Nearest Water Reservoir: Morbe Dam Net Capacity: 165.37 MCM Capacity/day: 450 MLD
K
SECTOR - 7
Ground Coverage: 30% permitted by SEZ ByLaws
50 MC LIG LA
BA RL MAND Y. ST ONG N. RI
E NN HA E NM
Site Location: Sector 7, Near Bamandongari Railway Stn., Ulwe Node
NT
The project aims to deliver the needs of startups & big companies alike in a flexible & scalable manner.
EXISTING STRUCTURE
100M Width Buffer to the Bay/Creek as per CRZ notification.
India has been a fertile ground for innovative startups and now ranks third in the world behind US & UK for the most number of startups emerging every year. Govt policies have helped ease for setting new businesses & SEZs have added benefit of duty free customs for service & trade operations. In 2018, Indian Govt made some important changes to IT policies that have created very demanding conditions for MNCs to continue businesses in India. This includes the Data Localization policy which requires foreign companies to hold all the data of Indian clients & customers locally. This has created a surge in Data Center requirement & jobs for Data Center Managers.
E
ByLaws applicable: Navi Mumbai DCR FSI for Information Technology Park - 1.4 Total area of plot - 10.94 hectares
E
In the last decade, technology has changed how we live our lives, interact with people, implement our work, etc. At the heart of all of this change is Information Technology which has driven this exponential growth. This integration with people & technology has given rise to new opportunity in the urban sector. There has been a sharp rise in the number of startups, and established companies diversifying their businesses in this InfoTech arena. This need explains the growing number of businesses adopting IT enabled services to expand their business.
R
Sector 7, Special Economic Zone, ULWE
C
INTRODUCTION
Area: 10.94 hectares (27.03 acres)
NORTH
DCR: Navi Mumbai Airport Notified Area (NAINA) Landuse: SEZ
SCALE 1:2000
DESIGN BRIEF
Authority: NMSEZ (Private entity)
Name of Space
Space Requirement Occupants
Area per Room
Total Area Sq.m
40-50
185
370
20
59.55
59.55
Janitor's Room
3.9
31.2
First Aid
3.9
3.9
18.64
18.64
52.67
52.67
OFFICE BUILDING Reception & Waiting Area/Lobby Admin. & H.R. Block
Data Center Manager
1
Maintenance/Repair
Site Photo
Water Channel along Site
AV Room
242
96.58
193.16
Conference Room A
18
28.98
463.68
Data Center
777.69
777.69
Toilets
38.17
305.36
Battery & UPS Room
26.27
210.16
Workstation/floor
2324
2103.75
15603
Manager Room
1
28.98
550.62
Facility Manager
1
34.8
34.8
Conference Room B
12
22.04
176.32
Meeting Room C
10
19.11
94.63
Pantry
2-4
43.8
306.6
Library
10
26.1
78.3
Banquet hall
250
379.15
379.15
Kitchen & Storage
14
85
85
Gym
57
212.78
212.78
Spa & Sauna
46
141.71
142
1.27
8.49
69.18
69.18
1.81
17.77
AMENITY SPACES
LEISURE SPACES
Changing Rooms 60
Salon Toilets
Site Photo
NMSEZ office on Site
Nodal Plan of Ulwe showing the Site Location Accessibility: 15 mins walk or 5 mins drive from Bamandongri Railway Station. 34 mins drive from Vashi, 36 mins drive from Panvel.
PUBLIC SPACES Coffee House
44
102.18
102.18
Restaurant SERVICES & PARKING B.M.S. Facility
78
129.91
129.91
12
34.8
34.8
Fire Pump Room
2
66.93
121.27
Generator (no Room)
—
S.T.P. (ext facility)
—
Chiller Room (basement) Fire Command Centre w/Surveillance
1hr, 20mins from Mumbai International Airport, 30 mins from upcoming Navi Mumbai Airport Climate:
Ext Chiller Plant
35.15
140.6
4
24
24
2
—
Warm & Humid Precipitation: 2000 -5000mm from months June - September
Bamandongri Rly Stn
Nearby Residential Areas
Soil type & preferred foundation: Clay soil Pile foundation mostly used for other projects in the context.
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
INTRODUCTION & SITE INFORMATION SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 DESIGN DISSERTATION B.V.C.O.A.
SHEET:
01
30M WIDE ROAD
3.5M WIDE FOOTPATH
9M WIDE INTERNAL ROAD ENTRY
6M WIDE ROAD +5.26M
11M WIDE ROAD
+21.72M
+22.2M
6M
+22.2M
+22.5M
+21.72M
WI DE RO A
D
+22.5M
6M WIDE ROAD
+18.45M +18.45M
PATH
+22.5M
EXISTING STRUCTURE
3.5M WIDE FOOT
9M W
IDE IN
ED H IGHW
TERN
AY
AL RO
AD
Bird's eye view of Site
±0.0M
+22.5M
+18.45M
6M WIDE ROAD +22.5M
+18.45M
1.5M WIDE PATHWAY
2.5M WIDE PATHWAY
PROP OS
+5.85M
−2.7M
9M WIDE RAMP TO BASEMENT
±0.0M DOWN
+4.35M
±0.0M
2.5M WIDE PATHWAY
TH
WATER BODY FOR RWH
OO TPA
+4.95M
6M WIDE ROAD
3.5 M
+4.35M
+22.2M
+21.72M
+18.45M
+21.72M
WID
EF
Bird's eye view of Site
POOL AREA +22.5M +18.45M
+22.2M
±0.0M
+22.5M
+22.5M
+5.26M
AD IDE IN
D WID E
ELECTRIC SUBSTATION
ROA
Bird's eye view of Entrance Gate
9M W
50M WIDE WATER CHANNEL
+10.35M
+7.86M
TERN
AL RO
+7.86M
+4.35M
6M WIDE ROAD
6M WIDE ROAD
CHILLER PLANT
30M
SEZ - SECTOR 9A
PLOT FOR FUTURE EXTENSION
Bird's eye view of Site
SITE PLAN
NORTH
SCALE 1:500
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 DESIGN DISSERTATION B.V.C.O.A.
SHEET:
02
3.5M WIDE FOOTPATH
C' 9M WIDE INTERNAL ROAD ENTRY
UP
B
B'
PUMP ROOM 19.4M × 3.45M
LOBBY 19.65M × 8.05M
−2.7M FIRE HYDRANT
6M WIDE ROAD
FABRICATED CANOPY ABOVE
+0.99M
+0.99M
+1.5M
VALET
JANITOR'S FIRST AID 2M×1.95M 2M×1.95M
COFFEE 4.95M × 4.9M
RECEPTION DESK
AHU ROOM 7.15M × 5.7M PANTRY 4.95M × 3.95M
ACCOUNTS, ADMIN & COMMUNICATIONS 19.85M × 3M
STORAGE & UTILITIES 3.55M × 3.85M
CHILLER ROOM
CHILLER ROOM
4.75M × 7.4M
4.75M × 7.4M
A'
A
6M WIDE ROAD
LOUNGE 24.15M × 7.7M
TOILET LADIES 3.5M × 5.5M
AHU ROOM 4.6M × 11.5M
UP +1.5M
±0.0M
EXIT ACCESS
AV ROOM - 11.85M × 8.15M
WATER
2M WIDE PASSAGE
+1.5M
DISABLED TOILET 2M×2.08M
DRINKING WATER
TOILET GENTS 3.44M × 5.5M
BATTERY & UPS ROOM 3.55M × 7.4M
FIREMAN'S LIFT
+0.15M
FIRE HYDRANT
2M WIDE PASSAGE
LIBRARY 8.85M × 2.95M
11M WIDE ROAD
OFFICE SPACE 39M × 22.5M
EXISTING STRUCTURE
OFFICE SPACE 22.5M × 54.5M CONFERENCE ROOM 3.8M × 5.8M
EXIT DISCHARGE
LAWN AREA
±0.0M BRIDGE ABOVE
3.5M WIDE FOOT PATH
+0.15M
EXIT DISCHARGE
±0.0M
+1.5M
6M WIDE ROAD
FIREMAN'S LIFT FIREMAN'S LIFT
+1.5M UP
UP
EXIT ACCESS
C −2.7M
EXIT DISCHARGE
PA
TH W
+0.15M
AY
EXIT ACCESS
9M WIDE RAMP TO BASEMENT
F'
E
GARBAGE DISPOSAL
±0.0M
7.25M × 13.35M
−2.7M
UP
GOODS UNLOADING PLATFORM
COFFEEHOUSE KITCHEN
RESTAURANT
6M × 12.5M
7.85M × 16.55M
±0.0M
9M WIDE RAMP
−2.7M
+0.75M
2. 5M
W
PROP
ID E
UP
±0.0M
±0.0M
7.5M WIDE ROAD
±0.0M
6M WIDE ROAD
CONFERENCE ROOM 3.8M × 5.8M
9M W IDE IN
FOYER 19.65M × 8.9M FIRE HYDRANT
MATV
STORAGE 2.37M×3.5M
DOWN
TELECOM ROOM 3.7M × 6.9M
WI DE 6M
4.9M × 3.9M
TELECOM ROOM 3.7M × 6.9M
RO A
GLASS CANOPY ABOVE
6M WIDE ROAD
ROAD TERN AL
WAY HIGH OSED
UP
±0.0M
D
UP
MEETING ROOM
6M WIDE ROAD
−2.7M
±0.0M
FIRE HYDRANT
CHILLER ROOM
CHILLER ROOM
4.75M × 7.4M
4.75M × 7.4M
COLD STORAGE 3.3M × 3.05M
CONFERENCE ROOM 3.8M × 5.8M
DOWN
6M WIDE ROAD W.C.
