Satoshi YAMADA
-------------------------------------------------------------
Architecture Portfolio
_
01
Resume _
02
Project _
03
Professional Reference _
2
01 | Resume |
Satoshi YAMADA
-
|
-
|
Architectural Designer (Master Degree of Architecture) / 8 Years Experience
-------------------------------------------------------------
| Personal Imformation | NATIONALITY DATE OF BIRTH SEX MOBILE EMAIL ADDRESS
Japan July 12, 1983 (35 years old) Male +852 9842 8278(HK) Satoshi.Yamada12@gmail.com Flat G/42F, Block 1, La Cite Noble, Tseung Kwan O, SAR HONG KONG 49, Mawatari 2974, Hitachinaka-shi, Ibaraki-pref, JAPAN
PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR
May 2014 to Present (4 years and 7 months) Senior Architectural Designer Atkins China Ltd *1 / SAR HONG KONG Architecture Firm November 2013 to May 2014 (7 months) Design Architect B+H Archtect / SAR HONG KONG Architecture Firm January 2011 to September 2013 (2.8years) 1.5 year as Project Architect, 1 year as Cheif Architect Beijing Matsubara and Architects *2 / Beijing, PR CHINA Architecture Studio / Office June 2010 to January 2011 (8 monthes) Internship as Design Architect N+B Architectes *3 / Montpellier, FRANCE Architecture Studio / Office April 2008 to March 2010 Part-time Draftman Mitsubishi Jisho Sekkei Inc. / Sendai, JAPAN Architecture Firm
| Education and Training | PERIOD TYPE OF DIPLOMA NAME AND TYPE OF ORGANIZATION PROVIDING EDUCATION AND TRAINING
PERIOD TYPE OF DIPLOMA NAME AND TYPE OF ORGANIZATION PROVIDING EDUCATION AND TRAINING
April 2008 to March 2010 Master Tohoku University, Graduate School of Engineering, Department of Architecture and Building Science, Archtecture and Urban Design, Architecture Design Lab. (JAPAN)
April 2004 to March 2008 Bachelor Tohoku University, Graduate School of Engineering, Department of Architecture and Building Science, Archtecture and Urban Design, Architecture Design Lab. (JAPAN)
3
| Skills and Competence | MOTHER TONGUE ENGLISH reading writing verval
CHINESE (MANDARIN)
reading writing verval
TECHNICAL SKILLS
Japanese Fluent good good good
Basic basic good basic
ArchiCAD, Auto CAD, Vectorworks, Sketch Up, Form Z, V-ray, Artlantis, Podium, Adobe Illustrator, Photoshop, Indesign, Microsoft Office, Rhinoceros(basic), Cinema 4D(basic)
_
*1 *2 *3
4
| | |
WS Atkins is acquired by SNC-Lavalin. Beijing Matsubara and Architect moved to Tokyo, and change their name into “ Tokyo Matsubara and Architects ”. N+B Architectes changed their name into “ NBJ Architectes”
01 | Resume |
-
|
-
|
| Axonometric Diagram of “Wooden Theatre Project in Nagano”(2008) |
5
6
02 | Project |
02 |
-
|
-
|
Project
-------------------------------------------------------------
010
project: Implementation
BMW Pilot Implementation Project 012 | BIC Wholesale Store in Shanghai _
011 |
020
project: Conceptual Design
IHG-Holiday Inn Standard Design Integrated Waste Management Facilities 023 | North Star Changsha Delta Plot A3 Nanjing Zijing Hi-Park Urban Competition _ 021 |
022 |
024 |
030
Project: Lead Consulting 031 |
Marina Bay Sands Casino Mass Gaming Floor & Nest _
040
Project: Competition 041 | 042 |
Fez, Inside Out
Wooden-Archi Hall _
050
Project: Diploma At University 051 |
High Rise University in Ochanomizu _
060
Project: Art Installation+ 061 | 062 |
U CHI WA
Book Cafe “PLAT� _
7
_02. Project / 011. Conceptual Design / Interior and Exteior Schematic Design Project for BMW
011_
BMW Pilot Implementation Project
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2011 January - 2012 August Design, Supervising at the Construction Site, Car Showroom Beijing Shanghai Hangzhou - / 5,600 m² / 5,500 m² / 5,100 m² Beijing, Shanghai, Hangzhou, PR CHINA Project and Cheif Architect / All the Phase of Project
BMW have advanced into Chinese market since 2008 with their standard design which head office in Germany has. However it doesn’t match with the site that is provided by Chinese dealer, and the showroom gets many idle spaces because of the largeness of the site. So BMW China had looked for the foreign office which knows well about the design for Chinese market, and been in contacted with us, then our collaboration started. Until now, apart from that design work, we designed three showrooms which was alreaady built in Beijing, Shanghai and Hangzhou. And also another conceptual work for redeveloping part of existing showrooms. | The Exisiting BMW Car Showroom in China |
8
| Site for Beijing Dealership |
| Beijing Pilot Inplementation Project |
02 | Project | 011. Implementation | BMW |
Following the success of the redeveloping BMW standard design project, BMA had got appointed to design interior and exterior of a new dealership in Beijing.
Concept is “Dynamics of Automobile”. During the process, it leads to a conventional fundamental problem: “to push the brand image to maximize the possibility of design”: ultimately, it can be paraphrased as to harmonize the conflicting ideas as ‘order and freedom’ or ‘unity and diversity’. It is an inevitable challenge common to both architectural design and branding strategy.
| Waiting Area | This space is for the customer who waiting for the check thier car at Car workishop.
| Design Area and Function | | Aftersale Car Workshop | The cosultation and workshop space for the customer who got trouble on thier BMW.
| Branding Space | Not only new BMW products but also their brand image, cocept and future technology are exhibited at this space.
| Car Hand Out Space | After the all contract work, finally the customer leave here with BMW.
| Car Showroom | The space for displaying BMW.
| Customer Lounge | This consultation space.
| 1F Plan[1:1000] | Design Area
| VIP Area | Waiting space for VIP.
| Car Showroom at 2F | The space for displaying BMW and premium second hand BMW.
| 2F Plan[1:1000] | Design Area
9
| Exterior Façade with “Cloud” Louver | The main facade is designed to convey the brand image in the motif of cloud. On the 80-meter-long curtain wall, the aluminum louvers are set up at the angles of various degrees, which gradually change its appearance as visitors approach.
| Concept of Louver Façade |
| Elevation of Louver Façade |
Part A
| Elevation | Part B
| Detail plan[1/20] | | Detail Section[1/20] |
| Part A - Elevation[1/150] |
10
| Part A - Section[1/150] |
| Part B - Section[1/40] |
| Sample and Construction Photo |
02 | Project | 011. Implementation | BMW |
The panels of different transparency and reflectivity not only function as a partition, but also can be used for advertisement. In addition to the grid lighting on the ceiling, they give the space a futuristic atmosphere for exhibiting brand vision.
Wire System Wall [typeA]
Wire System Wall [typeB]
Wire System Wall [typeA] Wire System Wall [typeB]
Adjacent to the showroom, there is “Branding Space� which is surrounded by the panels of three materials: acrylic, stainless steel mirror and half-mirror, all suspended by the steel cable system.
Wire System Wall [typeB]
| Branding Space with Wire System Wall |
Wire System Wall [typeA] Wire System Wall [typeB]
Wire System Wall [typeA]
Wire System Wall [typeB]
| Branding Space Plan[1:200] | | Wire System Wall [typeA] Elevation[1/50] |
| Wire System Wall [typeA] |
| Fixture of Top |
| Fixture of Pannels |
| Fixture of Bottom |
| Wire System Wall [typeB] Elevation[1/50] |
| Wire System Wall [typeB] |
| Fixture of Top |
| Fixture of Bottom |
11
| Car Hand-Out Space with Mirrors | Next to “Branding Space”, there is “Car HandOut Space” where customers receive a car after purchase. The tilted panels are suspended from the ceiling by the same steel cable system as in “Branding space”. The reflection of the panels creates a dynamic sense to the space.
| BB’ Detail Ceiling Section[1:50] |
B
A
| Car Hand-Out Space Plan[1:300] | | Fixtures |
A’
B’
| Car Hand-Out Space Reflected Ceiling Plan[1:300] |
| AA’ Section[1:300] |
12
| BB’ Section[1:300] |
| Reflected Ceiling Plan Detail[1:50] |
| Aftersale Car Workshop with Tube Lighting Wall and Ceiling |
02 | Project | 011. Implementation | BMW |
Wall A
| Wall A Elevation[1:150] |
| Aftersale Car Workshop Plan[1:300] |
| Aftersale Car Workshop Reflected Ceiling Plan[1:300] |
| Reflected Ceiling Plan Detail[1:50] |
| Wall A Elevation Detail[1:10] |
| Wall A Section Detail[1:10] |
| Ceiling Detail Section[1:10] |
13
| Shanghai Pilot Inplementation Project | This is the third project of our collaboration. The site that is located in residential area which is rather northwest than CBD in Shanghai.
To the exterior facade, office space and showroom, we applied the standard design that we designed for BMW 4S dealership store in China by collaboration with BMW China in last two projects. On the other hand, we tried to figure out new background design that strengthen the appearance of their concept “Efficient Dynamics� on each car, and updated the space.
14
02 | Project | 011. Implementation | BMW |
| Branding Centre Project |
During our collaboration, BMW has asked us to join some design work for their stores which is not pilot project but more like conceptual design work. For this project, they would like us to design 700m² rental car showrooms with little branding space. The customers come to this store and reserve their car and depart from this shop with it.
| Idea 01 / Chinese Dragon |
We suggested that the BMW stores should be localized bit more to China, then we got the concept from drangon. We put the series of walls to the store everywhere, at some point it can be pushed out from walls and have space for counter or barcorner. And also that walls made from mirrored to reflect the customer with the cars.
| Idea 02 / Circuit |
Our another idea is the circuit. Usual showroom must be flat and show the car usual, but this “Circuit” show the car with different angles and then if the customer get in the car, can get the view of circuit like real racing competitons.
15
_02. Project / 012. Conceptual Design: Interior Schematic Design Project for BIC Servise
012_
BIC Wholesale Store in Shanghai
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2011 November - 2012 June Design, Supervising at the Construction Site Retail Shop (for Stationary) 40 m² Shanghai, PR CHINA Project Manager / All the Phase of Project
This is the schematic design project for BiC Service that is most famous brand fot stationary and lighter all over the world, and it’s the first store in Asia area for them. The site is located in the Chinese typical wholesale market building in Shanghai. And the building is filled with stationary wholesale stores which are almost similar size. Thereby we would think how to design the eye-catching façade and how to leave the space for tons of wholesale stocks as the key of the design for this project.
| Site |
| Site |
16
02 | Project | 012. Implementation | BIC |
| Main Concept of the Layout |
At first we put the shelves on both side walls for the enough storage space, and install tilted orange walls between each shelves for avoiding the view from the entrance. Radial arrangement of shelves emphasizes the depth of the space, and makes customers focus on the orange walls that exhibit BiC products. The wall in the end was covered with mirror and reducing the oppressive feeling of the confined store space.
| Diagram of the Layout | | Sectionn[1:100] |
1_Put enough shelf for wholesale stocks.
2_Tilt each shelves for avoiding the view from entrance.
| Plan[1:100] | 3_Radial arrangement of shelves emphasizes the depth of the space.
| View from the entrance |
Once coming into the store, the shelves are not seen from the entrance since they are behind of the tilted orange walls. And the displayed products on each wall will catch eye of customers.
17
| Signboard of the Entrance |
Signboard of the entrance is one of most important factors for the impression of the store.
| Cloud Shaped Lighting and Table |
In the centre of this store, there is a cloud-shaped counter which has different levels.
We designed it with a lots of colors and especialy orange since the impression of BiC brand and thier products, and put the logo that have lighting behind also together with.
| Axonometric View |
The same shape hanged ceiling is illuminated with 7 colored acrylic tubes.
| Axonometric View |
| Elevation[1:80] |
| Detail[1:10] |
| Logo[1:20] |
| Detail[1:5] |
| Section A[1:10] |
18
| Section C[1:10] |
| Section D[1:10] |
| Making Process |
| Detail[1:1] |
| Signboard of the Entrance |
02 | Project | 012. Implementation | BIC | Selves behind each orange tilted walls must have enough space for stokes of wholesale. So we design it from top to bottom, the exhibition space at the middle of them with lighting from top, then put the mirror at the deepest wall to reflect the space. | D2-01 |
| D2-05 |
[1/15]
[1/15]
| D2-02 |
| D2-06 |
[1/15]
[1/15]
| D2-03 |
| D2-07 |
[1/15]
[1/15]
| D2-04 |
| D2-08 |
[1/15]
[1/15]
| Section[1:50] |
19
| Module Shelves for the Cycle of Products |
| 4 Patterns of Shelves |
| Shelf 1 |
To meet up with variety kinds and colors of BiC products and the cycle of turnover the products, we suggested 4 types of moduled furnitures which are easy to change to respond it on the tilted orange walls.
| Axonometric View |
| Shelf 2 |
| Shelf 3 |
| Shelf 2_BB’ Section[1/10] |
| Shelf 2_Elevation[1/10] |
| Shelf 2_AA’ Section[1/10] |
20
| Shelf 4 |
02 | Project | 012. Implementation | BIC |
21
_02. Project / 021. Conceptual Design: Standard Design Project for Holiday Inn&Exp. / IHG
021_
IHG Holiday Inn Standard Design Project
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2013 November - 2014 March Concept and Schematic Design for Asian Market Hotel 12,000 m² x3 South East Asia Design Architect
We designed the following proposals while keeping in mind the meaning of the Holiday Inn brand, its position within the overall strategy of IHG, and the shifting trends in hospitality aimed towards affordable but true human experiences. The real true luxury.
| Bangkok |
| Oxford |
| Site: “city” and “brownfield” |
Since our site were “South Asia“, we expected 2 different senarios which is: _city site: High land premium, especially at grade level. Privacy and street noise can be concern. _brownfield: Relatively lower land premium and bigger site area. Potential open to the pleasant lanscaped surrounding environment. | Australia |
22
02 | Project | 021. Conceptual Design | IHG |
| Floor Plate Efficiency Analysis |
After consideration during initial stages the Straight and Offset slab configurations were Guestrooms chosen as the typical guestrooms layouts for Guestrooms further development. The selection process considered plans based on: - high efficiency
Admin. Office Admin. Office Pool Deck Pool Deck Cafe/Lounge
| Concept “plug and play” |
Cafe/Lounge
Hotels are actually a series of standardized modules that needs to be carefully curated to offer the best guest experiences and optimized. We developped the project through design principles that connects the MODULES along a PLUG and PLAY concept. Offering maximum flexibility to respond to a wide array of site or ownership conditions. Also under the HI or HI Ex umbrella we seek to render the various ameniteis as VENUES that adds to the surrounding catchment area of the site and can be expanded, added or substracted per projects.
