Fall 2017-2018
4th Year Construction Project / FARM HOUSE IN ÇATALCA
Fall 2017-2018
4th Year Project / URBAN LINKAGE IN ATATURK OTO SANAYI
Spring 2016-2017
3rd Year Project / INTEGRAL PORTO
Spring 2016-2017
3rd Year Elective Course Project / THE CITY OF CHOICES
Fall 2016-2017
3rd Year Project / PASALIMANI ATELIER
Spring 2015-2016
2nd Year Project / FLOW OF TARLABASI
Spring 2015-2016
CECI N’EST PAS UNE TOILETTE
Fall 2015-2016 Spring 2014-2015 Fall 2014-2015
2nd Year Project / HABITABLE MYTH 1st Year Project / SARIHACILAR COLLECTIVE 1st Year Project / BOUNDARY NEGOTIATIONS IN BEYOGLU
2015
Collective exhibition / LEARNING FROM FILM SPACES
2017
Workshop / REFLECTING ON CHANGING CITIES
2016
Workshop / ALICE IN WONDERLAND
2016
Internship / CONSTRUCTION SITE
2015
Drawing Han / WHOSE SPACE? content / 1
Seçil Yatan secilyatan.itu@gmail.com +90 530 380 49 66 Date of Birth: 29.10.1995 Place of Birth: İstanbul
Courses
Education 2016-2017
2018Politecnico di Milano Spring Semester Erasmus Programme
2013-
Istanbul Technical University Faculty of Architecture Department of Architecture GPA: 3,26 / 4,00
2009-2013
Nişantaşı Nuri Akın High School
2000-2009
Şişli Terakki Vakfı Primary School
2002-2015
Tan Sağtürk Academy Classical Ballet
2007-2012
Tan Sağtürk Academy Street Jazz Dance
2 / cv
Dialog Anlatım İletişim Effective Communication
2013-2016
Italian Cultural Institude Italian Language Course A1, A2, B1 Levels
2014-2015
Boğaziçi University TOEFL Course
July 2011
CSLI-Canadian As A Second Language Institude, Vancouver
2010-2011
Beşiktaş Sanat Merkezi Piano course
Workshops
Internship July 2016
Yükselen Construction
SeptemberJune, 2010
Tan Sağtürk Academy, Classical Ballet , educator
Experience August 2016
‘Reflecting on changing cities’ workshop Ecole Nationale Supérieure d’Architecture de Paris-Malaquais, Paris
2015
Mimarlık Okulları 1. sınıf Stüdyoları Buluşması #2
Geoçözüm Zemin Araştırmaları ve Çözümleri İnşaat Ltd. Şti. 2014 Control team
Languages
2014
English
advanced
German
intermediate
Italian
intermediate
2017
2015
advanced
Autodesk Autocad
intermediate
Microsoft Office
advanced
State Conservatory of Rome, Street Jazz Dance workshop Opus Ballet, Florencei Contemporary Dance workshop
Competition
Exhibition
Computer Skills Adobe Photoshop
2017
Energy Efficient Building Design Competition Learning From Film Spaces, collective exhibition, Studio X
Certificates 2017
B1 Italian Language
2011
Classical Ballet Teacher Certificate
cv / 3
ENERGY EFFICIENT BUILDING DESIGN FARMHOUSE IN ร ATALCA Fall 2017-2018 4th Year Construction Project Prof. Dr. Alpin Kรถknel Yener Assist. Seda Kaรงel Istanbul Tecnical University
FARMHOUSE IN ÇATALCA Movable sliding walls and partially openable roof system are the main decisions of this project. These ideas were supported by the designed systems.
U Values: Roof External wall Ground Basement ceiling The systems:
0,17 W/m2K 0,27 W/m2K 0,31 W/m2K 0,44 W/m2K
Geothermal source heat pump, photovoltaic panel(roof window), Rainwater harvesting, Passive ventilation 6 / 4th year construction project / fall 2017-2018
Climate change determines the organisation of the house. In winter it act like a total house. In summer, rotatable external walls open. The corridor becomes an open street and passive cooling can be accomplished by the fresh air circulation around each unit such as living room, kitchen, bedrooms. These changes on structural elements redefine the spaces.
Figure 1.2
fall 2017-2018 / 4th year construction project / 7
The movable sliding walls provide an opportunity to changing the dimensions of the units according to the activity. By sliding walls through the living room and working room, workshop area arises in corridor. Because of this open and closed types of the house each wall act as an external wall.
