Safiyah Seth Portfolio

Page 1

Saf iyah Seth PORTFOLIO


RECEPTION

AREA

l

53

Great

Suffolk

St

53 Great Suffolk Street A collaboration with a Hawkins\Brown architectural team for the front of house areas for a sensitive refurbishment and extension of a Victorian Warehouse to create a hgh end office space. The design was based on the industrial aesthetic of the building whilst also bearing in mind the high-end offering of the business premises. I was responsible for • • • •

Design of reception area and joinery Specification of furniture and finishes Design of public bathrooms (finishes and sanware) Liaising with render team

SAFIYAH

SETH

l

Portfolio


53

Great

Suffolk

St

SAFIYAH

l

RECEPTION

SETH

l

AREA

Portfolio


OFFICE

DESIGN

l

Ninety9

Cents,

Advertising Agency Ninety9 Cents. The design of this space involved a playful approach with a consciously industrial aesthetic to suit the building’s architecture. As part of a team of 3 designers, I was involved from concept to completion. My key roles included • • • • •

Joinery - design and technicals Construction - various drawing packages Upholstery - specification of all fabrics, execution of all upholstery FF&E - assisting in FF&E specification, sample boards and presentation graphics Project Co-ordination - liaising with suppliers & contractors , tracking orders, on-site supervision & completion of snags and extras Signage - producing all concept & graphics for signage

SAFIYAH

SETH

l

Portfolio

Ad

Agency


Ninety9

Cents,

Ad

Agency

SAFIYAH

l

OFFICE

SETH

l

DESIGN

Portfolio


OFFICE

DESIGN

SAFIYAH

SETH

l

l

Ninety9

Cents,

Portfolio

Advertising

Agency


Ninety9

Cents,

Advertising

Agency

SAFIYAH

l

OFFICE

SETH

l

DESIGN

Portfolio


OFFICE

DESIGN

SAFIYAH

SETH

l

l

Ninety9

Cents,

Portfolio

Advertising

Agency


Ninety9

Cents,

Advertising

Agency

l

OFFICE

DESIGN

4710 16

16

654

654

16

500

500

500

16

500

654

16

16

654

Cutouts to cupboard door fronts, refer to Detail B Countertop front lip, 16mm OSB at 100 degree angle on top of plywood frame Exposed wall

D

eq.

90

Detail B

16

Shelving frames -­ 16mm pine ply

eq.

916

Cupboard door fronts, 16mm OSB

75

JO 06 Server in Boardroom Elevation A

54

75mm skirting, 16mm MDF, sprayed matt black

D

GENERAL NOTE: ALL FINAL DIMENSIONS TO BE TAKEN ON SITE NO BACK PANEL -­ SERVER TO BE FIXED DIRECTLY TO WALL

SCALE 1:20

S

TRADE NOTES

Cutouts to cupboard door fronts, refer to Detail B Countertop front lip, 16mm OSB at 100 degree angle on top of plywood frame Exposed wall

16mm pine ply countertop, wrapped over pine ply fins

Cupboard door fronts, 16mm OSB

SCALE 1:5

Shelving frames -­ 16mm pine ply

32

968

654

16

16

653

Contractors and subcontractors to verify all levels, heights and dimensions on site, and to check same against the drawings, before putting any work in hand.

690

Quality of all materials and workmanship to comply with the relevant SABS and BSS specifications.

541

The contractor is responsible for correct setting out on the specified works.

Contractors are to to locate and identify existing services on site, and are to protect these from damage thruout the duration of work. Contractors shall be resposible for ensuring the structural stability of all components of their work and ascertain that the main structure is capable of supporting all loads applied thereto.

16mm pine ply door fronts, resting on angled fins

Contractors are to ensure that their work, on site, is adequately protected at all times, during construction, and the responsibility for any damages incurred lies with the contractor until final hand over go the site. contractors and subcontractors are to ensure that all components, glazing panels and shopfitted items fit through all doorways, stairwells and lifts.

This drawing is invalid if it does not have an official INHOUSE stamp.

C 654

SCALE 1:5

Y TO WALL

16mm pine ply countertop, wrapped over pine ply fins

90

16

Copyright over all design and drawings shall remain the intellectual property of Inhouse Brand Architects (Pty) Ltd ("The Architect") and any provision to the contrary in terms of the Copyright Act No. 63 of 1965 is hereby specifically excluded.

Cutout within door to serve as handles

54

500

16mm pine ply fins

Cutouts to cupboard door fronts, refer to Detail B Countertop front lip, 16mm OSB at 100 REVISIONS degree angle on top of plywood frame

16

Exposed wall

item

date

825

764

916

16 120

16 130

654

654

54

Detail B EXISTING AV EQUIPMENT

Quality of all materials and workmanship to comply with the relevant SABS and BSS specifications.

110

description

Detail B

Contractors are to ensure that all details shown on this drawing are in complete compliance with local authority by-­laws and regulations. Contractors are to to locate and identify existing services on site, and are to protect these from damage thruout the duration of work. Contractors shall be resposible for ensuring the structural stability of all components of their work and ascertain that the main structure is capable of supporting all loads applied thereto. Contractors are to ensure that their work, on site, is adequately protected at all times, during construction, and the responsibility for any damages incurred lies with the contractor until final hand over go the site. contractors and subcontractors are to ensure that all components, glazing panels and shopfitted items fit through all doorways, stairwells and lifts.

TRADE NOTES

Copyright over all design and drawings shall remain the intellectual property of Inhouse Brand Architects (Pty) Ltd ("The Architect") and any provision to the contrary in terms of the Copyright Act No. 63 of 1965 is hereby specifically excluded.

This drawing is not to be scaled. Figured dimensions are to be used at all times. Any queries or variations arising from any of the above, must be reported to InHouse for clarification, prior to the commencement of any works .

DRAWING NOTES

16

75

Cutout within door to serve as handles Cutouts to cupboard door Door front fronts, refer to Detail B Countertop front lip, 16mm OSB at 100 degree angle on top of plywood frame Exposed wall

SCALE 1:5

project title

JO 06 Serve Section A -­A SCALE 1:20

The contractor is responsible for correct setting out on the specified works.

This drawing is invalid if it does not have an official INHOUSE stamp.

16 75mm skirting, 16mm MDF, 500 500 sprayed matt black Structural fins -­ 16mm pine ply

500

Contractors and subcontractors to verify all levels, heights and dimensions on site, and to check same against the drawings, before putting any work in hand.

GENERAL NOTE: ALL FINAL DIMENSIONS TO BE TAKEN ON SITE NO BACK PANEL -­ SERVER TO BE FIXED DIRECTLY TO WALL

16mm pine ply

Detail A

Cupboard door fronts, 16mm OSB

SCALE 1:5

Shelving frames -­ 16mm pine ply

4710

Quality of all materials and workmanship to comply with the relevant SABS and BSS specifications.

The contractor is responsible for correct setting out on the specified works. Contractors are to ensure that all details shown on this drawing are in complete compliance with local authority by-­laws and regulations.

16mm pine ply fins

Contractors are to to locate and identify existing services on site, and are to protect these from damage thruout the duration of work.

Contractors shall be resposible for ensuring the structural stability of all components of their work and ascertain that the main structure is capable of supporting all loads applied thereto.

16mm pine ply door fronts, resting on angled fins

Contractors are to ensure that their work, on site, is adequately protected at all times, during construction, and the responsibility for any damages incurred lies with the contractor until final hand over go the site. contractors and subcontractors are to ensure that all components, glazing panels and shopfitted items fit through all doorways, stairwells and lifts.

