1 minute read

Master Plan and Premises

Next Article
Athletics

Athletics

Project

Heating network in the Sports Complex

Advertisement

Enhancing the main gym ceiling

Replaced the washbasins in the works reliably in the gymnastics practice areas. all weather conditions, the rooftop was examined and refurbished.(The ceiling was fixed by supporting steel bars between the sandwich panels joints)

Sports Complex (Replacing six Granite countertops with twelve washbasins in the Removing the concrete planters in the MYS Garden

Building C (Primary School Grades 1-3) enhancement on the basement floor and

classroom construction

Conversion of the IB Collage staffroom window into a door to create a staff garden.

Separation of four classrooms on the Third Floor in Building A.

The Creche Store Room was upgraded with new tiles and refurbishment.

Notes

This work was conducted to ensure our heating system To ensure the main gymnasium ceiling can fully withstand sport complex and building B

A routine upgrade was made for health and safety.

In order to improve the wellbeing of MYS students, the concrete planters were removed, whilst introducing more shade for students to enjoy a larger area to use. As part of the ongoing refurbishment plan, the basement floor of Building C was refurnished with new tiles. Further to this, two offices were demolished to make way for two new classrooms to improve classroom ventilation. In the centre area, we created a new Media Centre.

IB College staff can now use a door from the staffroom to enjoy the garden area. This is a strategic decision for staff wellbeing. In order to use the learning spaces on the top floor of Building A, the IT Labs were separated to be used as dedicated classrooms to allow for a redesigned timetable in 2020/21 to maximise physical distancing. Due to humidity, ABS upgraded the Creche Store Room to ensure all items are stored in a healthy and clean environment.

Routine maintenance continued this year and as always, there is a high degree of attention to health and safety. The Estate Management Team worked very effectively this summer to complete the major project in the basement floor of Building C, to create two new classrooms and complete the new Media Centre.

Russell Peagram BSc Geography (PGCE) Director of Operations

This article is from: