Undergraduate Architect Porfolio

Page 1

UNDERGRADUATE ARCHITECTURE PORTFOLIO 2014 | 19 N. SAIKUMAR


CONTENTS

N. SAIKUMAR Mail: saikumarnadipelli@gmail.com Phone: +91-8686646046, 9494996631. D.O.B: 24-08-1996. Hyderabad, India.

EDUCATION

Board Of Secondary Education 2012 Board Of Intermediate 2014 Bachelor Of Architecture2014 -2019 (Affiliated To JNAFAU)

9.3 Gpa 92% 69%

22-08-2018 to 30-04-2019.

SOFO DESIGNS Kavuri Hills, Hyderabad, Telangana, india, 500081. Contact: Naveen Manne (Sr. Architect) +91-7795489997

LANGUAGES Telugu English Hindi

INTERESTS

Contemporary Passive solar Vernacular

SKILL SET • • • • • • • • • •

Autocad Sketchup Vray Lumion Adobe Photoshop Adobe Illustrator Adobe Indesign Microsoft Office Design Builder Revit

PERSONAL SKILLS • Manual Drafting • Model Making

COMPETITIONS • Griha Trophy / Nasa 2016. • Temple Documentation / Intach 2015.

WORKSHOPS:

WORK EXPERIENCE

Intern

SELECTED ACADEMICS / COMPETITION WORKS

HOBBIES

Anime Traveling Strategy Games

• Study, Use and Conservation of Brick / 2016 / INTACH. • Bamboo workshop / 2017 / Prashant Lingam. • Model Making Workshop / 2017 / College fest.

SEMINARS ATTENDED: • Green Building Congress 2018 Hyderabad International Convention Centre. • Building Performance Prediction by Vishal Vara & Mr.P.C.Thomas @ IIIT Hyderabad.

ACADEMIC PROJECTS • 1st YEAR

The Maze. Architects Office.

• 2nd YEAR

Center For Experimentation. Youth Hostel. Housing.

• 3rd YEAR

Hospice. Co-lab. Bus Terminal. Museum of Modern Art.

• 4th YEAR

Urban Design / Lower Tank Bund.

• THESIS

Passive Solar Architecture For A Multi Story Residential Building.

01 | OFFICE COMPLEX FOR EXPERION DEVELOPERS/ GRIHA TROPHY 2016 02 | DOCUMENTATION OF YAGANTI TEMPLE/ INTACH 03 | THESIS / PASSIVE SOLAR ARCHITECTURE FOR A MULTI-STORY RESIDENTIAL BUILDING

04 | CO-LAB 05 | VOCATIONAL TRAINING CENTER/ REDEFINING THE DBR MILLS 06 | MISCELLANEOUS WORKS • MODELS • COMPUTER RENDERING

SELECTED INTERNSHIP WORKS - SOFO DESIGNS 01 | TRR INFRA / MIXED USE BUILDING • PRESENTATION PLANS • ELEVATION DETAILS • STAIRCASE DETAILS 02 | 780 Sq.yards EAST FACING VILLA AT VESSELLA MEADOWS • PRESENTATION PLANS • SECTIONS 03 | PLUMBING DETAILS 04 | HIGH-RISE RESIDENCY AT NIZAMPET • PRESENTATION PLANS 05 | PROPOSED OFFICE AT JUBLIEE HILLS • PRESENTATION PLANS


NASA 2016 GRIHA TROPHY OFFICE COMPLEX / EXPERION DEVELOPERS

FORM GENERATION

Located in Gurgaon. Observing rapid urbanization,a leading financial & industrial hub. the city has many Skyscrapers, nationally recognized, Thus known as a MILLENNIUM CITY. With a humid subtropical climate, heavily monsoon influenced, cold Winters & extreme hot summers.

GURGAON CLIMATIC DATA

iE

on

a rg Gu

elh -D

The sun light in gurgaon is harsh, brings a lot of heat, thus heat consumption is to be minimized, by creating comfortable conditions in the building by using Environmental principles.

y xp

The design starts from a simple box, with additions Through the orientation, use of materials, & subtractions, creating an innovative form. lighting & push - pull of masses, the form is derived.

Due to heavy winds in the west a water body Green balconies & twisting louvers are is placed, followed by wind tunnel effect incorporated on the northern facade to allow creating a narrow passage inside the building indirect light & fresh air. for better air circulation .

WEST WALL DETAIL Aim : To design a sustainable office building Site area : 2.40 acres Building population : 2557 persons COOLING PAD

A

The West facade, inspired from a conventional Desert cooler, Firstly, funnels the air into the building & cooled by evaporative cooling. It is then purified while passing through the cooling pad, providing cool air indoors.

A’

SOUTH WALL DETAIL

TYPICAL FLOOR PLAN

MEZZANINE FLOOR PLAN

NORTH ELEVATION

TOP VENT

BOTTOM VENT

EXPLODED VIEW OF TYPICAL LAYOUT

NORTH WALL DETAIL

The blinds, controlled by cordless comb modules, twist the louvers & the multi comb design enabling creation of interesting patterns.

TWISTING LOUVERS

SOUTH WALL ELEVATION PAGE NO : 1


RAJA GOPURAM

INTACH DOCUMENTATION YAGANTI TEMPLE

The temple has a massive 5-tier raja gopuram along with dwajasthambham, which was erected in Vijayanagara style of architecture and built out of white granite stone. Raja gopurams with multiple tiers became a salient feature of all the temples built by the Vijayanagara kings during 15th century.

HISTORY OF THE TEMPLE :

Sage agastya wanted to build a temple for lord Venkateshwara at this place. However, the statue could not be installed as it had a broken toe nail. As he was upset he performed penance to please lord Shiva. Lord Shiva appeared and said that the present site resembled Kailash. Sage agastya then pleased lord Shiva to reside with Parvathi as Lord Uma Maheshwara in a single stone.

8th century

10th century

cholas (main temple)

western chalukyas (mandapas)

UMAMAHESHWARA ALAYAM The UMAMAHESHWARA ALAYAM, which includes Garbha griha,Antralaya and Mukha mandapa was built during the Chalukya period and is encircled with a Pradakshina patha for circumambulation. The idol in this temple is a self manifested one,which is in the form of ‘ARDHANARISHWARA’ meaning - half SHIVA and half PARVATHI split down in the middle.