Figure 1.3a
8 / 4th year construction project / fall 2017-2018
Figure 1.3b
Figure 1.4b
Figure 1.4a
fall 2017-2018 / 4th year construction project / 9
The variations of walls, plans and roof system has effects on spaces. Corridor is transforming to an open space when the walls slided and the roof opened. Conditions are changing such as; air vantilation and light transmission. When it is closed it is still taking controlled light into corridor. The light reach to each units. Pv panels on windows producing energy. Required slope for pv panels is provided when the roof is opened
10 / 4th year construction project / fall 2017-2018
fall 2017-2018 / 4th year construction project / 11
URBAN LINKAGE IN ATATURK OTO SANAYI Fall 2017-2018 4th Year Project Assoc. Prof. Dr. Nurbin Paker Kahvecioğlu Assist. Pelin Işık Istanbul Tecnical University
URBAN LINKAGE IN MASLAK ATATURK OTO SANAYI
Maslak AtatĂźrk Oto Sanayi site has been standing along 50 years. Even the surrounding has changed in these years, the site has retain its function. This conversion of the surrounding, invites to the change for the places which are relatively old.
Figure 2.1
Industrial areas are the most exposed parts in the city. Urbanisation brings with new centres. By this way, the industrial places which were built in the suburbans, now locating in the centres.
Figure 2.3
14 / 4th year project / fall 2017-2018
Figure 2.1.....the analysis of facilities, streets, and height of the buildings in maslak AtatĂźrk oto sanayi and around the site Figure 2.2.....sketches that point out the relationship with topography, the usage of facilities and changing silhouette Figure 2.3.....the idea of linkage Figure 2.4.....1/2000 model for understanding topography and existing buildings as a topography. Figure 2.5.....1/500 model of atelier, exhibiton part of the project Figures 2.6a,2.6b.....1/200 models of the circulation area that locates in between the caharacteristic industrial atelier buildings for connecting the parallel streets
Figure 2.2
Figure 2.4
Figure 2.5
The characteristic of the area comes from its function. The protection of the function and increasing the possibilities are the main aims of this project. Understanding both the topography and the relation between industrial buildings and topography were most important points in the process. Consequently, The re-adaptation of the site with keeping the current situation such as the original function and buildings, adopting the place by urbaners are the expectations of this proposal.
16 / 4th year project / fall 2017-2018
Figure 2.6a
Figure 2.6b
fall 2017-2018 / 4th year project / 17
INTEGRAL PORTO Spring 2016-2017 3rd Year Project Architectural Design in Historical Context Studio Master Degree in Architectural Design and History 1st Year Barbara Bogoni Eduardo Souto De Moura Politecnico di Milano (Erasmus Programme)
Group Members: Dmitriy Averyanovv Merve Bıyık Giorgio Pinotti Zhang Ruohan Klaudia Sitkiewicz Wu Yumeng Seçil Yatan
INTEGRAL PORTO This project is a result of a collaboration of seven architecture student. Museum building and residential buildings are sharing the wide garden that brings together the
20 / 3rd year project / spring 2016-2017
both sides of Porto near the Douro lake. The existent viaduct demolished and this garden is proposed. Personally focused on museum and especially auditorium. Detail of the auditorium is drawn.
Individual products: Figure 3.1 Figure 3.2 Figure 3.3 Figure 3.4 Figure 3.5 Figure 3.6 Figure 3.7 Figure 3.8 Figure 3.9 Figure 3.10
Figure 3.1
Figure 3.2
Figure 3.4
Figure 3.3
Figure 3.5
spring 2016-2017 / 3rd year project / 21
Figure 3.6
Figure 3.7
22 / 3rd year project / spring 2016-2017
Figure 3.8
spring 2016-2017 / 3rd year project / 23
Figure 3.9
24 / 3rd year project / spring 2016-2017
Figure 3.10
spring 2016-2017 / 3rd year project / 25
THE CITY OF CHOICES Spring 2016-2017 3rd Year Elective Course Project Landscape and Public Space Design Prof. Arch. Andreas Otto Kipar Arch. Cecillia Ricci Politecnico di Milano (Erasmus Programme)
Group Members: Santina Bertieux Merve Bıyık Johana Netrvalová Zahra Pasandidehkho Gina Soleymanpour Giuseppina Vastola Seçil Yatan
In this project all the railways are preserved and reused as THE CITY OF CHOICES an ecological corridors. Each scalo is connected to the surrounding neighbourhood. CyReconnect the blue and green cling and pedestrian paths are infrastructure in Milan by link- developed that move amoung ing abandoned areas to exist- th scali. Facilities are increased Individual Products: ing ecological corridors. Be more accessible while con- Figure 4.1 Figure 4.2 necting new center with the Figure 4.3 Figure 4.4 surroundings. Figure 4.5 Farini train station has one Figure 4.6 active railway and has some Figure 4.7 Figure 4.8 abondaned structure.
