_Graduate Arhictect
Satoshi YAMADA
-------------------------------------------------------------
Architecture Portfolio
_
01
Resume _
02
Project _
03
Professional Reference _
2
01 | Resume |
-
|
-
|
_01. Resume
Satoshi YAMADA
Graduate Architect(Master of Architecture) / 3 Years Experience as Arhcitect
-------------------------------------------------------------
| Personal Imformation | NATIONALITY DATE OF BIRTH SEX MOBILE EMAIL SKYPE ADDRESS
Japan July 12, 1983 (29 years old) Male +852 984 282 78(HK) / +86 137 124 2457(PR CHINA) Satoshi.Yamada12@gmail.com Satoshiyamada12 49, Mawatari 2974, Hitachinaka-shi, Inbaraki-pref, JAPAN 3120012 King Yu Hse Rm 602, King Lam Est, Junk Bay, Kowloon, Hongkong, PR CHINA(temporary)
| Profile Picture |
| Spontaneous Application | MOTIVATION
Dear Sir / Madam, _ I am Japanese architect who was graduated from the architecture department of Tohoku University (JAPAN). After graduation I have had three years experience working at N+B Architectes(France), Beijing Matsubara and Architects(Japanese firm in China). With 3 years of experience as an architect (including one year as chief), I am confident that I am a responsible person and able to work well under pressure as individual as well as in team. Besides, I have strong motivation which achieve a breakthrough any difficulties like I have done these three years. I would be more than happy to meet you at your convenience. Thank you very much in advance for your attention.. _ Sincerely yours, Satoshi YAMADA _ May 05 ‘13
3
| Work Experience | PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR
PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR
PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR
PERIOD OCCUPATION OR POSITION HELD NAME AND ADDRESS OF EMPLOYER TYPE OF BUSINESS OR SECTOR
January 2011 to Present (2.5 years) 1.5 year as Project Architect, 1 year as Cheif Architect Beijing Matsubara and Architects / Beijing, PR CHINA Architecture Office
June 2010 to January 2011 (8 monthes) Internship as Diploma Architect N+B Architectes / Montpellier, FRANCE Architecture Office
April 2008 to March 2010 Part-time Draftman Mitsubishi Jisho Sekkei Inc. / Sendai, JAPAN Architecture Company
April 2008 to March 2010 Tutor of Bachelor Students’ Studio Tohoku University / Sendai, JAPAN University
| Education and Training | PERIOD TYPE OF DIPLOMA NAME AND TYPE OF ORGANIZATION PROVIDING EDUCATION AND TRAINING
PERIOD TYPE OF DIPLOMA NAME AND TYPE OF ORGANIZATION PROVIDING EDUCATION AND TRAINING
PERIOD TYPE OF DIPLOMA NAME AND TYPE OF ORGANIZATION PROVIDING EDUCATION AND TRAINING
April 2008 to March 2010 Master Tohoku University, Graduate School of Engineering, Department of Architecture and Building Science, Archtecture and Urban Design, Architecture Design Lab. (JAPAN)
April 2004 to March 2008 Bachelor Tohoku University, Graduate School of Engineering, Department of Architecture and Building Science, Archtecture and Urban Design, Architecture Design Lab. (JAPAN)
April 1999 to March 2002 Mito First High School
| Skills and Competence | MOTHER TONGUE
ENGLISH reading
Fluent good
writing
good
verval
good
CHINESE (MANDARIN)
Basic
reading
basic
writing
good
verval
basic
TECHNICAL SKILLS
4
Japanese
Auto CAD, Vectorworks, Sketch Up, Form Z, V-ray, Artlantis, Podium, Adobe Illustrator, Photoshop, Indesign, Microsoft Office,
01 | Resume |
-
|
-
|
| Axonometric Drawing of “Wooden Theatre Project in Nagano”(2008) |
| Physical Model and Drawing of “Cross Culture Studio in Luoyang”(2008) |
5
6
02 | Project |
02 |
-
|
-
|
Project
-------------------------------------------------------------
01
Project Implementation
BMW Pilot Implementation Project 012 | BIC Wholesale Store in Shanghai _
011 |
02
Project of Competition 021 | 022 |
Fez, INSIDE OUT Wooden Archi Hall _
03
Project in University 031 |
High Rise University in Ochanomizu _
04
Project of Installation 041 |
U CHI WA _
05
Other Work 051 |
