01

Resume _

02

Project _

03

Professional Reference _


2


01 | Resume |

Satoshi YAMADA

-

|

-

|

Architectural Designer (Master Degree of Architecture) / 8 Years Experience

-------------------------------------------------------------

| Personal Imformation | NATIONALITY DATE OF BIRTH SEX MOBILE EMAIL ADDRESS

Japan July 12, 1983 (35 years old) Male +852 9842 8278(HK) Satoshi.Yamada12@gmail.com Flat G/42F, Block 1, La Cite Noble, Tseung Kwan O, SAR HONG KONG 49, Mawatari 2974, Hitachinaka-shi, Ibaraki-pref, JAPAN

PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR

May 2014 to Present (4 years and 7 months) Senior Architectural Designer Atkins China Ltd *1 / SAR HONG KONG Architecture Firm November 2013 to May 2014 (7 months) Design Architect B+H Archtect / SAR HONG KONG Architecture Firm January 2011 to September 2013 (2.8years) 1.5 year as Project Architect, 1 year as Cheif Architect Beijing Matsubara and Architects *2 / Beijing, PR CHINA Architecture Studio / Office June 2010 to January 2011 (8 monthes) Internship as Design Architect N+B Architectes *3 / Montpellier, FRANCE Architecture Studio / Office April 2008 to March 2010 Part-time Draftman Mitsubishi Jisho Sekkei Inc. / Sendai, JAPAN Architecture Firm

| Education and Training | PERIOD TYPE OF DIPLOMA NAME AND TYPE OF ORGANIZATION PROVIDING EDUCATION AND TRAINING

PERIOD TYPE OF DIPLOMA NAME AND TYPE OF ORGANIZATION PROVIDING EDUCATION AND TRAINING

April 2008 to March 2010 Master Tohoku University, Graduate School of Engineering, Department of Architecture and Building Science, Archtecture and Urban Design, Architecture Design Lab. (JAPAN)

April 2004 to March 2008 Bachelor Tohoku University, Graduate School of Engineering, Department of Architecture and Building Science, Archtecture and Urban Design, Architecture Design Lab. (JAPAN)

3


| Skills and Competence | MOTHER TONGUE ENGLISH reading writing verval

CHINESE (MANDARIN)

reading writing verval

TECHNICAL SKILLS

Japanese Fluent good good good

Basic basic good basic

ArchiCAD, Auto CAD, Vectorworks, Sketch Up, Form Z, V-ray, Artlantis, Podium, Adobe Illustrator, Photoshop, Indesign, Microsoft Office, Rhinoceros(basic), Cinema 4D(basic)

_

*1 *2 *3

4

| | |

WS Atkins is acquired by SNC-Lavalin. Beijing Matsubara and Architect moved to Tokyo, and change their name into “ Tokyo Matsubara and Architects ”. N+B Architectes changed their name into “ NBJ Architectes”


01 | Resume |

-

|

-

|

| Axonometric Diagram of “Wooden Theatre Project in Nagano”(2008) |

5


6


02 | Project |

02 |

-

|

-

|

Project

-------------------------------------------------------------

010

project: Implementation

BMW Pilot Implementation Project 012 | BIC Wholesale Store in Shanghai _

011 |

020

project: Conceptual Design

IHG-Holiday Inn Standard Design Integrated Waste Management Facilities 023 | North Star Changsha Delta Plot A3 Nanjing Zijing Hi-Park Urban Competition _ 021 |

022 |

024 |

030

Project: Lead Consulting 031 |

Marina Bay Sands Casino Mass Gaming Floor & Nest _

040

Project: Competition 041 | 042 |

Fez, Inside Out

Wooden-Archi Hall _

050

Project: Diploma At University 051 |

High Rise University in Ochanomizu _

060

Project: Art Installation+ 061 | 062 |

U CHI WA

Book Cafe “PLAT� _

7


_02. Project / 011. Conceptual Design / Interior and Exteior Schematic Design Project for BMW

011_

BMW Pilot Implementation Project

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

| Description |

2011 January - 2012 August Design, Supervising at the Construction Site, Car Showroom Beijing Shanghai Hangzhou - / 5,600 m² / 5,500 m² / 5,100 m² Beijing, Shanghai, Hangzhou, PR CHINA Project and Cheif Architect / All the Phase of Project

BMW have advanced into Chinese market since 2008 with their standard design which head office in Germany has. However it doesn’t match with the site that is provided by Chinese dealer, and the showroom gets many idle spaces because of the largeness of the site. So BMW China had looked for the foreign office which knows well about the design for Chinese market, and been in contacted with us, then our collaboration started. Until now, apart from that design work, we designed three showrooms which was alreaady built in Beijing, Shanghai and Hangzhou. And also another conceptual work for redeveloping part of existing showrooms. | The Exisiting BMW Car Showroom in China |

8

| Site for Beijing Dealership |


| Beijing Pilot Inplementation Project |

02 | Project | 011. Implementation | BMW |

Following the success of the redeveloping BMW standard design project, BMA had got appointed to design interior and exterior of a new dealership in Beijing.

Concept is “Dynamics of Automobile”. During the process, it leads to a conventional fundamental problem: “to push the brand image to maximize the possibility of design”: ultimately, it can be paraphrased as to harmonize the conflicting ideas as ‘order and freedom’ or ‘unity and diversity’. It is an inevitable challenge common to both architectural design and branding strategy.

| Waiting Area | This space is for the customer who waiting for the check thier car at Car workishop.

| Design Area and Function | | Aftersale Car Workshop | The cosultation and workshop space for the customer who got trouble on thier BMW.

| Branding Space | Not only new BMW products but also their brand image, cocept and future technology are exhibited at this space.

| Car Hand Out Space | After the all contract work, finally the customer leave here with BMW.

| Car Showroom | The space for displaying BMW.

| Customer Lounge | This consultation space.

| 1F Plan[1:1000] | Design Area

| VIP Area | Waiting space for VIP.

| Car Showroom at 2F | The space for displaying BMW and premium second hand BMW.

| 2F Plan[1:1000] | Design Area

9


| Exterior Façade with “Cloud” Louver | The main facade is designed to convey the brand image in the motif of cloud. On the 80-meter-long curtain wall, the aluminum louvers are set up at the angles of various degrees, which gradually change its appearance as visitors approach.

| Concept of Louver Façade |

| Elevation of Louver Façade |

Part A

| Elevation | Part B

| Detail plan[1/20] | | Detail Section[1/20] |

| Part A - Elevation[1/150] |

10

| Part A - Section[1/150] |

| Part B - Section[1/40] |

| Sample and Construction Photo |


02 | Project | 011. Implementation | BMW |

The panels of different transparency and reflectivity not only function as a partition, but also can be used for advertisement. In addition to the grid lighting on the ceiling, they give the space a futuristic atmosphere for exhibiting brand vision.

Wire System Wall [typeA]

Wire System Wall [typeB]

Wire System Wall [typeA] Wire System Wall [typeB]

Adjacent to the showroom, there is “Branding Space� which is surrounded by the panels of three materials: acrylic, stainless steel mirror and half-mirror, all suspended by the steel cable system.

Wire System Wall [typeB]

| Branding Space with Wire System Wall |

Wire System Wall [typeA] Wire System Wall [typeB]

Wire System Wall [typeA]

Wire System Wall [typeB]

| Branding Space Plan[1:200] | | Wire System Wall [typeA] Elevation[1/50] |

| Wire System Wall [typeA] |

| Fixture of Top |

| Fixture of Pannels |

| Fixture of Bottom |

| Wire System Wall [typeB] Elevation[1/50] |

| Wire System Wall [typeB] |

| Fixture of Top |

| Fixture of Bottom |

11


| Car Hand-Out Space with Mirrors | Next to “Branding Space”, there is “Car HandOut Space” where customers receive a car after purchase. The tilted panels are suspended from the ceiling by the same steel cable system as in “Branding space”. The reflection of the panels creates a dynamic sense to the space.

| BB’ Detail Ceiling Section[1:50] |

B

A

| Car Hand-Out Space Plan[1:300] | | Fixtures |

A’

B’

| Car Hand-Out Space Reflected Ceiling Plan[1:300] |

| AA’ Section[1:300] |

12

| BB’ Section[1:300] |

| Reflected Ceiling Plan Detail[1:50] |


| Aftersale Car Workshop with Tube Lighting Wall and Ceiling |

02 | Project | 011. Implementation | BMW |

Wall A

| Wall A Elevation[1:150] |

| Aftersale Car Workshop Plan[1:300] |

| Aftersale Car Workshop Reflected Ceiling Plan[1:300] |

| Reflected Ceiling Plan Detail[1:50] |

| Wall A Elevation Detail[1:10] |

| Wall A Section Detail[1:10] |

| Ceiling Detail Section[1:10] |

13


| Shanghai Pilot Inplementation Project | This is the third project of our collaboration. The site that is located in residential area which is rather northwest than CBD in Shanghai.

To the exterior facade, office space and showroom, we applied the standard design that we designed for BMW 4S dealership store in China by collaboration with BMW China in last two projects. On the other hand, we tried to figure out new background design that strengthen the appearance of their concept “Efficient Dynamics� on each car, and updated the space.

14


02 | Project | 011. Implementation | BMW |

| Branding Centre Project |

During our collaboration, BMW has asked us to join some design work for their stores which is not pilot project but more like conceptual design work. For this project, they would like us to design 700m² rental car showrooms with little branding space. The customers come to this store and reserve their car and depart from this shop with it.

| Idea 01 / Chinese Dragon |

We suggested that the BMW stores should be localized bit more to China, then we got the concept from drangon. We put the series of walls to the store everywhere, at some point it can be pushed out from walls and have space for counter or barcorner. And also that walls made from mirrored to reflect the customer with the cars.

| Idea 02 / Circuit |

Our another idea is the circuit. Usual showroom must be flat and show the car usual, but this “Circuit” show the car with different angles and then if the customer get in the car, can get the view of circuit like real racing competitons.

15


_02. Project / 012. Conceptual Design: Interior Schematic Design Project for BIC Servise

012_

BIC Wholesale Store in Shanghai

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

| Description |

2011 November - 2012 June Design, Supervising at the Construction Site Retail Shop (for Stationary) 40 m² Shanghai, PR CHINA Project Manager / All the Phase of Project

This is the schematic design project for BiC Service that is most famous brand fot stationary and lighter all over the world, and it’s the first store in Asia area for them. The site is located in the Chinese typical wholesale market building in Shanghai. And the building is filled with stationary wholesale stores which are almost similar size. Thereby we would think how to design the eye-catching façade and how to leave the space for tons of wholesale stocks as the key of the design for this project.

| Site |

| Site |

16


02 | Project | 012. Implementation | BIC |

| Main Concept of the Layout |

At first we put the shelves on both side walls for the enough storage space, and install tilted orange walls between each shelves for avoiding the view from the entrance. Radial arrangement of shelves emphasizes the depth of the space, and makes customers focus on the orange walls that exhibit BiC products. The wall in the end was covered with mirror and reducing the oppressive feeling of the confined store space.

| Diagram of the Layout | | Sectionn[1:100] |

1_Put enough shelf for wholesale stocks.

2_Tilt each shelves for avoiding the view from entrance.

| Plan[1:100] | 3_Radial arrangement of shelves emphasizes the depth of the space.

| View from the entrance |

Once coming into the store, the shelves are not seen from the entrance since they are behind of the tilted orange walls. And the displayed products on each wall will catch eye of customers.

17


| Signboard of the Entrance |

Signboard of the entrance is one of most important factors for the impression of the store.

| Cloud Shaped Lighting and Table |

In the centre of this store, there is a cloud-shaped counter which has different levels.

We designed it with a lots of colors and especialy orange since the impression of BiC brand and thier products, and put the logo that have lighting behind also together with.

| Axonometric View |

The same shape hanged ceiling is illuminated with 7 colored acrylic tubes.

| Axonometric View |

| Elevation[1:80] |

| Detail[1:10] |

| Logo[1:20] |

| Detail[1:5] |

| Section A[1:10] |

18

| Section C[1:10] |

| Section D[1:10] |

| Making Process |

| Detail[1:1] |


| Signboard of the Entrance |

02 | Project | 012. Implementation | BIC | Selves behind each orange tilted walls must have enough space for stokes of wholesale. So we design it from top to bottom, the exhibition space at the middle of them with lighting from top, then put the mirror at the deepest wall to reflect the space. | D2-01 |

| D2-05 |

[1/15]

[1/15]

| D2-02 |

| D2-06 |

[1/15]

[1/15]

| D2-03 |

| D2-07 |

[1/15]

[1/15]

| D2-04 |

| D2-08 |

[1/15]

[1/15]

| Section[1:50] |

19


| Module Shelves for the Cycle of Products |

| 4 Patterns of Shelves |

| Shelf 1 |

To meet up with variety kinds and colors of BiC products and the cycle of turnover the products, we suggested 4 types of moduled furnitures which are easy to change to respond it on the tilted orange walls.

| Axonometric View |

| Shelf 2 |

| Shelf 3 |

| Shelf 2_BB’ Section[1/10] |

| Shelf 2_Elevation[1/10] |

| Shelf 2_AA’ Section[1/10] |

20

| Shelf 4 |


02 | Project | 012. Implementation | BIC |

21


_02. Project / 021. Conceptual Design: Standard Design Project for Holiday Inn&Exp. / IHG

021_

IHG Holiday Inn Standard Design Project

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

| Description |

2013 November - 2014 March Concept and Schematic Design for Asian Market Hotel 12,000 m² x3 South East Asia Design Architect

We designed the following proposals while keeping in mind the meaning of the Holiday Inn brand, its position within the overall strategy of IHG, and the shifting trends in hospitality aimed towards affordable but true human experiences. The real true luxury.

| Bangkok |

| Oxford |

| Site: “city” and “brownfield” |

Since our site were “South Asia“, we expected 2 different senarios which is: _city site: High land premium, especially at grade level. Privacy and street noise can be concern. _brownfield: Relatively lower land premium and bigger site area. Potential open to the pleasant lanscaped surrounding environment. | Australia |

22


02 | Project | 021. Conceptual Design | IHG |

| Floor Plate Efficiency Analysis |

After consideration during initial stages the Straight and Offset slab configurations were Guestrooms chosen as the typical guestrooms layouts for Guestrooms further development. The selection process considered plans based on: - high efficiency

Admin. Office Admin. Office Pool Deck Pool Deck Cafe/Lounge

| Concept “plug and play” |

Cafe/Lounge

Hotels are actually a series of standardized modules that needs to be carefully curated to offer the best guest experiences and optimized. We developped the project through design principles that connects the MODULES along a PLUG and PLAY concept. Offering maximum flexibility to respond to a wide array of site or ownership conditions. Also under the HI or HI Ex umbrella we seek to render the various ameniteis as VENUES that adds to the surrounding catchment area of the site and can be expanded, added or substracted per projects.

