Architectural Studies

Page 1

a

rchitectural

s

u n d e r g r a d u a t e

p ortfolio d e s i g n

by

sagar naresh karale

sagarkaralearch@gmail.com

tudies



"Engaging Architecture into Experience"

T he course of my academic and professional learning, has not only transformed my architectural learning but it has also urged me to play an active role in our society by exposing me to numerous issues we face as a community, city, country while simultaneously teaching me to address them architecturally. The exposure to various theories, concepts and methods have led me to explore the idea of architecture. At this point I stand in a transitional phase where I am ready to take a position on the practice, which stands ahead of me. Many great minds in our profession, in various ways have presented the diverse approaches one can take to address the challenges put forth to us. This has been instrumental towards developing my approach towards architecture. A rchitecture, both in my learning and consideration has always been a science of creating spaces. A space that gives an experiential value to the user while it sits in harmony with its context. My approach has always been a mixture of intuitive and conscious design values based on function, observation and research. Often while addressing a project, the aspect of function has been my prime concern. This framework allows me to convert my theoretical learnings into practice and address the project based on the functionality of the program. T his portfolio is a collection of projects that have been approached in the framework stated above. The nature of projects included display the flexibility from interior space to an urban intervention.


SAGAR NARESH KARALE 31 ST AUGUST 1993 sagarkaralearch@gmail.com +91 73032 45440 A4 - 603, Shree Satguru Garden, Vijay Garden Lane, Kavesar, Ghodbunder road, Thane (W). 400 615 I wish to expand my carreer path as I am ardent to practice in a meaningful employment that allows me to constantly push my current limits and develop my abilities and provide me with oppor tunities to gain respect of my fellow peers.

EDUCATION B. Arch. 2018

HSC. 2011

SSC. 2009

LINGUAL SKILLS INTERESTS

KAMLA RAHEJA VIDYANIDHI INSTITUTE FOR ARCHITECTURE AND ENVIRONMENTAL STUDIES. Juhu, Mumbai. University Of Mumbai. VASANT VIHAR HIGH SCHOOL & JUNIOR COLLEGE. Vasant Vihar, Thane. Maharashtra State Board of Secondary & Higher Secondary education. ST. XAVIERS' ENGLISH HIGH SCHOOL & JUNIOR COLLEGE. Ghodbunder Road, Thane. Maharashtra State Board of Secondary & Higher Secondary education.

English.

Marathi.

Hindi.

Gujrati.

Football.

Music.

Cinema.

Travelling.

Photography.

Represented Football Teams at District and University Tournaments.


PROFESSIONAL EXPERIENCE Nov 2016 - May 2017 Intern Architect

June 2016. Freelance Work

May 2016. Intern Architect

Feb 2016 - March 2016. Project Manager

May 2015 - Nov 2015. Intern Architect

Feb 2014 - April 2014. Intern Architect

October 2013. Freelance Work

DEM CONSULTANTS. Professional Practice. Preparing Approval Drawings, Working Drawings, Client Presentation, Designing, Planning and Site Visits. Chikani Residence. Ceiling Layout Design. Designing and executing the false ceiling layout of living room of a private residence. DEM CONSULTANTS. Professional Training. Training under the principal architect to learn entire gamut of liasoning. MAGNUM FOOD VENTURES & DEM CONSULTANTS. Project execution & management for minus 301 degree F ice cream parlour. Executing the interiors designed by procurring required material and ensuring desired quality and costing. YANTRA DESIGN STUDIO. Production design for the film 'BAJIRAO MASTANI' under the bannner of SLB Productions. Preparing Working Drawings as well as to provide the team with design inputs and supervise site work. STUDIO DEM. Professional Training. Preparing Working Drawings, Designing, Planning and Site Supervision. Way 2 Health Clinic. Interior Design. Designing and executing the interior layout of a Physiotherapy Clinic.

EXPERTISE MANUAL

Drafting

Model - Making

Architectural Sketching

DIGITAL

AutoCAD

SketchUp

Vray / Kerkythea

Photoshop

InDesign

MS Office

ARCHITECTURAL COMPETENCY

Concept Development.

Architectural Design.

Technical Resolution.

3D Visualization.

Presentation.

Documentation.

PROFESSIONAL COMPETENCY

Management.

Leadership.

Communicative.

Resilience.

Optimistic.

Authoritative.


PUBLICATIONS & EXHIBITIONS 2017

TRANSPORT HUB IN THANE: Improving Transfer Conditions at Majiwada Junction. Undergraduate Thesis (Volume One). Author.

2013

BAYUL DEMAZONG: SIKKIM, INDIA. Measured Drawings & Documentation. Part of Quality Control Team (monitoring inked drawings) and Exhibition Team / Author among others. Work exhibited and Published. THE NARRATIVE CANVAS: Documenting Harihareshwar. Author among others. Work exhibited in the Annual Exhibition, KRVIA.

2012

AD STUDIOS First Year

Broken Objects.

Understanding Pavillions.

School by the hill.

Second Year

What can Architecture do for Walking?

Annex to the Trust.

Exhibition Centre.

Third Year

Folk Art & Dance Training Institute.

Extension to the Museum.

Fourth Year

Gwalior Visitor Centre.

Fifth Year

Social Housing.

Chinchwada, Pune.

Drafting Exercise.

Jama Masjid, Mumbai.

Harihareshwar.

Yuksom, Sikkim.

Dr. Bhau Daji Lad Museum, Mumbai.

Gwalior fort, Gwalior.

Nehru Nagar Slum, Juhu, Mumbai.

Design Dissertation. Transport Hub in Thane.

ELECTIVES & WORKSHOPS First Year

Introductory Workshop.

Building Technology.

Second Year

Ceramics

Music Workshop.

Third Year

Learning Bamboo Techniques.

Community Participation.

Fourth Year

Alternative Construction.

Fashion Design Workshop.

Fifth Year

Housing Finance.

Art.

Technology as our sixth sense. by Rashi Jain by Areen Attari.

by Deeksha Surendra. by Dipti Talpade.

by Apurva Parikh & George Jerry. by Vidya.

by Azeer Attari.

Film Workshop.

by Avijit Mukul Kishore.

by Fatima Khan.

by Kausik Mukhopadhyay.

Film Making Workshop. by Reema Borah.

ORGANIZING EXPERTISE Providing voluntary help during Annual Exhibitions at KRVIA. Class Representative for the academic year 2014 - 2015. Part of Study-Trip Committee to organise a study trip to Sikkim, India. Part of Quality Control Team and Exhibition Team for Study Trip Documentation.


SELECTED WORKS

01 - 14

15 - 22

23 - 30

31 - 36

37 - 38

39 - 42

43 - 44

45 - 46

01 02 03 04 05 06 07 08

TRANSPORT HUB IN THANE: Improving Transfer Conditions at Majiwada Junction. Undergraduate Thesis.

SOCIAL HOUSING: Nehru Nagar, Mumbai. Semester IX.

GWALIOR VISITOR CENTRE: Gwalior. Semester VII.

TECHNICAL SKILLS. Working Drawings.

DIGITAL SKILLS. Academic & Professional Projects.

PROFESSIONAL WORKS. Professioinal Practice & Freelance.

MISCELLANEOUS. Academic Projects.

PHOTOGRAPHY. Architecture, Landscape & Street.


01

TRANSPORT HUB I N T H A N E IMPRO VING THE TRANSFER CONDITIONS AT MAJIWADA JUNCTION

There is a constant pressure on the transport system due to the increasing population. The planners have used multiple methods to tackle this issue. All transport related issues come from many broader issues or planning failures, but can be remedied by the development and usage of public transportation. There is a need for planning in the transit system. The architectural failures in existing transit systems can be improved to bestow upon the commuters a better experience. The primary problem that was created by over saturation of automobiles in our major cities around the country was the degradation of other modes of transportation that it creates through limiting the accessibility of their use. Also automobiles isolate the user from the community. There is no interaction with the outdoor or the people which creates even further isolation of individuals in the community. An attempted solution to this issue is the concept of an Intermodal Transport Hub. An intermodal transport hub provides the use of multiple modes of transport at a single point, thus reducing the transfer time in the transition and providing a suitable environment for the same. A successful Transport hub facilitates safe transfer between multiple modes of transport and provides with an environment that implements a seamless travel experience. Further, these facilities can be supported by various other public or private functions that may be convenient to the users. These observations and demands led me to select Thane as my thesis location and to explore how to improve transfer environment at key locations, to facilitate a seamless transfer and potentially encourage the use of public transportation. The introduction of Metro-IV corridor further strengthens the need for a transit node in Thane. The aim was to explore architectural interventions to provide an efficient transfer and will also provide a comfortable experience with other user amenities during the transfer. And finally, a lively sustainable public space to benefit not only the commuters but also the neighborhood.

01



Theoretical Premise:

Point to Point Design

Proximity Map showing the connectivity of Thane city with adjacent landmarks.

Connectivity to the City Network.

Proposed Site.

Primary & Secondary Road Network. 03

Existing Conditions

Well accessible by Transport Modes.

Pedestrian Flow during Off-Peak Hour.

Pedestrian Flow during Peak Hour.

Integrated Hub Design

Seamless Travel

Well connected to the City Fabric.

Facilitate and promote the use of Public Transport.

Augmenting Experience

Connecting the Surrounding Programs.

Associating the Neighborhood

Site Urban Context.

Existing Pedestrian Movement.

Proposed Pedestrian Movement.

Existing Travel Movement.

Proposed Travel Movement.


Site Vicinity

Commercial & Business Hubs.

Existing Land Use.

Axonometric Plan.

Existing Traffic Movement. Vehicular Flow (Peak Hour): 40,507. Vehicular Flow (Off-Peak Hour): 29,116.

SITE PLAN 04



GROUND FLOOR PLAN


FIRST FLOOR PLAN

SECOND FLOOR PLAN & METRO-STATION CONCOURSE LEVEL 07


THIRD & FOURTH FLOOR PLAN & METRO-STATION PLATFORM LEVEL

BASEMENT FLOOR PLAN 08


SECTION A - A’

SECTION B - B’

3D Visualization

09


SECTIONAL PERSPECTIVE STRUCTURAL MODEL

PRESENTATION MODEL

10


Aluminium Corrugated Roofing.

(Panel Size 1200mm X 2400mm)

Double Webbed I-Section Purlins. (300mm X 600mm) Aluminium Corrugated Roofing.

M.S. Gutter. (600mm deep)

(Panel Size 1200mm X 2400mm)

Triangular Roof Truss.

Double Webbed I-Section Purlins. (300mm X 600mm)

Pin-Joint for Roof Truss.

Triangular Roof Truss.

RCC Parapet Wall.

(1500mm Deep)

(150mm Thick)

Steel Tube support for the Roof Truss with Pin-Joint.

M.S. Gutter. (600mm deep)

(2100mm Deep)

Double Webbed I-Section Purlins. (300mm X 600mm)

(200mm Dia.)

Triangular Roof Truss.

Existing Flyover.

(1500mm Deep)

Precast U-Girder for Rail-Tracks.

Metro-Station Platform Level.

Glazed Curtain Wall with I-Section Support.

Edge Beam for Platform Slab.

(450mm X 900mm)

PT Floor Slab. (300mm Thick)

Precast U-Girder for Rail-Tracks.

Edge Beam for PT Floor Slab. (450mm X 900mm)

PT Slab for Metro-Concourse Level. (300mm Thick)

PT Slab for Metro-Concourse Level. (300mm Thick)

Edge Beam.

Edge Beam. (750mm X 1500mm)

(750mm X 1500mm)

Gutter-Outlet G.I. Pipe.

Suspended IC.

(150mm Dia.)

Gutter-Outlet G.I. Pipe. (300mm Dia.)

Branched Concrete Column for Metro-Station & Metro-Concourse Level.

Branched Concrete Column for Metro-Station & Metro-Concourse Level.

(1500mm X 3000mm)

(1500mm X 3000mm)

Plinth Level.

Road Level.

Road Level. Brick Wall. (230mm Thick) RCC Wall. (600mm Thick) Basement Level. (-4.20M) Concrete Topping. (100mm Thick)

Lean Concrete. (750mm Thick) Raft Slab. (450mm Thick) Pcc Bed. (230mm Thick) Pile Foundation.

STRIP SECTION 01 11

STRIP SECTION 02


Aluminium Corrugated Roofing. (Panel Size 1200mm X 2400mm)

Double Webbed I-section Purlins. (300mm X 600mm)

Triangular Roof Truss.

(2100mm Deep)

Steel Tube support for the Roof Truss with Pin-Joint. (200mm Dia.)

Base-Plate. RCC Parapet Wall. (150mm Thick) Suspended Ceiling. Glazed Curtain Wall with I-Section support. PT Floor Slab. (300mm Thick) Edge Beam for PT Floor Slab. (450mm X 900mm)

Suspended Ceiling. Glazed Curtain Wall with I-Section support. PT Floor Slab. (300mm Thick)

Polycarbonate Transluscent Sheet. Aluminium Corrugated Roofing. (Panel Size 1200mm X 2400mm)

Aluminium Corrugated Roofing.

I-Section Beam. (300mm X 600mm)

(Panel Size 1200mm X 2400mm)

I-Section Purlins. (150mm X 300mm)

I-Section Beam. (300mm X 600mm)

M.S. Gutter. (450mm deep)

I-Section Purlins. (150mm X 300mm) Polycarbonate Transluscent Sheet.

Steel Tube Screen.

Glazed Curtain Wall with I-Section support.

I-Section Column. (300mm X 600mm)

PT Floor Slab. (300mm Thick) Edge Beam for PT Floor Slab. (450mm X 900mm)

STRIP SECTION 03

Asphalt. (50mm Thick)

Bus Stand & Footpath.

Rickshaw Stand & Footpath.

Concrete Pedestal. (1.5m high)

Lean Concrete. (450mm Thick)

Lean Concrete. (450mm Thick)

PT Floor Slab. (300mm Thick)

PT Floor Slab. (300mm Thick)

Concrete Column. (1500mm X 3000mm)

Concrete Column. (450mm X 900mm)

Basement Level. (-4.20M)

Basement Level. (-4.20M)

Concrete Topping. (100mm Thick)

Concrete Topping. (100mm Thick)

Lean Concrete. (750mm Thick)

Lean Concrete. (750mm Thick)

Raft Slab. (450mm Thick)

Raft Slab. (450mm Thick)

Raft Slab Beam. (600mm X 1200mm)

Raft Slab Beam. (900mm X 1200mm)

Pcc Bed. (230mm Thick)

Pcc Bed. (230mm Thick)

Pile Foundation.

STRIP SECTION 04

Pile Foundation. 12


Aluminium Corrugated Roofing. (Panel Size 1200mm X 2400mm)

Double Webbed I-Section Purlins. (300mm X 600mm)

Triangular Roof Truss. (2100mm Deep)

Roof System.

