Question: 1 A BPM analyst is creating a process model for requesting a renovation permit. The BPM analyst is using the following description of the first activity: "One of our municipal office clerks receives a paper permit application from the local resident, an applicant. The clerk first looks up the resident's name and address in our system, then enters the information from the paper application into the system, and assigns a temporary permit number to the application. When the application entry is complete, the clerk sends it to a manager to assign it to an adjudicator." Which name should the BPM analyst use for the first task that accurately describes the activity and follows recommended naming conventions? A. Application Entry B. Create Application C. Clerk Receive and Enter Application D. Lookup name, create application, assign number, and send it to the manager

Answer: B Question: 2 A BPM analyst needs to make a change to the connections in the following process diagram. The order of activities needs to be changed so that "Grind Beans" is followed by "Brew Coffee". "Heat Milk" will come last after "Brew Coffee".

How should the BPM analyst make this change to the connection? A. Click on the "Brew Coffee" activity and drag it onto the connection between "Grind Beans" and "Heat Milk"

Microsoft

2

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


B. Click on the "Grind Beans" activity and drag it onto the connection between "Heat Milk" and "Brew Coffee" C. Click on the connection between "Heat Milk" and "Brew Coffee" and drag the connection arrow to "Grind Beans" D. Click on the connection between "Grind Beans" and "Heat Milk" and drag the connection arrow to "Brew Coffee".

Answer: A Question: 3 A BPM analyst is designing a process in the Process Diagram View, and realizes the process must account for a technical exception following an activity. What symbol in the BlueWorks Live needs to be used for this technical exception?

Microsoft

3

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


A. Option A B. Option B C. Option C D. Option D

Answer: B Question: 4 A BPM analyst has modeled the process for creating a custom coffee beverage. The BPM analyst noticed a lot of detail in the process model and has started refactoring the model to reduce the complexity. Which section of the process represents a series of activities performed by the same participant that the analyst reduced into a single activity?

Microsoft

4

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Microsoft

5

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Microsoft

6

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Microsoft

7

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Microsoft

8

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


A. option A B. Option B C. Option C D. Option D

Answer: B Question: 5 A BPM analyst has modeled the process for creating a custom coffee beverage. The BPM analyst noticed a lot of detail in the process model and has started refactoring the model to reduce the complexity. Which section of the process represents multiple roles working together that the BPM analyst reduced into a single sub-process without losing the intent or meaning of the process?

Microsoft

9

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Microsoft

10

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Microsoft

11

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Microsoft

12

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Microsoft

13

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


A. Option A B. Otpion B C. Option C D. Option D

Answer: C Question: 6 A BPM analyst has modeled the following process. However, after the "Extract Data" and "Send data use case template to client", the client has stated that "Complete data scenarios" should be done.

How should the BPM analyst adjust the process? A. Join A and B B. Insert join before A, and move B after A C. Insert Join before B, and move A after B D. Move B before A, and insert a join after A

Answer: B Microsoft

14

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Question: 7 A company needs to improve their hiring process and hired a BPM analyst to map the current state. During the discovery session, the business subject matter experts (SMEs) indicate to the BPM analyst that the hiring request is reviewed by both the human resource admin and the human resource manager. How should the BPM analyst document the participant role for this activity? A. Assign the admin as the participant since the admin is paid less. B. Assign the manager as the participant since the admin reports to the manager. C. Break the "Review" task into separate tasks and define who does what. D. Pick either the admin or the manager and assign the "Review" task to that role.

Answer: C Question: 8 A company needs to improve their hiring process and hired a BPM analyst to map the current state. What is the first thing the BPM analyst should do while constructing a discovery map? Identify the: A. Value-Add activities. B. sub processes within the hiring process. C. start and end points of the hiring process. D. activity where the maximum problems lie.

Answer: C Question: 9 During the Process Discovery phase, the BPM analyst needs to schedule and plan for the Process Improvement and Discovery Workshop (PIDW). In planning the PIDW, what activities should the BPM analyst include on the agenda? A. 1. Prepare workshop participants. 2. Introduce BPM. 3. Identify: Business case overview. 4. Assess: Determine business impact. 5. Define: Document the business process. 6. Develop the use cases. 7. Discuss findings and proposed solution. B. 1. Prepare workshop participants.

Microsoft

15

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


2. Introduce BPM. 3. Identify: Business case overview. 4. Assess: Determine business impact. 5. Define: Document the business process inventory and roadmap. 6. Develop the solution approach. 7. Discuss detailed estimates. C. 1. Prepare workshop participants. 2. Introduce BPM. 3. Identify: Business case overview. 4. Assess: Determine business impact. 5. Define: Document the business process. 6. Develop the solution approach. 7. Discuss findings and proposed solution. D. 1. Prepare workshop participants. 2. Introduce BPM. 3. Identify: Business case overview. 4. Assess: Determine business impact. 5. Define: Demonstrate the business process playback. 6. Develop the use cases. 7. Discuss findings and proposed solution.

Answer: C Question: 10 During the Process Discovery phase, the BPM analyst needs to identify who must fully participate in the Process Improvement and Discovery Workshops (PIDW). Of the many roles in a BPM project, which roles must fully participate? A. Process Owner, Subject Matter Expert B. Technical Consultant, Process Owner, BPM Developer C. Technical Consultant, Process Owner, Project Manager D. Project Manager, Process Owner, Subject Matter Expert

Answer: A

Microsoft

16

IBM

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


IBM

CODE: 000-189 Exam Name: Blueworks Live; IBM Business Process Manager Express or Standard Edition V7.5.1, BPM Analysis Exam

http://www.testsexpert.com/000-189.html Microsoft

Cisco

IBM

MCTS 70-177

CCNA 640-802 640-822 640-816 640-460

MBS 98-361 98-366

CCNP 642-832 642-813 642-825 642-845

000-G01 000-M44

MCAS 77-602

CCSP 642-627 642-637 642-647 642-545

000-444 000-910

MCSE 70-282

CCIE 350-001 350-018 350-029 350-060

COG-105 COG-185

MCSA 2003 70-461 70-620

DATA CENTER 642-972 642-973 642-974 642-975

70-162 70-462

MB3-861

77-601 77-604 70-281 70-284 70-680

70-463

MB3-862

77-605 70-285

70-291

Microsoft

17

IBM

IBM Lotus

000-M42 000-M60

000-M41 000-M62

IBM Mastery

000-M43 000-M45

Solutions Expert

000-640 000-913

IBM Cognos

COG-180 COG-200

IBM Specialist

000-005 000-032

000-015 000-042

HP

Other

AIS

70-323 9L0-063 9L0-010 9L0-517 HP2-E53 70-321 650-179 1Y0-A20 00M-646 MB2-876 646-206 9L0-314 MB6-884 220-701 650-196 3305 MB6-871 HP2-Z22 9L0-407 9A0-146 HP2-H23 000-184 1Z0-527 HP2-B91 000-781 M70-201 M70-101 7004 HP3-X11 HP3-X08

HP0-311

HP0-M28

HP0-A25

HP0-M30

APC

HP0-D11 HP0-S29

HP0-J37 HP0-P14

MASE HP0-J33 HP0-M48 HP0-M49 HP0-M50 ASE

HP0-066 HP0-781

HP0-082 HP0-782

CSE

HP0-090 HP0-277

HP0-276 HP0-760

HP Cisco Oracle Instant download after purchase

http://www.testsexpert.com/000-189.html

Symantec


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.