- adaptability to various site conditions Gym/Spa
- potential for future expansions
Gym/Spa - stuctural simplicity to integrate a carpark
All day Dining+Terrace Meeting Area All day Dining+Terrace Lobby Meeting Area Porte Chochere Lobby Porte Chochere
Iconic Box: Guestrooms Iconic Box: Guestrooms
Guest Rooms Guest Rooms
Pool Deck Guestrooms
Pool Deck Cafe/Lounge Cafe/Lounge
Admin. Office
Gym/Spa
Pool Deck
Potential Gym/Spa Potential Gym/Spa Meeting Area All day Dining+Terrace Meeting Area Lobby All dayChochere Dining+Terrace Porte Lobby
| Holiday Inn inPorte brownfield site | Chochere
Iconic Box: Guestrooms
All day Dining+Terrace
Iconic Box: Guestrooms
Meeting Area Lobby Porte Chochere All day dining
Cafe/Lounge
| Holiday Inn in city site |
Cafe/Lounge All day dining Cafe/Lounge
Iconic Box: Guestrooms
| Façade Strategy |
Guestrooms Guestrooms Gym Meeting Area Lobby Gym Porte Chochere Meeting Area Lobby Porte Chochere
| Holiday Inn Express in brownfield site |
On the Southern Facade the Horizontal and Vertical Mullions are extracted from the façade to become efficient Brise-Soleil to shade this long elevation. These elements are designed to be attractive from the street level while from the inside to creat a sense of enclosure and peace by establishing a distance between the exterior and interior. Now we can see thickness. Potential Gym/Spa
Guest Rooms
Pool Deck
Meeting Area All day Dining+Terrace Cafe/Lounge
Lobby Porte Chochere
| Southern Façade |
| Detail Section | Iconic Box: Guestrooms
On the Northern Facade, there are no vertical elements for sun control to interefere with the view, but the horizontals are kept to minimize glare and cross-views into the rooms. Guestrooms All day dining Gym Meeting Area Lobby Porte Chochere
Cafe/Lounge
| Northern Façade |
| Detail Section |
23
| Holiday Inn in brownfield site |
| Ground Floor Plan |
| Typical Guestroom Floor Plan |
| Holiday Inn in city site Holiday Inn Express in brownfield site | | Holiday Inn in city site |
| Typical Guestroom Floor Plan |
| Holiday Inn Express in brownfield site |
| Typical Guestroom Floor Plan |
24
Facility and Area Design Program IHG REQUIREMENT Guestrooms Function Space Other
| Accomodation Schedules | Gross Floor Area by Sections
Notes:
Total Number of Rooms Meeting Room[sq/m] Gym[sq/m] Guest DIY Laundry[sq/m]
ACTUAL NUMBER
150 50 40 30 IHG REQUIREMENT G.F.A.(%)
150 56 45 30 ACTUAL G.F.A.(%)
3475(69.3%) 3525(68.9%) *1 *2 *3 *1 *2 58 (1.2%) 75 (1.5%) Food and Beverage 50 (1.0%) 56 (1.1%) Function Rooms 40 (0.8%) 45 (0.9%) Indoor Recreational 518(10.3%) 532(10.3%) Public Areas Administration 62 (1.2%) 62 (1.2%) Back of the House 310 (6.2%) 323 (6.3%) Plantrooms 500 (10%) 500 (9.8%) Total G.F.A. 5013 (100%) 5118 (100%) *1 Please note vertical shaft(elevators, stairs, MEP shaft) space has not been included in IHG Requirement or in B+H data Chart (Stairs and elevators=44m2/floor, for 5 floors = 220m2, not added to G.F.A.) *2 Refer to highlighted cell for a break down diffrence of G.F.A. *3 Junior Suite and Exective Suite square footage are not included. Guestrooms
IHG REQUIREMENT
1 Design Parameters
Number of KEYS 2 Total Gross Floor Area[m2] Gross Area/KEY Guestroom Unit Area Number of Guestroom Floor Staff/Room Ratio Total Staff Guest Lifts Service Lifts
4
IHG REQUIREMENT Number of KEYS Total Gross Floor Area[m2] Gross Area/KEY Guestroom Unit Area Number of Guestroom Floor Staff/Room Ratio Total Staff Guest Lifts Service Lifts
Design Parameters
150 5118 34 19.5 5 0.8 160 2 1
5
7
|
ACTUAL SIZE
150 5013 33 19.5 5 0.8 160 2 1
150 5118 34 19.5 5 0.8 160 2 1
| Green Design Strategy |
ACTUAL SIZE
150 5013 33 19.5 5 0.8 3 160 2 1
6
8
Notes:
40 (0.8%) 45 (0.9%) Indoor Recreational 518(10.3%) 532(10.3%) Public Areas Administration 62 (1.2%) 62 (1.2%) Back of the House 310 (6.2%) 323 (6.3%) Plantrooms 500 (10%) 500 (9.8%) Total G.F.A. 5013 (100%) 5118 (100%) *1 Please note vertical shaft(elevators, stairs, MEP shaft) space has not been included Project | 021. Conceptual Design | IHG in IHG Requirement or in02 B+H|data Chart (Stairs and elevators=44m2/floor, for 5 floors = 220m2, not added to G.F.A.) *2 Refer to highlighted cell for a break down diffrence of G.F.A. *3 Junior Suite and Exective Suite square footage are not included.
A sample of preliminary green design strategies.
1
Solar Orientation to minimize solar gains
2
Rainwater harvesting minimize stormwater runoofs
3
Building integrated Photo Voltaics / Heat Pumps and other renewable energy strategies
4
‘‘Cool Roof’’ - low albedo roof material and low pitch roof efficiently drain/harvest water
5
Brise-soleil on South Facade reduce solar gain
6
Grey Water is used for WC, Low flow fixtures
7
Fresh air ventilation monitors for public amenities
8
Project decks and canopies shade the Podium and offer covered al fresco dining
9
On-site water treatment and water harvesting
10 Local plants are use for landscape and roof gardens
12
11 Pervious Low albedo paving reduce the heat island
effect and recharge the aquifer reducing stormwater runoffs
12 Shading deciduous trees and plants on-site and on
10
decks reduce the cooling demand on the podium floors, promore bio-diversity and contribute to the greening of the city.
11 9
| Architectural Signature for Holiday Inn |
For the next generation of Holiday inn and Holiday Inn Express Hotels. We propose a simple recognizable architectural language for new construction or adapted on retrofits. The branded architecture seek to enhance the visual presence of the brand in the skyline while promoting green design strategies.
Backlit Metal Mesh Colored Perforated Aluminum Louvers
Aluminum Powder Coated Brise-Soleils
Aluminum Composite Panels Rainscreen Cladding
Window Facade System Low-E Double Glazing
Patio Decks with Integrated Planters Trespa Panels
Porte Cochere w/ Integrated Logo
25
_02. Project / 022. Conceptual Design / Hong Kong Government Bidding Project
022_
Integrated Waste Management Facilities
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
2016 November - 2017 May Design/Bidding Competition Industrial Building - Waste Treatment Plant/Incinerator - m² Shek Kwu Chau, HONG KONG Design Architect
SEDGE GROUP IWMF DESIGN PLAN PRESENTATION
| Background |
The project was a tender submission for waste-to-energy | JV/Team Organization | facilities on an artificial island southwest of Shek Kwu | Operation Chau. Hong Kong’s three strategic landfill sites are fast approaching capacity. With the proposed facilities, the Environmental Protection Department aims to substantially reduce landfill and sustainably recover useful resources.
|
| Design Architect |
The goal of the proejct was to provide an architectural solution responds to the project brief in providing a clean, green and human environment to the otherwise industrial processes. | Concept / Strategy |
| Site: Reclaimed Land & Breakwater |
COLOUR HARMONY WITH SURROUNDING ENVIRONMENT
RECYCLABLE
UNIFIED DESIGN
HIGH PERFORMANCE GREEN BUILDINGS
VIEWS
FRUGAL
REDUCE VISUAL MASS BLENDING IN
26
GREEN
INNOVATIVE
DURABLE
NATIVE SPECIES
RENEWABLES
BEAM PLUS GOLD
VERTICAL GREENING MAXIMISE LANDSCAPE PERMEABLE MASSING
ENERGY EFFICIENT COMPACT SITE PLANNING
CLEAN
ROOFTOP GREENING
ENERGY SAVING DESIGN
MODULAR
SIMPLE LEAN
RELATE TO GEOGRAPHIC CHARACTER OF SITE
BEAM PLUS HUMAN SCALE BLENDED WITH ENVIRONMENT
| Lead Contractor |
02 | Project | 022. Conceptual Design | IWMF |
| Faceade Concept: Sampling Environment |
Bunker Wall Masonic Pattern
| Site Masterplan |
2
1 3 10
4
4
4
5
5
5
1
ADMINISTRATION BUILDING
2
BERTH AND TILTER HALLS
3
MECHANICAL TREATMENT PLANT
4
INCINERATOR AND BOILER MODULES
5
FLUE GAS TREATMENT PLANT
6
SUBSTATION
7
AIR COOLED CONDENSERS
8
STEAM TURBINE GENERATORS
9
DESAL / DEMIN / WASTEWATER TREATMENT PLANT
6
7
8
7
7
8
8
9 10
10 FUTURE DEVELOPMENT SPACE - 5,000m²
| Facade Strategy for Bunker Building: Architecure Wall Panel System | | Detail of Architecture Wall Panel |
| Bunker Module |
| Subframe |
27
IWMF Screening to plant areas
IWMF Screening to plant areas
| Facade Strategy for FGTP Building: Aluminium Mesh Panel | | Aluminium Mesh Panel |
Larger units may be affixed to equipment blocks, or to support structure. Larger units may be affixed to equipment Image shows an assumed 4.5m tall typical
blocks, or to support structure. IWMF module, fixed at 2.25 centres, onto windposts Screening to plant Image shows an assumed 4.5m tall typical at 10mareas centres
module, fixed at 2.25 centres, onto windposts at 10m centres
Aluminium capping pieces and stiffeners as required to optimize weight and rigidity
Panel size and setout
Aluminium extrusions with integrated vertical fixing rail.
Curved, perforated aluminium panels
Reverse View Fixing setout
| Facade Strategy for MT Plant and Other: Precast Concrete Panel | | Precast Concrete Panel |
Insitu Topping Mesh Rebar Precast Plank Precast Wall Panel Precast Main Beam Precast Column
| Detail |
28
Integrated Waste Management Facilities Schedule of Accommodation ‐ Admin Building (15) Rev B0
17 March 2017
| Admin Building |
| Schedule of Required Accommodation | Proposed Level Category/Type RF (+31.6m PD)
L E V E L 4 RF (+26.0m PD)
User
Exterior
Communal
Ancillary‐Open Ancillary‐Cellular Ancillary‐Open
Public MEP Public
RDS Nos. ‐
15‐01‐04 15‐02‐04 15‐03‐04
Room/Space/Description
Classification
Green Roof
Lift Lobby 1 Bridge AHU Visitor Route Lobby
‐ 0.0
‐ 0.0
0.0
0.0
Provided (ATKINS)
0.0
0.0 0.0
‐ ‐ ‐
11.2 106.8 26.1
0.0
144.1 10.7 16.1 4.5 15.5 10.6 5.4 4.8 10.0 13.0 1.7 5.0 9.0 8.0 61.7 6.0 2.4 45.0 45.0 8.2 54.0 20.7 6.9 17.7
Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Open Ancillary‐Open Ancillary‐Open Office‐Open Office‐Open Office‐Open Office‐Open Office‐Open
Communal Communal Communal Communal Government Government Government Government Government MEP MEP MEP MEP Communal Communal Government Government Government Government Government Government Government Government
15‐01‐03 15‐02‐03 15‐03‐03 15‐04‐03 15‐06‐03 15‐07‐03 15‐08‐03 15‐09‐03 15‐10‐03 15‐11‐03 15‐12‐03 15‐13‐03 15‐14‐03 15‐15‐03 15‐16‐03 15‐17‐03 15‐18‐03 15‐19‐03 15‐20‐03 15‐21‐03 15‐22‐03 15‐23‐03 15‐24‐03
Lift Lobby 1 Male Toilet Disabled Toilet Female Toilet EPD Changing Area EPD Locker area EPD Shower Compartment LAN server room Data server and monitoring room FM 200 CRAC Room ELV Room ‐ 10 sqm=5x2 Electrical Room ‐ 10 sqm=5x2 Lift Lobby 2 Pantry Share‐used Printer Storage Operation and Equipment Storage Field Assistant (Fisheries)(AFCD) EPI (EPD) SEPI (EPD) CEPI (EPD) EPO (EPD)
4b‐Public information, etc. ‐ ‐ ‐ 4a‐Staff Rm 4a‐Staff Rm 4a‐Staff Rm 8‐Plant Rm, etc. 8‐Plant Rm, etc. 68‐Plant Rm, etc.