This drawing is not to be scaled. Figured dimensions are to be used at all times. Any queries or variations arising from any of the above, must be reported to InHouse for clarification, prior to the commencement of any works .

JO 06 Server in Boardroom

Cupboard door fronts, P_230.1_9.1_DT_606 16mm OSB scale date Countertop front lip, 16mm 690 1:20@A3 14.08.2013 OSB at 100 degree angle 541 designer revision wrapped on top of plywood AH/MV/SS 0 frame client approval GENERAL NOTE: ALL FINAL DIMENSIONS TO BE TAKEN ON SITE Structural fins -­ 16mm pine NO BACK PANEL -­ SERVER TO BE FIXED DIRECTLY TO WALL ply

130

110

drawing number

DRAWING NOTES

Cutout within door to serve as handles Door front

16 120

90

EXISTING AV EQUIPMENT

780

916

JO 06 Server in Boardroom Section A -­A er in Boardroom SCALE 1:20

Contractors and subcontractors to verify all levels, heights and dimensions on site, and to check same against the drawings, before putting any work in hand.

This drawing is invalid if it does not have an official INHOUSE stamp.

REVISIONS 75mm skirting, 16mm MDF, sprayed matt black

Working Drawings 8th Floor Joinery

16

653

16

825

654

16

764

32

Reproduction of this drawing or design and/or any portion hereof, other than in terms of the Client/Architect Agreement, is strictly prohibited.

16mm pine ply countertop, wrapped over pine ply fins

Atlantic Centre Ninety9 Cents

drawing description

54

fronts, 16mm OSB m cutouts at top 968

500

wrapped on top of plywood frame

780

16

4710

SCALE 1:5

Cupboard door fronts, 16mm OSB with 40x140mm cutouts at top

Reproduction of this drawing or design and/or any portion hereof, other than in terms of the Client/Architect Agreement, is strictly prohibited.

90

654

90

16

541

16mm pine ply door fronts, resting on angled fins

Detail A

Cupboard door fronts, 16mm OSB Cupboard door fronts, 16mm OSB Countertop front lip, 16mm Shelving frames -­ 16mm pine ply OSB at 100 degree angle

690

EXISTING EQUIPMEN

Structural fins -­ 16mm pine ply

DRAWING NOTES

JO 06 Server in Boardroom Door front Plan SCALE 1:20 Detail B 16 16 654

B

ELEV

TRADE NOTES

130

110

A

This drawing is not to be scaled. Figured dimensions are to be used at all times. Any queries or variations arising from any of the above, must be reported to InHouse for clarification, prior to the commencement of any works .

75mm skirting, 16mm MDF, sprayed matt black

90

Contractors are to ensure that all details shown on this drawing are in complete compliance with local authority by-­laws and regulations.

16mm pine ply fins

Detail A

32

16

90

4710

968

Reproduction of this drawing or design and/or any portion hereof, other than in terms of the Client/Architect Agreement, is strictly prohibited.

825

32

764

16

654

916

16

654

75

16

Copyright over all design and drawings shall remain the intellectual property of Inhouse Brand Architects (Pty) Ltd ("The Architect") and any provision to the contrary in terms of the Copyright Act No. 63 of 1965 is hereby specifically excluded.

SAFIYAH

item

date

description

Detail B SETH l SCALE 1:5

Portfolio

REVISIONS


MULTI-

RESIDENTIAL

l

Hill

House

Hill House; High-rise Residential A 1970’s office block converted into ‘buy to let’ housing as a Permitted Development. This design and build project entailed working in conjunction with the architectural team to design and specify all interior finishes, fittings and joinery. These items included • • • • • •

Reception Area; design, joinery, lighting and FF&E documentation Apartment kitchens and bathrooms; finishes, fittings and joinery Specification of all interior fixtures and fittings for 11 floors and 12 unit types Co-ordination of services within an existing building (working with engineers and contractors) Mock-up unit Lighting and Electrical Layouts

SAFIYAH

SETH

l

Portfolio

Floors: 11 Unit Types: 12 Total units: 150


Hill

House

l

MULTI-RESIDENTIAL

CONCIERGE & COMMUNAL AREAS

SAFIYAH

SETH

l

Portfolio


BH

BD

L /K

— —

11 12

SAFIYAH

SETH

l

Portfolio BEDROOM B AT H R O O M B A LC O N Y

BY

S T R U C T U R A L C O LU M N

L I V I N G / K I TC H E N

Hill

BH

LIVING l

BD

RESIDENTIAL

L/K

KEY

10

MULTIHouse

SPACES


MULTI-RESIDENTIAL l House Hill

BH

L /K

BY

BD

APT

4

110

5

LEVEL

7

214

8

1

9

314

10

2

11

BH

BD

L/K

B A LC O N Y

B AT H R O O M

BEDROOM

L I V I N G / K I TC H E N

S T R U C T U R A L C O LU M N

BY

KEY

12

3

Portfolio

l

SETH

SAFIYAH

T.5

STUDIO 32 SQ M / 344 SQ FT

BEDROOMS


T.12 1 BED 42 SQ M / 452 SQ FT

BD

BH

BY

L /K

10

9

8

7

5

4

3

2

1

LEVEL

309

209

105

APT

L/K

B AT H R O O M

BEDROOM

L I V I N G / K I TC H E N

11 12

BD

B A LC O N Y

KEY

BH

S T R U C T U R A L C O LU M N

BY

Portfolio

l

SETH

SAFIYAH

House Hill l RESIDENTIAL MULTI-

BATHROOMS


T.21 1 BED 48 SQ M / 517 SQ FT

BH

BD

L /K

9

8

7

5

4

3

2

1

LEVEL

323

223

APT

L/K

B AT H R O O M

BEDROOM

L I V I N G / K I TC H E N

10 11 12

BD

B A LC O N Y

KEY

BH

S T R U C T U R A L C O LU M N

BY

Portfolio

l

SETH

SAFIYAH

MULTI-RESIDENTIAL l House Hill

KITCHENS


OFFICE

DESIGN

l

Old

Mutual

Old Mutual Specialised Finance A striking minimalist space where timber and glass finishes abound. This project required extensive drawing work, site supervision, client liaison and FF&E scheduling from my side, working in a small team of two (myself and a senior). In summary, my key responsibilities included • • • •

Joinery - sole responsibility for all technicals and design of certain items too Construction - various drawing packages FF&E - sole responsibility for all schedules Project Co-ordination - liaising with suppliers & contractors , tracking orders, on-site supervision & completion of snags and extras after handover

SAFIYAH

SETH

l

Portfolio

Specialised

Finance


Old Mutual Specialised Finance l OFFICE DESIGN

SAFIYAH

SETH

l

Portfolio


OFFICE

DESIGN

l

Old

Mutual

Specialised

Finance

TRADE NOTES

Copyright over all design and drawings shal intellectual property of Inhouse Brand Archit ("The Architect") and any provision to the co terms of the Copyright Act No. 63 of 1965 is specifically excluded.

Reproduction of this drawing or design and/o hereof, other than in terms of the Client/Arc Agreement, is strictly prohibited.

Contractors and subcontractors to verify all and dimensions on site, and to check same drawings, before putting any work in hand. Quality of all materials and workmanship to the relevant SABS and BSS specifications.

The contractor is responsible for correct set specified works. 1

2

3

4

5

6

7

8

9

10 11 12

Contractors are to ensure that all details sho drawing are in complete compliance with loc by-laws and regulations.

