Client: Contractor: Location: Object: Operating conditions: Year of application: Coating system: Reason: Surface preparation:
China National Petroleum Corporation Daqing Oilfield Construction Group East Siberian Oil Pipeline system, China/Russia 30 inch pipeline, total length 926km -25째C, Arctic conditions, arctic tundra and boreal forests 2010/2011 Stopaq Wrappingband / Stopaq High Impact Shield Cracking of existing PE coating due to low temperatures Pre-heating with torch