Portfolio
Interior Architect
CONTENTS
Resume Upcycling Fac(s)tory : Jatujak Minor : Academy of music The Living room : Multi-function space Bauhaus 2021 Explore : Copetition AYDA 2020 : Competition Gentlement’s Hour : Omega retail VENUS : Vatanika’s Hospitality Sri Kham : Hospitality Pavilion 1:1 Ligthing / Installation Volunteer camp Hobby 01 03 09 17 21 23 25 29 35 39 41 45 47
PONGPAT POLSORN
Contacts
Phone : 092-313-5539
E-mail : sandsin2527@gmail.com
Address : 77/444 Friendship village soi 9
Phasert-Manukitch Rd. soi 29 lane 2
Lat Phrao, BKK 10230
Interior Architect
Education
2011 - 2017
2017 - 2022
Scolarship
Horwang School
School of Architecture and Design, KMUTT
GPAX : 3.29 / Second class honors*
Petch Phrachom Klao Scolarship, KMUTT / Ability Excellency Music
Software
Experience
Art and Architecture Study Trip in Europe
Italy : Rome / Florence / Venich / Milan
Geramany : Berlin / Dessau
“Tawan Yim Chang” Volunteer Camp
Joined in 2017 / 2018 / 2019
PMAC 2020 World Art contest
“Honorable Mention Prize” in Community Art Project
The Livin Interior Design Contest
“1st Prize Winner”
Bauhaus Campus Competition 2021 by Arkitekturo
P.O.AR (Patchara + Ornnicha ARchitecture)
4 month Internship / Jun - Sep 2021
Department of Architecture Co.
Interior Designer / 2022
sans
Thai / English
Beer / Camping / Drums / Modern Furniture / Vintage stuff
01
Craft
Languages
Post-production Drawing + + 3D modeling + render
02
03
04
Upcycling hub
Advisor : Nuttinee Karnchanaporn
This thesis came up with my favorite place and hobby about second hands products, then became the question of can upcycling become the behavior of Thai people?
5th year Thesis project
Awareness of environmental problems about household waste makes humans call out and changing the behavior to be careful of new product that create more wastes to our planet. There are a lot of events to reuse/recycle/up-cycle and reducing single water but is not sustainable in long term.
What if we can change the perspective about waste, that can blend with human activity by experience of user and architecture as the medium.
Thesis statement Thesis question
Reiner Pilz, 1994
the upcycling become the behavior of Thai people ? Site context Ideo Phaholyothin Chatuchak Or Tor Kor market MRT Kampangphet BTS Mo Chit Wat Phai Tan community M Chatuchak Bank for Agriculture Sa-nan Seafood Or Tor Kor office Chatuchak market Bangsue canal N7 BTS Saphankwai A Abandoned Building Sanam Pha Jatujak 3060 sqm. the building is standard shophouse type 4 x 12 meter but the shape follows the corner background is unclear about owner and history, from an interview this building is abandoned before the amulet community move in. Next to site, there is the shophouse having the same construction / size and facade. so that can assume this abandoned building and shophouse nearby is the same project. overview, the bangsue canal is on southside / phahonyothin rd. is on eastside and back of building’s next to the sanan seafood restaurants.
“What we need is Upcycling, where old product are given more value not less.”
