Portfolio Saray Palomino

Page 1

S I

Building Engineer Portfolio2019 SARAYPALOMINOSALGUERO




Contents





schema l r

NICE MERIDIA year

summer 2017

place

Nice, France

enterprise

OXO Architecture

The main propose of this project is to give back at first place to nature. The presence of abundant and diversified vegetation outside and inside the building allows to extend the park from the University to the building. The boundary between the landscape and the building disappear. Indeed, the building blends into the landscape through a natural and ecological continuity. This continuity is made possible thanks to the presence of "floating gardens" present in the large "framed terraces" located on the south facade, by the existence of a vegetable facade and a vegetated courtyard inside the building. Finally, a green rooftop landscaped space on the roof perfect the principle of nature in the heart of the project. All the different apartments are benefit of shared spaces. The vegetation courtyard is at the center of the building and is accessible to all residents. The facades develop according to a double principle.

volum

free

soci


room & terrace

volumetry l 3D

plan mass l zoom

This project is proposed by Nice city council. OXO took part beside other architectural companies. We proposed an hotel and apartments building. There are diferents types of apartments from social until familiar and luxury houses.

metry l program

e apartments

diaphanous space

hotel

cial apartments

student’s residence

parking


schema l r section l tower

NICE MERIDIA year

summer 2017

place

Nice, France

enterprise

OXO Architecture

The main propose of this project is to give back at first place to nature. The presence of abundant and diversified vegetation outside and inside the building allows to extend the park from the University to the building. The boundary between the landscape and the building disappear. Indeed, the building blends into the landscape through a natural and ecological continuity. This continuity is made possible thanks to the presence of "floating gardens" present in the large "framed terraces" located on the south facade, by the existence of a vegetable facade and a vegetated courtyard inside the building. Finally, a green rooftop landscaped space on the roof perfect the principle of nature in the heart of the project. All the different apartments are benefit of shared spaces. The vegetation courtyard is at the center of the building and is accessible to all residents. The facades develop according to a double principle.

volum

facade sud

free

soci


room & terrace

volumetry l 3D

plan mass l zoom

This project is proposed by Nice city council. OXO took part beside other architectural companies. We proposed an hotel and apartments building. There are diferents types of apartments from social until familiar and luxury houses.

metry l program

e apartments

diaphanous space

hotel

cial apartments

student’s residence

parking


schema l r section l tower

NICE MERIDIA “OXYGEN HOUSES� MARSEILLE year

summer 2017

place

Nice, 44 Rue France Callelongue, Marseille, France

enterprise

OXO Architecture

Because The mainapropose place is of defined this project by his is occupation to give back as much at firstasplace by his to history, nature. The transformation the presence of abundant of the 44 and ruediversified Callelongue vegetation site mustoutside be enriched and inside by what the buildingtoday: defines allowshis to shape, extendlandscape the park from heritage the and University his environmental to the building. biodiverThe boundary between the landscape and the building disappear. Indeed, the sity. building blends Especially important into the by landscape the projectthrough is existing a natural natureand in the ecological area. We continuidesign ty. buildings being aware of the surrounding and existing vegetation trying this This to respect continuity as much is made as possible possiblethe thanks nature to the andpresence singular trees. of "floating gardens" present The project in the is formed large "framed by 13 buildings terraces" of located varying onheights, the south between facade,4 by and the 8 existence floors, which of acome vegetable together facade andand shifta between vegetatedthem courtyard to let inside the vegetation the building. between slide Finally, a them. green Distances rooftop landscaped of more than space 20m on between the roof perfect facades, the including principle ofthe with nature neighboring in the heart buildings of thetoproject. the south-east of the plot, allow a perfect All the different sunshine of all the apartments facades and are abenefit controlled of shared intimacy. spaces. Thebuildings 13 vegetation form courtyard 6 differents is at volumes the center with of differents the building typologies. and is accessible to all residents. IThe contributed facades develop in this according project with to athe double realization principle. of differents architectural models, designing schemes, plan mass, typologies and distribution of appartments and parkings. Analizing green areas and soleil.

volum

Architectural competition won in December 2017. facade sud

free

soci


room & terrace

volumetry l 3D typologies l section

plan mass l zoom

This project is proposed by Nice city council. Typology | relationship OXO took part beside other architectural companies. We proposed an nature hotel and apartments building. There are diferents types of apartments from social until familiar and luxury houses. Relation between distances.