N/A
36.3
10.6 5.4 As Approp. 10.0 20.0 ‐
‐ ‐ 6.0 ‐ ‐ 1.5
8‐Plant Rm, etc. 8‐Plant Rm, etc. 4b‐Public information, etc. 6a‐Commercial Kitchen 4a‐Staff Rm 6c‐Storage 6c‐Storage 4a‐Staff Rm 4a‐Staff Rm 4a‐Staff Rm 4a‐Staff Rm 4a‐Staff Rm
6.0 2.4 45.0 45.0 8.2 54.0 20.7 6.9 15.4
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ 10.6 5.4 6.0 10.0 20.0 1.5 ‐ 10.0 10.0 ‐ 6.0 2.4 45.0 45.0 8.2 54.0 20.7 6.9 15.4
249.6
63.8
277.1
381.9
Ancillary‐Open Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Open Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Open Ancillary‐Open Ancillary‐Open Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Open Ancillary‐Open Ancillary‐Open Ancillary‐Open Ancillary‐Open
Communal Communal Communal Communal Communal Communal MEP MEP Communal Communal Communal Communal Communal Communal Communal Communal Communal Communal
15‐01‐02 15‐02‐02 15‐03‐02 15‐04‐02 15‐05‐02 15‐06‐02 15‐07‐02 15‐08‐02 15‐09‐02 15‐10‐02 15‐11‐02 15‐12‐02 15‐13‐02 15‐14‐02 15‐15‐02 15‐16‐02 15‐17‐02 15‐18‐02
Lift Lobby 1 MaleToilet Disabled Toilet Female Toilet Babycare Room General Office Furniture and Equipment ELV Room ‐ 10 sqm=5x2 (2 rooms for each floor) Electrical Room ‐ 10 sqm=5x2 (2 rooms for each floor) Lift Lobby 2 Work Station for Multi‐purpose Room Equipment Storage for Multi‐purpose Room Multi‐purpose Room Conference/Meeting Room (Suez additional area) File and General Storage Food Reserve Kitchen Storage Kitchen Canteen
4b‐Public information, etc. ‐ ‐ ‐ ‐ 6c‐Storage 8‐Plant Rm, etc. 8‐Plant Rm, etc. 4b‐Public information, etc. 5d‐Public Hall, etc. 5d‐Public Hall, etc. 5d‐Public Hall, etc. 4a‐Board Rm, etc. 6c‐Storage 6a‐Commercial Kitchen 6a‐Commercial Kitchen 6a‐Commercial Kitchen 4b‐Cafe, etc.
N/A
36.3
5.0 11.3
‐ ‐ 10.0 10.0
5.0 6.0 65.0 25.0 71.4 15.4 4.4 22.0 55.0
‐ ‐ ‐ 15.0 ‐ ‐ ‐ ‐ ‐
‐ 36.3 ‐ ‐ 5.0 11.3 10.0 10.0 ‐ 5.0 6.0 65.0 40.0 71.4 15.4 4.4 22.0 55.0
10.7 16.1 4.5 15.5 8.6 37.1 11.9 10.0 39.2 5.0 6.0 55.0 46.0 70.5 5.4 4.4 24.8 55.8
285.5
71.3
356.8
426.5
Sub‐total L E V E L 2 L2 (+17.0m PD)
NET AREA (sq.m) Operator Required (SEDGE) (TOTAL)
5d‐Public Hall, etc. 8‐Plant Rm, etc. 4b‐Public information, etc.
Sub‐total L E V E L 3 L3 (+21.5m PD)
Brief (EPD)
Sub‐total
10.0 10.0
MIN. DIMENSIONS (m) Clear Length Height2
Width ‐
‐
‐
Brief (EPD) ‐ 0
OCCUPANTS (Nos.) Operator Visitors (SEDGE) ‐ 0
| Admin Building Planning & Circulation | Maximum
Air Conditioned
‐ 0
0 0
N Sub‐total
‐ ‐ 50
Y Y Y
0
50
0
50
Sub‐total
‐ ‐
‐ ‐
3.0 3.0
‐ ‐
0 6
‐ ‐ ‐ ‐ ‐ ‐
3.0 ‐ 0.0 4.5 4.5 4.5
‐ ‐ ‐ ‐ ‐ ‐
‐ 6 1 2 ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
0 0 0 0 0 0
5.0 5.0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
2.0 2.0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
‐ ‐ ‐ ‐ ‐ ‐ ‐ 2 10 3 1 2
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
0 0 0 0 0 0 0 2 10 3 1 2
Y Y Y Y Y Y Y Y Y Y Y N N Y Y Y Y Y Y Y Y Y Y
9
0
27
Sub‐total
‐
‐
3.0
‐
‐
6
‐ ‐ 5.0 5.0
‐ ‐ 2.0 2.0
3.0 3.0 3.0 3.0
‐ ‐ ‐ ‐
1 ‐ ‐ ‐
3 0 0 0
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
142
‐ ‐ 50 ‐ ‐ ‐ ‐ ‐ ‐
0 0 50 0 0 0 0 0 142
Y Y Y Y Y Y N N Y Y Y Y Y Y Y Y Y Y
153
51
204
Sub‐total
18
0
‐ 6 1 2 2 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
02 | Project | 022. Conceptual Design | IWMF |
| Ground Floor Plan | 1 of 3
ATKINS
29
_02. Project / 02. Conceptual Design / Mixed-Used High-Rise and Conference Centre Competition
023_
North Star Changsha Delta Plot A3
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2014 March to 2015 November Competition: Concept Design to Detail Design/Tender Documentation Conference Centre, Office, Hotel, Service Appartment and Retail 155,000 m² Changsha, PR CHINA Design Architect
The Changsha Centre is a competition winning design for an urban centerpiece for the Northstar Delta district in Changsha. The 400,000sqm development consists of grand civic plaza bounded on three sides by a 400m super high-rise office tower and a secondary office tower, retail, a 20,000sqm conference centre, a high five star hotel tower and a serviced apartment tower.
| Plot A2 |
| Plot A3 |
| Plot A3: Plan |
30
02 | Project | 023. Conceptual Design | NSC |
| Conference Centre: Facade Studies |
| Conference Centre |
北辰·长沙中心
NORTH STAR • CHANGSHA CENTRE
36
会议中心规划 Conference Centre Planning
超大型会议厅灵活性 Super Large Multifunction Hall Flexibility 会议厅所有的座椅均可拆除,所以会议厅可以完全转化为一个全开敞大空间,全高的可移动隔声防火分隔板可用于将空间细分,成为不同的用途,会议厅净高10米。
| Plan 1F |
The hall is planned for all seating to be either retractable or movable so the hall can be completely clear of seating. Full height movable acoustic and fire rated partitions are used to sub-divide the space into various configurations. A 10 metre clear height is provided for the hall.
| Plan 2F |
| Plan 3F |
北辰·长沙中心
NORTH STAR • CHANGSHA CENTRE
37
会议中心规划 Conference Centre Planning
超大型会议厅灵活性 Super Large Multifunction Hall Flexibility
3500个座位的会议/剧院/演讲厅 面积4000平方米 3500no. seat conference/theatre/lecture venue 4000m2 Area
1000个座位的会议/剧院/演讲厅 1000no. seat conference/theatre/lecture venue
2个1000个座位的会议/剧院/演讲厅 2no. x 1000no. seat conference/theatre/lecture venue
可伸缩座位 Retractable Seating 可摆放座位 Movable Seating
6个667平方米展览/宴会/接待区 6no. x 667m2 Exhibition/ Banquet/ Reception Venues
| Section |
2个2000平方米展览厅 2no. x 2000m2 Exhibition Hall
1个4000平方米展览厅 1no. x 4000m2 Exhibition Hall
各108个国际标准展览摊位 108. no. international standard exhibitions booths per hall
234个国际标准展览摊位 234 no. international standard exhibition booths
| Super Multifunction Room |
| Conference Centre: Roof Canopy Studies |
| Conference Centre: Night View |
北辰·长沙中心
NORTH STAR • CHANGSHA CENTRE
北辰·长沙中心
NORTH STAR • CHANGSHA CENTRE
32
32
会议中心概念 Conference Centre Concept 会议中心概念 Conference Centre Concept
阳光直射 = 热 Direct Sunlight = Hot
大型的屋顶集中所有会议中心的组件以及屏蔽覆盖的空间。18米 x18米的屋顶模块是朝北的天窗,将日照间接带到平台、宴会前厅 及会议厅空间。屋顶大型的屋檐保护宴会前厅免受日照,而玻璃 窗则使用透明玻璃。 大型的屋顶集中所有会议中心的组件以及屏蔽覆盖的空间。18米 屋顶大型的表面面积极适宜雨水收集,收集的雨水可用作景观灌 x18米的屋顶模块是朝北的天窗,将日照间接带到平台、宴会前厅 溉或中水供应。 及会议厅空间。屋顶大型的屋檐保护宴会前厅免受日照,而玻璃 窗则使用透明玻璃。 屋顶大型的表面面积极适宜雨水收集,收集的雨水可用作景观灌 The roof is designed to unify all the conference centre elements 溉或中水供应。 as well as provide shelter for the spaces below. The 18m x 18m roof modules each form a skylight that is orientated to the north to bring indirect daylight down to the terrace, pre-function and The roof is designed to unify all the conference centre elements hall spaces below. The large eaves of the roof protect the preas well as provide shelter for the spaces below. The 18m x 18m function spaces from the sun and allow the glass walls to be very roof modules each form a skylight that is orientated to the north clear. to bring indirect daylight down to the terrace, pre-function and hall spaces below.area The of large theideal roof for protect the preThe large surface the eaves roof is of also rainwater function the sun and allow the glassirrigation walls to be collectionspaces which from can then be used for landscape or very clear. greywater supply. The large surface area of the roof is also ideal for rainwater collection which can then be used for landscape irrigation or greywater supply.
| North Facing Roof Lights | 阳光直射 = 热 Direct Sunlight = Hot
| Construction Site Photo |
间接的日光 = 凉快 Indirect Daylight = Cool 间接的日光 = 凉快 Indirect Daylight = Cool
朝北屋顶采光 North Facing Roof lights 朝北屋顶采光 North Facing Roof lights
| Rainwater Collection |
| Canopy Detail |
雨水收集 Rainwater Collection 雨水收集 Rainwater Collection
31
_02. Project / 02. Conceptual Design / Urban & Architecture Design Competition for R&D Office
024_
Nanjing Zijing Hi-Park Urban Competition
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
2014 September Site Masterplan/Architecture Concept Design Competition Office Institute and Education 800,000 m² Nanjing, PR CHINA Design Architect
隆 京 南 鑫 HI 渝 -北 PARK 二设 村计 太征 阳集 谷 广 场 项 目 Loncin HI PARK Yubei COMPETITION Er Chun Taiyang • NANJING Plaza Development Project
| Description |
| Concept |
Atkins proposed a high-tech R&D hub centerpiece for the Zijin district with a GFA of 800,000sqm. The project consisted of office, retail and R&D office buildings arranged in a radial form encircling the large central water body.
| Site Masterplan |
8
8
8
6
1 8
8
8
8
8
2
6
1
8 8
7 3
8
2
8
8
8
7
4
3
5
| Existing Site Condition |
8
8
8 8
4
8 8
5
8
8 8 8
8 8 8
8
8
8
8 8
8 8
1. 地标楼 Iconic Tower 2. 塔楼一 Tower 1 3. 塔楼二 Tower 2 4. 塔楼三 Tower 3 5. 商业裙楼 Retail Podium 6. 会展裙楼 Convention Podium
8 8
8
8. 研发楼 R&D Office
8
8 8
8
7. 销售办事处/会所 Sales Office /Clubhouse
8
1. 地标楼 Iconic Tower 2. 塔楼一 Tower 1 3. 塔楼二 Tower 2 4. 塔楼三 Tower 3 5. 商业裙楼 Retail Podium 6. 会展裙楼 Convention Podium 7. 销售办事处/会所 Sales Office /Clubhouse 8. 研发楼 R&D Office
南 京 HI - PARK 设 计 征 集 HI - PARK COMPETITION • NANJING
32 南 京 HI - PARK 设 计 征 集 HI - PARK COMPETITION • NANJING
8 8
8 8
| Concept: Iconic High-Rise |
| Concept: Loop Podium |
02 | Project | 024. Conceptual Design | NZHi | | Iconic High-Rise: Moon-shaped Tower |
| Typical Floor Plan |
| Loop Podium |
南 京 HI - PARK 设 计 征 集 HI - PARK COMPETITION • NANJING
| Section |
| Concept: Slide |
| R&D Building Plan |
| Louvre Facade |
南 京 HI - PARK 设 计 征 集 HI - PARK COMPETITION • NANJING
33
_02. Project / 03. Lead Consulting / MBS Casino Mass Gaming Floor and F&B Refurbishment / A&A Work
031_
Marina Bay Sands
------------------------------------------------------------| Period | | Task |
| Type / Program | | Design Area | | Site Location | | Roll / Period |
2015 September - Present Lead Consultant (Concept Design to Construction Admin - A&A Work) Casino
-
m²
Bayfront Avenue, SINGAPORE Design Architect
Marina Bay Sands Singapore: 16,000 m² massing gaming area and F+B outlets to be re designed and
| Description |
refurbished as part of the MBS upgrade programme. Atkins got appointed to look after the design from concept stage to tender, the shopdrawing reviewing, the construction admin as a lead consultant, who needs to organize and coordinate the design with interior designer, MEP consultant, audio-visual consultant, kitchen consultant, contractor and QP for statutory submission. | Project Organization Chart | Client
Marina Bay Sands Design Direction MEP Direction Operation Surveillance
Lead Consultant
Atkins
Qualified Person
Aedas Singapore Fire Engineering
Arup Singapore Contractor
Sunray Wood Craft Interior Designer
Peter Silling & Associates MEP Consultant
Aurecon Singapore Kitchen Consultant
Food Service Consultants Singapore | Current B2M Mass Gaming Floor |
34
Audio Visual Consultant
Sennen
PG 7
| B2M MASS GAMING FLOOR & NEST(F&B) |
9000
9000
EX IT
9000
9000
EXIT
9000
9000 9000
9000
9000
IT EX
EXIT
9000
9000
9000
EXIT 9000
9000 9000
9000
9000
9000
9000
9000
EX
IT
9000
IT EX
9000
EXIT
EXIT
IT EX EXIT
EXIT
EXIT
9000
9000 9000
9000
EXIT EXIT
EXIT
EXIT
9000
EXIT
EXIT
9000
9000
9000
EXIT
DEV_096A 1
5000
4000
Pilot Date: CAS
JULY22015
9000
4000
2418
11000
3 1:300 @ A1
BFA
21
BFA
6
23
9000
9000
CAS
7
CAS
9000
+100.00
8
9
9000
9000
CAS
10
D
SVC
+98.10
9000 CAS
CAS
11
9000
9000
CAS
12
CAS
13
9000
9000
CAS
14
CAS
15
16
C
9000 CAS
P
CAS
17
18
D
SVC
B
11000
11000
This drawing is toBFA be read in conjunction with all related drawings. Do not scale from this drawing. BFA BFA All dimensions must 24 be checked and verified on site before 25 commencing any work or producing 26 shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.
