Cybercraft Samantha Grabowski S3334577
Research of 3D printing
3D Printed Jewellery
Potential Materials
Brainstorming
Brainstorming
Model prototypes
Model prototypes
Model prototypes
Further Development
CAD
CAD After some deliberation due to time constraints with the process of 3D printing and the fragility of the wall thicknesses, I decided to shift from my original idea with the holes in each part. This means that my idea of weaving colourful string through would need to change and instead I decided that it would be better to paint my piece for an even more indivual design. This change also adds greater strength to the peice so that it is not as easily damaged.
Original 3D Print
Incorporating Craft - Paint
Final Model
Costs of Production The following invoive from 3D Print RMIT displays costs incurred to produce several pieces.
DESIGN AND SOCIAL CONTEXT (DSC) PORTFOLIO NON-STANDARD PRINTING
Please follow these steps to complete the process 1. Student fills in appropriate details on this form ticking these squares - o 2. Student takes the payment and the form to the cashier at the 'RMIT Hub' located at City: Building 12, level 4 3. Bring the purchase reciept back to the relvant area for proof of payment in order to have the print credit applied.
The necklace was one of 10 items produced for a total of $147.00. Therefore, the production cost of this piece was approximately $14.70.
Student Details I Students are to complete this section
Surname :
Grabowski
Student ID :
Given Name :
Samantha
Print Ref :
Select Your School
✓
s3334577 2013-268
Description
Internal Cost
Architecture & Design 3D Printing - Building 8, Level 7, Room 88
461730
Code/Element
311541
Cost EFTPOS
Minimum Charge: $5.00 (including GST)
Credit Card Cheque/Money Order
No Cash Payments
Authorized by Lecturer/Tutor
Andrew Thompson
Total Print Cost :
$147.00
Signature
This section is to be completed by the Hub Cashier o
TIME
The time taken to produce this piece was approximately 100 hours. Due to the high demand of the 3D printing manufacturer at this time of the year, the piece took 10 days to be produced between the day in which it was commissioned until day in which it was received.
o
Staff Signature
Authorized by Hub Cashier
Verified the Student is current on AMS
Staff Number
E __ __ __ __ __
or
X __ __ __ __ __
Hub Stamp
Packaging
Final Package