buildings,

with

high

and

- The modules of 3 buildings are compose for 2 buildings low and other higher compose with a central public space. - The module of 2 buildings are compose for 1 building of 5 floors and other of 8 floors. - The module of just 1 building has a 5 floors high.

simple T2

duplex T4

duplex T3

distances between buildings l plan

The goal is organize density of buildings and greening.

parking l plan

metry l program

e apartments

diaphanous space

hotel

cial apartments

student’s residence

parking

plan situation buildings

plan parkings


DUPLEX

GUEST ROOMS PISCINE

COLLECTIVE GARDEN

“OXYGEN HOUSES� MARSEILLE year

summer 2017

place

44 Rue Callelongue, Marseille, France

INPUT PAVILION

enterprise LAUNDRY OXO Architecture

Because a place is defined by his occupation as much as by his history, the transformation of the 44 rue Callelongue site must be enriched by what defines today: his shape, landscape heritage and his environmental biodiversity. Especially important by the project is existing nature in the area. We design this buildings being aware of the surrounding and existing vegetation trying to respect as much as possible the nature and singular trees. The project is formed by 13 buildings of varying heights, between 4 and 8 floors, which come together and shift between them to let the vegetation slide between them. Distances of more than 20m between facades, including with the neighboring buildings to the south-east of the plot, allow a perfect sunshine of all the facades and a controlled intimacy. 13 buildings form 6 differents volumes with differents typologies.

TERRACE

I contributed in this project with the realization of differents architectural GYM models, designing schemes, plan mass, typologies and distribution of appartments and parkings. Analizing green areas and soleil. Architectural competition won in December 2017.

COLLECTIVE SPACES

BICYCLES PARKING

CHILDREN PARK

uses


typologies l section Typology | relationship with nature section | scheme

Relation between distances.

buildings,

high

and

Sunny and luminosity enter in every appartment thanks to the differents high and - Thethe modules of 3provide buildings are compose huge glass windos. Slats windows allow to chage light and privacy to for 2 buildings low and other higher compeople. pose with a central public space. In summer all greens areas facilitate air fresh and adequate ventilation through exterior and courtyard. - The module of 2 buildings are compose for 1 building of 5 floors and other of 8 floors. - The module of just 1 building has a 5 floors high.

simple T2

duplex T4

duplex T3

The goal is organize density of buildings and greening.

section ventilation & sunny

distances between buildings l plan

exterior view

plan situation buildings

parking l plan

plan parkings

interior view


“L’ETOILE DE LA METROPOLE” PARIS year

summer 2017

place

Paris, France

enterprise

OXO Architecture

We conceived this project as a large creative campus given place a multitude of companies, artists and researchers, brought to work and live in an active and recognizable landscape. We imagine a great diversity of activities, more tertiary or more productive, all attracted by the idea of the proliferation of a new "Hive". In the office building we have designed a unique facade for the entire building, regardless of where we are from. Through the artistic path that it supports, the facade is a programmatic element in itself. Specifically, there are a staircase, steps, green areas and balconies that connect the four sides of the building. From level 2 to level 6 of the building are the offices. We have designed offices areas as open and flexible as possible to allow to have different types of configurations according to the needs of the program. As a result, we placed the stairs outside the office spaces. The rooftop of the Halle Créative is dedicated to sporting areas. Connected to the neighboring buildings due to two bridges on each side. The Student Building is located at the south entrance of the "Creation Garden". At first glance, this building is conceived as a dynamic project linked to the railway lines. The movement and oscillation of the floors create generous terraces and outdoor spaces for users and urban agriculture. The general program of the building is dedicated to students: a "Student Hub" and two student residences with a capacity of 150 students.


Movility pavillion

April Pavillion

Art gallery rooftop

Sportive area

Gym/ Spectacle’s area

Suspends courts Art Gallery suspend

Cultural and realx Sports Slackline

Petanque

Meeting points

Basketball

Creative park

Amphitheater park

Education Hub







Terrace

Movility pavillion

April Pavillion

Art gallery rooftop GREEN HOUSE

Sportive area

Gym/ Spectacle’s area

Footbridge

LIST OF PROJECTS.

