Sam Chan - Work Samples

Page 1

WORK SAMPLES

Background Summary

BSc Architecture

Hong Kong, 2011-2014

MA Architecture Germany, 2015-2017

Year-out Assistant, P&T

Architects & Engineers; Hong Kong — Jun 2014-Aug 2015

1)Various residential Facade Design in Taiwan

Foreign Registered Architect, P&T

Architects & Engineers; Hong Kong — May 2018-Jan 2019

1)30-storey twin tower residential (approximate GFA: 29160m2)

2)Single residential tower (two wings) on top of a 3 level podium (approximate GFA: 28557m2)

Foreign Registered Architect, A.LEAD Architects; Hong Kong

— Sep 2017-Apr 2018

1)Sewage Treatment Works (Site Area: 28 Ha.)

2)Sewage Treatment Works Expansion (Site Area: 5000m2)

Foreign Registered Architect, HOK; Hong Kong — Feb-Jul 2019

RIBA Architect Registration Exam, England — 2021

MSc Urban & Regional Planning England, 2021-2022

Foreign Registered Architect, Wong Tung & Partners; Hong Kong — Jul 2019-May 2021

1)Headquarter (Site Area: 5000m2)

2)Office Tower(Site Area: 22000m2)

3)Sheraton Hotel Complex (Site Area: 9500m2, 240 keys)

4)Serviced Apartment Interior Design (Site Area: 10000m2)

5)Jianye Triumph Plaza (Site Area: 35000m2)

1)Forte Financial Island (Construction Area: 28000m2)

2)Delta Resort Hotel (Site Area: 32000m2, 300 keys)

3)Hilton Doubletree Hotel(Site Area: 7000m2, 250 keys)

4)Hyatt Resort Hotel (Site Area: 42,784m2, 336 keys)

5)Prince of Wales Hospital Expansion(1,200 beds and 16 operating theatres)

6)Hopson One Shopping Mall Renovation (GFA: 54000m2, 17940m2 interior design of public area)

7)Train Station Transport Integrated Development (Site Area: 3800m2)

Foreign Registered Architect, Leigh & Orange; Hong Kong — Feb 2023-Mar 2024

1)Qatar Equestrian Farm Regeneration with Clinic and Lab (Site Area: 69 Ha.)

Foreign Registered Architect, AECOM; London, England — Aug 2022-Jan 2023

1)AlUla AlMuatadil Equestrian Village (Site Area: 30 Ha.)

1. Hospitality Design

• J18 Serviced Apartment Interior Design

• Hilton Doubletree Hotel

• Delta Resort Hotel

• Hyatt Hotel

• Sheraton Hotel Complex

3. Residential Design

• Train Station Transport Integrated Development

• 30-storey twin tower residential and commercial complex

• Single residential tower (two wings) on top of a 3 level podium

2. Commercial Design

• Hopson One Shopping Mall Renovation

• Great China Technology Office Tower

• Yee Fung International Ltd Headquarter

• Forte Financial Island Phase 4

4. Healthcare / Sports Design

• Prince of Wales Hospital Expansion

• AlUla AlMuatadil Equestrian Village

• Equestrian Farm Regeneration with Clinic & Labs

1.Hospitality Design

• J18 Serviced Apartment Interior Design

• Sheraton Hotel Complex

• Hilton Doubletree Hotel

• Delta Resort Hotel

• Hyatt Hotel

J18 Serviced Apartment Interior Design, Zhengzhou, China

Firm: Wong Tung & Partners, HK

Site Area: 10000m2

• A team of 3 people; 1 Chief Designer, 1 Architect, 1 Architectural Assistant

• Design-bid-build Contract; Concept to Construction Stage

• Produced technical drawings, all presentation materials from ideas to construction

• Chaired meetings with clients, retail consultants, main contractor and nominated sub-contractors

• Provided cost estimates and detailing design/adjustment due to budget control, including facade detail design

Sheraton Hotel Complex, Huizhou, China

Firm: Wong Tung & Partners, HK

Site Area: 9500m2, 240 Keys

• A team of 3 people; 1 Chief Designer, 1 Architect, 1 Architectural Assistant

• Design-bid-build Contract; Concept to Construction Stage

• Produced MLP, demolition drawings, Building and Planning Applications, technical drawings, all presentation materials from ideas to construction

• Chaired meetings with the Municipal/ clients, consultants, main contractor and nominated sub-contractors

• Provided cost estimates and detailing design/adjustment due to budget control, including facade detail design

Hilton Doubletree Hotel, Zhengzhou, China

Firm: HOK HK

Site Area: 7000m

• A team of 3 people; 1 Design Director, 1 Design Architect, 1 Architect Assistant

• Design-bid-build Contract; Concept to Design Development Stage

Delta Resort Hotel, Qidong, China

Firm: HOK HK

Site Area: 32000m2, 300 Keys

• A team of 3 people; 1 Design Director, 1 Design Architect, 1 Architect Assistant

• Design-bid-build Contract; Concept to Design Development Stage

• Produced MLP, building model and technical drawing production from CD to DD, including 3D renderings and animations, under BIM manager’s standard