From monocentric to policentric city
towards a heterogeneous city
Figure 4.1
28 / 3rd year elective course project / spring 2016-2017
Figure 4.2
spring 2016-2017 / 3rd year elective course project / 29
30 / 3rd year elective course project / spring 2016-2017
Figure 4.3
spring 2016-2017 / 3rd year elective course project / 31
Figure 4.4
Figure 4.5
Figure 4.6
32 / 3rd year elective course project / spring 2016-2017
Figure 4.7
Figure 4.8
spring 2016-2017 / 3rd year elective course project / 33
PASALIMANI ATELIER Fall 2016-2017 3rd Year Project Assoc. Prof. Pelin Dursun Cebi Assoc. Prof. Fatma Erkök Res. Assist. Ecem Kara Res. Assist. İrem Burcu Ummansu Istanbul Tecnical University
There are a lot of factories which are become different in subject, life, history, network, connection between people, country, topography. Some of them correlate with these topics strongly and they make an impression on memories of city and people. 36 / 3rd year project / fall 2016-2017
Most of the factories become inactive as a result of incidents like going to the wall, transferring, becoming needless in Istanbul.
How do they become integrated with the urban life?
PaĹ&#x;alimanÄą Flour Plant This flour plant is one of the initials in Istanbul, Uskudar. It is amulti-layer building for each layers: 1st storey for transmission 2nd storey for vas 3rd storey for pipes 4th storey for sieve 5th storey for joints
The multi-layer pattern is continued. The existent flora within the factory building is preserved. By plant growing Nowadays only walls, chimney and plant collection, conserand factory’s annex building vation is provided. Paths are are existed. recreate and elevation differProject’s aim is to bring peoence is connected by working ple together while producing together and producing, fulfil and learning something. the needs of Paşalimanı
PASALIMANI ATELIER
Atelier. People keep alive this space by being there and come up with their ideas. There are ballet and dance studio and a little stage which offers a different experience. The stage prop is also manufactured by professionals and participants collectively in prop atelier. fall 2016-2017 / 3rd year project / 37
38 / 3rd year project / fall 2016-2017
fall 2016-2017 / 3rd year project / 39
PEACE BUILDING - FLOW OF TARLABASI Spring 2015-2016 2nd Year Project Assoc. Prof. Aslıhan Şenel Collective Imaginations Studio https://collectiveimaginations.wordpress.com Istanbul Tecnical University
FLOW OF TARLABASI
Being in safe and peace is gradually increasing while getting into interior in these days. As a result of this attitude, individual and society are disintegrated by evident borders. Flow of Tarlabaşı, seeks that the building peace potential of the intermediary spaces which are in between the private spaces and public spaces. The intermediary spaces that maintain their daily life, provides connection
42 / 2nd year project / spring 2015-2016
between the neighbourhood and residents. The space can take form according to the demand of the user. The structure made of composite material supply elasticity of this space (Fig. 3.7.3). The frequency of the structure’s netting increases while the areas are getting private so this system creates
constant and changeable areas. Transition between common areas and private areas, the structure’s netting get loose. The load that arises from the users on the flooring transfers by cables to the vertical structure, this transmission provide a change on the structures netting and the spaces.
spring 2015-2016 / 2nd year project / 43
CECI N’EST PAS UNE TOILETTE Spring 2015-2016 2nd Year Project Assoc. Prof. Aslıhan Şenel Collective Imaginations Studio https://collectiveimaginations.wordpress.com Istanbul Tecnical University
CECI N’EST PAS UNE TOILETTE
At the beginning of the project Taksim square analyzed and mapped according to specific situations and spontaneous activities.
46 / ceci n’est pas une toilette / spring 2015-2016
According to the analysis the project settles down inbetween Taksim square and Gezi parkı. While the structure was closed and using as a toilet, the outside walls produce streets that people can pass by. The movement as a result of usage creates different possibilities for common spaces. The 2,5 dimensional plan expresses the idea of movement with its rotatable wall lines from their joints.
spring 2015-2016 / ceci n’est pas une toilette / 47
HABITABLE MYTH Fall 2015-2016 2nd Year Project Assoc. Prof. Aslıhan Şenel Collective Imaginations Studio Istanbul Tecnical University
This topography is available for people who pass by, specially come there to find missing stuff or want to spend time while using dropped and collected wares at midnight. There is a junkwoman who is the single resident of this topography. She is configuring these dropped and collected stuffs by the help of this topoghraphy. Only her living unit is stable but the rest is rolling 360 degrees according to the sunlight.The topoghrapy. can’t be 50 / 2nd year project / fall 2015-2016
thought independently from people and surrounding just because it is hosting people’s stuffs. The organisation of these stuffs and utilisation done by the junkwoman and also people. Besides these waste wares and dropped stuffs getable so it is servicing as a waste ware storage and variously as a place using stuffs commonly.
here is a yard which is in between buildings and two perpendicular street. People are using this People couldn’t use this yard L shaped yard for passing and spending time with wares. Now it is open for everyone. because it was using as a storage and it has barriers whole openness except the entry for the junkman to put in the wares.