- adaptability to various site conditions Gym/Spa

- potential for future expansions

Gym/Spa - stuctural simplicity to integrate a carpark

All day Dining+Terrace Meeting Area All day Dining+Terrace Lobby Meeting Area Porte Chochere Lobby Porte Chochere

Iconic Box: Guestrooms Iconic Box: Guestrooms

Guest Rooms Guest Rooms

Pool Deck Guestrooms

Pool Deck Cafe/Lounge Cafe/Lounge

Admin. Office

Gym/Spa

Pool Deck

Potential Gym/Spa Potential Gym/Spa Meeting Area All day Dining+Terrace Meeting Area Lobby All dayChochere Dining+Terrace Porte Lobby

| Holiday Inn inPorte brownfield site | Chochere

Iconic Box: Guestrooms

All day Dining+Terrace

Iconic Box: Guestrooms

Meeting Area Lobby Porte Chochere All day dining

Cafe/Lounge

| Holiday Inn in city site |

Cafe/Lounge All day dining Cafe/Lounge

Iconic Box: Guestrooms

| Façade Strategy |

Guestrooms Guestrooms Gym Meeting Area Lobby Gym Porte Chochere Meeting Area Lobby Porte Chochere

| Holiday Inn Express in brownfield site |

On the Southern Facade the Horizontal and Vertical Mullions are extracted from the façade to become efficient Brise-Soleil to shade this long elevation. These elements are designed to be attractive from the street level while from the inside to creat a sense of enclosure and peace by establishing a distance between the exterior and interior. Now we can see thickness. Potential Gym/Spa

Guest Rooms

Pool Deck

Meeting Area All day Dining+Terrace Cafe/Lounge

Lobby Porte Chochere

| Southern Façade |

| Detail Section | Iconic Box: Guestrooms

On the Northern Facade, there are no vertical elements for sun control to interefere with the view, but the horizontals are kept to minimize glare and cross-views into the rooms. Guestrooms All day dining Gym Meeting Area Lobby Porte Chochere

Cafe/Lounge

| Northern Façade |

| Detail Section |

23


| Holiday Inn in brownfield site |

| Ground Floor Plan |

| Typical Guestroom Floor Plan |

| Holiday Inn in city site Holiday Inn Express in brownfield site | | Holiday Inn in city site |

| Typical Guestroom Floor Plan |

| Holiday Inn Express in brownfield site |

| Typical Guestroom Floor Plan |

24


Facility and Area Design Program IHG REQUIREMENT Guestrooms Function Space Other

| Accomodation Schedules | Gross Floor Area by Sections

Notes:

Total Number of Rooms Meeting Room[sq/m] Gym[sq/m] Guest DIY Laundry[sq/m]

ACTUAL NUMBER

150 50 40 30 IHG REQUIREMENT G.F.A.(%)

150 56 45 30 ACTUAL G.F.A.(%)

3475(69.3%) 3525(68.9%) *1 *2 *3 *1 *2 58 (1.2%) 75 (1.5%) Food and Beverage 50 (1.0%) 56 (1.1%) Function Rooms 40 (0.8%) 45 (0.9%) Indoor Recreational 518(10.3%) 532(10.3%) Public Areas Administration 62 (1.2%) 62 (1.2%) Back of the House 310 (6.2%) 323 (6.3%) Plantrooms 500 (10%) 500 (9.8%) Total G.F.A. 5013 (100%) 5118 (100%) *1 Please note vertical shaft(elevators, stairs, MEP shaft) space has not been included in IHG Requirement or in B+H data Chart (Stairs and elevators=44m2/floor, for 5 floors = 220m2, not added to G.F.A.) *2 Refer to highlighted cell for a break down diffrence of G.F.A. *3 Junior Suite and Exective Suite square footage are not included. Guestrooms

IHG REQUIREMENT

1 Design Parameters

Number of KEYS 2 Total Gross Floor Area[m2] Gross Area/KEY Guestroom Unit Area Number of Guestroom Floor Staff/Room Ratio Total Staff Guest Lifts Service Lifts

4

IHG REQUIREMENT Number of KEYS Total Gross Floor Area[m2] Gross Area/KEY Guestroom Unit Area Number of Guestroom Floor Staff/Room Ratio Total Staff Guest Lifts Service Lifts

Design Parameters

150 5118 34 19.5 5 0.8 160 2 1

5

7

|

ACTUAL SIZE

150 5013 33 19.5 5 0.8 160 2 1

150 5118 34 19.5 5 0.8 160 2 1

| Green Design Strategy |

ACTUAL SIZE

150 5013 33 19.5 5 0.8 3 160 2 1

6

8

Notes:

40 (0.8%) 45 (0.9%) Indoor Recreational 518(10.3%) 532(10.3%) Public Areas Administration 62 (1.2%) 62 (1.2%) Back of the House 310 (6.2%) 323 (6.3%) Plantrooms 500 (10%) 500 (9.8%) Total G.F.A. 5013 (100%) 5118 (100%) *1 Please note vertical shaft(elevators, stairs, MEP shaft) space has not been included Project | 021. Conceptual Design | IHG in IHG Requirement or in02 B+H|data Chart (Stairs and elevators=44m2/floor, for 5 floors = 220m2, not added to G.F.A.) *2 Refer to highlighted cell for a break down diffrence of G.F.A. *3 Junior Suite and Exective Suite square footage are not included.

A sample of preliminary green design strategies.

1

Solar Orientation to minimize solar gains

2

Rainwater harvesting minimize stormwater runoofs

3

Building integrated Photo Voltaics / Heat Pumps and other renewable energy strategies

4

‘‘Cool Roof’’ - low albedo roof material and low pitch roof efficiently drain/harvest water

5

Brise-soleil on South Facade reduce solar gain

6

Grey Water is used for WC, Low flow fixtures

7

Fresh air ventilation monitors for public amenities

8

Project decks and canopies shade the Podium and offer covered al fresco dining

9

On-site water treatment and water harvesting

10 Local plants are use for landscape and roof gardens

12

11 Pervious Low albedo paving reduce the heat island

effect and recharge the aquifer reducing stormwater runoffs

12 Shading deciduous trees and plants on-site and on

10

decks reduce the cooling demand on the podium floors, promore bio-diversity and contribute to the greening of the city.

11 9

| Architectural Signature for Holiday Inn |

For the next generation of Holiday inn and Holiday Inn Express Hotels. We propose a simple recognizable architectural language for new construction or adapted on retrofits. The branded architecture seek to enhance the visual presence of the brand in the skyline while promoting green design strategies.

Backlit Metal Mesh Colored Perforated Aluminum Louvers

Aluminum Powder Coated Brise-Soleils

Aluminum Composite Panels Rainscreen Cladding

Window Facade System Low-E Double Glazing

Patio Decks with Integrated Planters Trespa Panels

Porte Cochere w/ Integrated Logo

25


_02. Project / 022. Conceptual Design / Hong Kong Government Bidding Project

022_

Integrated Waste Management Facilities

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

2016 November - 2017 May Design/Bidding Competition Industrial Building - Waste Treatment Plant/Incinerator - m² Shek Kwu Chau, HONG KONG Design Architect

SEDGE GROUP IWMF DESIGN PLAN PRESENTATION

| Background |

The project was a tender submission for waste-to-energy | JV/Team Organization | facilities on an artificial island southwest of Shek Kwu | Operation Chau. Hong Kong’s three strategic landfill sites are fast approaching capacity. With the proposed facilities, the Environmental Protection Department aims to substantially reduce landfill and sustainably recover useful resources.

|

| Design Architect |

The goal of the proejct was to provide an architectural solution responds to the project brief in providing a clean, green and human environment to the otherwise industrial processes. | Concept / Strategy |

| Site: Reclaimed Land & Breakwater |

COLOUR HARMONY WITH SURROUNDING ENVIRONMENT

RECYCLABLE

UNIFIED DESIGN

HIGH PERFORMANCE GREEN BUILDINGS

VIEWS

FRUGAL

REDUCE VISUAL MASS BLENDING IN

26

GREEN

INNOVATIVE

DURABLE

NATIVE SPECIES

RENEWABLES

BEAM PLUS GOLD

VERTICAL GREENING MAXIMISE LANDSCAPE PERMEABLE MASSING

ENERGY EFFICIENT COMPACT SITE PLANNING

CLEAN

ROOFTOP GREENING

ENERGY SAVING DESIGN

MODULAR

SIMPLE LEAN

RELATE TO GEOGRAPHIC CHARACTER OF SITE

BEAM PLUS HUMAN SCALE BLENDED WITH ENVIRONMENT

| Lead Contractor |


02 | Project | 022. Conceptual Design | IWMF |

| Faceade Concept: Sampling Environment |

Bunker Wall Masonic Pattern

| Site Masterplan |

2

1 3 10

4

4

4

5

5

5

1

ADMINISTRATION BUILDING

2

BERTH AND TILTER HALLS

3

MECHANICAL TREATMENT PLANT

4

INCINERATOR AND BOILER MODULES

5

FLUE GAS TREATMENT PLANT

6

SUBSTATION

7

AIR COOLED CONDENSERS

8

STEAM TURBINE GENERATORS

9

DESAL / DEMIN / WASTEWATER TREATMENT PLANT

6

7

8

7

7

8

8

9 10

10 FUTURE DEVELOPMENT SPACE - 5,000m²

| Facade Strategy for Bunker Building: Architecure Wall Panel System | | Detail of Architecture Wall Panel |

| Bunker Module |

| Subframe |

27


IWMF Screening to plant areas

IWMF Screening to plant areas

| Facade Strategy for FGTP Building: Aluminium Mesh Panel | | Aluminium Mesh Panel |

Larger units may be affixed to equipment blocks, or to support structure. Larger units may be affixed to equipment Image shows an assumed 4.5m tall typical

blocks, or to support structure. IWMF module, fixed at 2.25 centres, onto windposts Screening to plant Image shows an assumed 4.5m tall typical at 10mareas centres

module, fixed at 2.25 centres, onto windposts at 10m centres

Aluminium capping pieces and stiffeners as required to optimize weight and rigidity

Panel size and setout

Aluminium extrusions with integrated vertical fixing rail.

Curved, perforated aluminium panels

Reverse View Fixing setout

| Facade Strategy for MT Plant and Other: Precast Concrete Panel | | Precast Concrete Panel |

Insitu Topping Mesh Rebar Precast Plank Precast Wall Panel Precast Main Beam Precast Column

| Detail |

28


Integrated Waste Management Facilities Schedule of Accommodation ‐ Admin Building (15) Rev B0

17 March 2017

| Admin Building |

| Schedule of Required Accommodation | Proposed Level Category/Type RF (+31.6m PD)

L E V E L 4 RF (+26.0m PD)

User

Exterior

Communal

Ancillary‐Open Ancillary‐Cellular Ancillary‐Open

Public MEP Public

RDS Nos. ‐

15‐01‐04 15‐02‐04 15‐03‐04

Room/Space/Description

Classification

Green Roof

Lift Lobby 1 Bridge AHU Visitor Route Lobby

‐ 0.0

‐ 0.0

0.0

0.0

Provided (ATKINS)

0.0

0.0 0.0

‐ ‐ ‐

11.2 106.8 26.1

0.0

144.1 10.7 16.1 4.5 15.5 10.6 5.4 4.8 10.0 13.0 1.7 5.0 9.0 8.0 61.7 6.0 2.4 45.0 45.0 8.2 54.0 20.7 6.9 17.7

Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Open Ancillary‐Open Ancillary‐Open Office‐Open Office‐Open Office‐Open Office‐Open Office‐Open

Communal Communal Communal Communal Government Government Government Government Government MEP MEP MEP MEP Communal Communal Government Government Government Government Government Government Government Government

15‐01‐03 15‐02‐03 15‐03‐03 15‐04‐03 15‐06‐03 15‐07‐03 15‐08‐03 15‐09‐03 15‐10‐03 15‐11‐03 15‐12‐03 15‐13‐03 15‐14‐03 15‐15‐03 15‐16‐03 15‐17‐03 15‐18‐03 15‐19‐03 15‐20‐03 15‐21‐03 15‐22‐03 15‐23‐03 15‐24‐03

Lift Lobby 1 Male Toilet Disabled Toilet Female Toilet EPD Changing Area EPD Locker area EPD Shower Compartment LAN server room Data server and monitoring room FM 200 CRAC Room ELV Room ‐ 10 sqm=5x2 Electrical Room ‐ 10 sqm=5x2 Lift Lobby 2 Pantry Share‐used Printer Storage Operation and Equipment Storage Field Assistant (Fisheries)(AFCD) EPI (EPD) SEPI (EPD) CEPI (EPD) EPO (EPD)

4b‐Public information, etc. ‐ ‐ ‐ 4a‐Staff Rm 4a‐Staff Rm 4a‐Staff Rm 8‐Plant Rm, etc. 8‐Plant Rm, etc. 68‐Plant Rm, etc.

