Continuing Education Cesar E. Chavez Campus Project Update

Page 1

San Diego Community College District

PROPOSITIONS S & N PROJECT UPDATE César E. Chávez Campus Address

1901 Main Street San Diego, CA 92113 www.sdce.edu

Architect

Martinez + Cutri Architects

Construction Manager

Rudolph & Sletten

http://public.sdccdprops‐ n.com/Projects/CE/Pages/CesarChavez.aspx

Project Description The new César E. Chávez Campus will be a 67,924 square foot facility with 22 classrooms for vocational training, English as a Second Language, Adult Basic Education, General Education Diploma preparation, Business Information Technology, Parent Education and Emeritus (age 55+) programs. It will become the Campus of Excellence for Allied Health Career Training. The facility will include a multi‐purpose room, administrative offices and a Small Business Incubator. Underground parking will provide 149 parking spaces, including preferred parking for carpools and high fuel efficiency vehicles. An adjacent parking structure will provide 320 spaces. The building design is on track to obtain a Leadership in Energy and Environmental Design (LEED) Silver certification from the United States Green Building Council (USGBC).

Project Status The design of the new campus was approved in June 2012 by the Division of the State Architect (DSA) which must approve all designs for community college district construction. Because of the project’s proximity to the waterfront, the District is required to provide parking for the campus so we are not competing for the public parking currently available near this site. We have proposed the construction of a parking structure on our current Cesar Chavez site on National Avenue, and are awaiting formal review by the City of San Diego. A review of the California Environmental Quality Act (CEQA) is also being completed for the selected site. We expect this review to be completed and our requested Coastal Development Permit approved and issued by the end of December. Should approvals be received as currently anticipated, bid packages for the classroom building would be advertised in the first quarter of 2013, with a construction started targeted for mid‐to‐late April. Bid packages for the parking structure would be advertised in August of 2013, with a construction start targeted for late September 2013. San Diego Community College District • 3375 Camino Del Rio South • San Diego, CA 92108 Phone: 619.338.6546 • Fax: 619.338.6509 • http://public.sdccdprops‐n.com/Pages/Home.aspx


Bid Opportunities Classroom Building Parking Structure Tentative Bid & Award: Jan. 2013 – Apr. 2013 Tentative Bid & Award: Aug. 2013 – Sept. 2013 Estimated Construction: Apr. 2013 – Nov. 2014 Estimated Construction: Sept. 2013 – Sept. 2014 Contact: Andrew Gaylor, Rudolph & Sletten, (858) 259‐6262 Contact: Glenn Evans, PCL Construction, (858) 657‐3400 Interested subcontractors are encouraged to fill out and submit the District’s Certification Verification Form so they may be added to the District’s database of small and historically underutilized firms and receive early notifications about bid opportunities. The form is located at http://public.sdccdprops‐n.com/cr/forms/sdccdcertificationform.pdf. Subcontractors may track bid opportunities at http://public.sdccdprops‐n.com/BPR/Pages/BidRoom.aspx. Chuey’s Student Lounge

Parking Structure By The Numbers • Four‐level structure will have 320 parking spaces • 3,830 yards of concrete • 380 total concrete truck deliveries • 6,240 linear feet of paint striping in the structure • 4,000 square feet of rooftop level solar panels

César E. Chávez Parking Structure Funding Source

Proposition S

Architect

RJC Architects

Design/Builder

PCL Construction Services, Inc.

Structural Engineer

DCI Engineers

Mechanical Engineer

MA Engineers

Electrical Engineer

Michael Wall Engineering, Inc.

Civil Engineer

Project Design Consultants

Geotechnical Engineer

Leighton Consulting, Inc.

Parking Consultants

Graelic, LLC

Props S & N Program Mgr.

Gafcon, Inc.

Campus Project Manager

Scott Ellis, URS Corp.

Anticipated Construction Start

September 2013

Project Budget

$6.5 million

Anticipated Completion Date

September 2014

César E. Chávez Campus Funding Source

Proposition S

Architect

Martinez + Cutri

Construction Manager

Rudolph & Sletten

Civil/Structural Engineer

Flores Lund Consultants

Electrical Engineer

LSW Engineers, Inc.

Mechanical Engineer

Merrick & Associates

Landscape Architect

Parterre

Props S & N Program Mgr.

Gafcon, Inc.

Campus Project Manager

Scott Ellis, URS Corp.

Anticipated Construction Start

April 2013

Project Budget

$48.5 million

(incl. land acquisition)

Anticipated Completion Date

January 2015