“La Cerquilla, 40” (Marbella) FARMING

“La Cerquilla, 59” (Marbella)

Art Gallery suspend

Suspends courts

Urbanisation “El Paraiso” GARDENS

Renovation penthouse (Estepona) Cultural and realx Sports

Student Hub

Renovation two appartments “Oasis” (Marbella) Enter Slackline

House enlargement for guests “El Rincón” (Marbella) TERRACES

Refurbish urbanisation “La Paloma”

Renovation of systems urbanisation “Lindavista” Petanque

Meeting points

Basketball

HALL

7 FLOOR

9 FLOOR Creative park

COUPE Amphitheater park

Education Hub



LIST OF PROJECTS.

“La Cerquilla, 40” (Marbella)

“La Cerquilla, 59” (Marbella)

Urbanisation “El Paraiso” OASIS Renovation penthouse (Estepona)

Renovation two appartments “Oasis” (Marbella)

EL RINCÓN House enlargement for guests “El Rincón” (Marbella)

Refurbish urbanisation “La Paloma”

Renovation of systems urbanisation “Lindavista”



geothermal | scheme

Primary circuit

Geothermal Energy is renewable thermal energy generated and stored in the Earth. The shallow ground of the Earth’s surface maintains a nearly constant temperature between 10-17ºC.

Pipes

Water pass across the pipes buried in the subsoil (primary circuit) until heat pump that takes the subsoil accumulate heat and transform through electrical energy in cooling and heating (secondary circuit). Electricidad 25%

Secondary circuit

LIST OF PROJECTS.

Collectors & Distributors

1/4

Heat Pump

+21ºC Heating/ Cooling systems

“La Cerquilla, 40” (Marbella) Active foundations Walls foundations

“La Cerquilla, Piles foundatios59” (Marbella) +17ºC -

Urbanisation “El Paraiso” OASIS Renovation penthouse (Estepona)

Renovation two appartments “Oasis” (Marbella)

EL RINCÓN House enlargement for guests “El Rincón” (Marbella)

Refurbish urbanisation “La Paloma”

Renovation of systems urbanisation “Lindavista”

Section Propose of four new under-floors to the Market Perspective 3D Active wall and technical room



SYSTEMS DISTRIBUTION Conclusions geothermal | scheme

Primary circuit

Geothermal Energy is renewable thermal energy generated and stored in the Earth. The shallow ground of the Earth’s surface maintains a nearly constant temperature · Geothermal energy is considered the most efficiency between 10-17ºC.

heating among the

Pipes

renewable sources.

· Building can increase its energetic classification and aldo decrease the CO2 emissions to the atmosphere.

LIST OF PROJECTS.

Collectors & Distributors

1/4

+21ºC -

Heat Pump 29%

Heating/ Cooling systems

“La Cerquilla, 40” (Marbella)

· Thermo-active foundations coul be the best solutions in the urban areas densely built, where possibility of space is minimum. · Geothermal systems are cheaper than other non renewable energies after the amortization period.

Secondary circuit

Cooling Aerothermal Energy

41%

Heating Geothermal Energy

Water pass across the pipes buried in the subsoil (primary circuit) until heat pump that takes the subsoil accumulate heat and transform through electrical energy in cooling and heating (secondary circuit). Electricidad 25%

30%

Active foundations

Cooling Geothermal Energy

Walls foundations

“La Cerquilla, Piles foundatios59” (Marbella) +17ºC -

Urbanisation “El Paraiso” CO2 EMISSION

OASIS

· Thermo-actives foundtions reduce the initial costs in the geothermal system. Therefore this is the best option when foundations are needed.

Renovation penthouse (Estepona)

Renovation two appartments “Oasis” (Marbella)

EL RINCÓN House enlargement for guests “El Rincón” (Marbella)

Refurbish urbanisation “La Paloma”

DEMANDS AND LOADS

Renovation of systems urbanisation “Lindavista”

Section Propose of four new under-floors to the Market Perspective 3D AEROTHERMAL ActiveGEOTHERMAL wall and technical room

NATURAL GAS



SYSTEMS DISTRIBUTION Conclusions geothermal | scheme

Primary circuit

Geothermal Energy is renewable thermal energy generated and stored in the Earth. The shallow ground of the Earth’s surface maintains a nearly constant temperature · Geothermal energy is considered the most efficiency between 10-17ºC.

heating among the

Pipes

renewable sources.

· Building can increase its energetic classification and aldo decrease the CO2 emissions to the atmosphere.

LIST OF PROJECTS.

Collectors & Distributors

1/4

+21ºC -

Heat Pump 29%

Heating/ Cooling systems

“La Cerquilla, 40” (Marbella)

· Thermo-active foundations coul be the best solutions in the urban areas densely built, where possibility of space is minimum. · Geothermal systems are cheaper than other non renewable energies after the amortization period.

