Portfolio | Saksham Raheja
Hello
Contact
Saksham_raheja@yahoo.co.in
I’m Saksham Raheja
C-6/6577 Vasant Kunj, New Delhi, India - 110070 + (91)-9910083043 www.linkedin.com/in/saksham-raheja
prompt | curious | perceptive
hindi | english | german
Practice experience Internship_2019 - D.I.P.L, Gurgaon Duration -2 Months Guide - Mr. Aditya Tognatta
Site Documentation, Design Ideation, Interior, 3d Modelling
Internship_2018 - G.S.A Architects Duration - 2 Months Guide - Ms. Gunmeet Kaur Design Ideation, Drafting
Software skills
Acadamic background aug.2007-feb.2014
DPS International, Saket, New Delhi IGCSE Board aug.2014-feb.2016
DPS International, Saket, New Delhi Cambridge A & AS levels aug.2016-june.2021
Sushant School of Art and Architecture Bachelors of Architecture
Extra-Curricular
MS Office
Music Society Head_2018-2020
AutoCad
ZONASA_2019 - Music Trophy Head Runners-up trophy
Photoshop
ZONASA_2018 - Music Trophy Head
Illustrator
Selection in top 7
Indesign
Campus Development_2018 - Project Head
Rhino
Designing, Implimenting, Executing
Grasshopper
Annual NASA Design Competition_2018 - Member Top 18 All-India
3Ds Max
Campus Development_2017 - Member
Vray
Wall painting and designing
Twinmotion
Publication
Interests
“Critiquing the Subject-Object debate in the production of a city” Published by Sushant School of Art and Architecture
References Gaurav Sanan Partner at “Urban Architecture Works” gaurav@uaworks.in
copyright by saksham raheja 2020
03
1
FUTURE OF HOUSING //
06
“Inter-Living” for Millenials Site - DLF Phase 3, Gurgaon Group Project with Tarunima Nigam Design Studio // Sem VII
2
ADAPTIVE HABITAT //
16
“IdentiCity” a mixed use project Site - WTC Sector 29, Gurgaon Design Studio // Sem VI
3
CITY INTERVENTION //
24
“Townhall” for the people of Mangalagiri Site - Mangalagiri, Andhra Pradesh Design Studio // Sem IV
4
ARCHITECTONIC TRANSLATION //
30
“World Media Labs” Site - National Crafts Museum, Delhi Design Studio // Sem V
5
URBAN ACUPUNCTURE //
34
Urban Design Studio Site - Pagarganj, Delhi Group Project with Bhavya Jain and Tarunima Nigam Design Studio // Sem VIII
6
WORKING DRAWINGS //
42
Set of drawings made for the college of art and architecture Building Construction Studio // Sem 6
7
MISCELLANEOUS //
48
Series of personal artworks from 2016-2020
copyright by saksham raheja 2020
05
01 PROJECT
LOCATION
Future of Housing
DLF Phase 3, Gurugram
SEMESTER VII 2019 YEAR
The intent of the studio was to decipher the complexities in a typical large housing complex and de-
signing an output catering to the future of housing.
The design follows the methodology based on the strand of demographic exploration in order to cater to a certain set of people that defines the “future�.
The design primarily emphasises on integration of a public realm within a housing project, not disrupting the lifestyle of the residents and at the same time being an integral part within a busy city fabric. This project breaks the monotony of a typical isolated housing project and adds multiple layers of interaction at many physcial layers.
06
ROOF PLAN
08
Linear pedestrian axis used
A cycling/Jogg Linear pedestrian axis green usedspaces. to divide green spaces. to divide Easily accessib
Linear pedestrian axis used to divide green spaces.
A cycling/Jogging trackaround created around the built. Cycling/Jogging track the built with easy Easily accessible due to pedestrian friendly layout. access due to pedestrian friendly layout.
Public Realm on the third floor.
Linear pedestrian axis used to divide green spaces.
cling/Jogging track created around the built. y accessible due to pedestrian friendly layout.
A cycling/Jogging track created around the built. Easily accessible due to pedestrian friendly layout.
Paths
Ground fl
Paths derived from outside the site in referance to Public realm on the third floor; form derived throughOverlay of the future development. bringi context. Masses containing public functions.
Ground floor linear overlay with Public Realm on the third floor. Ground floorpaths linear pedestrian axis. organic third Paths derived from outside the site in referance to public Overlay of third floor pedestrian axis, floor realm. the future development. bringing people into the site. Masses containing public functions. 09
UNIT PLANS
3BHK + EWS
2BHK
STUDIO 10
CLUSTER PLANS 5775
4225
4930
6380
8250
3080
2050
5400
4770
3235
4145
TOILET 1500 x 3000
BEDROOM 4500 x 4100
DRAWING ROOM 5200 x 3500 BEDROOM 4500 x 3800
TOILET 1500 x 3000
3780
5962
TOILET 1500 x 3000
BEDROOM 4500 x 4100
BEDROOM 4100 x 5600 DRAWING ROOM 6200 x 3200
TOILET
KITCHEN/ DRAWING ROOM
4275
DINING/ KITCHEN 6200 x 3800 TOILET 1500 x 3000
BEDROOM 4000 x 5600 BEDROOM STUDIO 10000 x 6000
DINING 5200 x 3000 TOILET 1900 x 3000
6199
KITCHEN 3000 x 3000
3950
TOILET 3000 x 1600 FIRE HOSE 1200 x 900
3950
2429
EWS UNIT 8000 x 3700
6115
GARBAGE CHUTE 2000 x 2000
4275
6230
3780
SERVICES
TOWER A
5775
4225
4930
6380
8250
3080
2050
5400
4770
3235
4145
DINING/ KITCHEN 6200 x 3800
4275
TOILET 1500 x 3000
BEDROOM 4100 x 5600 DRAWING ROOM 6200 x 3200
TOILET
KITCHEN/ DRAWING ROOM
3780
5962
BEDROOM 4000 x 5600 BEDROOM STUDIO 10000 x 6000
3950
6199
TOILET 1500 x 3000
3950
2429
FIRE HOSE 1200 x 900
6115
GARBAGE CHUTE 2000 x 2000
4275
6230
3780
SERVICES
TOWER A DUPLEX
6200
4470
6200
6200
6200
6200
4470
6200
6200
2050
5390
4770
3235
4145
2050
5390
4770
3235
4145
4275
4075
3780
5700
3950
2160
FIRE HOSE 1200 x 900
3950
5700
3780
4075
4275
6200
TOILET 1500 x 3000
TOILET 1500 x 3000
4075
BEDROOM 4500 x 4100
BEDROOM 4500 x 4100
4275
TOWER B & C
PRIVATE LAWN 4500 x 3800
DINING 5200 x 3000 PANTRY 1900 x 3000
3950
STORAGE 3000 x 3800
4275
4075
3780
5700
3950
2160
FIRE HOSE 1200 x 900
5700
KITCHEN 3000 x 3000
3780
DRAWING ROOM 5200 x 3500
TOWER B & C DUPLEX
11
ROOF PLAN (Scale: 1:500) ACCESS LEVEL PLAN
SITE SECTION
12
(Scale: 1:200)
BUILDING SECTION
Introduction of cycling tracks with parking on stilt level.
A semi-public sports complex integrated within site.
Surface parking for semi-public function of a club house.
A public retail as active frontage to induce pedestrian interactions.
Swimming pool at deck level to maintain privacy from ground level.
13
14
3D RENDERS AND VIEWS
15
02 PROJECT
LOCATION
Mixed-Use Project
WTC Sector 29, Gurugram
SEMESTER VI 2019 YEAR
The intent of the studio was to develop an iterative process that could be modulated and eval-
uated for a given set of criterions. By the use of shape grammer multiple
iterations were generated
through the context and implemented in the design.
The project consists of Residential, office spac-
es, X-factor, retail, and a business hotel. The site being a TOD active zone,
allows flexibility in num-
bers along with extensive scope for an intervention.
16
ACCESS LEVEL PLAN
18
Creation of a drop-off catering to the residential block and the pedestrian influx to the hotel.
Drop-off to the hotel along with ramp entrances to the basement.
Zoning of retail along the primary road to ensure TOD based active frontage.
Office drop-off along with ramp entrance to the basement.
19
ROOF PLAN
MASSING ITERATIONS
Co
G
G
G
20 Idea of a Visual Corridor
Interactive edge for pedestrian flow to site.
Emphasis on pedestrian con-
Multiple small masses allow
Buildings at the periphery of the site concealing the site
Attempt at activating the dead part of the site.
4. CONTRAST IN ARCHITECTURAL LANGUAGE (MATERIAL + FORM)
Facade materiality
Achieving Maximum visual permeability pockets.
2D ITERATIONS AND SHAPE GRAMMAR
DESIGN CONCEPT (HAND GRAPHICS)
Activation of edge conditions
Context driven natural built-unbuilt massing
Building form iterations
I
Idea of a Visual Corridor Emphasis on pedestrian connectivity to courtyard.
M p
Dense mass towards the inactive part of the site.
Ma by
Creating multiple buffer points on site. MATHEMATICS AND SHAPE GRAMMAR
Achieving contrasting architectural language from context.
4. MIRROR
1. REPETITION
Applying shape grammar to decide scale and impact of each buffer point. 2. MULTIPLICATION
x 2x x 3. SCALE
4x x
Unique form for X-Factor for emphasis.
5. ROTATE
Connecting functions on different levels, creating cutouts on ground floor for visual permeability. Inactive edge activated by providing major functional mass. Visual corridors designed leading to a congragational space. 21
HOTEL DETAIL
MASSING DIAGRAMATIC ILLUSTRATIONS
UG FLOOR LAYOUT
GROUND FLOOR LAYOUT
Core FIRST FLOOR LAYOUT
Shafts
22
Structure TYPICAL FLOOR LAYOUT
Grid-Shell Structure to allow penetration of natural light inside the double height atrium.
Semi-Terrace concept to provide a transition between the public and semi-public spaces.