Book Cafe “PLAT” _
7
_02. Project / 01. Execution: Interior and Exteior Schematic Design Project for BMW
BMW Pilot Implementation Project ++
011_
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2011 January - 2012 August Design, Supervising at the Construction Site, Car Showroom Beijing Shanghai Hangzhou - / 5,600 m² / 5,500 m² / 5,100 m² Beijing, Shanghai, Hangzhou, PR CHINA Project and Cheif Architect / All the Phase of Project
BMW have advanced into Chinese market since 2008 with their standard design which head office in Germany has. However it doesn’t match with the site that is provided by Chinese dealer, and the showroom gets many idle spaces because of the largeness of the site. So BMW China had looked for the foreign office which knows well about the design for Chinese market, and been in contacted with us, then our collaboration started. Until now, apart from that design work, we designed three showrooms which was alreaady built in Beijing, Shanghai and Hangzhou. And also another conceptual work for redeveloping part of existing showrooms.
8
| The Exisiting BMW Car Showroom in China |
| Redeveloping Standard Design of BMW |
02 | Project | 01. Execution | BMW |
For corresponding with their concept “Efficient Dynamics” and flexibility of BMW vehicle design, basically we utilized their existing design: liner and grid. At the same time, actively we had tried to adapt “the design of dynamics”, “the design with nature” as new design factor. We use a lot of metal mesh fabric, wire and mirrored finished panel. And for avoiding monotonous and chilly impression, they are used repeatedly with slightly change and sensitive treatments.
9
| Beijing Pilot Inplementation Project | Following the success of the redeveloping BMW standard design project, in July 2011, BMA was asked to design the interior and exterior of a new dealership in Beijing. We are assigned to the customer area of 5,600m².
The theme of this project is “to express dynamics of automobile with minimum elements”. In the process, it leads to a conventional yet fundamental problem: “to push the limit of the brand image to maximize the possibility of design”: ultimately, it can be paraphrased as” to harmonize the conflicting ideas as ‘order and freedom’ or ‘unity and diversity’”. It is an inevitable challenge common to both architectural design and branding strategy.
| Design Area and Function |
| Waiting Area | This space is for the customer who waiting for the check thier car at Car workishop.
| Aftersale Car Workshop and Office | The cosultation and workshop space for the customer who got trouble on thier BMW.
| Branding Space | Not only new BMW products but also their brand image, cocept and future technology are exhibited at this space.
| Car Hand Out Space | After the all contract work, finally the customer leave here with BMW.
| Car Showroom | The space for displaying BMW.
| Customer Lounge | This consultation space.
| 1F Plan[1:1000] | Design Area
| VIP Area | Waiting space for VIP.
| Car Showroom at 2F | The space for displaying BMW and premium second hand BMW.
| 2F Plan[1:1000] | Design Area
10
02 | Project | 01. Execution | BMW |
| Exterior Façade with “Cloud” Louver | The main facade is designed to convey the brand image in the motif of cloud. On the 80-meter-long curtain wall, the aluminum louvers are set up at the angles of various degrees, which gradually change its appearance as visitors approach.
| Concept of Louver Façade |
| Elevation of Louver Façade |
Part A
| Elevation | Part B
| Detail plan[1/20] | | Detail Section[1/20] |
| Part A - Elevation[1/150] |
| Part A - Section[1/150] |
| Part B - Section[1/40] |
| Sample and Construction Photo |
11
The panels of different transparency and reflectivity not only function as a partition, but also can be used for advertisement. In addition to the grid lighting on the ceiling, they give the space a futuristic atmosphere for exhibiting brand vision.
