Simon Dahl - Portfolio

Page 1

Simon Dahl

PORTFOLIO


Ha’il City - SDC Development Location: Saudi Arabia As part of the KSA 2030 goal to move away from oil. The Saudi Downtown Corporation is engaged in upgrades and enhancements to 12 cities around the Kingdom.

Ha’il’s SDC Downtown project is approximately 140 000m2 Public Realm development. Split equally between a large Urban Park and the Retial Downtown Zone.

I was contracted to develop a Detailed Master Plan and Subsequent Concept Master Plan for the Downtown.

The Brief required the site to link up with existing upgrades along the northern bounding road, while acknowledging the KSA 2030 goals for accessibility and sustainability. Roles included liaising with the Egis (Master Planners) on the Master Plan, while developing the look and feel of the Public Realm. Following this I was engaged with Red Vertex to deliver an appropriate set of CGI static and animated images.

Sketch Section Showing Site Fall

Facing Page: Overview of North Plaza Image by Red Vertex


Ha’il City - SDC Development Location: Saudi Arabia As part of the KSA 2030 goal to move away from oil. The Saudi Downtown Corporation is engaged in upgrades and enhancements to 12 cities around the Kingdom.

Ha’il’s SDC Downtown project is approximately 140 000m2 Public Realm development. Split equally between a large Urban Park and the Retial Downtown Zone.

I was contracted to develop a Detailed Master Plan and Subsequent Concept Master Plan for the Downtown.

The Brief required the site to link up with existing upgrades along the northern bounding road, while acknowledging the KSA 2030 goals for accessibility and sustainability. Roles included liaising with the Egis (Master Planners) on the Master Plan, while developing the look and feel of the Public Realm. Following this I was engaged with Red Vertex to deliver an appropriate set of CGI static and animated images.

Sketch Section Showing Site Fall

Facing Page: Overview of North Plaza Image by Red Vertex


View of South Plaza

View of District Park (North)

Image by Red Vertex

Image by Red Vertex

View of Hotel Plaza

View of Private Courtyard

Image by Red Vertex

Image by Red Vertex

Concept Urban Zone

Concept District Park


View of South Plaza

View of District Park (North)

Image by Red Vertex

Image by Red Vertex

View of Hotel Plaza

View of Private Courtyard

Image by Red Vertex

Image by Red Vertex

Concept Urban Zone

Concept District Park


10

51

1052.50

.2

5

10

1056.25

1055.00

.75 53

1057 .50

LVL 1055.00

57 .50

LVL 1056.25

10

LVL 1053.75

LVL 1052.75

LVL 1053.25

LVL 1052.50

LVL 5 1057.5 56.2 10

10x10 LVL 1053.75 ODF Room LVL 1053.5 5

.7

53 LVL 10 1053.25

LVL 1058.00

1A_MU2_1

1A_P1 LVL 1057.75

1A_MU4_1 .50

LVL 1053.25

52

10

1A_MU4_2

1A_MU2_2

LVL 1052.5

1A_F2

LVL

LVL 1056.25

1053.25 1A_MU1_1

1A_MU5_1 1A_MU1_2 1A_P2

10

10

51

.25

1047.50

0

.5 52

LVL 1052.50

10

47

.5 0

LVL 1055.00

1A_MU5_2

LVL 1051.5

Ac uti cess lity s plo ervin to nly g

FIRE WATER UTILITIES BUILDING

1A_IU 1A_MU6_1

1A_MU5_3

1A_E1 to be confirmed

1A_P3 LVL 1050.5

1A_MU7_1

1A_MU6_2 5

.2

51

10

1A_E2

1A_MU7_2

105

0.00

1A_MU8_1

LE 10 VEL 46 .70

1A_MU8_2

SLOP

LVL 1049.5

6%

MAX.

E

1A_F1

0

.0

1A_MU7_3

E

CEM

SLOPE

FOR

6% MAX.

