Architecture Portfolio_2019

Page 1

Gaia Sessarego selected works 2015-2019

Port folio


Gaia Sessarego Italian, born 21/06/1995


Architect

years, exploring various phases of design and scales ranging from urban to architectural and interior ones. I chose the master degree in Building Architecture for its interdisciplinary approach and to deepen my particular interest in the construction detail and the executive aspects of the project, aspects that I would like to investigate also in the workplace.

CV

CONTACTS and PERSONAL INFORMATIONS

+39 340 21 95 371 s.gaia.95@gmail.com www.linkedin.com/in/gaiasessarego Portfolio Viale Tibaldi, 54 20136, Milano - Italy

WORK EXPERIENCES

2017 - TODAY ARCHITECTURAL ASSISTANT Arch. Anna Camisasca - Settimo Milanese (Milan) - preparation of documents for the release of the landscape authorization to be presented for an intervention of extraordinary maintenance of a parish building in Settimo Milanese. (link) - development of various project proposals to be submitted to the client for a redevelopment and redistribution of the spaces of an apartment on Lake Como. (link)

EDUCATION

LANGUAGES

IT SKILLS and OTHERS

italian

mothertongue

english

B2

portuguese

basic

spanish

basic

2013 Cambridge First Certificate in English (Level B) 2017 Toeic Certificate in English (900/990)

software

2D or 3D modeling| Autocad, Revit, Sketchup, 3dsMax, Recap, Termolog graphic | Photoshop, Illustrator, Indesign in the next future | Dynamo, Rhino others | hand drawing, model making, photography

(expected date of graduation: December 2019)

MSc in Building Architecture POLIMI | Politecnico di Milano GPA 28.73 / 30

2018 ERASMUS+ FOR STUDIES FAUL | Faculdade de Arquitetura da Universidade de Lisboa 2014 - 2017 BSc in Architecture Design POLIMI | Politecnico di Milano 108 / 110

2018 - 2019 LIVING ROOM AREA DESIGNER AND SALES CLERK IKEA - Corsico (Milan) Direct interface with the customer and need to rapidly develop customized solutions. 2014 - 2018 SHOP ASSISTANT Maxi Toys - Buccinasco (Milan)

2017 - TODAY

2009 - 2014 High School leaving qualification in CLASSICAL STUDIES ‘Alexis Carrel’ High School, Milano 86|100

FURTHER TRAINING

2019 TERRAVIVA WORKSHOP Politecnico di Milano - Copparo (Italy) “The Agritecture paradigm” 2017 International SUMMER SCHOOL Hasselt University - Hasselt (Belgium) “Seamless retail design” - integrating the spatial, experiential and digital to reflect on the challenges and opportunities of the store of the future. (link) 2016 ATHENS International Program TU Delft - Delft (Netherlands) “The Design of Serendipity” reenvisioning the Public Library. (link) 2016 International SUMMER SCHOOL Bauhaus Universitat - Weimar (Germany) “Understanding Spaces” (link) “Sensual Awareness” (link)


My works


01 Milan

02 Ceuta

03 Milan

04 Belluno

05 Novara

pg. 06 // Palasesto to the 2026 Olympics

pg. 14 // spa Hotel ***

pg. 22 // the infrastructure project in the contemporary cities

pg. 28 // renovation of an old summer camp

pg. 34 // project in an extra-urban context


PALASESTO to the 2026 olympics Sesto San Giovanni. Milano prof. Tomaso Monestiroli Design Studio VI I-II sem. 2018/2019

software used: Revit, Termolog, Midas, Ces, Photoshop main task: plant design, 3D views, masterplan challenges/achievements: management of a complex project in all technological and executive aspects

The project for the new sports center in Sesto San Giovanni is located exactly where the current Palasesto is, as the idea is to replace it and expand the current offer in order to create a place that is suitable to host some of the activities planned for the 2026 Olympic Games in Milano-Cortina. With the design of our project we wanted to recreate a relationship between two parts of the city that have been separated by the railway for a long time but that will necessarily have to return to dialogue in order to re-establish a unitary and organic vision of the city. First of all we have bordered the lot with a single-story volume positioned according to the grid of the historic city, the one to the north-west of our lot. This volume collects all the service and public spaces, protects the activities that take place inside and at the same time acts as a filter between public and private space. The sport activities take place in separate volumes; the main one contains the ice rink provided with seats to accomodate up to 3500 spectators, the second volume contains the swimming pools and another one is the climbing tower. All this three buildings emerge from the fence to be visible and easily identifiable from the street working as a landmark for the area, they are also rotated in order to reconstruct the axes on which the Falck area was set and finally recreate at least within the lot a synergy between these two parts of the city. [with A. Delli Compagni and L. Secreti]

