Sara Moreno Architect Portfolio

Page 1

























UEM ARCHITECTS Urban design



Longitudinal Section

Model A

Model B

Model C

Large corten steel plates work as structural elements, extensions, ramps, stairs or rails along 600 m of promenade. We also sea propose swimming pools and gazebo. Situation Plan

My role was to work in a team for the competition, from the concept to the design development.






ENVIRONMENT MAP NACIONAL DE DANZA PALACIO DE CRISTAL DEL MANZANARES

NACIONAL DE

POLICIA MUNICIPAL CASA JUVENTUD JUNTA MUNICIPAL DE ARGANZUELA

ANTONIO

COLONIA DEL GENERAL MOSCARDO

CENTRO DE DE HIDROCARBUROS DE REPSOL COLEGIO SAN AYUNTAMIENTO MADRID

EL CANO

INSERSO

DE HACIENDA

OVERLAPPING NETS CONSULTORIO DE LA SEGURIDA SOCIAL CONSULTORIO DE LA SEGURIDA SOCIAL

LEVEL 6 SERVICIO DE LIMPIEZA DEL AYUNTAMIENTO

INEM

PREVIOUS SITUATION

LEVEL 5

CENTRO DE SALUD CONSULTORIO DE LA SEGURIDA SOCIAL

SOLID MATERIAL NET

LEVEL 4

GREEN NET

LEVEL 3

WATER NET

LEVEL 2

250 m COMUNICATIONS NET

LEVEL 1

BASIC NET

LEVEL 0

URBAN NET

The tool used for the resolution of the problems is a complex process. It begins with a needs analysis and culminates with the incorporation of a " non architectural " element, the molecular structure of black gunpowder.I chose this element as a reference to a centuries-old Chinese contribution to the world. The result of the project is a combination of lines which represent the poetic geometry. The effect is that the whole ideas and every concept become tangible in the architecture. They move away from the creation of an object to come closer to the functionability of the space, where each of the rooms are interrelated. The development of the building turns into a succession of operations where it is the process the one that receives importance and not the final product.

LEYENDA MAPA

RESULT

crean una malla de tensiones virtuales sobre la trama urbana actual.

Abastecimiento y transportes Calles principales

Deportes

Servicio sanitario y administrativo

Caminos Comercio

Bridges Fences

URBAN GENERAL USES

Residual spaces Vegetation River

Housing

Industry














HISTORICAL INDUSTRIAL ZONE_Zollverein

ALZADO OESTE

The existing Kokerei building is extended and rehabilited. The creation of different spaces is developed throught the utilization of different types of fabric and the use of auxiliary metal structures. Existing rooms are rehabilited by covering the walls, ceilings and floors with different kinds of fabric. In this way we can obtain new spaces that have a different geometries from the originals. SECOND FLOOR 6,69

8,65

9,16

8,92

8,84

8,87

8,85

8,85

3,95

7,99

2,53

3,69

TYPES OF FABRIC

MONTACARGAS

7,75

TALLER

JEFE ADMON.

COMUNICACIONES AUX.ADMON.

7,99

DIRECCION

7,75

JEFE SECC.

BIBLIOTECA

JEFE SECC.

5,09

SALA DE

AUX.ADMON.

