6'-0"

ASSISTANT LEAD OFFICE B-101D

9'-0" ACT 2 SLC LEAD OFFICE B-101C

7'-0" P2

CORRIDOR B-117C 9'-0" ACT 1

FL

SD 8'-0" P5

8'-0" P5

FL

SD

CONTROL ROOM B-104C

FS

SD

SD

ELEVATOR

FL

CO

SD

FS

FS

FL

FL

CO

SD

18'-0"

B.G

FS

1. 2. 3. 4.

B.H

FL

5. 6. 7. 8. 9. 10.

B.J

11.

CO

SD FS

FL FS FL

SD

12. 13. 14. 15. 16.

FL

17. 18.

SD

CORRIDOR B-118D

16 40

ART CLASSROOM B-103 9'-0" ACT 1

2 / AB3.11 EXISTING CANOPY

WORKROOM B-103A 9'-0" ACT 1

2'-0"

FILE ROOM B-104A 9'-0" ACT 1

1/8" = 1'-0"

HD

CO DETECTOR - FIRE ALARM DEVICE CENTERED ON TILE, U.N.O. HEAT DETECTOR - FIRE ALARM DEVICE CENTERED ON TILE, U.N.O.

SPRINKLERS

GENERAL NOTES:

INDICATES CEILING HEIGHT. CEILING HEIGHTS ARE REFERENCED FROM 1'-0" THE FLOOR BELOW WHERE HEIGHTS ARE INDICATED. FIN LOCATION OF ALL LIGHT FIXTURES, MECHANICAL DIFFUSERS, ACCESS PANELS, FIRE ALARM DEVICES AND SECURITY DEVICES IN CEILINGS SHALL BE GOVERNED BY THE ARCHITECTURAL REFLECTED CEILING PLANS CENTER ALL DEVICES AND FIXTURES IN CEILING/TILE/PANELS, TYPICAL U.N.O. SEE FLOOR PLANS AND INTERIOR ELEVATIONS FOR WALL-MOUNTED LIGHT FIXTURES AND OTHER FIRE ALARM SYSTEM, SECURITY AND ELECTRICAL DEVICE LOCATIONS NOT SHOWN OR DIMENSIONED ON THE RCP'S. REFER TO THE MECHANICAL DRAWINGS FOR DUCT LOCATIONS IN AREAS WITHOUT CEILINGS, U.N.O. LOCATION OF ACCESS PANELS IN CEILING TO BE COORDINATED WITH ARCHITECT. SIZE TO BE COORDINATED WITH MEP REQUIREMENTS. SEE ELECTRICAL LIGHTING PLANS FOR LIGHT FIXTURE TYPES. SEE ELECTRICAL PLANS FOR LOCATION OF LIFE SAFETY SENSOR DEVICES, ALARMS DEVICES, OCCUPANCY SENSORS ETC. SEE SHEET A10.43 FOR SOLA TUBE DETAILS STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION SYSTEMS ARE TO BE PAINTED AT EXPOSED CEILING AREAS TYPICAL AT ALL OCCUPIED SPACES, U.N.O. LOCATE ELECTRICAL JUNCTION BOXES ABOVE ACCESSIBLE CEILINGS OR AREAS WITHOUT CEILINGS UNDERSIDE OF SOFFITS TO BE PAINTED P1, U.N.O. ALL GYP. BD. CEILINGS TO BE PAINTED P1, U.N.O REFER TO SHEETS A10.30, A10.31, A10.32, A10.33, A10.34 FOR CEILING DETAILS. REFER TO A9.30 FOR SCHEDULE OF FINISHES. SEE SPECIFICATION DIVISION 7 FOR NEW EXTERIOR PLASTER CEILINGS AND DIVISION 9 FOR INTERIOR GYP. BD. AND ACOUSTICAL TILE CEILINGS. ACOUSTICAL CEILING GRID SHALL BE CENTERED IN ROOMS, UNO. ALL SOFFITS WITH AN ACCENT PAINT SHALL BE PAINTED ON THE VERTICAL FRONTS AND SIDES OF SOFFITS.