Sky-walk integrated with vegetation on either sides, resting on an extended beam.
23
03 PROJECT
LOCATION
City Intervention (Townhall)
Mangalagiri, Andhra Pradesh
SEMESTER IV 2018 YEAR
The basic premise of the studio was to analyse cul-
tural, socio-economic and political patterns within the
built city fabric and examining the need of intervention. The project began with an extensive on foot site study
and
documentation
leading
to
deduc-
ing the functional needs of the city. Mangalagi-
ri being at the cusp of the past and the future of Andhra Pradesh lacked the sense of Authority. To tackle the question of Authority, Mangalagirir needs an identity with a bold statement “This is Mangalagiri�.
24
ROOF PLAN
Art gallery and museum designed with a shell structure for emphasis on site. Use of glass and skylights to make the speed of architecture continous.
A sunken court consisiting of an amphitheatre, a food court, congragational space an retail. Creating a public realm.
26
f
nd
What is the future of Mangalagiri? Mangalagiri is intended to expand as a sattellite city but its essence will narrow down but never diminish. By essence it is reffered mainly to relegious impact of the city. The development is approaching Mangalagiri from its both ends making Mangalagiri the region of future conflicts which is not being recognised as of now. Mangalagiri will soon become a city of power and it becomes essential for us to dwell on the idea of identity and power to ensure the progressive development of the city.
Where will the intervention happen? A fomal space designed for the function of a townhall; a state management.
I feel the development is creeping into Mangalagiri than fading in which in turn might have negetive impacts if not conisdered yet. Since the edge conditions of Mangaligiri becomes the primary areas of impact it is essential to create a bold statement of identity there. The western edge being more subject to development would be the ideal area of intervention.
What will the intervention be? The idea of strengtheneing the western edge keeping the essence of mangalagiri static can be achieved by introducing an intervention of power and authority. A multifunctional complex comprising of a democratic Towhnhall and State management to assert dominance by the people. A museum and a gallery space to keep the tradition,culture and the essence alive. An archive and library to document the city. A public realm to engage social gatherings and increase the lacking culture of interaction in Mangalaigiri. An semi-public archive and a library consisting of documentation of the City.
27
DESIGN CONCEPT - UNDERSTANDING SPEED OF ARCHITECTURE
Verticality
Expanse of mass
Orientation
Layers of Mass 28
Depth of View
Quality of enclosure
Physical penetration
Reveal - Conceal
Fast
Fastest
View contained within sunken courtyard.
Vanishing Point at site, maximum permeability.
Slowest
Concealed layered Enclosue, needs more time to be percieved.
29
04 World Media Labs
PROJECT
National Crafts Museum, Delhi
LOCATION
SEMESTER V 2018 YEAR
The intent of the studio was to document and analyse the
existing context of the National Crafts
Museum and introduce an alternative strategical function to regenerate the essence of the muse-
um using the ideation of architectonic translation. The concept was developed to the function of media labs
with the primary function of doc-
umentation and dissipation. In terms of functionality,
the
design
digitally
documents
exist-
ing artifacts and is displayed in the gallery within. Furtheron,
the
the
of
lens
breaking
30
the
design
is
architectonic conventional
explored of
through
deconstructivism
design
approach.
DESIGN CONCEPT - A DIGITAL MUSEUM COMPLEX THROUGH THE LENS OF DECONSTRUCTIVISM
32
Entry to basement for digital museum.
Library and open gallery display space.
Vocational Centre connected to a workshop.
33
05 Urban Acupuncture
PROJECT
LOCATION
Paharganj, Delhi
The
intent
of
plore
an
SEMESTER VIII 2020 YEAR
Study tion
urban
the
fabric
prevalent
agendas
and
and
their
studio
was
in
city
the
upcoming
relevance
to
of
ex-
Delhi.
urbaniza-
with
India.
Identify and incorporate a suitable selected agenda for improvement of urban life in the assigned urban fabric. In conclusion, suggest sensetively grounded architectural “acupuncture� responses for improvement of the city. The idea of acupuncture is explored through the lens of existing VOIDS and feasible strategical interventions are designed to implement the concept.
34
35
DESIGN CONCEPT - VOID ANALYSIS AND TRANSFORMATION LEGEND
SUB - STRATEGIES 1. Redevelopment of voids to achieve formality of informal spaces 2. Integration of community spaces/functions to revive inactive voids
MASTER STRATEGY - Redevelopment of Unused/Abandoned spaces to achieve void transformation.
CURRENT
CURRENT
CURRENT
CURRENT
DIAGRAMMATIC ILLUSTRATION
DIAGRAMMATIC ILLUSTRATION
DIAGRAMMATIC ILLUSTRATION
INTERVENTION
INTERVENTION
REDEVELOPMENT OF WAREHOUSE
36
REDEVELOPMENT OF UNUSED VOIDS IN SCHOOL
INTERVENTION
INTERVENTION
MULTI- STOREY PARKING
CREATING VOIDS FOR PARKING
CONCEPT DIAGRAMS
FUNCTIONAL STRATEGY FLOWCHART
INTERVENTION 1 - Informal Hawker Zone 6WUDWHJLHV )ORZFKDUW )RXU GLIIHUHQW VWUDWHJLHV FRPELQHG LQWR WZR ĆQDO VXE VWUDWHJLHV LQWHJUDWLQJ PXOWLSOH IXQFWLRQDO HOHPHQWV
37
INTERVENTION 2 - Abandoned Warehouse
&RQFHSW 6NHWFK
38
Functions?