CONT 2Wx1 ROL .6Hx0 PANE .6D L

AIN

LINE

STOR LIFTI MWA NG TER STAT

ION

50 10

.75

48

SL

OP

10

PLATFORM LEVEL 1053.5m

ZE

RO

Sketch Study Building over “Open Tunnel” at Park

LVL 1048.5

1A_MU9

LVL 1050.75

LE 10 VEL 46 .70

6% MAX. SLOPE

1A_MU3 1048.75

PE

Sketch Studies of Private Courtyard

6%

MAX

. SLO

PLATFORM LEVEL 1052.5m

1A_P4

1B_A3_2

1B_A3_3

Sketch Study of Northern Bounding Road Edge

1B_A2_1

.50

1047

1A_MU10

PLATFORM LEVEL 1051.5m

.50

1047

1B_A2_2

LVL 1047.5 1B_A2_3

1B_MU3 1046

.25

104

7.50

.25

1046

PLATFORM LEVEL 1050.5m

0

1B_A1_1

.0

50

10

1B_A1_2

1B_MU2

47 .50

PLATFORM LEVEL 1049.5m

LVL 1046.5

1B_A1_4

10

1B_P5

1045.00

1B_A1_3

1047.50

1045.00

1046.25

1B_A1_5

1B_MU1

LVL 1048

PLATFORM LEVEL 1048.5m

1045.00

.25

46

10

LVL 1047 .25

1046

1045.00

PLATFORM LEVEL 1048m

104

6.25

.00

1045

1046

.25

1B_E1

POTABLE WATER UTILITIES BUILDING

LVL 1045.5

1B_IU

10

43

.7

5

3.75

104

1B_F1

10

47

.50

PLATFORM LEVEL 1047.5m

1043.75

.25

PLATFORM LEVEL 1046.5m

OP

E

LVL 1044.5

% MA 0.3

5

X.

LE 10 VEL 38 .86

3.7

SL

104

6% MAX.

6% MAX.

SLOPE

SLOPE

0

100

200 m

LE 10 VEL 38 .51

PLATFORM LEVEL 1045.5m

ES W RT ERE H

LE 10 VEL 38 .59

LE 10 VEL 38 .65

1046.25

10

LE V 38 EL .79

43 10

Site Analysis Urban Zone

PLATFORM LEVEL 1047m

AL TA -BAS KE AT N FR EE OM N RO GO AD OG LINE LE EA S WER RT H E

LE 10 VEL 38 .84

. SLO PE MAX 6%

1045.00

.75

tem co por nti ary nu ati clos tem on e pa por of d ro a th futu ad futu un ry s re unti re til c etup ph ph onti as l for as n es es uati PT on of

LE 10 VEL 39 .05

1046

1047.50

Sketch Study of Northern Bounding Road Edge

1B_A3_1

Platform Cut Concept

PLATFORM LEVEL 1044.5m


10

51

1052.50

.2

5

10

1056.25

1055.00

.75 53

1057 .50

LVL 1055.00

57 .50

LVL 1056.25

10

LVL 1053.75

LVL 1052.75

LVL 1053.25

LVL 1052.50

LVL 5 1057.5 56.2 10

10x10 LVL 1053.75 ODF Room LVL 1053.5 5

.7

53 LVL 10 1053.25

LVL 1058.00

1A_MU2_1

1A_P1 LVL 1057.75

1A_MU4_1 .50

LVL 1053.25

52

10

1A_MU4_2

1A_MU2_2

LVL 1052.5

1A_F2

LVL

LVL 1056.25

1053.25 1A_MU1_1

1A_MU5_1 1A_MU1_2 1A_P2

10

10

51

.25

1047.50

0

.5 52

LVL 1052.50

10

47

.5 0

LVL 1055.00

1A_MU5_2

LVL 1051.5

Ac uti cess lity s plo ervin to nly g

FIRE WATER UTILITIES BUILDING

1A_IU 1A_MU6_1

1A_MU5_3

1A_E1 to be confirmed

1A_P3 LVL 1050.5

1A_MU7_1

1A_MU6_2 5

.2

51

10

1A_E2

1A_MU7_2

105

0.00

1A_MU8_1

LE 10 VEL 46 .70

1A_MU8_2

SLOP

LVL 1049.5

6%

MAX.

E

1A_F1

0

.0

1A_MU7_3

E

CEM

SLOPE

FOR

6% MAX.