Pin-Joint for Roof Truss. RCC Parapet Wall. (150mm Thick)

Steel Tube support for the Bridge Truss with PinJoint. (300mm Dia.)

Strutural System.

Glazed Curtain Wall.

(Panel size1200mm X 2400mm)

Edge Beam for PT Floor Slab. (450mm X 900mm)

Fourth Floor.

(Commercial Spaces)

Third Floor.

(Commercial Spaces)

M.S. Railing. Roller-Deck Slab. Edge Beam. (750mm X 1500mm)

Metro-Station Platform Level.

Second Floor. (Food Court)

RCC Parapet Wall. (150mm Thick) Branched Concrete Column for MetroStation & Metro-Concourse Level.

Metro-Station Concourse Level.

(1500mm X 3000mm)

Plinth Level. Covered Plaza.

First Floor.

(Retail Spaces)

PT Floor Slab. (300mm Thick) Brick Wall. (230mm Thick) RCC Wall. (600mm Thick) Basement Level. (-4.20M) Concrete Topping. (100mm Thick)

Lean Concrete. (750mm Thick) Raft Slab. (450mm Thick)

Ground Floor.

(Main Waiting Concourse, Plaza, Bus Services, Public Services, Locker Rooms, & Transit Corridor)

Pcc Bed. (230mm Thick) Pile Foundation.

STRIP SECTION 05 13

Basement Floor. (Public Parking, Plant & Services)

EXPLODED AXONOMETRIC.


Detail 01 Aluminium Corrugated Roofing. (Panel Size 1200mm X 2400mm)

M.S. Gutter. (600mm X 600mm) M.S. Holding Strap. (35mm wide) M.S. Support Strap. (25mm wide) G.I. Outlet Pipe. (150mm Dia.)

Aluminium Corrugated Roofing.

(Panel Size 1200mm X 2400mm)

Polycarbonate Transluscent Sheet.

(Panel Size 1200mm X 2400mm)

Double Webbed I-section Purlin as Fascia. (300mm X 600mm)

Triangular Roof Truss. (1500mm Deep)

Base-Plate with Pin-joint.

Roof Detail 01 Detail 02

Steel Tube Bracing for the Roof-Truss. (300mm Thick)

Aluminium Corrugated Roofing.

(Panel Size 1200mm X 2400mm)

Aluminium Corrugated Roofing. (Panel Size 1200mm X 2400mm)

Polycarbonate Transluscent Sheet.

M.S. Gutter. (600mm X 450mm)

(Panel Size 1200mm X 2400mm)

M.S. Holding Strap. (35mm wide)

Double Webbed I-section Purlin as Fascia. (300mm X 600mm)

M.S. Restraint Strap. (25mm wide)

Triangular Roof Truss. (2100mm Deep)

Steel Tube Screen. I-Section Column. (300mm X 600mm)

Roof Detail 02 Detail 03 Aluminium Corrugated Roofing. (Panel Size 1200mm X 2400mm)

Steel Tube Bracing for the RoofTruss. (300mm Thick) Base-Plate with Pin-Joint to support the Steel tube.

Aluminium Corrugated & Polycarbonate Transluscent Roofing.

(Panel Size 1200mm X 2400mm)

Double Webbed I-section Purlins. (300mm X 600mm)

Triangular Roof Truss. (2100mm Deep)

Pin-Joint.

Double Webbed I-section Purlin. (300mm X 600mm)

Steel Tube support for the Bridge Truss with Pin-Joint. (300mm Dia.) Roller-Deck Slab.

Triangular Roof Truss. (1500mm Deep)

Detail 04

Steel Tube Bracing for the Roof-Truss. (300mm Thick)

Aluminium Corrugated Roofing. (Panel Size 1200mm X 2400mm)

M.S. Gutter. (600mm X 450mm) M.S. Steel Tube. (38mm Dia.) M.S. Box Channel. (35mm X 75mm) M.S. Bracket. (35mm wide)

Branched Concrete Column for Metro-Station & Metro-Concourse Level. (1500mm X 3000mm)

M.S. C-Section. (100mm X 150mm) M.S. Steel Tube. (38mm Dia.)

Exploded Roof System 14


02 H

S O C I A L O U S I N G NEHRU NAGAR, JVPD SCHEME, MUMBAI

Nehru Nagar is a 25 acres slum located in Juhu - Vile-Parle Development (JVPD) Scheme and is a home to approximately 10,000 households. The slum is in a major despair and obviously lacks basic facilities such as water supply, sanitation and public recreational amenities. The overall study comprised of physical and mental mapping of entire Nehru nagar. The front edge of the Nehru nagar is facing the V.M. Marg with a diverse fabric of commercial, residential and service sector settlements. The back edge reaches the boundaries of Pawan Hans Airport. The back edge of the Nehru nagar reaches the boundaries of Pawan Hans Airport. The slum has two main primary entry points amd two secondary entry points. The physical structure of the slum consists of a central lane as a core to all the chawls. All the major convenience amenities are along this central lane. Though being the only major route of acces for the entire slum, it is not properly maintained. There are by-lanes on each side of this lane which provide immediate acces to each settlement in the slum. This bylanes emerge from the central lane and reach out till the periphery of the slum. There are nodes formed at some places at the junction of this bylanes and the central lane. Public toilets are placed on the Pawan Hans side, as all the sewage can be connected to the airport sewage line. Through a series of interviews and site visits, an insight into the daily life of the residents provided a better understandingof the social life in Nehru nagar. The slum is home to many migrants who left their native in search of better monetary opportunities. Whilst most occupants are families, a significant portion also comprises of shared and single occupancies. Extremely dense fabric of the slum does not allow any space for recreational or community activities. However, the residents have informally created relief spaces such as otlas that extend out from a settlement. These spaces form an integral part for the gatherings within the clusters. The project focused on to provide an In-Situ Rehabilitation for the existing households by keeping the social nature of the settlements unchanged and to provide with the amenities that were lacking in the existing conditions. The projected concentrated on creating a 5-acres Masterplan that would act as a module for the rest 20 acres of Nehru Nagar.

GROUP PROJECT (2 PARTICIPANTS): SAGAR NARESH KARALE NIKUNJ RAJESH HINGU 15


Community Attraction / Self Sustainance : The variation of mix-use and single-use settlements. There are certain ares which are used for community gatherings. These spaces are kept away from encroachment. The internal road housing all the convenience commodities making Nehru Nagar a self-sustaining system.

Unsafe Pedestrian Movement : The main internal road is the spine of Nehru Nagar. The high-level density within the slum and at the edge of the spine make it inefficient to provide a Map showing Nehru Nagar and 5 acre site selected for intervention.

decent passive surveellance to the pedestrian links (by-lanes), resulting in potential safety issues to the pedestrians.

Plan showing the Structures

Gateway Establishment : The establishment of distinct getaways to the proposed plot will redefine the perimeter to provide more open spaces and solve the issue of missing pedestrians links, thus providing a safe access and circulation.

Plan showing the By-Lanes Unsafe Settlements on the edges : The high degree of density has resulted encroachment till the extreme perimeter of the plot. There are settlements which have been constructed on and along the nallah. Also there are slums which have been constructed on the boundary walls of the adjacent residential plots. Axonometric plan showing the main central road with by-lanes extending from it; all the important nodes and the open spaces in each cluster.

This type of development has caused isolation and open space deficiency within the the site. 18


Single Unit to Two Units

Four Units

Six Units

Module 1

Eight Units = One Cluster

Single Cluster

Two

Clusters

with

Pedestrian Connectivity. 17

Strategy for cluster masterplan by providing open spaces for community in between.

Module 2


Strategies for Masterplaning :

Site Access

Formation of small nodes through Primary & Secondary Pedestrain pedestrian access access

Placement of Clusters

Open Spaces due to the placement of clusters.

CLUSTER PLAN

Single Module showing the idea of relief spaces being vertically stacked

First and Third Floor Plan

Second and Fourth Floor Plan

Fifth Floor Plan

Sixth Floor Plan

over each other.

18


GROUND FLOOR PLAN 19


PODIUM LEVEL PLAN 18


Section A - A'

21


Section B - B'

22


03

GWALIOR VISITOR CENTRE KILA GATE, OLD CITY, GWALIOR.

The Gwalior fort is the only known identity of Gwalior city, since the 8th century. Old Gwalior, began to grow in the 13th century and was the first settlement of the city. Now it bears traces of heritage, both built and un-built belonging to different time periods. The area attracts tourists only because of the fort and Tansen's tomb, however the old city itself has a rich history and distinct character of its own. It has various old buildings, local small industries, market areas, educational and religious institutions. The study intends to capture the essence of the old where remnants of the old have been retrofitted by the new. The design will serve both the locals and the tourists and will attempt to revive the old city. Existing scenario: Currently the movement of the tourists' is towards the Kila Gate (which is the south entrance to the fort). Due to this the tourists ignore many buildings which can be classified as Heritage Buildings. Also because of this direct movement of the tourists to the fort, there is a lack of interaction between the tourists and the local people. Proposed intervention: The primary aim is to increase the time period, a tourist spends in the old city. This will happen if the programme focuses on creating a space which educates the tourists about the old city and old city is much more than the fort. The programme will also focus on creating many community spaces which will boost the interaction between the tourists and the local people.

23



Swarnarekah river

Map showing Proposed Site and Heritage Buildings nearby.

Gwalior Fort

Heritage buildings in the vicinity of the proposed site. To establish a relationship between

the

heritage

buildings and the site. Map Showing Heritage Buildings in the Old City of Gwalior.

Diagrams representing the proposed route of movement for the tourists leading to the Site through all the Heritage Buildings. The path in pink is the proposed route of movement for the tourists. All the important buildings in the vicinity are marked in blue color. The pathways are further developed to create a distinct route of movement within the Site. Thus making the site accessible from all sides.

25

A distinct pathway is then freezed so as to divert the tourist in a pattern that leads to the heritage buildings in the area through the dense fabric, thus improving the interaction between the the tourists and the locals.


26




29

Section A - A’

Section B - B’

West Elevation

North Elevation

South Elevation

East Elevation


30


04

TECHNICAL S K I L L S

WORKING DRAWINGS Exhibition Centre, Sikkim.

Setting - out Plan 31


Ground FLoor Plan 32


First Floor Plan 33


Elevations & Sections 33


Staircase Details 35


Wall Sections 36


05

FOLK ART & DANCE TRAINING I

DIGITAL S K I L L S

I. ACADEMIC PROJECTS ANNEX TO THE TRUST.

37

JAMA MASJID, MUMBAI.


NSTITUTE.

C H I N C H W A D A , PU N E .

II. PROFESSIONAL PROJECTS

38


06

P R O F E S S I O N A L W O R K S

I. DEM CONSULTANTS. PROJECT: AURIS SERENITY, MALAD

by Transon-Sheth Creators.

DEM Consultants in collaboration with Skyline Infrabuilt Consultants were involved in preparing and executing the proposed and on-going approvals of the project. Role: Preparing Approval Drawings, Parking Layout and Area Statement of Tower 1 (Wing 'A') under the guidance of the Principal Architect.