14th century vijayanagara empire (pushkarini and major renovations)

EXPLODED VIEW

Originally,the temple was built for LORD VISHNU,which is the reason why the four ornamented pillars in the Mukha mandapa depict the stories from VISHNU PURANA.

O M P

N

K B

L

E I

D G

H

C

J

SECTION

F

SITE PLAN

SECTION ALONG THE AXIS OF CIRCULATION

PLAN PAGE NO : 2


THESIS HOUSING COMMUNITY/PASSIVE SOLAR ARCHITECTURE

SITE ANALYSIS

“Passive solar architectural design maximizes the use of ‘natural’ sources of heating, cooling and ventilation to create comfortable conditions inside buildings.” By Stephen Finnegan. It harness(control and make use of) environmental conditions such as solar radiation, cool night air and air pressure differences to drive the internal environment. Today, buildings are designed with complete indifference to the climate and materials. Energy consumption in buildings is mainly connected to space cooling, supply of hot water, lighting, cooking and, use of appliances. But its important for us to understand that space cooling and lighting are directly influenced by the design of the building. Energy codes should be concerned with ‘sufficiency’ as well as ‘efficiency’. A more economic and ecological approach to building design is needed. These sustainable designs are not only economical in long term but also reduces its influence on our environment.

METHODOLOGY

The Proposed Site Is Located in hyderabed. HYDERABAD is located in central Telangana and has a tropical wet and dry climate bordering on a hot semi-arid climate. The annual mean temperature is 26.6 °C (79.9 °F); monthly mean temperatures are 21–33 °C (70–91 °F). Summers (March–June) are hot and humid, with average highs in the mid-to-high 30s Celsius; maximum temperatures often exceed 40 °C (104 °F) between April and June. The coolest temperatures occur in December and January, when the lowest temperature occasionally dips to 10 °C (50 °F). The highest temperature ever recorded was 45.5 °C (114 °F) on 2 June 1966, and the lowest was 6.1 °C (43 °F) on 8 January 1946.The city receives 2,731 hours of sunshine per year; maximum daily sunlight exposure occurs in February.

CLIMATIC DATA OF HYDERABAD

Passive solar Architecture. Synopsis

Literature study • • • • •

Human thermal comfort Modes of heat transfer Elements of PSD Passive colling techniques Design considerations

Data collection • Housing byelaw’s • Minimum sizes of rooms • Material study

Desktop Study

Case study

passive techniques and materials used • kanchanjunga apartments • Sangath • torrent research center • indira paryavaran bhavan

passive techniques and materials used • Organo • Prabha bhawan

Parameters and indicators

qualitative and quantitative analysis

SITE PROXIMITY: • NEAREST AIRPORT : Begumpet Airport (12.2 km), Rajiv Gandhi International Airport (34.7 km). • NEAREST RAILWAY STATION : Borabanda Railway Station (1.7 km), Hi-Tech City Railway Station (4.2 km). • NEAREST BUS STATION : Jubilee Bus Station (15.0 km), Mahatma Gandhi Bus Station (15.6 KM), • NEAREST HOSPITAL : MaxCure Hospitals (2.7 km) Hyderabad Apollo Hospitals (6.3 km). • ENTERTAINMENT ZONE: Shilparamam (2.0 Km), Pvr Icon (1.9 Km), Inorbit Mall (4.5 Km), The Forum (5.5 km).

2.0 KM

1.5 KM

BUS STOP

1.0 KM

0.5 KM

(0,0)

RAILWAY STATION

AUTO STAND

SUN PATH ON SITE CONDITION Design guidelines and area statements Selection Of Site And Site Study

www.organo.co.in Hyderabad, India

Page : 18

Page : 19

DESKTOP AND CASE STUDIES

DATE : 2-4-1018 ; TIME : 8:30 AM

Introducing NAANDI – Organo’s first project

DATE : 2-4-1018 ; TIME : 1:30 PM

DATE : 2-4-1018 ; TIME : 5:30 PM

SITE CONDITIOND AND SURROUNDINGS PHOTOGRAPHS OF THE SITE & ITS SURROUNDINGS.

N 1 2

NAANDI – Organo

PRABHA BHAWAN , MNIT, JAIPUR

TORRENT RESEARCH CENTRE

INDIRA PARYAVARAN BHAWAN

KANCHANJUNGA APARTMENTS

2

3

4

5

6

3

5 4

SANGATH

1

6

5.95 Acre (204080 Sqm)

PAGE NO : 3


lvl-05

lvl-04

lvl-02

lvl-03

lvl-01

lvl-00

DETAILS OF PASSIVE DOWN DRAFT COOLING:

lvl-04

lvl-05

40 F T W

lvl-04

lvl-04

I D E RO

Air Catchers Are Provided At A Height Of 25 Meters From The Ground. The Air Entering The Air Catcher Is Pushed Down Fan Which Rotates With The Wind Flow. Micronizer Are Installed Just Below The Air Catcher Which Helps In Cooling The Incoming Air. Then The Air Is Collected Through A Duct And Supplied To The Dwelling Units. Each Duct Provides Cool Fresh Air To 10 Dwelling Units

AD

C

E G +4

C

COL

L EG

C

C

AD

lvl-05

I

AIR FLOW THROUGH DUCTS

J

G H

F

E RO WID

PLAN

40 F T

7M

H

AD

RO WI

DE

WID

B

7M

E

lvl-07

AD

E RO

AD

100 FT

lvl-06

POSITIONS OF DUCTS

WID

E RO

B

D

9M W ID E R

lvl-00

OA D

lvl-01

lvl-04

lvl-07

lvl-06

lvl-05

lvl-04

lvl-02

lvl-03

N

SITE PLAN DETAILS OF ALTERNATING TERRACE GARDEN:

1.Cluster Housing 2.Semi Detached Housing 3.Club House 4.Commercial Block 5.Security Kiosk 6. Oat 7.Tot-Lot 8.Swimming Pool 9.Bio-Pool

DETAILS OF AIR CATCHER Circular Air Catchers Provided So That Air Can Be Captured Efficiently From All Directions. Light Weight Triangular Fins With Pivot Are Used For Channeling The Air, All The Fins Are Arranged According To The Direction Of Air For The Maximum Intake Of Air . A Fan Is Placed Which Helps In Pumping The Air Into The Building When The Outdoor Air Pressure Is Insufficient. Micronizers Are Provided At The End Of Air Catcher To Lower The Temperature Of The Air Entering In . A Ducting System Is Provided For Efficient Circulation Of Cool & Fresh Air Into The Building.