CONT 2Wx1 ROL .6Hx0 PANE .6D L

AIN

LINE

STOR LIFTI MWA NG TER STAT

ION

50 10

.75

48

SL

OP

10

PLATFORM LEVEL 1053.5m

ZE

RO

Sketch Study Building over “Open Tunnel” at Park

LVL 1048.5

1A_MU9

LVL 1050.75

LE 10 VEL 46 .70

6% MAX. SLOPE

1A_MU3 1048.75

PE

Sketch Studies of Private Courtyard

6%

MAX

. SLO

PLATFORM LEVEL 1052.5m

1A_P4

1B_A3_2

1B_A3_3

Sketch Study of Northern Bounding Road Edge

1B_A2_1

.50

1047

1A_MU10

PLATFORM LEVEL 1051.5m

.50

1047

1B_A2_2

LVL 1047.5 1B_A2_3

1B_MU3 1046

.25

104

7.50

.25

1046

PLATFORM LEVEL 1050.5m

0

1B_A1_1

.0

50

10

1B_A1_2

1B_MU2

47 .50

PLATFORM LEVEL 1049.5m

LVL 1046.5

1B_A1_4

10

1B_P5

1045.00

1B_A1_3

1047.50

1045.00

1046.25

1B_A1_5

1B_MU1

LVL 1048

PLATFORM LEVEL 1048.5m

1045.00

.25

46

10

LVL 1047 .25

1046

1045.00

PLATFORM LEVEL 1048m

104

6.25

.00

1045

1046

.25

1B_E1

POTABLE WATER UTILITIES BUILDING

LVL 1045.5

1B_IU

10

43

.7

5

3.75

104

1B_F1

10

47

.50

PLATFORM LEVEL 1047.5m

1043.75

.25

PLATFORM LEVEL 1046.5m

OP

E

LVL 1044.5

% MA 0.3

5

X.

LE 10 VEL 38 .86

3.7

SL

104

6% MAX.

6% MAX.

SLOPE

SLOPE

0

100

200 m

LE 10 VEL 38 .51

PLATFORM LEVEL 1045.5m

ES W RT ERE H

LE 10 VEL 38 .59

LE 10 VEL 38 .65

1046.25

10

LE V 38 EL .79

43 10

Site Analysis Urban Zone

PLATFORM LEVEL 1047m

AL TA -BAS KE AT N FR EE OM N RO GO AD OG LINE LE EA S WER RT H E

LE 10 VEL 38 .84

. SLO PE MAX 6%

1045.00

.75

tem co por nti ary nu ati clos tem on e pa por of d ro a th futu ad futu un ry s re unti re til c etup ph ph onti as l for as n es es uati PT on of

LE 10 VEL 39 .05

1046

1047.50

Sketch Study of Northern Bounding Road Edge

1B_A3_1

Platform Cut Concept

PLATFORM LEVEL 1044.5m


Chehelseton Gardens - Aga Khan Location: Kabul, Afghanistan The Aga Khan commissioned Planning Partners to work on the landscape for a renovation to the crumbling royal palace and gardens in Kabul.

The brief was to create a place of safety and recration. My role was Project Architect, responsible for design development, detail design and change control.

Garden seating area

Facing: Completed Site photo by client


Chehelseton Gardens - Aga Khan Location: Kabul, Afghanistan The Aga Khan commissioned Planning Partners to work on the landscape for a renovation to the crumbling royal palace and gardens in Kabul.

The brief was to create a place of safety and recration. My role was Project Architect, responsible for design development, detail design and change control.

Garden seating area

Facing: Completed Site photo by client


View of North entrance (Internal)

View of North Entrance (External)

Image by Client

Image by Client

View of Palace Hill

View of Central Rose Garden

Image by Client

Image by Client

Portion of overall plan


View of North entrance (Internal)

View of North Entrance (External)

Image by Client

Image by Client

View of Palace Hill

View of Central Rose Garden

Image by Client

Image by Client

Portion of overall plan


Azuri - IOREC Location: Mauritius My initial foray into Landscape Architecture.

This project was a combined residential and hotel resort, with a mix of residential units for local and foreign owners.

My role was initially documentation and drafting support, but soon expanded to maintaining the overall Master Plan, planting and detail designs.

Completed Residential Unit Gardens

Facing: Master Plan (CAD)


Azuri - IOREC Location: Mauritius My initial foray into Landscape Architecture.

This project was a combined residential and hotel resort, with a mix of residential units for local and foreign owners.

My role was initially documentation and drafting support, but soon expanded to maintaining the overall Master Plan, planting and detail designs.

Completed Residential Unit Gardens

Facing: Master Plan (CAD)


View of Hotel Pool

Initial Entrance Proposal

Image by Planning Partners Initial Entrance Proposal

View of Tropical Planting Image by Planning Partners

IRS Residential LMP

Completed Residential Landscape


View of Hotel Pool

Initial Entrance Proposal

Image by Planning Partners Initial Entrance Proposal

View of Tropical Planting Image by Planning Partners

IRS Residential LMP

Completed Residential Landscape


Residential Hard Landscape Details

Portion Hard Landscape Details


Residential Hard Landscape Details

Portion Hard Landscape Details


6 5 4 3 2 1 0

"BOUCHON" STONE SIDEWALL WITH BRUSH HAMMERED CONCRETE COPING

NGL BASED ON SDDS CONTOURS DRAWING

BASALT & MORTAR FIELDSTONE STEPS WITH BEACHSAND LANDINGS tread 450mm, riser 166mm

