1 minute read
MEHERABAD , AHMEDNAGAR RELATIVE STUDY PROGRAM
1ST yr 2020
Meherabad is the final resting place of Meher Baba and situated on the outskirts of Ahmednagar, approximately 20 mins from Ahmednagar railway station and 45 mins from Ahmednagar Bus station. The place is serene, tranquil and self-rejuvenating to give you a spiritual high. There are a Quite a few places of interest for the first time visitors starting from Meher Baba’s Samadhi, Meher Baba Musuem, Jhopdi located on a small hillock also called as Upper Meherabad. And then there is also Lower Meherabad where you get to see the Mandali hall, Hazrat Gilori Shah’s Tomb and other commercial centres like the PostOffice, School e.t.c
Advertisement
A SUB-CENTRE AND PRIMARY HEALTH CARE CENTRE COMPETITION
3rd yr Architectural Design
ROOF PLAN
M
Ground Floor Plan
Yellow colored part for main circulation structure which also working as a semi-open corridor. The width of the corridor is about 2.5 meters which quiet sufficient for the moment the staff members and patients. Blue areas are the main working areas.
In plan the site surrounded by three road on North, East, and South. The main entry to the site is from the South side. Entering the site we have the open waiting area on the left there is sub-center for the people having viral diseases or small illness and on the right side there primary health center where wards with beds provided any person want to hospitalized urgently and also the labour ward provided and the third cluster provided with services for the patients, people, and for the staff.
EXPLODED ROOF
About Community
Roof is 150 mm thick ferrocement roof this roof is provided in order to decrease the slab weight. Pitches roof is provided to give a height to the structure for easy escape of hot air during summer and also play with volume in elevation.
EXPLODED ROOF
Timber planks are provided to cover the corridor as the corridor is more than 2.5 meters wide and having the roof of ferrocement would take more time for exchange in air and to avoid overheating of the closed spaced this timber planks are provided over semi-open corridor
Roof is 150 mm thick ferrocement roof this roof is provided in order decrease the slab weight. Pitches roof is provided to give height the structure for easy escape of hot air during summer and also play with volume in elevation.
Design Approach
ELEVATION C
VIEWS OF THE STRUCTURE
Elevation C
These
ROOF PLAN
Timber planks are provided to cover the corridor as the corridor is more than 2.5 meters wide and having the roof ferrocement would take more time for exchange in air and to avoid overheating of the closed spaced this timber planks are provided over semi-open corridor
ELEVATION C
Roof Plan
SECTION BB'
Section BB’
SECTION BB'
SECTION AA'
SECTION AA'
Section AA’
Views of Structure