INTERVENTION 3 - Time Based Vooid WHAT? Creating a Workshop + Exhibition area in an existing school plot which is treated as a time based void.
NARRATIVE Worked on a 2x2 m grid (Area required to accomodate 4 people).
In this small module every space has its own character and experience.
Since the space is in the middle of a school, a solid block wasnt designed which would disrupt the current scenario.
Cutouts have been provided in some studios to accmodate variety of functions and use of flexibilty in spaces. PLAN
FORM CONCEPT
39
06
G
G
TO B1
RAMP SLOPE 1:12
G
G
6M WIDE
SERVICE PARKING P
WORKING DRAWINGS
G
Content -
External Development Plan (Cover) Ground Floor Plan Toilet Details Staircase Details Door/Window Details Building Sections
40
+450
G
G G
GUARD ROOM 2000X1500
DG ROOM 4000X5000
ENTRY 2
+600
10M WIDE
00
32
+4600
G
+6900
G
+3600
+3600 +3600
G
SERVICE DECK
G
P
+450
+600
75
00
45
00
+9900
G G 10
00
0
SERVICE DROP - OFF G
12M WIDE G
MACHINE ROOM
G
DOMESTIC WATER FIRE TANK TANK 2500X3000 2500X3000
8M WIDE
+6900
STONE PAVED G
1200 MM WIDE 1200 FOOTPATH
12000 150 150 MM WIDE CURBSTONE
80
00
6000
+600
P
30 60 00
00
14 00 0
G
28
00
25 00
0
TAR BLACK TOP
G
+450
METERING 3000X5000
TRANSFORMER 8000X5000 GUARD ROOM 2000X1500
ENTRY 1
G
METER ROOM 1500X1000
W1 AXX
1740
3465
W1 AXX
A5
C
6635
EQ
EQ
L
W1 AXX
BA
BB
BD
BC
BE
EC
B1
EQ
5735 C
EQ
00
5195
L
14655
5000
ED
60
5030
EQ
EQ
L
D2 AXX
94
EF
90
27380
D1 AXX
5005
10
+900
10000
70
BLOCK B
19690
B3
K
VINYL OIL BASED DISTEMPER
5010
O DIS IL B TE ASE M D PE R
EQ
M
02 WHITEWASH+ EMULSION PAINT
10000
20 M AR M BL TH E C
W1 AXX
15010
00
L
EE
60
85
5000
61
B4 EQ
AXX
9195 L
5000 C
W1
7730 C EQ
EQ
B
BH
8430
B5
L
W1
3880
20 M AR M BL TH O E CK DIS IL B TE ASE M D PE R M
EQ
10 W EM HIT UL EW SIO AS N H+ PA IN T
5
W1
AXX
AXX
5335
5590
B6
PLUMBING SHAFT 1200 X 600
PLUMBING SHAFT 1200 X 600
06 TOILET
03
VINYL
WHITEWASH+ EMULSION PAINT
OIL BASED DISTEMPER
L
6140 C
EQ
W1
11385
B7 L
AXX
EQ
AXX
20385 D5
5205 C
W1
OIL BASED DISTEMPER
D6 AXX
EQ
+450
12MM VITRIFIED TILES
WHITEWASH+ EMULSION PAINT
EQ
AXX
14005 10455
B8 EQ
AXX
14005 20 MM THCK MARBLE
05 VINYL
WHITEWASH+ EMULSION PAINT
OIL BASED DISTEMPER
WHITEWASH+ EMULSION PAINT
+900
OIL BASED DISTEMPER
D5 AXX
EQ
+00
04
L
5725 C
W1
B9
10785 4980
07
D6
VINYL
AXX
OIL BASED DISTEMPER
19060
WHITEWASH+ EMULSION PAINT
45
05
B10
EQ
13655
4525
C
73 W1
B11
0L 5
D6
EQ
AXX
4365
AXX
9300
66
60
B12
EQ
66
90L
12970
4220
C
EQ
W1
B13
AXX
4395
11 W EM HIT UL EW SIO AS N H+ PA IN T
C
EQ
B2
22
AXX
15
00
50 00
60
3470
5460 C
2500
BG
AXX
AXX
W1
BF
W1
W1
71
10
B14
42
08 WHITEWASH+ EMULSION PAINT
4990
6
NOTES
5 4 3
S2
2 1
Wooden Staircase
UP
1. ALL DIMENSIONS ARE IN MM
D3 EQ
EQ
2. WALLS ARE 230 MM THICK UNLESS OTHERWISE SPECIFIED 3. FINISHES SCHEDULE
L
C
5800
W1
C
L
W1
AXX
ROOM NO. FLOORING WALL
EQ
EQ
AXX
D4 24540
D6 3980
AXX
CEILING
4. BASE MATERIALS BEFORE FINISHING : D6
BLOCK D
+900
AXX
PLASTER ON WALL SCREED ON FLOOR
EQ
20 MM THCK MARBLE OIL BASED DISTEMPER
L
C
09 WHITEWASH+ EMULSION PAINT
C
W1
L
W1 AXX
EQ
AXX
EQ
4890
EQ
D5
EQ
L
C
C
W1
L
4890
EQ
D6 W1 AXX
AXX
14545 EQ
C
EQ
D7
EQ
EQ
L
W1 AXX
BJ
BI
4190
CA
12 11
13
10
14
9
15
8
16
7
17
6
18
5
19
4
20 21
3 2
22
1
UP
CC
CB
5455
23
S1
24
DN
5000
4645
TREAD - 300 RISER - 150 WIDTH - 1800
D7
BLOCK C
AXX
C1 KEY PLAN
SCHEDULE OF OPENINGS
CD
5075
D3 AXX
S.NO
TYPE WIDTH SILL LINTEL HGT.
