Pf_17

Page 1

PORTFOLIO ‘17 SEÇİL YILMAZ


SEÇİL YILMAZ, Architect 21/10/1991, Bolu +90 555 482 84 94 scl.ylmz91@gmail.com


EDUCATION 2005/2009 Izzet Baysal Anatolian High School Sciences, 86.73/100 2010/2012 Middle East Technical University Department of Maths 2013/2017 Abant Izzet Baysal University Department of Arc. 2.90/4.00

INTERNSHIP 2015, July- August 2016, June-July

Tunçok Con. Con. ve Tur. Ltd. Com. , Bolu CRC Con. Con. ve Tur. Ltd. Com. , Bolu

PROGRAMS Autodesk Autocad Autodest Revit Adobe Photoshop Adobe Ilustrator Google SketcUp Corel Draw Lumion Autodesk 3D max Microsoft Office

ACTIVITIES 2015, August 2016, August

Mudurnu City Marque Competition, Reporter Eyewitness from Anatolia: Mudurnu in the Early Republican Era Through the Lens of Bengüboz, Photography Date Assistant



CONTENT

01

AIRPORT DESING | GRADUATED PROJECT

09

CITY LIBRARY | ARCHITECTURE PROJECT IV

17

YOUTH CENTER AND SPORTS COMPLEX | ARCHITECTURE PROJECT III


AIRPORT DESING I

GRADUATED PROJECT


Project area is in Bolu which is used a military zone and landing field. This area is between Ankara and Ä°stanbul which users reached area easily.

PROJECT AREA SETTLEMENT

HOSPITAL UNIVERSITY

SETTLEMENT PROJECT AREA

MAIN ROAD D100 WAY

ROAD ROAD

BUS TERMINAL INDUSTRY

2


CONTROL TOWER

FIRE STATION

DHMI

TERMINAL

PARKING AREA

PUBLIC HOUSİNG SECURİTY AREA

SECURİTY AREA

MASTER PLAN 3

CONTROL AREA


2

ENTER 3

7 3

6

3

3

3 7

3

5

3

3

3

3 3

ENTER

4 4

4

3

3

3

3

4

4

3

4

4

4

3

3

7

3

2

4 1

3 7

1 4

ENTER

ENTER

PUBLIC AREA PASSENGER AREA ATRIUM

0.00 LEVEL PLAN (ARRIVING PASSENGER) 1- WAITING AREA 2- WAITING AREA FOR PASSENGER 3- COMMERCIAL AREA 4- OFFICE 5- VIP 6- CREW MEMBER 7- ATRIUM

1 1 1

2 2 2

3 3 3

13

SECTION B-B

1- CHANGING ROOM FOR CREW MEMBER 2- VIP 3- SERVICE AREA 4- OFFICE 5- WAITING AREA 6- CREW MEMBER 7- ENTERING FOR DEPARTING PASSENSER (DOMESTIC) 8- EXIT FOR ARRIVING PASSENGER (DOMESTIC)

4 6

5

7 8 14

4 6

3

9

3 3 3

14

3

10 4 4

5 15

6

11 12

6 6 6

15

9- ATRIUM 10- CHECK-IN 11- ENTERING FOR DEPARTING PASSENSER (INTERNATIONAL) 12- EXIT FOR ARRIVING PASSENGER (INTERNATIONAL 13- CAFETERIA FOR PERSONAL 14- BAGGAGE 15- STORAGE 4


2

3 3

2

3

7

3 3

6

5

1

3 3

7

3

1

3 3 4

7

7

+4.50 LEVEL PLAN (DEPARTING PASSENGER) 1- WAITING AREA 2- WAITING AREA FOR PASSENGER 3- COMMERCIAL AREA 4- OFFICE 5- VIP 6- CREW MEMBER 7- ATRIUM

PUBLIC AREA PASSENGER AREA ATRIUM

1

4

2 3

SECTION A-A

1- ENTERING FOR DEPATING PASSENGER 2- ENTERING FOR ARRIVING PASSENGER 3- SERVICE WAY 4- WAITING AREA 5- COMMERCIAL AREA 6- ENTERING FOR DEPARTING PASSENSER (DOMESTIC) 7- COMMERCIAL AREA AND SITTING AREA X

5

12

4

5 5 3

8- EXIT FOR ARRIVING PASSENGER (DOMESTIC) 9- ATRIUM 10- WAITING AREA FOR DEPARTING PASSENGER (DOMESTIC) 11- WAITING FOR ARRIVING PASSENSER (DOMESTIC) 12- TECHNICAL AREA 13- STORAGE 14- BAGGAGE

13

5 14

6 7 8

9 14

10 11 11


2 7 3 2

3

3

3 7

7 4 4 4 4 4 4 4 4 4

3

7

4 4 4 4

1

3 3

1

7

PUBLIC AREA PASSENGER AREA ATRIUM

+9.00 LEVEL PLAN (DEPARTING PASSENGER) 1- WAITING AREA 2- WAITING AREA FOR PASSENGER 3- COMMERCIAL AREA 4- OFFICE 5- VIP 6- CREW MEMBER 7- ATRIUM

6


PUBLIC SPACE

DEPARTİNG PASSENGER

ENTER ARRİVİNG PASSENGER

ENTER SUN DİRECTION

7

ATRIUM

PRİVATE SPACE


8


CITY LIBRARY I

ARCHITECTURAL PROJECT IV


Project area is in Bolu. It is a closer city center. If people want to project area, they used a bus or a walk in. It generally is a residence area. It has a elemantary school and high school near the area. And also, two dormitories is in there.