• Assisted Design Director/Chief Designer to produce design options for site matters/ updates

• All communications among hotel operators, developers and consultants

Hyatt Hotel, Zhengzhou, China

Firm: HOK HK

Site Area: 42,784m2, 336 Keys

• A team of 3 people; 1 Design Director, 1 Design Architect, 1 Architect Assistant

• Design-bid-build Contract; Concept to Design Development Stage

• Produced MLP, building model and technical drawing production from CD to DD, including 3D renderings and animations, under BIM manager’s standard

• Assisted Design Director/Chief Designer to produce design options for site matters/ updates

• All communications among hotel operators, developers and consultants

2.Commercial Design

• Hopson One Shopping Mall Renovation

• Great China Technology Office Tower

• Yee Fung International Ltd Headquarter

• Forte Financial Island Phase 4

Hopson One Shopping Mall Renovation, Xi’an, China

Firm: Wong Tung & Partners, HK

GFA: 54000m2

17940m2 Interior Design of Public Area

• A team of 3 people; 1 Chief Designer, 1 Architect, 1 Architectural Assistant

• Design-bid-build Contract; Concept to Construction Stage

• Produced technical drawings, all presentation materials from ideas to construction

• Chaired meetings with clients, retail consultants, main contractor and nominated sub-contractors

• Provided cost estimates and detailing design/adjustment due to budget control, including facade detail design

Great China Technology Office Tower, Huizho, China

Firm: Wong Tung & Partners, HK

Site Area: 22000m2

• A team of 3 people; 1 Chief Designer, 1 Architect, 1 Architectural Assistant

• Design-bid-build Contract; Concept to Construction Stage

• Produced MLP, demolition drawings, Building and Planning Applications, technical drawings, all presentation materials from ideas to construction

• Chaired meetings with the Municipal/ clients, consultants, main contractor and nominated sub-contractors

• Provided cost estimates and detailing design/adjustment due to budget control, including facade detail design

Yee Fung International Ltd Headquarter, Shenzhen, China

Firm: Wong Tung & Partners, HK

Site Area: 5000m2

• A team of 3 people; 1 Chief Designer, 1 Architect, 1 Architectural Assistant

• Design-bid-build Contract; Concept to Construction Stage

• Produced MLP, demolition drawings, Building and Planning Applications, technical drawings, all presentation materials from ideas to construction

• Chaired meetings with the Municipal/ clients, consultants, main contractor and nominated sub-contractors

• Provided cost estimates and detailing design/adjustment due to budget control, including facade detail design

Forte Financial Island Phase 4, Chengdu, China

3.Residential Design

• Train Station Transport Integrated Development

• 30-storey twin tower residential and commercial complex

• Single residential tower (two wings) on top of a 3 level podium

Train Station Transport Integrated Development, Dongguang, China

Firm: Wong Tung & Partners, HK

Site Area: 3800m2

• A team of 3 people; 1 Chief Designer, 1 Architect, 1 Architectural Assistant

• Design-bid-build Contract; Concept to Construction Stage

• Produced MLP, demolition drawings, Building and Planning Applications, technical drawings, all presentation materials from ideas to construction

• Chaired meetings with the Municipal/ clients, consultants, main contractor and nominated sub-contractors

• Provided cost estimates and detailing design/adjustment due to budget control, including facade detail design

One East Coast, Hong Kong

Firm: P&T Architects & Engineers

GFA: 291600m2

• A team of 2 people; 1 Senior Associate, 1 Architect

• Design-bid-build Contract; Construction and Close-out Stage

• Preparation for Occupation Permit (equivalent to Occupancy Permit in Ontario)

• Held project progress and site meeting with Client’s project managers, consultants, main contractor and nominated subcontractors

• Produced Statutory submission including

The Campton, Hong Kong

Firm: P&T Architects & Engineers

GFA: 28557m2

• A team of 2 people; 1 Senior Associate, 1 Architect

• Design-bid-build Contract; Construction and Close-out Stage

• Preparation for Occupation Permit (equivalent to Occupancy Permit in Ontario)

• Held project progress and site meeting with Client’s project managers, consultants, main contractor and nominated subcontractors

• Produced Statutory submission including The Design, Disposition and Height, Public Car Park application/hand-over (Similar with Planning and Building Application Process in Ontario)

• Preparation of Authorised Certificates for The Deed of Mutual Covenant and Pre-sale submission to Local District

• Produced Sales Brochure under the First Hand Sale Ordinance (Similar with Condominium Act, 1998 in Ontario)

4.Healthcare / Sports Design

• Prince of Wales Hospital Expansion

• AlUla AlMuatadil Equestrian Village

• Equestrian Farm Regeneration with Clinic & Labs

Prince of Wales Hospital

Firm: HOK HK

Size: 1,200 Beds and 16 Operating Theatres

• A team of 3 people; 1 Design Director, 1 Design Architect, 1 Architect Assistant

• Design-bid-build Contract; Concept to Design Development Stage

• Produced MLP, building model and technical drawing production from CD to DD, including 3D renderings and animations, under BIM manager’s standard

• Assisted Design Director/Chief Designer to produce design options for site matters/updates

• All communications among hotel operators, developers and consultants

Equestrian Farm Regeneration

Firm: Leigh & Orange, Hong Kong

Site Area: 69 Ha.