262

6.00 M WIDE

238

281

280

DR

VOID ABOVE

279

278

277

VOID

276

275

274

283

272

271

270

269

CHAJJA

FIRE ESCAPE CHUTE CHAJJA

ELECTRSHAFT

ICAL

DUCT

UP

SL-01 LIFT 2.75 X 2.10 GARBAGE ROOM x 4550

5850

39

HANDICAP TOILET 2.80x2.00

LOBBY 1.90x2.00

DRIVER'S.TOI 3025 x 3600

11 12 13

49

ABOVE

6.00 M 33

14

WIDE

15

46

31

16

17

42

43

DRIVE

WAY

32

ABOVE

47

40 41

228

268

30

45

44

18 19

29 28

27

20

21

26 25

231

WAY RAMP Slope- 1:10

SHAFT

LV

Y EWA E DRIV M WID

38

230

273

WAY

50

37

ABOVE

229

7.50 MT W.TWO

FHC-2

W.TWO WAY RAMP Slope1:10 7.50 MT

6.00 36

10

DRIVE

22

24

23

UP

284

9

WIDE

52

48

W

VOID

53

51

PY BELO

ABOVE

DRIVEWAY

Y

WA

IVE

285

54 70

CANO

227

6.10

WIDE

282

6.00 M

55

UP

RAMP 1:10 SLOPE

FIRE ESCAPE CHUTE

VOID

56

72

ABOVE

VOID

0M

VOID ABOVE

VOID ABOVE

260

73

34

6.0

286

255

38.38

288 287

239

261

57

74

ABOVE

0

1.5

VOID

VOID ABOVE

8

6.00

DRIVEWAY

263

VOID

'S AP DRIVER HANDIC TOILET

7

35.06

2.35 X 2.40 P LIFT

254

264

5

2.9

226

DRIVEWAY

1.90 X 2.75 GARBAGE CHUTE

2.35 X 2.40 P LIFT

265

289

75

DRIVEWAY

71 0

475X75

6

35

6.00 M WIDE

2.35 X 2.40 P LIFT

7.43

VOID

DOWN TO GROUND

266

SL-02 LIFT 2.75 x 2.35

SL-01 LIFT X 2.75 2.10

0

WIDE

475X75

240

267

PL-02 LIFT 2.35 x 2.55

PL-01 LIFT 2.35 x 2.55

DRIVER'S 3.02

225

6.00

VOID ABOVE

4 5

ENTRANC LOBBY E

224 242 241

253

WAY RAMP

7.16

.TOI x 3.60

244 243 251 252

259

0

290

1.3

FHC 1.50 X 1.50

SERVANT TOI. 1.50 X 1.05

299

7.50 MT W.TWO

DRIVEWAY

249 250

6.00

258

ENTRANCE LOBBY

291

3

6.00

67

76

PL-04 LIFT 2.35 x 2.55

PL-03 LIFT 2.35 x 2.55

VOID ABOVE

PL-03 LIFT 2.55 x 2.35 PL-02 LIFT 2.55 x 2.35

69

3

6.00 M WIDE

292

2.9

S LIFT3.45 X 2.35

359

VOID ABOVE

6.00 M WIDE

SERVANT TOI. 1.50 X 1.05

256

293

300

301

302

UP

PL-04 LIFT 2.55 x 2.35

LIFT Y LOBB

FHC-1

6.00

LOBBY WIDE

LIFT

MM

2.75

2.35 S LIFT X 3.45 2.35 S LIFT X 3.45

P LIFT 2.35 X 2.40 P LIFT 2.35 X 2.40 P LIFT 2.35 X 2.40

FHC 1.50 X 1.50

11.17

1.90 X 2.75

257

294

303 358

2.15 MM WIDE LIFT LOBBY

GARBAGE CHUTE

6.00

357

LIFT LOBBY

FHC-1

2

1.2

SL-02 LIFT 2.75 x 2.35

PL-01 LIFT 2.55 x 2.35

68

6.00 M

LIFT-1

S LIFT3.45 X 2.35

LOBBY LIFT WIDE MM 2.75

ABOVE

308

307

306

305

304 356

0

475X75

245

VOID ABOVE

toilet 8

1.38x1.4

2

66

77

LIFT-2

2.35 P LIFT X 2.40

LIFT LOBBY MM WIDE

2.90

5

FHC X 1.50

1.50 NT TOI. X 1.10

248

UP

PL-05 LIFT 3.65 X 2.35 TOILETION PROVIS

GE GARBACHUTE ABOVE

1.8

2.15

1.50

FIRE ESCAP CHUTE E 1.50 X 2.5

SERVA

65

78

311

310

309

62 63

79

209

208 PL-06

223

PL-05 LIFT 2.35 X 3.65

ABOV

L ROOF BELOW LINE

64

LIFT 3.65 x 2.35

222 247

LIFT LOBBY 2.15 MM WIDE

DRIVEWAY

9.93

VOID

ABOVE

6.00 M WIDE

2.35 P LIFT X 2.40

ENTRANCE

PL-06 LIFT .35 3.65x2

80

246 145

VOID

UP

E ABOV

E

VOID

ELECTRICA

UP

144

T TOI. SERVANX 1.10 1.50

1

60

61

81

210

2.45

6.00

355

2.35 P LIFT X 2.40

211

LOBBY

143

ESCAPE FIRE CHUTE X 2.5 1.50

212

213

214 BUILDING LINE ABOVE

CAPE LANDS

30.02

FHC X 1.50

1.50

295

84

82

DRIVEWAY

215

216

217

218

219

220

VOID ABOVE

ABOV

59

FHC-2

VOID

ABOVE

LOBBY LIFT WIDE MM 2.15

298

313

314

315

316

317

318

319

320

321

221

142

P LIFT2.40 X 2.35

ABOVE

6.00 312

322

IN FSI

6.00 M WIDE

141

VOID ABOVE

85

19.33

ABOVE VOID ABOVE VOID

323

354 COUNTED

165

163

161

159

156

154

152

150

148

140 P LIFT X 2.40 2.35

P LIFT X 2.40 2.35

353

VOID

139

300 299

VOID ABOVE

E

VOID

LINE ABOVE

334

203

83

6.00

6.00

333

332

331

330

329

328

BEL

58

205

BUILDING

DRIVEWAY

327

326

325

324

352

OW

OPY

CAN

201

199

197

195

193

191

189

187

185

183

181

179

177

175

173

171

169

167

90

UP

87

34.83

6.00 M WIDE

14.95

351

137 138

91

86

146

335

336

337

338

339

340

341

342

343

344

345

93

89

88

30.57

348

349

346

182

180

178

176

174

172

196

194

192

190

188

186

184

94

92

207

206

204

202

200

198

30.56

350

349

DRIVEWAY

170

168

166

164

162

160

158

157

155

153

151

149

147

6.00 M WIDE

6.00

130

131

132

133

134

135

136

124

125

126

127

128

129

117

118

119

120

121

122

123

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

6.19

6.00 M WIDE DRIVEWAY

237

236

235

234

233

232

Podium Parking Layout (First Floor). CTS 384

1st PODIUM FLOOR PLAN

DUCT

1.95 M.W.PASSAGE

W.C 1.45 X 1.10

8.94

+ 0.30 mt Lev.

1.50

FD1

V1

V1

V1

OP

OP

V1

FRD

V1

V1

V1

0.9 M HIGH PARAPET WALL

D4

FFD

LIFT 2.15X2.15

LD

LIFT 2.15X2.15

FD1

V1

STAIRCASE 01

ELEC.

DUCT E.S.S ED

SD

CHOWK OPEN TO SKY W0

METER ROOM 5

DUCT

FFD FD1

FRD

V1

DUCT OP

V1

FRD LD

METER ROOM - 4

W0

OP

OP

V1

CHOWK OPEN TO SKY

STAIRCASE 02

ELEC. DUCT E.S.S ED

D4

V1

V1

OP

V1

DUCT OP

FHC X 1.50

306

307

OP

OP

OP

358

FIRE ESCAP CHUTE E 1.50 X 2.5

SERVA

1.50 NT TOI. X 1.10

ABOVE

LAYOUT RG 187.90 Sq.mt.

2.35 X 2.40 P LIFT

361

304

6.00 M WIDE

293

292

290

DRIVEWAY

266

265

263

289

262

261

288

OP

6.00 M WIDE 282

281

VOID ABOVE VOID ABOVE

280

279

285

VOID ABOVE

239 255 238

278

277

276

275

284

283

274

VOID

ABOVE

VOID

272

271

270

269

ICAL

DUCT

6.00

ABOVE

9

10

DRIVE

WAY

11 12

50

13

49

14 47

39

41

WIDE

32 31

30

42

DRIVE

WAY

17 43

45

44

18 19

29 28

27

25

22

24

23

6.19

6.00 M WIDE DRIVEWAY

236

235

234

233

232

AD RO P D ID

E

2ND TO 6TH PODIUM FLOOR PLAN JOGGING

TRACK

W

SCALE - 1:200 361 NOS SINGLE PARKING

R

361 X 5 NOS OF PODIUM = 1805 NOS.

LAYOUT R.G

OPEN TO SKY

1805 NOS OF PARKING PROPOSED

TRACK

0 M E

JOGGING

VOID ABOVE

SWIMMING POOL

VOID ABOVE

STUD

IO

SUB PLOT (RM) FOR D.P. RESERVATION OF R.M.

VOID ABOVE

YOG

A STUD

FITN

IO

ESS

CAPE

UGE

A

ARE

PL-06 LIFT .35 3.65x2

OPEN TO SKY

1.50 NT TOI. X 1.10

SL-02 LIFT 2.75 x 2.35

VOID

VOID

2.35 X 2.40 P LIFT 2.35 X 2.40 P LIFT

2.15 MM WIDE LIFT LOBBY

2.35 X 2.40 P LIFT

A

GE REFU A ARE

VOID

R P

VOID ABOVE

E

VOID ABOVE

ID W

STORE

Female toilet

SAUNA

GALLERY

DRY ZONE

WET ZONE UP

STEAM ROOM

FITNESS STUDIO

OPEN TO SKY Male toilet

TOWEL COUNTER

R E T E

LAYOUT R.G

LIFT

FUNCTION ROOM (72 PAX)

M

DRY ZONE

DUCT

UP

SL-01 LIFT 2.75 X 2.10 GARBAGE ROOM x 4550

RAMP 1:10 SLOPE

LOBBY 1.90x2.00

HANDICAP TOILET 2.80x2.00

5850

DRIVER'S.TOI 3025 x 3600

LAYOUT R.G OPEN TO SKY

SWIMMING POOL

BUFFET COUNTER

AD

0

WATER BODY

ABOVE

ABOVE

SWIMMING POOL

SERVICE KITCHEN

RO D P

.4

BUFF COU ET NTER

SERV KITC ICE HEN

ABOVE

WATER BODY VOID

JOGGING TRACK

O

1.90 X 2.75 GARBAGE CHUTE

E 13

ELECTRSHAFT

LV

PL-03 LIFT 2.35 x 2.55

UP

1.30

WID

Layout Plan.

WET ZONE

WET ZONE PL-02 LIFT 2.35 x 2.55

G TRACK

E

PL-01 LIFT 2.35 x 2.55

SL-01 LIFT X 2.75 2.10

GE REFU A ARE

FHC 1.50 X 1.50

SERVANT TOI. 1.50 X 1.05

D

FHC-2

.TOI 3.60

x DRIVER'S 3.02

LIFT-1 2.35x2. 20

OPEN TO SKY

S LIFT3.45 X 2.35

TER

32.31

CTS 363

STEAM ROOM

RY FIRE ESCAPE CHUTE

LAYOUT R.G

LANSCAPE

VOID ABOVE

VOID ABOVE

CTS 364

VOID ABOVE

JOGGIN

LIFT-1 2.35x2. 20

CHUTE 1.90 X 2.75

SERVANT TOI. 1.50 X 1.05

GARBAGE

PL-04 LIFT 2.35 x 2.55

VOID ABOVE

ENTRANCE LOBBY

ME D

GALLE

LOBBY WIDE

LIFT

MM

2.75

2.35 S LIFT X 3.45

2.35 S LIFT X 3.45

P LIFT 2.35 X 2.40

LIFT LOBBY 2.15 MM WIDE

P LIFT 2.35 X 2.40

S LIFT3.45 X 2.35

SERVA

ABOVE

WATER BODY

2.35 P LIFT X 2.40

LIFT LOBBY MM WIDE

FIRE ESCAP CHUTE E 1.50 X 2.5

30

21.44

R.G T RG-1) ION OF (SUB PLO. RESERVAT FOR D.P

39

P LIFT 2.35 X 2.40

OPEN TO SKY

FHC 1.50 X 1.50

VOID

ABOVE

FHC X 1.50

NCE ENTRA LOBBY

NE

UP

LOBBY LIFT WIDE MM 2.75

18.

1.50

LI

TION ROO (72 PAX)M

LIFT LOBBY

FHC-1

1.22

LAYOUT R.G

2.35 P LIFT X 2.40

FUNC

2.90

1.85

PO

2.35 P LIFT X 2.40

ENTRANC LOBBY E

UP

PL-05 LIFT 3.65 X 2.35 TOILETION PROVIS

GE GARBACHUTE ABOVE

2.45

DIUM

E

LIN

LINE

G

DIN IL

BU

IN FSI

2.15

G

LIFT 3.65 x 2.35

T TOI. SERVANX 1.10 1.50

VOID ABOVE

PL-03 LIFT 2.55 x 2.35

PL-02 LIFT 2.55 x 2.35 FHC-1

PL-01 LIFT 2.55 x 2.35

SAUNA

Female toilet SAUNA

OPEN TO SKY

PL-06

ESCAPE FIRE CHUTE X 2.5 1.50

VOID ABOVE

LIFT Y LOBB

LAYOUT R.G OPEN TO SKY

UP

ABOVE VOID

ABOVE VOID

LAYOUT R.G

FHC X 1.50 UP

COUNTED

IL

DIN

LIFT

ENTRANCE LOBBY LIFT WIDE MM 2.15

LOBBY

STEAM ROOM

BUILDING LINE ABOVE

Male toilet

K

STORE

WATER BODY

GE REFU AREA

TRAC

STOR

ING

PL-04 LIFT 2.55 x 2.35

SHAFT

DRY ZONE ABOVE VOID

JOGG

1.50

BU

TOWE COUN L TER

TRACK

SL-02 LIFT 2.75 x 2.35

LINE ABOVE

JOGGING

ICAL

VOID

ABOVE

PL-05 LIFT 2.35 X 3.65

BUILDING

D P ROAD

FHC-2

CHAJJA

REF

LAYOUT R.G

GE REFU AREA

UP

CHAJJA

LANDS

FIRE ESCAPE CHUTE

LAYOUT R.G

OPEN TO SKY

P LIFT2.40 X 2.35

LAYOUT R.G.

20

21

26

231

Podium Parking Layout (Second to Sixth Floor).

(SUB PLOT S-2) FOR SALE BLDG NO.2

26.52

16

40

ABOVE

P LIFT X 2.40 2.35

9.00

15

46

37 38

ABOVE

HANDICAP TOILET 2.80x2.00

LOBBY 1.90x2.00

WIDE

52

48

33

P LIFT X 2.40 2.35

CTS 332

FHC-2

SL-01 LIFT 2.75 X 2.10

53

UP

51

228

TE

PODIUM LINE

CTS 371

(SUB PLOT S-4) FOR SALE BLDG

WING - A

CHAJJA

UP GARBAGE ROOM x 4550

5850

54

36

6.00 M

(SUB PLOT S-3) FOR SALE BLDG NO. 3

(SUB PLOT RG-3) FOR D.P. Reservation OF R.G

DE 9.15 M E T E R W I

CTS 333

FIRE ESCAPE CHUTE

ELECTRSHAFT

SHAFT

LV

E DRIV EWA Y M WID

6.00 M

55

70

229

268

56

72

34

227

CHAJJA

W.TWO WAY RAMP Slope1:10 7.50 MT

73

ABOVE

ABOVE

VOID

DRIVER'S.TOI 3025 x 3600

FIRE ESCAPE CHUTE

226

VOID ABOVE

VOID ABOVE

8 57

0

13.4

CTS 329

(SUB PLOT RG-2) FOR D.P. RESERVATION OF R.G

BUILDING LINE

CTS 328

74

7

69

DRIVEWAY

35

237

(SUB PLOT-PG) FOR D.P. RESERVATION OF P.G.

CTS 373

WIDE

1.5

VOID

PL-01 LIFT 2.55 x 2.35

6

230

273

WAY RAMP Slope- 1:10

FOR D.P. RESERVATION OF MAP

VOID

'S AP DRIVER HANDIC TOILET

DRIVEWAY

7.50 MT W.TWO

(SUB PLOT-MAP)

5

2.9

VOID

VOID ABOVE

CTS 433

75

71 0

FHC-1

3

ENTRANC LOBBY E

475X75

475X75

VOID ABOVE

4 5

67

6.00 M

SL-01 LIFT X 2.75 2.10

0

SL-02

LIFT 2.75 x 2.35

PL-04 LIFT 2.55 x 2.35

PL-03 LIFT 2.55 x 2.35 PL-02 LIFT 2.55 x 2.35

68

224 225

6.00

VOID ABOVE

toilet 8

LIFT Y LOBB

6.00

66

77

76 SL-02 LIFT 2.75 x 2.35

ABOV

2

UP

6.04

REHAB WING - A GR. + 23RD UPPER FLR.

D P ROAD

UP

PL-04 LIFT 2.35 x 2.55

PL-03 LIFT 2.35 x 2.55

PL-02 LIFT 2.35 x 2.55

PL-01 LIFT 2.35 x 2.55

243

242 241

260

UP

250

251 252 253

254

264

LIFT LOBBY

FHC-1

2

1.2

.TOI x 3.60

DRIVER'S 3.02

240

267

286

0

475X75

245 244

6.00

259

27.36

2.90

GARBACHUTE ABOVE

27.45

248

65

41.79

78

249

258

ENTRANCE LOBBY

291

301

302

303

33.46

79

209

208 PL-06

LIFT 3.65 x 2.35

PL-05 LIFT 3.65 X 2.35

PL-05 LIFT 2.35 X 3.65

RAMP 1:10 SLOPE

LOBBY WIDE

LIFT

256

305

287

9.15 M E T E R W I D E

LAYOUT R.G.