Secondary circuit

Cooling Aerothermal Energy

41%

Heating Geothermal Energy

Water pass across the pipes buried in the subsoil (primary circuit) until heat pump that takes the subsoil accumulate heat and transform through electrical energy in cooling and heating (secondary circuit). Electricidad 25%

30%

Active foundations

Cooling Geothermal Energy

Walls foundations

“La Cerquilla, Piles foundatios59” (Marbella) +17ºC -

Urbanisation “El Paraiso” CO2 EMISSION

OASIS

· Thermo-actives foundtions reduce the initial costs in the geothermal system. Therefore this is the best option when foundations are needed.

Renovation penthouse (Estepona)

Renovation two appartments “Oasis” (Marbella)

EL RINCÓN House enlargement for guests “El Rincón” (Marbella)

Refurbish urbanisation “La Paloma”

DEMANDS AND LOADS

Renovation of systems urbanisation “Lindavista”

Section Propose of four new under-floors to the Market Perspective 3D AEROTHERMAL ActiveGEOTHERMAL wall and technical room

NATURAL GAS



SYSTEMS DISTRIBUTION new building | shops | plan Conclusions geothermal | scheme A new building will be built keeping the Geothermal Energy is renewable thermal energy generated and stored in the Earth. average height of the rest buildings in The shallow ground of the Earth’s surface maintains a nearly constant temperature · Geothermal energy is considered the most efficiency the between Latn Quarter. 10-17ºC. heating among the renewable sources.

Primary circuit

Pipes

· Building canbuilding increasewill itsgive energetic classification and citizen works, etc. This aldo the CO2 emissions a new live to decrease the neighbourhood with 1/4 to the atmosphere. 25% shops in the groundfloor.

Secondary circuit

Cooling Aerothermal Energy

41%

Heating Geothermal Energy

Water pass across the pipes buried in the subsoil (primary circuit) until heat pump Thethat goal is use the building for citizen takes the subsoil accumulate heat and transform through electrical energy in meetings, for circuit). childrens, cooling andworkshops heating (secondary Electricidad

LIST OF PROJECTS.

Collectors & Distributors

+21ºC -

Heat Pump 29%

Heating/ Cooling systems

“La Cerquilla, 40” (Marbella)

· Thermo-active coul be the best solutions The public areas will be foundations connected by in the urban areas densely built, where possibility of green areas. space is minimum. · Geothermal systems are cheaper than other non renewable energies after the amortization period.

30%

Active foundations

Cooling Geothermal Energy

Walls foundations

“La Cerquilla, Piles foundatios59” (Marbella) +17ºC -

Urbanisation “El Paraiso” CO2 EMISSION

OASIS

· Thermo-actives foundtions reduce the initial costs in the geothermal system. Therefore this is the best option when foundations are needed.

Renovation penthouse (Estepona)

refurbishment | connecting

most important aspect is maintain Renovation two The appartments “Oasis” (Marbella)

the aesthetic of the facade of the neighbourhood.

EL RINCÓN House enlargement for guests “El Rincón” (Marbella)

The new buildings will be built in the place of a old building not protected.

Refurbish urbanisation “La Paloma”

DEMANDS AND LOADS

Renovation of systems urbanisation “Lindavista”

Section Propose of four new under-floors to the Market Perspective 3D AEROTHERMAL ActiveGEOTHERMAL wall and technical room

NATURAL GAS



SYSTEMS DISTRIBUTION new building | shops | plan Conclusions geothermal | scheme A new building will be built keeping the Geothermal Energy is renewable thermal energy generated and stored in the Earth. average height of the rest buildings in The shallow ground of the Earth’s surface maintains a nearly constant temperature · Geothermal energy is considered the most efficiency the between Latn Quarter. 10-17ºC. heating among the renewable sources.

latin quartier | pergola Secondary circuit

Primary circuit

Pipes

30%

The pergola is one of the solutions to Cooling implement more green areas in the Aerothermal Latin Quarter. This kind of structure is a Energy functional idea to create green areas in the middle of a traffic street.

41%

Heating Geothermal Energy

Water pass across the pipes buried in the subsoil (primary circuit) until heat pump Thethat goal is use the building for citizen takes the subsoil accumulate heat and transform through electrical energy in meetings, for circuit). childrens, cooling andworkshops heating (secondary Electricidad

· Building canbuilding increasewill itsgive energetic classification and citizen works, etc. This aldo the CO2 emissions a new live to decrease the neighbourhood with 1/4 to the atmosphere. 25% shops in the groundfloor.