Contractors are to to locate and identify exis on site, and are to protect these from dama duration of work.

DE 36

JO 15

New Spiral Staircase JO 24

UP 03

DE 01

Open Plan Area 3

JO 22

UP 03

Office 01

UP 03

Waiting Area

DE 37

JO 20

DE 11

JO 20

DE 25

DE 24

DE 12

DE 10

DE 23

Office 04

JO 15 JO 20

TB 06 UP 04 TB 07

Private Box

TB 04

TB 06

UP 02

UP 02

TB 06

Meeting room G-03

Business Lounge G-01 TB 05

6 Seater

TB 05

TB 04 UP 01

DE 29

DE 20

DE 15

JO 20

DE 07

JO 19

Open Plan Area 2

REVISIONS

JO 09

UP 04 DE 06

JO 08

LAN Data JO 25

DE 28

DE 21

JO 15

DE 14

DE 08

DRAWING NOTE

UP 02

TB 06

JO 20

DE 05

This drawing is invalid if it does not have an INHOUSE stamp.

JO 07

6 Seater (vc room)

TB 05

Meeting room G-01 UP 02

DE 27

Female Bathrooms

DB Board

Meeting room G-02

UP 01

24 Seater

DE 22

JO 06

JO 12

DE 26

Open Plan Area 1 DE 09

This drawing is not to be scaled. Figured di to be used at all times.

Any queries or variations arising from any o must be reported to InHouse for clarification commencement of any works .

Kitchen Area

TB 05

DE 04

Contractors are to ensure that their work, o adequately protected at all times, during co and the responsibility for any damages incur the contractor until final hand over go the sit and subcontractors are to ensure that all com glazing panels and shopfitted items fit throug doorways, stairwells and lifts.

WB

JO 16.2

JO 13

JO 20

DE 13

JO 23

JO 20

JO 20

DE 02

DE 03

JO 20

JO 03

JO 04 JO 05

Reception Area JO 20

JO 01 JO 02

WB

JO 15

DE 35

Male Bathrooms

Paraplegic Bathrooms

UP 03 TB 05

4 Seater

Contractors shall be resposible for ensuring stability of all components of their work and the main structure is capable of supporting a applied thereto.

JO 16.2

JO 06

JO 16. 1

DE 34

Problem area

Boardroom G-01

8 Seater

10 Seater Area onto which folding stacking doors need to close onto. DE 19

DE 30

DE 33

DE 18

DE 31

DE 32

1100

1100

DE 17

JO 10

Office 03 Lance

JO 11

Office 02 Andrew

DE 16

19 2014.07.02

Ground Floor Furniture Layout Plan

item

NOTES:

24 23 22

date

Changes made to R

description

21 20 19 18 17 16 15 14 13

 Existing desk storage units to be cut down. SCALE 1:100 1

2

3

4

5

6

7

8

9

10

11 12

project title

OMSFIN

NOTES: TO BE RED IN-CONJUCTION WITH THE FOLLOWING DOCUMENTS AND DWG'S:    

WALL FINISHES: P_199.6_Wall finish _901 EQUIPMENT: P_199.6_Equipment _904 WINDOW TREATMENTS: P_199.6_Window Treatments_905 CHAIRS: P_199.6_Chairs _906

       

UPHOLSTERY : P_199.6_Upholstery_907 SIGNAGE: P_199.6_Signage_908 JOINERY: P_199.6_0G_DT_601 FEATURE LIGHTS: P_199.6_Feature lights_909 TABLES: P_199.6_Tables_910 DESK: P_199.6_Desks_911 WHITE BOARD: P_199.6_White Board_912 ROOM DATA : P_199.6_0G_ELE_850 & P_199.6_0G_ELE_851 & P_199.6_0G_ELE_852

drawing description

Working drawings Furniture layout Ground Floor

drawing number

P_199.6_0G_FL_3

scale

A2@1:100

designer

MV/AH

client approval

Left // Material proposal. Hot rolled steel, Prime oak panelling,tiling, lighting

SAFIYAH

SETH

l

Portfolio

date

22.08. revision


Old Mutual Specialised Finance l OFFICE DESIGN

Meeting room 1-01

JO 07

80

JO 07

87

0

0

0

72

10 Seater

EX CH 10

0

TB 06 DE 49

DE 01

EX TB 12

CH 01

Executive Office 1

EX CH 12

Meeting room Meeting room 1-05 2 Seater 1-06 2 Seater

JO 02

Printer station

TB 02

CH 01

JO 04

JO 04

JO 04

DE 01

6 Seater

DE 13

DE 12

DE 26

DE 27

JO 17

TB 13 TB 13

JO 04 DE 39

Brads meeting room

TB 12

New spiral staircase

Office 1

EX CH 10

Cafe area

EX CH 12

80

DE 43

DE 38

EX TB 03 TB 11

TB 01

DE 11

DE 14

DE 25

DE 28

Open plan area 1 50 Seater

3540

DE 03

DE 10

DE 15

DE 09

DE 16

DE 46 JO 10

JO 10

4591

DE 17

DE 22

DE 30

DE 35 JO 15

JO 10

JO 10

Kitchen JO 21

Female Bathrooms

Male Bathrooms

Executive Office 3 4591

JO 08

JO 22

3540

10740

JO 07

8 Seater

DE 36

Executive Office 2

DE 08

JO 06

Open plan area 2 DE 29

DE 42

DE 04

TB 10

TB 03

TB 03

DE 45

DE 41

DE 24

JO 07

DE 44

DE 40

New Desk to be installed

DE 23

EX CH 17

TB 11

DE 37 8711

DE 02

TB 08

EX CH 08

EX CH 09

TB 11

JO 16

EX CH 07

TB 04

JO 11 DE 05

DE 07

DE 18

DE 21

DE 31

DE 34

WB

3520

Meeting room 1-02 6 Seater

Executive Office 4

DE 19

DE 06

DE 20

DE 32

JO 09

JO 26

WB

Meeting room 1-03

'PLUVIA'

6 Seater

JO 18

DE 33 TB 05

TB 05

Store room 1 (cleaning) Store room 2 (Kitchen)

HWC

JO 23 JO 19

First Floor Furniture Layout Plan

Meditation room (no of work stations = 48x)

JO 14

JO 13

SCALE 1:100 NOTES:

TO BE RED IN-CONJUCTION WITH THE FOLLOWING DOCUMENTS AND DWG'S:    

WALL FINISHES: P_199.6_Wall finish _901 EQUIPMENT: P_199.6_Equipment _904 WINDOW TREATMENTS: P_199.6_Window Treatments_905 CHAIRS: P_199.6_Chairs _906

        

UPHOLSTERY : P_199.6_Upholstery_907 SIGNAGE: P_199.6_Signage_908 JOINERY: P_199.6_0G_DT_601 FEATURE LIGHTS: P_199.6_Feature lights_909 TABLES: P_199.6_Tables_910 DESK: P_199.6_Desks_911 WHITE BOARD: P_199.6_White Board_912 ROOM DATA : P_199.6_0G_ELE_850 & P_199.6_0G_ELE_851 & P_199.6_0G_ELE_852 AV EQUIPMENT: P_199.6_AV_913