-0.6

PATH @ 7.2

LAWN TO FALL

EDGING @ 7.05

BEACH TO FALL

TIMBER 'SLEEPER ' EDGE ON CONCRETE BED TO LATER DETAIL

BRICK EDGE ON CONCRETE BED TO LATER DETAIL 800

COPING @ 7.15

FINISHED SURFACE TO HAVE ROUNDING IN CORNERS TO PREVENT POOL CLEANER STICKY ZONE

POOL @7.0 COPING @ 7.15

( SURFACE OF WATER)

WED ALLO

T RD S

URES RUCT

"BOUCHON" STONE SIDEWALL WITH BRUSH HAMMERED CONCRETE COPING

fgl 5.0

PATH @ 6.0

LAWN TO FALL

SOAK-AWAYS TO PREVENT PONDING IN BEACH AREA TO SPECIALIST DESIGN AND SPCIFICATION

BASALT & MORTAR FIELDSTONE STEPS WITH BEACHSAND LANDINGS tread 450mm, riser 166mm

SECTION B-B

BIDUM MEMBRANE TO CONTAIN SAND IN BEACH AREA TO PRVENT SAND AND SOIL MIXING (TO SPECIALIST DESIGN AND SPCIFICATION)

PLANTER TO BE OPEN TO EARTH BELOW .WALLS AND FOOTINGS INDICATIVE (TO ENGINEERS SPECIFICATION AND DESIGN

50mm POOL FINISHED SURFACE ON 150mm CONCRETE SURFACE BED (ALL DIMENSIONS INDICATIVE -TO BE CONFIRMED BY SPECIALIST DESIGNER)

WALLS AND FOOTINGS INDICATIVE (TO ENGINEERS SPECIFICATION AND DESIGN

NGL BASED ON SDDS CONTOURS DRAWING

-0.6

O HA

D

15m O

FFSE

TERRACES TO BE 300mm DEEP BEACH SAND ON BIDDUM LAYER. 600mm INDICATIVE COVER TO FOOTINGS. RETAINING WALLS AND FOOTINGS ARE ONLY INDICATIVE AND ARE BY OTHER

fgl 5.0

LAWN

+7.20

fgl 4.0 1.5m

E. N T ZON

6 5 4 3 2 1 0

fgl 3.0 NGL BASED ON SDDS CONTOURS DRAWING

-0.6

+6.00

2.0m

A

BEACH TERRACE SECTION A-A SAND BEACH

B

B

+6.00

SURFACE OF WATER

AZURI HAUTE RIVE PHASE I MAURITIUS

5,07

APPROX 6.5m

PLOT - 1CORALIS SECTION THROUGH POOL

7912

30m

fset tal of coas

+7.20

7912 MAY 2012 1:50 @ A0

INDICATIVE POSITION 230 AND SIZE OF PUMP ROOM .TO HOLD BALANCING TANK AND PUMP EQUIPMENT FOR POOL

2000

230

Haute Rive IRS Company Limited & Haute Rive Ocean Front Living Limited 8th FLOOR, HARBOUR FRONT BUILDING PRESIDENT JOHN KENNEDY STREET PORT LOUIS - MAURITIUS - INDIAN OCEAN

A

D

1

NEW SURVEY SPOT LEVEL REQUIRED AT BOTTOM TREAD OF EXISTING LIME KILN STAIRCASE

5.5m

4.0m

3,02

5.0m

4.0m 5.1m

CASCADES & POND

+7.00

5.0m

7 4,5

4.5m

3.0m 3,7 3,54

4.0m

3.5m

3.0m 4,87

2.0m 2.0m

3.0m

BEACH POOL

230

SLOPE

COMMUNAL GARDENS & POOL

2000

5.1m

LAWN TO FALL

230

B

TD

BEACH TERRACE SECTION B-B

B

C

SD

-0.6

75

2.0m

PARCEL NUMBERS ADDED

BASALT & MORTAR FIELDSTONE STEPS WITH BEACHSAND LANDINGS tread 450mm, riser 166mm

6 5 4 3 2 1 0

500mm HIGH STONE WALL TO FOLLOW SLOPE OF NGL ON UPPER LEVEL C

11-05-12

NGL BASED ON SDDS CONTOURS DRAWING

BEACH TERRACE SECTION C-C

DAY MARINE EXTENT OF MAIN BEACH. 1,5m DAY MARINE CONTOUR LEVEL MATCHES 2m SDDS CONTOUR LEVEL. TWO SURVEYS DO NOT HAVE AN ACCURATE MATCH. EXTENT OF BEACH SHOULD TIE IN WITH EXISTING EMBANKMENT.

