PORTFOLIO ‘17 SEÇİL YILMAZ
SEÇİL YILMAZ, Architect 21/10/1991, Bolu +90 555 482 84 94 scl.ylmz91@gmail.com
EDUCATION 2005/2009 Izzet Baysal Anatolian High School Sciences, 86.73/100 2010/2012 Middle East Technical University Department of Maths 2013/2017 Abant Izzet Baysal University Department of Arc. 2.90/4.00
INTERNSHIP 2015, July- August 2016, June-July
Tunçok Con. Con. ve Tur. Ltd. Com. , Bolu CRC Con. Con. ve Tur. Ltd. Com. , Bolu
PROGRAMS Autodesk Autocad Autodest Revit Adobe Photoshop Adobe Ilustrator Google SketcUp Corel Draw Lumion Autodesk 3D max Microsoft Office
ACTIVITIES 2015, August 2016, August
Mudurnu City Marque Competition, Reporter Eyewitness from Anatolia: Mudurnu in the Early Republican Era Through the Lens of Bengüboz, Photography Date Assistant
CONTENT
01
AIRPORT DESING | GRADUATED PROJECT
09
CITY LIBRARY | ARCHITECTURE PROJECT IV
17
YOUTH CENTER AND SPORTS COMPLEX | ARCHITECTURE PROJECT III
AIRPORT DESING I
GRADUATED PROJECT
Project area is in Bolu which is used a military zone and landing field. This area is between Ankara and Ä°stanbul which users reached area easily.
PROJECT AREA SETTLEMENT
HOSPITAL UNIVERSITY
SETTLEMENT PROJECT AREA
MAIN ROAD D100 WAY
ROAD ROAD
BUS TERMINAL INDUSTRY
2
CONTROL TOWER
FIRE STATION
DHMI
TERMINAL
PARKING AREA
PUBLIC HOUSİNG SECURİTY AREA
SECURİTY AREA
MASTER PLAN 3
CONTROL AREA
2
ENTER 3
7 3
6
3
3
3 7
3
5
3
3
3
3 3
ENTER
4 4
4
3
3
3
3
4
4
3
4
4
4
3
3
7
3
2
4 1
3 7
1 4
ENTER
ENTER
PUBLIC AREA PASSENGER AREA ATRIUM
0.00 LEVEL PLAN (ARRIVING PASSENGER) 1- WAITING AREA 2- WAITING AREA FOR PASSENGER 3- COMMERCIAL AREA 4- OFFICE 5- VIP 6- CREW MEMBER 7- ATRIUM
1 1 1
2 2 2
3 3 3
13
SECTION B-B
1- CHANGING ROOM FOR CREW MEMBER 2- VIP 3- SERVICE AREA 4- OFFICE 5- WAITING AREA 6- CREW MEMBER 7- ENTERING FOR DEPARTING PASSENSER (DOMESTIC) 8- EXIT FOR ARRIVING PASSENGER (DOMESTIC)
4 6
5
7 8 14
4 6
3
9
3 3 3
14
3
10 4 4
5 15
6
11 12
6 6 6
15
9- ATRIUM 10- CHECK-IN 11- ENTERING FOR DEPARTING PASSENSER (INTERNATIONAL) 12- EXIT FOR ARRIVING PASSENGER (INTERNATIONAL 13- CAFETERIA FOR PERSONAL 14- BAGGAGE 15- STORAGE 4
2
3 3
2
3
7
3 3
6
5
1
3 3
7
3
1
3 3 4
7
7
+4.50 LEVEL PLAN (DEPARTING PASSENGER) 1- WAITING AREA 2- WAITING AREA FOR PASSENGER 3- COMMERCIAL AREA 4- OFFICE 5- VIP 6- CREW MEMBER 7- ATRIUM
PUBLIC AREA PASSENGER AREA ATRIUM
1
4
2 3
SECTION A-A
1- ENTERING FOR DEPATING PASSENGER 2- ENTERING FOR ARRIVING PASSENGER 3- SERVICE WAY 4- WAITING AREA 5- COMMERCIAL AREA 6- ENTERING FOR DEPARTING PASSENSER (DOMESTIC) 7- COMMERCIAL AREA AND SITTING AREA X
5
12
4
5 5 3
8- EXIT FOR ARRIVING PASSENGER (DOMESTIC) 9- ATRIUM 10- WAITING AREA FOR DEPARTING PASSENGER (DOMESTIC) 11- WAITING FOR ARRIVING PASSENSER (DOMESTIC) 12- TECHNICAL AREA 13- STORAGE 14- BAGGAGE
13
5 14
6 7 8
9 14
10 11 11
2 7 3 2
3
3
3 7
7 4 4 4 4 4 4 4 4 4
3
7
4 4 4 4
1
3 3
1
7
PUBLIC AREA PASSENGER AREA ATRIUM
+9.00 LEVEL PLAN (DEPARTING PASSENGER) 1- WAITING AREA 2- WAITING AREA FOR PASSENGER 3- COMMERCIAL AREA 4- OFFICE 5- VIP 6- CREW MEMBER 7- ATRIUM
6
PUBLIC SPACE
DEPARTİNG PASSENGER
ENTER ARRİVİNG PASSENGER
ENTER SUN DİRECTION
7
ATRIUM
PRİVATE SPACE
8
CITY LIBRARY I
ARCHITECTURAL PROJECT IV
Project area is in Bolu. It is a closer city center. If people want to project area, they used a bus or a walk in. It generally is a residence area. It has a elemantary school and high school near the area. And also, two dormitories is in there.