Wire System Wall [typeA]
Wire System Wall [typeB]
Wire System Wall [typeA] Wire System Wall [typeB]
Adjacent to the showroom, there is “Branding Space� which is surrounded by the panels of three materials: acrylic, stainless steel mirror and half-mirror, all suspended by the steel cable system.
Wire System Wall [typeB]
| Branding Space with Wire System Wall |
Wire System Wall [typeA] Wire System Wall [typeB]
Wire System Wall [typeA]
Wire System Wall [typeB]
| Branding Space Plan[1:200] | | Wire System Wall [typeA] Elevation[1/50] |
| Wire System Wall [typeA] |
| Fixture of Top |
| Fixture of Pannels |
| Fixture of Bottom |
12
| Wire System Wall [typeB] Elevation[1/50] |
| Wire System Wall [typeB] |
| Fixture of Top |
| Fixture of Bottom |
02 | Project | 01. Execution | BMW | Direction Y
Direction X
| Branding Space Reflected Ceiling Plan[1:200] |
| X-general |
| Ceiling Section[1:30] |
| Y-general |
| Detail Plan[1:30] |
| Ceiling Section[1:5] |
13
| Car Hand-Out Space with Mirrors | Next to “Branding Space”, there is “Car HandOut Space” where customers receive a car after purchase. The tilted panels are suspended from the ceiling by the same steel cable system as in “Branding space”. The reflection of the panels creates a dynamic sense to the space.
| BB’ Detail Ceiling Section[1:50] |
B
A
| Car Hand-Out Space Plan[1:300] | | Fixtures |
A’
B’
| Car Hand-Out Space Reflected Ceiling Plan[1:300] |
| AA’ Section[1:300] |
14
| BB’ Section[1:300] |
| Reflected Ceiling Plan Detail[1:50] |
| Aftersale Car Workshop with Tube Lighting Wall and Ceiling |
02 | Project | 01. Execution | BMW |
Wall A
| Wall A Elevation[1:150] |
| Aftersale Car Workshop Plan[1:300] |
| Aftersale Car Workshop Reflected Ceiling Plan[1:300] |
| Reflected Ceiling Plan Detail[1:50] |
| Wall A Elevation Detail[1:10] |
| Wall A Section Detail[1:10] |
| Ceiling Detail Section[1:10] |
15
| Shanghai Pilot Inplementation Project | This is the third project of our collaboration. The site that is located in residential area which is rather northwest than CBD in Shanghai.
To the exterior facade, office space and showroom, we applied the standard design that we designed for BMW 4S dealership store in China by collaboration with BMW China in last two projects. On the other hand, we tried to figure out new background design that strengthen the appearance of their concept “Efficient Dynamics� on each car, and updated the space.
16
02 | Project | 01. Execution | BMW |
| Branding Centre Project |
During our collaboration, BMW has asked us to join some design work for their stores which is not pilot project but more like conceptual design work. For this project, they would like us to design 700m² rental car showrooms with little branding space. The customers come to this store and reserve their car and depart from this shop with it.
| Idea 01 / Chinese Dragon |
We suggested that the BMW stores should be localized bit more to China, then we got the concept from drangon. We put the series of walls to the store everywhere, at some point it can be pushed out from walls and have space for counter or barcorner. And also that walls made from mirrored to reflect the customer with the cars.
| Idea 02 / Circuit |
Our another idea is the circuit. Usual showroom must be flat and show the car usual, but this “Circuit” show the car with different angles and then if the customer get in the car, can get the view of circuit like real racing competitons.
17
_02. Project / 01. Execution: Interior Schematic Design Project for BIC Servise
012_
BIC Wholesale Store in Shanghai
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2011 November - 2012 June Design, Supervising at the Construction Site Retail Shop (for Stationary) 40 m² Shanghai, PR CHINA Project Manager / All the Phase of Project
This is the schematic design project for BiC Service that is most famous brand fot stationary and lighter all over the world, and it’s the first store in Asia area for them. The site is located in the Chinese typical wholesale market building in Shanghai. And the building is filled with stationary wholesale stores which are almost similar size. Thereby we would think how to design the eye-catching façade and how to leave the space for tons of wholesale stocks as the key of the design for this project.
| Site |
| Site |
18
02 | Project | 01. Execution | BIC |
| Main Concept of the Layout |
At first we put the shelves on both side walls for the enough storage space, and install tilted orange walls between each shelves for avoiding the view from the entrance. Radial arrangement of shelves emphasizes the depth of the space, and makes customers focus on the orange walls that exhibit BiC products. The wall in the end was covered with mirror and reducing the oppressive feeling of the confined store space.
| Diagram of the Layout | | Sectionn[1:100] |
1_Put enough shelf for wholesale stocks.