Beach Edge Retaining Details

A

"BOUCHON" STONE SIDEWALL WITH BRUSH HAMMERED CONCRETE COPING

300

PROPOSED DAY MARINE HWM

fgl 5.0

1500

ALL WORKS TO BE SET OUT ON fgl 4.0 fgl 3.0 SITE FOR INSPECTION AND VERIFICATION PRIOR TO COMMENCEMENT OF BEACH TERRACE SECTION D-D CONSTRUCTION TO CHECK AGAINST LEVELS AND EXISTING TREES THAT MUST BE RETAINED

33

fgl 5.0

2.0m

fgl 6.5 (approx)

2.5m

6 5 4 3 2 1 0

PROPOSED LOCALIZED SLOPE TO REDUCE HEIGHT OF RETAINING WALL

Residential Beach Entry Pool Detail

A


6 5 4 3 2 1 0

"BOUCHON" STONE SIDEWALL WITH BRUSH HAMMERED CONCRETE COPING

NGL BASED ON SDDS CONTOURS DRAWING

BASALT & MORTAR FIELDSTONE STEPS WITH BEACHSAND LANDINGS tread 450mm, riser 166mm

-0.6

PATH @ 7.2

LAWN TO FALL

EDGING @ 7.05

BEACH TO FALL

TIMBER 'SLEEPER ' EDGE ON CONCRETE BED TO LATER DETAIL

BRICK EDGE ON CONCRETE BED TO LATER DETAIL 800

COPING @ 7.15

FINISHED SURFACE TO HAVE ROUNDING IN CORNERS TO PREVENT POOL CLEANER STICKY ZONE

POOL @7.0 COPING @ 7.15

( SURFACE OF WATER)

WED ALLO

T RD S

URES RUCT

"BOUCHON" STONE SIDEWALL WITH BRUSH HAMMERED CONCRETE COPING

fgl 5.0

PATH @ 6.0

LAWN TO FALL

SOAK-AWAYS TO PREVENT PONDING IN BEACH AREA TO SPECIALIST DESIGN AND SPCIFICATION

BASALT & MORTAR FIELDSTONE STEPS WITH BEACHSAND LANDINGS tread 450mm, riser 166mm

SECTION B-B

BIDUM MEMBRANE TO CONTAIN SAND IN BEACH AREA TO PRVENT SAND AND SOIL MIXING (TO SPECIALIST DESIGN AND SPCIFICATION)

PLANTER TO BE OPEN TO EARTH BELOW .WALLS AND FOOTINGS INDICATIVE (TO ENGINEERS SPECIFICATION AND DESIGN

50mm POOL FINISHED SURFACE ON 150mm CONCRETE SURFACE BED (ALL DIMENSIONS INDICATIVE -TO BE CONFIRMED BY SPECIALIST DESIGNER)

WALLS AND FOOTINGS INDICATIVE (TO ENGINEERS SPECIFICATION AND DESIGN

NGL BASED ON SDDS CONTOURS DRAWING

-0.6

O HA

D

15m O

FFSE

TERRACES TO BE 300mm DEEP BEACH SAND ON BIDDUM LAYER. 600mm INDICATIVE COVER TO FOOTINGS. RETAINING WALLS AND FOOTINGS ARE ONLY INDICATIVE AND ARE BY OTHER

fgl 5.0

LAWN

+7.20

fgl 4.0 1.5m

E. N T ZON

6 5 4 3 2 1 0

fgl 3.0 NGL BASED ON SDDS CONTOURS DRAWING

-0.6

+6.00

2.0m

A

BEACH TERRACE SECTION A-A SAND BEACH

B

B

+6.00

SURFACE OF WATER

AZURI HAUTE RIVE PHASE I MAURITIUS

5,07

APPROX 6.5m

PLOT - 1CORALIS SECTION THROUGH POOL

7912

30m

fset tal of coas

+7.20

7912 MAY 2012 1:50 @ A0

INDICATIVE POSITION 230 AND SIZE OF PUMP ROOM .TO HOLD BALANCING TANK AND PUMP EQUIPMENT FOR POOL

2000

230

Haute Rive IRS Company Limited & Haute Rive Ocean Front Living Limited 8th FLOOR, HARBOUR FRONT BUILDING PRESIDENT JOHN KENNEDY STREET PORT LOUIS - MAURITIUS - INDIAN OCEAN