Can
05
(Front)
makerspace for upcycling products Design Studio Upcycling material library Market Coffee shop + Retail shop Hotel using upcycle furniture using upcycle furniture for upcycling artist / designer Factory for upcycling maker / designer exsiting market Research + explore upcycling material by local waste, and display to public Waste Material Library Work shop Re-create Fabric Wooden Paper Clothing work space Community space + Craft market Craft space Organic Fertilizer maker Thesis direction Programing Concept Amulet market Upcycling hub Overlaping space patch the material with the building patch the existing program with new programing
(F1 Cafe)
(F2 RAW Shop)
06
(F1 Bar)
F1 PLAN : Upcycling fac(s)tory Phahonyothin Rd. Bangsue canal 1 0 4 12 13 5 3 2 9 10 11 8 CAFE / RAW shop / Corridor market / Workshop / Garden A B A B C D (0) Amulet market (1) Cafe (2) RAW shop (3) Restaurant (4) Bar (5) Kitchen (6) Bar Terrace (7) Amulet storage (8) Corridor market (9) Workshop space (10) First aid room (11) Sorting + Storage space (12) Garden (13) Parking lot Phahonyothin Rd. 18 19 20 21 22 15 16 17 F2 PLAN : Upcycling fac(s)tory Studio pod / Material library / Exhibition hall Fabric studio / Conference room Bangsue canal A B A B C D (14) Conference (15) Material library (16) Facilities (17) Studio pod (18) Exhibition (19) Fabric studio (20) Printing dye lab (21) Laundery (22) Photo studio 0 1 2 5 N Phahonyothin Rd. 24 25 26 28 29 30 Hotel / Rental studio Bangsue canal A B A B C D (23) Rental studio (24) Rental studio (25) Rental studio (26) Studio pod (group) (27) Living room (28) Hotel (29) Multi-purpose area (30) Public terrace F3 PLAN : Upcycling fac(s)tory 07
(F1 Corridor market)
(F2 Studio Pod)
08
(F1 Garden)
0 1 2 5 SECTION A : Upcycling fac(s)tory +3000 +6000 Exhibition hall +0000 Cafe Material Library Studio pod Rental studio Conference room Raw shop Restaurant factory resource studio residence pubilc space +5000 +4000 +4500 +6000 +3500 +5000 +5500 +6000 +9000 (F2 (F2 Material library) (F1 Corridor market) 09
+3000 +6000 +9000 +0000 Garden Hotel Fabric lab Corridor market Maker space Steel structure Existing structure 0 1 2 5
SECTION B : Upcycling fac(s)tory
(F2 Material library)
(F1 Factory)
10
(F2 Exhibition hall)
Learning center
Advisor : Nuttinee Karnchanaporn
The Frist project Brief of the 4th year, brief of the project is to design the old standalone cinema name “Thonburi Rama” turn to be a tutorial school for high school students.
acadamy of music
minor is from “Minority ” of Thai Education are the alternative skill to like music, art, and sport, These skills are judged to by some adult “it’s not a necessary thing to learn because if you turn these skill to the profession it’s not the acceptable by the parents” In the other hand, Minor is kind of chorus to represent the program of music.
The main programming is very genaral thing that I compare to word “ MAJOR ” to represent the main thing at the end of way.
Along the way going to major thing , “ MINOR ” word that I compare to sub programming but important than the end of the way. “Processing” make the value to result. So in
The programming is for music academic and performance space for sure, to communicate with people that pass the building is important
The main space of building is for the music practice room and music education. To make people that walking through the way understand and appreciate the process more than result how musician commit to practice
So, I will accecnt at the front area like a “music complex”
music wall this key design I want to shown process of practice to audience that only seeing thire performance. In the other hand musician and take visual connection along playing music
MAJOR MINOR MINOR MINOR MINOR MINOR
MAJOR
scan to watch documentory
11 A
4th year project
/ Artist Students Audiunce Public
N Elevator Corridor 7 - 11 W.C. Instrument store Repairing shop Back stage VIP room Back stage Artist room Jazz’s bar 12
Exploded Isometric Musician
W.C.
SCALE GARDEN
I Thinking about “how to educate some music knowledge” to student that use building, So space at the front is fit to located educated space. Concept is “music garden” Blend music theory with garden, Scale is basic skill of music that all musician must known it
Adjustable space
I design the multipurpose setting on a different level. this space can see stage on 2nd floor and the music wall facade. This space can be transforming into a music flea market with music in the garden.