N/A

36.3

10.6 5.4 As Approp. 10.0 20.0 ‐

‐ ‐ 6.0 ‐ ‐ 1.5

8‐Plant Rm, etc. 8‐Plant Rm, etc. 4b‐Public information, etc. 6a‐Commercial Kitchen 4a‐Staff Rm 6c‐Storage 6c‐Storage 4a‐Staff Rm 4a‐Staff Rm 4a‐Staff Rm 4a‐Staff Rm 4a‐Staff Rm

6.0 2.4 45.0 45.0 8.2 54.0 20.7 6.9 15.4

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

‐ ‐ ‐ ‐ 10.6 5.4 6.0 10.0 20.0 1.5 ‐ 10.0 10.0 ‐ 6.0 2.4 45.0 45.0 8.2 54.0 20.7 6.9 15.4

249.6

63.8

277.1

381.9

Ancillary‐Open Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Open Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Open Ancillary‐Open Ancillary‐Open Ancillary‐Cellular Ancillary‐Cellular Ancillary‐Open Ancillary‐Open Ancillary‐Open Ancillary‐Open Ancillary‐Open

Communal Communal Communal Communal Communal Communal MEP MEP Communal Communal Communal Communal Communal Communal Communal Communal Communal Communal

15‐01‐02 15‐02‐02 15‐03‐02 15‐04‐02 15‐05‐02 15‐06‐02 15‐07‐02 15‐08‐02 15‐09‐02 15‐10‐02 15‐11‐02 15‐12‐02 15‐13‐02 15‐14‐02 15‐15‐02 15‐16‐02 15‐17‐02 15‐18‐02

Lift Lobby 1 MaleToilet Disabled Toilet Female Toilet Babycare Room General Office Furniture and Equipment ELV Room ‐ 10 sqm=5x2 (2 rooms for each floor) Electrical Room ‐ 10 sqm=5x2 (2 rooms for each floor) Lift Lobby 2 Work Station for Multi‐purpose Room Equipment Storage for Multi‐purpose Room Multi‐purpose Room Conference/Meeting Room (Suez additional area) File and General Storage Food Reserve Kitchen Storage Kitchen Canteen

4b‐Public information, etc. ‐ ‐ ‐ ‐ 6c‐Storage 8‐Plant Rm, etc. 8‐Plant Rm, etc. 4b‐Public information, etc. 5d‐Public Hall, etc. 5d‐Public Hall, etc. 5d‐Public Hall, etc. 4a‐Board Rm, etc. 6c‐Storage 6a‐Commercial Kitchen 6a‐Commercial Kitchen 6a‐Commercial Kitchen 4b‐Cafe, etc.

N/A

36.3

5.0 11.3

‐ ‐ 10.0 10.0

5.0 6.0 65.0 25.0 71.4 15.4 4.4 22.0 55.0

‐ ‐ ‐ 15.0 ‐ ‐ ‐ ‐ ‐

‐ 36.3 ‐ ‐ 5.0 11.3 10.0 10.0 ‐ 5.0 6.0 65.0 40.0 71.4 15.4 4.4 22.0 55.0

10.7 16.1 4.5 15.5 8.6 37.1 11.9 10.0 39.2 5.0 6.0 55.0 46.0 70.5 5.4 4.4 24.8 55.8

285.5

71.3

356.8

426.5

Sub‐total L E V E L 2 L2 (+17.0m PD)

NET AREA (sq.m) Operator Required (SEDGE) (TOTAL)

5d‐Public Hall, etc. 8‐Plant Rm, etc. 4b‐Public information, etc.

Sub‐total L E V E L 3 L3 (+21.5m PD)

Brief (EPD)

Sub‐total

10.0 10.0

MIN. DIMENSIONS (m) Clear Length Height2

Width ‐

Brief (EPD) ‐ 0

OCCUPANTS (Nos.) Operator Visitors (SEDGE) ‐ 0

| Admin Building Planning & Circulation | Maximum

Air Conditioned

‐ 0

0 0

N Sub‐total

‐ ‐ 50

Y Y Y

0

50

0

50

Sub‐total

‐ ‐

‐ ‐

3.0 3.0

‐ ‐

0 6

‐ ‐ ‐ ‐ ‐ ‐

3.0 ‐ 0.0 4.5 4.5 4.5

‐ ‐ ‐ ‐ ‐ ‐

‐ 6 1 2 ‐ ‐ ‐ ‐ ‐ ‐

‐ ‐

‐ ‐ ‐ ‐ ‐ ‐

‐ ‐ ‐ ‐ ‐ ‐

0 0 0 0 0 0

5.0 5.0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

2.0 2.0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

‐ ‐ ‐ ‐ ‐ ‐ ‐ 2 10 3 1 2

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

0 0 0 0 0 0 0 2 10 3 1 2

Y Y Y Y Y Y Y Y Y Y Y N N Y Y Y Y Y Y Y Y Y Y

9

0

27

Sub‐total

3.0

6

‐ ‐ 5.0 5.0

‐ ‐ 2.0 2.0

3.0 3.0 3.0 3.0

‐ ‐ ‐ ‐

1 ‐ ‐ ‐

3 0 0 0

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

142

‐ ‐ 50 ‐ ‐ ‐ ‐ ‐ ‐

0 0 50 0 0 0 0 0 142

Y Y Y Y Y Y N N Y Y Y Y Y Y Y Y Y Y

153

51

204

Sub‐total

18

0

‐ 6 1 2 2 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

02 | Project | 022. Conceptual Design | IWMF |

| Ground Floor Plan | 1 of 3

ATKINS

29


_02. Project / 02. Conceptual Design / Mixed-Used High-Rise and Conference Centre Competition

023_

North Star Changsha Delta Plot A3

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

| Description |

2014 March to 2015 November Competition: Concept Design to Detail Design/Tender Documentation Conference Centre, Office, Hotel, Service Appartment and Retail 155,000 m² Changsha, PR CHINA Design Architect

The Changsha Centre is a competition winning design for an urban centerpiece for the Northstar Delta district in Changsha. The 400,000sqm development consists of grand civic plaza bounded on three sides by a 400m super high-rise office tower and a secondary office tower, retail, a 20,000sqm conference centre, a high five star hotel tower and a serviced apartment tower.

| Plot A2 |

| Plot A3 |

| Plot A3: Plan |

30


02 | Project | 023. Conceptual Design | NSC |

| Conference Centre: Facade Studies |

| Conference Centre |

北辰·长沙中心

NORTH STAR • CHANGSHA CENTRE

36

会议中心规划 Conference Centre Planning

超大型会议厅灵活性 Super Large Multifunction Hall Flexibility 会议厅所有的座椅均可拆除,所以会议厅可以完全转化为一个全开敞大空间,全高的可移动隔声防火分隔板可用于将空间细分,成为不同的用途,会议厅净高10米。

| Plan 1F |

The hall is planned for all seating to be either retractable or movable so the hall can be completely clear of seating. Full height movable acoustic and fire rated partitions are used to sub-divide the space into various configurations. A 10 metre clear height is provided for the hall.

| Plan 2F |

| Plan 3F |

北辰·长沙中心

NORTH STAR • CHANGSHA CENTRE

37

会议中心规划 Conference Centre Planning

超大型会议厅灵活性 Super Large Multifunction Hall Flexibility

3500个座位的会议/剧院/演讲厅 面积4000平方米 3500no. seat conference/theatre/lecture venue 4000m2 Area

1000个座位的会议/剧院/演讲厅 1000no. seat conference/theatre/lecture venue

2个1000个座位的会议/剧院/演讲厅 2no. x 1000no. seat conference/theatre/lecture venue

可伸缩座位 Retractable Seating 可摆放座位 Movable Seating

6个667平方米展览/宴会/接待区 6no. x 667m2 Exhibition/ Banquet/ Reception Venues

| Section |

2个2000平方米展览厅 2no. x 2000m2 Exhibition Hall

1个4000平方米展览厅 1no. x 4000m2 Exhibition Hall

各108个国际标准展览摊位 108. no. international standard exhibitions booths per hall

234个国际标准展览摊位 234 no. international standard exhibition booths

| Super Multifunction Room |

| Conference Centre: Roof Canopy Studies |

| Conference Centre: Night View |

北辰·长沙中心

NORTH STAR • CHANGSHA CENTRE

北辰·长沙中心

NORTH STAR • CHANGSHA CENTRE

32

32

会议中心概念 Conference Centre Concept 会议中心概念 Conference Centre Concept

阳光直射 = 热 Direct Sunlight = Hot

大型的屋顶集中所有会议中心的组件以及屏蔽覆盖的空间。18米 x18米的屋顶模块是朝北的天窗,将日照间接带到平台、宴会前厅 及会议厅空间。屋顶大型的屋檐保护宴会前厅免受日照,而玻璃 窗则使用透明玻璃。 大型的屋顶集中所有会议中心的组件以及屏蔽覆盖的空间。18米 屋顶大型的表面面积极适宜雨水收集,收集的雨水可用作景观灌 x18米的屋顶模块是朝北的天窗,将日照间接带到平台、宴会前厅 溉或中水供应。 及会议厅空间。屋顶大型的屋檐保护宴会前厅免受日照,而玻璃 窗则使用透明玻璃。 屋顶大型的表面面积极适宜雨水收集,收集的雨水可用作景观灌 The roof is designed to unify all the conference centre elements 溉或中水供应。 as well as provide shelter for the spaces below. The 18m x 18m roof modules each form a skylight that is orientated to the north to bring indirect daylight down to the terrace, pre-function and The roof is designed to unify all the conference centre elements hall spaces below. The large eaves of the roof protect the preas well as provide shelter for the spaces below. The 18m x 18m function spaces from the sun and allow the glass walls to be very roof modules each form a skylight that is orientated to the north clear. to bring indirect daylight down to the terrace, pre-function and hall spaces below.area The of large theideal roof for protect the preThe large surface the eaves roof is of also rainwater function the sun and allow the glassirrigation walls to be collectionspaces which from can then be used for landscape or very clear. greywater supply. The large surface area of the roof is also ideal for rainwater collection which can then be used for landscape irrigation or greywater supply.

| North Facing Roof Lights | 阳光直射 = 热 Direct Sunlight = Hot

| Construction Site Photo |

间接的日光 = 凉快 Indirect Daylight = Cool 间接的日光 = 凉快 Indirect Daylight = Cool

朝北屋顶采光 North Facing Roof lights 朝北屋顶采光 North Facing Roof lights

| Rainwater Collection |

| Canopy Detail |

雨水收集 Rainwater Collection 雨水收集 Rainwater Collection

31


_02. Project / 02. Conceptual Design / Urban & Architecture Design Competition for R&D Office

024_

Nanjing Zijing Hi-Park Urban Competition

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

2014 September Site Masterplan/Architecture Concept Design Competition Office Institute and Education 800,000 m² Nanjing, PR CHINA Design Architect

隆 京 南 鑫 HI 渝 -北 PARK 二设 村计 太征 阳集 谷 广 场 项 目 Loncin HI PARK Yubei COMPETITION Er Chun Taiyang • NANJING Plaza Development Project

| Description |

| Concept |

Atkins proposed a high-tech R&D hub centerpiece for the Zijin district with a GFA of 800,000sqm. The project consisted of office, retail and R&D office buildings arranged in a radial form encircling the large central water body.

| Site Masterplan |

8

8

8

6

1 8

8

8

8

8

2

6

1

8 8

7 3

8

2

8

8

8

7

4

3

5

| Existing Site Condition |

8

8

8 8

4

8 8

5

8

8 8 8

8 8 8

8

8

8

8 8

8 8

1. 地标楼 Iconic Tower 2. 塔楼一 Tower 1 3. 塔楼二 Tower 2 4. 塔楼三 Tower 3 5. 商业裙楼 Retail Podium 6. 会展裙楼 Convention Podium

8 8

8

8. 研发楼 R&D Office

8

8 8

8

7. 销售办事处/会所 Sales Office /Clubhouse

8

1. 地标楼 Iconic Tower 2. 塔楼一 Tower 1 3. 塔楼二 Tower 2 4. 塔楼三 Tower 3 5. 商业裙楼 Retail Podium 6. 会展裙楼 Convention Podium 7. 销售办事处/会所 Sales Office /Clubhouse 8. 研发楼 R&D Office

南 京 HI - PARK 设 计 征 集 HI - PARK COMPETITION • NANJING

32 南 京 HI - PARK 设 计 征 集 HI - PARK COMPETITION • NANJING

8 8

8 8


| Concept: Iconic High-Rise |

| Concept: Loop Podium |

02 | Project | 024. Conceptual Design | NZHi | | Iconic High-Rise: Moon-shaped Tower |

| Typical Floor Plan |

| Loop Podium |

南 京 HI - PARK 设 计 征 集 HI - PARK COMPETITION • NANJING

| Section |

| Concept: Slide |

| R&D Building Plan |

| Louvre Facade |

南 京 HI - PARK 设 计 征 集 HI - PARK COMPETITION • NANJING

33


_02. Project / 03. Lead Consulting / MBS Casino Mass Gaming Floor and F&B Refurbishment / A&A Work

031_

Marina Bay Sands

------------------------------------------------------------| Period | | Task |

| Type / Program | | Design Area | | Site Location | | Roll / Period |

2015 September - Present Lead Consultant (Concept Design to Construction Admin - A&A Work) Casino

-

m²

Bayfront Avenue, SINGAPORE Design Architect

Marina Bay Sands Singapore: 16,000 m² massing gaming area and F+B outlets to be re designed and

| Description |

refurbished as part of the MBS upgrade programme. Atkins got appointed to look after the design from concept stage to tender, the shopdrawing reviewing, the construction admin as a lead consultant, who needs to organize and coordinate the design with interior designer, MEP consultant, audio-visual consultant, kitchen consultant, contractor and QP for statutory submission. | Project Organization Chart | Client

Marina Bay Sands Design Direction MEP Direction Operation Surveillance

Lead Consultant

Atkins

Qualified Person

Aedas Singapore Fire Engineering

Arup Singapore Contractor

Sunray Wood Craft Interior Designer

Peter Silling & Associates MEP Consultant

Aurecon Singapore Kitchen Consultant

Food Service Consultants Singapore | Current B2M Mass Gaming Floor |

34

Audio Visual Consultant

Sennen


PG 7

| B2M MASS GAMING FLOOR & NEST(F&B) |

9000

9000

EX IT

9000

9000

EXIT

9000

9000 9000

9000

9000

IT EX

EXIT

9000

9000

9000

EXIT 9000

9000 9000

9000

9000

9000

9000

9000

EX

IT

9000

IT EX

9000

EXIT

EXIT

IT EX EXIT

EXIT

EXIT

9000

9000 9000

9000

EXIT EXIT

EXIT

EXIT

9000

EXIT

EXIT

9000

9000

9000

EXIT

DEV_096A 1

5000

4000

Pilot Date: CAS

JULY22015

9000

4000

2418

11000

3 1:300 @ A1

BFA

21

BFA

6

23

9000

9000

CAS

7

CAS

9000

+100.00

8

9

9000

9000

CAS

10

D

SVC

+98.10

9000 CAS

CAS

11

9000

9000

CAS

12

CAS

13

9000

9000

CAS

14

CAS

15

16

C

9000 CAS

P

CAS

17

18

D

SVC

B

11000

11000

This drawing is toBFA be read in conjunction with all related drawings. Do not scale from this drawing. BFA BFA All dimensions must 24 be checked and verified on site before 25 commencing any work or producing 26 shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.