PROJECT AREA
HURRIYET STREET
ANITPARK
BUS STATION
MASS Ä°DEA
CHILDREN AREA ENTER
ENTER
MANAGEMENT AREA
ADULT AREA
CHILDREN AREA
ATRIUM
ADULT AREA
MANAGEMENT AREA
MANAGEMENT AREA
ADULT AREA
CHILDREN AREA
ENTER
SECTION TRAFFIC
10
11
PARKING AREA FOR WORKERS
0.00
+4.00
ENTER
PARKING AREA FOR USERS
+12.00 ENTER
+8.00
0.00
ENTER HURRIYET STREET
MASTER PLAN
12
B 7
7
7
7
7
7
7
7
4
4
2
3
1
1 2
2
3
1
1
3
4
SECTION A-A
A
1- LIBRARY FOR CHILDREN 2- STUDYING AREA FOR CHILDREN 3- ACTIVITY AREA FOR CHILDREN
5
A 6
B
5
0.00 LEVEL PLAN 4 1
2
1
2
3
5 6
7
8 9
SECTION B-B
1- ACTIVITY AREA FOR CHILDREN 2- CIRCULATION AREA 3- ATRIUM 4- STUDYING AREA FOR ADULT 5- LIBRARY FOR ADULT 6- CAFETERIA 7- DISABLED USERS 8- OFFICE 9- STORAGE
13
1- ATRIUM 2- BOOKSTORE 3- CAFETERIA 4- DISABLED USERS 5- LIBRARY 6- ACTIVITY AREA FOR CHILDREN 7- OFFICE 8- WC
B
B
+4.00
+4.00
2 2
2
1
1
2
1 3
+8.00 LEVEL PLAN
+4.00 LEVEL PLAN A 4
5
1- ATRIUM 2- STUDYING AREA FOR ADULT
+8.00
B
4
B
A
1- ATRIUM 2- LIBRARY FOR ADULT 3- STUDYING AREA FOR ADULT 4- STUDYING AREA FOR ADULT 5- ACTIVITY AREA FOR CHILDREN
14
15
16
CITY LIBRARY I
YOUTH CENTER AND SPORTS COMPLEX I
ARCHITECTURAL PROJECT IV
ARCHITECTURAL PROJECT III
STUDIO
STUDIO
STUDÄ°O
CONFERENFE
OPEN SPORTS AREA
EA
AR
ENTER
OPEN SPORTS TAREA
FE REN
ENTER
NFE
RTS
SPO
ION LAT
SPORTS AREA
CO
FE REN
CIRCULATION
CU CIR
NFE
CIRCULATION
ENTER
ENTER
CO
SUGGESTION ROAD
ENTER
RTS
ENTER
SPO
EA
AR
OPEN SPORTS AREA
Project area is in Bolu. After earthquake in 1999, this area is starting to build. It generally is a residence area. It was built a school which is a pre-school, a elementary school and a high school so I prefered it.
18
0.00
+13.50 +9.00 +4.50
+18.50
0.00
+9.00 PARKÄ°NG AREA
0.00
ENTER
OPEN SPORTS AREA
MASTER PLAN
19
20
SECTION A-A 3
1- FOYAR 2- CONFERENCE HALL 3- TENNIS COURT 4- PARKING AREA 5- SHELTER
1
2
4
5
A 3 4
3
1 4
C 2
B 6
3
3 5
5
5
SECTION B-B
5
1 2
2
8
5
C 1 7
4
1- ENTRANCE 2- TRIBUNE 3- CHANGÄ°NG ROOM 4- BASKETBALL COURT 4- TECHNICAL AREA 5- PARKING AREA
2
4
5
3 5
4
5
6
4
4
4
10
4 9
A
B
2
1
2
2
1
2
2
1
SECTION C-C 1- ATRIUM 2- OFFICE
0.00 LEVEL PLAN 1- ENTRANCE 2- OFFICE 3- STUDIO 4- CHANGING ROOM 5- WC
6- FOYAR 7- CONFERENCE HALL 8- CAFE 9- BASEBALL COURT 10- TENNIS COURT
3
3 4
3
2 2
2
4
2
2
2
2
2
2
2
3
1
3
3 3 5
5
5
2
1
2
+4.50
+4.50
6
4
4
4
+9.00
5
5
1
5
2 4
+4.50 LEVEL PLAN 1- ATRIUM 2- OFFICE 3- STUDIO 4- CHANGING ROOM 5- WC 6- CAFE 7- TRIBUNE 8- BASKETBALL AREA
21
+9.00 LEVEL PLAN
7
8
1- ATRIUM 2- LIBRARY 3- CLASSROOM 4- WC 5- OFFICE
-3.50 LEVEL PLAN +9.00
1- CONFERENCE HALL 2- TECHNICAL AREA 3- SHELTER 4- PARKING AREA 5- BACK STAGE
+14.10 +13.50 +12.90
+9.00 +8.40
+4.50 +3.90
0.00
SYSTEM SECTION 22
scl.ylmz91@gmail.com +9 0 555 482 84 94