2_Tilt each shelves for avoiding the view from entrance.
| Plan[1:100] | 3_Radial arrangement of shelves emphasizes the depth of the space.
| View from the entrance |
Once coming into the store, the shelves are not seen from the entrance since they are behind of the tilted orange walls. And the displayed products on each wall will catch eye of customers.
19
| Signboard of the Entrance |
Signboard of the entrance is one of most important factors for the impression of the store.
| Cloud Shaped Lighting and Table |
In the centre of this store, there is a cloud-shaped counter which has different levels.
We designed it with a lots of colors and especialy orange since the impression of BiC brand and thier products, and put the logo that have lighting behind also together with.
| Axonometric View |
The same shape hanged ceiling is illuminated with 7 colored acrylic tubes.
| Axonometric View |
| Elevation[1:80] |
| Detail[1:10] |
| Logo[1:20] |
| Detail[1:5] |
| Section A[1:10] |
20
| Section C[1:10] |
| Section D[1:10] |
| Making Process |
| Detail[1:1] |
| Signboard of the Entrance |
02 | Project | 01. Execution | BIC | Selves behind each orange tilted walls must have enough space for stokes of wholesale. So we design it from top to bottom, the exhibition space at the middle of them with lighting from top, then put the mirror at the deepest wall to reflect the space. | D2-01 |
| D2-05 |
[1/15]
[1/15]
| D2-02 |
| D2-06 |
[1/15]
[1/15]
| D2-03 |
| D2-07 |
[1/15]
[1/15]
| D2-04 |
| D2-08 |
[1/15]
[1/15]
| Section[1:50] |
21
| Module Shelves for the Cycle of Products |
| 4 Patterns of Shelves |
| Shelf 1 |
To meet up with variety kinds and colors of BiC products and the cycle of turnover the products, we suggested 4 types of moduled furnitures which are easy to change to respond it on the tilted orange walls.
| Axonometric View |
| Shelf 2 |
| Shelf 3 |
| Shelf 2_BB’ Section[1/10] |
| Shelf 2_Elevation[1/10] |
| Shelf 2_AA’ Section[1/10] |
22
| Shelf 4 |
02 | Project | 01. Execution | BIC |
23
_02. Project / 02. Competition: Place Lalla Yeddouna in Medhina of Fez
021_
Fez, Inside Out
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2010 September Design[open competition] Residence and Retail Shop 6,832 m² Medina of Fez, MOROCCO Project Manager / All the phase of project
In the site, there were full of Arabic traditional buildings which have high cultural and historical value and worth to be preserved. Besides it is located in the centre of Medina district, still many artisans live and work there. Then the site have highly potencial and possibility to be important place for both local people and tourist in next decades. So our insight for this project was how to develop this area by refining old valuabe architecture and putting new architecture. Our main concept was “INSIDE OUT”. Now almost all the building is closed to outside, public, and open to thier courtyard, private. And each courtyard has unique activity that characterize that building. So we tried to “inside out”, and expose the inside private space that is filled with a lots of activities out.
| Unique Activities of Courtyard | Playground Fountain
Cafe Gallery
Restaurant Park Gallery
Market Stage
Park
Playground Restaurant Fountain
Cafe Market Stage
24
02 | Project | 02. Competition | Fez |
| How to transform cityscape: INSIDE OUT |
:Closed to public, Open to courtyard.
:Make access to courtyard, then the inside is glanced.
:Stud courtyard, make strees wider.