Entrance ll
Terrace Stage
C D E F G A B
Sitting + Garden area Entrance l Music wall
N 13 B E H
F I
C
Activity Seqences Private / Band Practice Recording Performance Work shop Music library Back to doing priord activity member register Prepare room (BOH) Cafe / Restaurant Garden Stage Scenario / Live performance hall Full stage 8 x 8 m Half stage 6 x 6 m Triangle stage “ I ” shape stage “ U ” shape stage Two-side stage Corner stage Random stage 14 D G J
Drawing / PLAN 15
16
Model / conceptual
Model / mass
Wall of music is transparent to have a visual connection with students and audiences. I design to have 2 layers, the first layer is for user that pass this area they can see the musician. The inner layer is closer than the first layer it clearly to see musician performance. On the other hand, musicians will practice among many audiences it will make them decrease the nervous when they on the stage.
17
Drawing / SECTION
final 18
Model /
Multi-Function space
By : The Livin Phetkasem
Team members
Consequences of rapid urban growth in developing countries such as Bangkok, Thailand has resulted in a decreasing of people’s relation since people value more in privacy.
The Livin Room has created a balance of living to meet new lifestyle of society. Connect is the main concept of this project, which portrays on the 9th floor of The Livin Phet Kasem, where it connects people and area together in aims to create activities among residents. Moreover, the variation of floor level is added as a design strategy to create a different visual perception, which leads to a visual connection among the residents.
The project arise from the statement mentioned earlier, as a young designer we would like to create a community in vertical space as in modern approach. The program delivers from analyzing the behavior of resident from various condominiums with related space, as well as investigating the program from brief we have unfolded the zoning, and make an assumption of activity density within the 9th floor.
As we unfold the density of each space, we have seen varieties of program neatly scattered on 9th floor, each program contains different activity and density therefore a buffer space is needed to be add inside the space. The Livin room’s program are Grab and go cafe for office worker and people who visit the 9th floor, a different setting of seating in different position which serves as a waiting space, gathering space, and observing space for adult whom look after kids, last but not least, locker is also provided.
The Living design contest brief was to design a multifunctional room for the activity area inside of the condominium. We as a team of 4 took a chance in the competition and won a 1st prize award
Healty Zone Family Zone Entertainment Zone Working Zone
Active Passive
Pongpat Polsorn Kittapong Chongtrakul Sasithorn Pombutr Sipoom Nimmit
Zonning Activity density
19
20
Space diagram Relaxing room Locker space 2nd Sitting area Cafe counter Front sitting Overall programming Exsiting Locker space Relaxing room 2nd Sitting area Cafe counter Front sitting 21
22
Bauhaus 2021 Explore
By : arkitekturo
Bauhaus has been an ideal destination for Artist and Designer to experiment and integrate both fields of practice, leading to an advancement in our lives. Bauhaus emphasized on creating endless possibilities through exploring hands on. We would like to bring back the exploration process through a different approach.
Zonning
Digital presentation room
Digital presentation room located at the most forefront of the entrance, acting as both showcase and formal presentation room for students. By using transparent material, students and guests could participate in the presentation from a different perspective.
Neaw norn
Athipat Sinswas
Setthawut Boonyamanee
Sorawit Traitippikul
Architect Interior Architect
Pongpat Polsorn
Kittapong Chongtrakul
Sasithorn Pombutr
Sipoom Nimmit
Pornpitcha Eiamtaksin
Explore Site
The site is a triangular piece of land of approximately 250m on its longest side and 180m and 200m on the other two, which can be considered flat. It is delimited by Bitterfelder Street on one side, Elisabethstraβe on another and the train tracks on the third. The Bauhaus museum is located approximately 600m to the east and the Gropius Bauhaus building another 600m to the north-west with the houses for the masters of the Bauhaus just a bit further in that same direction.