BFA
22
9000 CAS
Rev.#
11000ATK_MBSDEV_096A_DD_TC_CAS_0179_B2M 11000 11000
11000
SVC
4000 CAS
For4 Construction 5
Drawing No:
RETAIL ENTRANCE NORTH HIGH LIMIT AREA CAGE COUNTER
5000
Issue Status: CAS CAS
Scale:
CAS
9000
CAS
11000
BFA
11000
BFA
27
11000
BFA
28
11000
BFA
29
11000
BFA
30
BFA
31
11000 BFA
32
33
1
11000 BFA
34
SVC
B
BFA
T A s T
35
9000
EXIT
9000 9000
EXIT
9000
9000 9000 9000
SC
EXIT
IT EX IT EX IT
EXIT
9000
7350
PLAN B2M
9000
FA
EX
EXIT
9000 9000 9000
+100.27
MASS GAMING -
9000
EXIT
EXIT
EXIT
User name: Yamada, Satoshi Date:26 January 2018 16:16:28 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_0479_B2M
FA
EXIT
EXIT
ELEC T
EXI
ICE
9000
SC
210 AF 0 FL
GE CA IT EX
FE SC
210 AFF 0 L
SC
210 AFF 0 L
E-C E-C U .11 .1 P 2
EXIT
CA
GE EXIT
EXIT FA
L-C .13
SE RV PA IC NT E RY
210 AF 0 FL
9000 9000 9000 9000
9000
FA
OFFICE
EXIT
EXIT IT
EX
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
IT
EX
EXIT EXIT
EXIT
EXIT
EXIT
OFF
IT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
VP
EX
ICE
EXIT
IT
EX
OFF
EXIT
S
EXIT
S
S
HE-C.06
EXIT
S
9000
S
IT
S
S
9000
S
S
EX
S
EXIT
EXIT
S
EXIT
S
9000
EXIT
S
S
SHEC.27 EXIT -C.0 6
S
000
S
IL B1
S
S
S
TA
S
S S
S
S
S
P
D
PROPOSED GENERAL ARRANGEMENT Project No:
B BFA 20.1
E
SVC
Drawing Title
C
18
1
35
S
RE
S
S
S
TO
S
S
EXIT
S
S
C
SVC
SVC
BFA
34
S
S
EXIT
RETAIL ENTRANCE WEST
10
CAS
17
11000
BFA
EXIT
MASS GAMING FLOOR F&B: TONG DIM
16
11000
33
S
15
BFA
32
C
PV
A
BFA
S
14
11000 BFA
BFA
BB
S
31
D
9000
9 Raffles Place # 45-01 Republic Plaza Singapore 048619
B Project MEP LAYOUT MBSDEV 096A_CASINO MASS GAMING & NEST UPDATED AND PROPOSED ALTERATION AND REFURBISHMENT DRAWING REVISED SPREAD ACROSS THE B2M AND LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, CASINO ENTRANCES AND RESTROOMS.
PV
11
SVC
CAS
S
13
11000 BFA
30
9000 CAS
S
12
11000 BFA
S
11
11000
29
9000 CAS
S
10
BFA
9000 CAS
S
28
9000 CAS
S
9
11000 BFA
27
9000
S
8
11000 BFA
WOMEN'S WC CAS
S
7
9000
S
6
11000
26
JANITOR'S ROOM CAS
S
5
BFA
FE
9000 CAS
S
25
9000 CAS
S
4
11000
BFA
9000 CAS
S
3
24
9000 CAS
R
SVC
S
2
11000
BFA
23
4000 CAS
E
C
F
Marina Bay Sands Pte Ltd
PV
9
SVC
8 Cross Street #24-01, PWC Building Singapore 048424 Tel : +65 6227-6433
Developer / Owner
S
11000
BFA
5000 CAS
SVC
B
G
EXIT
Architect
Atkins Design Engineering Consultants Pte Ltd
B NOTE REVISED
BFA
SVC
S
22
4000 CAS
MAIN ENTRANCE 11000
BFA
9000 CAS
152 Beach Road #22-02, Gateway East Singapore 189721 T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com
S
1
11000
4000 CAS
A
Aurecon Singapore Pte Ltd
RESTROOM WOMEN'S 3B TOILET
BFA
D
MEP & Structural Engineers
RESTROOM MEN'S TOILE3B T
F
C
H
Hotel Interior Design Limited
Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000 Fax: +852 2523 1666
SVC
BFA
SVC
I
S
5000 CAS
FE
MP FE HE-C.03
AHU
HR
STORAGE RESTROOM 1 MEN'S WC
D
S
L-C.12
C
O
SVC
Interior Designer
P
BFA
S
HR MP FE
FE MP
MP FE
B
R
J
+101.00 +101.60
Audiovisual Consultant
S
K K T
SRC COUNTER
PV
B
AL
One Raffles Place Tower 2, 10-62 Singapore, 048616
AG
C
App.
NC
Sennen Design Pte Ltd
Sennen Design
SVC CAS
PV
Check
SY
S
SC
2100 AFFL
HR MP FE TONG DIM
HE-C.05 C
FE
C
S
K T
FE
B NOTE REVISED
FE
K
SVC
CAS
S
+96.00 +95.75
PV
INDICATES UNAFFECTED AREAS SCOPE BY OTHERS F&B PROPOSED BOUNDARY
SANDS REWARDS CLUB COUNTER
EXISTING FLOOR TRAP NEW FLOOR WASTE EXTENT OF LIGHT WEIGHT CONCRETE BACKFILL
| Nest Restaurant - Potential Construction Issues | CAS
CAS
15
16
17
9000
Shaft Wall w/ Countertop To Be FireRated. GENERAL FLOOR FINISH LEVEL
EXTENT OF NEW WATERPROOFING
9000
INDICATES UNAFFECTED AREAS
EXTENT OF EXISTING WATERPROOFING TO BE VERIFIED AND MADE GOOD WHERE NECESSARY
FLOOR SLAB DEMARKATION LINE SSL +104.25
SCOPE BY OTHERS
SSL +104.35
EXISTING RAISED FLOOR SYSTEM
MASS GAMING AREA
EXISTING CONCRETE SLAB
F&B PROPOSED BOUNDARY EXISTING FLOOR TRAP NEW FLOOR WASTE
CAS
G
CONCRETE PLINTH
400x400x250
MT-12
FALL
FL-01
SHOW KITCHEN SCARICO
D=50
1
THIS DRAWING PRODUCED FROM INFORMATION RECEIVED FROM MBS. MAY NOT MATCH ACTUAL CONDITIONS ON SITE.
CONCRETE PLINTH
46 KW
6702
FFL +104.50
SSL +104.25 FL-01 EXTENT OF EXISTING WATERPROOFING TO BE VERIFIED AND MADE GOOD WHERE NECESSARY
FFL +104.60 SSL +104.35
FFL +104.47
FALL
EXTENT OF NEW WATERPROOFING
9000
300
300
FLOOR TILE SETTING OUT POINT TILE SIZE: 300 x 300
CARPET TO FF&E SPEC
CHEF'S TABLE FFL +104.50 SSL +104.35
WD-11
960
WD-11
GAS 1"
STAGE FFL +104.89 SSL +104.25
FREDDA UNICA 3/4" PER 2 RUBINETTI
6
GENERAL FLOOR FINISH LEVEL
46 KW
EXTENT OF LIGHT WEIGHT CONCRETE BACKFILL FFL +104.50 SSL +104.35
FFL +104.60 SSL +104.35
FINISHES BY MASS GAMING CONTRACTOR
2
6701
RISER
1
6701 FALL
1
FFL +104.47
FALL
SVC
FALL
300
GN 1/3
GN 1/3 ELECTRICAL COMPARTMENT
6701
FALL
4
6702
DISH WASH
2
FALL
FFL +104.48 T-10 FL-02
Audiovisual Consultant
T-10 FL-03
T-10 FL-03
FALL
CHILLER
Foodservice Consultants Singapore f ood ser vice
200
FFL +104.48
UP
K
A Rev.
Tender Construction DOC 100% - L1 Nest
Description
Original by ATKINS
Date 23:12:15
06:04:16
Initial
Draw
Check
App.
CAD
MW
AL
Rider Levett Bucknall 150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg Audiovisual Consultant
Sennen Design Pte Ltd One Raffles Place Tower 2, 10-62 Singapore, 048616 Kitchen Consultant
Raised Floor w/ Waterproofing.
3
Aurecon Singapore Pte Ltd Partition Wall To Be Built On Top Of ELV Trunking.
4
MOE Route Crushes w/ Steps.
MICHAEL FIEBRICH DESIGN
160 Gibraltar Crescent Singapore 759582 T. 65 6527 6681 F. 65 6527 6682 www.michaelfiebrich.com MEP & Structural Engineers
152 Beach Road #22-02, Gateway East Singapore 189721 T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com Architect
Atkins Design Engineering Consultants Pte Ltd
8 Cross Street #24-01, PWC Building Singapore 048424 Tel : +65 6227-6433
Developer / Owner
5 Project
Marina Bay Sands Pte Ltd
Sprinkler To Be Required Below Banquette Seat For Fire Protection. 9 Raffles Place # 45-01 Republic Plaza Singapore 048619
MBSDEV 096A_CASINO MASS GAMING & NEST PROPOSED ALTERATION AND REFURBISHMENT AT LEVEL 1 - NEST RESTAURANT.
6
-
Issue Date
WALL, FLOOR FINISHES TO MATCH WITH FFL +104.50 EXISTING SSL +104.35
7 Jalan Kilang, 5th Floor Singapore 159407 Interior Designer
2
4
FLOOR TILE SETTING OUT POINT TILE SIZE: 300 x 300
6701
RAISED FLOOR BOUNDARY SVC
sin g a p ore
300
300
FALL
6701 stom
cu
3
FALL
300
3
FLOOR TILE SETTING OUT POINT TILE SIZE: 300 x 300
AL
One Raffles Place Tower 2, 10-62 Singapore, 048616
custom
5
6702
T-10 FL-03
5
OPEN TO BELOW
THIS DRAWING PRODUCED FROM INFORMATION RECEIVED FROM MBS. MAY NOT MATCH ACTUAL CONDITIONS ON SITE.
6701
App.
MW
Kitchen Consultant
FFL +104.90
custom
BANQUETTE SEAT FFL +104.75 SSL +104.25 CARPET TO FF&E SPEC
HOT BEVERAGE FFL +104.48
8
Check
CAD
Sennen Design Pte Ltd FREEZER FLOOR TILE SETTING OUT POINT TILE SIZE: 300 x 300
custom
7
6701
custom
FALL
MECHANICAL COMPARTMENT
300
6702
ELV TRUNKING TO BE RETAINED AND DEPTH/LOCATION VERIFIED ON SITE
GN 1/3
FALL
FALL
GN 1/3
F
Initial
Draw
150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg
custom
5
-
06:04:16
Issue Date
Rider Levett Bucknall
custom
2
6702
3
CAS
23:12:15
FFL +104.46
FFL +104.60 SSL +104.35 GN 1/3
2
Date
400x400x250
FFL +104.46
WD-11 FL-01
6701
Tender Construction DOC 100% - L1 Nest
Description
ATKINS
FFL +104.60 SSL +104.35
PICK UP
GN 1/3
6
T-10
CONCRETE PLINTH
A Rev.
Original by
GN 1/3
FFL +104.50 SSL +104.35
L
FFL L1 +104.50
GN 1/3
MAIN DINING
2
GN 1/3
BAR FFL L1 +104.50
CONCRETE PLINTH
GN 1/3
6701
GN 1/3
T-10 FL-03
GN 1/3
4
FALL
CONCRETE PLINTH FFL +104.60 SSL +104.25
GN 1/3
User name: Satoooshi Date:Tuesday, December 25, 2018 23:06:36 Filename: X:\02.00 - Works\02.02 - At Office\05 Atkins[May 2014-]\02 Project\5141750-MBS_Casino_MGF&Nest\Correspondense\Outgoing\20160406_TC_100%_NEST\01_Nest Drawings\20160407_Transmittal\CAD\ATK_MBSDEV_096A_DD_TC_6162_01_NR_CAD[edit]
1
FFL +104.50 SSL +104.35
CAS
CONNESSIONE ELETTRICO GAS 1" PER SCARICO 2 WOK 1 KW D=50 230 VOLT CONNESSIONE
11
EXIT
210 L AFF
FE
B NOTE REVISED DRINK STATION #1 AV RACK STORAGE
C
Draw
23:12:15
SMOKE CURTAIN HOUSING
S
SC 0
FE
S
LEVY COUNTER
+96.00 +95.75
SINGAPOREAN ENTRANCE / EXIT
PV
C
+101.60
150 Beach Road, #09-01 Gateway West, EX Singapore 189720 IT Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg
S
LUGGAGE DEPOSIT
MAIN ENTRANCE
H
MP HR
FE MP
S-C.26
+101.00
Rider Levett Bucknall
S
FE
FE MP NEW HR
WALL PANEL EXTENDED
C
SVC
NEW HR
Date
ATKINS
S
EXIT
EXIT
L-C.23
BOH EXIT
ATM
E-C.17
+96.00 +95.75
SVC
Initial
S
+96.00
B +95.75 NOTE REVISED STORAGE FOREIGNER ENTRANCE / EXIT FE
Original by
CAS
I
PV
D
EXIT EXIT
EXIT
ORE
E-C.18
DRINK STATION #5
AV RACK FOR STAGE
HE-C.02
ST
FE
FE
E-C.20 UP E-C.19
K K
S
SC
2100 AFFL
NEW SCREEN WALL
S
FE
D
L-C.04
L-C.03 SVC
S-C.24 FE
HR
EXIT EXIT EXIT EXIT
B
FE MP
22:11:17
Issue Date
C
E
XX:XX:XX
100% TENDER CONSTRUCTION
Description
PV
S-C.25
K K
SC
2100 AFFL
FE
VOID
S
CAS
STORAGE
ELEC
100% TENDER CONSTRUCTION
Rev.
CAS
J
HR MP
LINE OF VOID ABOVE
T K
HO LDIN RO OM G HO LDIN RO OM G
B A
C
L
EXIT
S
PR OTE LO CT SE BBY ED RV ICE
SVC
EXIT
S
IT
C
E-C. 06 E-C. 05
SEE DRAWING NO. PV ATK_MBSDEV_096A_DD_TC_0533_B2M C CAS G E
210 FL AF
FE
SMOKE CURTAIN HOUSING
BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.