1
5320
C2
6275
ELECTRICAL SHAFT 1200 X 600
W1
2000
900
2
W2
1200
900
3
D1
2000
2400
2400
4
D2
2400
2400
2400
5
D3
2500
2100
6
D4
5000
2400
2400
7
D5
1800
2100
2100
2100
1200
2100
1200
2100
8
D6
1200
2100
2100
9
D7
1500
2100
2100
C3 6065
LIFT SHAFT 1 2500 X 2400
LIFT SHAFT 2 2500 X 2400
CE
ISSUES DATE
NOS.
ISSUED TO/REMARKS
4385
EQ
5990
C4
VINYL C
L
W1
C5 REVISION
REMARKS
REVISIONS
C6
PROJECT
3715
EQ
DATE
3835
AXX
OIL BASED DISTEMPER
TITLE
C7
GROUND FLOOR PLAN ARCHITECT
SAKSHAM RAHEJA SCALE
DATE
1:100 MADE BY
SIGN
43DWG NO.
REV NO.
C'
670
C
670
C'
L
L
150MM THK.R.C.C SLAB
BH
L
SECTION A-A' BF
90
915
300X300 Vitrified Tile, laid on 15mm cement sand mortar
SECTION A-A'
C
670
PLUMBING SHAFT 2400 X 600
L
670
B6
1515
B'
6130
6140
915 900
915 900
915
2250
SECTION B-B'
DET
300X300 Vitrified Tile, laid on 15mm cement sand mortar
A B
DETA
250MM SUN WEIGHT
6140
6130
805
150MM THK.R.C.C SLAB
C
SECTION B-B'
D
5590
600x300 ceramic Tiles
2250 2250
300X300 Vitrified Tile, laid on 15mm cement sand mortar
250MM SUNK, LIGHT WEIGHT FILING
1st Floor finish level
BG
250MM SUNK, LIGHT WEIGHT FILING
5195 SECTION D-D'
230
150MM THK.R.C.C 1350 SLAB
VITRIFIED TILES 600 X 600
FLOORING PLAN
6130
230
SLAB
100 MM LED SLIM DOWNLIGHT 10W
BH
1st Floor finish level
300X300 Vitrified Tile, laid on 15mm cement sand mortar
5590
PLUMBING SHAFT 2400 X 600
SECTION D-D' 2000
1415 2250
REFLECTED CEILING PLAN
SECTION D-D'
2nd Floor finish level
2250
44
SECTION D-D'
300X300 Vitrified Tile, laid on 15mm cement sand mortar
830
2000
250MM SU WEIGHT
150MM THK.R.C.C SLAB
150MM THK.R.C.C SLAB
300X300 Vitrified Tile, laid on 15mm cement sand mortar
B6 CEILING PLAN REFLECTED
B7
600x300 ceramic Tiles 2nd Floor finish level
100 MM LED SLIM DOWNLIGHT 10W
BF
150MM
2nd Floor finish level
2250 6130
6130 6130
5510
1200 THK.R.C.C1350
1350
2000
5510
2250
830 1415
1200
230
2000
PLUMBING SHAFT 2400 X 600
1200
230
830
PLUMBING SHAFT 2400 X 600
B7
230
5510
805
805
SECTION A-A'
1415
230
900
805 805 805
805 805
5590
300X300 Vitrified Tile, laid on 15mm cement sand mortar
A
BH
250MM SU WEIGHT 2000
150MM THK.R.C.C SLAB
1st Floor finish level
BH
150MM THK.R.C.C SLAB
B6
A
1415
6130
6140
PLUMBING SHAFT 2400 X 600
SECTION A-A'
4970
600x300 ceramic Tiles 1st Floor finish level
250MM SUNK, LIGHT WEIGHT FILING
300X300 Vitrified Tile, laid on 15mm cement sand mortar
BF
2250
250MM SUNK, LIGHT
300X300 Vitrified Tile, laid on 15mm FLOORING PLAN BGcement sand mortar
5195
5590
670
VITRIFIED TILES WEIGHT FILING 600 X 600
150MM THK.R.C.C SLAB
BG
670
830
805
B6 FLOORING PLAN
150MM THK.R.C.C SLAB
BH
600x300 ceramic Tiles 2nd Floor finish level
D
VITRIFIED TILES 670 670 600 X 600
W.C
W.C
BG
C
5195
230
1350
2nd Floor finish level
Ventilator
A
B
SECTION D-D' SECTION D-D'
6130
805 805 805 805 805
805 805 805 805 805 230
1200
BF
250MM SUNK, LIGHT WEIGHT FILING