CTS 331

1.90 X 2.75

257

294 360

CTS 327

CTS 330

GARBAGE CHUTE

6.00

359

CTS 372

WING - B

296

295

RAIN WATER DOWNTAKE CUT-OUT

CTS 374

CTS 325/A/1

MM

2.75

313

312

311

310

309

308

LOBBY

ABOV

1.38x1.4

UP

6.10

FRD

LD

LIFT 2.15X2.15

LIFT 2.15X2.15

FFD

D4

- - 2000m WIDE PASSAGE - -

- - 2000m WIDE PASSAGE - -

METER ROOM 3

W0

7.75

Arch. feature line above

OP

V1

0.9 M HIGH PARAPET WALL

FRD LD

CHOWK OPEN TO SKY

STAIRCASE 03

ELEC. DUCT E.S.S

DRIVEWAY

VOID

6.84 7.15

0.9 M HIGH PARAPET WALL

ED

2.35 P LIFT X 2.40

LIFT 2.15 LOBBY MM WIDE

2.15 MM WIDE LIFT LOBBY

V1

DRIVE WAY.

V1

RAIN WATER DOWNTAKE CUT-OUT

CHAJJA ABOVE IN SLOPING PROFILE

OP

V1

FRD LD

LIFT 2.15X2.15

Arch. feature line above

CTS 427

RAIN WATER DOWNTAKE CUT-OUT

CHAJJA ABOVE IN SLOPING PROFILE

OP

6.00 M WIDE

2.35 P LIFT X 2.40

6.00 M.W.

cutout

357

2.35 P LIFT X 2.40

VOID

62

64

19.33

ABOVE VOID ABOVE

IN FSI

ENTRANCE

TOILETION PROVIS

GE

DUCT

± 0.00 mt. Lev.

6.00 M.W. DRIVE WAY. cutout

OP

V1

VOID

ABOVE VOID

COUNTED

219

220

223

VOID

E

63

80

222 247

UP

PL-06 LIFT .35 3.65x2

81

210

246 145

211

1

60

61

35.06

W.C 1.45 X 1.10

144

T TOI. SERVANX 1.10 1.50

CAPE LANDS

E

82 212

213

214

VOID ABOVE

59

84

BUILDING LINE ABOVE

41.39

143

ESCAPE FIRE CHUTE X 2.5 1.50

85

83

DRIVEWAY

215

216

217

218

VOID ABOVE

ABOV

205

203

201

E

VOID

6.00

1.50 M.W.PASSAGE

DUCT

1.50 X 0.60 cutout for

cutout

V1

FHC X 1.50

1.50

199

58

30.02

W.C 1.15 X 1.10 W.C 0.96 X 1.10

UP FRD

cutout for basement ventilation

Building line above

cutout

FOR D.P. RESERVATION OF H.D.

DN VENTILATION DUCT ABOVE OPEN TO SKY

1.95 x 1.35

DUCT

Building line above

1.50 X 0.60 cutout for

(SUB PLOT-HD)

7.06

Building line above

1.50 X 0.60 cutout for

W.C X 1.10 0.96

FRD

METER ROOM 3.00 x 1.80

FD

7.63

Building line above

CHAJJA LINE ABOVE

LIFT 2.15 x 2.15

FRD

221

142 LOBBY LIFT WIDE MM 2.15

297

38.38

1.50 M.W. PASSAGE

DUCT

CTS 426

8 BUILDING LINE ABOVE

LIFT 2.15 x 2.15

UP

FD

P LIFT X 2.40 2.35 P LIFT2.40 X 2.35

298

315

316

317

318

319

320

195

197

LIFT-1

7

321

2.35 X 2.40 P LIFT

LIFT 2.15 x 2.15

+ 0.30 mt Lev.

DUCT

6

BUILDING LINE ABOVE CHAJJA LINE ABOVE

322

2.35 X 2.40 P LIFT

LIFT 2.15 x 2.15

FRD

1.50 M.W. PASSAGE

DUCT

VENTILATION DUCT ABOVE OPEN TO SKY

Meter Room 2.90 x 3.15

UP

- - 2000m WIDE PASSAGE - -

1.50 M.W. PASSAGE

DUCT

5

7.18

323

ABOVE F.D.above

ED

LIFT 2.15X2.25

FRD

DN

VENTILATION DUCT ABOVE OPEN TO SKY LIFT 2.15X2.25

FRD

1.50

UP

Building line above

+ 0.30 mt Lev.

FRD METER ROOM-2 2.90X3.15

VENTILATION DUCT ABOVE OPEN TO SKY

F.D. 0.90 x1.20

ED

METER ROOM-1 3.00X3.15 1.05X1.80

LIFT 2.15X2.25

ELEC. DUCT ABOVE

LIFT 2.15X2.25

ENTRANCE LOBBY

- - 2000m WIDE PASSAGE - -

FRD

VOID

7.60

DUCT

PAVED R.G.

DUCT

ENTRANCE LOBBY

1.50 M.W. PASSAGE FRD

ELEC. DUCT 3.15 X 0.75

0.75 m.w. chajja

DN

UP

324

356

.

DRIVEWAY

AY

SERVANT TOI. 1.50 X 1.05

W

2.35 S LIFT X 3.45

E

Building line above

2.35 S LIFT X 3.45

6.06

6.06

RIV

1.50 X 0.60 cutout for basement ventilation

cutout for basement ventilation

299

314

.D

36

Building line above

Building line above

P LIFT 2.35 X 2.40

35

34

cutout for basement ventilation

P LIFT 2.35 X 2.40

33

± 0.00 mt. Lev.

LIFT LOBBY 2.15 MM WIDE

M

6.00

355

ABOVE

6.00

DUCT

32

A

5.06

6.14

5.26

31 Building line above

1.50 X 0.60 cutout for basement ventilation

P LIFT 2.35 X 2.40

30

29

8.06

28

cutout for basement ventilation

Arch. feature line above 1.50 M.W. PASSAGE

FRD

LIFT 2.15 x 2.15

325

37

DUCT

1.50 M.W. PASSAGE

DUCT ABOVE

.W

27

Building line above

FHC 1.50 X 1.50

38

UP FRD

VOID

ED

+ 0.30 mt Lev. DUCT ABOVE

26 Building line above

6.00 M WIDE

354

Down to Basement

39

FD

7.07

Head room more than 2.40 mt 1.001.5

1.001.5

2.15 M.W.

1.00

4.38

6.14

) -M OT PL UB (S

40

LIFT 2.15 x 2.15

DUCT

DUCT

UP

1.50 X 0.60 cutout for basement ventilation

6.00 M WIDE

141

VOID ABOVE

87

LIFT-2

EXIST

1.75 X 0.60

cutout for basement ventilation

169

167

165

163

161

159

156

154

152

150

148

140 P LIFT X 2.40 2.35

0

WIDE

DUCT

25

139

300

1.3

36.60 M.

24

Building line above

DUCT

LIFT 2.15 x 2.15

380

CTS 326

SUB PLOT-(S-1) FOR SALE BLDG NO.1

23

6.00 M.W. DRIVE WAY.

DUCT

1.50 M.W. PASSAGE LOBBY

UP

D P ROAD

WING - C CTS 322/C

ED

1.50 M.W. PASSAGE

22

336

90

UP

3

CTS 375

METER ROOM 5.26 X 3.60 LIFT 2.15 x 2.15

FD

DUCT ABOVE

21

1.50 X 0.60 cutout for basement ventilation

335

334

333

332

331

330

2.9

E

20 Building line above

138

DRIVEWAY

329

193

191

189

187

185

183

181

5

LIN

19

4

6.00 M WIDE

328

327

1.8

G

UP

DN FRD

DUCT ABOVE

18

4

FHC 1.50 X 1.50

DIN

17

Building line above

4

SERVANT TOI. 1.50 X 1.05

IL

16

4

4

S LIFT3.45 X 2.35

BU

6

DUCT

1.50 M.W. PASSAGE

+ 0.30 mt Lev.

15

4 4

S LIFT3.45 X 2.35

CTS 376/A

CTS 424

SPACE FOR TWO WHEELER PARKING

6

DUCT

DUCT ABOVE

ENTRANCE LOBBY

0.78 X 3.05

line above Building

PASSAGE

+ 0.30 mt Lev.

SPACE FOR TWO WHEELER PARKING

DN

UP

1.45

14

3

1

347

91

88

2.45

K ROAD

LIFT 2.15 x 2.15

DUCT ABOVE

ENTRANCE LOBBY

13

1.50 X 0.60 cutout for basement ventilation

2

4

348

6.00

378

3

349

326

LOBBY LIFT WIDE MM 2.75

18.30 METER WIDE

ING LIN

LIFT 2.15 x 2.15

FRD

12 Building line above

Building line above

BUILDING LINE ABOVE

2

A

6.06

EXISTING MASJID TO BE RETAINED

DEPT. STORE GR. +1 UP. FL.

1

11

CHAJJA LINE ABOVE

BUILDING LINE ABOVE

350

351

7.33

± 0.00 mt. Lev.

0.75 M.W. CHAJJA

1.90 X 2.75 GARBAGE CHUTE

10

SPACE FOR TWO WHEELER PARKING

FD

1.50 M.W. PASSAGE

CHAJJA LINE ABOVE

1.20 mt high parapet wall

7.71

09 ENTRANCE LOBBY

DUCT

CTS 425 8.00

Slab over ramp designed to take load of Vehicle

0.75 M.W. CHAJJA

179

177

175

173

171

6.00

353

08

381

SLOPE 1:10 --->

0.75 M.W. CHAJJA

14.95

1.20 mt high parapet wall

<< 6.00 MT WIDE RAMP >>

0.75 M.W. CHAJJA

92

LINE ABOVE

352

PAVED R.G.

DN

METER ROOM 5.75 X 2.20

6.00

UP

93

BUILDING

07

6.00

06 FRD

SPACE FOR TWO WHEELER PARKING

SPACE FOR TWO WHEELER PARKING

DUCT

94

89

86

137

DRIVEWAY

05

CTS 382/A

186

184

182

180

178

176

174

172

170

168

146

337

338

339

340

341

342

343

344

345

346

6.00 M WIDE

± 0.00 mt. Lev.

04

422

6.00

9.93

03

LAYOUT R.G. CTS 460.79 Sq.mtrs.

± 0.00 mt. Lev.

RAMP DN TO BASEMENT

SPACE FOR TWO WHEELER PARKING

SPACE FOR TWO WHEELER PARKING

160

158

157

155

153

151

149

147

01

WING - D

136

6.00

166

164

162

DRIVEWAY

02

5.59

128

129

130

131

132

133

134

135

200

198

196

194

192

190

188

30.56

E

PROPOSED COMPOSITE BUILDING U/R

CTS 416

SUB PLOT-(R-1)

LIN

6.00 M WIDE

G

M WIDE DRIVEWAY

95

96

97

207

206

204

98

99

100

101

202

34.83

DIN

SCALE103- 1:200102 361 NOS PARKING

30.57

IL

122

123

124

125

126

127

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

6.00

BU

CTS 415

FHC-2

CTS 383

6.00

19.68

LAYOUT R.G.

STEAM ROOM

WET ZONE

STORE

DRY ZONE

SAUNA

YOGA STUDIO

LAYOUT R.G OPEN TO SKY

Podium Eco-Deck Plan (Seventh Floor).

LAYOUT R.G OPEN TO SKY


Approval Drawings & Area Statement for Tower 1 (Wing - 'A') :

0.60

6

0 0.3

2

5 0.6

5 4.7

23 11.

5

0 2.4

2.1

0

0 4.6

0

8

4.6

5 2.6

7.6

1.7

3

5 2.2

0.5

0 5 2.4

0

0.2

5 0.1

2.2

0 2.0

5

8

0.4

5 1.4

5

1.2 0

1.4

5.30

5.45

2.89

3.25

2.80

2.95

1.4 8

1

3.65

2.25

1.6

0.62

0.68

0.68

1.3 1

1.6

3 2.6

2.4

2

8 1.4

S FIN

7.1 2 R.C C.

0.2

4.15

3.68

4.4

5.78

5.85 7.20 0.45 4.40

1.57

0.60

0 4.2

2.80

1.2 9

0 2.0

2 1.2

4

0.8

5.78 2.25

jja cha

duc t

0

0

UP

5 2.4

2.95 5 5

2.6

2.3

9 2.9

5.85

3.68 3.65

t duc

cha4 jja

5

1.6

0

1.0

8 0.8

0

1.7

5

7.6

8

FHC -2

1.6

1.7

1.1 7 2.2 2x

2 2.7

1.9 5x

E.

1.6 5

1.0 0

cha jja

0 2.0

1.0 6.93 7 M. WI DE .PA SS AG

1.84

2.25 0

2.5

E ES CH CAPE UT E

5.45

0 4.6

2.45

4.15

1.4 8 1.4 7 1.6 2x

1 4.4

2.25

3.65

0.60 1.70x 0.60 1.20

LV SHAFT

FIR

ELECTRICAL SHAFT

4.40

2.45

2.0

2.5

0.60

1.70x 0.60

2.25

1.57 2.95

0.60

0.60

1.08 2.28

0

2.9

9 1.5

2.2

8 2 3.1

2 1.6

3.6 5 9 4.5

S

0

4.1

FIN C. R.C

0 7.8

5

0 2.5

0 1.7

1.0 PA 8 w. SS AG E

5 5.0

1.1 8 2.2 4x

5 1.7

1 1.3

1.6 3x

9

3.6

0

CH AJJ 3.6 A

0 1.5

2 1.6 4.5 0 1.0

1.0

0 0.3

1.08 3.65

7.00

9

5 1.7

8 1.4

1

3

2

5 0.6 5 4.7

23 11.

5

0 2.4

2.1

0

0 4.6

0 4.6

5 2.6

7.6

1.7

3

5 2.2

5.30

5.45

5 0

2.0 5

8 1.6

5

1.2

1.4

2.4

0

0.2

5 0.1

0.4

5 1.4

0

2.89

3.25

6

0.2

3.65

1.6

0.62

0.68

0.68 2.95

0.2

4.15

3.68

4.4

5.78

5.85 0.45 4.40

1.57

0.60 2.80

1.3

1

3 2.6

28

10.

2

07

2.4

S

53

4

FIN

8

1

52

2.1

2

9

1.2

0 4.2

8 1.4

6

51

2.2

C.

8

25

5.1

8.1

9

1.9

8

2.0

29

9

R.C

3

0.2

8

2.2

0.8

7.1

2.25

2.25

5 7.6 JJA CHA

t duc

8 1.4 0 2.5

0 2.0

2

5

27

6

1.2

5.78

7.20 3.65

t

4

duc

1.7 JJA CHA

E. AG SS

8

UP

5 2.4

2.95 5 5

2.80

7 1.4 4x 3.8

2 1.6

.PA

1.6

0

DE

1.0

cha

WI 7 M.