DETAILS OF EVAPORATIVE COOLING:

Below Is A Conceptual Section Showing The Air Flow Through The Alternate Terrace Garden And How Its Circulated Along The Site. Alternating Terrace Gardens Help In Circulating Unob- A Central Courtyard Along With A Water Body in The Direction Of Wind structed Air To All The Apartment. They Are Placed Along The Direction Of Wind Flow For Maximum Efficiency Flow Which Helps In Cooling The Air Through Evaporative Cooling

BALCONY’S & BLINDS:

Balcony Are Provided With Blinds Which Helps In Controlling The Amount Of Air And Light Entering into the building

PAGE NO : 4


B

A

A’

ELEVATIONS - CLUSTER

3 BHK 2 BHK

B’

CLUSTER LAYOUT

TERRACE GARDEN

FLOOR PLAN - 3BHK

DUCTS

DAYLIGHT ANALYSIS - 3BHK

DAYLIGHT ANALYSIS - 2BHK

SECTION - AA’

SECTION - BB’

EXPLODED VIEW - CLUSTER

FLOOR PLAN - 2BHK PAGE NO : 5


CO-LAB Step 1

The site is situated in 100 feet road,madhapur, next to palumuri grill,Hyderabad.

Students are asked to choose a combination of any number of the above frames to create a module.

Co-Lab

Step 2

“Time And Space -There Are Many Kinds Of Time Throughout A Day At Work, And There Are Many Ways To Use The Space.” _ Patricia Urquiola

In step two this will be defined as “workspace”. Create a composition out of the modules in different directions within an order (with some changes/transformations in modules to provide passages and different kinds of spaces).

Collaborate. Create . Control . Compete

Aim

Co-Lab WHO?

To create a module which should be arranged into work desks,meeting areas,archive shelv­ing and sleeping quarters. We don’t want to make furniture objects, but provide a concept on the scale of a whole working environment.”

For Architects ,Artists ,Photographers and Graphic Visualizers

Co-Lab WHAT?

Presentation Spaces, Tactical Execution Spaces, Strategic Thinking Spaces, Social Spaces

BASIC FRAMES L

T HAL

UE BANQ

ARTISTS

1.They were provided with larger sized room with open floor plans as many professions come under artists.

ARCHITECTS

1.They need a space for drafting as well as model making 2.They need a discussion space where the can place a sheet a discuss there ideas, which can be accessible from there individual work space. 3.To accommodate different no of people a portable wall is used to separate two workspace. 4.Architects and artists ape placed in three inter linked floors.

VIEW TYPE ‘A’

A

A’

B’

B

ISTS.

ITE

ARCH

ENT

SECTION AA’ CAFE

PLAN TYPE ‘A’

PLAN TYPE ‘B’

ART CTS &

AINM TERT

& EN

SECTION BB’

PHOTOGRAPHERS AND GRAPHIC VISUALIZERS 1.Most of the work is carried out on desktops. 2.There work desk should not be a long straight desk it should be at least angled so that he can operate multiple desks at the same time. 3.Visual contact should be provided in between person to person and person to desktop. 4. Photographers and graphic visualizers are placed in two inter linked floors.

C

C

D’ C’

PLAN @ 0.4M

D’

D C’

PLAN @ 1M

ERS

PH GRA

TO

PHO

C

SECTION CC’

D

S

IZER

L SUA I V &

D

SECTION DD’

D’ C’

PLAN @ 1.75M

PAGE NO : 6


N

VOCATIONAL TRAINING CENTER N

H

N T RO AN GA K AD B L UN OR D E

hussain sagar TO

IM

M

G IN

P

N

AG

PU

R

O

O

L

A O R

D

N GR TR OU ND S LOW ER TAN BU ND ST K

DBR MILLS

ASH

OK

NAGAR ROAD TO R RO TC X AD

Business Art and design Information technology Health services Plumbing.

ROA D

AGA R RO AD

TI APA HTR RAS ROAD

HI N

KAVA DIGU DA

GAN D

SITE PROGRAM: Auto repair Retail Electronics Construction Agriculture

ORIENTATION

BA

W

AL A ROA GUDA D

ER

INDIRA PARK

DOM

I ND IR A PAR KR R.K OA D MA . TH

DBR mills has been left in the state of ruins for the past 2 decades. Since,its demolition the site context and surroundings have been completely changed. We believe the site can restored for an interim period which serve the city in multiple ways. which can serve the city in several ways. When we look at the lower tankbund area as a whole, there is a huge unemployment and illiteracy rate, in fact not just in the neighborhood but the Telangana state as a whole. There is also a growing skill gap in the industrial sector which we need to address as a nation. It is appropriate if we address the issues in the industrial sector at a place which interprets the industrial heritage of the Hyderabad as a whole.

44

S

REDEFINING THE DBR MILLS

LO W

The ribbon window helps in providing diffused light in to the building.

Secondary skin helps in protecting the west facade from the harsh sun. While interrupting the industrial heritage.

SERVICE ROAD 8M

DESIGN OBJECTIVES • Designing a space that can be adapted for all kinds of workshops and seminars conducted. • Interpreting the industrial heritage of Hyderabad

FORM GENERATION

TO K At the stage of form generation, the three spacial aspects considered are Public, semi public and private spaces. The private built up mass is oriented such that it creates visual barrier in between courtyard and outdoor workshop. Public spaces - light blue Semi public - violet Private spaces - pink

AVA DIG

Punchers provided at regular intervals to help in providing in sufficient ventilation.

U DA

TO LOWER TANKBUND

SITE PLAN

WEST FACADE DETAIL

SECTION BB’

SECTION AA’

WEST ELEVATION PAGE NO : 7


MISCELLANEOUS WORKS MODEL MAKING

DIGITAL RENDERING

PAGE NO : 8


TRR INFRA / MIXED USED SITE AREA

: 8352.2 Sq.ft (831.8 Sqm)

BUILT-UP AREA

: 23598.6 Sq.ft (2192.4 Sqm)

BUILDING HEIGHT : 62 Ft (18.9m) LOCATION

: ROAD NO 5, GACHIBOWLI, HYD

Trr Infra Comes Under Mixed Use Where In 1St, 2Nd, 3Rd Floors Are Commercial Use And 4Th, 5Th Floors Are For The Residential Use. The Challenging Part In The Design Was To Accommodate Client Requirements In A Built Structure.