Concept – Bauhaus campus 2021 separates programs into clusters, letting people to explore the campus. We encourage the student and guest to explore and inspire through communicating, meeting as well as visualizing variation of activities. Therefore the Bauhaus campus 2021 is designed to be an exhibition itself.
Studio and workshop
Studio and workshop are located across the exhibition space, emphasizing both working process and outcome. Studio is placed on the second floor to gain visual connection all around. The facilities are located on the lower floor for convenience.
Exhibition space
Exhibition space connects the exterior and interior space together. The exhibition space is placed with columns of different heights, allowing students to exhibit their projects in a different posture.
21
22
AYDA 2020
Theme for the year is “Human-centred Design”. Human-centred design is about cultivating deep empathy for the people you’re designing for: generating ideas and sharing what you’ve made and, eventually, putting your innovative new solution out in the world.
4th year project
Nonthaburi’s PORT
The site is where I often went as a kid. The source that I referred to is my own experience and the interview of local merchants with the key message “what do you want to improve this place?”. The most common answer is, there is no space for the consumers who came to buy food from a small food carts.
Site are located next to the Jao Pha-Ya river by west side of site is face to the river, Nonthaburi’s port are on north side, East side is face to Nonthaburi townhall and South side are face to Chiness temple.
ฉัน
Existing sapce Isometric
Eating arae on Public sitting
Nonthaburi’s Townhall
In the past this building this the center of Nonthaburi people so the reason why townhall is nearby the river because in the past boat in the main transportation of Thai people. Now this building is the museum and kindergarten
2400 sqm
Human activity on site
Eldery exercise Bird Freeding
Visitor from Market
Street Food Temporary Eating area (from street food)
พอ -
(สําหรับ)
Nonthaburi’s Port Pontoon l Nonthaburi’s Signs Krai Thong Pavilion Phiboonsongkram Pavilion Nonthaburi Municipality Pavilion Parking lot
Portion
Pontoon ll
Eldery Meeting Fish Freeding
Port Pontoon Site Pavilion 23
24
Retail shop
Keuapmongkon The assignment was to create a retail shop from the brand that resarch before. Located in central world on 3rd floor area about 16m x 16m 2nd year project this concept from spy character so element that use are about Hide / seek / secret 25
Advisor : Kharuna
FLOOR PLAN 4800 8000 16000 8000 ENTRANCE BATHROOM + 50 + 0000 - 50 - 50 - 50 PROGRAMMING Reserved Consulting Shower Salon Dressed up Check in Fitting suite Reserved Check in Omega member are only use This shop is only book by call Reserved USER Office user Often shopping person 25 - 40 Event person / MC 25 - 35 16:00 - 19:00 10:00 - 16:00 12:00 - 18:00 USER AGE PERSONA TIME TIME TIME PERSONA PERSONA USER AGE USER AGE 22 - 35 - Many of event for this user - Buy new suite is not necessary - Working all day are can’t prepare colthing for event - Boring clothing person morning - evening evening noon AREA REQUIREMENT - Reception - Conversation / Consult - Bathroom - Fitting point - walk-in closet - Hair salon area for men 1 1 2 3 5 4 2 3 4 5 5% 20% 15% 40% 20% Area proportion ZONNING small entrance for reserverd customer This space for waiting and consulting with customer walk in closet are connecting all area Salon area are display to outside Bathroom is located inner of shop BACK OF HOUSE ELEVATION A SCALE 1 : 50 ELEVATION B SCALE 1 : 50 G E N T L E M ‘ S H O U R N A 26
ENTRANCE 27
BATHROOM WALK - IN CLOSET 28
LOUNGE
site BTS ASOKE Terminal 21 ASOKE conjuction Grace Baptist Church The Westin Grande Sukhumvit N This area is take advantage of economic area that is the transportation is easy to access and disadvantage is the site is very crowned from terminal 21 and BTS asoke
