Media Production
Risk Management Plan
Name
Sagar Gautam
Date
06/09/12
Event
Position
Chief Director
Venue/s
Drama room
Description
Organization
FilmItCo
Contact info.
Video Installation
Ref:#
The Risk
Likelihood
Consequences
Level of Risk
Pre-emptive
Response
People tripping over in the dark due to wires
unlikely
moderate
L – Low Risk
Provide visible light + visible hazard tape signs in places where there is a wire at risk
First aider on hand
Electric shock from wires used in equipment.
unlikely
moderate
M – Moderate risk
Faulty equipment check, ensure no loose currents
First aider on hand
Projector catching fire due to overheating
unlikely
high
H- High Risk
Ensure projector does not over heat by checking regularly
First aider and fire estinguished on hand
Speakers or projector falling from tables onto vistors due to darkness
unlikely
moderate
L- Low risk
Ensure hazard tape First aider on hand in areas where there is a hazard, advising spectates to stay away
Page 1 of 1
Thursday, 6 December 2012