C
D
230
830 6130 6130
230 805
1350
B7
C'
1200
300X300 Vitrified Tile, laid on 15mm cement sand mortar
LAYOUT PLAN
A Ventilator 5510
300X30 cemen
300X300 Vitrified Tile, laid on 15mm cement sand mortar
5510
B
4970 150MM THK.R.C.C SLAB
250MM SUNK, LIGHT WEIGHT FILING
150MM THK.R.C.C SLAB
PLUMBING SHAFT 2400 X 600 1415
900
915
230
L
B7
1350
230
915
805
805 805
915
805
6130
915
900
6130
915
900
900
6140
D
900
L
1200
W.C
150MM THK.R.C.C SLAB
C
900
L
C
C D
C
L
830
L
B
A' D'
L
C
C
L
1415
195
A
C
L
5590
PLUMBING SHAFT 2400 X 600
5510
C
BH
C
L
670
L
C
5590
C
4965
L
195
C
L
C
L
670
C
C
L
BG
BH
900
1415
LAYOUT PLAN ABG
4965
300X300 Vitrified Tile, laid on 15mm cement sand mortar 250MM SUNK, LIGHT WEIGHT FILING
5590
830
L 1515
900
915 915 670
C
900 900
915
670
C
900
915 915
B
805
230 230
230
L
5195 C
WEIGHT FILING
150MM THK.R.C.C SLAB
BG
900
6130
805 805 805
805 230 805
L
C C
1350
L
C
C
L 1200
W.C
900
805
805 805 805
6130
L
C
C
L
C D
L
C
A
B
A' D'
L
L
BF
L
L
C C
D
1350
C
C
5510
B6 LAYOUT PLAN
70
965
B
C
L 1200
5195
0
C
C C
L
4965
A
250MM SUN WEIGHT
C'
6140
COLUMN
BI
DETAIL AB7(SUNKEN SLAB)
BASEMENT
STITCHED SLAB
Sand Composite
1st Floor
level LAYOUTfinish PLAN
30 MM SCREED
B6 RCC Slab 150 mm
UP
20 MM GRANITE STONE
10 MM THK SKIRTING
6130
4195
805 805 805
4195 4195 4195
-12
-11
-10
-9
-8
-7
-13
-15
-14
-16
-18
-17
-19
4195
830 805 805 805
230
230
-14
-13
-15
-16
-18
-17
-19
-9
-11
-12
-8
-10
-7
-4
-6
-5
DETAIL A BJ 300X300 Vitrified Tile, laid on 15mm (FOUNDATION cement sand mortar HoldfastSTAIRCASE DETAIL)
SECTION B-B'
50 MM DIA STAINLESS STEEL HANDRAIL
BASEMENT PLAN
830
DETAIL B (DRY PARTITION DETAIL)
S.NO
Wall
2250
+6900
6130
230
BI UP -9
-8
4195
-12
-7
-11
-10
-6
-5
-1
-3
-2
-4
DN
A'
1st Floor finish level
BASEMENT
UNK, LIGHT T FILING
SECTION D-D'
400 MM SAND
Wall
450 X 450 MM RCC COLUMN
B
Rivet
Mirror
50 MM
STE PROJ
Mirror +12900 MUMPTY LVL
12 MM WATER PROOFING
Wall
BASEMENT LVL
A
DAT STITCHED SLAB RCC FOUNDATION
30 MM SCREED
-3600
1st Floor finish level
PROJE TITLE EARTH
DETAIL A (FOUNDATION STAIRCASE DETAIL)
T
30 MM STE
ARCH TITLE
STEE
DETAIL D (MIRROR FIXING TERRACE LVL DETAIL)
SA TO RA
4195
+9900
SECTIN A-A' BJ
+6900 S.F LVL
DATE
100 MM PCC
BI
A'
DATE 250MM WEIG
100 MM PCC
Rivet BJ
TREAD - 300 RISER - 150 WIDTH - 1800
DAT
300X300 Vitrified Tile, laid on 15mm cement sand 100 MM mortar TRIMIX
DETAIL C (URINAL DRY +450 PARTITION DETAIL) G.F LVL
-13
-14
-16
-15
-17
-21
-18
-20
-19
-24
-22
-23
C
25
RIVET
Mortar DETAIL C (BALISTER JOINERY DETAIL) 150 MM THK RCC SLAB DETAIL B (NOSING Steel Angle with C (URINAL DRY DETAIL 150MM DETAIL) THK.R.C.C Rivets PARTITION DETAIL) SLAB
B6
50 MM DIA STAINLESS STEEL HANDRAIL
Mortar Wall
Steel Angle with +3900 Rivets F.F LVL Tiling
10 MM THK SKIRTING
REFLECTED CEILING PLAN
Tiling
100 MM LED SLIM DOWNLIGHT 10W
20 MM GRANITE STONE