A

D

1

NEW SURVEY SPOT LEVEL REQUIRED AT BOTTOM TREAD OF EXISTING LIME KILN STAIRCASE

5.5m

4.0m

3,02

5.0m

4.0m 5.1m

CASCADES & POND

+7.00

5.0m

7 4,5

4.5m

3.0m 3,7 3,54

4.0m

3.5m

3.0m 4,87

2.0m 2.0m

3.0m

BEACH POOL

230

SLOPE

COMMUNAL GARDENS & POOL

2000

5.1m

LAWN TO FALL

230

B

TD

BEACH TERRACE SECTION B-B

B

C

SD

-0.6

75

2.0m

PARCEL NUMBERS ADDED

BASALT & MORTAR FIELDSTONE STEPS WITH BEACHSAND LANDINGS tread 450mm, riser 166mm

6 5 4 3 2 1 0

500mm HIGH STONE WALL TO FOLLOW SLOPE OF NGL ON UPPER LEVEL C

11-05-12

NGL BASED ON SDDS CONTOURS DRAWING

BEACH TERRACE SECTION C-C

DAY MARINE EXTENT OF MAIN BEACH. 1,5m DAY MARINE CONTOUR LEVEL MATCHES 2m SDDS CONTOUR LEVEL. TWO SURVEYS DO NOT HAVE AN ACCURATE MATCH. EXTENT OF BEACH SHOULD TIE IN WITH EXISTING EMBANKMENT.

Beach Edge Retaining Details

A

"BOUCHON" STONE SIDEWALL WITH BRUSH HAMMERED CONCRETE COPING

300

PROPOSED DAY MARINE HWM

fgl 5.0

1500

ALL WORKS TO BE SET OUT ON fgl 4.0 fgl 3.0 SITE FOR INSPECTION AND VERIFICATION PRIOR TO COMMENCEMENT OF BEACH TERRACE SECTION D-D CONSTRUCTION TO CHECK AGAINST LEVELS AND EXISTING TREES THAT MUST BE RETAINED

33

fgl 5.0

2.0m

fgl 6.5 (approx)

2.5m

6 5 4 3 2 1 0

PROPOSED LOCALIZED SLOPE TO REDUCE HEIGHT OF RETAINING WALL

Residential Beach Entry Pool Detail

A


Mayfair - Mixed Use Development Location: Century City, Cape Town This project was a mixed use project, with the site split roughly in two, to create a Commercial and Residential project. My roles were landscape concept design and development on the residential component and hard landscape design and development on the commercial component. Work included both the 2D concept design and 3D resolution of all levels and land-forms.

REGENT LIGHT SOLUTIONS : ORION CODE : C127 HOUSING : LM 6 die cast aluminium. DIFFUSER : Prismatic acrylic diffuser FINISH : Powder coated. (black) MOUNTING : Post or wall mounted. Recommended mounting height 2.5m to 5m. Spigot entry 76mm diameter. For detailed mounting specifications refer to pole and accessories section.

REVELSTONE RAVINE POND CAPPING COLOUR SANDSTONE

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

WATER FEATURE ELEVATION 1:50 Water Feature Design Intent

REVELSTONE RANDOM CLADDING COLOUR SANDSTONE

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

PAINTED PLASTER COLOUR CODES BY PLASCON LOG CABIN 47-24-D TO BE MATCHED BY DULUX

PAINTED PLASTER SIGNAGE WALL

GARGOYLE AS PER PHOTO AND SPEC

REVELSTONE RAVINE SPLIT CLADDING COLOUR CARBON

REVELSTONE RAVINE POND CAPPING COLOUR SANDSTONE

SIGNAGE 150mm HIGH LETTERS

PAINTED PLASTER COLOUR CODES BY PLASCON LOG CABIN 47-24-D TO BE MATCHED BY DULUX

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

PAINTED PLASTER SIGNAGE WALL SIGNAGE 150mm HIGH LETTERS

PAINTED PLASTER COLOUR CODES BY PLASCON LOG CABIN 47-24-D TO BE MATCHED BY DULUX

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

REVELSTONE RANDOM CLADDING COLOUR SANDSTONE

REVELSTONE RAVINE POND CAPPING COLOUR SANDSTONE

PAINTED PLASTER COLOUR CODES BY PLASCON LOG CABIN 47-24-D TO BE MATCHED BY DULUX

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

FOR APPROVAL PRIOR TO FINAL COATS BEING APPLIED


Mayfair - Mixed Use Development Location: Century City, Cape Town This project was a mixed use project, with the site split roughly in two, to create a Commercial and Residential project. My roles were landscape concept design and development on the residential component and hard landscape design and development on the commercial component. Work included both the 2D concept design and 3D resolution of all levels and land-forms.