8

0.8

2.7 jja 5

0 2.0

-2

5

FHC

1.6

0 2.0

2.45

1.0

1.84

1.90

0

2.5

E ES CH CAPE UT E

5.45

0 4.6

FIR

ELECTRICAL SHAFT LV SHAFT

2.45

5.85

3.68

1 4.4

2.25

3.65

0.60 1.70x 0.67 1.20

2.70x 0.67

4.40

4.15

8

0.60

2.25

1.57 2.95

0.60

0.60

1.08

1.4

9 2.9

1.5

2.2

8 2

0

5 37

3.6

9 4.5

S

4.9

7

0

4.1

FIN C. R.C

0 7.8

0.6 37a

5

0 1.7

1.0 PA 8 w. SS AG E

8 1.4 5x

0

1.0

1

4.4

37a

36

5

1.3

4

3.9

0

0.6

5.7

1

5

35 40

4.4

1.7 BA TH 5x 1.5 3

1

2

2.4

39

7

1.7

5

1.7

t

3

S

0.5

12

3

0.2

S

FIN

6

6

12

0.2

7

38

4.4 duc

4.9 7 R.C C.

S

FIN

0.9

3.1

42

B2

5

34

5

5

7

4.9

0

5

31

5.4

3.1

2 43

1.9

0.9

9

0 1.5

2 1.6 9 4.5

2

MA BE STER DR 3.3 OO 5x M 3.7 4

7

3.1

1.6

6

0.7

3

5

0.9 33

41

44

1.6

0

0

2.4

6

4.0

8

1.0

3

45

BE DR 3.3 OO 0 x M-3 3.5 0

1.8

3.1

1.4

7

FIN

1.7

C.

C.

30

46

0

4.9

B1

2

0

8

0x

R.C

7

4.9

R.C

3.6 47

2.0

t

1.7

0.6

1.4

1.7

T ILE 0 TO x 1.6 5 2.4 S.S

1.9

duc

7

3

0

0

7.1

0.2

6.7

1.5 W.C 3x 1.5

0

BA 1.9 LCON 0x Y 2.2 8

BA 2.4 TH 5x 3 1.5 2

t

0

7

1.6 9

0.7

1.6

AJJ

3.6 A 0

CH

50

1.0

2.28

2.28

1.08 3.65 1.56

2.14

2.6

2.3

4.1

P3

5

P2

1.5 26

0.8

9

2.1

3

S26a

9

2.9

1.2

0

1.3

7

1.5

7

5.1

P1

0.5

balc.

R.C C. FINS REFUGE

Typical Floor Plan (Type: 2)

Area Diagram for Typical Floor Plan (Type: 2)

TYPICAL FLOOR22nd-27th; PLAN (type 2) (16th-20th; 33th-34th; 36th-37th; 41st; 45th-48th; 50th-55th FLoors)

AREA DIAGRAM FOR TYPICAL FLOOR PLAN (type 2) (16th-20th; 22nd-27th; 33th-34th; 36th-37th; 41st; 45th-48th; 50th-55th FLoors)

balc.

R.C C. FINS

LIVING

balc.

R.C C. FINS

LIVING

LIFT

LIFT

LIVING

LIVING

LIFT

LIFT

LIVING

SCALE - 1:100 (16TH TO 20TH ,22ND TO 27TH, 33TH,34TH,36TH,37TH,41ST,45TH TO 48TH ,50TH TO 55TH Floor)

balc.

R.C C. FINS

SCALE - 1:100 (16th.TO 20TH ,22ND TO 27TH, 33TH,36TH,37TH,41ST,45TH TO 48TH ,50TH TO 55TH Floor)

balc.

R.C C. FINS

LIVING

LIFT

LIFT

LIVING

LIVING

LIFT

LIFT

LIVING

LIVING

LIFT

LIFT

LIVING

LIFT

LIFT

LIFT

LIFT

LIFT

LIFT

balc.

R.C C. FINS

balc.

R.C C. FINS

balc.

R.C C. FINS REFUGE

balc.

R.C C. FINS

LIVING

LIVING

balc.

R.C C. FINS FIRE CHECK 1 R.C C. FINS

LIVING

LIVING

balc.

R.C C. FINS

LIVING

LIFT

LIFT

LIFT

LIFT

LIFT

LIFT

LIFT

LIFT

LIFT

LIFT

LIFT

LIFT

LIVING

R.C C. FINS

LIVING

balc. LIVING

R.C C. FINS

LIVING

balc. LIVING

R.C C. FINS

LIVING

balc. LIVING

balc.

R.C C. FINS

8

6

3 0.2

2 5 2.2

5 4.7

5

11.

0 2.4

2.1

0

0 4.6

0 4.6

5 2.6

7.6

1.7 3

5 0.6

5.30

5.45

0.2 0

5

0

8 1.6

5

1.2

1.4

2.4

5

2.0 5

0.1

0.4

5 1.4

0

2.89

3.25

1.4

1 4.4

2.25

1.6

0.62

0.68

0.68

1

2.95

23

0.45 4.40

1.57

0.60 2.80

9

1.2

1.3

0.2

4.15

3.68

3.65

7.20 2.25

3 2.6

2.4

2

5 7.6 JJA CHA

t duc

8 1.4 0 2.5

0 4.2

1.4 8 S FIN C. R.C

0

0

9

3.6

2.9

9.4

W

9

LO

1.5

E BE AC RR TE

2 3.1

3.6 5

9 4.5

S

4.9

7

5

0 1.0

37

0

4.1

24.

1.6

2 0 1.7

42

1.0 PA 8 w. SS AG E

FIN

0

LO R.C W C.

E BE

0.6 37a

36

TE

1.7 5

RR

4

AC

37a

0

7.8

0

0.6

1.0

8

5

35 40

1

1.1

0.9

5.7

7

5

5

3.1

42

0.9 31

5.4

34

5

5

7

4.9

4.4

4x

5.78

5.85

5.78

5.85

3.68 3.65

4

duc t

1.7

CHA JJA

E. AG SS

0 2.0

2 1.2

AJJ

3.6 A 0

2.80

7 1.4 4x 3.8

2 1.6 8 1.6

.PA DE WI 7 M.

1.0 0

cha

1.0

2.7 jja 5

0 2.0

UP

5 2.4

2.95 5 5

2.6

2.3

9 2.9

4.15

8 1.4

1

3.65 1.84

0.8

0

E ES CH CAPE UT E

2.5

-2

5

FHC

1.6

0 2.0

2

4.4

4.4

1

38

9

7

3 0.2

7

S

FIN

1.7

C.

1.7

5

1.7

R.C

S

0.5

12

3

1.0

39

S.S

FIN

6

0.2

2.45 0 1.5

2 9

43

2

6

0.7

1.6

2.2

7

3.1

8

1.4

0.60

0.60

1.08

4.4

2.25

5.45

0 4.6

FIR

ELECTRICAL SHAFT LV SHAFT

1.6

3 0.9 33

41

44

1.8

4.5

2.0

0

2.4

6

4.0

3

1

30

46

45

1.6

1.3

7

0

2

0x

7.1

3 0.2

47

4.9

1.7

1.7

6.00

6.00

0.60 1.70x 0.67

2.70x 0.67

CH

9

9

07

29

7

1.6 9

0.7

0

7

1.0

9 10.

51

50

6.7

24.00

2.2

53

1

4

2.2

2.80

8

8.1 28

52

2.1

4.00

8

25

5.1 27

6

6

8

2.0

0

4.1

P3

5

0.8

0.8

2.80

P2

1.5 26

9

1.20

2.45

2.60

6.00

S26a

1.3

7

8

7

5.1

2.1

3

0

5

0

1.5

1.4

1.4

4.05

5

S27

1.2

0.3

3.3

P1

3

8

1.9

1.9

24

0.1 5 0

2.0

0.2

4 4.1 54

6

22

B1

3

S21

55

56

BA 2.4 TH 5x 1.5 3

4.9 7 R.C C.

7

0.9

S26

3.2

2

5.1

2

S13

5

2.2

S5

0.6

1

2.7

0.7 S25

3.5 S23

S6

0 2.4

57

7

8

0x

W

S

FIN

1.75

1.21

S22

2

5

2.6

8

4.2

58

0

S20

S19

8

2.2

MA BE STER DR 3.3 OO 5x M 3.7 4

5

1.4

1.7

LO

C.

S18

17 16

4

3.1

S24

0.68

7.27 S15

11.40

2.5

0.6

P5

5

8

E BE 7

4.9

R.C

S14

8

18

2.7 20

3.5 21

0

5

0.1

0

2.0 0.4

3.1

6

19

2.5

5 2.4

0

1.0

1.1

AC

RR

TE

9x

2.2

2

7.6

0

0.90

S12

3.59

5

S3a

0

0.2

0

S3

P6

5

2.0

2.4

5

5

1

E

4.4

AG

57

T ILE 0 TO x 1.6 5 2.4

0.6

2.89

8

S4

S.S

BE DR 3.3 OO 0 x M-3 3.5 0

BE DR 3.1 OO 2 x M-2 4.2 1

3.21

0

0.6 5 3.1 JA AJ CH

1.6

S17

S7

2.6

8.0

BA 2.4 TH 5x 3 1.5 2

PW 1.5 D RM 3x 1.5 0

3.70

P4

0.2

60

0.25

5

0.5

59

3.47

S10 S11

S8

3.3

0

3.9

0

4.8

t

0.58 0.68

1.57

S9

5

SS

3 M3

19.

4.05

5

S2

S1

6

6

0

1.0

12

0.5

0.7

0

0

4.1

2

2

4

3.5

5

4.4 11

4.2

4.0 13 2

15

2.7

0.75

8

Y

3.35

S16

0.45 0.45

0.23

0.23

8b

S16a

4.9

duc

BA 2.4 TH-2 5x 1.5 3

8a

0

7

ice

S.S

0.23

2.0

SR1

0

3 1.6

S.S

OO DR BE 2 x 4.0 3.1 ER ST M MADROO 4 BE 5 x 3.7 3.3

S.S

serv

3

7

1.7

7

PA 6 6.8M.W. 8 1.0

1.4

2

3.2

1.6

0

T ILE 2 1.5

TO 5x 2.4

9a

3.60

9

1.7

1.5

E

E CH

0.5

8.5

2

W

LIFT PIT

LIV ING 8x 5.5 7

4.8

2.0

LO

E BE

AC

RR

0

t

duc

3.3

M OO 5 DR BE 5 x 3.3 3.3

0

5

14

10

10

5.7

5.1

PETAL - 2

2.0 S.S

0

1.6

e 2 1.6 servic

6

0.7

GA

23

0

1

0

3.3

2.65

1

AG

RB

32

5

4.6

61

1.9 BA LC 1.9 ON 0X 2.5 Y 0

1.9

3

2

UT

7

1.6 49

BE DR 3.5 OOM 0x 3.4 -4 4

1.2

1.62

8

5

0

0.4

48

0

8

1.6

JA

S

LIFT PIT

BA 2.4 TH 5x 4 1.5 3

8

8x

DIN ING 0x 3.4 2

7

6.1

TE

FIN

LIFT

R

8 x 2.3

1.2

3.3

3

LIFT

YE

1.2

.I.

FO YE 8x R 1.5 0

2.8

5

6

2.4

C W. 2 x 1.5 9 1.6

T ILE TO 1.52 4x 2.6

S.S

LIFT

1 PODIUM

5

0

F.S

6

4.27

6

2

4.1

3.0

JA AJ CH2.14

AJ

C.

LIFT

IN

UT ILIT 1.5 0 x Y RM 2.3 1

KIT 4.6 CHEN 5x 2.7 4

1.9

JA

CH

R.C

2 PODIUM

TO ILE 3x T 1.3 7

1.3 3 0.8 x 4

2.12

7

1

5

7

AJ

0

3 PODIUM

1.9

CH

8

4.2

NING \ DI ING x 6.10 7 4.8

LIV

TED

5

3.2

1.2

N HE 5 KITCx 2.7 0 4.1

5

UN

SER 1.23 V. DUC x 1.50 T

5

2.7

4

1

0.8

2.0

CO

2.7 LIFT 5X 2.4

0.7

1.06

0

0

0.8

3.4

0.3

LIFT

ING

FO

2.19

7

0.23

DIN

LIV 6.1 ING 0x4 .87

SL-02

3.80

4

5

BE DR 3.3 OOM 0x 3.3 -2 5

BA 2.2 TH9x 2 1.5 2

0

11.40

6

0.9

1 1.6 t duc

4

7

LIFT

1.2

. WC x 5 1.5 4 1.2

3

2.20

6

3.60

3.0

5

2.7

3x 0.9 7 0.9

LIFT 2.35 X 2.55

0

C-1 FH 3 x 0.9 2 1.3

TY ILI UTRM. 2 2.2 4x 1.5

LIFT 2.35 X 2.55

9 cuto 1.6 ut 8

1.5 W.C 3X 1.6

5

0)

2.4

.I.

F.S

8

1.3

LIFT 2.35 X 2.55

2.5

7

t

t

2.2

2

PL-04

0

2.1

1.4

4 PODIUM

LIFT 2.35 X 2.55

1.0 duc

KIT 4.0 CHEN 0x 2.6 0

duc

0

0

G. <1.5

1.5

PL-03

BA 2.5 TH9x 3 1.5 2

serv ice duc t

2.0

(AV

2.0

PL-02

MA BE STER DR 3.3 OO 5x M 3.7 4

0

5

7

8.5

3X

t

5 PODIUM

LIFT LOBBY

2.4

D IN

NTE

1 1.6

8X 1.3 3 3.0 2 TH BA 5 x 2.4 3 1.5

PETAL - 3

2.0

0

0

0

2.0

COU

R

YE

FO

-01 SL T LIF 2.10 5X 2.7

duc

LIFT

0

1.5

7.93

PL-01

0

A

M-2 OO 0 DR BE 0 X 3.2 3.9

ECO DECK

LIFT

4.3

PL-05

LIFT 3.65 X 2.43

0

2.3

2.0

R YE FO 2.25 7X 1.3 2

ECO DECK

6 PODIUM

cha1.76 jja

3.50

M. TO ILE 5x T 1.5 9

1

CHAJJA

6.25

LIFT 3.65 X 2.43

LIFT LOBBY

5.03 )

. <1.50

(AVG

0

1.5

AJJ

LIFT

CHAJJA

2.30

5

2.05

4

2.4

0.3

0

0.9

ING \ DIN 9 ING 3.4 LIV 3 X 5.4 CH

LIFT

2.06

4.17

C-1

FH

0.6

2.0

0X

3.4

2.20

3

2.65

BE DR 3.0 OO 5 x M-3 3.9 6

5

0

. W.C 1.17 3x

CHAJJA

REFUGE

7

3.7

0

4.8

1.2

0

2.0

ET OIL 8 M.T x 2.4 3 1.4

CHAJJA

CT

2.2

1.9

balc.