RECEPTION UP
CONFERENCE ROOM 3.8M × 5.8M
±0.0M
EQUIPMENT ROOM 11.85M × 3.45M
ENTRANCE FACILITIES 4.65M × 3.45M
UP
+1.5M
UP
BATTERY & UPS ROOM 4.65M × 3.45M
+0.15M
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
±0.0M
PUMP ROOM 15.75M × 3.45M
12M × 24M
POOL AREA
GYM 9.65M × 22.05M
+1.5M
UP
UP
1.5M WIDE PASSAGE
W.C.
±0.0M
E'
W.C.
SPA CENTER
COLD AISLE
COLD AISLE
COLD AISLE
5.85M × 6.85M
ORIGIN
F
STORAGE ROOM 3.89M × 3M
+0.75M
UP
RECEPTION COLD AISLE
−2.7M
+2.1M COLD AISLE
COLD AISLE COLD AISLE
BANQUET HALL 17.65M × 23.55M
D'
19.65M × 8.05M
SWIMMING POOL
EXIT DISCHARGE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE COLD AISLE
DATA CENTER 39.55M × 23.55M
COLD AISLE
FOYER 19.65M × 8.9M
COLD AISLE
TELECOM ROOM 3.7M × 6.9M
MATV
COLD AISLE
FIRE HYDRANT
COLD AISLE
2M WIDE PASSAGE FIRE HYDRANT
WATER
TELECOM ROOM 3.7M × 6.9M
AV ROOM - 11.85M × 8.15M
BATTERY & UPS ROOM 3.55M × 5.95M
COLD AISLE
2M WIDE PASSAGE
DRINKING WATER
LOBBY
D
+0.15M
FIREMAN'S LIFT
COLD AISLE
DISABLED TOILET 2M×2.08M
CRAC UNIT
UP
COLD AISLE
+1.5M
LOUNGE 24.15M × 7.7M
COLD AISLE
FIRST AID JANITOR'S 2M×1.95M 2M×1.95M
DATA CENTER MANAGER 3.55M × 5.25M
COLD AISLE
RECEPTION DESK VALET
4 RACK SERVER CABINETS - 0.9mx3.6m
COFFEE 4.95M × 4.9M
COLD AISLE
6M WIDE ROAD
AHU ROOM 7.15M × 5.7M
MAINTENANCE & REPAIR STAFF 11.45 × 4.6M
B.M.S. ROOM & FACILITY MANAGER OFFICE 11.6M × 3M
TOILET GENTS 3.44M × 5.5M
FIRE COMMAND CENTER 8M × 3M
TOILET LADIES 3.5M × 5.5M
PANTRY 4.95M × 3.95M
CRAC UNIT
+1.5M
CRAC UNIT
−0.6M
TH OTP A FO
IDE
2.5M WIDE PATHWAY LAWN AREA
EFX546
MW
FIRE HYDRANT
±0.0M EFX546
OFFICE SPACE 22.5M × 54.5M
FIRE HYDRANT
STORAGE ROOM 3.89M × 3M
+0.75M BRIDGE ABOVE
WATER BODY FOR RWH
W.C.
1.5M WIDE PASSAGE
5.9M × 5.45M
RECEPTION 6M × 4M
ADMIN 5.05M × 2.95M
W.C.
SAUNA & THERAPY ROOM 3.75M × 6.35M
SWIMMING AREA VESTIBULE
UP
±0.0M
5.7M × 6.35M
MASSAGE ROOM 4.55M × 3.75M
W.C.
GLASS CANOPY ABOVE
CRAC UNIT
CRAC UNIT
CRAC UNIT
CRAC UNIT
+0.83M
AHU
FABRICATED CANOPY ABOVE
MASSAGE ROOM 4.55M × 3.75M
6.3M × 4.75M
SHOWER AREA
+0.75M
6.15M × 11.25M
±0.0M
TOILET
6M WIDE ROAD
BASEMENT PARKING PLAN
W.C.
AL RO AD
SCALE 1:500 2.05M WIDE PASSAGE
DARTS BILLIARDS
10.25M × 7.05M
11.05M × 4.75M
RECEPTION & WAITING 11.75M × 7.05M
±0.0M BREAKOUT AREA
TERN
11.75M × 4.5M
SQUASH COURT 9.75M × 6.4M
SQUASH COURT 1.8M WIDE PASSAGE
9.75M × 6.4M
BADMINTON COURTS 21.5M × 35.25M SQUASH COURT
9M W
9.75M × 6.4M
SQUASH COURT 9.75M × 6.4M
MEN'S TOILET
LADIES' TOILET
3M × 2.75M
3M × 2.75M
STORAGE EQUIPMENT 6.65M × 5.3M
ELECTRIC SUBSTATION
CHILLER PLANT
30M
SEZ - SECTOR 9A
Population of Ulwe : Between 50,000 - 200,000 Occupancy : Business offices and firms for private businesses
WID E
50M WIDE WATER CHANNEL
PARKING CALCULATIONS (according to NBC Section (3) - Annex A)
D
+0.75M
ROA
UP
IDE IN
6M WIDE ROAD
MASSAGE ROOM 4.55M × 3.1M
UP
+0.83M
MASSAGE ROOM 3.75M × 3.3M
UNISEX SALON
NORTH
So, the criteria for parking would be; One car parking space for every 200 sq.m. area or fraction thereof. Floor plate area = 3712 sq.m. Number of floors = 8 Total Floor area = 29,696 sq.m. Total amount of parking required
= 29,696/200 = 148.48 ~ 149 car parking
Amount of car parking provided = 194 basement parking + 97 off street parking = 291 cars
PLOT FOR FUTURE EXTENSION
Off street Bike parking provided = 154 bikes
GROUND FLOOR PLAN SCALE 1:500
Bird's eye view of Building 01
Backside view of Building 01
Eye Level view of Building 01 from Bridge
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 DESIGN DISSERTATION B.V.C.O.A.