+21ºC -

LIST OF PROJECTS.

Collectors The& goal Distributors

Heat of covering the structure Heating/ Coolingwith Pump systemsflowers different kind of autochthone 29% and plants.

“La Cerquilla, 40” (Marbella)

· Thermo-active coul be the best solutions The public areas will be foundations connected by in the urban areas densely built, where possibility of green areas. space is minimum.

Active foundations

Cooling Geothermal Energy

Walls foundations

“La Cerquilla, Piles foundatios59” (Marbella) +17ºC -

· Geothermal systems are cheaper than other non renewable energies after the amortization period.

Urbanisation “El Paraiso” CO2 EMISSION

OASIS Renovation penthouse (Estepona)

· Thermo-actives foundtions reduce the initial costs in the geothermal system. Therefore this is the best option when foundations are needed. latin quartier | green wall In the South-West zone of the Latin Quarter, between which a large empty square is used as a parking area and a terrace for the surrounding coffee shops. The gable ends of two buildings are facing this square on their south face and already include vegetation. The spot is perfect for the implementation of a new green wall. The goals are improving the contrast Section between modern architectural concept and urbanPropose heritageofand absorving CO2. four new under-floors to the Market

Lavander

refurbishment | connecting

most important aspect is maintain Renovation two The appartments “Oasis” (Marbella) Basilic

the aesthetic of the facade of the neighbourhood. Epipactis Atrorubens

Hedera Helix

EL RINCÓN House enlargement for guests “El Rincón” (Marbella)

The new buildings will be built in the place of a old building not protected.

Refurbish urbanisation “La Paloma”

DEMANDS AND LOADS

Renovation of systems urbanisation “Lindavista”

Perspective 3D AEROTHERMAL ActiveGEOTHERMAL wall and technical room

NATURAL GAS



CURRENTLY SIYUATION

VATION

ovate the area and connect the neighbours pace. The aim is to change negative aspects iving it a new use in order to create a unified

p under consideration is privacy. Our inteny of the neighbours that live in the ground ted with enough space from the windows to urb them by the noise. design | optimize | chess Archicad

un cost and reusing existing materials stored Green for areas have been created playing with the shapes of the tiles and optimizing the resources in a cheap, creative ary requierement the rehabilitation of the

way. The chess board has been the way to connect people in this area. The chess board was built using left tiles of different colors, saving money with an exceptional result. This project was made with the technology BIM of Archicad.



CURRENTLY SIYUATION

section| detail

VATION

ovate the area and connect the neighbours pace. The aim is to change negative aspects iving it a new use in order to create a unified

p under consideration is privacy. Our inteny of the neighbours that live in the ground ted with enough space from the windows to urb them by the noise. design | optimize | chess Archicad

un cost and reusing existing materials stored Green for areas have been created playing with the shapes of the tiles and optimizing the resources in a cheap, creative ary requierement the rehabilitation of the

way. The chess board has been the way to connect people in this area. The chess board was built using left tiles of different colors, saving money with an exceptional result. This project was made with the technology BIM of Archicad.



CURRENTLY SIYUATION

Eames chair

section| detail

TILES

Stua Zero

CLINIC AREA

X-RAY

Stua Egg

TILES

VATION

CLEAN ROOM PUBLIC WC

Stua Lau

HALL

RUBBISH ROOM

ENGINE ROOM

ovate the area and connect the neighbours pace. The aim is to change negative aspects Stua Nube iving it a new use in order to create a unified

p under consideration is privacy. Our inteny of the neighbours that live in the ground ted with enough space from the windows to Stua Eclipse urb them by the noise. design | optimize | chess Archicad

PRIVATE WC

TILES OFFICE

un cost and reusing existing materials stored interior | design | furniture Green for areas have been created playing with the shapes of the tiles and optimizing the resources in a cheap, creative ary requierement the rehabilitation of the Relaxing perception

way. The chess board has been the way to connect people in this area. The chess board was built using left tiles of different The interior design of the clinic pretends to attract the client with a smart and minimalist colors, saving money with an exceptional result. design which provides a relax sensation. Using design furnitures like STUA and the famous EAMES chair always looking for the ergonomics for clients and personal workers. Stua Gas This project was made with the technology BIM of Archicad.