S
CAS
F SEE DRAWING NO. ATK_MBSDEV_096A_DD_TC_0532_B2M
PV
F
SVC
FE
SC 0
EXIT EXIT
EX
M
ATRIUM EAVE ATRIUM EAVE
CAS
C
S
FE
24
2100 AFFL
G
C
PV
H
S
L-C.
FE NE MP SC HR W
N
SVC
MEN'S WC
MP FIRE FE FIGHTING MP NEW FE LOBBY HR HR
LINE OF VOID ABOVE
210 FL AF
VIP LO LIFT BB Y
WC
K
FE
FE
SC 0
VP OFF ICE
05
ION
SVC
+101.60
S
D
AT
Y
L
SVC
T T
DR INK #2 ST
LIFT LO BB
S-C. 29 ES
WOMEN'S
B HIGH LIMIT CAGE & MEP LAYOUT UPDATED AND DRAWING REVISED
+101.00
CAS
CAS
S
07
L-C.
210 FL AF
EXIT
L-C. 09 L-C. 08
CAS
IT
EX
SVC
MP
DRINK STATION #4 FE RESTROOM 3A JANITOR'S CLOSET
SC 0
SC
2100 AFFL
O
SMOKE CURTAIN HOUSING
S
CASINO GAMING
FE
NEW HR
FE MP
EXIT
2100 AFFL
SVC
IT
IT
EX
S
2100 AFFL
FE
SC
EXIT
I
2100 AFFL
MP FE
EX
EXIT
EXIT
H
S
K K K
SC
PONY WALL
I
CAS
H.5 CAS
G.9
M
SC
2100 AFFL
CAS C
C
PV
2100 AFFL
FE
P
J
PV
K
J
PROTECTED LOBBY
SVC
IT
CAS
PV
SVC
+101.00
EX
C
S
EXIT
L-C.
C
N
FATT CHOI
E
PV
F
SVC
SC
MP EXIT
ELV & SURVEILLA NCE EQUIPMENT RM MAKE-UP AIR COMPARTM ENT L-C.16
FE
SC
CAS
ELEC MP FE
HR
HIGH LIMITS FE
L
S
C
L-C.02
FE
HIGH LIMITS RECEPTION DESK
EXIT
S
F
PV
G
B CAGE UPDATED
B MEP LAYOUT EXIT UPDATED +101.00
PV
SVC
FE
CAS
C
IT
EX
+99.00
LIFTS (STAF F CARD ACCE SS & ESCORT TO L3) O
C
CON LOBBY A
S
PR O LO TECT BB ED Y
PV
+96.00 +95.75
PR LO OTECT BB ED Y
G
C
I
FILL BA NK
L-C. 15 L-C. 14
SC
2100 AFFL
EXIT
MAJOR AISLE
SC
210 AF 0 FL
LIFT LOBBY
P
S-C.02
MP
PONY WALL
PV
N
L-C.01
SVC
S
CAS
CAS
MP HR FE
SC
EXIT
MAI BA N NK
MP
G.9
H
IT
Q
PROTECTED
FE
EXIT EXIT
L-C.35
EXIT
J
EX 2100 AFFL
TO
H
PV
MAN TR AP
R
SVC
Q
+96.00 +95.75
K
SVC
+102.60
+102.20
+101.30
EXIT
SVC
FA
CAS
H.5 CAS
K
+101.30
28 September 2015
B
FA
I
C
C
FE
28 September 2015
+101.00
CON
FA
AD M WO IN. AR RK ST EA AT IONS ILET
CAS
PV
K
PV
FE
B NOTE REVISED
NOTE REVISED
L-C.36
(VIF)
S
T
FE
T
T
B
FE MP
8603 (VIF)
42
8459 (VIF)
MICHAEL FIEBRICH DESIGN+98.10
S
EXI EXI
EXISTING RAISED FLOOR LINE
CAGE MAN TRAP
TITO MACHINE 8603 (VIF)
40
8459 (VIF)
8459 (VIF)
(VIF)
8458
(VIF)
41 8458 MICHAEL FIEBRICH DESIGN 8459 (VIF)
CON
39
38
8459 (VIF)
9122 (VIF)
9122 (VIF)
8603 (VIF)
8458
)
8458 (VIF
S
J
SC
210 AFF 0 L
PERSPECTIVE 1 14
T
8603 (VIF)
36
35
34
37
CON
CON
CON
24+2
45
44
8459 (VIF)
B1
EXIT
CAS
IT
TO RETAIL
+96.00 +95.85
STORAGE
EX
SCREEN WALL
EXIT
C
+96.00 +95.75
EXIT
HE-C.07
2100 AFFL
FE T K MP ER LEVY COUNT
EXIT
EXIT
T K
MP HR DR INK ST AT ION #3
RETAIL CE ENTRAN NORTH EXIT EXIT
L
SC
48
PV
PONY WALL
MP FE NEW HR
EXIT EXIT
EXIT
S-C.
RE ST WO RO MEN OM 'S W 2 C
A
CASINO STORAGE
FE
L-C.34
B.8
R
33
32 (SRC) KIOSK
FOR STATUTORY COMPLIANCE. LOCATION FOR ALL EXIT SIGNS TO BE MAX. 2.5M ABOVE AFFL TO THE UNDERSIDE OF SIGN.
CON
SVC
TOTAL
CON
CON
K
CON
CON
CON
SYMBOL DESCRIPTION
CON
8
C
FE MP
EXIT
HE-C.08
+99.00 +98.90
S-C.20
EXIT
C
CON
S-C.19 ES
EXIT
EXIT
JANI RO TOR' OM S
PV
FE
DOCUMENT STORAGE
EXIT
B
HR
MP
931 6
CON
+96.00 +95.90
NEW HR MBS Dev 096 100%FEschematic design EXIT
CON
THE NEST DEVELOPMENT . E
STORAG
D
PROTECTE LOBBY L-C.33
S-C.18 ES
L1
CON
MBS Dev 096 100% schematic design
FIRE EXTINGUISHER
L-C.20
RETAIL ENTRANCE WEST LOBBY L-C.31 LIFT SHAFT
S-RN.17
HOLDING RM
RE ST MEN RO 'S W OM 2 C
N
TO RETAIL B2
HEIGHT GLASS S EXISTING FULL DOUBLE LEAVE PANEL WITH RETAINED. DOOR TO BE STORAGE
SCOPE BY OTHERS F&B PROPOSED BOUNDARY
B2M
15+2
43
CON
46
CON CON
CON
INDICATES UNAFFECTED AREAS
47
CON
REFER TO ATK_MBSDEV_096A_DD_DD_0011 FOR LEGEND AND SYMBOLS.
IT
8603 (VIF)
8603 (VIF)
8603 (VIF)
C
CON
LEGEND:
(VIF)
8458 (VIF)
8459 (VIF)
8459 (VIF)
8459 (VIF)
8459 (VIF)
8459 (VIF)
9122 (VIF)
9122 (VIF)
8458
(VIF)
EXIT
41
40
39
38
37
36
35
8603 (VIF)
8458
)
8458 (VIF
8459 (VIF)
Drawing Title
Demountable Ramp To Be Required For The Stage for Accesibility.
NEST RESTAURANT
PROPOSED FLOOR PLAN L1 - FINISHES MASS GAMING AREA
PG 9
EX
CON CON
B.8
C
2
42
CON CON
CON CON CON
CON
CON
34
33
32
31
CON
CON
CON
CON
46
45
44
43
| B2M - Reflected Ceililng Plan THE|NEST DEVELOPMENT . PERSPECTIVE 3
47
CON CON CON CON CON
4_B2M
21
CON
| B2M - General Arrangement Plan |
1_B2M
BFA
02 | Project | 031. Lead Consulting | MBS |
Project No:
DEV_096A
Drawing No:
Pilot Date:
JULY 2015
Scale:
1:50@ A1
Issue Status:
For Construction
Rev.#
ATK_MBSDEV_096A_DD_TC_6162_01_NR_CAD[EDIT]A This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.
35
| B2M - HIGH LIMIT AREA |
| Proposed Design |
SVC
| Photo of Current High Limit Area |
SVC
SVC
P
SVC
O
SVC
N
SVC
M
MAKE-UP AIR COMPARTME
9000
LEGEND: REFER TO ATK_MBSDEV_096A_DD_DD_0011 FOR LEGEND AND SYMBOLS.
K
9000
9000
INDICATES UNAFFECTED AREAS SVC
9000
9000
J
SCOPE BY OTHERS F&B PROPOSED BOUNDARY
9000
9000
SVC
L
NT
Q
FIRE EXTINGUISHER L1
15+2
9
K
KIOSK (SRC)
8
6
T
TITO MACHINE
S-C.20
FE
LIFT LOBBY
9000
B2M
SYMBOL DESCRIPTION
TOTAL 24+2 14
L-C.16
EXIT EXIT
1
MP
PROTECTED LOBBY
SVC
EXIT
PROTECTED LOBBY
ELEC
S-C.02
L-C.02
L-C.01
FOR STATUTORY COMPLIANCE. LOCATION FOR ALL EXIT SIGNS TO BE MAX. 2.5M ABOVE AFFL TO THE UNDERSIDE OF SIGN.
EXIT
WOMEN'S WC
FIRE FIGHTING LOBBY
| Detail of Side Throw Air Outlet & Slot for Return Air |
NEW WALL
1/2
FE MP
9000
FE MP
HR T
T
DRINK STATION #4
SC
FE
2100 AFFL
JANITOR'S CLOSET
RESTROOM
EXIT
FA
NEW HR
3A
FE MP
HR
FE MP
FA
EXISTING RAISED FLOOR LINE
FLOOR RAISED RY BOUNDA
OR AGA FLO RY BOUNDA
FA
BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.
1
B
8012
100% TENDER CONSTRUCTION
A CAS
16
HIGH LIMITS
IT EX
SVC L
0751
SVC K
FE
MP
OR
GE
NEW EXIT SIGN
SC
HIGH LIMITS RECEPTION DESK
SC 00
PONY WALL
8 Cross Street #24-01, PWC Building LINEAR048424 ACMV DIFFUSER Singapore Tel : +65 6227-6433
SMOKE CURTAIN Developer / Owner
Marina Bay Sands Pte Ltd ACMV SYSTEM R
CAS
14
S
1
9 Raffles Place # 45-01 TOILET EXHAUST Republic Plaza Singapore 048619
GRILLE (TEG)
TRANSFER AIR GRILLE (TAG)
Project
2
LINE OF VOID ABOVE
FE MP
L 21 FF A
FE
21 C AF 00 FL
+101.00
2100 AFFL
CA FE
NEW EXIT SIGN
SMOKE DETECTOR AT SIDE OF
Architect
SMOKE CURTAIN Atkins Design Engineering ACCESS PANEL Consultants Pte Ltd
CAS 18
0751
0751
SPEAKER
Aurecon Singapore Pte Ltd BGM SPEAKER
9000
1 8001
EXIT
FLUORESCENT LIGHT& NEST MBSDEV 096A_CASINO MASS GAMING PROPOSED ALTERATION AND REFURBISHMENT L-TYPE LIGHT SPREAD ACROSS THE B2M AND LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, ACMV DIFFUSER FOR BOH CASINO ENTRANCES AND RESTROOMS. OFFICE
Drawing Title
MASS GAMING -AIR DIFFUSER FOR ATRIUM
K
PROPOSED HIGH LIMITS FLOOR PLAN B2M Project No:
K
+101.30
EMERGENCY EVCS MEP & Structural Engineers
152 Beach Road #22-02, Gateway East Singapore 189721 SPRINKLER T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com
s
SVC 1
FE
PONY WALL
+101.00
NEW WALL FINISH
+102.20
+102.20
IT
AIR GRILLE TO BE RETAINED
S
BULKHEAD
Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000LIGHT EMERGENCY Fax: +852 2523 1666
0751
8004
AREAS
Hotel Interior Design Limited DIRECTIONAL DOWNLIGHT
OR
2
1
B
AL
SCOPE BY OTHERS One Raffles Place Tower 2, 10-62 Singapore, 048616 DOWNLIGHT
15
DEV_096A
Scale:
Pilot Date:
JULY 2015
Issue Status:
1:100 @ A1
For Construction
Drawing No:
PROPOSED HIGH LIMITS FLOOR PLAN B2M | Reflected Ceiling Plan | S
1
Audiovisual Consultant INDICATES UNAFFECTED
Sennen Design Pte Ltd
CAS
CAGE UPDATED
App.
NC
Interior Designer STRIP LIGHT
OR
1 3501
EX
EXIT
Initial
Check
SY
150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 [REFER TO ATK_MBSDEV_096A_DD_DD_0011] www.rlb.com.sg
OR
P
21 C AF 00 FL
1 0752
Draw
23:12:15
Sennen Design OR
9000
SVC M
21 FFL A
SVC N
S
3161
Issue Date Date
LEGEND:
5
FE SVC O
SC00
+101.00 (VIF)
+102.60
+96.00 +95.75
MP HR
PONY WALL
E
SVC P
-
22:11:17
Description
Rider Levett Bucknall IT
SVC Q
-
XX:XX:XX
100% TENDER CONSTRUCTION
Rev.
Original by ATKINS
EX
STORAG
KEYPLAN
17
EXIT
+102.20
5
CAS
EXIT EXIT
User name: Yamada, Satoshi Date:26 January 2018 16:29:11 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_3161_B2M
3
L-C.35
L-C.36
| Plan |
4
5
FATT CHOI
3
0 +96.0 5 +95.8
RETAIL CE RANRS ENTDOO NEWNORTH
4 3
MEN'S WC
EXIT
6500
7500
CAS
SCALE: 1:100 (A1) / 1:200 (A3)
9000
CAS
J
9000
CAS
I
CAS 17
9000
CAS
H
CAS
G
1
CAS
F
E
Rev.#
ATK_MBSDEV_096A_DD_TC_CAS_3161_B2M
B
This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.
S
EXIT
S S
BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.