6


7


road routes

transport

service ring

buildings

ice rink swimming pool climbing tower

delimitation of the area

8

insertion of the main volumes

urban integration


green areas

sport facilities

proposal of the new cycle connection among sports centers

9


Swimming pool and gym area

10


Ice rink

atrium

arena

11


gni

re ba

tratto

a es

cana

e

ion

piraz

le as

gni

tratto

canale mandata soffitto

ra

ndata

le ma

cana

no

A pia

a UT

no

A pia

a UT

resa

le rip

no

A pia

a UT

canale mandata soffitto

ndata

le ma

cana

-1

cana

canale mandata soffitto

ra

pertu

in co

i

gn re ba tratto ra a es pertu in co

pertu

in co

gni

re ba

tratto

a es

A

UT

i

gn re ba

a es

e

ion

piraz

le as

cana

A

UT

canale mandata soffitto

ra

pertu

in co

ra

pertu

in co

re ba

tratto

a es

gni

re ba

tratto

a es

ra

pertu

in co

-1

resa

le rip

cana

-1

no

A pia

a UT

-1

resa

le rip

cana

canale mandata soffitto

no

A pia

a UT

-1

ndata

le ma

cana

-1

no

A pia

a UT

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale mandata soffitto

resa

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

le rip

cana

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

canale ripresa soffitto

no

A pia

no

A pia

a UT

-1

i

gn re ba tratto ra a es pertu in co

ndata

le ma

cana

-1

no

A pia

a UT

no

A pia

a UT

ndata

le ma

cana

-1

resa

le rip

cana

-1

no

A pia

a UT

resa

le rip

a UT

-1

ndata

le ma

cana

cana

no

A pia

a UT

-1

resa

le rip

cana

no

A pia

a UT

-1

gni

ba ttore

tra

a es

ra

pertu

in co

e

ion

piraz

le as

cana

ndata

le ma

e

cana

ion

piraz

le as

cana

cana

canale mandata soffitto

gni

re ba

tratto

gni

gni

re ba

tratto

a es

ra

pertu

in co

gni

ra

pertu

in co

re ba

tratto

a es

ra

pertu

in co

ventilation system plan - ground floor - first floor

29 -

m siste iante o - p terra tt e z o z pian pala

ne razio

i ae

TAV

E II ESS

MPL

ELL

D URA

OST

EC

I CO ION

RUZ

o mpin

ta T lo Gallo S ITET Pao , II RCH liaro niele SSE DI A is, O zini Da il PLE ORIO s M s AT Fan I CO s Va ION LABOR I 2019 patsiko maso, 8 RUZ li To pam 201 OST A.A aola, M onestiro EC L L oP DE _M mpin ssori URA ETT o Sta Profe Gall CHIT iele, I AR n D a IO ini D TOR anz o, F 19 ORA mas LAB 18 I 20 li To 20 ro ti .A s A one _M ssori Profe

pa

pam

la, M

Pao

liaro

is, O

assil

sV tsiko

m siste iante o o-p zett no prim z la a pia 0-p

3

lo

Pao

tto

e lazz

ptoa t e zz

eptatola z z la

pa

12

ra

i ae

TAV

facade system detail

e

-1

re ba

tratto

a es

ra

pertu

in co

no

A pia

canale mandata soffitto

canale mandata soffitto

a es

-1

ion

piraz

le as

UT

a UT

canale mandata soffitto

no

A pia

a UT

A

A

UT

supporting pillar detail


107 897 NI - 97127 8 PAG OM RETI - 897296 C I C L DEL ISA SE REGO L NNA SA ARIA SES GAIA

ttore

estra

ttore

estra

i

bagn

107 897 NI - 97127 8 PAG OM RETI - 897296 C I C L DEL ISA SE REGO L NNA SA ARIA SES GAIA

i

bagn

ne

azio

13


Spa Hotel **** Ceuta. Spain prof. Carlos Ferreira Design Studio V II sem. 2017/2018

software used: Revit, Photoshop main task: 3ds view challenges/achievements: high slope of the land