SAFIYAH

SETH

l

Portfolio


OFFICE

DESIGN

l

Old

Mutual

Specialised

Finance

B

500

Prime oak veneer top w/ solid edge detail

300

800

750

Existing column t/b made good

50

Metal spec t/b confirmed 480

450

100

1370

1501 3900

A

B

JO 13 Reception desk Plan

D

ELEV

B

C

SCALE 1:20

2400 1370

50100 100 100 100 100 100 100

2870 2763 2870

700

950

2820

2820 2692

50

2870

750

200

1030

JO 13 Reception desk Elevation C SCALE 1:20

existing column t/b made good 100 mm Solid timber panels, oak 50mm Prime oak veneer counter with 100mm overhang.Solid edge detailing to be used

3900 1501

1370

1030

350

380

50 Metal spec t/b confirmed, 10mm thick

942

Storage cupboard door to be clad in metal as per spec.Door to be lockable

50

200

210

600

16mm Duco sprayed drawer and door fronts, 0NN 72/000, gloss, with finger pull detail to top, to be lockable

50

750

950

100

200

600

559

1962

350 3692

JO 13 Reception desk Elevation A SCALE 1:20

SAFIYAH

SETH

l

Portfolio

980

50

50mm skirting, duco sprayed MDF, matt black


Old

Specialised

Finance

l

OFFICE

DESIGN

B

Prime oak veneer top w/ solid edge detail Existing column t/b made good

Metal spec t/b confirmed 1501

A

B

D

ELEV

B

C existing column t/b made good

800 50

750 300

500

2820 2692 2870

700

2870

Copyright over all design and drawings shall remain the intellectual property of Inhouse Brand Architects (Pty) Ltd ("The Architect") and any provision to the contrary in terms of the Copyright Act No. 63 of 1965 is hereby specifically excluded.750

Metal spec t/b confirmed

700 or design and/or any portion Reproduction of this drawing hereof, other than in terms of the Client/Architect Agreement, is strictly750 prohibited.

100 mm Solid timber panels.oak, sample to Inhouse approval

Contractors and subcontractors 715 to verify all levels, heights and dimensions on site, and to check same against the drawings, before putting any work in hand.

660

Quality of all materials and workmanship to comply with the relevant SABS and715 BSS specifications.

50

2820 2763

750

50100 100 100 100 100 100 100

2870

950

200

TRADE NOTES

750 for correct setting out on the The contractor is responsible specified works.

50mm skirting, duco sprayed MDF, matt black

Contractors are to ensure that all details shown on this 600 drawing are in complete compliance with local authority by-laws and regulations. Contractors are to to locate and identify existing services on site, and are to protect these from damage thruout the duration of work.

JO 13 Reception desk Elevation B Contractors shall be resposible for ensuring the structural stability of all components of their work and ascertain that the main structure is capable of supporting all loads applied thereto. Contractors are to ensure that their work, on site, is

adequately protected at all times, during construction, SCALE 1:20 and the responsibility for any damages incurred lies with

the contractor until final hand over go the site. contractors and subcontractors are to ensure that all components, glazing panels and shopfitted items fit through all doorways, stairwells and lifts. This drawing is not to be scaled. Figured dimensions are to be used at all times.

600 300

800 1030 750 500

DRAWING 450 NOTES 150

Metal spec t/b confirmed, 10mm thick Metal Storage spec t/b cupboard confirmeddoor to be

750

100 mm Solid timber panels.oak, sample to Inhouse approval 16mm Duco sprayed drawer and door fronts, 0NN 72/000, gloss, with finger pull detail to top, to be lockable

700

715 660 715

50

750 50

600 980

350

50mm skirting, duco sprayed 50mmMDF, skirting, mattduco blacksprayed MDF, matt black

900

700

950

clad in metal as per spec.Door to be lockable

750

950

200

50

380

200

50

This drawing is invalid if it does not have an official INHOUSE stamp. 800

50mm Prime oak veneer counter with 100mm overhang.Solid edge detailing to be used

Metal spec t/b confirmed

600 50

JO 13 Reception desk Elevation B

100mm skirting duco sprayed MDF, matt black

50

1370

existing column t/b made good

Any queries or variations arising from any of the above, must be reported to InHouse for clarification, prior to the commencement of any works .

existing column t/b made good existing column t/b made100 good mm Solid timber panels, oak

2

GENERAL NOTE:  ALL FINAL MEASUREMENTS TO B TAKEN ON SITE  ALL CUPBOARDS TO BE LOCKAB JOINER TO SUPPLY LOCK FOR INHOUSE APPROVAL

100

JO 13REVISIONS Reception desk Elevation D

SCALE 1:20

SCALE 1:20

JOINERY ITE NO. 12

existing column t/b made good

k

800

er

m

Mutual

200

450

150

SAFIYAH

SETH

l

Portfolio


150

Full tile to sit at centre of mirror

DRAWING NOTES

SAN 10

OFFICE WF 06

DESIGN

900

JO 01 Vanity Units Refer to JO 01 DWG no P_199.6_0G_DT_607

l

Old

Mutual

Specialised

Finance

Shadow gap detail to underside of timber cladding. Refer to details 01& 02

105

SP

3080 GENERAL NOTES:

300

ALL FINAL MEASUREMENTS TO BE TAKEN ON SITE

300

POSITIONING OF ALL SANWARE ACCESSORIES TO BE COMFIRMED ON SITE BY INHOUSE

INSTALLATION OF ALL SANITARY FITTINGS IS TO COMPLY WITH MANUFACTURER'S INSTRUCTIONS. SHOULD ANY DISCREPANCIES ARISE BETWEEN ROOM DATA DRAWINGS AND MANUFACTURER'S INSTRUCTIONS, INHOUSE SHOULD BE INFORMED IMMEDIATELY BEFORE PROCEEDING WITH INSTALLATION.

       

1474 For wall heights, refer to DWG_P_199.6_OG_CON_203 334

2800 affl

DOOR SCHEDULE: refer to P_199.6_AF_DS_700 WALL FINISHES : refer to P_199.6_Wall finish_901 SANITARYWARE : refer to P_199.6_Sanware_902 IRONMONGERY: refer to P_199.6_Ironmongery_903 LIGHTING LAYOUT: refer to P_199.6_OG_LL_550 FEATURE LIGHTS: refer to P_199.6_Feature lights_909 FLOOR FINISHES: refer to P_199.6_OG_FF_450 WALL HEIGHTS: refer to P_199.6_OG_CON_203

150mm bulkhead, refer to DWG no P_199.6_OG_RC_500

30

418

30

WF 03

Drywall

15

item

S/S angle, 1.5mm thick, powder coated black

Drywall

Detail 02

date SAN 09

WF 04

FE 01 Cubicle Pendants refer to P_199.6_Feature lights_909

Amendment to wall cladding detail

eq. SAN 04

Wall hung WC with concealed Geberit system and actuator plate . To be installed as per manufacturer's spec.