BFA

22

9000 CAS

Rev.#

11000ATK_MBSDEV_096A_DD_TC_CAS_0179_B2M 11000 11000

11000

SVC

4000 CAS

For4 Construction 5

Drawing No:

RETAIL ENTRANCE NORTH HIGH LIMIT AREA CAGE COUNTER

5000

Issue Status: CAS CAS

Scale:

CAS

9000

CAS

11000

BFA

11000

BFA

27

11000

BFA

28

11000

BFA

29

11000

BFA

30

BFA

31

11000 BFA

32

33

1

11000 BFA

34

SVC

B

BFA

T A s T

35

9000

EXIT

9000 9000

EXIT

9000

9000 9000 9000

SC

EXIT

IT EX IT EX IT

EXIT

9000

7350

PLAN B2M

9000

FA

EX

EXIT

9000 9000 9000

+100.27

MASS GAMING -

9000

EXIT

EXIT

EXIT

User name: Yamada, Satoshi Date:26 January 2018 16:16:28 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_0479_B2M

FA

EXIT

EXIT

ELEC T

EXI

ICE

9000

SC

210 AF 0 FL

GE CA IT EX

FE SC

210 AFF 0 L

SC

210 AFF 0 L

E-C E-C U .11 .1 P 2

EXIT

CA

GE EXIT

EXIT FA

L-C .13

SE RV PA IC NT E RY

210 AF 0 FL

9000 9000 9000 9000

9000

FA

OFFICE

EXIT

EXIT IT

EX

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

IT

EX

EXIT EXIT

EXIT

EXIT

EXIT

OFF

IT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

VP

EX

ICE

EXIT

IT

EX

OFF

EXIT

S

EXIT

S

S

HE-C.06

EXIT

S

9000

S

IT

S

S

9000

S

S

EX

S

EXIT

EXIT

S

EXIT

S

9000

EXIT

S

S

SHEC.27 EXIT -C.0 6

S

000

S

IL B1

S

S

S

TA

S

S S

S

S

S

P

D

PROPOSED GENERAL ARRANGEMENT Project No:

B BFA 20.1

E

SVC

Drawing Title

C

18

1

35

S

RE

S

S

S

TO

S

S

EXIT

S

S

C

SVC

SVC

BFA

34

S

S

EXIT

RETAIL ENTRANCE WEST

10

CAS

17

11000

BFA

EXIT

MASS GAMING FLOOR F&B: TONG DIM

16

11000

33

S

15

BFA

32

C

PV

A

BFA

S

14

11000 BFA

BFA

BB

S

31

D

9000

9 Raffles Place # 45-01 Republic Plaza Singapore 048619

B Project MEP LAYOUT MBSDEV 096A_CASINO MASS GAMING & NEST UPDATED AND PROPOSED ALTERATION AND REFURBISHMENT DRAWING REVISED SPREAD ACROSS THE B2M AND LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, CASINO ENTRANCES AND RESTROOMS.

PV

11

SVC

CAS

S

13

11000 BFA

30

9000 CAS

S

12

11000 BFA

S

11

11000

29

9000 CAS

S

10

BFA

9000 CAS

S

28

9000 CAS

S

9

11000 BFA

27

9000

S

8

11000 BFA

WOMEN'S WC CAS

S

7

9000

S

6

11000

26

JANITOR'S ROOM CAS

S

5

BFA

FE

9000 CAS

S

25

9000 CAS

S

4

11000

BFA

9000 CAS

S

3

24

9000 CAS

R

SVC

S

2

11000

BFA

23

4000 CAS

E

C

F

Marina Bay Sands Pte Ltd

PV

9

SVC

8 Cross Street #24-01, PWC Building Singapore 048424 Tel : +65 6227-6433

Developer / Owner

S

11000

BFA

5000 CAS

SVC

B

G

EXIT

Architect

Atkins Design Engineering Consultants Pte Ltd

B NOTE REVISED

BFA

SVC

S

22

4000 CAS

MAIN ENTRANCE 11000

BFA

9000 CAS

152 Beach Road #22-02, Gateway East Singapore 189721 T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com

S

1

11000

4000 CAS

A

Aurecon Singapore Pte Ltd

RESTROOM WOMEN'S 3B TOILET

BFA

D

MEP & Structural Engineers

RESTROOM MEN'S TOILE3B T

F

C

H

Hotel Interior Design Limited

Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000 Fax: +852 2523 1666

SVC

BFA

SVC

I

S

5000 CAS

FE

MP FE HE-C.03

AHU

HR

STORAGE RESTROOM 1 MEN'S WC

D

S

L-C.12

C

O

SVC

Interior Designer

P

BFA

S

HR MP FE

FE MP

MP FE

B

R

J

+101.00 +101.60

Audiovisual Consultant

S

K K T

SRC COUNTER

PV

B

AL

One Raffles Place Tower 2, 10-62 Singapore, 048616

AG

C

App.

NC

Sennen Design Pte Ltd

Sennen Design

SVC CAS

PV

Check

SY

S

SC

2100 AFFL

HR MP FE TONG DIM

HE-C.05 C

FE

C

S

K T

FE

B NOTE REVISED

FE

K

SVC

CAS

S

+96.00 +95.75

PV

INDICATES UNAFFECTED AREAS SCOPE BY OTHERS F&B PROPOSED BOUNDARY

SANDS REWARDS CLUB COUNTER

EXISTING FLOOR TRAP NEW FLOOR WASTE EXTENT OF LIGHT WEIGHT CONCRETE BACKFILL

| Nest Restaurant - Potential Construction Issues | CAS

CAS

15

16

17

9000

Shaft Wall w/ Countertop To Be FireRated. GENERAL FLOOR FINISH LEVEL

EXTENT OF NEW WATERPROOFING

9000

INDICATES UNAFFECTED AREAS

EXTENT OF EXISTING WATERPROOFING TO BE VERIFIED AND MADE GOOD WHERE NECESSARY

FLOOR SLAB DEMARKATION LINE SSL +104.25

SCOPE BY OTHERS

SSL +104.35

EXISTING RAISED FLOOR SYSTEM

MASS GAMING AREA

EXISTING CONCRETE SLAB

F&B PROPOSED BOUNDARY EXISTING FLOOR TRAP NEW FLOOR WASTE

CAS

G

CONCRETE PLINTH

400x400x250

MT-12

FALL

FL-01

SHOW KITCHEN SCARICO

D=50

1

THIS DRAWING PRODUCED FROM INFORMATION RECEIVED FROM MBS. MAY NOT MATCH ACTUAL CONDITIONS ON SITE.

CONCRETE PLINTH

46 KW

6702

FFL +104.50

SSL +104.25 FL-01 EXTENT OF EXISTING WATERPROOFING TO BE VERIFIED AND MADE GOOD WHERE NECESSARY

FFL +104.60 SSL +104.35

FFL +104.47

FALL

EXTENT OF NEW WATERPROOFING

9000

300

300

FLOOR TILE SETTING OUT POINT TILE SIZE: 300 x 300

CARPET TO FF&E SPEC

CHEF'S TABLE FFL +104.50 SSL +104.35

WD-11

960

WD-11

GAS 1"

STAGE FFL +104.89 SSL +104.25

FREDDA UNICA 3/4" PER 2 RUBINETTI

6

GENERAL FLOOR FINISH LEVEL

46 KW

EXTENT OF LIGHT WEIGHT CONCRETE BACKFILL FFL +104.50 SSL +104.35

FFL +104.60 SSL +104.35

FINISHES BY MASS GAMING CONTRACTOR

2

6701

RISER

1

6701 FALL

1

FFL +104.47

FALL

SVC

FALL

300

GN 1/3

GN 1/3 ELECTRICAL COMPARTMENT

6701

FALL

4

6702

DISH WASH

2

FALL

FFL +104.48 T-10 FL-02

Audiovisual Consultant

T-10 FL-03

T-10 FL-03

FALL

CHILLER

Foodservice Consultants Singapore f ood ser vice

200

FFL +104.48

UP

K

A Rev.

Tender Construction DOC 100% - L1 Nest

Description

Original by ATKINS

Date 23:12:15

06:04:16

Initial

Draw

Check

App.

CAD

MW

AL

Rider Levett Bucknall 150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg Audiovisual Consultant

Sennen Design Pte Ltd One Raffles Place Tower 2, 10-62 Singapore, 048616 Kitchen Consultant

Raised Floor w/ Waterproofing.

3

Aurecon Singapore Pte Ltd Partition Wall To Be Built On Top Of ELV Trunking.

4

MOE Route Crushes w/ Steps.

MICHAEL FIEBRICH DESIGN

160 Gibraltar Crescent Singapore 759582 T. 65 6527 6681 F. 65 6527 6682 www.michaelfiebrich.com MEP & Structural Engineers

152 Beach Road #22-02, Gateway East Singapore 189721 T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com Architect

Atkins Design Engineering Consultants Pte Ltd

8 Cross Street #24-01, PWC Building Singapore 048424 Tel : +65 6227-6433

Developer / Owner

5 Project

Marina Bay Sands Pte Ltd

Sprinkler To Be Required Below Banquette Seat For Fire Protection. 9 Raffles Place # 45-01 Republic Plaza Singapore 048619

MBSDEV 096A_CASINO MASS GAMING & NEST PROPOSED ALTERATION AND REFURBISHMENT AT LEVEL 1 - NEST RESTAURANT.

6

-

Issue Date

WALL, FLOOR FINISHES TO MATCH WITH FFL +104.50 EXISTING SSL +104.35

7 Jalan Kilang, 5th Floor Singapore 159407 Interior Designer

2

4

FLOOR TILE SETTING OUT POINT TILE SIZE: 300 x 300

6701

RAISED FLOOR BOUNDARY SVC

sin g a p ore

300

300

FALL

6701 stom

cu

3

FALL

300

3

FLOOR TILE SETTING OUT POINT TILE SIZE: 300 x 300

AL

One Raffles Place Tower 2, 10-62 Singapore, 048616

custom

5

6702

T-10 FL-03

5

OPEN TO BELOW

THIS DRAWING PRODUCED FROM INFORMATION RECEIVED FROM MBS. MAY NOT MATCH ACTUAL CONDITIONS ON SITE.

6701

App.

MW

Kitchen Consultant

FFL +104.90

custom

BANQUETTE SEAT FFL +104.75 SSL +104.25 CARPET TO FF&E SPEC

HOT BEVERAGE FFL +104.48

8

Check

CAD

Sennen Design Pte Ltd FREEZER FLOOR TILE SETTING OUT POINT TILE SIZE: 300 x 300

custom

7

6701

custom

FALL

MECHANICAL COMPARTMENT

300

6702

ELV TRUNKING TO BE RETAINED AND DEPTH/LOCATION VERIFIED ON SITE

GN 1/3

FALL

FALL

GN 1/3

F

Initial

Draw

150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg

custom

5

-

06:04:16

Issue Date

Rider Levett Bucknall

custom

2

6702

3

CAS

23:12:15

FFL +104.46

FFL +104.60 SSL +104.35 GN 1/3

2

Date

400x400x250

FFL +104.46

WD-11 FL-01

6701

Tender Construction DOC 100% - L1 Nest

Description

ATKINS

FFL +104.60 SSL +104.35

PICK UP

GN 1/3

6

T-10

CONCRETE PLINTH

A Rev.

Original by

GN 1/3

FFL +104.50 SSL +104.35

L

FFL L1 +104.50

GN 1/3

MAIN DINING

2

GN 1/3

BAR FFL L1 +104.50

CONCRETE PLINTH

GN 1/3

6701

GN 1/3

T-10 FL-03

GN 1/3

4

FALL

CONCRETE PLINTH FFL +104.60 SSL +104.25

GN 1/3

User name: Satoooshi Date:Tuesday, December 25, 2018 23:06:36 Filename: X:\02.00 - Works\02.02 - At Office\05 Atkins[May 2014-]\02 Project\5141750-MBS_Casino_MGF&Nest\Correspondense\Outgoing\20160406_TC_100%_NEST\01_Nest Drawings\20160407_Transmittal\CAD\ATK_MBSDEV_096A_DD_TC_6162_01_NR_CAD[edit]

1

FFL +104.50 SSL +104.35

CAS

CONNESSIONE ELETTRICO GAS 1" PER SCARICO 2 WOK 1 KW D=50 230 VOLT CONNESSIONE

11

EXIT

210 L AFF

FE

B NOTE REVISED DRINK STATION #1 AV RACK STORAGE

C

Draw

23:12:15

SMOKE CURTAIN HOUSING

S

SC 0

FE

S

LEVY COUNTER

+96.00 +95.75

SINGAPOREAN ENTRANCE / EXIT

PV

C

+101.60

150 Beach Road, #09-01 Gateway West, EX Singapore 189720 IT Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg

S

LUGGAGE DEPOSIT

MAIN ENTRANCE

H

MP HR

FE MP

S-C.26

+101.00

Rider Levett Bucknall

S

FE

FE MP NEW HR

WALL PANEL EXTENDED

C

SVC

NEW HR

Date

ATKINS

S

EXIT

EXIT

L-C.23

BOH EXIT

ATM

E-C.17

+96.00 +95.75

SVC

Initial

S

+96.00

B +95.75 NOTE REVISED STORAGE FOREIGNER ENTRANCE / EXIT FE

Original by

CAS

I

PV

D

EXIT EXIT

EXIT

ORE

E-C.18

DRINK STATION #5

AV RACK FOR STAGE

HE-C.02

ST

FE

FE

E-C.20 UP E-C.19

K K

S

SC

2100 AFFL

NEW SCREEN WALL

S

FE

D

L-C.04

L-C.03 SVC

S-C.24 FE

HR

EXIT EXIT EXIT EXIT

B

FE MP

22:11:17

Issue Date

C

E

XX:XX:XX

100% TENDER CONSTRUCTION

Description

PV

S-C.25

K K

SC

2100 AFFL

FE

VOID

S

CAS

STORAGE

ELEC

100% TENDER CONSTRUCTION

Rev.

CAS

J

HR MP

LINE OF VOID ABOVE

T K

HO LDIN RO OM G HO LDIN RO OM G

B A

C

L

EXIT

S

PR OTE LO CT SE BBY ED RV ICE

SVC

EXIT

S

IT

C

E-C. 06 E-C. 05

SEE DRAWING NO. PV ATK_MBSDEV_096A_DD_TC_0533_B2M C CAS G E

210 FL AF

FE

SMOKE CURTAIN HOUSING

BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.

S

CAS

F SEE DRAWING NO. ATK_MBSDEV_096A_DD_TC_0532_B2M

PV

F

SVC

FE

SC 0

EXIT EXIT

EX

M

ATRIUM EAVE ATRIUM EAVE

CAS

C

S

FE

24

2100 AFFL

G

C

PV

H

S

L-C.

