Bastar constructions[1] bolder

Page 1

BASTAR CONSTRUCTIONS Jagdalpur Bastar C.G.(494001) Ref …………….

Date: 15.11.2013

To, Abhiram Constructions Nagarnar ,Jagdalpur

Disst: Bastar(C.G.) Subject: -Quotation for earth excavation work in NISP,Nagarnar We hereby submit our lowest rates and details are given below. Si no

Description

Unit

Amount

01

Earth Excavation

Cum

95.00

Terms and Conditions 1. After getting of WO 20% advance amount should be provided by you for mobilization of vehicles. 2. Payment should be release in 07 days after bill submission. 3. Excavation will be without striping. 4. Soil will be dump without rolling ,dozing & watering. 5. for unloading of soil will be charged @17 Rs per KM if lead will be above 3 KM. 6. Excavation will be done without any type shapes(step cutting ,burm cutting etc.) 7. Site will level as per your requirement but level may be (+- 150MM.)


3. Taxes as applicable. 4. Rate is valid for one month after submission of quotation. We are looking forward to your favorable order .

Thanks and Regards For ,Bastar Constructions


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.