SAN 09

16mm timber cladding, spec to be confirmed by Inhouse Timber batten, 34mm x 34mm

Skimmed ceiling

SAN 07Toilet roll holder

50 15

SCALE 1:5

S/S angle, 1.5mm thick, powder coated black

SCALE 1:5

Drywall

34 16

project title

Detail 01 SCALE 1:5

OMSFIN

S/S angle, 1.5mm thick, powder coated black

Drywall

f.f.l. 50

50

16mm timber cladding, spec to be confirmed by Inhouse

34 16

50

SAN 05 100mm skirting. spec to be confirmed with InHouse

drawing description

Detail drawings Ground Floor Male Bathrooms

16mm timber cladding, spec to be confirmed by Inhouse 100mm skirting. spec to be confirmed with InHouse

SAN 06 Spare toilet roll holder

SAN 04

Detail 02

Floor finish level

JO 01 Vanity Units to refer to DWG no P_199.6_0G_DT_607

eq.

description

16mm timber cladding, spec to be confirmed by Inhouse Timber batten, 34mm x 34mm

Detail 02

2800

Change to SOP for wall tiles Removal of ironmongeryy no's

02 12.12.2012

2700

2800

Skimmed ceiling

50 34 16

50

334

WF 03

03 25.01.2013

50

50 34 16

230

REVISIONS

DOOR IDENTITY TD = TIMBER DOOR 00 = DOOR NUMBER

JO 02 Mirrors mounted away from wall with LED strip lights.Refer to DWG no P_199.6_OG_DT_608

1134

2800

For wall heights, refer to DWG_P_199.6_OG_CON_203

110

50

230

2550 1307

S/S angle, 1.5mm thick, powder coated black

Detail 01

Male drawing Bathroom number Elevation B P_199.6_0G_ELE_850

Floor finish level

SCALE 1:20 scale

f.f.l.

date

A1@1:20 20.11.2012

Detail 01

designer

SCALE 1:5

MV/AH

300 300

client approval

3080

revision

032551

1257

230 277

900

117

230

For wall heights, refer to DWG_P_199.6_OG_CON_203

334

2800 affl

30

418

WF 03

30

334

277

WF 03

WF 11

900

117

2800 affl

TD 04

900

J0 03 Urinal screen, refer to DWG no 199.6_OG_DT_609

2800

2700

2800

Semi solid door, to be painted and made good, colour to be confirmed with Inhouse. Refer to DWG no P_199.6_AF_DS_700

100mm skirting. spec to be confirmed with InHouse

100

f.f.l.

Male Bathroom Elevation B SCALE 1:20

SAFIYAH

SETH

l

Portfolio

f.f.l.


Old Mutual Specialised Finance l OFFICE DESIGN

6219

220 220

1900

989

100

1600

250

150 110

900

Reprod hereof Agreem

Contra and dim drawin

1800 520

760

100

refer to OG_CON_203

Quality the rel

250 520

250 100

1700

For wall heights, refer to DWG_P_199.6_OG_CON_203

200

50

150 100

150

Bulkhead, refer to DWG no P_199.6_OG_RC_500

TD 03

WF 08

WF 06

WF 10 300

400

WF 08

1650

JO 02 Mirrors mounted away from wall with LED strip lights. Refer to DWG no P_199.6_OG_DT_608

SAN 15

520

760

TILE SPEC: Cubica Gris V1389995, pale grey in colour Tiles to be butt jointed. Grout colour to match colour of tiles as accurately as possible. Full tile to sit at centre of mirror

520

1500

older

150

SAN 11

h concealed Geberit or plate . To be anufacturer's spec.

Contra adequ and th the co and su glazing doorwa

This d to be u

Any qu must b comme

This d INHOU

900

750

WF 06 105

100

Shadow gap detail to underside of timber cladding. Refer to details 01& 02

Male Bathroom Elevation C SCALE 1:20

GENERAL NOTES:

ALL FINAL MEASUREMENTS TO BE TAKEN ON SITE

POSITIONING OF ALL SANWARE ACCESSORIES TO BE COMFIRMED ON SITE BY INHOUSE

INSTALLATION OF ALL SANITARY FITTINGS IS TO COMPLY WITH MANUFACTURER'S INSTRUCTIONS. SHOULD ANY DISCREPANCIES ARISE BETWEEN ROOM DATA DRAWINGS AND MANUFACTURER'S INSTRUCTIONS, INHOUSE SHOULD BE INFORMED IMMEDIATELY BEFORE PROCEEDING WITH INSTALLATION.

DOOR IDENTITY TD = TIMBER DOOR 00 = DOOR NUMBER

       

DOOR SCHEDULE: refer to P_199.6_AF_DS_700 WALL FINISHES : refer to P_199.6_Wall finish_901 SANITARYWARE : refer to P_199.6_Sanware_902 IRONMONGERY: refer to P_199.6_Ironmongery_903 LIGHTING LAYOUT: refer to P_199.6_OG_LL_550 FEATURE LIGHTS: refer to P_199.6_Feature lights_909 FLOOR FINISHES: refer to P_199.6_OG_FF_450 WALL HEIGHTS: refer to P_199.6_OG_CON_203

3080 2550

230 230

510

300 2040

300

For wall heights, refer to DWG_P_199.6_OG_CON_203

100 150

2800 affl 150mm bulkhead, refer to DWG no P_199.6_OG_RC_500

Drywall

JO 02 Mirrors mounted away from wall with LED strip lights.Refer to DWG no P_199.6_OG_DT_608

2700

2800

50 34 16

03 2

02 1

Skimmed ceiling 50

1650

WF 09

15

WF 07

be painted olour to be ouse. Refer to AF_DS_700

item

S/S angle, 1.5mm thick, powder coated black

Drywall

16mm timber cladding, spec to be confirmed by Inhouse Timber batten, 34mm x 34mm

Skimmed ceiling

15

SAN 11

da

50

50 34 16

S/S angle, 1.5mm thick, powder coated black 16mm timber cladding, spec to be confirmed by Inhouse Timber batten, 34mm x 34mm

150

SCALE 1:5

Detail 02 SCALE 1:5

Drywall

34 16

project

16mm timber cladding, spec to be confirmed by Inhouse

50

Detail 02

SAN 10

OM

S/S angle, 1.5mm thick, powder coated black

Floor finish level

SCALE 1:5

34 16

Drywall

drawing

Deta Gro Mal

16mm timber cladding, spec to be confirmed by Inhouse 100mm skirting. spec to be confirmed with InHouse 50

f.f.l.

Detail 01

750

750

JO 01 Vanity Units to refer to DWG no P_199.6_0G_DT_607

100

ec to be ouse

Contra stabilit the ma applied

JO 01 Vanity Units Refer to JO 01 DWG no P_199.6_0G_DT_607

SP

refer to OG_CON_203

n, refer to G_DT_609

Contra on site duratio

SAN 10

SAN 17

et roll holder

f.f.l.

Semi solid door, to be painted and made good, colour to be confirmed with Inhouse. Refer to DWG no P_199.6_AF_DS_700

290

2550

2800

SAN 18

The co specifi

Contra drawin by-law

2800 affl

dants refer to ights_909

ec to be ouse

Copyri intellec ("The terms specifi

110

5889

S/S angle, 1.5mm thick, powder coated black

drawing

P_19

Floor finish level

scale

Male Bathroom Elevation D SCALE 1:20

A1

Detail 01

designer

SCALE 1:5

client ap

SAFIYAH

SETH

l

Portfolio


COMPETITION

DESIGN

l

Dream

Entitled ‘Desert Rituals’, I based my entry on the concept of Petrichor (a pleasant smell that frequently accompanies the first rain after a long period of warm, dry weather.)

in

Kohler

Concept Sket ch

Above: Concept sket ch Below: Mirrors inspired by dramat ic desert sun-

Right : Cust om t erracot t a screen, inspired by t he undulat ing curves and orange- hued sand of t he desert .

Saffron Studio // Design & Interiors

D e s e r t R I T U

A

L

S

Petrichor: the earthy scent produced when rain falls on dry soil. The word is constructed from Greek “petra”, meaning “stone”, and “ichor”, the fluid that flows in the veins of the gods in Greek mythology.