FE NE MP SC HR W

N

SVC

MEN'S WC

MP FIRE FE FIGHTING MP NEW FE LOBBY HR HR

LINE OF VOID ABOVE

210 FL AF

VIP LO LIFT BB Y

WC

K

FE

FE

SC 0

VP OFF ICE

05

ION

SVC

+101.60

S

D

AT

Y

L

SVC

T T

DR INK #2 ST

LIFT LO BB

S-C. 29 ES

WOMEN'S

B HIGH LIMIT CAGE & MEP LAYOUT UPDATED AND DRAWING REVISED

+101.00

CAS

CAS

S

07

L-C.

210 FL AF

EXIT

L-C. 09 L-C. 08

CAS

IT

EX

SVC

MP

DRINK STATION #4 FE RESTROOM 3A JANITOR'S CLOSET

SC 0

SC

2100 AFFL

O

SMOKE CURTAIN HOUSING

S

CASINO GAMING

FE

NEW HR

FE MP

EXIT

2100 AFFL

SVC

IT

IT

EX

S

2100 AFFL

FE

SC

EXIT

I

2100 AFFL

MP FE

EX

EXIT

EXIT

H

S

K K K

SC

PONY WALL

I

CAS

H.5 CAS

G.9

M

SC

2100 AFFL

CAS C

C

PV

2100 AFFL

FE

P

J

PV

K

J

PROTECTED LOBBY

SVC

IT

CAS

PV

SVC

+101.00

EX

C

S

EXIT

L-C.

C

N

FATT CHOI

E

PV

F

SVC

SC

MP EXIT

ELV & SURVEILLA NCE EQUIPMENT RM MAKE-UP AIR COMPARTM ENT L-C.16

FE

SC

CAS

ELEC MP FE

HR

HIGH LIMITS FE

L

S

C

L-C.02

FE

HIGH LIMITS RECEPTION DESK

EXIT

S

F

PV

G

B CAGE UPDATED

B MEP LAYOUT EXIT UPDATED +101.00

PV

SVC

FE

CAS

C

IT

EX

+99.00

LIFTS (STAF F CARD ACCE SS & ESCORT TO L3) O

C

CON LOBBY A

S

PR O LO TECT BB ED Y

PV

+96.00 +95.75

PR LO OTECT BB ED Y

G

C

I

FILL BA NK

L-C. 15 L-C. 14

SC

2100 AFFL

EXIT

MAJOR AISLE

SC

210 AF 0 FL

LIFT LOBBY

P

S-C.02

MP

PONY WALL

PV

N

L-C.01

SVC

S

CAS

CAS

MP HR FE

SC

EXIT

MAI BA N NK

MP

G.9

H

IT

Q

PROTECTED

FE

EXIT EXIT

L-C.35

EXIT

J

EX 2100 AFFL

TO

H

PV

MAN TR AP

R

SVC

Q

+96.00 +95.75

K

SVC

+102.60

+102.20

+101.30

EXIT

SVC

FA

CAS

H.5 CAS

K

+101.30

28 September 2015

B

FA

I

C

C

FE

28 September 2015

+101.00

CON

FA

AD M WO IN. AR RK ST EA AT IONS ILET

CAS

PV

K

PV

FE

B NOTE REVISED

NOTE REVISED

L-C.36

(VIF)

S

T

FE

T

T

B

FE MP

8603 (VIF)

42

8459 (VIF)

MICHAEL FIEBRICH DESIGN+98.10

S

EXI EXI

EXISTING RAISED FLOOR LINE

CAGE MAN TRAP

TITO MACHINE 8603 (VIF)

40

8459 (VIF)

8459 (VIF)

(VIF)

8458

(VIF)

41 8458 MICHAEL FIEBRICH DESIGN 8459 (VIF)

CON

39

38

8459 (VIF)

9122 (VIF)

9122 (VIF)

8603 (VIF)

8458

)

8458 (VIF

S

J

SC

210 AFF 0 L

PERSPECTIVE 1 14

T

8603 (VIF)

36

35

34

37

CON

CON

CON

24+2

45

44

8459 (VIF)

B1

EXIT

CAS

IT

TO RETAIL

+96.00 +95.85

STORAGE

EX

SCREEN WALL

EXIT

C

+96.00 +95.75

EXIT

HE-C.07

2100 AFFL

FE T K MP ER LEVY COUNT

EXIT

EXIT

T K

MP HR DR INK ST AT ION #3

RETAIL CE ENTRAN NORTH EXIT EXIT

L

SC

48

PV

PONY WALL

MP FE NEW HR

EXIT EXIT

EXIT

S-C.

RE ST WO RO MEN OM 'S W 2 C

A

CASINO STORAGE

FE

L-C.34

B.8

R

33

32 (SRC) KIOSK

FOR STATUTORY COMPLIANCE. LOCATION FOR ALL EXIT SIGNS TO BE MAX. 2.5M ABOVE AFFL TO THE UNDERSIDE OF SIGN.

CON

SVC

TOTAL

CON

CON

K

CON

CON

CON

SYMBOL DESCRIPTION

CON

8

C

FE MP

EXIT

HE-C.08

+99.00 +98.90

S-C.20

EXIT

C

CON

S-C.19 ES

EXIT

EXIT

JANI RO TOR' OM S

PV

FE

DOCUMENT STORAGE

EXIT

B

HR

MP

931 6

CON

+96.00 +95.90

NEW HR MBS Dev 096 100%FEschematic design EXIT

CON

THE NEST DEVELOPMENT . E

STORAG

D

PROTECTE LOBBY L-C.33

S-C.18 ES

L1

CON

MBS Dev 096 100% schematic design

FIRE EXTINGUISHER

L-C.20

RETAIL ENTRANCE WEST LOBBY L-C.31 LIFT SHAFT

S-RN.17

HOLDING RM

RE ST MEN RO 'S W OM 2 C

N

TO RETAIL B2

HEIGHT GLASS S EXISTING FULL DOUBLE LEAVE PANEL WITH RETAINED. DOOR TO BE STORAGE

SCOPE BY OTHERS F&B PROPOSED BOUNDARY

B2M

15+2

43

CON

46

CON CON

CON

INDICATES UNAFFECTED AREAS

47

CON

REFER TO ATK_MBSDEV_096A_DD_DD_0011 FOR LEGEND AND SYMBOLS.

IT

8603 (VIF)

8603 (VIF)

8603 (VIF)

C

CON

LEGEND:

(VIF)

8458 (VIF)

8459 (VIF)

8459 (VIF)

8459 (VIF)

8459 (VIF)

8459 (VIF)

9122 (VIF)

9122 (VIF)

8458

(VIF)

EXIT

41

40

39

38

37

36

35

8603 (VIF)

8458

)

8458 (VIF

8459 (VIF)

Drawing Title

Demountable Ramp To Be Required For The Stage for Accesibility.

NEST RESTAURANT

PROPOSED FLOOR PLAN L1 - FINISHES MASS GAMING AREA

PG 9

EX

CON CON

B.8

C

2

42

CON CON

CON CON CON

CON

CON

34

33

32

31

CON

CON

CON

CON

46

45

44

43

| B2M - Reflected Ceililng Plan THE|NEST DEVELOPMENT . PERSPECTIVE 3

47

CON CON CON CON CON

4_B2M

21

CON

| B2M - General Arrangement Plan |

1_B2M

BFA

02 | Project | 031. Lead Consulting | MBS |

Project No:

DEV_096A

Drawing No:

Pilot Date:

JULY 2015

Scale:

1:50@ A1

Issue Status:

For Construction

Rev.#

ATK_MBSDEV_096A_DD_TC_6162_01_NR_CAD[EDIT]A This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.

35


| B2M - HIGH LIMIT AREA |

| Proposed Design |

SVC

| Photo of Current High Limit Area |

SVC

SVC

P

SVC

O

SVC

N

SVC

M

MAKE-UP AIR COMPARTME

9000

LEGEND: REFER TO ATK_MBSDEV_096A_DD_DD_0011 FOR LEGEND AND SYMBOLS.

K

9000

9000

INDICATES UNAFFECTED AREAS SVC

9000

9000

J

SCOPE BY OTHERS F&B PROPOSED BOUNDARY

9000

9000

SVC

L

NT

Q

FIRE EXTINGUISHER L1

15+2

9

K

KIOSK (SRC)

8

6

T

TITO MACHINE

S-C.20

FE

LIFT LOBBY

9000

B2M

SYMBOL DESCRIPTION

TOTAL 24+2 14

L-C.16

EXIT EXIT

1

MP

PROTECTED LOBBY

SVC

EXIT

PROTECTED LOBBY

ELEC

S-C.02

L-C.02

L-C.01

FOR STATUTORY COMPLIANCE. LOCATION FOR ALL EXIT SIGNS TO BE MAX. 2.5M ABOVE AFFL TO THE UNDERSIDE OF SIGN.

EXIT

WOMEN'S WC

FIRE FIGHTING LOBBY

| Detail of Side Throw Air Outlet & Slot for Return Air |

NEW WALL

1/2

FE MP

9000

FE MP

HR T

T

DRINK STATION #4

SC

FE

2100 AFFL

JANITOR'S CLOSET

RESTROOM

EXIT

FA

NEW HR

3A

FE MP

HR

FE MP

FA

EXISTING RAISED FLOOR LINE

FLOOR RAISED RY BOUNDA

OR AGA FLO RY BOUNDA

FA

BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.

1

B

8012

100% TENDER CONSTRUCTION

A CAS

16

HIGH LIMITS

IT EX

SVC L

0751

SVC K

FE

MP

OR

GE

NEW EXIT SIGN

SC

HIGH LIMITS RECEPTION DESK

SC 00

PONY WALL

8 Cross Street #24-01, PWC Building LINEAR048424 ACMV DIFFUSER Singapore Tel : +65 6227-6433

SMOKE CURTAIN Developer / Owner

Marina Bay Sands Pte Ltd ACMV SYSTEM R

CAS

14

S

1

9 Raffles Place # 45-01 TOILET EXHAUST Republic Plaza Singapore 048619

GRILLE (TEG)

TRANSFER AIR GRILLE (TAG)

Project

2

LINE OF VOID ABOVE

FE MP

L 21 FF A

FE

21 C AF 00 FL

+101.00

2100 AFFL

CA FE

NEW EXIT SIGN

SMOKE DETECTOR AT SIDE OF

Architect

SMOKE CURTAIN Atkins Design Engineering ACCESS PANEL Consultants Pte Ltd

CAS 18

0751

0751

SPEAKER

Aurecon Singapore Pte Ltd BGM SPEAKER

9000

1 8001

EXIT

FLUORESCENT LIGHT& NEST MBSDEV 096A_CASINO MASS GAMING PROPOSED ALTERATION AND REFURBISHMENT L-TYPE LIGHT SPREAD ACROSS THE B2M AND LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, ACMV DIFFUSER FOR BOH CASINO ENTRANCES AND RESTROOMS. OFFICE

Drawing Title

MASS GAMING -AIR DIFFUSER FOR ATRIUM

K

PROPOSED HIGH LIMITS FLOOR PLAN B2M Project No:

K

+101.30

EMERGENCY EVCS MEP & Structural Engineers

152 Beach Road #22-02, Gateway East Singapore 189721 SPRINKLER T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com

s

SVC 1

FE

PONY WALL

+101.00

NEW WALL FINISH

+102.20

+102.20

IT

AIR GRILLE TO BE RETAINED

S

BULKHEAD

Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000LIGHT EMERGENCY Fax: +852 2523 1666

0751

8004

AREAS

Hotel Interior Design Limited DIRECTIONAL DOWNLIGHT

OR

2

1

B

AL

SCOPE BY OTHERS One Raffles Place Tower 2, 10-62 Singapore, 048616 DOWNLIGHT

15

DEV_096A

Scale:

Pilot Date:

JULY 2015

Issue Status:

1:100 @ A1

For Construction

Drawing No:

PROPOSED HIGH LIMITS FLOOR PLAN B2M | Reflected Ceiling Plan | S

1

Audiovisual Consultant INDICATES UNAFFECTED

Sennen Design Pte Ltd

CAS

CAGE UPDATED

App.

NC

Interior Designer STRIP LIGHT

OR

1 3501

EX

EXIT

Initial

Check

SY

150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 [REFER TO ATK_MBSDEV_096A_DD_DD_0011] www.rlb.com.sg

OR

P

21 C AF 00 FL

1 0752

Draw

23:12:15

Sennen Design OR

9000

SVC M

21 FFL A

SVC N

S

3161

Issue Date Date

LEGEND:

5

FE SVC O

SC00

+101.00 (VIF)

+102.60

+96.00 +95.75

MP HR

PONY WALL

E

SVC P

-

22:11:17

Description

Rider Levett Bucknall IT

SVC Q

-

XX:XX:XX

100% TENDER CONSTRUCTION

Rev.

Original by ATKINS

EX

STORAG

KEYPLAN

17

EXIT

+102.20

5

CAS

EXIT EXIT

User name: Yamada, Satoshi Date:26 January 2018 16:29:11 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_3161_B2M

3

L-C.35

L-C.36

| Plan |

4

5

FATT CHOI

3

0 +96.0 5 +95.8

RETAIL CE RANRS ENTDOO NEWNORTH

4 3

MEN'S WC

EXIT

6500

7500

CAS

SCALE: 1:100 (A1) / 1:200 (A3)

9000

CAS

J

9000

CAS

I

CAS 17

9000

CAS

H

CAS

G

1

CAS

F

E

Rev.#

ATK_MBSDEV_096A_DD_TC_CAS_3161_B2M

B

This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.

S

EXIT

S S

BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.

S

EXIT

3 +100.995 +100.70

1

1

CAS 16

22:11:17

Issue Date Date

Draw

23:12:15

Check

SY

NC

Initial App. AL

Rider Levett Bucknall

+101.01

IT

150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg

1

EX

IT

XX:XX:XX

100% TENDER CONSTRUCTION

Description

ATKINS

EX

| Detail of Down Throw Diffuser | Audiovisual Consultant

+101.01

MEP & Structural Engineers

Architect

1

S

8 Cross Street #24-01, PWC Building Singapore 048424 Tel : +65 6227-6433

SF-101 5010

SF-102 4995

SF-102 5010

HIGH LIMIT CAGE AND MEP LAYOUT UPDATED

R

CAS 14

open S

SMOKE CURTAIN HOUSING

ATRIUM EAVE

SF-102 4700

Marina Bay Sands Pte Ltd

B

SF-102 4995

2

ALL LIGHTING FIXTURES TO BE REPLACED, TYP.