SHEET:
03
C'
+22.5M LVL
EXIT ACCESS +18.3M LVL
FABRICATED CANOPY ABOVE
±0.0M
OFFICE SPACE 39M × 22.5M
±0.0M
EXIT ACCESS
A'
AHU ROOM 4.6M × 11.5M
UP
OFFICE SPACE
EXIT ACCESS
±0.0M
TOILET LADIES
TOILET GENTS
AHU ROOM
OFFICE SPACE
EXIT ACCESS +9.9M LVL
PANTRY
OFFICE SPACE 550
550
550
550
550
AHU ROOM
FAST FOOD OUTLET
TOILET LADIES
AV ROOM - 11.85M × 8.15M
550
550
550
STORAGE & UTILITIES
AHU ROOM
OFFICE SPACE
EXIT ACCESS +5.7M LVL
PANTRY
550
TOILET GENTS
550
OFFICE SPACE
WATER
STORAGE & UTILITIES
AHU ROOM HANGOUT SPACE
TELECOM ROOM 3.7M × 6.9M
TELECOM ROOM 3.7M × 6.9M
PANTRY
OFFICE SPACE
AHU ROOM
550
STORAGE & UTILITIES
RECEPTION TOILET LADIES
TOILET GENTS
AHU ROOM
OFFICE SPACE
EXIT ACCESS +1.5M LVL
550
±0.0M LVL
WAY OUT
BASEMENT PARKING
VALET
JANITOR'S FIRST AID 2M×1.95M 2M×1.95M
BMW
BMW
BMW
BMW
BMW
BMW
BMW
−2.7M LVL
BMW
COFFEE 4.95M × 4.9M
RECEPTION DESK
SECTION A-A'
AHU ROOM 7.15M × 5.7M PANTRY 4.95M × 3.95M
ACCOUNTS, ADMIN & COMMUNICATIONS 19.85M × 3M
STORAGE & UTILITIES 3.55M × 3.85M
+1.5M
B'
LIBRARY 8.85M × 2.95M
2M WIDE PASSAGE
LOUNGE 24.15M × 7.7M
TOILET LADIES 3.5M × 5.5M
FIREMAN'S LIFT
+0.15M
FIRE HYDRANT
+1.5M
DISABLED TOILET 2M×2.08M
DRINKING WATER
TOILET GENTS 3.44M × 5.5M
BATTERY & UPS ROOM 3.55M × 7.4M
STORAGE 2.37M×3.5M
LOUNGE
FIRE HYDRANT
2M WIDE PASSAGE
AHU ROOM
+14.1M LVL
DOWN
FOYER 19.65M × 8.9M
MATV
TOILET GENTS
UP
GLASS CANOPY ABOVE
4.9M × 3.9M
TOILET LADIES
HANGOUT SPACE
BMW
B
STORAGE & UTILIITES
AHU ROOM
+0.99M
+0.99M
+1.5M
UP
MEETING ROOM
PANTRY
OFFICE SPACE
OFFICE SPACE 22.5M × 54.5M
LAWN AREA
±0.0M
SCALE 1:250
A
CONFERENCE ROOM 3.8M × 5.8M
EXIT DISCHARGE
+22.5M LVL
WATER TANK
WATER TANK
BRIDGE ABOVE
CONFERENCE ROOM 3.8M × 5.8M
+18.3M LVL
TELECOM ROOM
OFFICE SPACE
LOBBY
TELECOM ROOM
LOBBY
550
OFFICE SPACE
TELECOM ROOM
LOBBY
550
550
550
TELECOM ROOM
550
550
LOBBY
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
LOBBY
TELECOM ROOM
LOBBY
550
550
550
550
550
550
550
550
+14.1M LVL
550
CONFERENCE ROOM
550
550
550
550
550
550
550
550
+9.9M LVL
550
OFFICE SPACE 550
TELECOM ROOM
550
TELECOM ROOM
LOBBY
550
OFFICE SPACE
550
OFFICE SPACE 550
OFFICE SPACE
550
TELECOM ROOM
LOBBY
CONFERENCE ROOM
OFFICE SPACE
ATRIUM
550
550
550
OFFICE SPACE
AV ROOM
±0.0M 550
550
550
550
550
550
550
550
+1.5M LVL
+0.15M
±0.0M LVL BASEMENT PARKING
BASEMENT PARKING
LOBBY
BMW
BMW
−2.7M LVL
BMW
BMW
EXIT DISCHARGE
550
+5.7M LVL
BMW
SECTION B-B'
FIREMAN'S LIFT FIREMAN'S LIFT
+1.5M
SCALE 1:250
UP
+1.5M
UP
EXIT ACCESS
+0.15M
EXIT DISCHARGE
PA TH W AY
EXIT ACCESS
E
+22.5M LVL
2. 5M
W
ID
C
±0.0M +18.3M LVL
OFFICE SPACE
9M WIDE RAMP TO BASEMENT
−2.7M
+14.1M LVL
±0.0M DOWN
CONFERENCE ROOM 3.8M × 5.8M
OFFICE SPACE
OFFICE SPACE
OFFICE SPACE +9.9M LVL
F'
E
OFFICE SPACE
CONFERENCE ROOM
CONFERENCE ROOM
OFFICE SPACE +5.7M LVL
BRIDGE ABOVE
CONFERENCE ROOM 3.8M × 5.8M
±0.0M
CONFERENCE ROOM
CONFERENCE ROOM
OFFICE SPACE
2.5M WIDE PATHWAY
+1.5M LVL
LAWN AREA
±0.0M LVL BASEMENT PARKING
+1.5M
UP
GLASS CANOPY ABOVE
±0.0M
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
BMW
−2.7M LVL
BMW
SECTION C-C'
+1.5M
SCALE 1:250
UP
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE COLD AISLE
COLD AISLE COLD AISLE
COLD AISLE
COLD AISLE COLD AISLE
BMW
+2.1M
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE COLD AISLE
COLD AISLE COLD AISLE
COLD AISLE
TELECOM ROOM 3.7M × 6.9M UP
BATTERY & UPS ROOM 4.65M × 3.45M
DATA CENTER 39.55M × 23.55M
BMW
+22.5M LVL
D'
+18.3M LVL
MANAGER'S CABIN
MANAGER'S CABIN
OFFICE SPACE
MEETING ROOM
CONFERENCE ROOM
MANAGER'S CABIN
OFFICE SPACE
+16.2M LVL
ORIGIN 550
CRAC UNIT
CRAC UNIT
CRAC UNIT
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
+14.1M LVL
550
CRAC UNIT
OFFICE SPACE
MANAGER'S CABIN
+0.83M
ENTRANCE FACILITIES 4.65M × 3.45M
−0.6M
FOYER 19.65M × 8.9M
+0.83M
EQUIPMENT ROOM 11.85M × 3.45M
MATV
COLD AISLE
FIRE HYDRANT
COLD AISLE
FIRE HYDRANT
WATER
TELECOM ROOM 3.7M × 6.9M
AV ROOM - 11.85M × 8.15M
2M WIDE PASSAGE
4 RACK SERVER CABINETS - 0.9mx3.6m
2M WIDE PASSAGE
COLD AISLE
DISABLED TOILET 2M×2.08M
+0.15M EXIT DISCHARGE
+0.15M
FIREMAN'S LIFT
BATTERY & UPS ROOM 3.55M × 5.95M
COLD AISLE
+1.5M
LOUNGE 24.15M × 7.7M
DRINKING WATER
CRAC UNIT
UP
COLD AISLE
VALET
DATA CENTER MANAGER 3.55M × 5.25M
COLD AISLE
RECEPTION DESK FIRST AID JANITOR'S 2M×1.95M 2M×1.95M
COLD AISLE
COFFEE 4.95M × 4.9M
MAINTENANCE & REPAIR STAFF 11.45 × 4.6M
AHU ROOM 7.15M × 5.7M
TOILET GENTS 3.44M × 5.5M
TOILET LADIES 3.5M × 5.5M
FIRE COMMAND CENTER 8M × 3M
B.M.S. ROOM & FACILITY MANAGER OFFICE 11.6M × 3M
CRAC UNIT
+1.5M
CRAC UNIT
PANTRY 4.95M × 3.95M
BMW
OFFICE SPACE 22.5M × 54.5M
OFFICE SPACE
550
550
550
550
550
550
550
550
MANAGER'S CABIN
550
550
550
550
550
550
550
550
550
550
550
STAIRCASE
STAIRCASE MEETING ROOM
CONFERENCE ROOM
OFFICE SPACE
MANAGER'S CABIN
FRONT FACADE
550
+12.0M LVL +9.9M LVL
FABRICATED CANOPY ABOVE
±0.0M
F
OFFICE SPACE
NORTH
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
550
EQUIPMENT ROOM
550
550
ENTRANCE FACILITES
BATTERY & UPS ROOM
DATA CENTER +1.5M LVL
550
WAY OUT
BASEMENT PARKING BMW
PUMP ROOM BMW
BMW
BMW
GROUND FLOOR PLAN
+5.7M LVL +3.6M LVL
OFFICE SPACE
E'
+7.8M LVL
OFFICE SPACE
MEETING ROOM
±0.0M LVL
BASEMENT PARKING
BMW
BMW
BMW
BMW
−2.7M LVL
SCALE 1:250
TOTAL NUMBER OF USERS - BUILDING: GROUND FLOOR: Cubicles = 14 Triple Seat = 191 *3 = 573 Single Seat = 118 Trainees = 121 *2 = 242 Staff = 34 Admin + 1 Data center Mgr + 2 Janitors + 3 Maintenance
SECTION D-D' SECOND+THIRD FLOOR Six Seater = (144+96) *2 = 480 Four Seater = (32+48) *2 = 160 Two seater = 48 *2 = 96 Cubicles = 16 Staff = 4 Janitors
SCALE 1:250 +22.5M LVL
+22.5M LVL
+18.3M LVL
+18.3M LVL
WATER TANK
TOILET GENTS
DRINKING WATER
OFFICE SPACE HANGOUT SPACE
+14.1M LVL TOILET GENTS
ATRIUM
DRINKING WATER
OFFICE SPACE
HANGOUT SPACE
+9.9M LVL
FIRST FLOOR Cubicles = 21 Triple Seat = 234 *3 = 702 Single Seat = 160 Staff = 10 Chef + 2 Janitors
Total employees = 2324 employed Trainees = 242 Staff = 56 Watchmen = 2 Total people = 2,624 people
GROUND FLOOR PLAN & SECTIONS
TOILET GENTS
DRINKING WATER
CHILLER ROOM
ELEVATION BEHIND
550
CAFETERIA
+5.7M LVL
+5.7M LVL FOYER
DRINKING WATER
RECEPTION
DATA CENTER +1.5M LVL
+1.5M LVL
±0.0M LVL
±0.0M LVL
BASEMENT PARKING BMW
−2.7M LVL
SECTION E-E' SCALE 1:250
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
+9.9M LVL
OFFICE SPACE 550
TOILET GENTS
+14.1M LVL
PUMP ROOM
LOBBY
B.M.S. ROOM & FACILITY MGR OFFICE
BASEMENT PARKING
−2.7M LVL
BMW
SECTION F-F' SCALE 1:250
SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 DESIGN DISSERTATION B.V.C.O.A.