SAFIYAH

SETH

l

Portfolio

I

DESERT RITUALS

Left : A rock- l ike c o m p o sit ion for t he b a s in p linth, comprised of r e d ja d e t op, a met al inse r t a nd a n Ann Sacks Se lv a g g io mosaicked ba s e .

I created a hypothetical arid landscape reminiscent of curved and swirling rocks, cracked earth, charcoal and ostrich eggshell with the deep green of the walls reminiscent of desert succulents. Saffron Studio // Design & Interiors

CONCEPT

DREAM IN KOHLER 2018


Dream

in

Kohler

l

COMPETITION

SAFIYAH

SETH

l

DESIGN

Portfolio


LAB

&

EDUCATION

l

Charles

Charles Bell House, Medical Research Centre, University College London A technical piece of design work for a centre housing research, office and public engagement facilities, within a grade II listed building. A complex project, with a 4 year history, I ran this project single handedly and was responsible for • • • • • • • •

FF&E (including lab furniture) for 6 floors Change Control Feasibility Studies Project co-ordination; site progress and liaison with various stakeholders Reviewing of technical submissions from architectural team Signage and wayfinding package Client liaison Commissioning of renders

SAFIYAH

SETH

l

Portfolio

Bell

House

Charles Bell House Wellcome Trust EPSRC Centre for Surgical and Interventional Sciences


Charles

Bell

House

l

LAB

&

EDUCATION

SAFIYAH

SETH

l

Portfolio


PRODUCT

DESIGN

l

Champagne

GH Mumm Champagne Cart and Cabanas Pernod Ricard South Africa commissioned a number of installations and products for the champagne brand GH Mumm. These included a showpiece, prototype champagne cart and a flatpackable cabana that could withstand the elements of its intended seaside location.

SAFIYAH

SETH

l

Cart

Project responsibilities • • • •

Concept design and Sketchup 3Ds Liaising with supplier to create prototype cart Producing technical drawings and material specifications for Cabanas On site supervision

Portfolio


GH

Mumm

Cabana

SAFIYAH

l

PRODUCT

SETH

l

DESIGN

Portfolio


PRODUCT

DESIGN

l

GH

Mumm

Cabana

TRAD

Detail A

100

eq.

592 eq. eq.

eq.

eq.

2800 592 eq. 2600 eq.

eq.

eq.

Copyright over all design a intellectual property of Inho ("The Architect") and any p terms of the Copyright Act specifically excluded.

TRADE NOTES

2368 592 eq. 143

eq.

eq.

eq.

592 eq.

Copyright over all design and drawings shall remain the intellectual property of Inhouse Brand Architects (Pty) Ltd ("The Architect") and any provision to the contrary in terms of the Copyright Act No. 63 of 1965 is hereby specifically excluded.

100 eq.

Reproduction of this drawin hereof, other than in terms Agreement, is strictly prohi

Contractors and subcontra and dimensions on site, an drawings, before putting a

116

Reproduction of this drawing or design and/or any portion hereof, other than in terms of the Client/Architect Agreement, is strictly prohibited.

Metal uprights to sit into sleeve at base. Sleeve to be fixed to perimeter base frame.

50

Contractors are to to locate and identify existing services on site, and are to protect these from damage thruout the duration of work.

50

592 592

Contractors shall be resposible for ensuring the structural stability of all components of their work and ascertain that the main structure is capable of supporting all loads applied thereto.

30

592

1400

1184

2367 1184

Contractors are to ensure that their work, eq. on site, is 30at all times, during construction, adequately protected and the responsibility for any damages incurred lies with the contractor until final hand over go the site. contractors and subcontractors are to ensure that all components, glazing panels and shopfitted items fit through all doorways, stairwells and lifts.

eq.

New 16mm aluminium tubing, powder coated white as per the frame. Fixing detail to frame to be agreed with Inhouse. Fixing poles to frame to be thinner than the 16mm internal wrap around frame

Contractors are to to locate on site, and are to protect duration of work.

Contractors shall be respos stability of all components o the main structure is capab applied thereto.

Contractors are to ensure t adequately protected at all and the responsibility for an the contractor until final ha and subcontractors are to e glazing panels and shopfitt doorways, stairwells and li

This drawing is not to be sc to be used at all times.

Any queries or variations a must be reported to InHous commencement of any wor

This drawing is invalid if it d INHOUSE stamp.

DRAWI

Awning. to be offset from aluminium tubing by 80mm

This drawing is not to be scaled. Figured dimensions are to be used at all times.

Detail A SCALE 1:5

Any queries or variations arising from any of the above, must be reported to InHouse for clarification, prior to the commencement of any works .

Eyelet to joiner/upholsterer's detail. To ensure red rope will fir through

This drawing is invalid if it does not have an official INHOUSE stamp.

DRAWING NOTES

592

1400

Red 5mm polyprop rope

Contractors are to ensure that all details shown on this drawing are in complete compliance with local authority by-laws and regulations.

Contractors are to ensure t drawing are in complete co by-laws and regulations.

GENERAL NOTE: ALL FINAL DIMENSIONS TO BE TAKEN ON SITE OFFSETS AND EQUAL PROPORTIONING (AS STIPULATED IN THE DRAWING) ARE TO BE MAINTAINED, HOWEVER OVERALL DIMENSIONS ARE TO BE ADJUSTED ACCORDING TO THE ON-SITE MEASUREMENTS TAKEN BY JOINER  FIXING DETAIL TO FRAME TO BE DISCUSSED WITH INHOUSE

REV

115

 

GH Mumm Lounger Plan 02,Lounger Aerial View, GH Mumm SCALE 1:20 Plan 03, Deck Structure

16

100

50

Flat metal fixing to original frame Joiner to advise/ensure stability

eq.

IATE SPECIALISTS.

The contractor is responsible for correct setting out on the specified works.

New roundbar tubing to wrap Metal framing detail.around Profile and internal face of existing fixing detail to be confirmed with frame. Tubing to be 16mm and metal contractor. Framing detail powder coated white to match to be fixed to deck structure existing frame. Fixings from roundbar tubing to existing frame to be thinner than 16mm - joiner to advise

Existing white powder coated frame

The contractor is responsib specified works.

Original frame (white powder coated aluminium)

Quality of all materials and workmanship to comply with the relevant SABS and BSS specifications.

Eyelets. Joiner to ensure opening fits the red rope. 38x144 timber joists,Spacing suitabletoforbe 144mm from outdoor use to form centre under to centre ( structure of deck. Under Red rope, 5mm polyprop structure to come in 2 parts.

Awning with eyelets (spacing 144mm centre to centre)

Quality of all materials and the relevant SABS and BS

Contractors and subcontractors to verify all levels, heights and dimensions on site, and to check same against the drawings, before putting any work in hand.

eq.

100

SCALE 1:20

Original frame (white powder coated aluminium)

REVISIONS

item

date

descr

New roundbar to perimeter 2800 100 150

1950

project title

GH Mumm L

100

600

Metal Sheet. powder coated matt gold. Refer to Detail A for fixing and Detail B for front edge detail.

Detail A

eq.

592 eq. eq.

Steel rope to be fixed between upright posts to serve as curtain rail for curtaining

2368 eq.

eq.

592 eq. eq.

eq.

eq.

592 eq. 143

eq.

eq.

eq.

592 eq.

eq.

