Risk assessment vid installation

Page 1

Media Production

Risk Management Plan

Name

Sagar Gautam

Date

06/09/12

Event

Position

Chief Director

Venue/s

Drama room

Description

Organization

FilmItCo

Contact info.

Video Installation

Ref:#

The Risk

Likelihood

Consequences

Level of Risk

Pre-emptive

Response

People tripping over in the dark due to wires

unlikely

moderate

L – Low Risk

Provide visible light + visible hazard tape signs in places where there is a wire at risk

First aider on hand

Electric shock from wires used in equipment.

unlikely

moderate

M – Moderate risk

Faulty equipment check, ensure no loose currents

First aider on hand

Projector catching fire due to overheating

unlikely

high

H- High Risk

Ensure projector does not over heat by checking regularly

First aider and fire estinguished on hand

Speakers or projector falling from tables onto vistors due to darkness

unlikely

moderate

L- Low risk

Ensure hazard tape First aider on hand in areas where there is a hazard, advising spectates to stay away

Page 1 of 1

Thursday, 6 December 2012


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.