SHEET:
04
C' +5.23M
UP
4.9M × 3.9M
MATV
OFFICE SPACE 39M × 22.5M
FIRE HYDRANT
+5.7M
UP +5.7M
TOILET LADIES 3.5M × 5.5M
AHU ROOM 4.6M × 11.5M
JANITOR'S FIRST AID 2M×1.95M 2M×1.95M
COFFEE 4.95M × 4.9M
AHU ROOM 7.15M × 5.7M PANTRY 4.95M × 3.95M
FAST FOOD COUNTER 7.75M × 3.85M
STORAGE & UTILITIES 3.55M × 3.85M
OFFICE SPACE 22.5M × 54.5M
A
CONFERENCE ROOM 3.8M × 5.8M
CONFERENCE ROOM 3.8M × 5.8M
A'
WATER
2M WIDE PASSAGE
DISABLED TOILET 2M×2.08M
DRINKING WATER
TOILET GENTS 3.44M × 5.5M
BATTERY & UPS ROOM 3.55M × 7.4M
EXIT ACCESS
+3.6M
FIRE HYDRANT
2M WIDE PASSAGE
FIREMAN'S LIFT
B'
LIBRARY
TELECOM ROOM 3.7M × 6.9M
MEETING ROOM
TELECOM ROOM 3.7M × 6.9M
+3.6M
B
+3.6M
UP
BUILDING 2 - SOUTH ELEVATION
BUILDING 1 - NORTH ELEVATION
SCALE 1:500
SCALE 1:250
+3.6M
+5.7M
UP
EXIT ACCESS
+5.85M
FIREMAN'S LIFT
FIREMAN'S LIFT
UP
+5.7M
EXIT ACCESS
+3.6M
C
FIRST AID JANITOR'S 2M×1.95M 2M×1.95M
2M WIDE PASSAGE
FIRE HYDRANT
OFFICE SPACE 39M × 22.5M
BRIDGE BELOW
TELECOM ROOM 3.7M × 6.9M UP
UP
CENTRIFUGAL FAN UNIT DOWN
D' MEETING ROOM 7.9M × 2.95M
+3.6M
+3.6M
LIBRARY
PANTRY COUNTER
+3.6M
EXIT DISCHARGE
EXIT ACCESS
FIREMAN'S LIFT
BATTERY & UPS ROOM 3.55M × 7.4M
MATV
TELECOM ROOM 3.7M × 6.9M
D
AHU ROOM 4.6M × 11.5M
2M WIDE PASSAGE
+5.7M FIRE HYDRANT
WATER
+18.45M
+18.3M
DRINKING WATER
DISABLED TOILET 2M×2.08M
+5.7M
PANTRY COUNTER
COFFEE 4.95M × 4.9M
+18.45M
UP
+16.2M
AHU ROOM 7.15M × 5.7M
STORAGE & UTILITIES 3.55M × 3.85M
TOILET GENTS 3.44M × 5.5M
TOILET LADIES 3.5M × 5.5M
FAST FOOD COUNTER 7.75M × 3.85M
CENTRIFUGAL FAN UNIT
WATER TANK
CONFERENCE ROOM 3.8M × 5.8M
PANTRY 4.95M × 3.95M
DOWN
GLASS FRAMEWORK ROOF
WATER TANK
OFFICE SPACE 22.5M × 54.5M
+16.2M
E
DOWN
+18.3M
CENTRIFUGAL FAN UNIT
+18.3M
F'
+16.2M
CONFERENCE ROOM 3.8M × 5.8M
+5.23M
WAY TO BASEMENT
+5.23M
E' +18.3M
+5.85M EXIT DISCHARGE
CENTRIFUGAL FAN UNIT
DOWN
EXIT DISCHARGE
+18.45M
SCALE 1:500
SCALE 1:250
CENTRIFUGAL FAN UNIT
+16.2M
SCALE 1:500
+18.45M
DOWN
F
FIRST FLOOR PLAN
BUILDING 2 - EAST ELEVATION
BUILDING 1 - WEST ELEVATION
NORTH
+18.3M
+16.2M
C' +5.23M
UP MANAGER'S CABIN 3.45M × 3.45M
B' BRIDGE BELOW
CONFERENCE ROOM 8.4M × 3.45M
TELECOM ROOM 3.7M × 6.9M
TELECOM ROOM 3.7M × 6.9M
+7.8M
B
+7.8M
UP CONFERENCE ROOM 8.4M × 3.45M
MANAGER'S CABIN 8.4M × 3.45M
OFFICE SPACE - 39M × 22.5M +9.9M
PANTRY 4.95M × 3.95M
A WATER TANK
MANAGER'S CABIN 3.45M × 4.35M
BRIDGE BELOW
EXIT DISCHARGE
+18.3M
+18.45M
AHU ROOM 7.15M × 5.7M
STORAGE & UTILITIES 3.55M × 3.85M
A'
+18.45M
COFFEE 4.95M × 4.9M
PANTRY COUNTER
MANAGER'S CABIN 8.4M × 3.45M
JANITOR'S FIRST AID 2M×1.95M 2M×1.95M
HANGOUT SPACES 24.15M × 8.95M
PANTRY COUNTER
MANAGER'S CABIN 3.45M × 3.45M
+9.9M
+7.8M
UP
AHU ROOM 4.6M × 11.5M
CENTRIFUGAL FAN UNIT
2M WIDE PASSAGE
TOILET LADIES 3.5M × 5.5M
EXIT ACCESS
DISABLED TOILET 2M×2.08M
DRINKING WATER
TOILET GENTS 3.44M × 5.5M
BATTERY & UPS ROOM 3.55M × 7.4M
FIREMAN'S LIFT
DOWN
WATER
+16.2M
FIRE HYDRANT
FIRE HYDRANT
MANAGER'S CABIN 8.4M × 3.45M
MATV
2M WIDE PASSAGE
WATER TANK
GLASS FRAMEWORK ROOF
DOWN +18.3M
+18.3M
CENTRIFUGAL FAN UNIT
+16.2M
DOWN
+16.2M
OFFICE SPACE 22.5M × 54.5M
CENTRIFUGAL FAN UNIT
CONFERENCE ROOM 8.4M × 3.45M
CONFERENCE ROOM 8.4M × 3.45M
+5.23M
EXIT ACCESS MANAGER'S CABIN 3.45M × 3.45M
UP
+9.9M
BUILDING 1 - EAST ELEVATION
TERRACE FLOOR PLAN
+7.8M
MANAGER'S CABIN 3.45M × 3.45M
BUILDING 2 - WEST ELEVATION
NORTH
SCALE 1:500
SCALE 1:250
SCALE 1:500
+5.85M
FIREMAN'S LIFT
FIREMAN'S LIFT
MANAGER'S CABIN 3.45M × 3.45M
+9.9M UP
MANAGER'S CABIN 3.45M × 3.45M
EXIT ACCESS
+7.8M
CONFERENCE ROOM 8.4M × 3.45M
CONFERENCE ROOM 8.4M × 3.45M
C
OFFICE SPACE 22.5M × 54.5M
F'
PRINTER & CABINET AREA
E
BRIDGE BELOW
AHU ROOM 7.15M × 5.7M COFFEE 4.95M × 4.9M
HANGOUT SPACES 24.15M × 8.95M
FIRST AID JANITOR'S 2M×1.95M 2M×1.95M
DISABLED TOILET 2M×2.08M
TOILET GENTS 3.44M × 5.5M
TOILET LADIES 3.5M × 5.5M
STORAGE & UTILITIES 3.55M × 3.85M
MANAGER'S CABIN 8.4M × 3.45M
MANAGER'S CABIN 3.45M × 3.45M
UP
AHU ROOM 4.6M × 11.5M
EXIT ACCESS
FIREMAN'S LIFT
BATTERY & UPS ROOM 3.55M × 7.4M
DRINKING WATER
+7.8M
PANTRY 4.95M × 3.95M
+9.9M
MANAGER'S CABIN 8.4M × 3.45M
MANAGER'S CABIN 3.45M × 4.35M
OFFICE SPACE - 39M × 22.5M 2M WIDE PASSAGE
FIRE HYDRANT
MATV
TELECOM ROOM 3.7M × 6.9M UP
UP
+7.8M
MANAGER'S CABIN 8.85M × 3.45M
MANAGER'S CABIN 3.45M × 3.45M
+7.8M
CONFERENCE ROOM 8.4M × 3.45M
D
2M WIDE PASSAGE
+9.9M FIRE HYDRANT
TELECOM ROOM 3.7M × 6.9M
WATER
D' MEETING ROOM 8.85M × 2.95M
CONFERENCE ROOM 8.4M × 3.45M
PRINTER & CABINET AREA
MANAGER'S CABIN 8.4M × 3.45M
TOWARDS BASEMENT
+5.23M
BUILDING 2 - NORTH ELEVATION
TOWARDS BASEMENT
F
E'
BUILDING 1 - SOUTH ELEVATION
NORTH
SCALE 1:500
SCALE 1:250
SECOND-THIRD TYPICAL PLAN SCALE 1:500
Eye Level view of Building 02
Terrace Level view of Building 02
Bird's eye view of Building 02
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
PLANS & ELEVATIONS SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 DESIGN DISSERTATION B.V.C.O.A.