We are in Ceuta, a nice city on Mediterranean coast where different traditions, lenguages and religions cohexist from ages. The reason is that it is a spanish autonomous city but on the North Coast of Africa. As a result of that strange combination, the city reveals itself to be an extremely multicultural city, rich of history, in which various architectural styles cohexist. What I am asked to do there is to replace the old public market with a new receptive activity that hosts an Hotel*****, a SPA, a restaurant and other additional services for tourists, as tourism is slowly increasing. The challenge was to face with a context that was completely different from the one I was used to work with; starting from the architectural technologies and materials, until the high slope of the land that was an absolute new entry for me. I decided to take the most out of this opportunity trying to experience something new. I studied the history and the characteristic of the islamic architecture in order to enrich the spaces with a local atmosphere and to keep as much respect as possible in this big intervention. Moreover, the level difference between the two opposite sides of the block finally reveal to be successfull in the differentiations of the flows between one more public access that faces the seaside and one more private side where the hotel rooms overlook. [with T. Corti]

14


15


MASTERPLAN 1 : 2.000

16


17


VOLUMES

INSERT VOLUMES

FRAME

VOLUMES

INSERT VOLUMES

CONCEPT

The concept developed from the idea of a fence enclosing the block into which three volumes are inserted (SPA, hotel rooms, restaurant)The main purpose was to recall the traditional islamic constructions with some elements: a space closed to the outside but open in the interior with various courtyards, the materials and the color.

3D AXO

ROOMS CAMERE

PROSPETTO SUD

0

2

10

SWIMMING POOL PISCINA

LIVING PUBLIC SQUARE CAMERE PIAZZA

3D PISCINA AXO

2

22

CAMERE

2

CAMERE

SPA

PISCINA

CAMERE

PISCINA LIVING PIAZZA PIAZZA

LIVING

PISCINA

LIVING LIVING PROSPETTO NORD

0

2

10

PIAZZA SPA

RESTAURANT

CONFERENCE HALL

RECEPTION

LOUNGE - BAR

DIAGRAMMI FUNZIONALI

UNZIONALI MMI FUNZIONALI PIANO TERRA +8.80m Scala 1:200 MMI FUNZIONALI DIAGRAMMI FUNZIONALI Distribuzione e Spazi comuni (VUOTO)

66

Ingombro Edifici (PIENI)

Ingombro Camere (PIENI) NO TERRA TERRA +8.80m 1:200 PIANO TERRAScala +8.80m NO +8.80m Scala 1:200 Scala 1:200 PIANO TERRA +8.80m Scala 1:200 Distribuzione Spazi comuni Distribuzione Spazi comuniPIANO (VUOTO) Distribuzione ee Spazi comuni e(VUOTO) (VUOTO) TERRA +8.80m Scala 1:200

Ingombro Edifici EdificiDistribuzione (PIENI) Edifici Ingombro (PIENI) e Spazi comuni (VUOTO) Ingombro (PIENI) Distribuzione e Spazi comuni (VUOTO) Ingombro Camere (PIENI) Ingombro Camere (PIENI) Ingombro Edifici (PIENI) Ingombro Camere (PIENI) Ingombro Edifici (PIENI) Ingombro Camere (PIENI) PIANO TERRA Scala 1:200 Ingombro Camere +13.30m (PIENI) PERSPECTIVE SECTION 1 : 200

Progetação | Professor: Carlos Ferreira| Tommaso Corti 20178218 Gaia Sessarego 20178213 | Sezione prospettica scala 1:100 | TAV

Distribuzione e Spazi comuni (VUOTO)

18

NO TERRA TERRA +13.30m Scala PIANO TERRA +13.30m NO +13.30m Scala 1:200 1:200

Ingombro Edifici (PIENI)

Scala 1:200

Ingombro Camere (PIENI)

4


CONCEPT

DIAGRAMMI FUNZIONA 4

6

2

FRAME

PIANO TERRA +8.8

7 1

5

Distribuzione e Spazi c

Ingombro Edifici (PIEN

Ingombro Camere (PIE

3

12

PIANO TERRA +13

Distribuzione e Spazi c 9

Ingombro Edifici (PIEN 8

13

Ingombro Camere (PIE 3D AXO

PIAZZA SPA

LEGENDA Accessi pedonali Accessi carrabili

10

16

11

12

13

ricular: Progetação | Professor: Carlos Ferreira| Tommaso Corti 20178218 Gaia Sessarego 20178213