4

DU

balc. LIVING

0

LIFT

3

service duct

0

LIFT

LIFT

4.9

0.6

duct

0.23

5

0

1.8 5

2.0

LIVING

D10

E BAG GAR TE CHU 820 0x2 150

EN CH 5 KIT X 2.7 5 3.0

1.5 . RV SE T ILE TO

CHA

MA

UP

LIFT

2 FLOOR R.C C. FINS

0.45

M.BED ROOM 4.05x3.35

M.TOILET 1.59x2.15

PL-06

JJA

OO DR R BE 5 STE 0 X 3.3 3.6

1.75

8

2.5

5

M

balc. LIVING

1 FLOOR

5

8

2.4

LIVING

LIFT

CHAJJA

1.83

3.0

LIFT

LIVING

2.30

W.C. 1.59x1.53

1.90

5

5

LIVING

3 FLOOR R.C C. FINS

CHAJJA

6.25

FOYER 1.59x1.35

1.20

CHAJJA

balc.

FOYER 1.60x1.35

0

LIFT

duct

4.1

R.C C. FINS

service duct

LIVING

4 FLOOR

W.C. 1.60x1.53

3.95

5

4.27

jja

3.1

R.C C. FINS

LIVING / DINING 3.35x5.55

1.0

LIFT

M.TOILET 1.60x2.15

4.40

LIVING

M.BED ROOM 4.05x3.35

2.25

R.C C. FINS

3.95

1.62

cha TOILET 1.48 x 2.13

2.65 LIVING / DINING 3.35x5.55

balc.

5 FLOOR

1.62

BED ROOM 3.42x3.30

KITCHEN 3.02x2.75

LIVING

LIFT

R.C C. FINS 3.95

12.95

KITCHEN 3.02x2.75

2.95

LIFT

R.C C. FINS

duct

BED ROOM 3.42x3.30

TOILET 1.48 x 2.13

2.14

LIVING

PETAL - 1

0.60

R.C C. FINS 3.95

duct

2.28

balc.

2.28

1.08

LIVING

R.C C. FINS 2.65

R.C C. FINS

0.75

Y

balc. 1.62

LIVING

1.57

REFUGE

R.C C. FINS

3.65

3.35 3.35 3.35

1.4 7

5

0

24

0.1 5 0

2.0 S27

0.3

3.3

5

2.2

3.35

S26

0

1.9

B1

3

S21

56

4 4.1 54

6

22

7

0.9

S13

S6

55

5.1

2

3.2

2

0.6

1

2.7

0.7 S25

3.5 S23

0

S5

7

3.35

1.75

1.21

S22

2

57

58

0

S20

S19

8

2.2

3.35

S18

17 16

4

3.1

S24

0.68

7.27 S15

11.40

2.5

0.6 5

2.6

5

3.35

S14

8

18

2.7 20

3.5 21

0

5

2.4

0.4

229.70

6

19

2.5

5

2.6

0

P5

5

2.4

3.35

0.90

S12

S7

3.59

2.89

8

0.1

0

0.2

0

5

2.0

2.4

5

3.35

1.6

S17

0

8

3.35

0.25

8.0

S3a

2.0

8

4.2

2.5

0

1.0

LIVING

duc

BE DR 3.1 OO 2 x M-2 4.2 1

1

LIFT

4.4

LIFT

LIFT

3

LIFT

LIVING

1.6

LIVING

3

LIVING

LIFT

1.6

LIFT

LIFT

ice

t

3.21

0

0.6 5 3.1 JA AJ CH

1.1

LIFT

LIVING

3 M3

9x

LIVING

P6

60

LIV ING 8x 5.5 0

serv

duc

BA 2.4 TH-2 5x 1.5 3

OO DR BE 2 x 4.0 3.1 ER ST M MADROO 4 BE 5 x 3.7 3.3

balc.

R.C C. FINS

S.S

T ILE TO 1.52 5x 2.4

2.2

R.C C. FINS

2

Y

8

2

M OO 5 DR BE 5 x 3.3 3.3

balc.

S3

4.8

DIN ING 0x 3.4 2

2.0

LIVING

5

0.2

1.4

8

LIFT

balc.

R.C C. FINS

PETAL - 2

3.47

S10 S11

S8

3.3

S4

0

0

3.3

6

0.7

0.58 0.68

1.57

S9

0

3.9 5

0.5

6

6

3.70

P4

1.9

t

duc

e 2 1.6 servic

T ILE TO 1.52 4x 2.6

S.S

S2

S1

12

0.5

0.7

1.6

LIFT

1

1.4

E

LIVING

C W. 2 x 1.5 9 1.6

Y ON 0 LC BA x 2.5 0 1.9

0

2

2

4

0

1.0

8

5.1

4.4 11

4.2

4.0 13 2

15

2.7

0

duc

t

S16a

0

4.1

BE DR 3.5 OOM 0x 3.4 -4 4

0

3.35

S16

0.45 0.45

0.23

0.23

8b

3.5

5

59

BA 2.4 TH 5x 4 1.5 3

8

1.2

1.6

0

1.9

SR1

0.5

0

R

8 x 2.3

8x

8a

0.75

61

1

1.9

YE

1.2

.I.

FO YE 8x R 1.5 0

1.2

3.3

AG

LIVING

5

0

F.S

2.8

5

6

SS

LIVING

LIFT

IN

UT ILIT 1.5 0 x Y RM 2.3 1

KIT 4.6 CHEN 5x 2.7 4

1.9

JA

AJ

CH

8

4.2

PA 6 6.8M.W. 8 1.0

LIFT

LIFT

1.3 3 0.8 x 4

0.23

0

0

7

2.4

JA

LIFT

LIVING

TO ILE 3x T 1.3 7

1.2

1.9

FO

6

3.2

1

0.8

N HE 5 KITCx 2.7 0 4.1

NING \ DI ING x 6.10 7 4.8

LIV

TED

5

4

0

0

0.8

2.0

UN

SER 1.23 V. DUC x 1.50 T

5

2.7

0.7

1.06

CO

2.7 LIFT 5X 2.4

11.40

6

0.9

1 1.6 t duc

SL-02

9a

3.60

9

5.7

4.8

LIFT 2.35 X 2.55

GA

23

5

. WC x 5 1.5 4 1.2

LIFT 2.35 X 2.55

5

14

10

1.7

1.5

E

UT

E CH

AG

RB

32

5

4.6

1.9 BA LC 1.9 ON 0X 2.5 Y 0

3.3

2.65

1

7

5

2.7

3x 0.9 7 0.9

LIFT 2.35 X 2.55

7

LIVING

ING

3

2

4.9

LIFT 2.35 X 2.55

1.62

5

0

0.4

7

1.6 49

8.5

C-1 FH 3 x 0.9 2 1.3

TY ILI UTRM. 2 2.2 4x 1.5

t

balc.

R.C C. FINS

DIN

7

8

10

0.23

LIV 6.1 ING 0x4 .87

0

4.27

6

2

4.1

48

0)

2

2.12

4 7

5

BE DR 3.3 OOM 0x 3.3 -2 5

BA 2.2 TH9x 2 1.5 2

0

G. <1.5

PL-04

2.19

1

0

.I.

F.S

8

1.3

3X

3

5

2.0

(AV

2.0

PL-03

9 cuto 1.6 ut 8

3.2

LIFT LOBBY

PL-02

2.5

1.5 W.C 3X 1.6

3.80

5

7.93

PL-01

7

t

t

2.2

3.0

4.17

)

1.0 duc

KIT 4.0 CHEN 0x 2.6 0

duc

0

2.20

6

3.60

0

D IN

NTE

1 1.6

8X 1.3 3 3.0

duc

PETAL - 3

balc.

R.C C. FINS

2.0

0

0

2.3

MA BE STER DR 3.3 OO 5x M 3.7 4

3.0

LIVING

0

1.5

JA AJ CH2.14

LIVING

cha1.76 jja

4.3

PL-05

LIFT 3.65 X 2.43

M. TO ILE 5x T 1.5 9

1

BA 2.5 TH9x 3 1.5 2

2.05

4

2.4

0.6

serv ice duc t

5

4.27

3

2.65

BE DR 3.0 OO 5 x M-3 3.9 6

CHAJJA

6.25

LIFT 3.65 X 2.43

3.50

0

LIFT

0

2.0

COU

R

YE

FO

2 TH BA 5 x 2.4 3 1.5

4

LIFT

M-2 OO 0 DR BE 0 X 3.2 3.9

balc.

R.C C. FINS

CHAJJA

2.30

2.4

R YE FO 2.25 7X 1.3 2

balc.

-01 SL T LIF 2.10 5X 2.7

1.2

LIVING

2.06

0

LIVING

LIFT

2.20

1.5

0

1.5

ING \ DIN 9 ING 3.4 LIV 3 X 5.4

2.1

LIFT

LIFT

CHAJJA

LIFT LOBBY

5.03

5

LIFT

4

service duct

2.4

LIVING

REFUGE

0.6

. <1.50

(AVG

1.9

balc.

R.C C. FINS

7

0

0

0.9

. W.C 1.17 3x

R.C C. FINS

4.9

0.3

0X

3.4

3

M.BED ROOM 4.05x3.35

3.95

5

1.62

5

5

0

0

2.0

ET OIL 8 M.T x 2.4 3 1.4

C-1

LIVING

FH

LIVING

LIFT

0

LIFT

LIFT

1.2

AJ

68.80

AREA DIAGRAM FOR TYPICAL FLOOR PLAN (type 1)

jja

3.1

R.C C. FINS

duct

CH

3.35

6

SCALE - 1:100 (2ND.To 6th.,8th.To13th.&15th.)

3.95

M.TOILET 1.59x2.15

0.23

5

0

1.8 5

2.2

4.8

LIFT

LIVING

0.45

FOYER 1.59x1.35

W.C. 1.59x1.53

0

LIVING

D10

E BAG GAR TE CHU 820 0x2 150

2.0

3.35

0.5 12

(2nd to 6th; 8th to 13th & 15th Floors)

cha TOILET 1.48 x 2.13

PL-06

CHA

EN CH 5 KIT X 2.7 5 3.0

balc.

R.C C. FINS

1.75

FOYER 1.60x1.35

CT

3.35

1

Area Diagram for Typical Floor Plan (Type: 1)

1.62

BED ROOM 3.42x3.30

LIVING / DINING 3.35x5.55

DU

R.C C. FINS

CHAJJA

1.83

7

2.5

JJA

OO DR R BE 5 STE 0 X 3.3 3.6

MA

1.56

3.35 3.35 3.35 3.35 3.35 1.80 3.35 3.35 3.35 3.35 3.35 3.35 3.35 3.35 3.35 3.35 68.80

3.35 3.35 3.35 3.35 3.35 3.35 3.35 3.35 3.35 3.35 1.80

2.4

M

balc.

2

3.35

4.4 38

7

5

5

4.1

LIVING

7.6

3.35

7

12

5

LIFT

R.C C. FINS 3.95

12.95

0

3.35

35

4.9

6

3.7

LIFT

LIFT

2.30

0

LIVING

CHAJJA

6.25

2.0

3.35

37

0

36

2.0

R.C C. FINS

service duct

1.5 . RV SE T ILE TO

LIFT

CHAJJA

7

3.35

0.6 37a

2

S

KITCHEN 3.02x2.75

W.C. 1.60x1.53

0

3.35

0

1.0

1

4.4

37a

1.7

R.C C. FINS FIRE CHECK 2

M.TOILET 1.60x2.15

2.0

3.35

0

0.6

39

0

balc.

7

1.80

5

4.4 t

FIN

PETAL - 1 R.C C. FINS

KITCHEN 3.02x2.75

duct

1.4

3.35

0.9

duc

0.3

LIVING

LIFT

1.4

3.35

40

BA TH 5x 1.5 3

C.

duct

M.BED ROOM 4.05x3.35

5

3.35

B3

5

4

R.C C. FINS 3.95

BED ROOM 3.42x3.30

TOILET 1.48 x 2.13

3.0

3.35

2

4.9

42

2.65

0

3.35

1.6

43

0

5

5.4

34

5

3.1

0.5

LIVING / DINING 3.35x5.55

2.5

3.35

7

3.1 5

7

5.7

R.C C. FINS 2.65

0 3.9 S FIN C.

3.35

0.9 33

41

44

3

LIFT

6 FLOOR 3.35

3

0

2.4

6

4.0

1.6

LIVING

7 FLOOR

3.35

0

2.0

45

1.9

0.9 31

0

4.9

6

0.7 8

R.C C. FINS

8 FLOOR

3.35

7

30

2.4

R.C

S

FIN

balc.

9 FLOOR

26.10

7.1

0.3 47

0

0.5

1.8

LIFT

12 FLOOR

3.35

4

9

B2

B1

2

LIFT

11 FLOOR

70.20

2.1

2.2

29

7

46

Y

LIVING

13 FLOOR

3.35

9

6

07

1.6

1.7

LIVING

14 FLOOR

4.00

2.2

0.8

10.

9

0

R.C C. FINS

15 FLOOR

2.90

6

1

52

0.7

0

1.4

2.5

MA BE STER DR 3.3 OO 5x M 3.6 7

duct

balc.

25 FLOOR

2.90

0.8

8.1 28

51

0

5

7

C.

balc. LIVING

26 FLOOR

24.00

8

9

1.3

7

1.5

8

6.7

LIFT

1.62

REFUGE

27 FLOOR

2.90

5

2.2

0

7

LIFT

R.C C. FINS

29 FLOOR

2.90

3.59

2.89

5

2.6

2.4

5.1 27

53

balc.

30 FLOOR

12

6

0.5

7.0

3

7.0

2.00

GR. FLOOR LVL. 0.30

0.25

0

0.2

25

26

0

0.3

1

1.9

2.0

0

8

LIVING

31 FLOOR

24.00

5

P2

1.5

5

0

2.2

LIFT

32 FLOOR

2.20

2.0

0

5

2.0

2.4

5

LIFT

33 FLOOR

ROAD LVL. - 2.20 M.