CURRENTLY SIYUATION Before

After

Eames chair

section| detail

TILES

Stua Zero

CLINIC AREA

X-RAY

Stua Egg

TILES

VATION

CLEAN ROOM PUBLIC WC

Stua Lau

details | sketch | construction Hotel Hyatt Regency walkway HALL

RUBBISH ROOM

ovate the areaThe and connect the neighbours Hyatt Regency collapse occurred in Kansas City in 1981. Two vertically continuous pace. The aimwalkways is to change negative aspects collapsed onto a tea dance being held in the hotel’s lobby. Stua Nube iving it a new use in order to create a unified Investigators found that changes to the design of the walkway’s steel tie rods were the cause of its failure. p under consideration is privacy. Our inteny of the neighbours that live in the ground ted with enough space from the windows to Stua Eclipse urb them by the noise. design | optimize | chess Archicad

ENGINE ROOM

PRIVATE WC

TILES OFFICE

un cost and reusing existing materials stored interior | design | furniture Green for areas have been created playing with the shapes of the tiles and optimizing the resources in a cheap, creative ary requierement the rehabilitation of the Relaxing perception

way. The chess board has been the way to connect people in this area. The chess board was built using left tiles of different The interior design of the clinic pretends to attract the client with a smart and minimalist colors, saving money with an exceptional result. design which provides a relax sensation. Using design furnitures like STUA and the famous EAMES chair always looking for the ergonomics for clients and personal workers. Stua Gas This project was made with the technology BIM of Archicad.



PAN FORM

CURRENTLY SIYUATION Before

After

Eames chair

section| detail

BRICK L PROFILE THERMAL INSULLATION CLEAR ROLLER Stua Zero

TILES

ALUMINIUM CARPENTRY

CLINIC AREA

LOUVERED WINDOW

GLASS

Stua Egg

X-RAY

W BRICK

TILES

VATION

P

CLEAN ROOM PUBLIC WC

WINDOW SILL Stua Lau

details | sketch | construction Hotel Hyatt Regency walkway HALL

FACEBRICK

AIR CHAMBER

RUBBISH ROOM

ENGINE ROOM

DOUBLE HOLLOW BRICK PARTITIONS

ovate the areaThe and connect the neighbours Hyatt Regency collapse occurred in Kansas City in 1981. Two vertically continuous pace. The aimwalkways is to change negative aspects collapsed onto a tea dance being held in the hotel’s lobby. Stua Nube FLOATING FLOORS 20X40 CM iving it a new use in order to create a unified INSULLATION Investigators found that changes to the design of theFOIL walkway’s steel tie rods were the cause of its failure. p under consideration is privacy. Our intenLEVELING MORTAR y of the neighbours that live in the ground CERAMIC TILE ted with enough space from the windows to ACUSTIC SHEET Stua Eclipse urb them by the noise. design | optimize | chess Archicad

PRIVATE WC

TILES OFFICE

POSITIVE/ NEGATIVE ARMED un cost and reusing existing materials stored interior | design | furniture Green areas have been created playing with the shapes of the tiles and optimizing the resources in a cheap, creative ary requierement for the rehabilitation of the Relaxing perception

INSTALLATION MORTAR way. ASFALTIC FABRIC The chess board has been the way to connect people in this area. The chess board was built using left tiles of different The interior design of the clinic pretends to attract the client with a smart and minimalist colors, saving money with an exceptional result. design which provides a relax sensation. Using design furnitures like STUA and the famous EAMES chair looking for the ergonomics for clients and personal workers. Stua Gas SECTION This project was made with the technology BIMWINDOW ofalways Archicad.


LEDGE

SECTION | DETAIL CURRENT STATE | LOCATEION

PRIMARY CIRCUIT

fire evacuation plan | accesibility Legend

MORTAR RENDERING

street | green area FOIL POLYMER

The principal street will be modify with a green line looking for a easy way to adapt green areas. For this way it is not neccesary a several rehabilitation.