REGENT LIGHT SOLUTIONS : ORION CODE : C127 HOUSING : LM 6 die cast aluminium. DIFFUSER : Prismatic acrylic diffuser FINISH : Powder coated. (black) MOUNTING : Post or wall mounted. Recommended mounting height 2.5m to 5m. Spigot entry 76mm diameter. For detailed mounting specifications refer to pole and accessories section.

REVELSTONE RAVINE POND CAPPING COLOUR SANDSTONE

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

WATER FEATURE ELEVATION 1:50 Water Feature Design Intent

REVELSTONE RANDOM CLADDING COLOUR SANDSTONE

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

PAINTED PLASTER COLOUR CODES BY PLASCON LOG CABIN 47-24-D TO BE MATCHED BY DULUX

PAINTED PLASTER SIGNAGE WALL

GARGOYLE AS PER PHOTO AND SPEC

REVELSTONE RAVINE SPLIT CLADDING COLOUR CARBON

REVELSTONE RAVINE POND CAPPING COLOUR SANDSTONE

SIGNAGE 150mm HIGH LETTERS

PAINTED PLASTER COLOUR CODES BY PLASCON LOG CABIN 47-24-D TO BE MATCHED BY DULUX

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

PAINTED PLASTER SIGNAGE WALL SIGNAGE 150mm HIGH LETTERS

PAINTED PLASTER COLOUR CODES BY PLASCON LOG CABIN 47-24-D TO BE MATCHED BY DULUX

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

REVELSTONE RANDOM CLADDING COLOUR SANDSTONE

REVELSTONE RAVINE POND CAPPING COLOUR SANDSTONE

PAINTED PLASTER COLOUR CODES BY PLASCON LOG CABIN 47-24-D TO BE MATCHED BY DULUX

PAINTED PLASTER COLOUR CODES BY PLASCON PAPYRUS E 14-3 TO BE MATCHED BY DULUX

FOR APPROVAL PRIOR TO FINAL COATS BEING APPLIED


SketchUp Platform Study

SketchUp Plan

Facing: LMP


SketchUp Platform Study

SketchUp Plan

Facing: LMP


Signage Design:

Signage Design:

“Grand Entrance”

Route Markers

Role: Designer

Role: Designer

Reporting directly to the Company Director and Associate Project Lead

Reporting directly to the Company Director and Associate Project Lead

Responsibilities:

Responsibilities:

Sketch design and development of “iconic” entrance elements to upmarket Bush Estate

Design several options for various signage requirements to MTB course in Mauritius


Signage Design:

Signage Design:

“Grand Entrance”

Route Markers

Role: Designer

Role: Designer

Reporting directly to the Company Director and Associate Project Lead

Reporting directly to the Company Director and Associate Project Lead

Responsibilities:

Responsibilities:

Sketch design and development of “iconic” entrance elements to upmarket Bush Estate

Design several options for various signage requirements to MTB course in Mauritius


Fence Design Options:

TRADITIONAL YURT ERECTED FOR CELEBRATIONS AND EVENTS. NON PERMANENT STRUCTURE

BOULDER BARRIER INTEGRATED WITH SEE THROUGH MESH FENCING

VIEW OVER MOUNTAINS

Two Sketch Design Options Role: Designer Reporting directly to the Company Director and Associate Project Lead

Look-Out Point “Yurt Park”:

ELEVATION FACING VIEW

AND

RIV E

R

Look Out Point: VA LL

EY

Traditional yurt Role: Designer Reporting directly to the Company

TYPICAL WALL TREATMENT

SCENIC AND GEOLOGICAL INTERPRETIVE SIGNAGE Director and Associate Project ON LOW STONE WALL

"CLEAR-VU" STYLE

Responsibilities:

Lead

Responsibilities: PLEATED ALUMINIUM ROOF

Sketch Design various options for client approval

SEMI DRESSED STONE FOR WALL & SEATING CONSTRUCTION

TIMBER YURT SKELETON ON PERMANENT DISPLAY

SEE THROUGH MESH FENCING

PARKING AREA TO BE SCREENED FROM VIEW WITH PLANTING AND BOULDER BERM TO HELP BUILD ANTICIPATION OF ARRIVAL AT LOOK OUT POINT

BOULDER CONSTRUCTED "CANYON" PASSAGEWAY TO CREATE THEATRICAL ARRIVAL AT ENTRANCE TO EXPANSIVE MOUNTAIN AND RIVER PANORAMA