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Reception 80mq Back Office 50mq Servizi 18mq Rampa Garage Negozi 130mq DIAGRAMMI Lavanderia 46mq Depositi/Magazzini 16mq x4 Camera Singola 25mq Camera Doppia 27 mq Sala Riunioni 25mq Sala Conferenze 82mq Auditorium 72mq Piazza Ipogea (spa) 565mq Hamam (spa) 88mq Sauna (spa) 117mq Palestra (spa) 213mq

1 2 3 4 5 FUN 6 7 8 PIANO 9 Distr 10Ingo 11Ingo 12 13 PIANO 14 15Distr Ingo 16Ingo

CEUTA | SPA-HOTEL**** LEGENDA Accessi pedonali Accessi carrabili

14

16 15

FLOOR PLAN + 8.80m PIANTA PIANO TERRA +8.80m

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Reception 80mq Back Office 50mq Servizi 18mq Rampa Garage Negozi 130mq Lavanderia 46mq Depositi/Magazzini 16mq Camera Singola 25mq Camera Doppia 27 mq Sala Riunioni 25mq Sala Conferenze 82mq Auditorium 72mq Piazza Ipogea (spa) 565m Hamam (spa) 88mq Sauna (spa) 117mq Palestra (spa) 213mq

19


1

2

1

PERSPECTIVE SECTION 20

2


3

4

3

4

21


The infrastructure project In the contemporary city

Milano. San Cristoforo prof. Bruggi Matteo, Folli Maria Grazia, Fassi Francesco Design Studio IV “Structure and Infrastructure in the Landscape” I sem. 2017/2018 software used: Sketchup, Photoshop, Recap main task: concept development, masterplan design challenges/achievements: the ability of taking complex design decision integrating coherently the functional, economic and socio-cultural perspectives

The project main purpose was to face the problem of the infrastructure design in the contemporary cities; particluarly in the context of the reconversion of the former disused Milanese railways. The area of intervention in fact is San Cristoforo, a suburban neighborhood of Milan that runs along Naviglio Grande and that once represented an important point of exchange for the trains that were coming from the south of the Country. The Naviglio represents the most relevant landscape element of the area which determines the design practice, beside the linear park requested by the PGT. In addition to the design of the park that will extend until the construction by Aldo Rossi for a new railway station that had never been finished and that is now completely abandoned, the area will be provided with public services and infrastructures that will made a new attractive pole of the city out of it. The design of the new railway station has developed from the concept of “volume zero”, as an interpretation of the urban renewal with an attention not to implode volumetrically the already dense fabric of the contemporary city. This led us to the creation of a spatial element rather than a building, a landmark that with its scanning of modular elements helps to provide a measure of the space and the landscape in which it is immersed. [with N. Sciolti and L. Secreti]

22


23


1

2

1

24

2

3


3

4

4

25


26


10,69

5,56

5,56

0,43

-5,00

-10,00

-15,00

10,69

5,56

5,56

0,43

-5,00

-10,00

-15,00

27


Renovation of an old summer camp Borca di Cadore. Belluno prof. Scaramellini Enrico, Ferrugiari Anna Interior Design Studio II sem. 2016/2017

software used: Sketchup, Photoshop, Autocad main task: Axonometric and 3d views, furniture detailing challenges/achievements: intervention inside an existing building that has to be maintained in the structure and volumes.

The site of this project is an old summer camp designed by a famous italian architect named Edoardo Gellner in the ‘50s for the Eni employees’ families. This place has been abandoned for a long time but is still full of charm and poetry and what we tried to do was to bring new life in this definitly suggestive and beautiful place. Starting from the analysis of the place we’ve tried to meet the needs of the locals giving them back some functions that are missing in the area. We’ve planned to use one of the dorms as a residence for teachers from far away who need a place to stay. The space has been designed with the main pourpose of maintain the original spatiality; the little spaces originally intended for the children become the private housing unit of each resident. As the space is very minimal, we’ve thought to maximize it combining partitions and furniture. The other activities as working or eating are located in common spaces. The other activity we want to bring in this place is a public library for young local students who have asked for some spaces for studying in. This is why we’ve deserved an other dorm for this function, dividing the levels according to different needs and kind of study, from an individual one to a group one. We think that this activity would easily be supported also by the presence of the teachers who live there. [ with A. Santoro and N. Baratta ]

