An Overview of the Actions Performed by Samarco in the Last 90 Days.
Central de Relacionamento: 0800 031 2303 Ouvidoria: 0800 721 0717
NOV 15 5
ÌÌ Accident at Fundão dam ÌÌ Emergency actions ÌÌ Psycosocial assistance to affected people ÌÌ Accommodation of the displaced families ÌÌ Samarco’s employees take paid leave ÌÌ Immediate implementation of an emergency plan
6
ÌÌ Beginning of the piezometers daily monitoring as well as monitoring at the structures ÌÌ Beginning of animal rescue
7 8
Installation of radars in Santarém, Selinha and Sela
First meeting with representatives of Samarco and the community
11
Beginning of intervantion at the dams structures
12
Beginning of water supply to affected communities
14
Displaced people are accommodated in houses rented by Samarco
15
ÌÌ Collection of water samples along Rio Doce ÌÌ Implementation of a radar control room ÌÌ Beginning of the cleaning process on the roads
9
10
ÌÌ Employees start paid leave ÌÌ Installation of a radar in Germano
16
ÌÌ Completion of the pipelines project for the water treatment plant in Rio Guandu ÌÌ Beginning of cleaning operations in Candonga ÌÌ Signing of the Preliminary Term for Environmental Liability ÌÌ Submission of Environmental Plans to SEMAD and IBAMA ÌÌ More than 600 students return to school
17
Delivery of school kits
18
Implementation of a weekly dialogue and negotiation table between Samarco and the Housing Company of Minas Gerais (Cohab MG)
19
ÌÌ Opening of assistance stations in Espírito Santo ÌÌ Dialogue meeting with the community ÌÌ Implementation of the integrated monitoring center
21
Delivery of the alternative water collection system and pipelines in Governador Valadares
23
Meeting with the National Mayors Front (FNP)
24
Gradual re-establishment of water supply in Colatina
26
Technical report from SES Geosol lab certifying that the water is appropriate for human consumption after treated
27
Lecture about Professional Training in Mariana and Barra Longa
28
Installation of electrical piezometers in Selinha
29
End of paid leave for employees
30
ÌÌ Visit from ALMG dams committee to Samarco’s dams ÌÌ Financial support cards start being delivered ÌÌ Beginning of company-wide vacation at Samarco
DO THE RIGHT THING.
Acesse:
www.samarco.com/historias
An Overview of the Actions Performed by Samarco in the Last 90 Days.
Central de Relacionamento: 0800 031 2303 Ouvidoria: 0800 721 0717
DEC 15 1
Houses started being delivered in Mariana
3
Beginning of sonar mapping of Rio Doce water
4 5 10
Samarco signs TAC with the Ministry of Labor in Minas Gerais and Espírito Santo Delivery of bridge between Águas Claras and Monsenhor Horta (Mariana) ÌÌ Delivery of the financial business card to fishermen and river side communities
15
16 18
20
ÌÌ Samarco gets officially liable for the center of rescued animals
11
ÌÌ Opening of an assistance station in Barra Longa ÌÌ CPRM (Brazil Geological Service) and ANA certify the water quality in Rio Doce Graduation of about 60 students in Bento Rodrigues ÌÌ Graduation of students in Paracatu de Baixo ÌÌ Signing of a Preliminary Term of Liability (TCP) to formalize the actions regarding animal care ÌÌ Delivery of bridge between Campinas and Barreto (Mariana) ÌÌ Delivery of 6 artesian wells in Colatina
ÌÌ Re-vegetation of the areas along the margins of rivers Gualaxo and Doce
22
Beginning of dredging operations in the reservoir of Risoleta Neves hydropower plant in Candonga
Delivery of the bridge which connects Pedras and Borba to Águas Claras and Campinas (Mariana)
25
99,7% of the families spend Christmas in houses rented by Samarco
30
99,7% of the families spend Christmas in houses rented by Samarco
31
Opening of an assistance station in Galileia
JAN 16 4
End of the company-wide vacation at Samarco
6
Delivery of bridge over the River Onça in Barra Longa
9
Sonar mapping confirms the existence of fish in Rio Doce
11
Employees return to the operations unit
15
Samarcos employees in Minas Gerais and Espírito Santo, approve during meeting, an agreement for the temporary interruption of their work contract (layoff)
18
Construction of a dike at a spot in river Gualaxo between Samarco’s unit and Bento Rodrigues (3km from Santarém)
18
Samarco registers the Recovery Plan within IBAMA
22
ÌÌ Delivery of the bridge over the river Gama in Mariana ÌÌ 220 residents impacted were re-employed
25
Samarco’s staff start layoff
27
Results of analysis prove that the plume did not reach Abrolhos
28
Construction of a containment barrier below Santarém dam
DO THE RIGHT THING. An Overview of the Actions Performed by Samarco in the Last 90 Days.
FEB 16 15
ÌÌ Back to School after holidays in Mariana and Barra Longa
16
ÌÌ Samarco, SESI and City Hall offer free training courses in em Mariana