S
EXIT
3 +100.995 +100.70
1
1
CAS 16
22:11:17
Issue Date Date
Draw
23:12:15
Check
SY
NC
Initial App. AL
Rider Levett Bucknall
+101.01
IT
150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg
1
EX
IT
XX:XX:XX
100% TENDER CONSTRUCTION
Description
ATKINS
EX
| Detail of Down Throw Diffuser | Audiovisual Consultant
+101.01
MEP & Structural Engineers
Architect
1
S
8 Cross Street #24-01, PWC Building Singapore 048424 Tel : +65 6227-6433
SF-101 5010
SF-102 4995
SF-102 5010
HIGH LIMIT CAGE AND MEP LAYOUT UPDATED
R
CAS 14
open S
SMOKE CURTAIN HOUSING
ATRIUM EAVE
SF-102 4700
Marina Bay Sands Pte Ltd
B
SF-102 4995
2
ALL LIGHTING FIXTURES TO BE REPLACED, TYP.
+101.01
MT-104 4060
Atkins Design Engineering Consultants Pte Ltd
EXIT
Developer / Owner
SF-101 5000 SF-102 4810
152 Beach Road #22-02, Gateway East Singapore 189721 T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com
S
S
1
2
3501
Aurecon Singapore Pte Ltd
S
+101.01
+101.01
+100.995
1
+100.995
+100.70
+101.01
S
Hotel Interior Design Limited Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000 Fax: +852 2523 1666
CAS 15
+100.995
+101.00 +100.06
100.81
IT
S
9 Raffles Place # 45-01 Republic Plaza Singapore 048619
Project
MBSDEV 096A_CASINO MASS GAMING & NEST PROPOSED ALTERATION AND REFURBISHMENT SPREAD ACROSS THE B2M AND LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, CASINO ENTRANCES AND RESTROOMS.
Drawing Title
MASS GAMING PROPOSED HIGH LIMITS REFLECTED CEILING PLAN B2M
Project No:
DEV_096A
1 3461
One Raffles Place Tower 2, 10-62 Singapore, 048616
Interior Designer
P
2
Sennen Design Pte Ltd
Sennen Design
S S
3
EX
Pilot Date:
APRIL 2016
Scale:
1:100 @ A1
Issue Status: For Construction
Rev.#
Drawing No:
REFLECTED CEILING PLAN B2M
ATK_MBSDEV_096A_DD_TC_CAS_3461_B2M CAS J
SCALE: 1:100 (A1) / 1:200 (A3)
CAS I
CAS H
CAS G
CAS F
CAS E
| MEP Drawing: ACMV |
B
This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.
| Photo of Mock-Up & Construction Site |
FLEXIBLE DUCT SCHEDULES
ABBREVATIONS CHWS
NEW SUPPLY AIR DUCT
CHWR
NEW RETURN AIR DUCT
NEW SMOKE EXTRACT DUCT
NEW FLEXIBLE DUCT
EXISTING DUCTWORK TO BE DELETED CHWS
CHWR
NEW RETURN AIR DUCT
| S43: Down Throw Diffuser |
36
8 AM ass Gaming Refurbishment\3 Project Delivery\CADD\ISSUED\180327 - Construction Document To MBS\CAD\ACMV\AUR_MBSDEV_096A_DD_TC_CAS_2002_B2M_CAD_C
NEW SMOKE EXTRACT DUCT
NEW FRESH AIR DUCT
EXISTING DUXTWORK TO REMAIN
EXISTING RETURN AIR LINEAR DIFFUSER TO REMAIN EXISTING SUPPLY AIR LINEAR DIFFUSER TO BE DELETED EXISTING RETURN AIR LINEAR DIFFUSER TO BE DELETED SUPPLY AIR DIFFUSER C/W VCD
S34
VCD
VCD S36 NVCD S43
NFD MD
AXIAL FAN
FAN COIL UNIT (WALL MOUNTED TYPE)
FCU SED FAD
R
14 NOS OF SLOT DIFFUSER FOR SMOKE EXTRACT FAN COIL UNIT (WALL TYPE)(ACT AS ONE SMOKE SYSTEM ATMOUNTED 116 CMH EACH EXTRACTION POINT OF 1620 CMH)
SE
CONDENSING UNITEXTRACT OPENING AT DUCT SMOKE 1200(L)x200(HT) CEILING CASSETE FAN COILSIDE UNITWALL BAR GRILLE C/W VCD. AIR FLOW TO BE DETERMINED AFTER PRE-CONSTRUCTION AIRFLOW MEASUREMENTS DUCTWORK WITH INTERNALLY ACOUSTIC ROCKWOOL INSULATION LINED WITH 1000(L)x50(W) 2 SLOTS PERFORATED GALVANISED SHEETLINEAR METALOPENING C/W VCD AS PER SPECIFICATION
S45
R12
RAD
RETURN AIR DUCT
KED
RETURN AIR PATH: CONSTRUCTION OPENING OF ATEXHAUST LEAST 100MM KITCHEN DUCT (HT) WITHIN CEILING COVE
KEF TED R
TAD
S45
EXISTING SUPPLY AIR DIFFUSER TO BE DELETED N
NEW 600x600 4 WAY SUPPLY AIR DIFFUSER C/W VCD. AIR FLOW TO BE DETERMINED AFTER PRE-CONSTRUCTION AIRFLOW MEASUREMENTS
N
NEW 600x600 3 WAY SUPPLY AIR DIFFUSER C/W VCD. AIR FLOW TO BE DETERMINED AFTER PRE-CONSTRUCTION AIRFLOW MEASUREMENTS
FAN COIL UNIT
SED
SMOKE EXTRACT DUCT
FAD
FRESH AIR DUCT
SAD
SUPPLY AIR DUCT
RAD
RETURN AIR DUCT
Ø400 N Ø450 Ø500 R
AIR QUANTITY (CMH) TOILET EXHAUST DUCT 0 - 200 201 - 400 TRANSFER AIR DUCT 401 - 720 721 - 1000 TYPICAL 1001 - 1330 1331 - 1600 DENOTE NEW ITEM 1601 - 2000 2001 - 2460 DENOTE RELOCATED ITEM
GENERAL NOTES 1.
ALL DIMENSIONS ARE IN mm. DO NOT SCALE THE DRAWINGS. PROVIDE AIR TURNING VANES IN ALL SQUARE ELBOWS, RADIUS ELBOWS. THE DUCT DIMENSION SHOWN ON THE DRAWING IS THE INTERNAL (AIR WAY) SIZE EXCLUDING INSULATION THICKNESS.
N
4.
VOLUME CONTROL DAMPER SHALL BE INSTALLED IN ALL BRANCH SUPPLY AND EXHAUST OR RETURN DUCTS. LOCATED DAMPERS AS FAR AS POSSIBLE FROM OUTLETS.
R
SMOKE EXTRACT OPENING AT DUCT DENOTE RELOCATED ITEM
5.
THE LENGTH OF EACH FLEXIBLE AIR DUCT SHALL BE INSTALLED AS SHORT AS POSSIBLE & NOT MORE THAN 4m.
1200(L)x200(HT) SIDE WALL BAR GRILLE C/W VCD. DENOTE BLANKED OFF OF EXISTING AIR FLOW TO BE DETERMINED AFTER DUCTWORK/OPENING PRE-CONSTRUCTION AIRFLOW MEASUREMENTS
6.
ALL DIFFUSERS, GRILLES & REGISTER SHALL BE COMPLETED WITH BLACK INTERNAL INSULATED PLENUM BOX AND WITH OPPOSED BLADE DAMPERS (OBD).
7.
UNLESS OTHERWISE NOTED, ALL SUPPLY AIR DUCT (SAD) AND RETURN AIR SHALL BE INTERNAL INSULATED WITH 25mm THICK FIBRE GLASS INSULATION & PERFORATRED G.I. SHEET.
8.
ALL CEILING DIFFUSER/GRILLES AFFECTED BY THE REPLACEMENT OF FALSE CEILING ARE TO BE CLEANED AND RE-INSTATED
9.
ALL SENSORS AT LEVEL 1 MOUNTED ON ALL COLUMNS/WALLS TO BE RE-INSTATED AFTER COLUMN REFURBISHMENT WORKS.
GENERAL NOTES
EXISTING SUPPLY AIR DIFFUSER TO BE DELETED
1. N 2.
600x600 4 WAY SUPPLY AIR DIFFUSER C/W ALL DIMENSIONS ARENEW IN mm. DO NOT SCALE THE DRAWINGS. VCD. AIR FLOW TO BE DETERMINED AFTER PROVIDE AIR TURNINGPRE-CONSTRUCTION VANES IN ALL SQUARE ELBOWS, RADIUS ELBOWS. AIRFLOW MEASUREMENTS
3. N
THE DUCT DIMENSION SHOWN ON THE DRAWING IS THE INTERNAL (AIR WAY) SIZE EXCLUDING NEW 600x600 3 WAY SUPPLY AIR DIFFUSER C/W INSULATION THICKNESS. VCD. AIR FLOW TO BE DETERMINED AFTER VOLUME CONTROL DAMPER SHALL BE INSTALLED IN MEASUREMENTS ALL BRANCH SUPPLY AND EXHAUST OR PRE-CONSTRUCTION AIRFLOW RETURN DUCTS. LOCATED DAMPERS AS FAR AS POSSIBLE FROM OUTLETS. THE LENGTH OF EACHNEW FLEXIBLE AIRRETURN DUCT SHALL BE INSTALLED AS SHORT AS POSSIBLE & NOT 600x600 AIR DIFFUSER MORE THAN 4m. ALL DIFFUSERS, GRILLES & REGISTER SHALL BE COMPLETED WITH BLACK INTERNAL INSULATED PLENUM BOX AND WITH OPPOSED DAMPERS (OBD). NEW 300x300 BLADE RETURN AIR DIFFUSER
7.
UNLESS OTHERWISE NOTED, ALL SUPPLY AIR DUCT (SAD) AND RETURN AIR SHALL BE INTERNAL INSULATED WITH 25mm THICK FIBRE GLASS INSULATION & PERFORATRED G.I. SHEET. EXISTING THERMOSTAT TO REMAIN 8. ALL CEILING DIFFUSER/GRILLES AFFECTED BY THE REPLACEMENT OF FALSE CEILING ARE TO BE CLEANED AND RE-INSTATED EXISTING THERMOSTAT TO BE DELETED TS 9. ALL SENSORS AT LEVEL 1 MOUNTED ON ALL COLUMNS/WALLS TO BE RE-INSTATED AFTER COLUMN REFURBISHMENT WORKS. NEW THERMOSTAT TS
TS
EXISTING TEMPERATURE SENSOR TO REMAIN EXISTING CO2 SENSOR TO REMAIN
AIR QUANTITY (CMH) 0 - 200 201 - 400 401 - 720 721 - 1000 1001 - 1330 1331 - 1600 1601 - 2000 2001 - 2460
NOTE: ALL FLEXIBLE DUCTWORK SHALL NOT EXCEED 2m IN LENGTH FOR ALL CONNECTIONS.
NOTE: B ALL FLEXIBLE DUCTWORK SHALL NOT EXCEED 2mEXISTING DENOTE BLANKED OFF OF IN LENGTH FOR ALL DUCTWORK/OPENING CONNECTIONS.
1000(L)x50(W) 2 SLOTS LINEAR OPENING C/W VCD
6. N
FCU
SIZE Ø150 Ø200 Ø250 Ø300 Ø350 Ø400 Ø450 Ø500
2.
R12
4.
AIR HANDLING UNIT
3.
B
N5.
AHU
14 NOS OF SLOT DIFFUSER FOR SMOKE EXTRACT TYPICAL SYSTEM AT 116 CMH EACH (ACT AS ONE SMOKE EXTRACTION POINT OF 1620 CMH) DENOTE NEW ITEM
TYP.
SE
KITCHEN EXHAUSTSUPPLY FAN AIR DIFFUSERS AT ALL EXISTING EXISTING FISHEYE CEILING TO BE TOILET EXHAUST DUCT RE-INSTALLED. REFER TO DETAIL 8 ON DRAWING NO.: AUR_MBSDEV_096A_DD_TC_CAS_2003_B2M TRANSFER AIR DUCT
AIR CONDITIONER
SIZE TED Ø150 Ø200 TAD Ø250 Ø300 TYP. Ø350
FAN COIL UNIT 1050(L)x75mm(W) (2 SLOT) DOWN THROW LINEAR INDUCTION DIFFUSER @ 430 CMH SMOKE EXTRACT DUCT
SUPPLY AIR DUCT 800(L)x200(W) SMOKE EXTRACTION DIFFUSER
A/C
KEF/ RETURN AIR FLEXIBLE KITCHENDUCT EXHAUST FAN SUPPLY
1000(L)x25(W) DOWN THROW SLOT AIR HANDLING UNIT LINEAR DIFFUSER @ 360 CMH
1000(L)x200(W) SIDE THROW AIR OUTLET WITH NOS. RECT. DISCHARGE CHAMBER FRESH AIR5DUCT @ 108 CMH
SUPPLY / RETURN AIR FLEXIBLE DUCT
DESCRIPTION
KED EXHAUST DUCT FLEXIBLE DUCTKITCHEN SCHEDULES
DESCRIPTION 1000(L)x25(W) 2 SLOTS DOWN THROW LINEAR DIFFUSER @ 500 CMH AIR CONDITIONER
SAD
800(L)x200(W) SMOKE EXTRACTION DIFFUSER MOTORISED SMOKE DAMPER
EXISTING FISHEYE CEILING TO BE RE-INSTALLED. REFER TO DETAIL 8 ON DRAWING NO.: AUR_MBSDEV_096A_DD_TC_CAS_2003_B2M ACCESS PANEL
FAN COIL UNIT
ACCESS PANEL
RETURN, EXHAUST AIR GRILLE NEW FLEXIBLE DUCT
SE
FAN COIL UNIT ALL EXISTING SUPPLY AIR DIFFUSERS AT
FIRE DAMPER (NEW)
MOTORISED SMOKE DAMPER
S44
AXIAL FAN RETURN AIR PATH: CONSTRUCTION OPENING OF AT LEAST 100MM (HT) WITHIN CEILING COVE
VOLUME CONTROL DAMPER (EXISTING)
M&D
EXISTING FLEXIBLE DUCT TO REMAIN SUPPLY AIR DIFFUSER C/W VCD
M&D
SE
VOLUME CONTROL DAMPER OPPOSED BLADE TYPE (EXISTING)
MOTORISED DAMPER
S43
1050(L)x75mm(W) SLOT) DOWN THROW VOLUME CONTROL DAMPER(2(NEW) LINEAR INDUCTION DIFFUSER @ 430 CMH
ARROW FOR SUPPLY AIR AND FRESH AIR
MD
AHU
S36
CONDENSATE DRAIN PIPE EXISTING RETURN AIR LINEAR DIFFUSER TO BE DELETED
FIRE DAMPER (NEW) 1000(L)x200(W) SIDE THROW AIR OUTLET WITH 5 NOS. RECT. DISCHARGE CHAMBER @ 108 CMH MD MOTORISED DAMPER
NFD S44
ARROW FOR RETURN AIR AND EXHAUST AIR
VOLUME CONTROL DAMPER (NEW)
A/C
1000(L)x25(W) DOWN THROW SLOT VOLUME CONTROL DAMPER (EXISTING) LINEAR DIFFUSER @ 360 CMH
| S44: Side Throw Air Outlet |
NVCD
ABBREV.