:Tilt walls for shadow.
| Masterplan |
We tried to break the existing big public place into small pieces and spread out all around the site, so that more shaded spaces. And put new street between buildings, then connect each zone smoothly, and it’s also connected with riverbank street, and with slight slope that this site has, you will see new variety of experience.
| Distribution Concept | Old Building Gallery Retail Shop, Workshop Office, Hotel, Residence Cafe, Restaurant Gift Shop Site
| Traffic Concept |
Main Road Riverbank Road Street Bridge Connection
| Open Space |
Site
Courtyard Openspace Plaza Riverbank
Site
25
| Refine Existings to New Architecture |
To preserve the existings is not only the way to keep present, but also to build new building that is similar with the existings. Our way to connect the past and the future is to draw new wider street between buildings and reinforce the structure of each, put new material which is consider with existing materials with combination. People walk through this street will see the existings and new alternately, and think them as new Medina district.
Building 03
Building 02
Building 01
| 1F Plan[1:500] |
| Section Building 03 |
| Cirsulation Diagram | Snack Bar Exhibition Workshop Courtyard Retail Shop Circultaion
Building 02
| 2F Plan[1:500] |
Building 03
Building 01
| Material for Exteiror |
Concrete façade faces to outside streets, public. It will match with old existings. Corten steel faces to inside streets, semi-private. Besides, there are windows more than the concrete facade which face to the outside.
280.4m(Rooftop Level)
280.1m(Rooftop Level)
275.1m(Rooftop Level)
276.8m(1st Floor Level)
| AA’ Section[1:500] |
26
270.3m(Riverbank Level)
276.0m(2nd Floor Level) 273.2m(1st Floor Level)
02 | Project | 02. Competition | Fez |
27
_02. Project / 02. Competition: Izunokunishi Traditional Culture Hall
022_
Wood Archi Hall
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2013 February Design[open competition : website] Multi-purpose Hall 684 m² Izunokunishi, Shizuoka-Pref, JAPAN Project Architect / 2013 January
This competition is for the hall for Japanese traditional performing arts. Main concept of our design is super long stages, which is 10m width and 80m length and going western point to eastern point through the inside of building. Besides, it’s done with all same level, so when the door is opened, whole this space(80m x 10m) can be used at the same time. And the stage for traditional performing arts is placed at the most western point which has small cliff, so it can be seen from everywhere from surroundings. Also this hall can be used as the hot spot of the surroundings which are a lots of hot spring public bath.
| Material and Fireproof |
This building is constructed with only standardized wood panels, pieces or logs, and it let us to use local products of wood. And each piece’s size are concidered with fireproof standard, then it’s can be exposed at any point, even ceiling.
| Eco and Self-Sufficient Function | | Axonometric View |
28
To save the running cost, we adapt some eco self-sufficient function which is like the window on top for air-circulation, facility for rainwater recucling, etc.
02 | Project | 02. Competition | Izunokunishi |
| AA’ section[1/500] |
Bus Stop Green Park Bike Parking (10bikes)
PLaza
Foyer
Seat (110seats)
[Rollback Chair Tracing]
Parking (28cars)
Dressing Room
Strage
Office
Gallery
[Truck Tracing]
Foot Spa
Etrance
Machine Toilet Room
Stage
Stage[outside] +emplacement
Backstage
Dressing Room
Dressing Room
Studio
Toilet Backyard Etrance
| Total | ① Hall ・ ・ ・ ・ ・・・・・・・・・・・・・・330 ㎡ ② Studio ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ 80 ㎡ ③ Entrance・・・・・・・・ ・ ・ ・ ・ ・ 181 ㎡ ④ Other Space・・ ・ ・ ・ ・ ・ ・ ・ 93 ㎡
Total
684 ㎡
| Plan[1/500] |
| View from stage to seat |
| Entrace View |
29
_02. Project / 03. University: Diploma Project in Master Degree
031_
High Rise University in Ochanomizu
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2010 February Research, Design[Diploma Project for Master Degree] High Rise Tower for University - m² Ochanomizu, Tokyo, JAPAN / -
The site is located in the centre of Tokyo. Now there are many redevelopment projects are considered around this site. Almost of them are supposed to be high-rise building. But it also breaks all the matters of surrounding, social construction, even the local people’s habits. This site is known well as the city for students, especially many university and colleage there. Most of their buildings are low(3~6 floors), and spread out everywhere.