DECK AREA 32'6"X5'0"

5'

32

14 13

5'

33

02

07

08

28

SERVANT ROOM1 10'7"X10'2"

SERVANT ROOM2 10'7.5"X10'2"

11 13

14

19

20

10

STORE 4'8"x5'9.5"

STORE 4'8"x5'9.5"

09 08

6" WIDE PASSAGE

38'-3"

25

FIRE HYDRANT

04

03

10

LIFT 4'2½"x5'2"

09

LIFT 6'0"x5'4½"

LIFT LOBBY 11'1"X5'4½"

1'-11"

22

21

05

12'

05

8'-3"

06

11

01

12

17

5'-6"

5'-6"

gate to detail

4'

4'-3"

16

02

STAIRCASE LOBBY 11'1"X13'8½"

soft landscaping

18 17

03

47'-11" RAMP

18

23

+2'-0" lvl

19

WATER BODY

1" 13'-84

20

UP

panel board

9'

15

04

21

10'-3"

16

06

23 22

2'

HOSE PIPE

9"

9'

9"

24

07

38'-3"

26

1" 3'-112

6' +1'-0" lvl

±

6'-6" DG 7'8.5"X13'3"

1" 7'-82

+1'-6" lvl

1" 10'-72

24

5'-6"

9'

27

9'

01

29

TOILET2 4'8"X5'6"

TOILET1 4'8"X6'0"

9'

9'

30

9'

12

31

9'

9'

15

9'

34

OPTION -2

5'-9"

3'

OPTION -1

1" 3'-112

46'-11" RAMP

14' FOOTHPATH

0'-0" Road lvl

STILT FLOOR PLAN PAGE NO : 9


STORAGE

LOW HEIGHT STORAGE

STORAGE

DISCUSSION - 2 8'4"X9'1 1 2"

DISCUSSION - 1 8'2"X9'1 1 2"

STORE 8'1 1 2"X5'10"

MANAGER - 1 10'6" x 9'0"

MANAGER - 1 10'7 12" x 9'1 12" LOUNGE 13'0"X13'9"

LIFT LOBBY 9'10½"X5'4½"

LIFT 6'0"x5'4½"

PRINTER/XEROX

LIFT 4'2½"x5'2"

INFORMAL DISCUSSION

MANAGER - 3 10'6" x 9'0" MANAGER - 4 10'6" x 9'0"

STAIRCASE LOBBY 9'10½"X13'8½"

LOW HEIGHT STORAGE

FILE ROOM 8'11" X 9'3"

LADIES TOILET 7'3" x 9'1 21"

MANAGER - 5 10'10" x 9'3"

LOBBY 4'0" X 7'11" GENTS TOILET 8'4 21" x 9'1 21"

FIRE HYDRANT

PRINTER/XEROX

STORAGE

WORK STATIONS 40'1012"X18'10½"

STORAGE

RECEPTION 21'6"X11'9"

STORAGE

LOUNGE 13'0"X13'9"

MANAGER - 2 10'6" x 9'0"

FIRST FLOOR PLAN

STORAGE

VIP LOUNGE 13'6"x11'6"

P.A 7'6"x11'6" Cabin - 1 11'6" x 10'6"

DIRECTOR'S ROOM -3 19'521"x12'912"

CORRIDOR 21'6" x 6'9"

INFORMAL DESKS 26'721"x10'912"

LOBBY 9'1"x7'6"

WORK STATIONS 26'6"X17'0"

LOBBY 5'1121"x7'6" LIFT 6'0"x5'4½"

STORAGE

LIFT 4'2½"x5'2"

CONFERENCE HALL 14'721"X22'0"

LIFT LOBBY 9'10½"X5'4½"

DIRECTOR'S ROOM -1 20'1121"x15'812" STORE 4'9"X 5'0"

DIRECTOR'S ROOM -2 14'6"x13'0"

STORAGE

PWD. ROOM 5'6"x7'6"

Cabin - 2 11'721" x 10'6"

PANTRY / DINING / KITCHEN 13'721"X14'421"

PRINTER/ STORAGE

STAIRCASE LOBBY 9'10½"X13'8½" SERVER ROOM 10'8"x9'121"

PWD. ROOM 4'9"x6'721"

FIRE HYDRANT

STORAGE

SCREEN

TOILET 10'421"x9'121"

FILES ROOM 6'6"x9'121"

SHAFT

SECOND FLOOR PLAN PAGE NO : 10


Shoe Rack

DRAWING 15'1"X16'2"

BUSINESS ROOM 20'11"x14'9"

UP DRAWING 13'5"X16'9"

BAR 9'5"x8'3" TOILET 6'3"x8'3"

FAMILY LOUNGE 19'1"x14'7½"

DINING 19'7"x14'4½"

tv unit

marble cladding on wall

LIFT 4'2½"x5'2"

P. ROOM 3'3"x4'7½"

LIFT 6'0"x5'4½"

tall unit

mirror panelling

mirror panelling

fridge

MASTER KITCHEN 10'0"x12'3"

BED ROOM 13'6½"x17'7½"

2 drawers

DN

fridge & freezer

visibility on top shutters / marble cladding / base drawers wooden flooring

crockery

P. ROOM 5'4½"x4'0"

STAIRCASE LOBBY 9'10½"X13'8½"

fridge & freezer

WM

Area Rug

micro wave oven

BED ROOM 19'1"x13'0"

DINING 16'4"x12'4½"

tall unit

LOBBY 6'3"x4'0"

bed as/selection

UTILITY 6'3"x6'721"

Ser.Toilet 3'11½"x4'0"

TOILET 7'6"x7'10½"

KITCHEN 12'9½"x13'0"

KITCHEN 9'6"x9'4½"

UTILITY 9'2½"x5'0"

UP

SINK

Side table

Wet Area

Side table

DRYER

WM

FOURTH FLOOR PLAN

Side table

PUJA 5'8½"x6'0"

PUJA 5'2"X9'0"

BED ROOM 20'11"x13'0"

SITOUT 13'9"x10'4½"

Area Rug

bed as/selection

BED ROOM 13'6½"x14'0"

Side table

dn

wall lamps

HOME THEATER 20'4½"x16'2"

DN

wall lamps

LOUNGE 13'2½" X 26'9" STORAGE

DRESS 6'8"X10'0"

(electronics/ pillows)

Display shelf

TOILET 12'1½"X10'0"

TOILET 13'6½"X8'3½"

BEDROOM 13'4½"X18'0"

STORE 9'10½"X4'4½" book rack

LOUNGE 19'4"X19'7"

BED ROOM 13'6½"x13'8½"

BED ROOM 20'11"x13'0" Area Rug

book rack

bed as/selection

Side table

DRESS 6'7½"X8'9"

TOILET 8'4½"X7'0"

TOILET 13'4½"X8'0"

STORE 5'8"X8'9"

Side table

FIFTH FLOOR PLAN PAGE NO : 11


M S JALI PATTERN P1

SLAB PROJECTION

P2

41 2" BRICK WORK

STRUCTURAL GLAZING Terrace Roof Lvl.