A
STEEL BASE PLATE
S.F LVL
6140
1350
S.NO
30 MM DIA STAINLESS STEEL BALISTER
2250 B7
SCH
SCH
TERRACE LVL
2000
6
250MM WEIG
A'
PLUMBING SHAFT 2400 X 600
5510
BJ
BASEMENT PLAN
+9900
-3600 BASEMENT LVL
SECTIN A-A'
230
14
13
15
17
18
16
6130
12
11
10
9
8
7
6
-21
-22
-20
DN
5590
1415
6130
13
14
15
17
18
16
-4
-6
-5
-1
-3
-2
B
BI
A
Holdfast150MM Hinge 100mm THK.R.C.C SLAB
DETAIL B (DRY PARTITION DETAIL)
NK, LIGHT FILING
4195
11
12
10
9
8
7
6
-21
-22
-24
450 X 450 MM RCC COLUMN
150 MM THK R
A'
450 X 450 MM RCC COLUMN
1st Floor finish level
NK, LIGHT 6FILING
-23
MUMPTY LVL
BH
-20
DN
BG
20 MM MORTA
DETAIL B (NOSING DETAIL) Hinge 100mm
TREAD - 300 RISER - 150 WIDTH - 1800
TREAD - 300 RISER - 150 WIDTH - 1800
+12900
A
BJ
21
UP
A
+450
-3
-1
50 MM DIA STAINLESS STEEL HANDRAIL
-2
A
1st Floor finish level
600x300 ceramic Tiles
20
50 MM DIA STAINLESS STEEL HANDRAIL
F.F LVL
C
6140 Shutter knob
-23
450 X 450 MM RCC COLUMN
-24
1350
600x300 ceramic Tiles
A'
25 MM THK GRANITE
B6
20 MM GRANITE STONE
UP
B7
finish level
600x300 ceramic 2nd Floor Tiles finish level
25MM NOSING BI
Shutter knob
BJ
G.F LVL
BI
19
6140
A'
10 MM THK SKIRTING
2nd Floor finish level
2nd Floor finish level 1200
3
10 MM THK SKIRTING
FLOORING PLAN
4965
4
-12
-11
-10
-9
-8
-7
+6900
VITRIFIED TILES 600 X 600
UNK, LIGHT T0 FILING
B6
20 MM GRANITE STONE
D
BASEMENT
5195
BJ
GROUND FLOOR PLAN
+3900
600x300 ceramic 2nd Floor Tiles
250MM SUNK, LIGHT WEIGHT FILING
SECTION D-D'
450 X 450 MM RCC COLUMN
B7
S.F LVL
C
5
300X300 Vitrified Tile, laid on 15mm
Partition Wall 15MM Thk
-13
-14
-15
-16
-17
-18
-19
-6
-3
-4
-5
DN
WIDTH - 1800
-20
-21
-1
-2
A
B
1st FloorTREAD - 300 RISER - 150 finish level
1200
-22
5510
1st Floor finish level
A
-23
-24
50 MM DIA STAINLESS STEEL HANDRAIL
21
Partition Wall 15MM
Thk cement sand mortar GROUND FLOOR PLAN
BI
EARTH
BJ
A'
THK.R.C.C SLAB
UP
600x300 ceramic Tiles
20
DN
+9900 TERRACE LVL
22
24
23
450 X 450 MM RCC 150MM COLUMN
TREAD - 300 RISER - 150 WIDTH - 1800
10 MM THK SKIRTING
finish level
2
1
PLUMBING SHAFT 2400 X 600 6140
600x300 ceramic 2nd Floor Tiles
1415
A
B6
20 MM GRANITE STONE
19
DN
B7
3
UP TREAD - 300 RISER - 150 WIDTH - 1800
50 MM DIA STAINLESS STEEL HANDRAIL
MUMPTY LVL
22
24
2nd Floor finish level
23
670
100 MM
BI A'
DETAIL A (FOUNDATION STAIRCASE DETAIL)
+12900
5590
5195
4
DETAIL A (SUNKEN SLAB)
12 MM W
50 MM DIA STAINLESS STEEL HANDRAIL
A
670
6140
5
BH
2
1
BG
DETAIL D (MIRROR FIXING DETAIL)
45 DETAIL C (BALISTER JOINERY 25MM NOSING
SCALE ARCHIT
1:50 SA
RA
MADE
SCALE
B13
B12
B12
B11
B11
B8
B9
B10
B8
B9
B10
B7
B7
B6
B6
+12900 MUMPTY LVL
B14
WATER TANK
B13
A
B12
B11
B8
B9
B10
+12900
B7
B6
MUMPTY LVL
+9900
WATER TANK
TERRACE LVL +12900 +9900
MUMPTY LVL
TERRACE LVL WATER TANK
A
+6900 +9900
S.F LVL
B
TERRACE LVL +6900 S.F LVL +3900 +6900
F.F LVL
S.F LVL
+3900
2100
F.F LVL
+450 +3900
G.F LVL
