Curtain Wall / Stone / Tile / Laminate Flooring / Wood and Bamboo Flooring / Door & Window / Aluminium Window&Door / Kitchen Cabinet / Vanity / Sanitary Ware
Electric hoist
Installation sequence of unitized curtain wall is from Bottom to Top Unitized Panel 4
Bracket, adapter Unitized Panel 1
Unitized Panel 3
Aluminium hook
Concrete structure Unitized Panel 2
2. Horizontal Beam Material: Aluminum/Carbon Steel Size: 75*60*2/ 75*60*3/ 60*45*3/ 60*45*2
3.Core Housing 4. Glass 6mm/5mm+6A+5mm /5mm+9A+5mm Reflective /Clear
1. Vertical Beam Material: Aluminum/Q235 Carbon Steel Size: 150*75*3/160*75*3/100*65*3/80*55*3 /80*55*2/80*55*2
5.Block
6.Tapping Screw
1. Vertical Beam Material: Aluminum/Q235 Carbon Steel Size: 160*75*3/150*75*3/100*65*3/90*55*3/80*55*3/80*55*2/80*55*2
7.Rubbcr Seal
11.Bracket 2. Horizontal Beam Material: Aluminum/Carbon Steel Size: 75*60*2/ 75*60*3/ 60*45*3/ 60*45*2
8.Decoraticve Cover 3. Core Housing 4. Glass 6mm/5mm+6A+5mm /5mm+9A+5mm Reflective /Clear
5.Sub-frame
6.Block
7.Self Tapping Screw
8.Structure Glue
9.Foam Rod & Silicon