ARROW FOR RETURN AIR AND EXHAUST AIR 1000(L)x25(W) 2 SLOTS DOWN THROW VOLUME CONTROL DAMPER OPPOSED LINEAR DIFFUSER @ 500 CMH BLADE TYPE (EXISTING)
MD
RETURN, EXHAUST AIR GRILLE
EXISTING RETURN AIR LINEAR DIFFUSER TO REMAIN CHILLER WATER RETURN EXISTING SUPPLY AIR LINEAR DIFFUSER TO BE DELETED
ABBREVATIONS FLEXIBLE DUCT TO BE DELATED S34
ARROW FOR SUPPLY AIR AND FRESH AIR FLEXIBLE DUCT TO BE DELATED
EXISTING DUCTWORK TO BE DELETED EXISTING SUPPLY AIR LINEAR DIFFUSER TO REMAIN
EXISTING SUPPLY AIR LINEAR DIFFUSER TO REMAINCHILLER WATER SUPPLY
CHILLER WATER RETURN
EXISTING FLEXIBLE DUCT TO REMAIN
EXISTING DUXTWORK TO REMAIN
NEW SUPPLY AIR DUCT
ABBREV.
CHILLER WATER SUPPLY
CONDENSATE DRAIN PIPE
NEW FRESH AIR DUCT
D\180327 - Construction Document To MBS\CAD\ACMV\AUR_MBSDEV_096A_DD_TC_CAS_2002_B2M_CAD_C
User name: Yamada, Satoshi Date:26 January 2018 16:29:32 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_3461_B2M
100% TENDER CONSTRUCTION
A
Original by
S S
B Rev.
+100.81
1
S
+100.06
S
02 | Project | 031. Lead Consulting | MBS |
| B2M - Main Entrance | | Proposed Design |
| Photo of Current Main Entrance |
DESIGN CONCEPT
B2M RETAIL TRANSITION PORTAL
PROPOSAL 01
B2M Main
PVC
PVC
9
CAS
PVC
10
CAS
1
11
CAS
2
5000
EXIT
FICE OF
4000
1
9000
D
4000
| Elevation PLAN & Detail of The Entrance Feature Wall | 2
CAS
6
7
5000
4000
B
4
ELEVATION MARK ADDED AND REVISED
NEW EXIT SIGNS
HO LDIN RO OM G
PVC
CAS
5
GOLD METAL STRIPS W/ FEATURE GLASS BEHIND
EXISING PORTAL TO BE KEPT
1
2
3
T
CAS
4
K
EXIT
9000
NEW DOOR CLEAR WIDTH 900
PR OT LO EC SE BBYTED RV ICE
CAS
3
EX IT
| Plan |
NEW EXIT SIGN
4
NEW WALL AND FINISH
FICE
4 CAS
OF
B
VP
HO LDIN RO OM G
06
E-C.
DESIGN CONCEPT
SCREEN WALL
EXIT
B2M RETAIL TRANSITION PORTAL
+96.00 +95.75
IT
EX
NEW FINISH
A
1
OR
E
ST
OR
E
EXIT
EXIT
ATM
1
NEW FINISH
2
NEW EXIT SIGNS
ALL NEW FINISHES TO EXISTING WON ACCESS PANEL AND WALL PANELS
EXIT
NEW FINISH
NEW COLUMN CLADDING AGE CHECKER ROSTRUM LOCATION TO BE CONFIRMED BY OPS
2
1
B
1
HE-C.06
NEW FINISH
NEW WALL FINISH
K
T
Audiovisual Consultant
9000
One Raffles Place Tower 2, 10-62 Singapore, 048616
CAS
5
INDICATES UNAFFECTED MEP & Structural Engineers
CAS
6
7
5000
HE-C.05 EX
IT
OR
HR
OR
STRIP LIGHT
OR
Architect
Atkins Design Engineering DIRECTIONAL DOWNLIGHT Consultants Pte Ltd
OR
8 Cross Street #24-01, PWC Building EMERGENCY LIGHT Singapore 048424 Tel : +65 6227-6433
EXI
EMERGENCY EVCS SPEAKER
GOLD METAL STRIP 8 W/ WOOD VENEER FINISHAND LED LIGHTING BEHIND
B
+99.30 EXISTING PORTAL TO BE KEPT
BGM SPEAKER Marina Bay Sands Pte Ltd R
s
Project
SMOKE CURTAIN
+101.00
Project No:
BFA
11000
BFA
22
5000
BFA
23
24
11000
FLUORESCENT Scale: LIGHT Pilot Date:
+101.00 4000
9000
BFA
25
4000
5000
BFA
26
4000
+101.30
27
+100.80
℄
7161
7161
NEW COVE
CS
NEW LIGHTING
+101.30
BFA
+99.00
C
CS
NEW LIGHTING
+102.10 S
S
+101.00
A
1
5595
NEW COVE
+101.00
S
S
S
S
S
S
WOOD VENEERFINISH
+100.00 7350
S
CS
NEW COVE
1302
CS
MT
106
WD
101
CS
1302
EXISTING LIGHTING DECORATION TO BE KEPT
90
Accessibility Code - Chapter 4.7
GLASS
MT
106
GL
109
1
Draw
23:12:15
WOOD VENEERFINISH 6
EXISTING BALUSTRADE TO BE KEPT
WD 1
101
B2M CASINO MASS GAMING REFRESH – ELEVATIONS MT
106
GL
109
LED LIGHTING
WD
101
MT
106
MT
DIFFUSER
106
DIFFUSER LED LIGHTING
6 GL
EXISTING BALUSTRADE TO BE KEPT
4
DETAIL SCALE: 1:2 (A1) / 1:4 (A3)
MT
106
GL
109
MT
106
AL
5
WD
101
MT
106
DETAIL
GL
109
106
WD
101
MT
106
Audiovisual Consultant
4
DETAIL SCALE: 1:2 (A1) / 1:4 (A3)
One Raffles Place Tower 2, 10-62 Singapore, 048616
5
DETAIL SCALE: 1:2 (A1) / 1:4 (A3)
6
101
MT
106
MT
106
MT
106
DETAIL SCALE: 1:2 (A1) / 1:4 (A3)
Hotel Interior Design Limited
Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000 Fax: +852 2523 1666
GOLD METAL STRIP
MEP & Structural Engineers
| Photo of Construction Site | Aurecon Singapore Pte Ltd
152 Beach Road #22-02, Gateway East Singapore 189721 T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com Architect
Atkins Design Engineering Consultants Pte Ltd
8 Cross Street #24-01, PWC Building Singapore 048424 Tel : +65 6227-6433
Developer / Owner
Marina Bay Sands Pte Ltd R
9 Raffles Place # 45-01 Republic Plaza Singapore 048619
Project
B2M CASINO MASS GAMING REFRESH – ELEVATIONS
MBSDEV 096A_CASINO MASS GAMING & NEST PROPOSED ALTERATION AND REFURBISHMENT SPREAD ACROSS THE B2M AND LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, CASINO ENTRANCES AND RESTROOMS.
2017.08.01. ATKINS Comments on 100% Concept Design Rev1
Drawing Title
MASS GAMING -
1
PROPOSED MAIN ENTRANCE
REFLECTED CEILING PLAN
BFA
BB
11000 BFA
22
REFLECTED CEILING PLAN B2M
EXISTING PORTAL TO BE KEPT
SCALE: 1:100 (A1) / 1:200 (A3) 11000 BFA
23
11000 BFA
24
5000
CFD Geometry 11000
4000
BFA
25
Project No:
DEV_096A
4000
BFA
26
5000
JULY 2015
Issue Status:
Scale:
1:100 @ A1
For Construction
Rev.#
ATK_MBSDEV_096A_DD_TC_CAS_4461_B2M
11000
9000
Pilot Date:
Drawing No:
4000
BFA
27
A
This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.
Smoke curtains Escalator smoke curtain
2017.08.01. ATKINS Comments on 100% Concept Design Rev1
| Layered Metal Fins - Smoke Evacuation CFD Test |
Privacy screens
CFD Result
Visibility slice across fire along X-axis (Xfire) At 885s (steady-state achieved)
Observation: smoke is able to spread through the proposed smoke barrier.
| Photo of Construction Site |
Proposed smoke barrier Fire
DE
SCA
WD
Rider Levett Bucknall
Sennen Design Pte Ltd
SCAL
6
SCALE: 1:2 (A1) / 1:4 (A3)
DIFFUSER
MT
DET
3
109
App.
NC
150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg
SECTION
GOLD METAL STRIP
Initial
Check
SY
DET
SCAL
Interior Designer
S
A
1302
EXISTING LIGHTING DECORATION TO BE KEPT
CONCEALED LED LIGHTING
SECTION
S
PVC
11
BFA
EXISTING LIGHTING DECORATION TO BE KEPT
P
S
NEW LIGHTING
B
Issue Date Date
Sennen Design
EXISTING COVE TO BE REFINISHED
| GOLDMETAL Balustrade - Building Code | FEATURE
Rev.#
22:11:17
Description
+100.80
+100.30
B
109
LED LIGHTING
100% TENDER CONSTRUCTION
Rev.
+101.00
+101.00
106
GL
2
DIFFUSER
ATKINS
BFA
MT
LED LIGHTING
Original by
+101.30
S
KEY MATERIALS
GOLD METAL STRIP W/ WOOD VENEER FINISH
101
CONCEALED LED LIGHTING
BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.
1302
NEW LIGHTING DECORATION TO MATCH WITH EXISTING
NEW LIGHTING DECORATION TO MATCH WITH EXISTING
7161
+102.07
NEW COVE
1302
For Construction
This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing AIR DIFFUSER FOR ATRIUM shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.
BFA
+100.70
+102.40
DIFFUSER
Issue Status:
JULY 2015 1:100 @ A1 L-TYPE LIGHT
ACMV DIFFUSER FOR BOH ATK_MBSDEV_096A_DD_TC_CAS_4161_B2M OFFICE
11000
CAS
ELEVATION
SCALE: 1:20 (A1) / 1:40 (A3)
TOILET EXHAUST GRILLE (TEG)
Drawing No:
11000
106
WD
2017.08.01. ATKIN
5
SCALE: 1:20 (A1) / 1:40 (A3)
DETAIL LED LIGHT W/ MILKY
TRANSFER AIR GRILLE (TAG) FLOOR PLAN B2M
7
DEV_096A
11000
+102.37
1
MASS GAMING -
BFA
C
AT SIDE OF
ACMV SYSTEM
Drawing Title
PROPOSED MAIN ENTRANCE
ARCHITECTURAL PLAN
PVC
SPRINKLER 9 Raffles Place # 45-01 Republic Plaza Singapore SMOKE048619 DETECTOR
ACCESS PANEL OR 096A_CASINO MBSDEV MASS GAMING & NEST PROPOSED ALTERATION AND REFURBISHMENT LINEAR ACMV SPREAD ACROSS THE B2M ANDDIFFUSER LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, SMOKE CURTAIN CASINO ENTRANCES AND RESTROOMS.
+101.00
SCALE: 1:100 (A1) / 1:200 (A3)
WOODVENEER
User name: Yamada, Satoshi Date:26 January 2018 16:53:02 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_7221_B2M
Developer / Owner
CAS
109
2017.08.01. ATKINS Comments on 100% Concept Design Rev1
152 Beach Road #22-02, Gateway East Singapore 189721 DOWNLIGHT F: +65 6251 7188 T: +65 6256 6188 W: www.aurecongroup.com
PROPOSED NEW FLAT CEILING D
BB
109
DETAIL
1
WOOD VENEER FINISH PANEL
AREAS
Aurecon Singapore Pte Ltd SCOPE BY OTHERS
4000
PVC
1
GOLD METAL STRIP
Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000 [REFER TO ATK_MBSDEV_096A_DD_DD_0011] Fax: +852 2523 1666
CAS
4000
A
User name: Yamada, Satoshi Date:26 January 2018 16:34:47 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_4461_B2M
Sennen Design Pte Ltd
Hotel Interior Design Limited
T
9000
3
4000
EXIT
PVC
102
106
GL
GOLD METAL STRIP W/ WOOD VENEER FINISH
5
FEATURE GLASS
LEGEND:
2 NOS. WON ACCESS PANEL TO BE CAS REFINISHED4
CAS
2
GOLD METAL STRIPS W/ FEATURE GLASS BEHIND
AL
Interior Designer
P
EXIT
7350
CAS
1
11
EXISING PORTAL TO BE KEPT
11
SF
CAS
PVC
10
5000
BFA
A
PVC
App.
NC
GOLDMETAL
WOODVENEER
1
9
Initial
Check
SY
150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg
Sennen Design
| Reflected Ceiling Plan |
Draw
23:12:15
Rider Levett Bucknall
1
2
-
22:11:17
Issue Date Date
ATKINS
DRINK STATION #1 NEW FINISH
-
XX:XX:XX
100% TENDER CONSTRUCTION
Description
Original by
2 NOS. OF NEW EXIT SIGNS
2
SINGAPOREAN ENTRANCE / EXIT
B
PVC
100% TENDER CONSTRUCTION
A Rev.
+96.00 +95.75
BFA
PLAN
B2M Main Entrance - Part Plan 3
1
NEW HR CABINET AND DOOR
4
KEY MATERIALS
EXIT
NEW DOOR CLEAR WIDTH 1500
E-C.18
L-C.23
NEW HR
BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.