Project:

Sheet:

BUILDING B-REMODEL CEILING PLAN-1ST FLOOR

100% CD SUBMITTAL Date:

BIM 360://3330041101 LAUSD Kennedy HS Renovation/3330041-AR-PKG4.rvt

STROBE SPEAKER - FIRE ALARM DEVICE CENTERED ON TILE, U.N.O.

CO

KHS-BLDG L&B - PACKAGE 4

ELEVATOR

2

FIRE ALARM DEVICE CENTERED ON TILE, U.N.O.

FS

KENNEDY HIGH SCHOOL 11254 GOTHIC AVE. GRANADA HILLS, CA 91344

N

BUILDING B ELEVATOR - REMODEL REFLECTED CEILING PLAN - 1ST FLOOR

VACANCY SENSOR CENTERED ON TILE, U.N.O.

FL

Facility:

B.K

41 17 18 42 C.A BUILDING C

SMOKE DETECTOR CENTERED ON TILE,U.N.O.

VS

RETURN AIR ACCESSORIES, REFER TO MECH. DWGS.

FL

8'-0" P5

20'-1"

EXISTING CANOPY

SD

SUPPLY AIR ACCESSORIES, REFER TO MECH. DWGS

B.F

CO

2'-0"

7'-0" P1

2'X2' ACCESS PANEL, REFER TO 11/AC10.32

VESTIBULE B-104E 9'-0" ACT 1

SD

EXIT SIGN

9'-0" ACT 1

EXISTING CEILING

SD

DAYLIGHT SENSOR CENTERED ON TILE, U.N.O.

SOLATUBE, SEE ROOF PLAN FOR SOURCE LOCATION ON ROOF

FL

FL

FS

7'-0" P1

DAYLIGHT SENSOR

EXISTING STUDIO LIGHT FIXTURE

FL

B.K

15 39

SOUND ISOLATION B-104F 9'-0" ACT 1

9'-0" ACT 1

BROADCAST/VIDEO PRODUCTION STUDIO B-104

1 / AB3.11

UR SENSOR CENTERED ON TILE, U.N.O.

DS

NEW CEILING MOUNTED LIGHT FIXTURE

7'-0" P1

SD

7'-0" P2 SD

UR

2'X4' LIGHT FIXTURE

1'X4' LIGHT FIXTURE

B.E

FL

SD

8'-0" P5

CORRIDOR B-117D 9'-0" ACT 1

CO

SD

9'-0" ACT 2

COUNSELOR OFFICE B-101E

FL

SD

9'-0" ACT 1

FL

SD FL

SD

2'-0"

7'-0" P1

FS

FILM MAKING COMPUTER LAB B-105

4'-0"

7'-0" P1

2'-0"

SD

FS

FL

SD SD

9'-0" ACT 1

1'-0"

FS

9'-0" ACT 1 FL

FS

SD

SD

SD FS

4'-0"

FL

ADMIN B-101 9'-0" ACT 1

CO FL

B.J

EXISTING CEILING

SD

SPED II SUPPORT B-106B

SPED II SUPPORT B-106A 9'-0" P1

17'-11"

3'-6"

SD

FL

9'-0" P1 EDITING B-104D

7'-0" P1

7'-0" P1

6'-6" P5

SD

CONFERENCE ROOM 9'-0" ACT 1 B-101B

8'-0" P5

SD 7'-0" P1

11'-0"

SD

EXISTING EXTERIOR CEMENT PLASTER CEILING TO REMAIN NEW LINEAR PENDANT LIGHT FIXTURE

7'-0" P1

FL

CORRIDOR B-117B 9'-0" ACT 1

NEW EXTERIOR CEMENT PLASTER CEILING TO MATCH EXISTING

EXPOSED CEILING

3'-6"

7'-0" P1

DATE 11/22/2019 05/01/2020 08/14/2020

NEW 2'X4' ACOUSTICAL CEILING TILE (1 HR)

CO

8'-0" P5

R

GYP2 - SUSPENDED GYP. BD. CEILING

SD 9'-0" P1

FO CAL I

GYP 1 - MOISTURE RESISTANT GYP BD.