PARAPET WALL PAINT AS PER SELECTION

lvl+ 3'9"

6" LINTEL

STONE CLADDING AS PER SELECTION TEXTURE PAINT AS PER SELECTION UPVC WINDOW GLAZING AS PER SELECTION AS PER DETAIL STONE CLADDING AS PER SELECTION

10'-0"

Terrace Floor Lvl.

lvl+ 3'0" 3'-0"

lvl +1'6"

lvl +1'0"

lvl +0'0"

Lintel lvl 11'-0" 7'-3"

Lintel lvl

41 2" BRICK WORK

10'-0" 7'-3"

WOODEN CLADDING STONE CLADDING AS PER SELECTION

2'-0" 9"

lvl+ 0'0" 10'-0" 7'-3"

SECURITY KIOSK

SECURITY KIOSK

FALSE CEILING

9"

Sill lvl First Floor Lvl

3" x 3" MS JALI PATTERN

PRECAST SLAB

FALSE CEILING

10'-0" 7'-3"

Lintel lvl

FIXED GLASS

3" x 3" MS JALI PATTERN lvl +3'0"

BRANDING

2'-0" 9"

Sill lvl Second Floor Lvl

PT BEAM AS PER STRUCTURAL DETAIL

WOODEN CLADING WOODEN CLADDING BRANDING UPVC WINDOWS

Lintel lvl

GLASS RAILING AS PER SELECTION LIGHTING AS PER SELECTION

PT BEAM AS PER BRANDING STRUCTURAL DETAIL AS PER SELECTION lvl +1'0"

Sill lvl Third Floor Lvl

SLIDING DOOR AS PER SELECTION

LIGHTING AS PER SELECTION M S JALI PATTERN

lvl+ 0'9"

2'-0" 9"

Sill lvl Fourth Floor Lvl.

UPVC WINDOW AS PER DETAIL

MARBLE LIPPING AS PER SELECTION

GLASS RAILING AS PER SELECTION

10'-0" 7'-3"

Lintel lvl

6" LINTEL

PT BEAM AS PER STRUCTURAL DETAIL

SLIDING DOOR AS PER SELECTION GLASS RAILING

2'-0" 9"

Sill lvl Fifth Floor Lvl.

PARAPET WALL

LINTEL AS PER STRUCTURAL DETAIL

lvl+ 5'0"

10'-0"

lvl+ 5'0"

Stilt Floor lvl

ROAD LVL

SOUTH ELEVATION

ROAD LVL

SOUTH (FRONT) ELEVATION

ROAD LVL

PART SECTION -A

COMMON STAIRCASE DETAIL

B

GENTS TOILET 8'4 12" x 9'1 12"

PART SECTION -B

PRINTER/XEROX

STORAGE

FIRE HYDRANT

19'-8"

1'-1112" 5"

15'-4"

9"

39'-1012"

6'-0"

24'-6"

3'-9"

3'-1021"

5'-0"

5'-921"

9"

9"

39'-112"

UP

5'-0"

6'-0"

4'-0"

3'-0"

5'-0"

6'-0"

5'-0"

2'-1021"

1'-6"

LOW HEIGHT STORAGE

1'-1112"

HOSE PIPE

A

21 20

9"

19 18

FIRST FLOOR DRAWING HOSE PIPE FIRE

19'-8"

9"

39'-1012"

3'-9"

3'-6"

6'-0"

9"

1'-0"

2'-9"

15'-4"

3'-6"

1'-1112" 5"

1'-10"

6'-0"

1'-6"

3'-0"

5'-0"

6'-0"

24'-6"

5"

1'-0" 3'-1021"

5'-0"

5'-921" 4'-0"

STORAGE

2'-1021"

SHAFT

39'-2"

9"

UTILITY 9'2½"x5'0"

UP

921" 9'-9"

3" 1'-0"

15'-4"

6'-0"

3'-9"

912"

11 10 9

3 4" Granite As Per Selection 1

2

8

MID LANDING

7

" Thick Mortar

10'-0"

5 4

6" Filling

3

Pebbles

5'-2"

KITCHEN 9'0"x9'4½"

2'-11"

1'-9"

5'-0"

1'-1112" 8" 1'-9" 512"

SECTION A

STAIRCASE PLAN

1'-1112" 10'-6"

Light Points

1'-0" 5'-6"

3'-6"

6'-412"

21

4'-0"

4'-012"

1'-6"

15'-0"

MID LANDING

12

2

1'-1112"

9" 7'-412"

13

1

6'3"x6'712"

1'-0"

14

STAIRCASE LOBBY 11'1"X13'

pebbles

SECOND FLOOR DRAWING

1'-9"

15

6

9"

13'-4"

16

WATER BODY

4'9"x6'721"

6'6"x8'12"

2

10'

2

panel board

17

20 19

40'-721" 18 17

FOURTH FLOOR DRAWING

16 15 14

MID LANDING

MID LANDING

13

13 12

STORE 5'8"X8'9 "

13'4½"X8'0"

11

2'-0"

TOILET 8'4½"X7'0" 921"

10

612" 1'-1121"

1'-1121" 15'-0"

4'-012"

10'-6"

9'-9"

1'-6"

9" 7'-412"

10'-0"

15'-4"

6'-0"

3'-9"

912"

9'-8"

1'-1112"

9

MID LANDING 8

1'-0"

2'-10 12"

7 6

15'-412"

5 4 3 2

FIFTH FLOOR DRAWING

1

SECTION B

SECTION C

PAGE NO : 12


780 Sq.yards EAST FASING VILLA AT VESSELLA MEADOWS VESSELLA MEADOWS

: 46.69 ACRES (289 VILLAS)