Ochanomizu Station (Yamanote Line)
So I propose to build one big high-rise to combine two university, and spend the space where that university built for the other redevelopment project.
Building Coposition of the site
30
0 50 100
200
02 | Project | 03. University | Diploma Project |
There is a ordinance to order to have educational space, when new building is built around this site. By having the office inside this campus, we can control and have connection with the office coming to the place where the university built before.
Meiji University 114,425 m² 10,694 ppl
Nihon University 56,755 m² 11,152 ppl
0
50
100
| 2 University to one |
9,072 m² 10,368 m² 5,184 m² 10,368 m² 2,592 m² 7,776 m² 2,592 m² 8,352 m² 9,072 m² 25,344 m² 13,584 m² 11,280 m² 10,368 m² 9,072 m² 18,144 m² 50,544 m² 40,176 m²
/ / / / / / / / / / / / / / / / /
Culb Room Library Office Teacher Room Seminor Room Hall Gallery Annex Dental Hospital Laboratory Concert Hall Public Entrance Student Entrance Administrative Office School Affair Lecture Room (S) Lecture Room (M) Lecture Room (L)
200
| Concept “Falling Tower” | As Koolhaas mentioned in his book, One of big problem of high-rise is the separated floor by slab.
1
4
Fall the high-rise down. Parts between each program will be public.
For the limits of the site and sun lays, roll them up. 2
5
Fall the buildings down, it can have public space on the middle of the building. And that public space works as terminal.
For the footprints of each function, each programs will be high and tight. 3
Aligh to the top for the view and sunlay for ground level.
6
Programs which is devided to mass prog and void pro, will be replaced on the floor connected by skip floor.
31
| Sampling for Void Part Programs | To make the void area program more public like surroundings, I sample the design factor from surroundings. Each on is utilized at the void area program.
| Sampling from Surroundings |
| Conversion to design of Void Area Program Surroundings |
| Plan |
32
| Plan: Floor 10F |
| Plan: Floor 24F |
| Plan: Floor 42F |
| Plan: Floor 47F |
| Plan: Floor 27F |
02 | Project | 03. University | Diploma Project |
| Design for Public Space (at middle) |
AFor the connection with the site and working as terminal for void program, the small building near the site are appeared there. On this part(Floor 32-37), only structure is built, no slab. And each tenant can build own buildings more like temporary or light structure architecture.
Name:
Satoshi Yamada
Laboratory:
Architecture Design 9000
9000
7000
9000
9000
7000
9000
9000
7000
9000
9000
9000
9000
9000
9000
9000 Project Title:
9000 9000 9000 9000 9000 9000 9000 9000
9000
9000 9000
9000
7000
9000
9000
7000
9000
9000
9000
9000
9000
9000
Diploma Project
Date:
2010.02.17
Draft:
9000
9000
Plan_Floor 32
Scale:
1/300 9000
9000
9000
9000
9000
9000
7000
9000
9000
7000
9000
9000
9000
9000
| Plan: Floor 32F |
005
no.
| Plan: Ground Floor |
33
_02. Project / 03. Installation: The Festival des Architectures Vives in Montpellier
041_
U Chi Wa - Grand Prix
------------------------------------------------------------| Period | | Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2009 April - June Design, Construction [open competition : website] Art Installation - m² Montpellier, FRANCE Project Architect / All the Phase of Project
The Festival des Architectures Vives a Monpellier that French architect (N+B Architectes) organizes in Montpellier, opens some courtyards to public, and let artists do art installation freely for each coutyard there. This festival is held every year. Our team is a group of a Professor, a fellow and three students, and we are in mind that the foreigners for them and aware of the courtyard that never seen in Japan. We apply to join this project, and finally won the Grand Prix.