Detail

CERAMIC TILE

Emergency exit

NEIGHBORHOOD RENOVATION

MORTAR

Detail

MORTAR PROTECTION

LATIN QUARTER OF AARHUS Fire extinguisher “L’ETOILE DE LA METROPOLE” PARIS year

ALSPERCHA SYSTEM

winter 2016

EXPANDED POLYSTYRENE

CERQUILLA 59

GEOTHERMAL ENERGY ANTONI MARKET RENOVATION HOUSESIN &SANT AFTER SALES CLIENT ENERGY SERVICE

place Aarhus, 2017 Denmark year summer RAILING WOOD ACTIVE WALL collaboration VIA University College Denmark Fire alarm buttom REFURBISHMENT AND EFFICIENCY CROSSPIECE place Paris, France

GEOTEXTIL

ACTIVE PILE

PAN FORM

enterprise OXOAarhus Architecture Fire lift is well known to be one of the “ Green Cities ” of ScanThe city of REINFORCING WIRE MESH year summer 2016 year winterhas 2017 dinavia and been growing in popularity thanks to the new buildings WELDED WIRE MESH Glass partition EI90 Barcelona, Spain investments Wplace e conceived this project as a large creative campus given a multitude SPIRAL and infrastructure of recent years, but place unfortunately the CONCRETE place Marbella, Málaga ofcollaboration companies, artists and of researchers, brought to work and live alluring in an active center of the Latin Quarter is not living up to the surrounding qualiSHUTTERING Sacyr and University Cantabria Glass partition EI45 UPN 200 and recognizable landscape. Wegreat imagine a greatofdiversity of activities, enterprise By Nok this ties. However, area has potential becoming the centermore of at-

HOLLOW

tertiary more productive, all attracted thestarts idea of proliferation of aan tentionorand elevated appraisal the areaby now to the benefit from. With PVC TUBE PUBLIC SPACE RENOV Accessibility GRAPHIC ENGINEER LEGEND new "Hive". intervention that improves specific aspects of the area, a compleLIGHTWEIGHT MORTAR objective Sant Antoni Market is one of the biggest and most emblematic market in Barte transformation can be achieved while keeping the heritage and During my period working inCOLECTORS ByItNok I was involved inintact refurbish and renovaUPPER CONECTION ACTIVE ACTIVE WALLS FOUNDATION celona. Inaugurated in 1882, is one of the most important example of “Iron Surface area: 1600 m2WALL In the office building we have designed a unique facade for the entire builDENTAL CLINIC AND INTERIOR DESIGN historic vibes one feels when walking around the Latin Quarter. year 2010 -2014 year winter 2014 tion of luxury houses of the high level qualty. Height building:of 48Barcelona. m Architecture” ding, regardless of where we are from. Through the artistic path that it suIPN 140 local plan limit Surface total:Autocad 11900 TOWARDS m2 software place Cádiz, Spain ACTIVE PILES FOUNDATION Work experience NEWelement SPACE 02 PROP pports, the facade is a programmatic in itself. The aim there, of2 goal thiswas is to start not just a project, but a social moveProgramme: students housing My mission be in charge of renovations houses like project manaThe principal ofproject the project was add space to the market for comercial areas year winter 2015 subarea limit Specifically, are staircase, steps, green areas and balconies that con-to ment of there people that workwith together to in connect their daily lives Complementary programme: urban and in the underground of the market. ger in parking charge and be inacontact the clients a aftersale service including year winter 2015 construction fields place Sevilla, Spain nect the four of the building. FLAT ACCESSIBLE ROOFTOP nature, by increasing biodiversity, improving recycling and methods, and new deagriculture in sides terrace It therefore becomes necessary to reinforce the structure incorporate some problems in the building. CASASOLA place Cádiz, Spain Examples of Graphic Engineer made during my degree studies are shown The project was created to renov existing roads From level new 2 to 6 of the building are the offices. Wehigher have designed offiveloping habits, Aarhus can easily reach a much level of sustaifoundaitions tolevel the Market. here. The sketchs are done by Autocad 3D and handmade. with the green collaboration Vilchez Maqueda existing roads worthy of preservation pavingarea and public sp The Hub openon for students stranger students. ces areasadvanteage asinEva open and flexible asit’s possible to allow toand have different types of this, active foundations are implemented in active walls of and nability I Taking functions this university company consisted doing budgets, technical inspecof the area of empty ground by giv This project was as aAsfinal project’s school path connections This university allow auditorium, recherches rooms, at the Technicalprincipal configurations according to the of developed the program. asynchronize result, we degree, placed activeinterior piles avoiding the need toneeds dig workshops, new holles. tions, design, client service, choice of materials, diffeSECONDARY CIRCUIT rehabilitation |environment. active-foundation The sketchs presented are just examples of construction details using and 300 students room. It’s a vertical university campues vertical. ofhere Building Engineering. The final result was mainly devoted to the detailed the stairs outside the office spaces. Increasing green areas, creating habitats for biodiversity, introducing waste principal road access rents works, realization of architectural projects. properof materials and measures with theto aim of understanding better how plans, sections, facades, materialization and systems Ithe cooperated with the department renowable energy Sacyr in Connected this project with The rooftop the Halle Créative isofdedicated sporting areas. harvesting, implementing photovoltaic energy, andof connecting people to to bu-calculation. worthy of preservation tree plantindiffereg Energy Foundations represent an aspects innovative the structures work. One of the major to keep my phd Master. the neighboring due to that two bridges each sinesses, are abuildings few measures can be on taken toside. guide the Latin Quarter technology that tion contributes to environmental differents zone is not to invade the privacy In I could learn first-hand active foundations were implemented Theatidea was tohow create a clinic easily accesible for clients. The plans show two in the the market direction it deserves to go. protection and provides subsantial long-term floor, therefore benchs were locat protected building until the installation heating and at cooling systmes in the building, studiesfor of clients and clinic main parts: a the private oneentrance for workers another area. The Student Buildingof is located south of and thethe "Creation cost saving and minimized maintenance. details 3D | Autocad| construction energy production, depreciation period and save costs in with tradi- to optimize the ergokeep the privacy and do not distu All this the space and design was carrefully stydied Garden". At first glance, building isinterior conceived ascomparation a dynamic project Active foundations walls and piles allow to reforActi Construction details tional systems nomics. linked to the railway lines. The movement and oscillation of the floors create ce the foundations in an heritage building in and I designed implement geothermal energythe space with minimu generous terraces and outdoor spaces for users and urban agriculture. The I choose this project because I am so interesed in projects relationed with refurbiin the council. This was a neccesa general program of the building is dedicated to students: a "Student Hub" There are three examples of construction details made it with shment and cultural heritage with the purpose of enhance the our patrimonial neighbourhood. and two student residences with a capacity of 150 students. heritage in a sustainable way. Autocad 3D for a graphical design subject in the university.