LOCATION

: NARSINGI, HYDERABAD

PLOT AREA

: 780 Sq.yards (652.17 Sqm)

BUILT-UP AREA

: 7970 Sq.ft

BUILDING HEIGHT

: 38 Ft (G+2) (

( 740.4 Sqm ) 11.58 m ) TYPICAL 780 EAST ELEVATION

GROUND FLOOR PLAN

FIRST FLOOR PLAN

SECOND FLOOR PLAN

PAGE NO : 13


+13'0" Lvl

A

W E L L

BEDROOM

DOUBLE HEIGHT

+2'0" Lvl

CAR PARKING

DINING

3'-10"

23' counter

Water proofing as per manufacturer detail 9"x9" brick work 9"x6" pcc band @ terrace lvl

+39'6" Lvl

9"x9" brick work 9"x6" pcc band 6" thk slab projection 6"x3" 'C' Channel

2'

4'-9"

Water proofing as per manufacturer detail 9"x9" brick work 9"x6" pcc band @ terrace lvl

6" 9"

6" 9"

9"x9" brick work 9"x6" pcc band 6" thk slab projection 6"x3" 'C' Channel 4'

4"

D

PASSAGE

+27'6" Lvl

TOILET

BEDROOM

12'

14'-6"

RCC plinth beam to structural detail

Parking Floor FFL Ground Lvl (NGL)

Ground Floor FFL +2'0" Lvl

+1'6" Lvl

DRESSING +3'6" Lvl

TOILET

Parking Floor FFL Ground Lvl (NGL)

+2'0" Lvl

UTILITY

STORE

counter

SECTION-DD'

Detail - B

"

3 4

"

Vitrified tile 19mm thk granite/marble PCC steps " 3 4

" 1 2

412"

1 2

"

3 4

"

1 2

1'

2" groove

412"

112"

1'-6"

6"

9" thk brick work 9"x6" lintel to structural detail

9"

2" slope to be provided

1

6"

9"x6" brick work

1

9"x9" brick work waterproofing as per manufacturer detail 9"x6" pcc band 3"x6" c-channel

412"

4" thk slab projection

4"

" 3 4

DECK

SECTION - DD’

upvc window to manufacturer detail Vitrified tile flooring 4" skirting mortar 19mm thk granite/marble coping 1"3 4" 4"

MASTER KITCHEN +1'6" Lvl

SECTION-BB'

Detail - A

9" x 6" brick work

BEDROOM

+13'0" Lvl

9'-6"

DRESSING

SECTION - CC’ 12mm thk toughened glass railing Vitrified tile flooring 4" skirting 19mm thk granite/marble coping mortar 9"x6" brick work

GYM

DRESSING

12'

12'

7'-6"

11'-6"

PCC bed

8'

11'

8'

DRAWING

+11'6" Lvl

MIDLANDING

LOBBY +2'0" Lvl

12mm thk toughened glass railing

TOILET+13'0" Lvl

4 1 2" thk brick work 9" thk brick work

LOBBY

DRESSING

3'

9" x 6" brick work

2'-10"

E

PASSAGE

TOILET

1'-6"

3' +13'0" Lvl

+15'6" Lvl

6"

LOBBY

WALK IN CLOSET

10'-6"

8' 3'-10"

4'-112"

BEDROOM

MIDLANDING

9'-4"

8'

12mm thk toughened glass railing

LOBBY +14'0" Lvl

12'

Brick bat / cinder filling

4" 7'-6" +3'6" Lvl

MULTI PURPOSE ROOM

+27'6" Lvl

6'

6'-6"

12" sunken for toilets

8'

7'-6"

LIFT

BEDROOM

OUTDOOR AREA

TOILET

STORE

4'

C

DRESSING

+27'6" Lvl

3'-10"

LOBBY

9'-10"

12'

12'

UPVC Sliding Door with 10/8mm thk toughened glass shutters to manufacturer detail

O.T.S

8'

7'-6"

BEDROOM

4"

4'-2"

+27'6" Lvl

1'-8"

+2'0" Lvl KITCHEN

LIFT

9"x6" brick work sill

1" 3 4" 4"

counter

SECTION-CC'

LIFT

Ground Floor FFL

MASTER KITCHEN

Parking Floor FFL Ground Lvl (NGL)

SECTION - BB’

+39'6" Lvl

+15'6" Lvl

PCC bed

9'-10"

STAIRCASE

SECTION- AA'

6" thk RCC lintel to structural detail 4" thk RCC slab projection to structural detail

9" x 6" brick work

13'

BEDROOM

SECTION - AA’

UPVC window with 10/8mm thk toughened glass shutters to manufacturer detail

BEDROOM

+13'0" Lvl

11' +3'6" Lvl

6"

Ground Floor FFL

+1'0" Lvl

CLOSET

6" 9"

+1'6" Lvl

DRAWING

2'

2'-8"

COURTYARD

POWDER ROOM

7'-6"

12'

11'

7'-6"

PCC bed 9"x6" brick work sill

+0'0" Lvl

6" ht brick work @ sill lvl.

12mm thk toughened glass railing

LIFT

B

+3'6" Lvl

Parking Floor FFL Ground Lvl (NGL)

Water proofing as per manufacturer detail 9"x9" brick work 9"x6" pcc band @ terrace lvl

LIFT 14'-6"

3'-10"

6" thk RCC lintel to structural detail 4" thk RCC slab projection to structural detail

+13'0" Lvl

+15'6" Lvl

MULTI PURPOSE ROOM

+27'6" Lvl

+27'6" Lvl

3'

SIT-OUT

6" 9"

3'-10" 7'-6"

OUTDOOR AREA S T A I R C A S E

6"

3'-10"

7'-6"

12'-6"

7'-6"

FAMILY HALL

1'-2"

SERVENT QUATER

6"

6"

RCC plinth beam to structural detail Ground Floor FFL

PANTRY

12' 7'-6"

7'-6"

10'-6" 8'

PCC bed

9" x 6" brick work

Family Room +13'0" Lvl

2'-4"

3'-10"

door in section

RCC slab To Structural Detail

UPVC Sliding Door with 10/8mm thk toughened glass shutters to manufacturer detail

25'-6"

Puja Room

6"

Sit-out

+14'0" Lvl

BEDROOM

7'-6"

14'-6"

2'-4" 8' +15'6" Lvl

2"

BED ROOM

2'-10"

SHOWER

UPVC window with 10/8mm thk toughened glass shutters to manufacturer detail

12mm thk toughened glass railing

6"

WC

6" thk RCC lintel to structural detail

12'-6"

10'-6"

9'-6"

9" thk brick wall 6" thk RCC sunken slab to structural detail

+27'6" Lvl

RCC slab To Structural Detail

UPVC Sliding door with 10/8mm thk toughened glass shutters to manufacturer detail

13'

11'-6"

11'-6"

11'-6"

UPVC Window in Elevation

6" ht brick work @ sill lvl.