SHEET:
05
+10.35M LVL +8.35M LVL 7.86M LVL
J'
N'
+6.45M LVL +4.95M LVL
+5.7M LVL +4.95M LVL +4.25M LVL RECEPTION
KITCHEN
RESTAURANT
K
BASINS W.C.
+2.25M LVL
BILLIARDS
UP
SECTION L-L'
11.75M × 7.05M
SCALE 1:250
GARBAGE DISPOSAL
COFFEEHOUSE 7.25M × 13.35M
+0.75M LVL ±0.0M LVL
10.25M × 7.05M
RECEPTION & WAITING
SECTION G-G'
±0.0M
+1.85M LVL
11.05M × 4.75M
+0.75M
GOODS UNLOADING PLATFORM
+0.75M
K'
2.05M WIDE PASSAGE
DARTS
+0.75M LVL ±0.0M LVL
UP
BADMINTON COURTS
SQUASH COURT
SCALE 1:250
±0.0M BREAKOUT AREA 11.75M × 4.5M
KITCHEN
RESTAURANT
6M × 12.5M
7.85M × 16.55M
+10.35M LVL
COLD STORAGE
G
+8.35M LVL
G'
3.3M × 3.05M
7.86M LVL
SQUASH COURT 9.75M × 6.4M
+6.45M LVL
W.C.
1.5M WIDE PASSAGE
UP
MEN'S TOILET
STORAGE ROOM 3.89M × 3M
+0.75M
BANQUET HALL
GYM
SECTION H-H'
EFX546
H
SWIMMING POOL BANQUET HALL 17.65M × 23.55M
SCALE 1:250
H'
+3.15M LVL
BADMINTON COURTS
+0.75M LVL ±0.0M LVL
SECTION M-M'
BADMINTON COURTS 21.5M × 35.25M
SCALE 1:250
SQUASH COURT 9.75M × 6.4M
L
12M × 24M
GYM 9.65M × 22.05M
STORAGE EQUIPMENT
9.75M × 6.4M
−1.8M LVL SWIMMING POOL
EFX546
±0.0M
LADIES' TOILET
SQUASH COURT +1.1M LVL +0.75M LVL ±0.0M LVL
1.8M WIDE PASSAGE
5.9M × 5.45M
+4.95M LVL
+5.7M LVL +4.95M LVL
W.C.
RECEPTION
L' +10.35M LVL +8.35M LVL
SQUASH COURT
7.86M LVL
9.75M × 6.4M
+6.45M LVL
M
+5.7M LVL +4.95M LVL
1.5M WIDE PASSAGE
RECEPTION
±0.0M
3M × 2.75M
3M × 2.75M
SWIMMING AREA VESTIBULE
UP
±0.0M
5.7M × 6.35M
MASSAGE ROOM 4.55M × 3.75M
I'
BILLIARDS +1.85M LVL
6.65M × 5.3M
+0.75M LVL
+0.75M LVL +0.15M LVL ±0.0M LVL
±0.0M LVL
NORTH
SECTION N-N'
SCALE 1:250
W.C.
SAUNA & THERAPY ROOM 3.75M × 6.35M
ADMIN 5.05M × 2.95M
AHU ROOM
BADMINTON COURTS
STORAGE EQUIPMENT
SECTION I-I'
W.C.
SPA CENTER
I
MASSAGE ROOM
LADIES' TOILET
+4.95M LVL
W.C.
5.85M × 6.85M
RECEPTION 6M × 4M
MASSAGE ROOM
MEN'S TOILET
N
+0.75M
UP
UNISEX SALON
STORAGE ROOM 3.89M × 3M
M'
SPORTS CLUB FLOOR PLAN SCALE 1:250
SCALE 1:250
W.C.
MASSAGE ROOM 3.75M × 3.3M
AHU UNISEX SALON
MASSAGE ROOM 4.55M × 3.75M
6.3M × 4.75M
SHOWER AREA 7.86M LVL
+0.75M
6.15M × 11.25M
+6.45M LVL TOILET W.C.
AMENITIES CENTER FLOOR PLAN SCALE 1:250
TOILET
MASSAGE ROOM
SAUNA & THERAPY ROOM
STORAGE ROOM
RECEPTION & WAITING
KITCHEN
GYM
NORTH
J
+4.95M LVL
+5.7M LVL +4.95M LVL
UP
MASSAGE ROOM 4.55M × 3.1M
STORAGE ROOM
+0.9M LVL +1.1M LVL +0.75M LVL ±0.0M LVL
BILLIARDS
DARTS
+0.75M LVL ±0.0M LVL
SECTION K-K'
SECTION J-J'
SCALE 1:250
SCALE 1:250
BIRD'S EYE VIEW OF SPORTS CLUB SPORTS CLUB - WEST ELEVATION SCALE 1:250
AMENITIES CENTER WEST ELEVATION SCALE 1:250
BIRD'S EYE VIEW OF AMENITIES CENTER
AMENITIES CENTER NORTH ELEVATION
SPORTS CLUB - NORTH ELEVATION
BIRD'S EYE VIEW OF SPORTS CLUB
SCALE 1:250
SCALE 1:250
BIRD'S EYE VIEW OF AMENITIES CENTER
AMENITIES CENTER EAST ELEVATION
SPORTS CLUB - EAST ELEVATION
SCALE 1:250
SCALE 1:250
BIRD'S EYE VIEW OF SPORTS CLUB AMENITIES CENTER SOUTH ELEVATION SCALE 1:250
BIRD'S EYE VIEW OF AMENITIES CENTER
AMENITIES CENTER & SPORTS CLUB
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
SPORTS CLUB - SOUTH ELEVATION SCALE 1:250
SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 DESIGN DISSERTATION B.V.C.O.A.
SHEET:
06
Plot area- 10.94 hectares (27acres) Usable Plot area - 80,461sqm (19.88 acres)
LIGHTING CALCULATION WITH AREA SPECIFICATION (according to ECBC 2017)
LEGEND
30M WIDE ROAD
FSI available - 1.4 Total Built-up area available - 112,645sqm
WATER SUPPLY
Name of Space
GREY WATER
Total Workstation Area - 29,696 sqm @ 3,712 sqm/floor x 8 floors
3.5M WIDE FOOTPATH
9M WIDE INTERNAL ROAD
WATER CALCULATIONS:
ELECTRIC SUPPLY
ENTRY
DATA CABLE TRENCH +0.99M
+0.99M
TELECOM 3 ROOM 3.7M × 6.9M
TELECOM 3 ROOM 3.7M × 6.9M TOILET LADIES 3.5M × 5.5M
JANITOR'S FIRST AID 2M×1.95M 2M×1.95M
COFFEE 4.95M × 4.9M
AHU ROOM 7.15M × 5.7M PANTRY 4.95M × 3.95M
EXISTING STRUCTURE
CONFERENCE ROOM 3.8M × 5.8M
LAWN AREA
CHILLED WATER TRENCH
OFFICE SPACE 22.5M × 54.5M
EXIT DISCHARGE
±0.0M
WASTEWATER TREATMENT PROCESS 3.5M WIDE FOOT PA
TH
CONFERENCE ROOM 3.8M × 5.8M
BRIDGE ABOVE
±0.0M
+0.15M
EXIT DISCHARGE
±0.0M
UGT
6M WIDE ROAD
FIREMAN'S LIFT FIREMAN'S LIFT
UP
UP
EXIT ACCESS
+1.5M
+1.5M
+0.15M
HW PA T
EXIT DISCHARGE
AY
EXIT ACCESS
FEEDER PILLAR
ID E
UP
GOODS UNLOADING PLATFORM
+0.75M
GARBAGE DISPOSAL
2. 5M
W
±0.0M
COFFEEHOUSE 7.25M × 13.35M
9M WIDE RAMP TO BASEMENT
−2.7M
KITCHEN
RESTAURANT
6M × 12.5M
7.85M × 16.55M
±0.0M
COLD STORAGE 3.3M × 3.05M
CONFERENCE ROOM 3.8M × 5.8M
DOWN
W.C.
RECEPTION
±0.0M
ENTRANCE
1FACILITIES
4.65M × 3.45M
UP
+1.5M
UP
BATTERY & UPS ROOM 4.65M × 3.45M
+1.5M
+0.15M
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
±0.0M UP
1.5M WIDE PASSAGE
RECEPTION
W.C. W.C.
SPA CENTER
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
5.85M × 6.85M
±0.0M ADMIN 5.05M × 2.95M
ORIGIN
RECEPTION 6M × 4M
W.C.