0.4

LIVING

34 FLOOR

LVL. + 0.30 M.

S26a

S21

55

4 4.1 54

1.9 B3

4.1

P3

5

TACO

t

Built-up Area Statement for Wing 'A'

787.73 684.27 684.27 641.41 787.73 681.53 39727.60

5.1

2.1

3

0

LIVING

8 2.4

0.00 0.00 0.00 14.01 0.00 0.00 112.08

5

R.C C. FINS

duc

2.17

0.00 0.00 0.00 16.94 0.00 0.00 92.76

5

S6

S27

1.2

0.3

LIVING

5

228.48 228.48 228.48 228.48 228.48 228.48 13251.84

2.4

LIFT

3.7

1478.68

1019.40 915.93 915.93 940.40 1019.40 913.19 53153.26

690.61 690.61 577.59 690.61 690.61 732.44 687.19 732.44 690.61 621.36 692.50 735.00 690.61 690.61 690.61 690.61 604.79 690.61 690.61 690.61

5

LIFT

LIFT

AJJ

98.28

0.00 0.00 14.01 0.00 0.00 0.00 0.00 0.00 0.00 14.01 0.00 0.00 0.00 0.00 0.00 0.00 14.01 0.00 0.00 0.00

8.0

LIFT

30.00

197.20

0.00 0.00 5.94 0.00 0.00 0.00 0.00 0.00 0.00 5.53 0.00 0.00 0.00 0.00 0.00 0.00 33.14 0.00 0.00 0.00

0

LIVING

5 4.0 A

197.20

228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48

690.32 580.87 690.32 690.32 690.32 690.32 690.32 690.32 580.87 690.32 690.32 690.32 690.32 690.32 690.32 575.20 742.76 687.61 787.73 684.27

4.8

LIVING

R.C C. FINS

CH

197.20

922.27 922.27 803.31 922.27 922.27 964.10 918.85 964.10 922.27 847.50 924.16 966.66 922.27 922.27 922.27 922.27 803.31 922.27 922.27 922.27

0.00 14.01 0.00 0.00 0.00 0.00 0.00 0.00 14.01 0.00 0.00 0.00 0.00 0.00 0.00 14.01 0.00 0.00 0.00 0.00

S26

24

0.1 5 0

2.0

P1

TACO

10 FLOOR

0.00 9.22 0.00 0.00 0.00 0.00 0.00 0.00 9.22 0.00 0.00 0.00 0.00 0.00 0.00 3.55 0.00 0.00 0.00 0.00

3

S22

56

6

22

7

0.9

3.3 3.2

2

5.1

2

LIVING

R.C

197.20

228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48

5

R.C C. FINS

0

197.20

921.98 803.31 921.98 921.98 921.98 921.98 921.98 921.98 803.31 921.98 921.98 921.98 921.98 921.98 921.98 803.31 974.42 919.27 1019.40 915.93

S5

0.6

1

2.7

0.7 S25

3.5 S23

LIVING

0.3

197.20

t

4.9

7

4.9

R.C

7

197.20

4.9

LIFT

16 FLOOR

0.00 0.00 0.00 0.00 0.00 0.00 14.01 0.00 0.00 0.00 0.00 0.00

57

7

8

LIFT

LIFT

17 FLOOR

0.00 0.00 0.00 0.00 0.00 0.00 9.22 0.00 0.00 0.00 0.00 0.00

5

2.6

8

2.2

LIFT

18 FLOOR

2.17

1.75

1.21

8

0.6

P5

0

S20

S19

2.5

2

58

8

LIVING

19 FLOOR

3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 557.64 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 FIRE CHK FLOOR 3.18 690.32 3.18 557.64 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 557.64 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 690.32 3.18 557.64 3.18 742.76 3.18 687.61 3.18 787.73 3.18 684.27 FIRE CHK FLOOR 3.18 690.61 3.18 690.61 3.18 557.64 3.18 690.61 3.18 690.61 3.18 732.44 3.18 687.19 3.18 732.44 3.18 690.61 3.18 601.82 3.18 692.50 3.18 735.00 3.18 690.61 3.18 690.61 3.18 690.61 3.18 690.61 3.18 557.64 3.18 690.61 3.18 690.61 3.18 690.61 FIRE CHK FLOOR 3.18 787.73 3.18 684.27 3.18 684.27 3.18 610.46 3.18 787.73 3.18 681.53 184.44 39520.59

S18

S13

balc.

20 FLOOR

228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48 228.48

0.68

7.27 S15

11.40

balc.

21 FLOOR

921.98 921.98 921.98 921.98 921.98 921.98 803.31 921.98 921.98 921.98 921.98 921.98

5

0.1

0

2.0

0

21

3.1

S24

LIVING

22 FLOOR

1 2 3 4 5 6 7 (Refuge) 8 9 10 11 12 12(a) 13 14 (Refuge) 15 16 17 18 19 20 21 (Refuge) 22 23 24 25 26 27 28 (Refuge) 29 30 31 32 32(a) 33 34 35 (Refuge) 36 37 38 39 40 41 42 (Refuge) 43 44 45 46 47 48 49 (Refuge) 50 51 52 52(a) 53 54 55 56 (Refuge) 57 58 TOTAL

S3

P6

60

1.4

LIVING

R.C C. FINS

35 FLOOR

NET BUILT-UP AREA PROPOSED (A+B+C+D) 692.49 690.32 690.32 690.32 690.32 690.32 580.87 690.32 690.32 690.32 690.32 690.32

0

LIFT

24 FLOOR

BUILT-UP DUCT EXCESS NET PROPOSED METER SERVICE SERVANT AREA ONCE IN REFUGE REFUGE CONSTRUCTION CORE AREA TOILET PROPOSED (A) F.S.I (B) AREA (C) ROOM (D) AREA AREA

3.2

LIFT

23 FLOOR

FLOORS

S14

17 16

4

3.5

LIVING

36 FLOOR

BUILT-UP AREA STATEMENT OF WING -A

5

LIFT

37 FLOOR

Area Statement.

0.90

S12

S7

8

18

2.7 20

0

R.C C. FINS

38 FLOOR

= 11226.97 Sq.mt = 28454.32 Sq.mt

3.0

LIFT

1.4

FUNGIBLE PROPOSED NET BUILT UP AREA ( A - C ) i.e. (39681.29 - 11226.97 )

5

LIVING

7

C)

0.8

REFUGE

R.C C. FINS

28 FLOOR

D)

4

6

19

D3

1.0

balc.

R.C C. FINS

39 FLOOR

= 13888.45 Sq.mt

2.7

1.6

S17

balc.

8.5

FUNGIBLE PERMISSIBLE

8

6

LIVING

A

B)

3.47

S10 S11

S8

3.3

S4 S3a

12

0.5

6

LIVING

40 FLOOR

= 39681.29 Sq.mt

( TOWER 1 : WING 'A' )

LIFT

AJJ

GROSS BUILT UP AREA

LIVING

CH

A)

LIVING

R.C C. FINS

41 FLOOR

137741.75

T ILE 2 TO x 1.5 5 2.4

UP

0.00

R.C C. FINS

5

Total Sale BUA Claimed including Fungible

LIFT

LIFT

balc.

8

0.00

LIFT

LIVING

t

28.67

0.00

LIFT

2.4

0.00

d) Commercial Fungible claimed

LIFT

duc

c) Commercial Fungible Permissible

LIVING

3.7

13294.10

0.58 0.68

1.57

S9

0

3.9 5

0.5

2

2

15

3.70

P4

5

0.2

4.2

SCALE - 1:100 (2nd.To 6th.,8th.To13th.&15th.)

AJJ

43506.51

0.00

S2

S1

59

TYPICAL FLOOR PLAN (type 1) (2nd to 6th; 8th to 13th & 15th Floors)

5 4.0 A

0.00

b) Residential Fungible claimed ( 5095.16 + 53.94 + 8145.00)

R.C C. FINS

CH

a) Residential Fungible Permissible

0

Typical Floor Plan (Type: 1)

LIVING

42 FLOOR

0.00

3.35

S16

4.4 11

4.2

4.0 13 2

0.7

3.60

9

0

1.0

5.1

7

0.00

S16a

0

Y

8b

0.45 0.45

0.30

0.30

3.5

5

8.5

Fungible Statement

LIFT

balc.

43 FLOOR

143.33

8a

0.75

4.1

0

0.00

SR1

23

61

3.0

c) Sale Commercial BUA Approved

0

124304.32

0.3

0.00

b) Sale Residential BUA Approved (107127.46 + 17176.86 )

5

52656.97

3.7

37852.60

0

0.00

--

0.30

0

50

BA 1.9 LCON 0x Y 2.2 8 duc

BE DR 3.0 OO 5 x M-2 4.1 4

3.1

0

7 1.4

0.00 14804.37

Proposed BUA

a) Rehab Building / PTC

LIFT

LIFT

balc. LIVING

44 FLOOR

136490.97

0.6

8

54169.90

10

10

5.7

BE DR 3.3 OO 5 x M-3 3.5 0

8

1.4

47773.32

LIFT

R.C C. FINS

45 FLOOR

52656.97

34547.75

2x 1.6

Total permissible sale BUA in-situ as per revised LOI dt. 16/2/2017

37852.60

--

0

3.21

0

0.6 5 3.1 JA AJ CH

8

14804

GA

0.5

PETAL - 2 t

BA 2.4 TH 5x 3 1.5 2

1.5 W.C 3x 1.5

1.0

1.0

-189270.40

5

5

14

1.7

1.5

E

UT

E CH

AG

RB

32

4.6

3.3

2.65

5

0

duc

0

9a

0.30

D2

0.4

7

1.6 49

3

8

2

5

48

BE DR 3.5 OOM 0x 3.3 -4 8

1.2

1.62

6

2

1.0

4.1

LIV ING 8x 5.5 0

t

t

BA 2.4 TH-2 5x 1.5 3

1

4.00 92138.64

S.S

T ILE 2 1.5

4.4

2.00 47773.32

8x

4.27

4

3.60

5

BA 2.4 TH 5x 4 1.5 3

8

1.2

5

2.12

7

1

4.8

duc

duc

3

2.50 49358.44

5

0.7

1.6

20

Total permissible Rehab BUA as per revised LOI dt. 16/2/2017

t

e duc

vic

ser

ice

3

Permissible FSI Total BUA Permissible for Scheme

1.6

18 19

2

--

8 x 2.3

.I.

FO YE 8x R 1.5 0

2.8

DIN ING 7x 3.3 5

2.0

NA

1.2

F.S

6

UT ILIT 1.5 0 x Y RM 2.3 1

2.13

1

0

1.1

NA

IN

R

3.80

7

1.9

2x 2.2

NA

8

FSI in lieu of premium to MCGM (0.5 X (1))

3

serv

TO 5x 2.4

S.S

M. TO ILE 5x T 1.5 2

BE DR 3.3 OOM 0x 3.3 -2 5

BA LC 1.9 ON 0X 2.2 Y 8

YE

2.13

6

1.6

17

JA AJ CH 4 2.1

24609.63

0

NA

2.4

65941.73

24609.63

JA

E

23034.66

NA

TO ILE 3x T 1.3 7

1.3 1.3 3 0.8 x 4

FO

5

AG SS

23163.69

TDR to be loaded on gross plot as per G.R 02/05/2016

SER 1.23 V. DUC x 1.50 T

5

5

0

4.3

PA

19743.38

16

4

--

1.2

--

0

--

2.1

19743.38

5

7687.60 50971.70

2.4

7687.60 23034.66

C-1

Plot area to be considered for base FSI 1(1-10)

-8193.66

FH

Total area for FSI Consideration.

-19743.38

0

Balance Plot Area

4.8

Add back area for 33(10) & Area for FSI in 32.

5

43284.10

2.0

4930.07

15347.06

15347.06

TED

7

S

--

8193.66

2.0

UN

3.95 D1

2.12

2.4

BA 2.2 TH9x 2 1.5 2

5

KIT 4.6 CHEN 5x 2.7 4

1.9

1.6

7

1445.94

LIVING

46 FLOOR

48214.16

9639.60

3484.13 19743.38

1

0.4

ut

0.65

D1

4

balc.

R.C C. FINS 47 FLOOR

22657.63

23227.50

LIVING

FIN

Net plot area

LIVING

LIFT

1.7

Balance Plot Area Less 15% R.G For Scheme DCR 33(14)D & DCR 32.

LIFT

LIFT

48 FLOOR

8511.87

7687.60

LIFT

balc. LIVING

2.2

CO

5

2.7

7

3 MOO 6 DR BE 5 x 3.9 3.0

C.

14970.03

0

Total

1062.40

5963.42

REFUGE

R.C C. FINS

SL-02

2.7 LIFT 5X 2.4

3.2

6

ER ST M MADROO 7 BE 5 x 3.6 3.3

R.C

10265.71

2548.45

R.C C. FINS 49 FLOOR

8

3

3

2.65

8

1.9

2.4

W.

539.18

1297.75

24

balc.

cuto

1.6

LIV 6.1 ING 0x4 .87

1.2

8 M. 1.0

--

8967.96

27.83

JA AJ CH

539.18

--

1034.57

--

0

--

vi) D.P. Road

23

LIVING

2

v) Housing for Dishoused

7

22

balc.

R.C C. FINS

7.6

--

6

21

LIVING

7

III) Municipal Primary School iv) Recreation Ground -I, II, & III.

15

LIFT

51 FLOOR

9

1.5 W.C 3X 1.6

0

4

5

2

7

0)

0.7

1.06

2.5

M OO 5 DR BE 5 x 3.3 3.3

7

t

t

0

G. <1.5

0

2

6

0.7

2.5

serv ice duc t

1.0 duc

KIT 3.0 CHEN 0x 2.6 0

duc

0

2

LIFT 2.35 X 2.55

1

CH

4.9

MA BE STER DR 3.3 OO 5x M 3.6 7

2.0

(AV

PL-04

LIFT 2.35 X 2.55

0.8

1.6

T ILE TO 1.52 4x 2.6

S.S

1.7

4 5

13

LIFT

Y ON 0 LC BA 0 x 2.5 1.9

0

1806.08

12

LIVING

PL-03

LIFT 2.35 X 2.55

11.40

6

0.9

D RM PW1.52 x 3 1.6

1.9

2.5

472.39

322.00

0

76.60

1484.08

14

LIVING

LIFT

2.0

0

t

0 duc

0.8

4.2

NING \ DI ING x 6.10 7 4.8

LIV

3.9

395.79

--

9

LIFT

LIFT

0

1.5

LIFT LOBBY

PL-02

LIFT 2.35 X 2.55

6

jja

2.0

PL-01

S

--

ii) Play Ground (As per Reconstruction)

11

LIFT

1.7 cha

LIFT 3.65 X 2.43

BA 2.5 TH9x 3 1.5 2

CHAJJA

4.3

PL-05

7.93

)

1

0

LIVING

6.25

CHAJJA

LIFT 3.65 X 2.43

3.50

1.6

. WC x 5 1.5 4 1.2

8

LIFT

balc.

R.C C. FINS

2.30

1.5

N HE 5 KITCx 2.7 0 4.1

FIN

i) Retail Market (As per Reconstruction)

3

10

LIFT

LIVING

50 FLOOR

2

8

R.C C. FINS

2.13

AJ

PETAL - 3

balc.

R.C C. FINS FIRE CHECK 3

C.