+27'6" Lvl

1'-6"

RCC slab To Structural Detail

9" thk brick work above lintel UPVC Window in Elevation

UPVC sliding door in elevation

3'-10"

4'-6"

4 1 2" thk brick wall

SWIMMING POOL

14'-6"

6"6"

+27'6" Lvl

+27'0" Lvl

6"

DECK AREA

OPEN TERRACE

Terrace Floor FFL

6" x 9" pcc band 6" thk slab projection 6"x3" 'C' Channel

6"x3" 'C' Channel

LIFT O.T.S

12mm thk toughened glass railing Terrace slab with 6" sunken 6" ht brick work @ terrace lvl.

First Floor FFL

+39'6" Lvl

2'

9" thk brick work above lintel UPVC Window in Elevation

9"x9" brick work 9"x6" pcc band 6" thk slab projection

Water proofing as per manufacturer detail 9"x9" brick work 9"x6" pcc band @ terrace lvl

6" 9"

6" 9"

Water proofing as per manufacturer detail 9"x9" brick work 9"x6" pcc band @ terrace lvl

Detail - C

4'

Detail - D

Detail - E

PAGE NO : 14


9" x 9" brick work 9" x 6" pcc band 6" thk slab projection 6"x3" 'C' Channel

9" x 9" brick work 9" x 6" pcc band 6" thk slab projection 6"x3" 'C' Channel

Water proofing as per manufacturer detail 9"x9" brick work 9"x6" pcc band @ terrace lvl

Headroom lvl.

+39'6" Lvl

3'-10"

6" RCC lintel to structural detail

2'

UPVC window with 10/8mm thk toughened glass shutters to manufacturer detail

+27'0" Lvl

TERRACE

6" 6"

BEDROOM

12' 18'

9' X 6" pcc band 6" thk slab projection 6"x3" 'C' Channel

inverted midlanding beam

ventilator to detail

3'-4"

+27'6" Lvl

6"

TOILET

12mm thk toughened glass railing

+27'6" Lvl

48 47

+27'0" Lvl OPEN

46

TERRACE

6" thk RCC lintel to structural detail

45 44

2" thk pcc sill

3'-4"

3'

7'-6"

12mm thk toughened glass railing 9"x6" brick work 6" thk slab projection 6"x3" 'C' Channel

43 42 41

UPVC window with 10/8mm thk toughened glass shutters to manufacturer detail

40 39

9" thk brick work

35

32

RCC beam to structural detail

31 30

+15'6" Lvl

RCC lintel to structural detail

SHOWER

4 1 2" thk brick work

6" ht brick work for sill

28 27 26 25

+15'6" Lvl BEDROOM

+15'6" Lvl

24

Midlanding slab to structural 19 detail 18

23 22 21 20

17

UPVC sliding door with 10/8mm thk toughened glass shutters to manufacturer detail

9" thk brick work

29

inverted midlanding beam

3'-10"

DRESSING

BEDROOM

9'

+15'6" Lvl

4'

TOILET

10'-6"

5'

UPVC Window in elevation

TREAD : 0'-11 " RISER : 0'-6 "

Tread-11" Riser-6"

11"

8'

8'

33

7'-6"

34

6"

Brick bat / cinder filling

waist slab to structural detail

16

1'

+11' 0" Lvl15

6"

+21' 6" Lvl 36

3'

12" sunken for toilets

38 37

14 13 12 11 10 09

8'

06

9'

8'-6"

11'

RCC plinth beam to structural detail

07

8'

TREAD : 0'-11 " RISER : 0'-6 "

08

PCC bed

05 04 03 02

+3'6" Lvl

01

FAMILY LIVING

POWDER ROOM

NGL

SECTION - FF’

SECTION-EE'

Water proofing as per manufacturer detail 9"x9" brick work 9"x6" pcc band @ terrace lvl

2'

9" x 9" brick work 9" x 6" pcc band 6" thk slab projection 6"x3" 'C' Channel

SECTION-FF' 6" 9"

9" x 9" brick work 9" x 6" pcc band 6" thk slab projection 6"x3" 'C' Channel

6" 9"

WOODEN DECK

+2'0" Lvl

SECTION - EE’

1'-3"

FAMILY HALL

+3'6" Lvl

2'

TOILET

BEDROOM

+3'6" Lvl

4'-6"

3'-6"

2'

SWIMMING POOL

+27'6" Lvl

3'

6" thk slab projection 6"x3" 'C' Channel

6"

+27'6" Lvl

DECK AREA

4'

Door to detail

14'-6"

9' X 6" brick work

8'

8'

9" thk block work

+13'0" Lvl

+13'0" Lvl

SIT-OUT

6"

BEDROOM

Door to detail

7'

8'

8'

11'-6"

6" thk RCC lintel to structural detail 4" thk RCC slab projection to structural detail

3'

Door to detail

11'

UPVC Sliding door with 10/8mm thk toughened glass shutters to manufacturer detail

12mm thk toughened glass railing

4'

10'

RCC beam to structural detail

12'-6"

1'

COURTYARD +1'6" Lvl

UTILITY

KITCHEN +2'0" Lvl

PARKING

+1'6" Lvl

6"

+2'0" Lvl

6"

DINING

6"

GYM

SITOUT

9" x 6" brick work

3'-10"

6"

+14'0" Lvl

9'

PCC bed

9'-10"

+11'6" Lvl

LOBBY

3' 1'-6"

3'

12mm thk toughened glass partition to detail

12mm thk Toughened glass railing

6"

8'

13'

16'

11'

1'-10"

+24'2" Lvl

PASSAGE

MULTI PURPOSE ROOM

4'

1'

+27'6" Lvl

9' X 6" pcc band 3'