VIEW

PALISADE STYLE

SECTION SHOWING "CANYON" PASSAGE AND VIEW POINT PLANNING PARTNERS INTERNATIONAL STADS- EN STREEKBEPLANNING . LANDSKAPARGITEKTUUR . OMGEWINGSBEPLANNING . STADSONTWERP TOWN AND REGIONAL PLANNING . LANDSCAPE ARCHITECTURE . ENVIRONMENTAL PLANNING . URBAN DESIGN

INDICATIVE SECTION NTS

NARYN PANORAMA PARK AND YURT EXHIBIT

Brickworks, Suite F03, 13 Brickfield Road, Salt River PO Box / Posbus 4866 Cape Town / Kaapstad 8000 Tel: (021) 418-0510

Sketch Design proposal


Fence Design Options:

TRADITIONAL YURT ERECTED FOR CELEBRATIONS AND EVENTS. NON PERMANENT STRUCTURE

BOULDER BARRIER INTEGRATED WITH SEE THROUGH MESH FENCING

VIEW OVER MOUNTAINS

Two Sketch Design Options Role: Designer Reporting directly to the Company Director and Associate Project Lead

Look-Out Point “Yurt Park”:

ELEVATION FACING VIEW

AND

RIV E

R

Look Out Point: VA LL

EY

Traditional yurt Role: Designer Reporting directly to the Company

TYPICAL WALL TREATMENT

SCENIC AND GEOLOGICAL INTERPRETIVE SIGNAGE Director and Associate Project ON LOW STONE WALL

"CLEAR-VU" STYLE

Responsibilities:

Lead

Responsibilities: PLEATED ALUMINIUM ROOF

Sketch Design various options for client approval

SEMI DRESSED STONE FOR WALL & SEATING CONSTRUCTION

TIMBER YURT SKELETON ON PERMANENT DISPLAY

SEE THROUGH MESH FENCING

PARKING AREA TO BE SCREENED FROM VIEW WITH PLANTING AND BOULDER BERM TO HELP BUILD ANTICIPATION OF ARRIVAL AT LOOK OUT POINT

BOULDER CONSTRUCTED "CANYON" PASSAGEWAY TO CREATE THEATRICAL ARRIVAL AT ENTRANCE TO EXPANSIVE MOUNTAIN AND RIVER PANORAMA

VIEW

PALISADE STYLE

SECTION SHOWING "CANYON" PASSAGE AND VIEW POINT PLANNING PARTNERS INTERNATIONAL STADS- EN STREEKBEPLANNING . LANDSKAPARGITEKTUUR . OMGEWINGSBEPLANNING . STADSONTWERP TOWN AND REGIONAL PLANNING . LANDSCAPE ARCHITECTURE . ENVIRONMENTAL PLANNING . URBAN DESIGN

INDICATIVE SECTION NTS

NARYN PANORAMA PARK AND YURT EXHIBIT

Brickworks, Suite F03, 13 Brickfield Road, Salt River PO Box / Posbus 4866 Cape Town / Kaapstad 8000 Tel: (021) 418-0510

Sketch Design proposal


Private Residence: Sketching study

Site Section: Slope cut and level study

Role: Designer Client Facing

Role: Designer

Responsibilities:

Reporting to Town Planning and Landscape Director

Sketch Design proposal Responsibilities: •

Master planing

Landscape Master planing

Slope Analysis and proposals


Private Residence: Sketching study

Site Section: Slope cut and level study

Role: Designer Client Facing

Role: Designer

Responsibilities:

Reporting to Town Planning and Landscape Director

Sketch Design proposal Responsibilities: •

Master planing

Landscape Master planing

Slope Analysis and proposals


Massing and Urban form Studies: Possible Commercial Building forms for Town Planning Proposal Mauritius Role: Designer

Elevation Study: Sketching study for a Car Rental Company located near Cape Town International Airport Role: Architect Reporting to Director and Client Facing Responsibilities:

Reporting to senior associate lead on the project

Sketch Design proposal

Responsibilities:

Design development

Full Construction management

Sketch Design proposal


Massing and Urban form Studies: Possible Commercial Building forms for Town Planning Proposal Mauritius Role: Designer

Elevation Study: Sketching study for a Car Rental Company located near Cape Town International Airport Role: Architect Reporting to Director and Client Facing Responsibilities:

Reporting to senior associate lead on the project

Sketch Design proposal

Responsibilities:

Design development

Full Construction management

Sketch Design proposal


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.