Why should constructions take up space on the ground? How does it achieve to come into existence by not standing an stealing from the site?
fall 2015-2016 / 2nd year project / 51
HABITABLE MYTH
It initiates a new topography for this yard, while it has convex and concave faces which provides hagridden’s belongings to be slipped. It has Open spaces which are enable to people to walk on and close places like saccus where the wares are collecting.These open topo is made of natural wood and the saccus areas are made of a material is effecting from sunlight. During the day it absorbs the energy and when 52 / 2nd year project / fall 2015-2016
the night comes it lights up and create an amorphous place. These amorphous surfaces are also generates heat and deliver habitable environment. The contents are changing temporally so the topogra‌ too. It is such a space that open for everyone, addable(handed or fallen wares), takable(taken wares by the users), related to sunlight and compatible with surrounding. Preserving the missions of waste ware collecting with the difference of not encompassing. It initiates an unimpaired nature, be located and in the same time not occupy, opportunity to access to sky.
There is only two contacting point to the ground which are access points for people in both ends. It consist of ramps which have proper slope for people and help feel the sorcery of the sky and garden and also cause them to drop their belongings. By overlapping of the two ramp, one step is taking shape. Words, drawings and model is using at the same expression. So the project has no ground, groundless is emphasising in topography models and sections. Continuous section is narrate ciculation.
fall 2015-2016 / 2nd year project / 53
SARIHACILAR COLLECTIVE Spring 2014-2015 1st Year Project Assoc. Prof. Aslıhan Şenel Reasearch Asst. Ozan Avcı Assist.Prof. Dr. Zeynep Ataş Research Asst. Sevgi Türkkan Research Asst. Esra Kahveci Dandelion https://dandelion14.wordpress.com/ Istanbul Tecnical University
SARIHACILAR COLLECTIVE Sarıhacılar is a village in Akseki which is facing extinction. The projects’ aim is to create collective life; producing and living. By the way of producing and living there, people may feel that they belong in this place. The place can live with the production and the existance of people who are living there and who are visiting and accomodating there. Productions are directly from the the nature of sarıhacılar.
This is a villigers’ house that contain a goat pen, an organisation for producing cheese and a guest house. The family take care of the goats and the cheese production. The first floor is for production and guest house. Guests are facing all the process and join to the work. There is also an entrance to the house of the family from the production area. The upper floor is for goat pen. There is also an entrance from the family house. The production process could followed from the structural elements.
hot milk
hot milk milking
56 / 1st year project / spring 2014-2015
fermantation
heat exchanger
balance tank
roof goat pen production area goat pen
production area guest house
entrance
family house entrance
spring 2014-2015 / 1st year project / 57
58 / 1st year project / spring 2014-2015
spring 2014-2015 / 1st year project / 59
BOUNDARY NEGOTIATIONS IN BEYOGLU Fall 2014-2015 1st Year Project Assoc. Prof. Aslıhan Şenel Reasearch Asst. Ozan Avcı Assist.Prof. Dr. Zeynep Ataş Research Asst. Sevgi Türkkan Research Asst. Esra Kahveci Dandelion https://dandelion14.wordpress.com/ Istanbul Tecnical University
The relationship in between body and space is searched. The project takes shape according to the functions and proportion of body. 62 / 1st year project / fall 2014-2015
It is possible to wait for jÄątneys and in the meanwhile it is possible to read books from in the library. The organisation allow for accessing jitneys.
fall 2014-2015 / 1st year project / 63
Levent 06:00
feel stressed
rush hour
feel safe
feel terrible
safe hour
feel stressed feel awful
rush hour
N
23:00
route 1
gayrettepe
taking the metro
route 2
sisli mecidiyekoy
crowded inflow tension
crowded inflow tension
osmanbey
taksim
crowded inflow tension
crowded inflow tension
safe route
take the bus
have a walk jitney
have a walk
bomb attack had happened
N
66 / ‘reflecting on changing cities’ / 2017 workshop
68 / alice in wonderland / fall 2014-2015
ALICE IN WONDERLAND
bir garip kiĹ&#x;i mekan workshop with mardin artuklu university collective work collective imaginations studio fall 2014-2015 / alice in wonderland / 69
70 / construction site / 2016
2016 / construction site / 71
72 / whose space? / fall 2015-2016
fall 2015-2016 / whose space? / 73