FL

ELECTRICAL B-112

RENEWAL DATE

OF

NEW 2'X4' ACOUSTICAL CEILING TILE

27'-3"

FS

3'-6" 2'-0"

7'-0" P1

FL

CO BOYS RESTROOM B-111 9'-0" P1

SD

CO FL

SUPPLY STORAGE B-100A

SD

I

REMODEL LEGEND:

B.D FS

H

06/30/2021 06/30/2019

E

ISSUED 100% DESIGN DEVELOPMENT 50% CONSTRUCTION DOCUMENTS 100% CONSTRUCTION DOCUMENTS

SPECIAL ED II B-106 9'-0" ACT 1

FL

SD

FL

14 38

10'-0" 2'-0"

7'-4" P2 GIRLS RESTROOM B-110 9'-0" P1

4'-1"

SD

CERAMICS B-100

7'-4" P2

7'-7"

SD

FS

FL

FS

7'-0"

9'-0" ACT 1

SD 2'-0"

8'-0" P5

HD

RSP #3 B-109

8'-0" P1 7'-0" P1

9'-0" P1

FL

FL

FL

SD

153'-4"

FL

SD

B.C

COUGAR CAFE B-106C 9'-0" ACT 3

21'-10"

GENDER NEUTRAL B-116 9'-0" P1

8'-0" P5

8'-0" P5 FS

JANITOR B-114

9'-0" P1

SD

8'-0" P5

10'-0"

SD

SD

NO.

7'-0" P1

FL

GENDER NEUTRAL B-115

WORK ROOM B-100D

SD FS

B.3

B.B

18'-8"

SD

8'-0" P1 FL

ISSUE:

CO

8'-0"

7'-0" P1

9'-0" P1

CORRIDOR B-117A 9'-0" ACT 1

FL

9'-9" ACT 1

SD

SPECIAL ED II SUPPORT B-108B

FL

CO

13 B.2 37

633 W. 5TH STREET, THIRD FLOOR LOS ANGELES, CA 90071 T 213 542 8300 / www.hmcarchitects.com

2'-0"

SD

FS

7'-6"

SD

FL

SD

2'-0"

FL

SD

9'-0" ACT 1

FL

2'-0"

8'-8"

KILNS B-100C

5'-6"

7'-0" P1

FL

FS

7'-0" P1

FL

7'-0" P2

8'-0" P5 FS

10'-2 1/2"

3'-0"

18'-0"

SD CO

D A RC

T

FL FS

SE

VIRGINIA ELAINE MARQUARDT

T

SD CO

1'-0"

FS

EN

No. C-33423

A

EXISTING CANOPY

C

3330041000 ST

SD

SD

B.A

FL

EC

FL

SD

ART CLASSROOM B-107 9'-0" ACT 1

T

SD

GLAZING B-100B 9'-0" ACT 1

28'-7"

WORK ROOM B-107A 9'-0" 1'-0" ACT 1

2'-0"

2'-0"

7'-0" P2

7'-0" P1

B.6

IA

28'-7"

B.5

N

B.2

18'-8"

B.1

BUILDING B - REMODEL REFLECTED CEILING PLAN - 1ST FLOOR

1

1/8" = 1'-0"

Please Recycle

Sheet:

08/14/2020

Client Project No.:

10368160 333041000

AB3.11

WORK EXPERIENCE


LIGHT WEAVER Work Experience: Drawings, Assembly & Fabrication

Programming: Festival Location: Detroit Client: Detroit Luminosity

Made the installation and assembly files ready and lead the installation and fabrication on the site. The process is done in a combination of Rhino, Grasshopper Scripting and Adobe Suite. Photo is taken by Joshua White.

SEPIDEH EMAMZADEHEI


360 STAGE

19

Work Experience: Programming: Festival Location: Coachella Client: Coachella Festival

Participated in modeling and gave out the initial idea and design. helped with preparing the mesh by Grasshopper scripting. Designing, Renderings and Drawings are produced in a combination of Rhino, Grasshopper Scripting, Vray Rendering and Adobe Suits. Photo is taken by Joshua White.