Hospitality
Sitibud The brief was to create a hopitality project that contains the identity of the given brand on given site that located next to the Terminal 21. Overall area about 2,000 sqm by 7th floor. 3rd year project VATANIKA site analysis EL Gaucho / steak house @Sukhumwit soi 19 Khlong toei nuea, Watthana, BKK TH 10110 this side are face to main street so it very crowded by people from terminal 21 and car entrance to terminal 21 back side is face to entrance to parking car of terminal 21, SIDE VIEW BACK OF BUILDING studio show room residential temporary store “ fashion trade fair for young designer ” programming fashion show space / catwalk “ showcase of fashion industrial and design” user modeling seamstress young fashion designer THAI fashion design student activity body measurement consult design craft / sew 2020 The LVMH Prize Young Fashion Designers 29
Advisor : Chavanaj
30
F02 Fire exit Exhibition ll W.C. Exhibition hallway Balcony Main Elevator Storage room Exhibition reception Staff elevetor +3800 +3850 +3900 +4150 +4350 F03 Bar Runway Ramp Fire exit Exhibition seating W.C. Main Elevator Staff elevetor +6800 +6900 +6800 W.C. Ligthing / Sound Control F01 Office Fire exit W.C. Main Elevator Lounge Loading area Reception Storage room W.C. Staff elevetor Back of house +800 +600 +400 +200 +000 Drawing / PLAN 31
32
Fire exit Model’s Dressing / make up room W.C. Model’s relaxing room Main Elevator Staff elevetor W.C. Fitting room +9900 +9800 +9800 F05 Fire exit W.C. Studio Auditorium Main Elevator Staff elevetor W.C. Pantry +12850 +12850 +12800 +12800 Craft room (sewing / drawing) Balcony
Fire exit Bedroom Store ll Store l Bedroom W.C. Main Elevator Staff elevetor +15800 Bathroom Bathroom 33
F04
F06
F07 Staff elevetor +18800 Bedroom Store Vl Store V Store lV Store lll Bathroom Bedroom Bathroom Bedroom Bathroom Bedroom Bathroom 34
Hospitality
Advisor : Thanarat Thamsupapong
This project started with one of the alumni who want to create a hotel at Phattalung, so became the assignment is to design the hospitality 3rd year project
Concept | YOR YAK
cross joist
“yor yak” local Fisherman’ tool, by catch fish by net at front of tool call ‘yok yor’. this tools are stand still on song khla lake, can call this tool are iconic on this location. Fisherman is local innovative craftsmanship by bamboo structure still motion
mess structure lake / water base of yor yak
35
SRI KHAM
“YOR STRUCTURE”
AM PM wind Site Analysis User Analysis tree tree tree road no. 4004 Kao chai son to Pak Pha yoon Song Khla lake Song Khla lake Andaman sea Gulf of Thailand 120000 Road level Lake level end of land road tree tree Site Elevation scale 1 500 site N Chong Thanon, Khao chaison, Phatthalung Thailand TRANG airport HAT YAI airport 98 km / 1HR 30 min 85 km / 1HR 20 min 85km/1HR20min Trang city Hai yai city Phatthalung city Songkhal city 33 km 40 min Thale Noi Khao Chaison Hot Spring Khao Chaison Cool Water Cave Nhan Mod Dang Ban Pak Pha Data from Minitry of Tourism & sport AUG 2019 Phatthalung Visitor 98,560 people stay 64,769 people Thai people 98.83% foreigners 1.17% 1,152 people 97,408 people all the important location are around Khao Chaison area near site located Natural travel is main destination of Phatthalung Destination Hotel & hospitality business 144 Location 2,387 Room Average Length of Stay (Day) Thai 1.96 Foreigners 2.01 USER TYPES THAI family on vacation time THAI young adults age 30 - 40 years old in this age people are travel with family in vacation time because they have kid so the time to vacation is end of semester by kids Teen age will find hostel with internet and read review to decide and select hostel time of vacation time is end of semester (university) age 23 - 27 years old SeptemberNovember DecemberJanuary privacy people vacation family time relaxing days fund comfortable comfortable privacy people days fund vacation social media couple explore 36 Song klha lake bridge this bridge start from Krasadsin, songklhaKao chaison, Pattharung length between two place are 90 km use 2 Hr to dive if bridge is complete can be save time(about 80 km) by length bridge is 6-7 km