28


29


30

Library - Study aid

Dorms

Activities

Common spaces


Ground floor - space for common activities and free time

Upper floors - space for co-working and co-living

CO CO-- UNITS UNITS

+ 1x 2.98x3.05x2.44 1x1X 2.98x3.05x2.44 2.98x3.05x2.44

1x 2.98x3.05x2.44 1X1x + 2.98x3.05x2.44 2.98x3.05x2.44 1x ++ 1x 2.98x3.05x2.44 1X

2x 2.98x3.05x2.44 2X2x

2.98x3.05x2.44 2.98x3.05x2.44

2.98x3.05x2.44

2.98x3.05x2.44

CO CO-- UNITS UNITS

31


0.30

2.14

32

0.30

2.14

2.14

0.30

2.14


All the furniture has been designed starting from the original ones trying to keep as much as possible of them. They have been adapted according to different needs of the users ( a desk for the teachers where to work, a bookcase for the library space..)

33


Project in an extra-urban context Dormelletto. Novara prof. Talamo Cinzia, Sangiorgi Claudio Construction Design Studio II sem. 2015/2016

software used: Sketchup, Autocad main task: roof detailing challenges/achievements: face the construction in the most executive aspect being able to search for solutions and products that meet my needs or adapt what is available to achieve the desired result.

The project concerns the design of a small building, located in an extra-urban context, intended for small-sized B&B. I started searching for references in which the relationship with nature and context was brought to the fore. Once the volume was defined the research moved to materials, construction elements, executive techniques and environmental and functional requirements. The most interesting aspect was to learn how to govern this system of relationship that guide the architecture configuration process leading it to the executive solution. I had the opportunity to consult technical sheets, contact manufacturers and adapt the solutions on the market to the needs of the project. All this process is very near to the real professional practice and made me passionate in the construction survey and research.

[with C. Vecchione and R. Dell’Orto]

34


35


CONCEPT All the design process developed from the observation of the context and the place we were working in. We figured out to be in a very strategic and special place, the lake view right in front of us and the mountains rising right behind us. This starting point guided the shape of our small construction to follow the ground level curves and the shape of the mountains. The final configuration of the house in fact mimic it with a kind of open arms towards the lake.

10 m 0m -10 m -15 m

250 m

36

200 m

150 m

100 m

50 m

0m

50 m

100 m

150 m

200 m

250 m

300 m

350 m


37


1. copertura - rivestimento in lastre di zinco titanio in doppia aggraffatura RHEINZINK (sp. 0.7mm) su assito di legno (sp. 25 mm) e stuoia a filamenti tridimensionali con membrana traspirante e nastro autoadesivo VAPOZINC (sp. 9 mm) - pannello isolante (sp. 60 mm) - soletta strutturale in laterocemento con Pignatta Wienerberger (dim. 220x450x300)

2. sistema di facciata - rivestimento in lamiera forata a foro tondo 60° in ferro elettrozincato (sp. 0.7 mm) - sottostruttura di ancoraggio in montanti e traversi con profilati di alluminio ancorati alla parete strutturale in blocchi di calcestruzzo cellulare Gasbeton (dim. 60x25x30) - malta leggera - pannello isolante (sp. 60 mm)

3. smaltimento acque meteoriche - scossalina di gronda - gronda incassata in zinco titanio - griglia para foglie - bocchetta per canale quadro - tubo pluviale

38

4. solaio - solaio controterra rivestito con piastrelle in gres su massetto portaimpianti, riscaldamento a pavimento e membrane anticalpestio.

5. soglia - soglia realizzata con materiale lapideo su strati di tenuta all’acqua e massetto di pendenza in cls alleggerito.

6. smaltimento acque - tubo pluviale - griglia metallica -pozzetto di raccolta - tubo in PVC di raccordo alla fognatura


1 3

2

5

3

4

39


Architecture Portfolio

Gaia Sessarego s.gaia.95gmail.com Viale Tibaldi 54, 20136 Milan + 3 9

3 4 0 2 1 9 5 3 7 1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.