The new buildings maintain the aesthetic of the neighbourhood like can we see in the render. In this way the neighbourhood BIDIRECTIONAL SANITARY HOT WATER Urban planFLOOR WAFFLE SLAB FAN-COILS RADIANT keep the real aspect. INTEGRAL REFURBISHMENT OF DENTAL CLINIC LA CERQUILLA 40


PAN FORM

CURRENTLY SIYUATION Before

After

Eames chair

section| detail

BRICK L PROFILE THERMAL INSULLATION CLEAR ROLLER Stua Zero

TILES

ALUMINIUM CARPENTRY

CLINIC AREA

LOUVERED WINDOW

GLASS

Stua Egg

X-RAY

W BRICK

VATION

P

Thank you! PUBLIC WC

WINDOW SILL Stua Lau

details | sketch | construction Hotel Hyatt Regency walkway HALL

FACEBRICK

TILES CLEAN ROOM

AIR CHAMBER

RUBBISH ROOM

ENGINE ROOM

DOUBLE HOLLOW BRICK PARTITIONS

ovate the areaThe and connect the neighbours Hyatt Regency collapse occurred in Kansas City in 1981. Two vertically continuous pace. The aimwalkways is to change negative aspects collapsed onto a tea dance being held in the· hotel’s Saraylobby. Palomino · Stua Nube FLOATING FLOORS 20X40 CM iving it a new use in order to create a unified INSULLATION Investigators found that changes to the design of theFOIL walkway’s steel tie rods were the cause of its failure. p under consideration is privacy. Our intenLEVELING MORTAR y of the neighbours that live in the ground CERAMIC TILE ted with enough space from the windows to ACUSTIC SHEET Stua Eclipse urb them by the noise. design | optimize | chess Archicad

PRIVATE WC

TILES OFFICE

POSITIVE/ NEGATIVE ARMED un cost and reusing existing materials stored interior | design | furniture Green areas have been created playing with the shapes of the tiles and optimizing the resources in a cheap, creative ary requierement for the rehabilitation of the Relaxing perception

INSTALLATION MORTAR way. ASFALTIC FABRIC The chess board has been the way to connect people in this area. The chess board was built using left tiles of different The interior design of the clinic pretends to attract the client with a smart and minimalist colors, saving money with an exceptional result. design which provides a relax sensation. Using design furnitures like STUA and the famous EAMES chair looking for the ergonomics for clients and personal workers. Stua Gas SECTION This project was made with the technology BIMWINDOW ofalways Archicad.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.