WORK EXPERIENCE


TWILIGHT STAGE Work Experience: Drawings, Assembly & Fabrication

Programming: Twilight Concerts Location: Santa Monica Client: City of Santa Monica

Participated in assembly and installation. Lead the fabric printing and assembly. The process is done in a combination of Rhino, Grasshopper Scripting and Adobe Suite. Photo is taken by Eiko.

SEPIDEH EMAMZADEHEI


GATEWAY

21

Work Experience:

Assembly & Fabrication Programming: Festival Location: Detroit Client: Detroit Luminosity

Participated in assembly and

proposal presentation, installation.

Design is done in Rhino with Grasshopper Scripting. Drawings and Renderings are produced in Rhino, Vray Rendering and Adobe Suits. Photo is taken by Joshua White.

WORK EXPERIENCE


360 BEACON Work Experience: Drawings, Assembly & Fabrication

Programming: Vidcon Location: Anaheim Client: Vidcon

Participated in assembly and installation. The process is done in a combination of Rhino, Grasshopper Scripting and Adobe Suite. Photo is taken by Joshua White.

SEPIDEH EMAMZADEHEI


HALLO

DIMENSIONS 23

Work Experience:

Assembly & Fabrication Programming: Festival Location: Detroit Client: Detroit Luminosity

Participated in assembly and

proposal presentation, installation.

3

Design is done in Rhino with Grasshopper Scripting. Drawings and Renderings are produced in Rhino, Vray Rendering and Adobe Suits. Photo is taken by Joshua White.

WORK EXPERIENCE


CURLY CUE Work Experience:

Assembly & Fabrication Programming: US National Drone Racing Championship Location: Governors Island, NY Client: GoPro NYC

Participated in assembly and

proposal presentation, installation.

Design is done in Rhino with Grasshopper scripting. Drawings and Renderings are produced in Rhino, Vray Rendering and Adobe Suits. Photo is taken by Joshua White.

SEPIDEH EMAMZADEHEI

2


25

2

WORK EXPERIENCE


LA PASSERELLE Advisor: Jakob & Macfarlane

Spring 2018

To connect the former industrial zone back to the city, I used these organic Shapes to define and adapt the multipurpose site to its diverse surroundings. The form constantly shifting slightly vertically allowing for more public aspects to penetrate into the building and create visual experience for people. The sense of speed is enhanced in the treatment of skin in order to emanate the highway experience into the massing by using grasshopper. It defines the public program to create a semipublic outdoor space at specific levels. It’s the piece that reflects the movement of the cars. SEPIDEH EMAMZADEHEI


ADAPTIVE SYSTEM

27

Instructor: Alexis Rochas Autumn 2017

The exercises were based on spaceframe, parametric design and analysis techniques including: linear development (space truss), surface development (double layer space frames), volume development (3D lattices), and structural patterns (event sequencing) by using grasshopper scripts. The projects were grasshopper animations which were picturing spaceframes, parametric designs and analysis techniques of each exercise by writing a specific script.

DESIGN STUDIO


PILLOW THOUGHT Advisor: Kerenza Harris Spring 2018

This course aimed at giving computational tools out to facilitate the practical implementation of performance goals in every day practice and allow to seamlessly integrate parametric intelligence into existing, more intuitive design processes. By using CATIA, one of the most powerful and widely used platforms in the industry, creates an opportunity to incorporate performance data early in the design process while maintaining the flexibility of design iteration/ideas.

SEPIDEH EMAMZADEHEI


BIG DUMB BUILDING

29

Instructor: Emmett Zeifman Spring 2017

The focus in this studio was moving from the scale of a building project to the scale of urbanism, a number of new different enters into the determination of site and program. The design process started by choosing a generic plan, scale and transform based on general guidelines regarding size, density and program mix in Rhino. The patterns on the facade were generated with grasshopper script by framing and bringing the city into the building by transforming one linear courtyardbased plan.

DESIGN STUDIO


CONCEPT ART SEPIDEH EMAMZADEHEI


31

MINIATURES



Sepideh Emamzadehei s.emamzadehi@gmail.com Thank You



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.