SAUNA & THERAPY ROOM 3.75M × 6.35M
SWIMMING AREA VESTIBULE
UP
±0.0M
5.7M × 6.35M
MASSAGE ROOM 4.55M × 3.75M
CRAC UNIT
CRAC UNIT
CRAC UNIT
CRAC UNIT MASSAGE ROOM 3.75M × 3.3M
AHU UNISEX SALON
FABRICATED CANOPY ABOVE
20 lphd
45
225
UGT
2.05M WIDE PASSAGE
DARTS BILLIARDS
UP
10.25M × 7.05M
11.05M × 4.75M
+0.75M RECEPTION & WAITING 11.75M × 7.05M
±0.0M BREAKOUT AREA 11.75M × 4.5M
SQUASH COURT 9.75M × 6.4M
SQUASH COURT 9.75M × 6.4M
50M WIDE WATER CHANNEL
21.5M × 35.25M
9M W
9.75M × 6.4M
Total water requirement for Office Building = 118,080 Ltrs/day OHT - ½ day capacity = 118,080 x ½ = 59,040 Ltrs. (OHT tank sizes as per design) = 8M x 8M x 0.9M UGT - 1 ½ day capacity = 8.5M x 4.6M x 3M
BADMINTON COURTS
SQUASH COURT
SQUASH COURT 9.75M × 6.4M
LADIES' TOILET
3M × 2.75M
3M × 2.75M
STORAGE EQUIPMENT 6.65M × 5.3M
ELECTRIC SUBSTATION
= 118,080 x 1½ = 117,120 Ltrs.
CHILLER PLANT
Total Volume of Water for Sports Arena UGT - 1 ½ day capacity = 5.175 cu.m. x 1.5 = 2.4M x 2.17M x 1.5M
= 22,595 Ltrs/day = 33.9 cu.m.
= 5,175 Ltrs/day = 7.7625 cu.m.
INTEGRATED SERVICES PLAN SCALE 1:750
WASTE WATER TREATMENT CALCULATION (AEROBIC PROCESS)
Plant Capacity: Average water supply per day = 145,850 liters = 0.145mld Average sewage generated per day = 85% of supplied water = 0.85 × 0.145 = 0.123 = 123.97 kld Average sewage generated per hour = 123.97/24 = 5.165 cum/hr Peak factor = 3 Design flow capacity (maximum) = 5.165 × 3 = 15.496 cum/hr
UP
PUMP ROOM 19.4M × 3.45M
LOBBY 19.65M × 8.05M
−2.7M FIRE HYDRANT
FIRE HYDRANT
6M WIDE ROAD
−2.7M
CHILLER ROOM
4.75M × 7.4M
4.75M × 7.4M
(where mld - Million liter per day; kld - Kilo liter per day)
JET FANS FOR AIR EXTRACTION IN BASEMENT
6M WIDE ROAD
CHILLER ROOM
PARKING CALCULATIONS (according to NBC Section (3) - Annex A) Population of Ulwe : Between 50,000 - 200,000 Occupancy : Business offices and firms for private businesses 6M WIDE ROAD
±0.0M
9M WIDE RAMP
−2.7M
7.5M WIDE ROAD
UP
CHILLER ROOM
CHILLER ROOM
4.75M × 7.4M
4.75M × 7.4M
So, the criteria for parking would be; One car parking space for every 200 sq.m. area or fraction thereof. Floor plate area = 3712 sq.m. Number of floors = 8 Total Floor area = 29,696 sq.m.
6M WIDE ROAD FIRE HYDRANT
FIRE HYDRANT
Total amount of parking required
LOBBY 19.65M × 8.05M
−2.7M
= 29,696/200 = 148.48 ~ 149 car
parking
PUMP ROOM 15.75M × 3.45M UP
PARKING LAYOUT PLAN
9
3330
20
59.55 3.9 3.9 18.64 52.67 96.58 28.98
59.55 31.2 3.9 18.64 52.67 193.16 463.68
Enclosed Storage Storage Enclosed Service/ Repair Classroom/ Lecture Conference/ Meeting
10 6.8 6.8 10 6.8 13.7 11.5
595.5 212.16 26.52 186.4 358.156 2646.292 5332.32
Data Center
777.69
777.69
Electrical/ Mechanical 7.1
5521.599
Toilets
38.17
305.36
Restroom
7.7
2351.272
Battery & UPS Room
26.27
210.16
Electrical/ Mechanical 7.1
1492.136 156030 5506.2 348 2027.68 1088.245 3709.86
1 242 18
Workstation/floor Manager Room Facility Manager Conference Room B Meeting Room C Pantry AMENITY SPACES
2324 1 1 12 10 2-4
2103.75 28.98 34.8 22.04 19.11 43.8
15603 550.62 34.8 176.32 94.63 306.6
Open Plan Enclosed Enclosed Conference/ Meeting Conference/ Meeting For food preparation
Library
10
26.1
78.3
Stacks/ Reading Area 18.3/ 10
783
Banquet hall Kitchen & Storage LEISURE SPACES
250 14
379.15 85
379.15 85
Hotel Dining 9.1 For food preparation 12.1
3450.265 1028.5
Gym
57
212.78
212.78
Spa & Sauna
46
141.71
142
60
1.27 69.18 1.81
8.49 69.18 17.77
Fitness AreaGymnasium Seating AreaGymnasium Dressing Room Dressing Room Restroom
44 78
102.18 129.91
102.18 129.91
12 2
34.8 66.93 — —
10 10 10 11.5 11.5 12.1
13.7
2915.086
4.6
653.2
9.1 9.1 7.7
77.259 629.538 136.829
For Family dining For Family dining
10.9 10.9
1113.762 1416.019
34.8 121.27
Service/ Repair Service/ Repair Service/ Repair Service/ Repair
6.8 6.8 6.8 6.8
236.64 824.636 — —
35.15
140.6
Service/ Repair
6.8
956.08
Fire Command Centre 4 w/Surveillance
24
24
Service/ Repair
6.8
163.2
Ext Chiller Plant
—
Service/ Repair
6.8
—
2
MOVING BED BIOFILM REACTOR - SINGLE PASS TREATMENT
30M
SEZ - SECTOR 9A
Total Volume of Water for Amenities Block UGT - 1 ½ day capacity = 22.6cu.m. x 1.5 = 4M x 5.67M x 1.5M
Lobby
E RO
MEN'S TOILET
AD
25 lphd
370
WID
5
6M WIDE ROAD
D
720 990 360 540 540 1080 360 360
L ROA
45 15 45 45 45 45 45 45
SHOWER AREA
+0.75M
W.C. MASSAGE ROOM 4.55M × 3.1M
TERN A
20 lphd 10 lphd 20 lphd 20 lphd 20 lphd 20 lphd 20 lphd 20 lphd
6.3M × 4.75M
TOILET
IDE IN
25 lphd 5 lphd 25 lphd 25 lphd 25 lphd 25 lphd 25 lphd 25 lphd
MASSAGE ROOM 4.55M × 3.75M
6.15M × 11.25M
±0.0M
UP
16 66 8 12 12 24 8 8
185
Changing Rooms Salon Toilets PUBLIC SPACES Coffee House Restaurant SERVICES & PARKING B.M.S. Facility Fire Pump Room Generator (no Room) S.T.P. (ext facility) Chiller Room (basement)
STORAGE ROOM 3.89M × 3M
+0.75M
UP
W.C.
GLASS CANOPY ABOVE
40-50
12M × 24M
GYM 9.65M × 22.05M
+1.8M COLD AISLE
COLD AISLE COLD AISLE
BANQUET HALL 17.65M × 23.55M
+0.15M +1.5M
Area per Total Area Sq.m Room
SWIMMING POOL
EXIT DISCHARGE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
COLD AISLE
DATA CENTER 39.55M × 23.55M COLD AISLE
COLD AISLE
COLD AISLE
MATV
FOYER 19.65M × 8.9M
COLD AISLE
FIRE HYDRANT
4 RACK SERVER CABINETS - 0.9mx3.6m
2M WIDE PASSAGE FIRE HYDRANT
WATER
CRAC UNIT
FIREMAN'S LIFT
BATTERY & UPS ROOM 3.55M × 5.95M
COLD AISLE
DRINKING WATER
COLD AISLE
DISABLED TOILET 2M×2.08M
CRAC UNIT
UP
COLD AISLE
+1.5M
LOUNGE 24.15M × 7.7M
DATA CENTER MANAGER 3.55M × 5.25M
COLD AISLE
VALET
2M WIDE PASSAGE
EQUIPMENT ROOM
TOILET GENTS 3.44M × 5.5M
RECEPTION DESK FIRST AID JANITOR'S 2M×1.95M 2M×1.95M
AV ROOM - 11.85M × 8.15M
2 11.85M × 3.45M
MAINTENANCE & REPAIR STAFF 11.45 × 4.6M
FIRE COMMAND CENTER 8M × 3M
B.M.S. ROOM & FACILITY MANAGER OFFICE 11.6M × 3M
AHU ROOM 7.15M × 5.7M COFFEE 4.95M × 4.9M
STORAGE ROOM 3.89M × 3M
+0.75M
LAWN AREA CRAC UNIT
PANTRY 4.95M × 3.95M
UP
2.5M WIDE PATHWAY
±0.0M
COLD AISLE
OFFICE SPACE 22.5M × 54.5M
BRIDGE ABOVE
W.C.