+101.01

MT-104 4060

Atkins Design Engineering Consultants Pte Ltd

EXIT

Developer / Owner

SF-101 5000 SF-102 4810

152 Beach Road #22-02, Gateway East Singapore 189721 T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com

S

S

1

2

3501

Aurecon Singapore Pte Ltd

S

+101.01

+101.01

+100.995

1

+100.995

+100.70

+101.01

S

Hotel Interior Design Limited Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000 Fax: +852 2523 1666

CAS 15

+100.995

+101.00 +100.06

100.81

IT

S

9 Raffles Place # 45-01 Republic Plaza Singapore 048619

Project

MBSDEV 096A_CASINO MASS GAMING & NEST PROPOSED ALTERATION AND REFURBISHMENT SPREAD ACROSS THE B2M AND LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, CASINO ENTRANCES AND RESTROOMS.

Drawing Title

MASS GAMING PROPOSED HIGH LIMITS REFLECTED CEILING PLAN B2M

Project No:

DEV_096A

1 3461

One Raffles Place Tower 2, 10-62 Singapore, 048616

Interior Designer

P

2

Sennen Design Pte Ltd

Sennen Design

S S

3

EX

Pilot Date:

APRIL 2016

Scale:

1:100 @ A1

Issue Status: For Construction

Rev.#

Drawing No:

REFLECTED CEILING PLAN B2M

ATK_MBSDEV_096A_DD_TC_CAS_3461_B2M CAS J

SCALE: 1:100 (A1) / 1:200 (A3)

CAS I

CAS H

CAS G

CAS F

CAS E

| MEP Drawing: ACMV |

B

This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.

| Photo of Mock-Up & Construction Site |

FLEXIBLE DUCT SCHEDULES

ABBREVATIONS CHWS

NEW SUPPLY AIR DUCT

CHWR

NEW RETURN AIR DUCT

NEW SMOKE EXTRACT DUCT

NEW FLEXIBLE DUCT

EXISTING DUCTWORK TO BE DELETED CHWS

CHWR

NEW RETURN AIR DUCT

| S43: Down Throw Diffuser |

36

8 AM ass Gaming Refurbishment\3 Project Delivery\CADD\ISSUED\180327 - Construction Document To MBS\CAD\ACMV\AUR_MBSDEV_096A_DD_TC_CAS_2002_B2M_CAD_C

NEW SMOKE EXTRACT DUCT

NEW FRESH AIR DUCT

EXISTING DUXTWORK TO REMAIN

EXISTING RETURN AIR LINEAR DIFFUSER TO REMAIN EXISTING SUPPLY AIR LINEAR DIFFUSER TO BE DELETED EXISTING RETURN AIR LINEAR DIFFUSER TO BE DELETED SUPPLY AIR DIFFUSER C/W VCD

S34

VCD

VCD S36 NVCD S43

NFD MD

AXIAL FAN

FAN COIL UNIT (WALL MOUNTED TYPE)

FCU SED FAD

R

14 NOS OF SLOT DIFFUSER FOR SMOKE EXTRACT FAN COIL UNIT (WALL TYPE)(ACT AS ONE SMOKE SYSTEM ATMOUNTED 116 CMH EACH EXTRACTION POINT OF 1620 CMH)

SE

CONDENSING UNITEXTRACT OPENING AT DUCT SMOKE 1200(L)x200(HT) CEILING CASSETE FAN COILSIDE UNITWALL BAR GRILLE C/W VCD. AIR FLOW TO BE DETERMINED AFTER PRE-CONSTRUCTION AIRFLOW MEASUREMENTS DUCTWORK WITH INTERNALLY ACOUSTIC ROCKWOOL INSULATION LINED WITH 1000(L)x50(W) 2 SLOTS PERFORATED GALVANISED SHEETLINEAR METALOPENING C/W VCD AS PER SPECIFICATION

S45

R12

RAD

RETURN AIR DUCT

KED

RETURN AIR PATH: CONSTRUCTION OPENING OF ATEXHAUST LEAST 100MM KITCHEN DUCT (HT) WITHIN CEILING COVE

KEF TED R

TAD

S45

EXISTING SUPPLY AIR DIFFUSER TO BE DELETED N

NEW 600x600 4 WAY SUPPLY AIR DIFFUSER C/W VCD. AIR FLOW TO BE DETERMINED AFTER PRE-CONSTRUCTION AIRFLOW MEASUREMENTS

N

NEW 600x600 3 WAY SUPPLY AIR DIFFUSER C/W VCD. AIR FLOW TO BE DETERMINED AFTER PRE-CONSTRUCTION AIRFLOW MEASUREMENTS

FAN COIL UNIT

SED

SMOKE EXTRACT DUCT

FAD

FRESH AIR DUCT

SAD

SUPPLY AIR DUCT

RAD

RETURN AIR DUCT

Ø400 N Ø450 Ø500 R

AIR QUANTITY (CMH) TOILET EXHAUST DUCT 0 - 200 201 - 400 TRANSFER AIR DUCT 401 - 720 721 - 1000 TYPICAL 1001 - 1330 1331 - 1600 DENOTE NEW ITEM 1601 - 2000 2001 - 2460 DENOTE RELOCATED ITEM

GENERAL NOTES 1.

ALL DIMENSIONS ARE IN mm. DO NOT SCALE THE DRAWINGS. PROVIDE AIR TURNING VANES IN ALL SQUARE ELBOWS, RADIUS ELBOWS. THE DUCT DIMENSION SHOWN ON THE DRAWING IS THE INTERNAL (AIR WAY) SIZE EXCLUDING INSULATION THICKNESS.

N

4.

VOLUME CONTROL DAMPER SHALL BE INSTALLED IN ALL BRANCH SUPPLY AND EXHAUST OR RETURN DUCTS. LOCATED DAMPERS AS FAR AS POSSIBLE FROM OUTLETS.

R

SMOKE EXTRACT OPENING AT DUCT DENOTE RELOCATED ITEM

5.

THE LENGTH OF EACH FLEXIBLE AIR DUCT SHALL BE INSTALLED AS SHORT AS POSSIBLE & NOT MORE THAN 4m.

1200(L)x200(HT) SIDE WALL BAR GRILLE C/W VCD. DENOTE BLANKED OFF OF EXISTING AIR FLOW TO BE DETERMINED AFTER DUCTWORK/OPENING PRE-CONSTRUCTION AIRFLOW MEASUREMENTS

6.

ALL DIFFUSERS, GRILLES & REGISTER SHALL BE COMPLETED WITH BLACK INTERNAL INSULATED PLENUM BOX AND WITH OPPOSED BLADE DAMPERS (OBD).

7.

UNLESS OTHERWISE NOTED, ALL SUPPLY AIR DUCT (SAD) AND RETURN AIR SHALL BE INTERNAL INSULATED WITH 25mm THICK FIBRE GLASS INSULATION & PERFORATRED G.I. SHEET.

8.

ALL CEILING DIFFUSER/GRILLES AFFECTED BY THE REPLACEMENT OF FALSE CEILING ARE TO BE CLEANED AND RE-INSTATED

9.

ALL SENSORS AT LEVEL 1 MOUNTED ON ALL COLUMNS/WALLS TO BE RE-INSTATED AFTER COLUMN REFURBISHMENT WORKS.

GENERAL NOTES

EXISTING SUPPLY AIR DIFFUSER TO BE DELETED

1. N 2.

600x600 4 WAY SUPPLY AIR DIFFUSER C/W ALL DIMENSIONS ARENEW IN mm. DO NOT SCALE THE DRAWINGS. VCD. AIR FLOW TO BE DETERMINED AFTER PROVIDE AIR TURNINGPRE-CONSTRUCTION VANES IN ALL SQUARE ELBOWS, RADIUS ELBOWS. AIRFLOW MEASUREMENTS

3. N

THE DUCT DIMENSION SHOWN ON THE DRAWING IS THE INTERNAL (AIR WAY) SIZE EXCLUDING NEW 600x600 3 WAY SUPPLY AIR DIFFUSER C/W INSULATION THICKNESS. VCD. AIR FLOW TO BE DETERMINED AFTER VOLUME CONTROL DAMPER SHALL BE INSTALLED IN MEASUREMENTS ALL BRANCH SUPPLY AND EXHAUST OR PRE-CONSTRUCTION AIRFLOW RETURN DUCTS. LOCATED DAMPERS AS FAR AS POSSIBLE FROM OUTLETS. THE LENGTH OF EACHNEW FLEXIBLE AIRRETURN DUCT SHALL BE INSTALLED AS SHORT AS POSSIBLE & NOT 600x600 AIR DIFFUSER MORE THAN 4m. ALL DIFFUSERS, GRILLES & REGISTER SHALL BE COMPLETED WITH BLACK INTERNAL INSULATED PLENUM BOX AND WITH OPPOSED DAMPERS (OBD). NEW 300x300 BLADE RETURN AIR DIFFUSER

7.

UNLESS OTHERWISE NOTED, ALL SUPPLY AIR DUCT (SAD) AND RETURN AIR SHALL BE INTERNAL INSULATED WITH 25mm THICK FIBRE GLASS INSULATION & PERFORATRED G.I. SHEET. EXISTING THERMOSTAT TO REMAIN 8. ALL CEILING DIFFUSER/GRILLES AFFECTED BY THE REPLACEMENT OF FALSE CEILING ARE TO BE CLEANED AND RE-INSTATED EXISTING THERMOSTAT TO BE DELETED TS 9. ALL SENSORS AT LEVEL 1 MOUNTED ON ALL COLUMNS/WALLS TO BE RE-INSTATED AFTER COLUMN REFURBISHMENT WORKS. NEW THERMOSTAT TS

TS

EXISTING TEMPERATURE SENSOR TO REMAIN EXISTING CO2 SENSOR TO REMAIN

AIR QUANTITY (CMH) 0 - 200 201 - 400 401 - 720 721 - 1000 1001 - 1330 1331 - 1600 1601 - 2000 2001 - 2460

NOTE: ALL FLEXIBLE DUCTWORK SHALL NOT EXCEED 2m IN LENGTH FOR ALL CONNECTIONS.

NOTE: B ALL FLEXIBLE DUCTWORK SHALL NOT EXCEED 2mEXISTING DENOTE BLANKED OFF OF IN LENGTH FOR ALL DUCTWORK/OPENING CONNECTIONS.

1000(L)x50(W) 2 SLOTS LINEAR OPENING C/W VCD

6. N

FCU

SIZE Ø150 Ø200 Ø250 Ø300 Ø350 Ø400 Ø450 Ø500

2.

R12

4.

AIR HANDLING UNIT

3.

B

N5.

AHU

14 NOS OF SLOT DIFFUSER FOR SMOKE EXTRACT TYPICAL SYSTEM AT 116 CMH EACH (ACT AS ONE SMOKE EXTRACTION POINT OF 1620 CMH) DENOTE NEW ITEM

TYP.

SE

KITCHEN EXHAUSTSUPPLY FAN AIR DIFFUSERS AT ALL EXISTING EXISTING FISHEYE CEILING TO BE TOILET EXHAUST DUCT RE-INSTALLED. REFER TO DETAIL 8 ON DRAWING NO.: AUR_MBSDEV_096A_DD_TC_CAS_2003_B2M TRANSFER AIR DUCT

AIR CONDITIONER

SIZE TED Ø150 Ø200 TAD Ø250 Ø300 TYP. Ø350

FAN COIL UNIT 1050(L)x75mm(W) (2 SLOT) DOWN THROW LINEAR INDUCTION DIFFUSER @ 430 CMH SMOKE EXTRACT DUCT

SUPPLY AIR DUCT 800(L)x200(W) SMOKE EXTRACTION DIFFUSER

A/C

KEF/ RETURN AIR FLEXIBLE KITCHENDUCT EXHAUST FAN SUPPLY

1000(L)x25(W) DOWN THROW SLOT AIR HANDLING UNIT LINEAR DIFFUSER @ 360 CMH

1000(L)x200(W) SIDE THROW AIR OUTLET WITH NOS. RECT. DISCHARGE CHAMBER FRESH AIR5DUCT @ 108 CMH

SUPPLY / RETURN AIR FLEXIBLE DUCT

DESCRIPTION

KED EXHAUST DUCT FLEXIBLE DUCTKITCHEN SCHEDULES

DESCRIPTION 1000(L)x25(W) 2 SLOTS DOWN THROW LINEAR DIFFUSER @ 500 CMH AIR CONDITIONER

SAD

800(L)x200(W) SMOKE EXTRACTION DIFFUSER MOTORISED SMOKE DAMPER

EXISTING FISHEYE CEILING TO BE RE-INSTALLED. REFER TO DETAIL 8 ON DRAWING NO.: AUR_MBSDEV_096A_DD_TC_CAS_2003_B2M ACCESS PANEL

FAN COIL UNIT

ACCESS PANEL

RETURN, EXHAUST AIR GRILLE NEW FLEXIBLE DUCT

SE

FAN COIL UNIT ALL EXISTING SUPPLY AIR DIFFUSERS AT

FIRE DAMPER (NEW)

MOTORISED SMOKE DAMPER

S44

AXIAL FAN RETURN AIR PATH: CONSTRUCTION OPENING OF AT LEAST 100MM (HT) WITHIN CEILING COVE

VOLUME CONTROL DAMPER (EXISTING)

M&D

EXISTING FLEXIBLE DUCT TO REMAIN SUPPLY AIR DIFFUSER C/W VCD

M&D

SE

VOLUME CONTROL DAMPER OPPOSED BLADE TYPE (EXISTING)

MOTORISED DAMPER

S43

1050(L)x75mm(W) SLOT) DOWN THROW VOLUME CONTROL DAMPER(2(NEW) LINEAR INDUCTION DIFFUSER @ 430 CMH

ARROW FOR SUPPLY AIR AND FRESH AIR

MD

AHU

S36

CONDENSATE DRAIN PIPE EXISTING RETURN AIR LINEAR DIFFUSER TO BE DELETED

FIRE DAMPER (NEW) 1000(L)x200(W) SIDE THROW AIR OUTLET WITH 5 NOS. RECT. DISCHARGE CHAMBER @ 108 CMH MD MOTORISED DAMPER

NFD S44

ARROW FOR RETURN AIR AND EXHAUST AIR

VOLUME CONTROL DAMPER (NEW)

A/C

1000(L)x25(W) DOWN THROW SLOT VOLUME CONTROL DAMPER (EXISTING) LINEAR DIFFUSER @ 360 CMH

| S44: Side Throw Air Outlet |

NVCD

ABBREV.