Detail B Indicating positioning of new roundbar SCALE 1:5

AH/SS

Reproduction of this drawin

hereof, other than in terms client approval

Agreement, is strictly prohi

Contractors and subcontrac and dimensions on site, an drawings, before putting an

116 2150

Red rope, 5mm polyprop Freestanding sofas in 4 segments. Segments A and B are to be theNew same size and roundbar tubing to wrap Segments Caround and D internal are to beface the of existing same size. Sofas insettobybe 16mm and frame.are Tubing 100mm along perimeter of deck powder coated white to match structure existing frame. Fixings from roundbar tubing to existing frame Red LED perimeter strip lighting to be thinner than 16mm - joiner to advise

The contractor is responsib specified works.

Original frame (white powder coated aluminium) Red 5mm polyprop rope

50

project title

30

GH Mumm Lounger

drawing description

Working30Drawingseq. Joinery Details p1 of 2

50

592

1184 2367

100

eq.

Contractors are to to locate on site, and are to protect duration of work.

Contractors shall be respos stability of all components o the main structure is capab applied thereto.

Contractors are to ensure t adequately protected at all and the responsibility for an the contractor until final han and subcontractors are to e glazing panels and shopfitt doorways, stairwells and li

This drawing is not to be sc to be used at all times.

Any queries or variations a must be reported to InHous commencement of any wor

This drawing is invalid if it d INHOUSE stamp.

DRAWIN

Awning. to be offset from aluminium tubing by 80mm

drawing number

592

New 16mm aluminium tubing, powder coated white as per the frame. Fixing detail to frame to be agreed with Inhouse. Fixing poles to frame to be thinner than the 16mm internal wrap around frame

Contractors are to ensure t drawing are in complete co by-laws and regulations.

P_229.56. Mumm Lounger scale

Detail A SCALE 1:5

date

1:20@ A2 08.09.2014

designer

AH/SS

revision

01

Eyelet to joiner/upholsterer's detail. To ensure red rope will fir through

client approval

592

1184

Quality of all materials and the relevant SABS and BSS

Addition of deck detail and metal sleeve detail

description

50

592

2400

date

Eyelets. Joiner to ensure opening fits the red rope. Spacing to be 144mm from centre to centre (

SCALE 1:20

P229.56 TRAD

1:5 @ A3

specifically excluded.

01 09.09.2014

Existing white powder coated frame

drawing number

scale

Copyright over all design a intellectual property of Inho ("The Architect") and any p

item

Awning with eyelets (spacing 144mm centre to centre)

Working Dra Joinery Deta Awning and

terms of the Copyright Act designer

Metal frame structure. Members to be 100mm. Powder coated a matt white finish

GH Mumm Lounger Elevation A

drawing description

GENERAL NOTE: ALL FINAL DIMENSIONS TO BE TAKEN ON SITE OFFSETS AND EQUAL PROPORTIONING (AS STIPULATED IN THE DRAWING) ARE TO BE MAINTAINED, HOWEVER OVERALL DIMENSIONS ARE TO BE ADJUSTED ACCORDING TO THE ON-SITE MEASUREMENTS TAKEN BY JOINER  FIXING DETAIL TO FRAME TO BE DISCUSSED WITH INHOUSE

REV

115

 

GH Mumm Lounger Plan 02, Aerial View,

16

50

100 Flat metal fixing to original frame Joiner to advise/ensure stability

eq.

100

eq.

SCALE 1:20

Original frame (white powder coated aluminium)

item

date

descr

New roundbar to perimeter

project title

GH Mumm L

SAFIYAH

SETH

l

Portfolio

Detail B Indicating positioning of new roundbar SCALE 1:5

drawing description

Working Dra Joinery Deta Awning and

drawing number

P229.56

scale

1:5 @ A3

designer

AH/SS

client approval


GH

Mumm

Cabana

100

l

PRODUCT

45

TOP AWNING: Stretched outdoor UV protected canvas fixed to aluminium angle. Angle to be powder coated white with circular cutouts. Awning fixed to angle with red tensile cord 100 x 100mm white powder coated aluminium section

100

50

40

METAL SCREEN 01 & 02 Satin gold powder coated aluminium sheet withpunched GH Mumm champagne graphics. Sheet edge to be bent to add structural stability and conceal LED perimeter strip lighting with 2800 diffuser.

2800 100 1300

LED perimeter strip lighting with 2600 diffuser. LED to be red

100

100

1300

100

METAL SCREEN 02, refer to

600

GH Mumm Lounger Plan 01, SCALE 1:20

C

420

Metal frame structure. Members to be 100mm. Powder coated a matt white finish

GH Mumm lounger GH Mumm Lounger Detail B Plan 03, Deck Structure

GENERAL NOTE: TECHNICAL DETAILS TO BE ADVISED UPON BY THE APPROPRIATE SPECIALISTS.

SCALE 1:5

2800

100

100

Detail A

eq.

592 eq. eq.

eq.

eq.

eq.

eq.

Copyrigh intellectu ("The A terms of specifica

SC

100

2600 2368

592 eq. eq.

592 eq. 143

eq.

eq.

592 eq. eq.

eq.

116

100

30

50

eq.

2150

LED perimeter strip lighting with diffuser. LED to be red

50

100

100 150 50

GH Mumm Lounger Plan 02, Aerial View, SCALE 1:20 GH Mumm Lounger Plan 02, Aerial View,

Quality o the relev

The con specified

Contract drawing by-laws

Contract on site, duration

Contract stability the main applied t

Red 5mm polyprop rope

Contract adequat and the the cont and sub glazing p doorway

New 16mm aluminium tubing, powder coated white as per the frame. Fixing detail to frame to be agreed with Inhouse. Fixing poles to frame to be thinner than the 16mm internal wrap around frame

This dra to be us

Any que must be commen

This dra INHOUS

Awning. to be offset from aluminium tubing by 80mm

White plastic outdoor timber-look Eyelet to joiner/upholsterer's decking fixed to 38 x 130mm SA detail. To ensure red rope will fir through pine outdoor treated members

38

SCALE 1:5

NOTE:Members MetalGENERAL frame structure. ALLPowder FINAL DIMENSIONS TO BE TAKEN ON SITE to be100mm. coated a AND EQUAL PROPORTIONING (AS STIPULATED IN THE matt white OFFSETS finish DRAWING) ARE TO BE MAINTAINED, HOWEVER OVERALL DIMENSIONS ARE TO BE ADJUSTED ACCORDING TO THE ON-SITE MEASUREMENTS TAKEN BY JOINER  FIXING DETAIL TO FRAME TO BE DISCUSSED WITH INHOUSE

METAL SCREEN 01 & 02 Satin gold powder coated aluminium sheet withpunched GH Mumm champagne graphics. Sheet edge to be bent to add structural stability and conceal LED perimeter strip lighting with diffuser. eq.

38 x 144 SA pine outdoor treated member, planed to a 38 x 130mm member screwed to 100 x 100mm white powder coated aluminium frame with LED profile fixed to underside of plinth.LED to be red

GH M Inten NTS

GH Mumm Lounger Elevation A SCALE 1:20 GH Mumm lounger 16 50 Detail A100SCALE 1:5 Flat metal fixing to original frame Joiner to advise/ensure stability

SCALE 1:20 100 eq.

100

eq.

100 x 100mm white powder coated aluminium section

Original frame (white powder Satin gold powder coated coated aluminium) aluminium sheet with punched GH Mumm champagne graphics. New roundbar perimeter Sheet to edge to be bent to add structural stability and conceal LED perimeter strip lighting with diffuser.