PROJECT AREA

HURRIYET STREET

ANITPARK

BUS STATION

MASS Ä°DEA

CHILDREN AREA ENTER

ENTER

MANAGEMENT AREA

ADULT AREA

CHILDREN AREA

ATRIUM

ADULT AREA

MANAGEMENT AREA

MANAGEMENT AREA

ADULT AREA

CHILDREN AREA

ENTER

SECTION TRAFFIC

10


11


PARKING AREA FOR WORKERS

0.00

+4.00

ENTER

PARKING AREA FOR USERS

+12.00 ENTER

+8.00

0.00

ENTER HURRIYET STREET

MASTER PLAN

12


B 7

7

7

7

7

7

7

7

4

4

2

3

1

1 2

2

3

1

1

3

4

SECTION A-A

A

1- LIBRARY FOR CHILDREN 2- STUDYING AREA FOR CHILDREN 3- ACTIVITY AREA FOR CHILDREN

5

A 6

B

5

0.00 LEVEL PLAN 4 1

2

1

2

3

5 6

7

8 9

SECTION B-B

1- ACTIVITY AREA FOR CHILDREN 2- CIRCULATION AREA 3- ATRIUM 4- STUDYING AREA FOR ADULT 5- LIBRARY FOR ADULT 6- CAFETERIA 7- DISABLED USERS 8- OFFICE 9- STORAGE

13

1- ATRIUM 2- BOOKSTORE 3- CAFETERIA 4- DISABLED USERS 5- LIBRARY 6- ACTIVITY AREA FOR CHILDREN 7- OFFICE 8- WC


B

B

+4.00

+4.00

2 2

2

1

1

2

1 3

+8.00 LEVEL PLAN

+4.00 LEVEL PLAN A 4

5

1- ATRIUM 2- STUDYING AREA FOR ADULT

+8.00

B

4

B

A

1- ATRIUM 2- LIBRARY FOR ADULT 3- STUDYING AREA FOR ADULT 4- STUDYING AREA FOR ADULT 5- ACTIVITY AREA FOR CHILDREN

14


15


16


CITY LIBRARY I

YOUTH CENTER AND SPORTS COMPLEX I

ARCHITECTURAL PROJECT IV

ARCHITECTURAL PROJECT III


STUDIO

STUDIO

STUDÄ°O

CONFERENFE

OPEN SPORTS AREA

EA

AR

ENTER

OPEN SPORTS TAREA

FE REN

ENTER

NFE

RTS

SPO

ION LAT

SPORTS AREA

CO

FE REN

CIRCULATION

CU CIR

NFE

CIRCULATION

ENTER

ENTER

CO

SUGGESTION ROAD

ENTER

RTS

ENTER

SPO

EA

AR

OPEN SPORTS AREA

Project area is in Bolu. After earthquake in 1999, this area is starting to build. It generally is a residence area. It was built a school which is a pre-school, a elementary school and a high school so I prefered it.

18


0.00

+13.50 +9.00 +4.50

+18.50

0.00

+9.00 PARKÄ°NG AREA

0.00

ENTER

OPEN SPORTS AREA

MASTER PLAN

19


20


SECTION A-A 3

1- FOYAR 2- CONFERENCE HALL 3- TENNIS COURT 4- PARKING AREA 5- SHELTER

1

2

4

5

A 3 4

3

1 4

C 2

B 6

3

3 5

5

5

SECTION B-B

5

1 2

2

8

5

C 1 7

4

1- ENTRANCE 2- TRIBUNE 3- CHANGÄ°NG ROOM 4- BASKETBALL COURT 4- TECHNICAL AREA 5- PARKING AREA

2

4

5

3 5

4

5

6

4

4

4

10

4 9

A

B

2

1

2

2

1

2

2

1

SECTION C-C 1- ATRIUM 2- OFFICE

0.00 LEVEL PLAN 1- ENTRANCE 2- OFFICE 3- STUDIO 4- CHANGING ROOM 5- WC

6- FOYAR 7- CONFERENCE HALL 8- CAFE 9- BASEBALL COURT 10- TENNIS COURT

3

3 4

3

2 2

2

4

2

2

2

2

2

2

2

3

1

3

3 3 5

5

5

2

1

2

+4.50

+4.50

6

4

4

4

+9.00

5

5

1

5

2 4

+4.50 LEVEL PLAN 1- ATRIUM 2- OFFICE 3- STUDIO 4- CHANGING ROOM 5- WC 6- CAFE 7- TRIBUNE 8- BASKETBALL AREA

21

+9.00 LEVEL PLAN

7

8

1- ATRIUM 2- LIBRARY 3- CLASSROOM 4- WC 5- OFFICE

-3.50 LEVEL PLAN +9.00

1- CONFERENCE HALL 2- TECHNICAL AREA 3- SHELTER 4- PARKING AREA 5- BACK STAGE


+14.10 +13.50 +12.90

+9.00 +8.40

+4.50 +3.90

0.00

SYSTEM SECTION 22


scl.ylmz91@gmail.com +9 0 555 482 84 94


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.