ARROW FOR RETURN AIR AND EXHAUST AIR 1000(L)x25(W) 2 SLOTS DOWN THROW VOLUME CONTROL DAMPER OPPOSED LINEAR DIFFUSER @ 500 CMH BLADE TYPE (EXISTING)

MD

RETURN, EXHAUST AIR GRILLE

EXISTING RETURN AIR LINEAR DIFFUSER TO REMAIN CHILLER WATER RETURN EXISTING SUPPLY AIR LINEAR DIFFUSER TO BE DELETED

ABBREVATIONS FLEXIBLE DUCT TO BE DELATED S34

ARROW FOR SUPPLY AIR AND FRESH AIR FLEXIBLE DUCT TO BE DELATED

EXISTING DUCTWORK TO BE DELETED EXISTING SUPPLY AIR LINEAR DIFFUSER TO REMAIN

EXISTING SUPPLY AIR LINEAR DIFFUSER TO REMAINCHILLER WATER SUPPLY

CHILLER WATER RETURN

EXISTING FLEXIBLE DUCT TO REMAIN

EXISTING DUXTWORK TO REMAIN

NEW SUPPLY AIR DUCT

ABBREV.

CHILLER WATER SUPPLY

CONDENSATE DRAIN PIPE

NEW FRESH AIR DUCT

D\180327 - Construction Document To MBS\CAD\ACMV\AUR_MBSDEV_096A_DD_TC_CAS_2002_B2M_CAD_C

User name: Yamada, Satoshi Date:26 January 2018 16:29:32 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_3461_B2M

100% TENDER CONSTRUCTION

A

Original by

S S

B Rev.

+100.81

1

S

+100.06

S


02 | Project | 031. Lead Consulting | MBS |

| B2M - Main Entrance | | Proposed Design |

| Photo of Current Main Entrance |

DESIGN CONCEPT

B2M RETAIL TRANSITION PORTAL

PROPOSAL 01

B2M Main

PVC

PVC

9

CAS

PVC

10

CAS

1

11

CAS

2

5000

EXIT

FICE OF

4000

1

9000

D

4000

| Elevation PLAN & Detail of The Entrance Feature Wall | 2

CAS

6

7

5000

4000

B

4

ELEVATION MARK ADDED AND REVISED

NEW EXIT SIGNS

HO LDIN RO OM G

PVC

CAS

5

GOLD METAL STRIPS W/ FEATURE GLASS BEHIND

EXISING PORTAL TO BE KEPT

1

2

3

T

CAS

4

K

EXIT

9000

NEW DOOR CLEAR WIDTH 900

PR OT LO EC SE BBYTED RV ICE

CAS

3

EX IT

| Plan |

NEW EXIT SIGN

4

NEW WALL AND FINISH

FICE

4 CAS

OF

B

VP

HO LDIN RO OM G

06

E-C.

DESIGN CONCEPT

SCREEN WALL

EXIT

B2M RETAIL TRANSITION PORTAL

+96.00 +95.75

IT

EX

NEW FINISH

A

1

OR

E

ST

OR

E

EXIT

EXIT

ATM

1

NEW FINISH

2

NEW EXIT SIGNS

ALL NEW FINISHES TO EXISTING WON ACCESS PANEL AND WALL PANELS

EXIT

NEW FINISH

NEW COLUMN CLADDING AGE CHECKER ROSTRUM LOCATION TO BE CONFIRMED BY OPS

2

1

B

1

HE-C.06

NEW FINISH

NEW WALL FINISH

K

T

Audiovisual Consultant

9000

One Raffles Place Tower 2, 10-62 Singapore, 048616

CAS

5

INDICATES UNAFFECTED MEP & Structural Engineers

CAS

6

7

5000

HE-C.05 EX

IT

OR

HR

OR

STRIP LIGHT

OR

Architect

Atkins Design Engineering DIRECTIONAL DOWNLIGHT Consultants Pte Ltd

OR

8 Cross Street #24-01, PWC Building EMERGENCY LIGHT Singapore 048424 Tel : +65 6227-6433

EXI

EMERGENCY EVCS SPEAKER

GOLD METAL STRIP 8 W/ WOOD VENEER FINISHAND LED LIGHTING BEHIND

B

+99.30 EXISTING PORTAL TO BE KEPT

BGM SPEAKER Marina Bay Sands Pte Ltd R

s

Project

SMOKE CURTAIN

+101.00

Project No:

BFA

11000

BFA

22

5000

BFA

23

24

11000

FLUORESCENT Scale: LIGHT Pilot Date:

+101.00 4000

9000

BFA

25

4000

5000

BFA

26

4000

+101.30

27

+100.80

7161

7161

NEW COVE

CS

NEW LIGHTING

+101.30

BFA

+99.00

C

CS

NEW LIGHTING

+102.10 S

S

+101.00

A

1

5595

NEW COVE

+101.00

S

S

S

S

S

S

WOOD VENEERFINISH

+100.00 7350

S

CS

NEW COVE

1302

CS

MT

106

WD

101

CS

1302

EXISTING LIGHTING DECORATION TO BE KEPT

90

Accessibility Code - Chapter 4.7

GLASS

MT

106

GL

109

1

Draw

23:12:15

WOOD VENEERFINISH 6

EXISTING BALUSTRADE TO BE KEPT

WD 1

101

B2M CASINO MASS GAMING REFRESH – ELEVATIONS MT

106

GL

109

LED LIGHTING

WD

101

MT

106

MT

DIFFUSER

106

DIFFUSER LED LIGHTING

6 GL

EXISTING BALUSTRADE TO BE KEPT

4

DETAIL SCALE: 1:2 (A1) / 1:4 (A3)

MT

106

GL

109

MT

106

AL

5

WD

101

MT

106

DETAIL

GL

109

106

WD

101

MT

106

Audiovisual Consultant

4

DETAIL SCALE: 1:2 (A1) / 1:4 (A3)

One Raffles Place Tower 2, 10-62 Singapore, 048616

5

DETAIL SCALE: 1:2 (A1) / 1:4 (A3)

6

101

MT

106

MT

106

MT

106

DETAIL SCALE: 1:2 (A1) / 1:4 (A3)

Hotel Interior Design Limited

Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000 Fax: +852 2523 1666

GOLD METAL STRIP

MEP & Structural Engineers

| Photo of Construction Site | Aurecon Singapore Pte Ltd

152 Beach Road #22-02, Gateway East Singapore 189721 T: +65 6256 6188 F: +65 6251 7188 W: www.aurecongroup.com Architect

Atkins Design Engineering Consultants Pte Ltd

8 Cross Street #24-01, PWC Building Singapore 048424 Tel : +65 6227-6433

Developer / Owner

Marina Bay Sands Pte Ltd R

9 Raffles Place # 45-01 Republic Plaza Singapore 048619

Project

B2M CASINO MASS GAMING REFRESH – ELEVATIONS

MBSDEV 096A_CASINO MASS GAMING & NEST PROPOSED ALTERATION AND REFURBISHMENT SPREAD ACROSS THE B2M AND LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, CASINO ENTRANCES AND RESTROOMS.

2017.08.01. ATKINS Comments on 100% Concept Design Rev1

Drawing Title

MASS GAMING -

1

PROPOSED MAIN ENTRANCE

REFLECTED CEILING PLAN

BFA

BB

11000 BFA

22

REFLECTED CEILING PLAN B2M

EXISTING PORTAL TO BE KEPT

SCALE: 1:100 (A1) / 1:200 (A3) 11000 BFA

23

11000 BFA

24

5000

CFD Geometry 11000

4000

BFA

25

Project No:

DEV_096A

4000

BFA

26

5000

JULY 2015

Issue Status:

Scale:

1:100 @ A1

For Construction

Rev.#

ATK_MBSDEV_096A_DD_TC_CAS_4461_B2M

11000

9000

Pilot Date:

Drawing No:

4000

BFA

27

A

This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.

Smoke curtains Escalator smoke curtain

2017.08.01. ATKINS Comments on 100% Concept Design Rev1

| Layered Metal Fins - Smoke Evacuation CFD Test |

Privacy screens

CFD Result

Visibility slice across fire along X-axis (Xfire) At 885s (steady-state achieved)

Observation: smoke is able to spread through the proposed smoke barrier.

| Photo of Construction Site |

Proposed smoke barrier Fire

DE

SCA

WD

Rider Levett Bucknall

Sennen Design Pte Ltd

SCAL

6

SCALE: 1:2 (A1) / 1:4 (A3)

DIFFUSER

MT

DET

3

109

App.

NC

150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg

SECTION

GOLD METAL STRIP

Initial

Check

SY

DET

SCAL

Interior Designer

S

A

1302

EXISTING LIGHTING DECORATION TO BE KEPT

CONCEALED LED LIGHTING

SECTION

S

PVC

11

BFA

EXISTING LIGHTING DECORATION TO BE KEPT

P

S

NEW LIGHTING

B

Issue Date Date

Sennen Design

EXISTING COVE TO BE REFINISHED

| GOLDMETAL Balustrade - Building Code | FEATURE

Rev.#

22:11:17

Description

+100.80

+100.30

B

109

LED LIGHTING

100% TENDER CONSTRUCTION

Rev.

+101.00

+101.00

106

GL

2

DIFFUSER

ATKINS

BFA

MT

LED LIGHTING

Original by

+101.30

S

KEY MATERIALS

GOLD METAL STRIP W/ WOOD VENEER FINISH

101

CONCEALED LED LIGHTING

BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.

1302

NEW LIGHTING DECORATION TO MATCH WITH EXISTING

NEW LIGHTING DECORATION TO MATCH WITH EXISTING

7161

+102.07

NEW COVE

1302

For Construction

This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing AIR DIFFUSER FOR ATRIUM shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Marina Bay Sands.

BFA

+100.70

+102.40

DIFFUSER

Issue Status:

JULY 2015 1:100 @ A1 L-TYPE LIGHT

ACMV DIFFUSER FOR BOH ATK_MBSDEV_096A_DD_TC_CAS_4161_B2M OFFICE

11000

CAS

ELEVATION

SCALE: 1:20 (A1) / 1:40 (A3)

TOILET EXHAUST GRILLE (TEG)

Drawing No:

11000

106

WD

2017.08.01. ATKIN

5

SCALE: 1:20 (A1) / 1:40 (A3)

DETAIL LED LIGHT W/ MILKY

TRANSFER AIR GRILLE (TAG) FLOOR PLAN B2M

7

DEV_096A

11000

+102.37

1

MASS GAMING -

BFA

C

AT SIDE OF

ACMV SYSTEM

Drawing Title

PROPOSED MAIN ENTRANCE

ARCHITECTURAL PLAN

PVC

SPRINKLER 9 Raffles Place # 45-01 Republic Plaza Singapore SMOKE048619 DETECTOR

ACCESS PANEL OR 096A_CASINO MBSDEV MASS GAMING & NEST PROPOSED ALTERATION AND REFURBISHMENT LINEAR ACMV SPREAD ACROSS THE B2M ANDDIFFUSER LEVEL 1 MASS CASINO FLOORS, INCLUDING GAMING AREAS, SMOKE CURTAIN CASINO ENTRANCES AND RESTROOMS.

+101.00

SCALE: 1:100 (A1) / 1:200 (A3)

WOODVENEER

User name: Yamada, Satoshi Date:26 January 2018 16:53:02 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_7221_B2M

Developer / Owner

CAS

109

2017.08.01. ATKINS Comments on 100% Concept Design Rev1

152 Beach Road #22-02, Gateway East Singapore 189721 DOWNLIGHT F: +65 6251 7188 T: +65 6256 6188 W: www.aurecongroup.com

PROPOSED NEW FLAT CEILING D

BB

109

DETAIL

1

WOOD VENEER FINISH PANEL

AREAS

Aurecon Singapore Pte Ltd SCOPE BY OTHERS

4000

PVC

1

GOLD METAL STRIP

Level 22, 28 Hennessy Road, Hong Kong Tel: +852 2523 9000 [REFER TO ATK_MBSDEV_096A_DD_DD_0011] Fax: +852 2523 1666

CAS

4000

A

User name: Yamada, Satoshi Date:26 January 2018 16:34:47 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_4461_B2M

Sennen Design Pte Ltd

Hotel Interior Design Limited

T

9000

3

4000

EXIT

PVC

102

106

GL

GOLD METAL STRIP W/ WOOD VENEER FINISH

5

FEATURE GLASS

LEGEND:

2 NOS. WON ACCESS PANEL TO BE CAS REFINISHED4

CAS

2

GOLD METAL STRIPS W/ FEATURE GLASS BEHIND

AL

Interior Designer

P

EXIT

7350

CAS

1

11

EXISING PORTAL TO BE KEPT

11

SF

CAS

PVC

10

5000

BFA

A

PVC

App.

NC

GOLDMETAL

WOODVENEER

1

9

Initial

Check

SY

150 Beach Road, #09-01 Gateway West, Singapore 189720 Tel +65 6339 1500 Fax +65 6339 1521 www.rlb.com.sg

Sennen Design

| Reflected Ceiling Plan |

Draw

23:12:15

Rider Levett Bucknall

1

2

-

22:11:17

Issue Date Date

ATKINS

DRINK STATION #1 NEW FINISH

-

XX:XX:XX

100% TENDER CONSTRUCTION

Description

Original by

2 NOS. OF NEW EXIT SIGNS

2

SINGAPOREAN ENTRANCE / EXIT

B

PVC

100% TENDER CONSTRUCTION

A Rev.

+96.00 +95.75

BFA

PLAN

B2M Main Entrance - Part Plan 3

1

NEW HR CABINET AND DOOR

4

KEY MATERIALS

EXIT

NEW DOOR CLEAR WIDTH 1500

E-C.18

L-C.23

NEW HR

BACKGROUND DRAWINGS ARE BASED ON AS-BUILT INFORMATION, THAT MAY NOT MATCH ACTUAL SITE CONDITION. VISUAL SURVEY HAS BEEN CARRIED OUT WHERE ACCESSIBLE. FURTHER SITE CHECKS AND VERIFICATION ARE REQUIRED BY THE CONTRACTOR AS NECESSARY UPON SITE POSSESSION.