40

B

100

50

100

2400

2510

592

Detail A

592 100

C

115

A ELEV

angle with red tensile cord 100 x 100mm white powder coated aluminium section

30

detail, refer to Detail A. Perforations to be made to top face of Awning metal angle. with eyelets (spacing Cut size diameter to beto20mm. 144mm centre centre) Spacing to be 150mm centre to centre. Joiner and metalworker Existing whiteintegrity powderand coated to ensure structural frame that perforations are large enough for the chosen tensile cord to wrap through.

Contract and dim drawings

1950

TOP AWNING: Stretched outdoor UV protected canvas fixed to aluminium angle. Original frame (white powder Angle to be powder coated white with coated aluminium) circular cutouts. Awning fixed to

40

592 592 2599

1184 2800

2367 1184

Eyelets. Joiner to ensure opening fits the red rope. Spacing to be 144mm from centre to centre ( UV protective canvas be Red rope, 5mmtopolyprop stretched over top of structure. Canvas to be fixed to perforated metal angle with red tensile cord. New roundbar tubing to wrap around internal face of existing frame. Tubing to be 16mm and Red LED perimeter stripwhite lighting powder coated to match existing frame. Fixings from roundbar tubing to existing Metal angle, powder coated matt frame to betothinner than 16mm white fixed top inner face of - joiner advise overall to metal structure. For fixing

600

45

50

2510

Reprodu hereof, Agreem

2800 100 150

D

JO S

SCALE 1:20

Detail B Indicating positioning of new roundbar SCALE 1:5 Mumm lounger GH Detail B SCALE 1:5

item

dat

project ti

150

B

150

40 100

1000

Satin gold powder coated aluminium sheet with punched GH Mumm champagne graphics. Sheet edge to be bent to add structural stability and conceal LED perimeter strip lighting with diffuser.

GH M

170 100 150

A

1000

100 x 100mm white powder coated aluminium section

420

100

ELEV

SEGMENT C

100

100

SEGMENT D

NT

270

METAL SCREEN 01

1400

60

G In

GH Mumm lounger Detail A SCALE 1:5

Freestanding sofas in 4 segments. Segments A and B are to be the same size and Segments C and D are to be the same size. Sofas are inset by 100mm along perimeter of deck structure, forming a 2.6m x 2.6m square

13

1300

m-

100

dia

D

50

Cork Table by furniture contractor

2599

2800

Red LED perimeter strip lighting

38 x 144 SA pine outdoor treated member, planed to a 38 x 130mm member screwed to 100 x 100mm white powder coated aluminium frame with LED profile fixed to underside of plinth.LED to be red

1400

100

SEGMENT B 150

1300

SEGMENT A

White plastic outdoor timber-look decking fixed to 38 x 130mm SA pine outdoor treated members

38

Power box to be placed within sofa carcass. Seat in this area to be able to flap up

drawing d

270

100

100

2600

100

DESIGN

Work Joine Awn

drawing n

P2

scale

1:5

designer

JO Sec

A

client app

SCALE

SAFIYAH

SETH

l

Portfolio


RETAIL/

DESIGN

PITCH

WORK

l

Pamperfest A self-initiated campaign proposal. Our goal was to create a unique fashion experience; introducing South African Fashion to an a new and un-tapped market. In collaboration with Mercedes Benz South Africa, my team of 3 devised a complete experience and strategy for this event; our objective being to attract a greater cross section of the Mercedes Benz’s target market than was possible with their numerous sponsored fashion weeks. My Key roles included • •

Concept -creating overall concept along with a digital strategist and fashion buyer. Spatial Design - design of key festival and pop-up elements such as fashion runway and fashion retail space

SAFIYAH

SETH

l

Portfolio

Pamperfest

• • •

Presentation work - writing text and preparing imagery for pitch presentations and sponsor communications Conceptualising of a companion app for the festival and the pop-ups Budget - liaising with the various stakeholders to produce an overall initial budget


Pamperfest

l

RETAIL/

DESIGN

SAFIYAH

SETH

PITCH

l

WORK

Portfolio


HOSPITALITY

SAFIYAH

l

SETH

The

l

Butcher

Portfolio

Shop

&

Grill


The

Butcher

Shop

&

Grill

l

HOSPITALITY

The Butcher Shop & Grill An interesting concept, where retail and restaurant spaces are combined. Honest, heavy materials re-inforce a feeling of a traditional steakhouse. My involvement on this project was in the design and concept for all items. The project co-ordination and site supervision was completed by another team member. • • •

Concept design 3D Sketchup modelling Joinery - design and technicals

SAFIYAH

SETH

l

Portfolio


BRANDED

SPACES

l

Absolut

Absolut Vodka Lounge at Zone 6. An outdoor poolside lounge and bar at a Soweto superclub. Produced for alcohol brand Pernod Ricard, this project had an incredibly quick turnaround, where we combined bespoke items with readymades that we customised. My involvement therefore included • • • • •

Concept and Sketchup 3Ds Joinery - design and technicals Liaising with 3D rendered for client presentation Furniture sourcing Finishes specification

SAFIYAH

SETH

l

Portfolio

Outdoor

Lounge


Bakery

Kiosk

l

RETAIL

Bakery Kiosk for Food Market Concept Stage A small bakery kiosk, utilizing curved corian and rainbow slats, aimed to appeal to children. I was involved in • •

Concept Joinery drawings for costing

SAFIYAH

SETH

l

Portfolio


RETAIL

l

Little

Elves

Pop-Up

Little Elves Pop-Up Shop In aid of the Santa Shoebox Project, we created a pop-up shop in the middle of a busy shopping mall. The aim was to generate awareness and interest in the project, creating a space where people can assemble their own shoeboxes in a fun, yet convenient environment. The overall structure was constructed from X-board and was made to resemble a shoebox, with a lid that appears to be popping off due to all the presents. Budget on this one was low, so we did almost all of the work ourselves. Some serious festive fun ! Duties included (but were not limited to) • • • • • •

Concept Design Signage design and DTP Project management Site supervision Liaising sponsorships from various stakeholders Wrapping lots of boxes by hand!

SAFIYAH

SETH

l

Portfolio


Little

Elves

SAFIYAH

Pop-Up

SETH

l

l

RETAIL

Portfolio


RESIDENTIALl

Man-

Cave,

Tokai

Basement/Man Cave Walnut panelling with raised brass inlay strips creates a sense of enclosure and warmth as well as providing concealed enclaves for various pieces of equipment. The integration of audiovisual hardware, wine storage, cigar humidifiers and a concealed gun safe played a key role in the design of this comfortable and highly customised space. Saffron Studio designed the custom joinery as well as selecting the finishes for the space.

SAFIYAH

SETH

l

Portfolio


Man-Cave,

Tokai

SAFIYAH

l

SETH

RESIDENTIAL

l

Portfolio


RESIDENTIAL

l

House

H,

Newlands

House H A modern, new-build, family home in leafy Newlands, Cape Town. Currently under constrution. Situated on the banks of the Liesbeek River, this family home’s design has been centred on a timeless, Scandinavian minimalism with subtle nautical touches in honor of the owner’s love of fishing and the open seas. Saffron Studio was commissioned to provide: • • •

Concept Design Selection of hard finishes Joinery design for all cabinetry including, kitchen,bar, study, bedrooms and all bathrooms

SAFIYAH

SETH

l

Portfolio


House

H,

Newlands

SAFIYAH

l

SETH

RESIDENTIAL

l

Portfolio


RESIDENTIAL

SAFIYAH

l

SETH

House

l

H

Portfolio


House

H

l

RESIDENTIAL

Contact Me: e: safiyahseth@gmail.com t : 084 354 4422

SAFIYAH

SETH

l

Portfolio


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.