1.5M WIDE PASSAGE
5.9M × 5.45M
FEEDER PILLAR
TOILET LADIES 3.5M × 5.5M
WATER BODY FOR RWH
5175
−2.7M
11M WIDE ROAD
+1.5M
UGT 8.5M×4.6M ×3M
±0.0M
TREATED WATER TANK 8.5M×6M×3M
TOILET GENTS 3.44M × 5.5M
6M WIDE ROAD
EFFLUENT TREATMENT
9M W
VALET RECEPTION DESK
ACCOUNTS, ADMIN & COMMUNICATIONS 19.85M × 3M
TELECOM 3 ROOM 3.7M × 6.9M
2700 270 1800 270 1800 90 22595
+0.15M
LOUNGE 24.15M × 7.7M
STORAGE & UTILITIES 3.55M × 3.85M
−0.6M
45 45 45 45 45 45
AHU ROOM 4.6M × 11.5M
3 TELECOM ROOM 3.7M × 6.9M
20 lphd 20 lphd 20 lphd 20 lphd 20 lphd 20 lphd
180
DRINKING WATER
UP
CONFERENCE ROOM 3.8M × 5.8M
25 lphd 25 lphd 25 lphd 25 lphd 25 lphd 25 lphd
45
±0.0M
RO AD WI 6M
20 lphd
EXIT ACCESS
PROP
25 lphd
AL RO AD
3080 5460 315 270 45 3750 2565
TERN
70 70 45 45 45 15 45
IDE IN
15L/seat 15L/seat 20 lphd 20 lphd 20 lphd 10 lphd 20 lphd
AY
55L/seat 55L/seat 25 lphd 25 lphd 25 lphd 5 lphd 25 lphd
IGHW
10890 2520 90 118080
OSED H
45 45 45
BATTERY & UPS ROOM 3.55M × 7.4M
FIREMAN'S LIFT
AV ROOM - 11.85M × 8.15M
WATER
2M WIDE PASSAGE
+1.5M
DISABLED TOILET 2M×2.08M
TREATED WATER
1.8M WIDE PASSAGE
viii
Players Visitors Players Squash Players Billiards Players Darts Players Basketball Players Tennis Cricket practice Players Reception/Offic Staff e
20 lphd 20 lphd 20 lphd
FIRE HYDRANT
2M WIDE PASSAGE
LIBRARY 8.85M × 2.95M
6M WIDE ROAD
ii iii iv v vi vii
Sports Block Badminton
25 lphd 25 lphd 25 lphd
FOYER 19.65M × 8.9M FIRE HYDRANT
MATV
STORAGE 2.37M ×3.5M
DOWN
+0.83M
3 i
4.9M × 3.9M
+0.83M
viii
MEETING ROOM
6M WIDE ROAD
viii
Amenities Block Coffee House Customer 44 Restaurant Customer 78 Kitchen Staff Chef 7 6 Waiter Helper 1 Banquet Hall Visitors 250 Gym Users 57 Reception/Offic Staff 4 e Users 60 Salon 6 Staff Spa Users 40 6 Staff Swimming Pool Users 40 Staff 2
104580
OTP ATH
vii
242 56 2
45
UP
GLASS CANOPY ABOVE
OFFICE SPACE 39M × 22.5M
FO
vi
2324
20 lphd
+1.5M
UP
3.5 MW IDE
iv v
25 lphd
RWH PIPES
FABRICATED CANOPY ABOVE
±0.0M
Office Building Employee s Trainees Staff Watchmen
2 i ii iii
6M WIDE ROAD
DE
Occupant No. of Domestic Flushing type Occupants
Total Water Domestic Requirement + (Litres) Flushing
EFX546
1
N.B.C. Standards
EFX546
Users Sr. Description of No. Space
Occupants OFFICE BUILDING Reception & Waiting Area/Lobby Admin. & H.R. Block Janitor's Room First Aid Data Center Manager Maintenance/Repair AV Room Conference Room A
BLACK WATER/ SLUDGE
Category for LPD (W/sq.m.) Total LPD Lighting conditions Table 6-4
Space Requirement
Amount of car parking provided parking + 97 off street parking = 291 cars
= 194 basement
Off street Bike parking provided
= 154 bikes
SCALE 1:500
Sizing calculation for collection pit: Retention time required = 4h Average design flow = 5.17 cum/hr Capacity of collection sump = 4 × 5.17 = 20.66 cum Assume liquid depth = 4m Area required for collection pits = 20.66/4 = 5.165 sqm For circular tank, 5.165 = πr² = 1.283m Volume of pit provided = πr²h = 5.165 × 4 = 20.66 m³ Sizing calculation of bar screen: Peak discharge = 15.5 m³/hr Average discharge = 5.17 m³/hr Average velocity @ average flow isn't allowed to exceed 0.8m/sec Average spacing between bar 20mm The velocity = 0.3 × 20.66 = 6.2 m/h/m² Cross sectional area required = flow/velocity = 15.5/6.2 = 2.5 m²
Width of channel = (78.13 × 20) + (78.13 × 6) = 2032mm Width of screen = 2030mm Sizing calculation of aeration tank: Bod in the feed sewage = 100ppm No. of aeration tank =2 Average flow = 124/2 = 62kld Total bod load to the aeration tank = 5.17 × 24 × 100 = 12.4 kgs Let mlss = 2000 mg/l; f/m = 0.15 Volume of tank required = (Q × bod load) / (f/m × mlss) = (62 × 100) / (0.15 × 2000) = 20.66 m³ Assume liquid depth =4m Area = 20.66/4 = 5.17 m² Tank size provided = 2.59 × 2 × 4 So, Volume of tank = 20.8 m³ Check for aeration period/hydraulic retention time: Hydraulic retention time, t = 20.8 × 24 / 62 = 8.05hr So, the tank retention time is more than the required time. Excessive sludge will be drained to municipal waste Maximum design flow rate = 15.5 m³/hr, 124 kld Total feed suspended solid = 250ppm Total outlet suspended solid = 50ppm Load to the clarifier = 250 - 50 = 200ppm Sludge generated per day = 124 × 200 / 1000 = 24.8 kg/day Solid content in the feed = 3% Specific gravity of the sludge = 1.015 Volume of sludge = ((24.8/0.03)/(1000/1.0.15)) = 0.839 m³
Liquid depth required = 1m Velocity through screen at the peak flow = 1.6 m/sec Clear area = 2.5/1.6 = 1.5625 m.sec No. of clear spacing = 1.5625/0.02m = 78.125
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
ACTIVE CELL MEDIA (VIRGIN HPDE) FOR BACTERIA CULTURE
TYPES OF REACTOR AND COMPONENTS FOR MBBR PROCESS
BUILDING SERVICES SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 A.R.D. B.V.C.O.A.
SHEET:
07
Fire Command Center
HVAC CALCULATIONS
(According to NBC 2016) [3.4.12] Total area of the floor = 29,696 sq.m Total volume of the floor = 97,996.8 cu.m i.e. total volume = 3,460,267 cu.ft [a] [b]
Fire command centre shall be on the entrance floor of the building having direct access. The control room shall have the main fire alarm panel with communication system (suitable public address system) to aid floors and facilities for receiving the message from different floors.
3,460,267 cu.ft x 6 = 20,761,602 150 x 2624 occupants = 393,600
All controls and monitoring of fire alarm systems, pressurization systems, smoke management systems shall happen from this room. Monitoring of integrated building management systems, CCTVs or any other critical parameters in building may also be from the same room.
20,761,602 + 393,600 = 21,155,202 ∴Tonnage = 21,155,202/12000 btu = 1762,93 Total tonnage = 1762.93 x 1 floors = 1763 tonnes (8 floors already calculated in the total area of the floor) AHU Capacity Required= 1763 x 400cfm = 881,500 cfm Single AHU Capacity = 7,500cfm Total AHU Units required= 881,500/7,500cfm = 117.53 units ≈ 118 units
RAISED FLOOR FOR DATA CENTER CABLING
FIRE COMMAND CENTER 8M × 3M
Computer Room Air Conditioning (CRAC) Calculations (for Data Center): A typical data center also has a cooling density (heat load) of 50 W to 150 W per sq. ft. Total area of the floor
B.M.S. ROOM & FACILITY MANAGER OFFICE
= 777.69 sq.m. (8367.94 sq.ft)
Cooling Capacity at the low end = 50W x 8367.94 sq.ft. x 3.412/12,000 btuh 118 tonnes
Cooling Capacity at the high end = 150W x 8367.94 sq.ft. x 3.412/12,000 btuh =
FIREMAN'S LIFT
354 tonnes
FIRE FIGHTING SHAFT
Units provided = Seven (under max. optimization)
RECEPTION DESK
+1.5M UP
=
FLOOR PLAN & STAIRWAY MARKING SIGN
EXIT ACCESS FIREMAN'S TALKBACK
Pressurization System EXIT DISCHARGE
WET RISER WITH HOSE REEL
✆
+0.15M
Pressurization systems are employed in stairwells, elevator shafts, refuge spaces & other egress routes to control smoke movement across a barrier. By implementing in an area designed for safe exit, they maintain a high pressure against the area exposed to fire. This prevents smoke infiltration through cracks, joints, slits, etc in the egress area thus protecting them for a safe discharge of people. Pressurization Systems work in contrast with Exhaust & dilution systems. VFD (Variable Frequency Drive) is a modern development in Pressurization Systems which regulates the pressure (by altering the fan speed i.e. RPM) in the stairwell my measuring pressure differences between occupied areas & pressurized stairwell.
