Vertical Transportation Consultants Scope Of Work

Page 1

Concept design Data collection Traffic circulation study Assess traffic types Best practice discussions Approx. Space allocation for elevator cores Meeting & Support-2 Mnths Schematic Design Population charts and stacking diagram Design criteria identification Traffic analysis, passenger elevators Traffic study results discussions Elevator core plan dimension details Elevator shaft vertical dimension details Schematic Design report Meeting & Support-2 Mnths Design Development Implement client comments MEP, structure, ELV Design coordination Interior Design coordination Machinery space details [MRL lifts] Machinery space details [MR above lifts] Elevator technical summary spread sheet Detail Design report Review DD Arch. Drawings Meeting & Support-2 Mnths Tender Documents Implement Client comments Full length specs Review TD Arch. Drawings Meeting & Support-2 Mnths

Contact: Samson Babu, Technical Director Mobile: 00971507689545

Adopting Concept Schem. Design Design

Design Dev.

Tend. Doc

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes


Construction Supervision Tasks Review existing specification & drawings. Issue full submittal required list, agree on time schedule Review technical submittals & report Review layout shop drawings & report Cab interior/fixture drawings review & report Approval of interior fit out vendors, comments only Material sample approval & report Review handing over documentation: Site data, 3rd party certicates, warranty certificates, O&M Manuals Review QA/QC documentation, interface management plans Provide coordination recommendations for other engineering disciplines Provide technical support for the project's duration, answer queries [directly related to elevators] by the main contractor. Optional Site Inspection Services On-site meetings for technical submittals, shop drawings, sample approvals & Report. On-site inspections for mock-ups, progress inspections, final inspections & Report Material delivery inspections & Report Installation progress inspections & Report CTU [Construction Time Use] lifts inspection & Report Final performance inspection, in full working condition & Report

Contact: Samson Babu, Technical Director Mobile: 00971507689545

Included Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

Yes Yes Yes Yes Yes Yes


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.