6,16

COMUNICACIONES

SALA DE JUNTAS

FIFTH FLOOR 6,69

8,65

9,16

8,92

8,84

8,87

8,85

8,85

3,95

7,99

2,53

3,69

MONTACARGAS

7,75

ARCHIVO

7,99

EXPOSICIONES TEMPORALES

7,75

BARRA

COCINA

EXPOSICIONES TEMPORALES

5,09

DESPENSA

6,16

COMUNICACIONES

SPACING






STRUCTURAL SYSTEM Foundation Layout 136,4 11,94

17,85

12,14

18,2

21

2,3

2,37

26,93

12,33

8,35

2,99

ZC

ZC

2,1

ZC

1,74

ZC

ZC

ZC

ZC

ZC

A

ZC ZC

ZC

1

ZC

ZC

ZC

ZC

-3.10 m

-6.55 m

1,47

ZC

ZC

ZC

-3.20 m

ZC

ZC

ZC

ZC

Pendiente 20%

5,19

ZC

ZC

ZC

ZC ZC

25,5

4,65

ZC

-1.60 m ZC

0,9 1,25 1,22 1,21

ZC

-3.20 m

ZC

ZC

ZC

-1.60 m

ZC

4,76

-1.60 m

ZC

ZC

ZC

-1.60 m

-3.20 m

Structure Plan 136,4 17,85

12,14

18,2

21

2,3

2,37

26,93

12,33

8,35

2,99

1,74

0,25

11,94

2,1

Losa alveolar 30+5 cm

Viga embrochalada

Losa alveolar 30+5 cm

Losa alveolar 30+5 cm

0,9 1,25 1,22 1,21

Viga pretensada en L

Losa alveolar 30+5 cm Losa alveolar 30+5 cm

Losa alveolar 30+5 cm

25,5

4,65

Losa alveolar 30+5 cm

Forjado sanitario encofrado perdido 25+6 cm

Losa alveolar 40+5 cm

0,25

Pendiente 20%

5,19

0,25

Losa alveolar 30+5 cm

Losa alveolar 30+5 cm

Losa alveolar 30+5 cm

Losa alveolar 30+5 cm

Losa alveolar 30+5 cm

Losa alveolar 30+5 cm

1,47

1

Losa alveolar 30+5 cm

4,76

Viga pretensada en L Losa alveolar 30+5 cm 0,25

Losa alveolar 30+5 cm

Cota de forjado

Cota de forjado +0.00 m

-1.60 m

PREFABRICATED CONCRETE DETAILS

DETAIL 1

DETAIL 2

DETAIL 3


ROOFING SYSTEM Cover floor 137,91

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,25

7,08

25,6 0,75

27,1

0,75

7,59

DETAIL 1

DETAIL 2

DETAIL 3

FACADE ENCLOSURE SYSTEM Sizing Schema First floor Schema

Wooden boards setting-out on site.

Metalic battens setting-out on site.

3,25

0,03

3,25

Titanium panels setting-out on site.

0,12

0,1 0,9 0,1

0,68

0,12

0,1 0,9 0,1

0,12

0,1 0,9 0,1

0,1

0,12 1,22

3,25

0,12

0,04 0,63

0,68

0,1

0,12

0,1

1,12

0,07

1,35

0,1

0,1

0,12 1,12

0,1

0,12

0,1 0,9 0,1

0,12

0,1 0,9

0,1

0,12

0,1 0,9 0,1

0,1 0,9 0,1

1,22

1,22

0,03

0,6

0,6

0,6

0,04

0,45

0,73

1,22

0,03

1,35 0,07

0,05

0,73

0,03 1,22

1,35

2,18

0,57 0,61

0,6

3,37

0,04

0,63 2,21

0,27 0,76

2,88

0,12

0,69

2,21

0,69

1,37

0,04

0,76

0,61

0,45

0,57

0,6

0,61

0,6

0,57

0,6

1,11

0,6

2,2

1,28

1,1

0,45

0,57

0,57

0,61

0,57

0,04

0,04

0,66

2,66

0,66

0,03

0,03 1,54

1,44

1,44

1,22

1,22

1,22 1,22

1,22

1,22

1,54

1,44

1,44

1,22

1,22

1,63

3,25

3,25 0,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,6 97,05

0,45

0,690,69 0,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,60,6 2,88

136,85

36,92

0,65

19,6

3,25

3,25

3,25

1,73

South Elevation


FACADE ENCLOSURE SYSTEM Cross Section

First floor Schema

Facade System Detail

Fixing System

Joint Detail

Titanium panels installation


ROOF SYSTEM

1,27

1,98

0,6

Cross Section

25,93

TWIN Beam Detail

6,52

1,29

5,95 7,25

2

1,05

1,05

1,01

5,68 0,19

1,05

2

2

0,78

Longitudinal Section

1,3

5,95

1,3

7,25

7,25

Waste-water Disposal System

Guttering joint

DETAILS LEGEND

5,95





Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.