FIRE FIGHTING SHAFT
PERFORATED TILING FOR COLD AISLE AIR CONDITIONING
WATER COOLED CHILLER (part of Central Chilled Water System) With water cooled chillers, the refrigerant is cooled with a shell and tube condenser that is part of the chiller package. The condenser water heat is then rejected to the cooling tower located outdoors. A chilled water system utilizes a secondary cooling medium, i.e. the refrigeration cycle first produces chilled water, which in turn is used to cool air. Water lends itself as a superior cooling medium primarily on the account of its easy controllability and it doesn't have any distance limitations.
CENTRIFUGAL FAN USED FOR TOP INJECTION PRESSURIZATION PROCESS
TOP-BOTTOM INJECTION PRESSURIZATION PROCESS
SMOKE DETECTORS
FIRE ALARMS
BUILDING SERVICES
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 A.R.D. B.V.C.O.A.
SHEET:
08
Direct Addressable Lighting Interface (DALI)
SOLAR ENERGY CALCULATION
DALI system consists of mechanical fins controlled by electrical motors, typically six fins per motor. A network of photo-sensors continuously measures the lighting levels, and a computer decides when to tilt the fins to let in more light or turn them to reduce glare from too much sunlight.
Site Coordinates: Latitude : 18.89° Longitude : 72.97°
The lighting system also incorporates innovations which are favourable for a commercial structure. The fluorescent office lighting is dimmable & each lighting fixture can be controlled separately by computer through the direct addressable lighting interface (DALI) protocol, the lighting control industry standard.
Area (40% of terrace) is generally considered for Solar Panel placement. Total area of terrace = 2969.6 m² Panel info: Panel Build GB54P6-185 Area of one panel No. of panels to be used on site (630 per building) Power rated per panel Weight per panel
Green Brilliance = 1.44m² = 1260 panels
SOLAR PANELS INSTALLED ON THE TERRACE FLOOR
= 185Watts = 17kg
No. of panels x Efficiency of one panel = 1260 x 185 watts = 233,100 Watts Estimated Amount of Energy Generated = 233.1 kW
SITE IS IN CLOSE PROXIMITY TO COASTAL AREAS AND MANGROVES 3.5M FOOTPATH
9M WIDE INTERNAL ROAD ENTRY
9M W IDE IN
TERN
AL RO
6M WIDE ROAD
AD
6M
WI DE
11M WIDE ROAD
RO A
D
6M WIDE ROAD
EXISTING STRUCTURE
±0.0M
MECHANICAL FACADES FOR OPTIMAL INDOOR LIGHTING CONDITIONS
2.
5M
W
ID
E
PA TH
W
AY
6M WIDE ROAD
−2.7M
9M WIDE RAMP TO BASEMENT
±0.0M DOWN
2.5M WIDE PATHWAY
RAIN WATER CATCHMENT AREA
6M WIDE ROAD
POOL AREA
USING COOLING WITH DEHUMIDIFICATION (LATENT COOLING) ALONG WITH SUNSHADING OF WINDOWS SIGNIFICANTLY IMPROVES THE COMFORT LEVELS IN THE INDOOR SPACE
REDUCED URBAN HEAT ISLAND EFFECT BY SHADING AREAS WITH TRESS AND PROVIDING LESS HARDSCAPES
AD
AD E RO WID
ELECTRIC
30M
WATER CHANNEL TO CREEK
9M W IDE IN TERN AL RO
6M WIDE ROAD
6M WIDE ROAD
FINDING OPTIMAL SHADING BY USING LOUVERS WITH FENESTRATIONS
RAIN WATER HARVESTING Annual Rainfall
= 2000-2500mm
Roof Catchment Area = 7424 sq.m. Run off coefficient
= 0.75
Total Water Harvested = 7424 x 2 x 0.75 = 11,136 cu.m. Dry days Per day collection = 89.88 cu.m.
= 240 = 11,136/240
Tank capacity to be provided for 1.5 days So total capacity required = 89.88 x 1.5 =134.82 cu.m.
DOUBLE PANEL HIGH PERFORMANCE GLAZING PROVES COST EFFECTIVE IN HOT CLEAR SUMMERS & DARK OVERCAST WINTERS DUE TO INSULATING FEATURES
USING TREE COVER ON THE WEST SIDES SIGNIFICANTLY REDUCES HEAT GAIN
Water body shown in landscape for RWH purposes
ENVIRONMENTAL SERVICES
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 A.R.D. B.V.C.O.A.
SHEET:
08
8.00
8.00
8.00
8.00
8.00
8.00
8.00
[26'-3"] [26'-3"]
[26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"]
8.00
8.00
BUILDING 1
8.00 8.00 8.00 8.00
8.00
550
Column Grid = 8M x 8M Column Size = 600MM x 600MM Peripheral Columns = 350MM x 450MM
3.78
[12'-4 1/2"]
[12'-4 1/2"]
FALSE CEILING PLENUM FOR AIR RETURN
1800
DATA CENTER
80.00 [262'-5 1/2"]
SECTIONPARKING OF DATA CENTER BASEMENT
FLAT SLAB WITH DROP
BUILDING 2
600MM HIGH RAISED FLOOR FOR CABLING & AIR SUPPLY
DROP
[26'-3"] [26'-3"] [26'-3"] 3.78
550
600
24.00 [78'-9"]
56.00 [183'-8 3/4"]
32.00 [104'-11 3/4"]
8.00
3.78
32.00 [104'-11 3/4"]
CONSTRUCTION DETAILS: G+3+Basement
5.34M
22M
150 600
0.75M HIGH CLERESTORY
2M
8.00
600
8.00
2700
8.00
600
8.00
1800
8.00
[26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"]
8.00
[12'-4 1/2"]
8.00
600
[12'-4 1/2"] [12'-4 1/2"]
[12'-4 1/2"]
3.78
[12'-4 1/2"]
3.78
[12'-4 1/2"]
8.00
8.00
3.78 3.78
3.78
6.66M
22M LONG TRUSS DETAILS AT B 112.00 [367'-5 1/2"]
TRUSS SUPPORTED TO COLUMN FACE DETAILS AT C
7.6M
DIFFUSED LIGHTING
PERIPHERAL BEAM 300MM x 900MM DEEP
RWH PIPES
1500
1M
0.60 [1'-11 1/2"] 0.60 [1'-11 1/2"] 0.30 [11 3/4"]
750MM x 1500MM BOXING WALL
150 TUBE SECTION
G.L.
150 TUBE SECTION
UNITIZED GLAZED WALL
+9.9M LVL
ANGLE SUPPORT WITH STIFFNERS
B - TRUSS CROSS SECTION DETAILS
B - TRUSS CROSS SECTION DETAILS
35MM DIA. TENSILE CABLE FOR SUPPORT 150MM DEEP ALU. BARS FOR GLAZAED CANOPY
400
450MM THK. PILE CAP
BOXING FOR RWH
150 RWH PIPE
+5.7M LVL
M.S. ROOFING FOR ENTRANCE PORCH
6mm THICK SHEET PILE
20mm THICK SHAHABAD TILES 4mm THICK WATERPROOFING LAYER
200MM DIA HOLLOW STEEL COLUMN
6.3M
230mm THICK BRICK WALL
900
1.25M HIGH WALL FOR DOWNTAKE RWH LOOP
5.3M
300 PILE
+1.5M LVL 150
±0.0M LVL
300mm THICK RETAINING WALL
900
150
400
TYPICAL SECTION IN OFFICE BUILDING
GROUND FLOOR
150
BMW
TRUSS RESTED ON ANGLE SUPPORT
1.9M
100 TUBE SECTION
2M
VERTICALLY MOUNTED SYSTEM WITH INTEGRATED WIRING & MOTORS
TYPICAL PLAN IN OFFICE BUILDING
BASEMENT RETAINING WALL 300MM THK. DETAILS AT (A)
COLUMN FACE
150
600
750MM WIDE ALCOVE
750
0.35 [1'-1 3/4"]
2.95 [9'-8 1/4"]
600
600MM DROP FALSE CEILING
OFFICE SPACE
BADMINTON COURTS
SQUASH COURT
0.75
PLANTER BOX 750MM x 350MM
750
0.90 [2'-11 1/2"]
0.35 [1'-1 3/4"]
5.7
OFFICE SPACE
BASEMENT
PUMP ROOM
1200
GRAVEL
WEEPHOLE
A - BASEMENT RETAINING WALL DETAILS
−2.7M LVL
SECTION OF RWH DOWNTAKE PIPE
TYPICAL SECTION AT BUILDING ENTRANCE
Proposed Information Technology Campus, Sector 7, Ulwe Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) Public License applicable to this work. Please visit https://creativecommons.org/licenses/by-sa/4.0/ for details.
PLAN OF A PILE CAP
CONSTRUCTION DETAILS SIGN:
Sameer Jadhav 5th Year B.Arch (C) - 30 A.R.D. B.V.C.O.A.
SHEET:
10