70871.79

5

2.7

3x 0.9 7 0.9

TY ILI UTRM. 2 2.2 4x 1.5

duc

0 R.C

23034.66

C-1 FH 3 x 0.9 2 1.3

8

1.3

3X

1.6

8X 1.3 3 3.0

0.3

24609.63

1

-01 SL T LIF 2.10 5X 2.7

.I.

F.S

7

23227.50

NTE

FO

2 TH BA 5 x 2.4 3 1.5

LIVING

52 FLOOR

Less Area Under Reservation

D IN

COU

R

YE

OO DR 3.2 BE 0 X 3.9

1.4

PLOT AREA

--

7 JA 8.5 AJ CH

1

33(10)

2 0

0

2.0

t

LIVING

53 FLOOR

Total

R YE FO 7 X 1.3 5 2.2 2

balc.

R.C C. FINS

2.13

0

2.3

0.6

duct

CHAJJA

LIFT LOBBY

5.03

2.0

LIVING

4

CT DU

LIFT

0

LIFT

FOYER 1.53x1.35

3

0.4 5 0.92

. <1.50

M-

LIVING

54 FLOOR

1.68

FOYER 1.53x1.35

4.17

(AVG

0

1.5

\ ING LIV NING 5 DI X 3.3 3 5.4

balc.

R.C C. FINS

0

0

0.9

0X

C. W. 1.17 3x

1.9

0

LIVING

0

0.6

2.0

LIFT

1.2

3.4

8

LIFT

5

2.0

T ILE TO 3 x 1.4 8 2.4

5

BE DR 3.0 OO 5 x M-3 3.9 6

1

PL-06

5

0

1.8 2.2

M.

2.4

21.90

LIVING

1.83

1.5 . RV SE T ILE TO

LIVING

2.30

0.45

M.BED ROOM 3.98x3.35

M.TOILET 1.53x2.15

service duct

0

LIFT

CHAJJA

W.C. 1.53x1.53

0.65

5

4.27

jja

3.1

R.C C. FINS

LIVING / DINING 3.35x5.55

0.30

1.5 D10

E BAG GAR TE CHU 820 0x2 150

2.0

LIFT

6.25

5

LIVING

12.80

5

A

AJJ

CH

balc.

R.C C. FINS

W.C. 1.53x1.53

service duct

CHAJJA

3.0

LIFT

t duc

REFUGE

M.TOILET 1.53x2.15

8

2.5

N HE 5 2.7 KITC 5X 3.0

balc.

R.C C. FINS

M.BED ROOM 3.98x3.35

UP

LIFT

55 FLOOR

Slum

5

ER ST M MA OO 5 DR BE 0 X 3.3 3.6

5 4.0 JA AJ CH

balc. LIVING

3.95

1.62

cha TOILET 1.48 x 2.13

2.65

2.4

LIVING

LIFT

5

LIFT

3.7

3.35

TERRACE 5

LIVING

R.C C. FINS

1.62

BED ROOM 3.35x3.30

KITCHEN 2.95x2.75

LIVING / DINING 3.35x5.55

CHAJJA

4.1

R.C C. FINS

R.C C. FINS 3.95

KITCHEN 2.95x2.75

duct

56 FLOOR

DCR 32 r/w DCR 34(TDR)

TOILET 1.48 x 2.13

2.65

PETAL - 2

57 FLOOR

33(14)D

PETAL - 1 R.C C. FINS 12.95

duct

BED ROOM 3.35x3.30

2.14

TERRACE

TERRACE

O/H WATER TANK

58 FLOOR

Non Slum

R.C C. FINS

1.56

4.20

PETAL - 1

S. Particulars No.

2.28

12.35

4.05

12.35

LIFT MACHINE ROOM

3.95

duct

0.60

Y R.C C. FINS 1.62

Crosss Section - Wing 'A'.

Typical Floor Plan (Type: 3) (57th & 58th Floors)

TYPICAL FLOOR PLAN (type 3)

SCALE - 1:100 (57TH & 58TH FLOOR)

Area Diagram for Typical Floor Plan (Type: 3) (57th & 58th Floors) AREA DIAGRAM FOR TYPICAL FLOOR PLAN (type 3)

SCALE - 1:100 (57TH & 58TH FLOOR)

40


II. DEM CONSULTANTS. PROJECT: ROY FARMS RESORT, GORAI.

Complete Architectural Services By DEM Consultants. Role: Client Presentation, Planning & Designing. Feasibilty:

Total Plot Area: FSI: Permissible BUA:

3422.16 sq.mt. 0.3 1026.648 sq.mt. (A)11050.83907 sq.ft.

Permissible Area for Balcony (Free of FSI) (10% of Permissible Area):

(B)1105.083907 sq.ft.

TOTAL PERMISSIBLE BUA: (A+B)

12155.92 sq.ft. Plot Location and CRZ Map.

Survey Plan.

Y

TR

EN

RK

PA G

IN

10'-6" x 4'-0"

AE G M O

S AS M RO

AE G M O

S AS M RO

RECEPTION

M EA M ST OO R

T

UR

CO UR

CO

T

S RE

TS G EN GIN AN OM CH RO

AR

U

RE

DIC

PE

BED ROOM

10'-0" x 13'-0" C/A = 132.00 SQ. FT

5'-0" x 6'-0"

TOILET

5'-0" x 6'-0"

BED ROOM

10'-0" x 13'-0" C/A = 132.00 SQ. FT

E

UR

DIC

PE

A O SP PTI CE

T UR

CO

N

S EA KID AR AY PL

RE

DE

NT RA AU EN ST CH RE KIT

E

UR

IC

AN

M

G

EA

CK

TOILET

E

UR

IC

AN

M

S G DIE IN LA NG M A O CH RO

T

T

AN

R AU

S

ER

CK

LO

(Type 1). ONLY ROOM Guest TYPE 1:Room GROUND FLOOR

ET

IL

TO

EN

RD ING GA AT SE

E

M

OL PO ECK D

OL

PO

S-

KID

S PO UR N TIP AW L

UL

L POO K DEC

G

HW

AY

TH WA

Y

IN M IM OL SW PO

PAT

PA

I ZZ CU L JA OO P

FAMILY ROOM

10'-0" x 13'-0" C/A = 325.00 SQ. FT

6'-6" x 3'-0"

5'-0" x 3'-0"

BED ROOM 10'-0" x 9'-6"

TOILET

6'-0" x 6'-0"

8'-9" x 4'-0"

TOILET

7'-9" x 6'-3"

PORC

H

UP

PORC

H

LIV

ING

UP LIV

ING

TOILE

T BEDR

OO

M BEDR

OO

M

TOILE

T

BED ROOM

14'-6" x 8'-3" C/A = 227.00 SQ. FT

Layout.

TOILET

7'-9" x 6'-3"

8'-9" x 4'-0"

Guest (Type 2).ONLY ROOM TYPE Room 2: FIRST FLOOR

PATHWAY

41

4'-0" x 6'-0"

BED ROOM

14'-6" x 8'-3" C/A = 227.00 SQ. FT

Room (Type 3). PLAN ROOMGuest TYPE 3: TYPICAL FLOOR

3D Visualization.


III. DEM CONSULTANTS.

IV. FREELANCE WORK.

PROJECT: PREETI CO-OP. HSG. SOC.

Landscape Services By DEM Consultants. Role: Working Drawings and Relevant Details.

PROJECT: CHIKANI RESIDENCE.

Designing and Executing the false ceiling layout.

0.15

0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45

5"

0.15

0.18

1.52

MS SECTION OF 3" X 5" EMBEDED IN BRICK AND PLASTER

5"

1'-3" 1'-3"

2" Cove

STONE CLADDING AS APPROVED

1.56

1'-3" 1'-3"

2" Cove

2.00

STONE CLADDING AS APPROVED ONE BRK. THK. WALL WITH FINISH AS APPROVED

2.06

STONE/TILE CLADDING AS APPROVED

3"

JOGGING TRACK

5"

3"

2" Cove

OPEN JOINT 6mm THK. LIGHT WEIGHT FILLING

0.40

0.45

SENIOR CITIZEN AREA

1"Plaster/Gypsum to level Beam with Column

5"

TILES AS SELECTED 0.020m THK. PCC LAYER 0.075m THK. SCREEDING LAID TO SLOPE 0.020m THK.

0.10

0.90

0.49

STONE/TILE CLADDING AS APPROVED

1"Plaster/Gypsum to level Beam with Column

2"-3" BLACK POLISHED PEBBLES AS APPROVED

2" Cove

PCC 0.10 M ONE BRK THK. WALL MURUM FILLING 0.23m THK.

SECTION B - B'

RUBBLE SOLING 0.23m THK.

SECTION AA'

3" 1'-3"

1"

4'

3"

2'

1"

2'

4'

1'-3"

JOGGING TRACK

U/G TANK

CHILDREN PLAY AREA

CE / 8507/ WS / AK O C. GRANTED DATED - 03 / 09 / 2007

STEPPING STONES

0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45

PAVED

STILT FOR CAR PARKING

D R I V E W A Y

LAWN

ING

R SEAT

AREA FO

2

SHRUBBERY

ENTRANCE LOBBY 4.88 x 3.05

1'-3"

2" Cove

BP

5"

1'-3"

1'-3"

DATE

1:100

29.03.2017

ENTRY

AP ASSOCIATES LANDSCAPE ARCHITECT & CONSULTANT

False Ceiling Layout.

DWG. NO.

1.90

2.87

2.87

1.35

1.35

AC

1.53

0.20

1.35

0.18

0.18

1.57

EQ

EQ

1.52

SCREEDING LAID TO SLOPE 0.020m THK. OPEN JOINT 6mm THK.

SWD PERFORATED GRATING AS APPROVED

GARDEN SOIL 0.60m THK.

ONE BRICK THK. WALL WITH NECESSARY FOUNDATION

TILE EDGING IN ROUGH SHAHABAD WITH P.C.C. BASE 0.05m THK.

SWD WITH GHOTAI FINISH

EXISTING COMPOUND WALL WITH FINISH AS APPROVED

2'-6"

15W Track Light

OPEN JOINT 6mm THK.

SWD PERFORATED GRATING AS APPROVED

GARDEN SOIL 0.60m THK.

ONE BRICK THK. WALL WITH NECESSARY FOUNDATION

TILE EDGING IN ROUGH SHAHABAD WITH P.C.C. BASE 0.05m THK.

SWD WITH GHOTAI FINISH

PCC LAYER 0.075m THK.

PCC LAYER 0.075m THK.

SECTION A - A'

2'-6"

TILES AS SELECTED 0.020m THK. SCREEDING LAID TO SLOPE 0.020m THK.

RUBBLE SOLING 0.23m THK.

RUBBLE SOLING 0.23m THK.

MURUM FILLING 0.23m THK.

MURUM FILLING 0.23m THK.

SECTION A - A'

OPTION 1

OPTION 2

CYLINDER

1.52

AC TILES AS SELECTED 0.020m THK.

EXISTING COMPOUND WALL WITH FINISH AS APPROVED

5"

WD-04-R0

0.18

0.18

SCALE NORTH

DRAWING: DETAILED SECTION THROUGH PERGOLA IN THE LANDSCAPED AREA

1.35

1'-3"

5"

SC 1:250

Detailed Section through Pergola.

1.90

3"

2" Cove

SPACE FOR METER PANELS

58

3"

KEY PLAN

LANDSCAPE DEVELOPMENT FOR PREETI CO-OP. HSG. SOC. LTD.

0.20

5"

60

SUB STATION

PLAN

2" Cove

STACK PARKING

61

59

PROJECT:

2" Cove

4.12 x 2.14

UP

OPEN GYM

CHAJJA LINE ABOVE BLDG. LINE ABOVE

1.52

0.22

0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45

LED Strip for Cove Lighting

Electrical Layout.

1.67

15W Track Light 2 - 15A plugs 6" above counter

CREAMLETTE

1.56

3- 15A plugs 15A plug with tripper

CREAMLETTE

SINK

0.13

CASHIER

5.99 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.18

5.98 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45

FREEZER

15A plug with tripper

15A plug with tripper

DRAWING: DETAILED SECTION THROUGH PERGOLA IN THE LANDSCAPED AREA

SCALE

DATE

1:100

29.03.2017

NORTH

DWG. NO.

WD-04-R0

AP ASSOCIATES LANDSCAPE ARCHITECT & CONSULTANT

PREP

2'-6"

LED Strip for Cove Lighting

TOPPINGS

Detailed Section through Pergola.

LANDSCAPE DEVELOPMENT FOR PREETI CO-OP. HSG. SOC. LTD.

2 - 15A plugs below counter

NITRO

PROJECT:

2'-6"

PLAN OPTION 2

CYLINDER

PLAN

Project Manager:

AC

2 - 15A plugs 6" above counter

PROJECT: minus 301F ICE-CREAM PARLOUR.

Execution and Management by procurring required material and ensuring desired quality and costing.

2 - 15A plugs with tripper

..\..\..\Desktop\FORMAT.jpg

42


07

MISCELLANEOUS

I.FIRST YEAR. Basic Design: Understanding Planes.

43

II. FIRST YEAR.

III. FIRST YEAR.

Theory & Design of Structures: Spaghetti Bridge.

Building Technology: 8 Metre Clear-Span Structure.


IV. FIRST YEAR (Study Trip).

V. SECOND YEAR (Study Trip).

VII. SECOND YEAR.

VIII. FOURTH YEAR.

Harihareshwar: The Narrative Canvas.

SIKKIM: Bayul Demazong.

Timber Workshop: 1:10 Monastery Model.

Theory & Design of Structures: High-rise Systems.

44


08

P H O T O G R A P H Y SAGAR KARALE

45

G W A L I O R F O R T, G W A L I O R . SAGAR KARALE

SASOON DOCKS, MUMBAI. SAGAR KARALE

GOL GUMBAZ, VIJAPUR. SAGAR KARALE

BARA - KAMAN, VIJAPUR. SAGAR KARALE

G W A L I O R F O R T, G W A L I O R . SAGAR KARALE

G W A L I O R F O R T, G W A L I O R . SAGAR KARALE

BORIVALI, MUMBAI. SAGAR KARALE


TANSEN’S TOMB, GWALIOR. SAGAR KARALE

GUJARI MAHAL, GWALIOR. SAGAR KARALE

MAHARAJ BADA, GWALIOR. SAGAR KARALE

KALA GHODA, MUMBAI. SAGAR KARALE

IRSHALGAD, RAIGAD. SAGAR KARALE

IBRAHIM ROUZA, VIJAPUR. SAGAR KARALE

KANDIVALI, MUMBAI. SAGAR KARALE

M A LV A N , S I N D H U D U R G . SAGAR KARALE

46



sagar naresh karale

sagarkaralearch@gmail.com



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.