6
MAIN ENTRANCE
EXIT
4 2
1
NEW WALL AND FINISH
LUGGAGE DEPOSIT
1
User name: Yamada, Satoshi Date:26 January 2018 16:53:02 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_7221_B2M
EXIT
EXIT
3
E-C.17
EXIT
1
LEVY COUNTER
5
EXIT
S-C. HE 27 -C.06
RE TO
NEW FINISH C
7
AGE CHECKER ROSTRUM LOCATION TO BE CONFIRMED BY OPS
EXIT
EXIT
TA
IL B1
1 NEW DOOR, WALL AND FINISHES BOH
EXIT
600M DET WID WAR ECT E ABL PAT NIN E THE TER G SUR DRA N REF FAC WIN ER E G 4/73TO 52.
3
MT
+96.00 +95.75
BFA
User name: Yamada, Satoshi Date:26 January 2018 16:31:35 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_4161_B2M
SCREEN WALL
FOREIGNER ENTRANCE / EXIT
AG
NEW FINISH
4
2
ELEVATION
IT
ST
1
2
1
EX
1
3
GL
MT
SCREEN WALL
1
CAS
NEW SCREEN WALL
4 NOS. OF NEW EXIT SIGNS
EXIT
C
July 2017 | 05
1
EXISTING DOOR TO BE REFINISHED
PVC
PROPOSAL 01
3
28th
1
05
106
B2M CASINO M
3 1
E-C.
GOLD METAL STRIP W/ WOOD VENEER FINISHAND LED LIGHTING BEHIND
MT
Smoke exhaust points
Proposed smoke barrier
37
_02. Project / 04. Competition / Place Lalla Yeddouna in Medhina of Fez
041_
Fez, Inside Out
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2010 September Design[open competition] Residence and Retail Shop 6,832 m² Medina of Fez, MOROCCO Project Manager / All the phase of project
In the site, there were full of Arabic traditional buildings which have high cultural and historical value and worth to be preserved. Besides it is located in the centre of Medina district, still many artisans live and work there. Then the site have highly potencial and possibility to be important place for both local people and tourist in next decades. So our insight for this project was how to develop this area by refining old valuabe architecture and putting new architecture. Our main concept was “INSIDE OUT”. Now almost all the building is closed to outside, public, and open to thier courtyard, private. And each courtyard has unique activity that characterize that building. So we tried to “inside out”, and expose the inside private space that is filled with a lots of activities out.
| Unique Activities of Courtyard | Playground Fountain
Cafe Gallery
Restaurant Park Gallery
Market Stage
Park
Playground Restaurant Fountain
Cafe Market Stage
38
02 | Project | 041. Competition | FEZ |
| How to transform cityscape: INSIDE OUT |
:Closed to public, Open to courtyard.
:Make access to courtyard, then the inside is glanced.
:Stud courtyard, make strees wider.
:Tilt walls for shadow.
| Masterplan |
We tried to break the existing big public place into small pieces and spread out all around the site, so that more shaded spaces. And put new street between buildings, then connect each zone smoothly, and it’s also connected with riverbank street, and with slight slope that this site has, you will see new variety of experience.
| Distribution Concept | Old Building Gallery Retail Shop, Workshop Office, Hotel, Residence Cafe, Restaurant Gift Shop Site
| Traffic Concept |
Main Road Riverbank Road Street Bridge Connection
| Open Space |
Site
Courtyard Openspace Plaza Riverbank
Site
39
| Refine Existings to New Architecture |
To preserve the existings is not only the way to keep present, but also to build new building that is similar with the existings. Our way to connect the past and the future is to draw new wider street between buildings and reinforce the structure of each, put new material which is consider with existing materials with combination. People walk through this street will see the existings and new alternately, and think them as new Medina district.
Building 03
Building 02
Building 01
| 1F Plan[1:500] |
| Section Building 03 |
| Cirsulation Diagram | Snack Bar Exhibition Workshop Courtyard Retail Shop Circultaion
Building 02
| 2F Plan[1:500] |
Building 03
Building 01
| Material for Exteiror |
Concrete façade faces to outside streets, public. It will match with old existings. Corten steel faces to inside streets, semi-private. Besides, there are windows more than the concrete facade which face to the outside.
280.4m(Rooftop Level)
280.1m(Rooftop Level)
275.1m(Rooftop Level)
276.8m(1st Floor Level)
| AA’ Section[1:500] |
40
270.3m(Riverbank Level)
276.0m(2nd Floor Level) 273.2m(1st Floor Level)
02 | Project | 041. Competition | FEZ |
41
_02. Project / 04. Competition / Izunokunishi Traditional Culture Hall
042_
Wood Archi Hall
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2013 February Design[open competition : website] Multi-purpose Hall 684 m² Izunokunishi, Shizuoka-Pref, JAPAN Project Architect / 2013 January
This competition is for the hall for Japanese traditional performing arts. Main concept of our design is super long stages, which is 10m width and 80m length and going western point to eastern point through the inside of building. Besides, it’s done with all same level, so when the door is opened, whole this space(80m x 10m) can be used at the same time. And the stage for traditional performing arts is placed at the most western point which has small cliff, so it can be seen from everywhere from surroundings. Also this hall can be used as the hot spot of the surroundings which are a lots of hot spring public bath.
| Material and Fireproof |
This building is constructed with only standardized wood panels, pieces or logs, and it let us to use local products of wood. And each piece’s size are concidered with fireproof standard, then it’s can be exposed at any point, even ceiling.
| Eco and Self-Sufficient Function | | Axonometric View |
42
To save the running cost, we adapt some eco self-sufficient function which is like the window on top for air-circulation, facility for rainwater recucling, etc.
02 | Project | 042. Competition | WAH |
| AA’ section[1/500] |
Bus Stop Green Park Bike Parking (10bikes)
PLaza
Foyer
Seat (110seats)
[Rollback Chair Tracing]
Parking (28cars)
Dressing Room
Strage
Office
Gallery
[Truck Tracing]
Foot Spa
Etrance
Machine Toilet Room
Stage
Stage[outside] +emplacement
Backstage
Dressing Room
Dressing Room
Studio
Toilet Backyard Etrance
| Total | ① Hall ・ ・ ・ ・ ・・・・・・・・・・・・・・330 ㎡ ② Studio ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ 80 ㎡ ③ Entrance・・・・・・・・・ ・ ・ ・ ・ 181 ㎡ ④ Other Space・・ ・ ・ ・ ・ ・ ・ ・ 93 ㎡
Total
684 ㎡
| Plan[1/500] |
| View from stage to seat |
| Entrace View |
43
_02. Project / 05. University / Diploma Project in Master Degree
051_
High Rise University in Ochanomizu
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2010 February Research, Design[Diploma Project for Master Degree] High Rise Tower for University - m² Ochanomizu, Tokyo, JAPAN / -
The site is located in the centre of Tokyo. Now there are many redevelopment projects are considered around this site. Almost of them are supposed to be high-rise building. But it also breaks all the matters of surrounding, social construction, even the local people’s habits. This site is known well as the city for students, especially many university and colleage there. Most of their buildings are low(3~6 floors), and spread out everywhere.
Ochanomizu Station (Yamanote Line)
So I propose to build one big high-rise to combine two university, and spend the space where that university built for the other redevelopment project.
Building Coposition of the site
44
0 50 100
200
02 | Project | 051. University | DPP |
There is a ordinance to order to have educational space, when new building is built around this site. By having the office inside this campus, we can control and have connection with the office coming to the place where the university built before.
Meiji University 114,425 m² 10,694 ppl
Nihon University 56,755 m² 11,152 ppl
0
50
100
| 2 University to one |
9,072 m² 10,368 m² 5,184 m² 10,368 m² 2,592 m² 7,776 m² 2,592 m² 8,352 m² 9,072 m² 25,344 m² 13,584 m² 11,280 m² 10,368 m² 9,072 m² 18,144 m² 50,544 m² 40,176 m²
/ / / / / / / / / / / / / / / / /
Culb Room Library Office Teacher Room Seminor Room Hall Gallery Annex Dental Hospital Laboratory Concert Hall Public Entrance Student Entrance Administrative Office School Affair Lecture Room (S) Lecture Room (M) Lecture Room (L)
200
| Concept “Falling Tower” | As Koolhaas mentioned in his book, One of big problem of high-rise is the separated floor by slab.
1
4
Fall the high-rise down. Parts between each program will be public.
For the limits of the site and sun lays, roll them up. 2
5
Fall the buildings down, it can have public space on the middle of the building. And that public space works as terminal.
For the footprints of each function, each programs will be high and tight. 3
Aligh to the top for the view and sunlay for ground level.
6
Programs which is devided to mass prog and void pro, will be replaced on the floor connected by skip floor.
45
| Sampling for Void Part Programs | To make the void area program more public like surroundings, I sample the design factor from surroundings. Each on is utilized at the void area program.
| Sampling from Surroundings |
| Conversion to design of Void Area Program Surroundings |
| Plan |
46
| Plan: Floor 10F |
| Plan: Floor 24F |
| Plan: Floor 42F |
| Plan: Floor 47F |
| Plan: Floor 27F |
02 | Project | 051. University | DPP |
| Design for Public Space (at middle) |
AFor the connection with the site and working as terminal for void program, the small building near the site are appeared there. On this part(Floor 32-37), only structure is built, no slab. And each tenant can build own buildings more like temporary or light structure architecture.
Name:
Satoshi Yamada
Laboratory:
Architecture Design 9000
9000
7000
9000
9000
7000
9000
9000
7000
9000
9000
9000
9000
9000
9000
9000 Project Title:
9000 9000 9000 9000 9000 9000 9000 9000
9000
9000 9000
9000
7000
9000
9000
7000
9000
9000
9000
9000
9000
9000
Diploma Project
Date:
2010.02.17
Draft:
9000
9000
Plan_Floor 32
Scale:
1/300 9000
9000
9000
9000
9000
9000
7000
9000
9000
7000
9000
9000
9000
9000
| Plan: Floor 32F |
005
no.
| Plan: Ground Floor |
47
_02. Project / 06. Installation / The Festival des Architectures Vives in Montpellier
061_
U Chi Wa - Grand Prix
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2009 April - June Design, Construction [open competition : website] Art Installation - m² Montpellier, FRANCE Project Architect / All the Phase of Project
The Festival des Architectures Vives a Monpellier that French architect (N+B Architectes) organizes in Montpellier, opens some courtyards to public, and let artists do art installation freely for each coutyard there. This festival is held every year. Our team is a group of a Professor, a fellow and three students, and we are in mind that the foreigners for them and aware of the courtyard that never seen in Japan. We apply to join this project, and finally won the Grand Prix.
| Site |
| Rough Design Image |
48
02 | Project | 061. Installation | UCW |
| Study Process |
| U Chi Wa scattering |
| Main Concept |
While the theme of this festival is “Short-Lived Curiosity”, we choose the Japanese traditional things, “U Chi Wa” that is used only during summer as materials. Only to show the beauty of its form, but without any other things, weave together U Chi Wa, this installation was made by the only U Chi Wa. Additionally the map of Montpellier is drawn on this U Chi Wa, so visitors can freely pick it off our installation. And that is also intended to spread like a scattering cherry blossom to the town. At the same time, this installation represents the theme of this festival by scattering to all over the city and getting shorter.
Here!
Grilling Fish
Lullaby to sleep
Slap your Boyfirend
Table Tennis?
Like a Parasol
Like a Umbrella
Bake a French Loaf
A Flyer
Naked Dance
Necessaries for a Festival
Refreshing breeze
HOW TO USE “U-CHI-WA”... HAVE FAN and FUN ! Festival des Architectures Vives 2009:
Short-Lived Curiousity
U-CHI-WA
deigned by Hiasato U, Hiroya U, Satoshi Y produced by Masashige M, Tohru H Tohoku University supported by The Obayashi Foundation
Festival des Architectures Vives 2009:
Short-Lived Curiousity
U-CHI-WA
deigned by
Hiasato U, Hiroya U, Satoshi Y Masashige M, Tohru H
produced by
supported by The Obayashi Foundation
| Design of U Chi Wa |
49
_02. Project / 06. Installation / Local Energy Reclamation Competition by Japan Government
062_
Book Cafe “PLAT”
-------------------------------------------------------------
| Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2008 September - November Design, Construction[open competition : website] Coffee Shop with Library 65.2 m² Kori-cho, Fukushima-Pref, JAPAN Project Architect, Contractor, Garçon / All the Phase of Project
We joined Local Energy Reclamation Competition by Japan Government, then got the badget for this BookCafe project. But this project is totaly independent project. All this project is organized by we all student. The town is currently without a library, nor meeting hall people can gather. So we design the place like a big livingroom as people can feel free to stop by, read a book, drink coffee and chatting.
X1
X2
11650
PLAT
| Period |
Book
| Shop Section[1/200] |
Y1
lounge_[ 59.1m² ] 4300 5600 1300
kitchen_[ 6.1m² ]
Y2
890
890 4660
4660
2330
11650 X1
| Team |
50
| Shop Plan[1/200] |
X2
book shelf gross area_[ 65.2m² ]
02 | Project | 062. Installation | PLT |
| Elevation Bookshelf |
45
0
00
380
270
270
210
20
φ=150
Bo
ok
sh
elf
Sh
ow
ca
se
| Bookshelf Concept |
We proposed bookshelf. One side is usual book shelf. But another side is fiiled with the pipe (φ=150). People can see the title of book easily and put the book yet to be read into the pipe. To repeat this movement make their own book shelf.(This side is always updated.) Pointing the stick in the backdrop, can also display a special stuff.
| Workshop |
This town has decline and depopulation problems, which prospered as a post town along the highway. Through discussions with the city council, we felt the low awareness of the revitalization of the town residents. We believed this project should be done with local residents, and that’s the only way to change the situation in this area. So while this project, we organized a lots of workshop for some stuff this bookcafe needs, and communicated with resident then try to do this project together for the revitalization.
51
52
03 | Professional Reference |
03 |
-
|
-
|
Professional Reference
-------------------------------------------------------------
01 Ms. Catherine SIU [B+H Architects Hong Kong] _
02 Mr. Hironori MATSUBARA [Beijing Matsubara and Architects] _
03 Mme. Elodie NOURRIGAT [N+B Architectes] _
53
_03. Professional Reference
Catherine Siu [B+H Architects] -------------------------------------------------------------
54
03 | Professional Reference |
-
|
-
|
Hironori MATSUBA [Beijing Matsubara and Architects] -------------------------------------------------------------
55
_03. Professional Reference
Elodie Nourrigat [N+B Architectes] -------------------------------------------------------------
56
03 | Professional Reference |
-
|
-
|
57