• A team of 4 people; 1 Equine Consultant, 1 Senior Associate, 1 Architect, 1 Architectural Assistant

• Fast-track Construction; Concept and Close-out Stage

• Produced project plan, construction phases, logistics plan, packages for Planning and Building Applications, technical drawing packages

• Chaired project and design coordination on RFI’s and design changes, and reported to Design Director directly

• Guided and supervised junior member on production quality

• Liaised with vendors on new products on specifications and project costing

Equestrian Farm Regeneration

Situation:

The client asked to add more horse training facilities when he/she also wanted to cut the cost of track build up. The main contractor placed a VO form for the changes, but those project managers got lost in the various changes of the build up and became only low-cost-oriented on the build up solution.

Task:

As I was the only person to handle this track design and all package, I needed to trace all history of changes and package issuances for (1) expressing again our design intent, (2) seeking a compromised solution to execute my professional role and satisfy the client’s request.

Action:

I organised a meeting with client-side project management team, track vendor, equestrian specialist, local structural consultant and the main contractor to seek an agreed solution.

Result:

The main contractor withdrew the VO because our Addendum 1 already provided a workable build up with relatively reasonable price.

NORTH GALLOP TRACK SETTING OUT PLAN SCALE 2500 GALLOP TRACK PART PLAN SCALE 250 DO NOT SCALE DRAWING. ALL DIMENSIONS SHOULD BE CHECKED ON SITE. Job No.:- Drawing Status:- Rev. Drawing No. Scale:CAD REF: Date:Designed By:- Drawn By:Approved:THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING RETAINED BY THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. Project Stage: KEY PLAN GENERAL NOTES Drawing Title DESCRIPTION DATECHECKED REV PROJECT WATHNAN EQUESTRIAN COMPLEX LOCAL ARCHITECTS & ENGINEERS EDSA R800 ORANGE AVENUE, SUITE 300, ORLANDO, FLORIDA LANDSCAPE ARCHITECT: MLP CONCEPT ARCHITECT STANHOPE GATE ARCHITECTURE EXECUTIVE ARCHITECT EQUINE SPECIALIST PROJECT MANAGEMENT & COST MANAGEMENT: TURNER TOWNSEND 23RD FLOOR, TORNADO TOWER, FUNDUQ STREET, WEST BAY, DOHA EMPLOYER THORNHAM MANAGEMENT LTD WATHNAN STUD WLL CLIENT    PROPOSED GALLOP TRACK GALLOP WARM UP RING SETTING OUT PLAN SCALE 1000 ISSUE FOR TENDER CONSTRUCTION 00 01 02 03 04 ADDENDUM ADDENDUM ADDENDUM ISSUE FOR CONSTRUCTION P.E. P.E. P.E. P.E. P.E. 17/02/2023 31/03/2023 06/04/2023 17/05/2023 02/06/2023 STAGE 3: DEVELOPED DESIGN GALLOP TRACK SETTING OUT PLANS AND PART PLAN SAM CHAN SAM CHAN P.EDUSSURIYA 23/06/2023 WTN-L&O-ARC-GLP-0002-1 1-00.DWG 1:2500 1:250 WTN-L&O-ARC-GLP-0002-1 of 1-00 22075 DD 05 A1 05 ISSUE FOR CONSTRUCTION P.E. 23/06/2023

Equestrian Farm Regeneration

Situation:

Because of the complexity of the project, project management delivery method and layers of stakeholders, the foundation works has been done on site without canter track vendor’s build up shop drawing and site coordination. The client wanted to ensure no abortive works but still achieve equestrian facility requirement.

Task:

Omitting exits was the only suggestion from the local consultants. I had to make sure to (1) omit the appropriate location and number of doors, (2) execute our professional role as a lead consultant and equestrian specialist, and (3) explain clearly our design intent to the client and consultants.

Action:

I suggested that the location and number of doors could be omitted after I reviewed all levels at fire exits and fire safety requirements on travel and deadend distance.

Result:

It was necessary to increase the thickness of track build up to achieve the canter track level requirement. No abortive works occurred and also minimised the cost and time implication.

Equestrian Clinic

Tendering Stage

Firm: Leigh & Orange

Layout Design Intent & My Role:

• Set grid and corridor according to FEI standard Scale

Check Up In X-ray Check Up By physical touch Small Operation Recovery or Transfer to Hospital inpatient ward

The Campton, Hong Kong

Firm: AECOM, London, England

Site Area: 30 Ha.

• A team of 4 people; 1 Design Director, 2 Architect, 1 Architectural

Assistant

• Design-bid-build Contract; Concept to Schematic Stage

• Produced Design presentations, close-out reports, BIM models

• Chaired design coordination workshops with consultants and specialists

FIN.