6

MAIN ENTRANCE

EXIT

4 2

1

NEW WALL AND FINISH

LUGGAGE DEPOSIT

1

User name: Yamada, Satoshi Date:26 January 2018 16:53:02 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_7221_B2M

EXIT

EXIT

3

E-C.17

EXIT

1

LEVY COUNTER

5

EXIT

S-C. HE 27 -C.06

RE TO

NEW FINISH C

7

AGE CHECKER ROSTRUM LOCATION TO BE CONFIRMED BY OPS

EXIT

EXIT

TA

IL B1

1 NEW DOOR, WALL AND FINISHES BOH

EXIT

600M DET WID WAR ECT E ABL PAT NIN E THE TER G SUR DRA N REF FAC WIN ER E G 4/73TO 52.

3

MT

+96.00 +95.75

BFA

User name: Yamada, Satoshi Date:26 January 2018 16:31:35 Filename: P:\CNHKA\Project\5141750-MBS_Casino_MGF&Nest\23.00 CAD\23.20 Drawing\ARC\CD2\ATK_MBSDEV_096A_DD_TC_CAS_4161_B2M

SCREEN WALL

FOREIGNER ENTRANCE / EXIT

AG

NEW FINISH

4

2

ELEVATION

IT

ST

1

2

1

EX

1

3

GL

MT

SCREEN WALL

1

CAS

NEW SCREEN WALL

4 NOS. OF NEW EXIT SIGNS

EXIT

C

July 2017 | 05

1

EXISTING DOOR TO BE REFINISHED

PVC

PROPOSAL 01

3

28th

1

05

106

B2M CASINO M

3 1

E-C.

GOLD METAL STRIP W/ WOOD VENEER FINISHAND LED LIGHTING BEHIND

MT

Smoke exhaust points

Proposed smoke barrier

37


_02. Project / 04. Competition / Place Lalla Yeddouna in Medhina of Fez

041_

Fez, Inside Out

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

| Description |

2010 September Design[open competition] Residence and Retail Shop 6,832 m² Medina of Fez, MOROCCO Project Manager / All the phase of project

In the site, there were full of Arabic traditional buildings which have high cultural and historical value and worth to be preserved. Besides it is located in the centre of Medina district, still many artisans live and work there. Then the site have highly potencial and possibility to be important place for both local people and tourist in next decades. So our insight for this project was how to develop this area by refining old valuabe architecture and putting new architecture. Our main concept was “INSIDE OUT”. Now almost all the building is closed to outside, public, and open to thier courtyard, private. And each courtyard has unique activity that characterize that building. So we tried to “inside out”, and expose the inside private space that is filled with a lots of activities out.

| Unique Activities of Courtyard | Playground Fountain

Cafe Gallery

Restaurant Park Gallery

Market Stage

Park

Playground Restaurant Fountain

Cafe Market Stage

38


02 | Project | 041. Competition | FEZ |

| How to transform cityscape: INSIDE OUT |

:Closed to public, Open to courtyard.

:Make access to courtyard, then the inside is glanced.

:Stud courtyard, make strees wider.

:Tilt walls for shadow.

| Masterplan |

We tried to break the existing big public place into small pieces and spread out all around the site, so that more shaded spaces. And put new street between buildings, then connect each zone smoothly, and it’s also connected with riverbank street, and with slight slope that this site has, you will see new variety of experience.

| Distribution Concept | Old Building Gallery Retail Shop, Workshop Office, Hotel, Residence Cafe, Restaurant Gift Shop Site

| Traffic Concept |

Main Road Riverbank Road Street Bridge Connection

| Open Space |

Site

Courtyard Openspace Plaza Riverbank

Site

39


| Refine Existings to New Architecture |

To preserve the existings is not only the way to keep present, but also to build new building that is similar with the existings. Our way to connect the past and the future is to draw new wider street between buildings and reinforce the structure of each, put new material which is consider with existing materials with combination. People walk through this street will see the existings and new alternately, and think them as new Medina district.

Building 03

Building 02

Building 01

| 1F Plan[1:500] |

| Section Building 03 |

| Cirsulation Diagram | Snack Bar Exhibition Workshop Courtyard Retail Shop Circultaion

Building 02

| 2F Plan[1:500] |

Building 03

Building 01

| Material for Exteiror |

Concrete façade faces to outside streets, public. It will match with old existings. Corten steel faces to inside streets, semi-private. Besides, there are windows more than the concrete facade which face to the outside.

280.4m(Rooftop Level)

280.1m(Rooftop Level)

275.1m(Rooftop Level)

276.8m(1st Floor Level)

| AA’ Section[1:500] |

40

270.3m(Riverbank Level)

276.0m(2nd Floor Level) 273.2m(1st Floor Level)


02 | Project | 041. Competition | FEZ |

41


_02. Project / 04. Competition / Izunokunishi Traditional Culture Hall

042_

Wood Archi Hall

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

| Description |

2013 February Design[open competition : website] Multi-purpose Hall 684 m² Izunokunishi, Shizuoka-Pref, JAPAN Project Architect / 2013 January

This competition is for the hall for Japanese traditional performing arts. Main concept of our design is super long stages, which is 10m width and 80m length and going western point to eastern point through the inside of building. Besides, it’s done with all same level, so when the door is opened, whole this space(80m x 10m) can be used at the same time. And the stage for traditional performing arts is placed at the most western point which has small cliff, so it can be seen from everywhere from surroundings. Also this hall can be used as the hot spot of the surroundings which are a lots of hot spring public bath.

| Material and Fireproof |

This building is constructed with only standardized wood panels, pieces or logs, and it let us to use local products of wood. And each piece’s size are concidered with fireproof standard, then it’s can be exposed at any point, even ceiling.

| Eco and Self-Sufficient Function | | Axonometric View |

42

To save the running cost, we adapt some eco self-sufficient function which is like the window on top for air-circulation, facility for rainwater recucling, etc.


02 | Project | 042. Competition | WAH |

| AA’ section[1/500] |

Bus Stop Green Park Bike Parking (10bikes)

PLaza

Foyer

Seat (110seats)

[Rollback Chair Tracing]

Parking (28cars)

Dressing Room

Strage

Office

Gallery

[Truck Tracing]

Foot Spa

Etrance

Machine Toilet Room

Stage

Stage[outside] +emplacement

Backstage

Dressing Room

Dressing Room

Studio

Toilet Backyard Etrance

| Total | ① Hall ・ ・ ・ ・ ・・・・・・・・・・・・・・330 ㎡ ② Studio ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ 80 ㎡ ③ Entrance・・・・・・・・・ ・ ・ ・ ・ 181 ㎡ ④ Other Space・・ ・ ・ ・ ・ ・ ・ ・ 93 ㎡

Total

684 ㎡

| Plan[1/500] |

| View from stage to seat |

| Entrace View |

43


_02. Project / 05. University / Diploma Project in Master Degree

051_

High Rise University in Ochanomizu

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

| Description |

2010 February Research, Design[Diploma Project for Master Degree] High Rise Tower for University - m² Ochanomizu, Tokyo, JAPAN / -

The site is located in the centre of Tokyo. Now there are many redevelopment projects are considered around this site. Almost of them are supposed to be high-rise building. But it also breaks all the matters of surrounding, social construction, even the local people’s habits. This site is known well as the city for students, especially many university and colleage there. Most of their buildings are low(3~6 floors), and spread out everywhere.

Ochanomizu Station (Yamanote Line)

So I propose to build one big high-rise to combine two university, and spend the space where that university built for the other redevelopment project.

Building Coposition of the site

44

0 50 100

200


02 | Project | 051. University | DPP |

There is a ordinance to order to have educational space, when new building is built around this site. By having the office inside this campus, we can control and have connection with the office coming to the place where the university built before.

Meiji University 114,425 m² 10,694 ppl

Nihon University 56,755 m² 11,152 ppl

0

50

100

| 2 University to one |

9,072 m² 10,368 m² 5,184 m² 10,368 m² 2,592 m² 7,776 m² 2,592 m² 8,352 m² 9,072 m² 25,344 m² 13,584 m² 11,280 m² 10,368 m² 9,072 m² 18,144 m² 50,544 m² 40,176 m²

/ / / / / / / / / / / / / / / / /

Culb Room Library Office Teacher Room Seminor Room Hall Gallery Annex Dental Hospital Laboratory Concert Hall Public Entrance Student Entrance Administrative Office School Affair Lecture Room (S) Lecture Room (M) Lecture Room (L)

200

| Concept “Falling Tower” | As Koolhaas mentioned in his book, One of big problem of high-rise is the separated floor by slab.

1

4

Fall the high-rise down. Parts between each program will be public.

For the limits of the site and sun lays, roll them up. 2

5

Fall the buildings down, it can have public space on the middle of the building. And that public space works as terminal.

For the footprints of each function, each programs will be high and tight. 3

Aligh to the top for the view and sunlay for ground level.

6

Programs which is devided to mass prog and void pro, will be replaced on the floor connected by skip floor.

45


| Sampling for Void Part Programs | To make the void area program more public like surroundings, I sample the design factor from surroundings. Each on is utilized at the void area program.

| Sampling from Surroundings |

| Conversion to design of Void Area Program Surroundings |

| Plan |

46

| Plan: Floor 10F |

| Plan: Floor 24F |

| Plan: Floor 42F |

| Plan: Floor 47F |

| Plan: Floor 27F |


02 | Project | 051. University | DPP |

| Design for Public Space (at middle) |

AFor the connection with the site and working as terminal for void program, the small building near the site are appeared there. On this part(Floor 32-37), only structure is built, no slab. And each tenant can build own buildings more like temporary or light structure architecture.

Name:

Satoshi Yamada

Laboratory:

Architecture Design 9000

9000

7000

9000

9000

7000

9000

9000

7000

9000

9000

9000

9000

9000

9000

9000 Project Title:

9000 9000 9000 9000 9000 9000 9000 9000

9000

9000 9000

9000

7000

9000

9000

7000

9000

9000

9000

9000

9000

9000

Diploma Project

Date:

2010.02.17

Draft:

9000

9000

Plan_Floor 32

Scale:

1/300 9000

9000

9000

9000

9000

9000

7000

9000

9000

7000

9000

9000

9000

9000

| Plan: Floor 32F |

005

no.

| Plan: Ground Floor |

47


_02. Project / 06. Installation / The Festival des Architectures Vives in Montpellier

061_

U Chi Wa - Grand Prix

------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

| Description |

2009 April - June Design, Construction [open competition : website] Art Installation - m² Montpellier, FRANCE Project Architect / All the Phase of Project

The Festival des Architectures Vives a Monpellier that French architect (N+B Architectes) organizes in Montpellier, opens some courtyards to public, and let artists do art installation freely for each coutyard there. This festival is held every year. Our team is a group of a Professor, a fellow and three students, and we are in mind that the foreigners for them and aware of the courtyard that never seen in Japan. We apply to join this project, and finally won the Grand Prix.

| Site |

| Rough Design Image |

48


02 | Project | 061. Installation | UCW |

| Study Process |

| U Chi Wa scattering |

| Main Concept |

While the theme of this festival is “Short-Lived Curiosity”, we choose the Japanese traditional things, “U Chi Wa” that is used only during summer as materials. Only to show the beauty of its form, but without any other things, weave together U Chi Wa, this installation was made by the only U Chi Wa. Additionally the map of Montpellier is drawn on this U Chi Wa, so visitors can freely pick it off our installation. And that is also intended to spread like a scattering cherry blossom to the town. At the same time, this installation represents the theme of this festival by scattering to all over the city and getting shorter.

Here!

Grilling Fish

Lullaby to sleep

Slap your Boyfirend

Table Tennis?

Like a Parasol

Like a Umbrella

Bake a French Loaf

A Flyer

Naked Dance

Necessaries for a Festival

Refreshing breeze

HOW TO USE “U-CHI-WA”... HAVE FAN and FUN ! Festival des Architectures Vives 2009:

Short-Lived Curiousity

U-CHI-WA

deigned by Hiasato U, Hiroya U, Satoshi Y produced by Masashige M, Tohru H Tohoku University supported by The Obayashi Foundation

Festival des Architectures Vives 2009:

Short-Lived Curiousity

U-CHI-WA

deigned by

Hiasato U, Hiroya U, Satoshi Y Masashige M, Tohru H

produced by

supported by The Obayashi Foundation

| Design of U Chi Wa |

49


_02. Project / 06. Installation / Local Energy Reclamation Competition by Japan Government

062_

Book Cafe “PLAT”

-------------------------------------------------------------

| Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |

| Description |

2008 September - November Design, Construction[open competition : website] Coffee Shop with Library 65.2 m² Kori-cho, Fukushima-Pref, JAPAN Project Architect, Contractor, Garçon / All the Phase of Project

We joined Local Energy Reclamation Competition by Japan Government, then got the badget for this BookCafe project. But this project is totaly independent project. All this project is organized by we all student. The town is currently without a library, nor meeting hall people can gather. So we design the place like a big livingroom as people can feel free to stop by, read a book, drink coffee and chatting.

X1

X2

11650

PLAT

| Period |

Book

| Shop Section[1/200] |

Y1

lounge_[ 59.1m² ] 4300 5600 1300

kitchen_[ 6.1m² ]

Y2

890

890 4660

4660

2330

11650 X1

| Team |

50

| Shop Plan[1/200] |

X2

book shelf gross area_[ 65.2m² ]


02 | Project | 062. Installation | PLT |

| Elevation Bookshelf |

45

0

00

380

270

270

210

20

φ=150

Bo

ok

sh

elf

Sh

ow

ca

se

| Bookshelf Concept |

We proposed bookshelf. One side is usual book shelf. But another side is fiiled with the pipe (φ=150). People can see the title of book easily and put the book yet to be read into the pipe. To repeat this movement make their own book shelf.(This side is always updated.) Pointing the stick in the backdrop, can also display a special stuff.

| Workshop |

This town has decline and depopulation problems, which prospered as a post town along the highway. Through discussions with the city council, we felt the low awareness of the revitalization of the town residents. We believed this project should be done with local residents, and that’s the only way to change the situation in this area. So while this project, we organized a lots of workshop for some stuff this bookcafe needs, and communicated with resident then try to do this project together for the revitalization.

51


52


03 | Professional Reference |

03 |

-

|

-

|

Professional Reference

-------------------------------------------------------------

01 Ms. Catherine SIU [B+H Architects Hong Kong] _

02 Mr. Hironori MATSUBARA [Beijing Matsubara and Architects] _

03 Mme. Elodie NOURRIGAT [N+B Architectes] _

53


_03. Professional Reference

Catherine Siu [B+H Architects] -------------------------------------------------------------

54


03 | Professional Reference |

-

|

-

|

Hironori MATSUBA [Beijing Matsubara and Architects] -------------------------------------------------------------

55


_03. Professional Reference

Elodie Nourrigat [N+B Architectes] -------------------------------------------------------------

56