F.F LVL +450 G.F LVL
C
+450 G.F LVL
B
-3600 BASEMENT LVL
-3600
C
B
BASEMENT LVL
1600
-3600
C
BASEMENT LVL
B
SECTION A-A' SECTION A-A' B12 B12
B11
B11
SECTION A-A'
B8
B9
B10
B8
B9
B10
B7
B7
B6
B
B6
A +9900
B12
A
B11
B8
B9
B10
B7
+9900
TERRACE LVL
B6
TERRACE LVL
B
A
+6900 +9900
S.F LVL
TERRACE LVL +6900 S.F LVL
2100
+3900 +6900
B
F.F LVL
S.F LVL
+3900 F.F LVL
+450 +3900
G.F LVL
F.F LVL
B
+450 G.F LVL
2400 C
+450 G.F LVL
B
-3600 BASEMENT LVL
-3600
C
B
BASEMENT LVL
B -3600
C
BASEMENT LVL
B
SECTION B-B' SECTION B-B' SECTION B-B'
100 MM TRIMIX
400 MM SAND
400 MM SAND
BRICK PARAPET WITH SLOPE
100 MM TRIMIX
WATER PROOFING TUCK IN GOLA
WATER PROOFING TUCK IN
100 MM PCC STITCHED SLAB RCC FOUNDATION 400 MM SAND 30 MM SCREED STITCHED SLAB RCC FOUNDATION 30 MM SCREED
BRICK PARAPET WITH SLOPE
3040
100 MM PCC
100 MM PCC 1200
100 MM TRIMIX
900
B14
B13
B14
12 MM WATER PROOFING
BRICK PARAPET WITH SLOPE GOLA WATER PROOFING TUCK IN GOLA
PCC STITCHED SLAB100 RCCMM FOUNDATION 12 MM WATER PROOFING EARTH 100 MM PCC 30 MM SCREED EARTH
DETAIL B (FOUNDATION DETAIL) 12 MM WATER PROOFING DETAIL 46B (FOUNDATION DETAIL) DETAIL B (FOUNDATION DETAIL)
100 MM PCC EARTH
DETAIL A (PARAPET
DETA
B BD
BC
BE
A
BF
BG
PLUMBING SHAFT 1200 X 600
PLUMBING SHAFT 1200 X 600
EQ
AXX
12
L
C
6140
W1
11
13
10
14
9
15
8
16
7
17
6
18 19
5 4
20 21
3 2
22
1
5205
24
DN
TREAD - 300 RISER - 150 WIDTH - 1800
20305 L
C
23
S1
2100
2100
UP
EQ
W1 AXX
11385
EQ
B7
N
4190
5335
5590
B6
BJ
BI
BH
EQ
14005 10455
B8 EQ
1200 AXX
14005
2000
+900 L
C
5725
W1
EQ
B9
10785 4980
ELECTRICAL SHAFT 1200 X 600
19060
B10
LIFT SHAFT 1 2500 X 2400
EQ
13655
C
80
58
4525
73 W1
B11
0L 5
LIFT SHAFT 2 2500 X 2400
EQ
AXX
60
1200
C
W1 AXX
EQ
EQ
W1
B13
C
90L
L
66
12970
4220
2100
EQ
EQ
B12
3000
4365
9300
66
900
AXX
4395
2500
S
71
10
B14
A'
B' KEY PLAN
DATE
12 MM WATER PROOFING SHEET FLOORING
DRAINAGE CHANNEL
10 MM PCC 200 MM INSULATION
150 MM RCC SLAB
P
100 MM TRIMIX
12 MM WATER PROOFING SHEET
DATE
100 MM PCC BRICK WALL
400 MM SAND
PROJECT
TITLE
DETAIL A (PARAPET DETAIL)
R
T
A
BUILD AND
DETAIL C (DRAINAGE DETAIL)
S
ARCHITECT
47
SAKSM RAHE SCALE
1:100 MADE BY
07 MISCELLANEOUS
Selected Artworks from 2016-2020 Content -
Sketch Series 1 (Inspired artwork) Sketch Series 2 {Lucidity} Sketch Series 3 {Mood} Canvas Series 1
48
Sketch Series 1 Inspired by Artist ‘Nester Formentera’
“Promise”
50
“May
ybe”
“Curves”
51
Sketch Series 2 ‘Lucidity’
“The body, whether nude or clothed, loses its form by putting more value on its symbolism than its
“Allure”
52
“Atten
s actual form.” - Shane Conant
ntion”
“Embrace”
53
Sketch Series 3 ‘Mood’
Mood has to be controlled. Otherwise, it’s your master. -Toby Beta
54
Canvas Series
Inspired by “ Painting with Jane”
“Solitude in Chaos”
“Isolation”
“Calm”
55
Selected works 2016 - 2019 | saksham_raheja@yahoo.co.in | +91 9910083043
56