| Site |
| Rough Design Image |
34
02 | Project | 04. Installation | Montpellier |
| Study Process |
| U Chi Wa scattering |
| Main Concept |
While the theme of this festival is “Short-Lived Curiosity”, we choose the Japanese traditional things, “U Chi Wa” that is used only during summer as materials. Only to show the beauty of its form, but without any other things, weave together U Chi Wa, this installation was made by the only U Chi Wa. Additionally the map of Montpellier is drawn on this U Chi Wa, so visitors can freely pick it off our installation. And that is also intended to spread like a scattering cherry blossom to the town. At the same time, this installation represents the theme of this festival by scattering to all over the city and getting shorter.
Here!
Grilling Fish
Lullaby to sleep
Slap your Boyfirend
Table Tennis?
Like a Parasol
Like a Umbrella
Bake a French Loaf
A Flyer
Naked Dance
Necessaries for a Festival
Refreshing breeze
HOW TO USE “U-CHI-WA”... HAVE FAN and FUN ! Festival des Architectures Vives 2009:
Short-Lived Curiousity
U-CHI-WA
deigned by Hiasato U, Hiroya U, Satoshi Y produced by Masashige M, Tohru H Tohoku University supported by The Obayashi Foundation
Festival des Architectures Vives 2009:
Short-Lived Curiousity
U-CHI-WA
deigned by
Hiasato U, Hiroya U, Satoshi Y Masashige M, Tohru H
produced by
supported by The Obayashi Foundation
| Design of U Chi Wa |
35
_02. Project / 04. Other Work: Local Energy Reclamation Competition by Japan Government
042_
Book Cafe “PLAT”
-------------------------------------------------------------
| Task | | Type / Program | | Design Area | | Site Location | | Roll / Period |
| Description |
2008 September - November Design, Construction[open competition : website] Coffee Shop with Library 65.2 m² Kori-cho, Fukushima-Pref, JAPAN Project Architect, Contractor, Garçon / All the Phase of Project
We joined Local Energy Reclamation Competition by Japan Government, then got the badget for this BookCafe project. But this project is totaly independent project. All this project is organized by we all student. The town is currently without a library, nor meeting hall people can gather. So we design the place like a big livingroom as people can feel free to stop by, read a book, drink coffee and chatting.
X1
X2
11650
PLAT
| Period |
Book
| Shop Section[1/200] |
Y1
lounge_[ 59.1m² ] 4300 5600 1300
kitchen_[ 6.1m² ]
Y2
890
890 4660
4660
2330
11650 X1
| Team |
36
| Shop Plan[1/200] |
X2
book shelf gross area_[ 65.2m² ]
02 | Project | 05. Other Work | BookCafe |
| Elevation Bookshelf |
45
0
00
380
270
270
210
20
φ=150
Bo
ok
sh
elf
Sh
ow
ca
se
| Bookshelf Concept |
We proposed bookshelf. One side is usual book shelf. But another side is fiiled with the pipe (φ=150). People can see the title of book easily and put the book yet to be read into the pipe. To repeat this movement make their own book shelf.(This side is always updated.) Pointing the stick in the backdrop, can also display a special stuff.
| Workshop |
This town has decline and depopulation problems, which prospered as a post town along the highway. Through discussions with the city council, we felt the low awareness of the revitalization of the town residents. We believed this project should be done with local residents, and that’s the only way to change the situation in this area. So while this project, we organized a lots of workshop for some stuff this bookcafe needs, and communicated with resident then try to do this project together for the revitalization.
37
38
03 | Professional Reference |
03 |
-
|
-
|
Professional Reference
-------------------------------------------------------------
01 Mr. Hironori MATSUBARA [Beijing Matsubara and Architects] _
02 Mme. Elodie NOURRIGAT [N+B Architectes] _
39
_03. Professional Reference
Hironori MATSUBA [Beijing Matsubara and Architects] -------------------------------------------------------------
40
03 | Professional Reference |
-
|
-
|
Elodie Nourrigat [N+B Architectes] -------------------------------------------------------------
41