37
N morning Wind from Eest & Eest north 2900 3000 4000 1500 4000 4000 3400 13300 9500 1200 2800 BEDROOM LIVINGROOM BATHROOM SWIMINGPOOL ELEVATION Form of villa are came from Yor yak shape, as you see shape on canvas structure are same the net part on front of Yor yak with stick around the villa came from base of Yor yak but design to take structure of villa by change proportion N 2 38 villa A villa B Ground Level tree tree pool pool road 12000 18000 60000 OPENING OF BATHROOM bathroom is only room that problem with humidity so opening for natural light & flow ventilation can solve this point, opening face to east for take sunlight in morning also wind can flow from east. opposite side is west that mean sunlight will come in afternoon use poplar partition and glass to filter sunlight SUNROOF FOR BENROOM / LIVINGROOM this couple room are main room for user sunlight make user active on daytime and take natural light all days 1 - CAVAS 2 - Poplar planks 3 - Poplar stick scale 1 : 20 Infinity edge pool detail water water will run all the time from high to low level this rock typs are orval shape waterfall rock POPLAR STICK PARTDITION // this partdition can hide vision from outdoor to bathroom and block some sunlight with shadow with partdition
Pavilion 1 : 1
2nd year project
This assignment started from individual project design from “animal shape”, then group up team to design the pavilion by combine the design in group. Our group selected the “Rugby field” with the sitting, stretch and rest for rugby players.
39
40
Stage / Concert design
2018
From the passion of SoA+D students group, want to play and design a music festival. Started by experiment and made a concert in our faculty, Then we move outside to perform to general people.
-
41
2019
Bang Khun Tian Music Festival
Visual & Sound 2018 H 3 F / ZWEED N’ ROLL / S.O.L.E at Circus Studio Visual & Sound 2019 FOLK 9 / SAFE PLANET at KMUTT 42
Live music with visual in our faculty building at Orange space, in this event are for soa+d student to absorb new test of music experience
Ligh t ing / Installation d e s ig n
I have a chance from our senior company name “Yeast” Lighting and visual design, from this point I had to do the setting the work and concert set up during I’m studying in SoA+D. This experience made me more knowledgeable about lighting
43
Bangkok Design Week Untitled XIQU 2019 @ Jo sue kong Shrine @ Tokyo hot Dec 2020 44
Tawan Yim Chang
volunteer camp
2017
2018
Ban Tor Kee / Tha Song Yang / TAK
2019 Ban Kok Jun / Pua / NAN
Ban Huai san / Huai Pha / MAE HONG SON
Tawan Yin Chang camp is the biggest event in our faculty, all the progress from design until on-site doing by SoA+D students and alumni. The main objective of our camp is to build a building of local people.
45
2017- 2019
46
Music
I started to play music at 10 years old in primary school and still play in high school as part of the marching band. Music brings me to many places and allows me to study at KMUTT through a scholarship. Music is not about sound, but it's my religion.
2008 - endless
47
hobby
Instumental Rock / Experimental For Life / Folk / Alternative JPBS Grandharva 48
Shop
I started to sell second-hand stuff when I was studying at Horwang school. My favorite hobby is walking in the Jatujak market. "Buyer becomes the sale" I decide to make my own shop on Instagram platform from this income, I can handle the utility cost by myself.
2016 - now
49 hobby
50
Contacts
Phone : 092-313-5539
E-mail : sandsin2527@gmail.com
Address : 77/444 Friendship village soi 9
Phasert-Manukitch Rd. soi 29 lane 2
Lat Phrao, BKK 10230