OUTDOOR AREA

12mm thk toughened glass railing 8'

12'

12'

Waterproofing as per manufacturer detail rcc retaining wall to structural detail 6" thk slab projection 6"x3" 'C' Channel

UPVC sliding door with 10/8mm thk toughened glass shutters to manufacturer detail

12'

12mm thk toughened glass railing

O.T.S

3'-10"

2'

SECTION - GG’

SECTION-GG'

+1'0" Lvl

SECTION - HH’

SECTION-HH'

PAGE NO : 15


PLUMBING DETAILS

5'-0"

Down Light

Concealed Geyser Dado Tile Line

eq

Cove Lighting

Gypsum ceiling

4'-412" 9'-1021" 1'-9"

SH 3" Ø Waste Water Pipe

eq

Glass Partition

Spot Light

eq

GY

eq

2'-3"

FT

Brick Marking

D

eq

-½"lvl 0"lvl

-1½"lvl

-13 4"lvl

FT

-½"lvl

Toilet 7'421"x9'1021"

Toilet

7'421"x9'1021"

PH

2'-0"

PH

eq 2'-0"

eq

2'-4 "

Wall Mounted Wc

GY

2'x2' Grid Ceiling

1'-0"

3'-9"

3'-9"

Start tile

7'-421" 2'-9"

2 in 1 Bib Tap With Health Faucet At 1'3" ht

-½"lvl

Gypsum ceiling

1 2

4" Ø Soil Pipe

FT

-1½"lvl

2 in 1 Bib Tap With Health Faucet At 1'3" ht

Toilet 1 7'42"x9'1021" 2'-0"

SH

Hot Water Line

3'-0"

6'-121" 2'-412"

eq

Down Light

-1½"lvl -½"lvl

Dado Tile Line

Domestic Water Line

Sliding Glass Door

FT

Toilet 1 7'42"x9'1012"

eq

Spot Light

-11 4"lvl

FT

eq

HF

HW FT

-½"lvl 0"lvl

Flooring Plan

Reflected Ceiling Plan

HF

-½"lvl 0"lvl

Water Lines Layout

Sewer Lines Layout

B Gypsum Ceiling

FALSE CEILING

Concealed Geyser

2" Plaster Band Concealed Geyser

GY

PAINT FACIA

Tissue Holder @2'3" ht Wooden Door As / Selection

Mirror Panelling

Glass Partition

Cove Lighting

-½"lvl

SUNKEN

2"

Thick Double Ply

Flooring as Per Selection

2'-0"

1012"

3"

2'-6"

Drawers laminate facia 3'-0"

SUNKEN

dummy storage for wash basin bottle trap

1'-0"

1'-412"

Open shelf

Flooring as Per Selection

concealed flush tank@3'-6"ht

1'-6" spout @ 2'-0" ht

1'-5"

1

4" ht Marble splash Board

1'-1012"

9"

drawer unit

Laminate As Per selection

Wash Basin

wall mixer @ 3'-6' ht

3'-6"

3" 5" 1'-5" 9"

C

7"

drawer unit

1'-1012"

eq

wash as/selection

7"

3'-6"

eq

concealed flush tank@3'-6"ht

A

Toilet 1 7'42"x9'1021"

4" ht Marble splash Board

2'-0"

2'-3"

GY

HW

FT

4'x2' Daddoing Tiles As / Selection

Ventilator

Mirror Paneling

Cove Lighting

PH

HF

4'x2' Daddoing Tiles As / Selection

-½"lvl

A

C

4'x2' Daddoing Tiles As / Selection shower @6'-6"ht

FT

-1½"lvl

Gypsum Ceiling

PAINT FACIA

PAINT FACIA

Glass Partition

3'-0"

SH : Shower GY : Geyser PH : Paper Holder HF : Health Faucet HW : Hand Wash

PAINT FACIA

4'x2' Daddoing Tiles As / Selection

eq

Sliding Glass Door

FALSE CEILING

Grid Ceiling

SH

3'-1021"

Mirror Paneling

Grid Ceiling

PAINT FACIA

eq

Dado Tile Line

Gypsum Ceiling

FALSE CEILING

FALSE CEILING

wash as/selection

dummy storage for wash basin trap

2 in 1 Bib Tap With Health Faucet At 1'3" ht

flush plate @3'3"ht

Wall Mounted Wc

Wall Mounted Wc

Flooring as Per Selection

SUNKEN

Flooring as Per Selection

SUNKEN

0"lvl

Presentation Plan

D

Section - AA

Section - BB

Section - CC

Section - DD

B

PAGE NO : 16


HIGH-RISE RESIDENCY AT NIZAMPET PRESENTATION PLAN

TYPICAL FLOOR PLAN

PAGE NO : 17


PROPOSED OFFICE AT JUBILEE HILLS PRESENTATION PLAN

CHOCOLATE SHOP / PANTRY 13’6” X 6’0”

CHOCOLATE SHOP

LOBBY 15’10” X 10’0”

LOBBY 15’7”X9’6”

MATERIAL DISPLAY AREA

DISCUSSION ROOM 8’6” X 12’0”

Storage

OPEN SHELF

CONFERENCE 15’3”X10’6”

MATERIAL DISPLAY AREA 10’4” X 15’4”

MATERIAL DISPLAY AREA

BOOTH SEATING

5’ WIDE PASSAGE

SCREEN

PANTRY 14’0”X8’3”

CONFERENCE 11’0” X 15’10”

CABIN -1 10’6” X 8’0”

BOOTH SEATING

5 ‘ HEIGHT STORAGE

STORAGE

LOCKERS / OPEN SHELFS

CABIN-1 10’4”X10’0”

Xerox

WORK STATIONS 22’0”X20’6”

5 ‘ HEIGHT STORAGE

CABIN-1 10’4”X10’0”

DIRECTOR ROOM-2 13’6”X10’6”

EXISTING CABIN -1

EXISTING CABIN -2

REST ROOM-2 6’5.5”X5’3.5”

REST ROOM-1 6’5.5”X5’3.5”

BREAK - OUT ROOM 16’11” X 9’0”

STORAGE

DIRECTOR ROOM-1 13’6”X10’6”

CABIN -3 10’6” X 8’0”

STORAGE

XEROX

STORAGE

CABIN -2 10’6” X 8’0”

OFFICE PLAN OPTION -A

MOOD-BOARDS

OPTION - B

PAGE NO : 18


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.